HomeMy WebLinkAboutNCG200469_Inspection Report_20191001ROY COOPER
Governor
MICHAEL S. PEGAN
Secretary
S. DANIEL SMITH
Director
Tri-State Scrap Metal, Inc.
Attn: John Gribble
79 Pond Road
Asheville, North Carolina 28806
NORTH CAROLINA
Environmental Quality
October 1, 2019
Subject: Compliance Evaluation Inspection
Permit: NCG200000
Certificate of Coverage: NCG200469
Buncombe County, North Carolina
Dear Mr. Gribble:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on September 17, 2019.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
X
Isaiah Reed, CPS Q, CEPSCI, MS4C CI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
rvomry curouxn
828296.4500
Compliance Inspection Report
Permit: NCG200469
SOC:
County: Buncombe
Region: Asheville
Contact Person: John Gribble
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Effective: 08/01/19 Expiration: 05/31/24 Owner: Tri-State Scrap Metal Inc
Effective: Expiration: Facility: Tri-State Scrap Metal, Inc.
79 Pond Rd
Inspection Date: 09/17/2019
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Title:
Entry Time: 10:30AM
Certification:
Asheville NC 28806
Phone: 828-670-9006
Phone:
Exit Time: 11:30AM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Wholesale Trade of Metal Waste and Scrap Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
permit: NCG200469 Owner -Facility: Tri-State Scrap Metal Inc
Inspection Date: 09/17/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary
On September 17, 2019 this facility was inspected for compliance and to evaluate progress made since the facility was
issued a Notice of Violation. I met with John Gribble on site. During the inspection, the following items were noted:
1) A clear and safe means of inspecting the site has still not been established. A clear safe path to get around the facility
must be maintained to allow for a full inspection of the facility.
The facility remains under Notice of Violation until the above items have been addressed. This facility will be re -inspected on
or after November 5, 2019. If the above items have not been addressed, further action will be taken.
If you have any questions, please contact this office at (828) 296-4614.
Page 2 of 3
Permit: NCG200469 Owner- Facility: Tri-State Scrap Metal Inc
Inspection Date: 09/17/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
E
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices'?
N
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
E
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
N
❑ ❑ ❑
# Does the Plan include a BMP summary?
N
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
E
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0
❑ ❑ ❑
# Does the facility provide and document Employee Training?
E
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑
0 ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
E ❑ ❑
Comment: SWPPP Coming together, but needs more information
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ E ❑ ❑
Comment:
Page 3 of 3