Subject: Jetty Extension 2 O O
From: Noelle Lutheran <Noelle.Lutheran@ncmail.nev T
Date: Tue, 02 Jan 2007 10:33:59 -0500 ~ 0 4 Q
To: bmarek@bhisland.com
CC: Laurie Dennison <laurie.j.dennison@ncmail.neV,Iav McMillan <ian.mcmillan@ncmail.nev
Bruce,
I received your application package before Christmas. I believe you may have misunderstood my
directions. You should have sent 5 copies of the package and the $200.00 processing fee to Raleigh to the
attention of Cyndi Karoly at DWQ 401 Oversight and Express Unit, 1650 Mail Service Center, Raleigh,
27699-1650.
Because you did send me 5 copies of the plans, I will copy the application and the letters and forward to
Raleigh for you. Please just send a check to Raleigh directly and reference the ~~Bald Head Island Marina
Southern Jetty Extension~~ so that we can officially begin the review process.
Let me know if you have any questions.
Sincerely,
Noelle
1 of 1 1/2/2007 11:06 AM
RE: CAMA correspondence dated 12/18/06
Subject: RE: LAMA correspondence dated 12/18/06
From: Laurie Dennison <laurie.j.dennison@ncmail.net>
Date: Fri, 22 Dec 2006 11:09:31 -0500
To: Noelle Lutheran <Noe1le.Lutheran@ncmail.nev
Noelle
2p~T~0
4q
Received CAMA correspondence (letter dated 12/18/06) from Doug Huggett & addressed to Bruce Marek. It's
regarding a CAMA permit (CAMA Major #208-86) for the Bald Head Island Marina.
I'm not able to find any related project in BIMS. Is there one? or is this just to be filed as general
correspondence?
Thanks & have a happy!
Laurie
1 of 1 12/22/2006 11:12 AM
~~_ r~
~-.~-
NCDENR
Carolina Department of Environment and Natural Resources
Division of Coastal Management
or Charles S. Jones, Director
- '~° _ ~~~
December 18, 2006
Bald Head Island, NC 28461
Dear Mr. Marek:
William G. Ross Jr., Secretary
~O~~Q
~4q
This correspondence is in reference to your letter of August 25, 2006 whereby you request to
construct a 100 ft. extension to the existing south jetty to the Bald Head Island Marina that is
currently permitted under CAMA Major Permit #208-86. Due to the length of time that has
elapsed since the activity was permitted, and to account for any changes in the location of the
Cape Fear River channel, the Division of Coastal Management consulted with applicable
agencies to ensure that the jetty extension would not have any adverse impacts to navigation or
any adjacent natural resources. Based on the Division's coordinated review, the current proposal
continues to meet the criteria found in the rules of the CRC. Therefore, as long as the
development is conducted in accordance with your August 25, 2006 letter and the associated
work-plat drawings, one dated 8/25/06 and one dated 9/1/06, the jetty extension hereby continues
to be authorized with the following stipulation:
Future by-pass excavation is suspended until sand compatibility testing has been completed
and the permit modified to rellect the new dredging area.
A 401 certification shall be applied for and received from the Division of Water Quality
and a copy to the certification supplied to this office prior to the onset of any construction.
Please attach this letter to the permit file to allow Division staff to review ~~~hen they are
monitoring the project.
I do appreciate your efforts to comply with the permit requirements of the Division, and if you
have any questions, please don't hesitate to contact me at 252-808-2808.
Si cerely,
~~
oug I~uggett
Major Permits Coordinator D ~~~OM
l:/
Attachment pE~ ~ D
cc: Ed Brooks -Coastal Representative, Wilmington DCM ~ 2D~~
Dave Timpy - USACOE, Wilmington DENR- WATE
~'~s,wo s R ~iN
Noelle Luthern -DWQ, Wilmington GIT~rRE
Cyndi Karoly -DWQ, Wilmington
400 Commerce Ave., Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net
Ar Equal Opoortun~ry \ Affirmative Action Employer - 50°o Recycled `, 10% Post Cons~~^er Paper
Bruce Marek, P.E. ~CCEtV~a
P. O. Box 3069 ACM WI! ~
Bald Head Island, NC 28461 I~~~IvGTON, !v~
910-457-7517
August 25, 2006 a ! ~ ~" ~~ B ~'~ QE
Mr. Ed Brooks
NCDENR Division of Coastal Management
127 CardinaF-prive Extension, Wilmington, NC 28405
Re: Letter of Refinement for Bald Head Island Limited CAMA Permit #208-86 Jetty Extension
Dear Mr. Brooks:
Enclosed are 13 copies of drawing J 1 sealed and dated 8/25/06 prepared in support of Bald Head
Island Limited's existing permitted 100' extension of the south jetty to Bald Head Island Marina. The
extension was first permitted several years ago (1986) and continuously kept in permit #208-86. Bald
Head Island Limited has an active Corps of Engineers Letter allowing this jetty extension, dated
January 28, 2004 and expiring on December 31,2008, based on the 10~h renewal to the CAMA Permit.
Per conversations, you wanted updated information on the Cape Fear River Shipping Channel .
This submittal is a replacement for my March 1 b, 2006 minor mod submittal(s) that included channel
deepening and marina deepening to -12 MLW as well as providing details for extending the jetty and
including a 6' "jetty walk" with a fishing deck at the end. After discussing your comments about
dredging the channel to the spoil island (required from station 8 eastward into the marina) with Mr.
Mitchell, it seemed too far in advance of the next scheduled marina basin dredging project. Of
course, one hurricane can change the timing sequence of any purported schedule. The barge and
ferries need to use the marina, and the slip owners sure like to use their boats.
The jetty extension will provide for wave and current relief for vessels entering the harbor. The newer
ferry boats are 82' long catamarans, and the 100' extension will provide an extra boat length of shelter
on a flood tide or from southwesterly waves.
I have looked at three sources for the information in regards to the shipping channel location. GPS
Igtitude/longitude information from one of the ferries, converted to state plane coordinates; from
chart data on the channel width and buoy locations; and from 2005 McKim and Creed survey data.
Green Buoy # 13A appears to be at feast 2100 ft from the existing end of the Bald Head Island Marina
jetties. From Chart Data, the shipping channel is 230 yards wide = 690'. That would put the eastern
edge of the channel at 1400' from the existing channel end, or 1300' from the jetty extension end.
From underwater survey data along South Beach that was gathered for the Village in 2005, it looks like
the channel is closer to 1000 wide. That would put the east edge 1 100 ft off of the existing jetty.
Presumably, the Corps of Engineers hps a bit more accurate channel location. From our island map,
which is based on NAD 27, I get the centerline of the jetty mouth as E2302933.4, N47917.8.
Latitude/Longitude of N33deg52'39.5", W78deg00'06.6' is a rounded approximation.
If you have any. questions and/or comments, please call me at 910-457-7517. Thanking you in
advance for attention to this matter. ~..~+ '"••~~~.j
,~a ~~~~ H Cq R~~/.,
Respectfully, ~ ~''~ ES ••'••. y ~~,
~~~~- r: ~~oF soy9.9
S~ai ~_
Bruce Marek, P.E. = t ~ ~~~,c~d ~~~-~~
For Bald head Island Planning Department ' ~p'•ti ti
Cc Jim Henry, Director, BHI Planning & Development, M. Kent Mitchell, CEO ~•,~G~•••~~/NEE~•j~~ :~
~~
~'~., ~q X19 E S t~1'~' ,,:
C-~
b~
a
a
o `~
n
~° ~~~~
~~~~~
G~
o~
~ ~~
~~
x
V ~ ~N
R ~ W Z~
V ~ o
~ ~ ~
"~
~~ ~~
~~ ~
v
~~,,- ~ - .
ter" o ~'i~
V a~1 -~ •
~ . ~-. • ,
i ~J aw. - f i ~+w-\~~ ~
•j ~r ihwswwwww \ '+~O
II U ~ ~`~~
= I~I+•=~iY`~ge
~ ~. c..o
J E- ~ ~ o
N
¢W ~ Z ~
Z CL ~ ~ ~
J ~
wW !!~ z ~
zo- ~ z
s c
0
H
W
O
e--~
~~
~~
bhR
Z
O
Z
-~
O
d
O
a
0
0
0
W
N
O
a
0
a
~I
0
0
~€
- 3N `GNY141 a1PeH Q7Y'6
,ls~nb~a .~.onaasNOO o~. ni
No~.zviaoHinv s~eoz vwtir~ ~ ,,.,~
No~sNa~x~ uaa~ r~aawnos
BDN~IL+13 [ aNY18] GY3H Q"1Y8 -
Q
U
W
W
z
u
U
W
Q
H
3
cu
U
O -~
~ ~
~-I ~ S
o ~ ~
~ ~ p4
~ o
~~
~~
r --1 ~ ~ b
r _n;
~,-~
~~ ~~ ~
{i~ SQb~
!~ r
~~
r
a
c
a
O
a~ ~
og
~~
~~
d ~ ~i
~~
~ ~
~~~I ~
LL~
1-'