Loading...
HomeMy WebLinkAboutNCS000250_NCDOT Durham Co Construction Inspection_20190828Raleigh Regional Office Site Inspections for 2019 NCDOT MS4 Audit Permit No. NCS000250 Audit Date(s): August 28, 2019 Page 1 of 4 Site Visit Evaluation: Construction Site No. 1 Site/Project Name: East End Connector Date and Time of Site Visit: August 28, 201910:00am Site/Project Address: 70 Hwy Operator: NCDOT, Dragados USA Project Type (Commercial, Industrial, Residential, CIP, Roadway, etc.): Roadway NCG Permit ID Number: NCS000250 Disturbed Acreage: 4 linear Miles Approx. 700 Acres Recent Enforcement Actions (Include Date): No Name of MS4 Inspector(s) evaluated: Donald Pearson Name(s) and Title(s) of Site Representative(s) Present During the Site Visit: Name Title Ben Dewit NCDOT-REU Donald Pearson NCDOT-REU Cameron Richards NCDOT-REU Stephen Arrington RK&K-PI Maria Polizzi Spangler Environmental Matt Levey Dragados USA -PM Jerrad Stewart Dragados USA -Engineer Taylor Young DEMLR Thad Valentine DEMLR Observations Site Documentation/Training Does the site have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it site -specific? The plan consists of marked up drawing s of all measures installed, and any issues addressed during construction for that particular project. The stormwoter records where available. Does the site have approved erosion and sedimentation control plans onsite? Are they representative of current site conditions? Yes, the plans are DOT approved from their consultant and they are kept up to date. What type of stormwater training do site employees receive? How often? There is online video training and erosion control flip guides are issued to all employees Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Dan O'Conner with DOT roadside environmental performs yearly training. Donald Pearson receives additional stormwater training periodically. Audit Date(s): August 28, 2019 Page 2 of 4 Site Visit Evaluation: Construction Site No. 1 Did the MS4 inspector appear knowledgeable about MS4 and NCGO10000 requirements for construction sites? Donald Pearson is very knowledgeable concerning the NCGO10000 requirements and the portions of the MS4 requirements that apply to this type of work Did the MS4 inspector appear knowledgeable about erosion and sedimentation control/stormwater pollution prevention BMPs? Donald Pearson has 26 years' experience with sediment control and stormwater pollution prevention BMP's Inspection Procedures Does the MS4 inspector's process include the use of a checklist? Yes, as it applies to this work and the NCGO10000. They inspect the site and all outfalls weekly and after each 1 inch or more rainfall Does the MS4 inspector's process include taking photos? Yes, photos are taken Maria Polizzi as well as DOT personnel Does the MS4 inspector's process include reviewing approved plans (erosion and sedimentation control and/or SWPPP)? It's a joint effort with limited input from all involved Does the M54 inspector's process include walking the entire site and inspecting all points of discharge? Donald Pearson delegates that to the environmental oversite Maria Polizzi Did the M54 inspector miss any obvious violations? If so, explain: No, the project is very well monitored and maintained. Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing? Yes, through inspection documents that are provided weekly and after 1 inch or more rainfall Does the MS4 inspector's process include providing construction stormwater educational materials to the site contact? Yes, through the environmental consultant Compliance/Enforcement What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in? None If compliance issues were identified, what timeline for correction/follow-up was provided? N/A Notes/Comments/Recommendations Audit Date(s): August 28, 2019 Page 3 of 4 Site Visit Evaluation: Construction Site No. 1 The project was very well maintained with all employees well trained and competent. Audit Date(s): August 28; 2019 Page 4 of 4