Loading...
HomeMy WebLinkAbout20191297 Ver 1_COE email Preliminary JD_20190926SAW-2019-01488 Barbour Tract: Preliminary JD Concurrence Inbox x Deal, Joshua A CIV USARMY CESAW (USA) <Joshua.A.Deal@usace.army.mil> Aug 13, 2019, 9:58 AM to me, Roscoe Hey Wyatt, Ross Sullivan and I conducted a site visit with you at the above referenced property on June 26, 2019 to verify the limits of any potentially jurisdictional waters of the United States (WoUS) within the project area. I have determined that the revised delineation map that you provided to me on July 7, 2019 entitled "Barbour Tract Preliminary Wetland Map Revised 7-1-19" accurately depicts the limits of any potentially jurisdictional WoUS within the project area. I will issue the Preliminary Jurisdictional Determination for this project in the order that it was received, but please note that I have a substantial backlog of permits and JDs to work through at this time and it may take several months. However, please note that delineation concurrence is more than sufficient for any required permitting under section 404 of the Clean Water Act. Please feel free to contact me with any questions. Best, Josh Joshua A. Deal Regulatory Specialist Raleigh Field Office US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 35 Fax: (919) 562-0421