Loading...
HomeMy WebLinkAbout20191287 Ver 1_CAMA Application_20190924FOR REGISTRATION REGISTER OF DEEDS Karen S. Hardesty Carteret County, NC June 19, 2019 3:31:18 PM DEED # Pages: 3 Fee:$26.00 , NO Revenue Stamp: $0.00 FILE # 1641125 '4g'd-�b Iretumert tmeparW By. Attxrey Dame J. BOW, MC, 6118 HWMey24, Newport NO 29670 MdAfbrReoaflrp7a Attu WDarrel.Boyce PLLC,62T6WwW24,NWMANC 2MM �M u ( ID .'i 3�io�id�49 �O� CAMCLAMDEED Starwps St* of Nati Ceroons CcU*0f Cerlaet THIS DEED, nredeiHe , by end between Joan MWN& Pdtyad G m ram P* arlhebee ctThe Cwdk* MwNeir Carl krwocabie 7hMfboJoenMeoNelrPoWdW I-11401$ Qanbr(e), end()kmMma PdVoW Wlk JalnW~ PattA Grerdee(e), of 119I+h well Ddve, Hekers Mang NO 29631; WRNESSETH: ThetseldGrer"a),Ward incaelderdondtown d0.00(i MDder(s) IID their Inhandpei0.temdptdwhich Ishereby 8010tor,4adyed,hweMrnj derdbir=9praeeriedgmai teieeee,andforovergtlldelmuriDt*Grsllee(e)ardMrhehead C teKwdSSMedNNoodhCatdkminHdwkkembbbWUwse *w'dmore�per�ydde�a mt§mm tlbCaayd SwAteded Eidibit"A" TOHAVEANDTOHOLD tedbmeeidtactorperoddland and dPN9e W#WOvnbbW4rgt0teGlert *)endihelrhdre wI aeeigre,*wwddedoWddd dyht, glia dOM orintereetatt*Gmnbr(s) orerryaedgftV byl9miph, orurdertem. IN TEST7MONYWHEREOF,said Gre br(e)havehereulbWtmirhende andaedetedgwdyae►ti Odmew ftm ("W) (no) gVCENEO AUG 2 g 'ZM1 CiC 'M-MVi1D CITY Submitted electronically by "ATTORNEY DONNA 7. BOGGS, PLLC" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Carteret county Register of Deeds. 1641126 STATE OF COLORASO Trod • IF •TOM= Yd. I, jq~ e,�_ 'n Notary Public for State and County shown above, do hereby cen* that Joan MacNair Petty and Glenn Thomas Petty personally appeared before me this day and acknowledged the due execution of the foregoing document. This the Piro day of June, 2019. Notary Public My Commission Expires: A? MkFtY JFNL+ YG7flsJkE Nt37ik�YyCp7,}C TA OP COLORApp MY COM01 MJSSJ M7� JULYp, X022 RECEIVED AUG 2 S 2019 DCM-MHD CITY 1641126 ATTACHMENT BEING all of Lot 23, Hackers Pant Subdivislon as shown on a plat papered by Stroud Engineering, PA. recorded In Map Book 29, Page 24, Carteret County Registry, reference to said map being made for greater certainlyof description. RECEIVED AUG 2 8 2019 DCM-MHD CITY PETTY 113 Maxwell Dme, Hinters Island, NO 28531 0 NtORi H CAROLINA. lnvvr�rmnnal ihr✓lay September 23, 2019 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) greog.bodnar(Wricdenngov SUBJECT: CA MA Major Permit Application Review Applicant: Glenn & Joan Petty Project Location: 113 Maxwell Dr. Harkers Island, Carteret County Proposed Project: Proposes to replace existing pier and dredge ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Dlrecroq Dlvlsian ofCoaslal Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by October 21, 2019. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. PRINT I_Celgk1[NI SIGNATURE DATE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 August 27, 2019 AVOLIS ENGINEERING, PA P.O. Box 15564 New Bern, North Carolina 28561 252.633.0068 - License No. C-0706 Mr. Ryan Davenport Client and Enforcement Representative NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 RE: CAMA Permit Petty Residence, 113 Maxwell Drive, Harkers Island, Carteret County, North Carolina AE Project No. 19052 Dear Ryan: Enclosed please find our CAMA Permit application package for the above -referenced project consisting of the following: • Project Plans (Three Copies) • CAMA Application with Narrative (Original and One Copy) • Property Deed (One Copy) • Riparian Owner Statements with Cover Letters and Certified Mail Green Card Receipts (One Copy) • Authorized Agent Form (Original) • Digital Copy of All Documents (CD and Thumb Drive) • $400 Permit Fee We appreciate your assistance. Should you have any questions, please do not hesitate to call. Sincerely, Kevin Avolis, P.E. Wce-President RECEIVED AUG 2 S 2019 DCM-MHD CITY acM MP -1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Joan MI M Last Name Petty Avolis Engineering, Pa Applicant 2: First Name Glenn MI T Last Name Petty Agent/ Contractor 1: First Name If additional applicants, please attach an additional page(s) with names listed. Last Name Mailing Address 776 Ransdell Road PC Box City Louisburg State NC ZIP 27549 Country USA Phone No. 919-669-9877 ext. FAX No. - - Street Address (if different from above) City State ZIP Email 15564 2. Agent/ContractorInformation Business Name Avolis Engineering, Pa Agent/ Contractor 1: First Name MI Last Name J. Kevin Avolis Agent/ Contractor 2: First Name MI Last Name Mailing Address PC Box City State 15564 New Bern NC ZIP Phone No. 1 Phone No. 2 28561 252-633-0068 ext. 252-671-9333 ext. FAX No. Contractor # C-0706 Street Address (if different from above) City State ZIP 5405 Morton Road New Bern NC 28562 - Email RECEIVED avolisengineering@embargmail.com <Form continues on back> AUG 2 S 2019 DCM-MHD CITY 11.52 808416'oa .. 1-Sb3-d1*C0A`t' www nccoasialman&gement.net Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3, Projecaocation County (can be multiple) Street Address State Rd. # Carteret 113 Maxwell Drive 30,086 SF, 0.69 AC Subdivision Name City State Zip Harkers Point Harkers Island NC 28531 - Phone No. Lot No.(s) (if many, attach additional page with list) 919 - 669 - 9877 ext. 23, 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Brooks Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown North River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site'Descilptilon a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 151.2 30,086 SF, 0.69 AC c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 6 ®NHW or ❑NWL e. Vegetation on tract Grass vegetation in yard area, coastal grasses and shrubby vegetation along shoreline. I. Man-made features and uses now on tract Lot is occupied by residential dwelling. Existing pier and boat lift is located in Brooks Creek servicing this property. g. Identify and describe the existing land uses adiacent to the proposed project site. Single-family residential dwellings about the property on each side. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No [INA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No [INA National Register listed or eligible property? <Form continues on next page> RECEIVED AUG 2 8 2019 nnM MHD61TY 252-808.2808 :: 1-888-4RCOAST :: www.necoastaimanagement.net Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (it) above, has a delineation been conducted? []Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater disposed is to public sewer system servicing Harkers Point Subdivision. o. Describe existing drinking water supply source. Existing well on site. p, Describe existing storm water management or treatment systems. All stormwater runoff occurs through sheet flow action to vegetated areas off site. 5. Acfivitl®s and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed pier and boat lifts will allow for the storage and use of boats for recreational purposes on the adjoining coastal waters. The dredging activities will ensure proper access to adjoing channel areas. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Dredging - Excavator (1), Barge (1), Dump Truck (1) Pier - Barge (1), Pile Driver (1) See also attached Narrative. d. List all development activities you propose. Construction of pier walkway, platform and shelter area. Construction of two (2) boat lifts. Completion of dredging in area of new dock facility. e. Are the proposed activities maintenance of an existing project, new work, or both? Both I. What is the approximate total disturbed land area resulting from the proposed project? 100 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The only runoff from the proposed project will be from rainfall runoff from the pier structure. No concentrated runoff will occur. i. Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No [INA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED AUG 2 g 2019 252-808.2808 :: 1-888-4RCOAST :: www.nccoas1tDrMh&M"B0ft "t Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional infohrration - In addition to this completed application form, (MP -1) the Po/lowing items below, if applicable, must be submitted in order for the application package. to be complete. Items (a). -.(t). are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. - a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the she. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name John Kevin Avolis Phone No. M -6711-9&n _ Address 102 Gfeekview Road, New Bern, NC 28562 - Name Josh Lane Phone No. Address 10590 Highway 55 West, Dover, NC 28526 Name Phone No, Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Not Known h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Z Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development aescriDea in me appucauon. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certi that the information provided in this application is truthful to the best of my knowledge. Date Print Name Joan MacNair Petty & Glenn Thomas Petty Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information RECEIVED AUG 2 S 2Gi9 [)nh- wn UTY 252.808.2808 :: 1.888.4RCOAST :: www.nccoastaimanagement.net Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. a. Amount of material to be excavated from below NHW or NWL in cubic yards. 432 Cubic Yards c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV RSB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: Allow proper access to pier facilities. a. Location of disposal area. Approved Contractor Disposal Area c. (i) Do you claim title to disposal area? ❑Yes RNo [INA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL RNone (ii) Describe the purpose of disposal in these areas: b. Type of material to be excavated. Silty Sand d. High -ground excavation in cubic yards. None ❑This section not applicabl b. Dimensions of disposal area. To be determined. d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA (ii) If yes, where? I. (i) Does the disposal include any area in the water? ❑Yes RNo [INA (ii) If yes, how much water area is affected? 252.808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagement.net RECEIVED AUG 2 8 2019 DCM-MHD CITY revised: 12/26/06 Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length 47.5 Width 48.3 Avg. Existing 2' NA NA Depth Final Project 4.5' NA NA Depth a. Amount of material to be excavated from below NHW or NWL in cubic yards. 432 Cubic Yards c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV RSB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: Allow proper access to pier facilities. a. Location of disposal area. Approved Contractor Disposal Area c. (i) Do you claim title to disposal area? ❑Yes RNo [INA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL RNone (ii) Describe the purpose of disposal in these areas: b. Type of material to be excavated. Silty Sand d. High -ground excavation in cubic yards. None ❑This section not applicabl b. Dimensions of disposal area. To be determined. d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA (ii) If yes, where? I. (i) Does the disposal include any area in the water? ❑Yes RNo [INA (ii) If yes, how much water area is affected? 252.808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagement.net RECEIVED AUG 2 8 2019 DCM-MHD CITY revised: 12/26/06 Form DCM MIP -2 (Excavation and Fill, Page 2 of 2) 3. 40410 INE.3f$Thissecti'gn n&OpplTcable7 (if development is a wood groin, use MP -4 — Structures) a. Tvoe of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other:_ Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill _ Riprap Breakwater/Sill Other L Source of fill material. 4. OTH�Ii-144 ACTMFIES, effZ ding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area _ (iv) Purpose of fill f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. REGENhu AUG 2 8 2019 is section not applicab1a b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV _ ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., controlled? backhoe, or hydraulic dredge)? No upland excavation/fill will occur. Excavator, Barge, Dump Truck c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. Date Pier Replacement & Dredging 113 Maxwell Drive, Harkers Island, North Carolina Project Name d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Joan Machlair Petty & Glenn Thomas Patty Applicant Name Mn 1 r I �. A plicantSignature 252-808-2808:: 1-888-4RCOAST :: www.nccoastalmanagem_ e_nt.net revised: 12/26106 Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1, DOCKING FACILITY/MARINA CHARACTERISTICS [I This, section not appllCab{s, a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑PubliclGovernment ®Private/Community ❑Yes NNo c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ❑Yes NNo (ii) Number 1 If yes: (iii) Length 117' (100' Walkway) (ii) Number (iv) Width 5' (iii) Length (v) Floating ❑Yes NNo (iv) Width (v) Floating ❑Yes []No e. (i) Are Platforms included? ®Yes []No f. (i) Are Boallifts included? ®Yes ❑No If yes: If yes: (ii) Number 1 (ii) Number 2 (iii) Length 21 (iii) Length 18' (iv) Width 17 (iv) Width 12' (v) Floating ❑Yes NNo Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 2 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 2 ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ®Open water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other; please describe: k. Typical boat length: 25' m. (i) Will the facility have lie pilings? ❑Yes NNo (ii) If yes number of lie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (i) Will the facility be open to the general public? ❑Yes ®NoRECEIVED AUG 2 8 2019 DCM-MHD CITY 252-808-2808 :: 1-888-411COAST :: www.nccoa_stalmanagement.net revised: 12/27/06 Form DCM MP -4 (structures, Page 2 of 4) I2 ��CIClNQfi`dCILyTti'/161.d�TNAOIt�RAl`IOIVS �Th'l�secl!4�t�aat�lRl��C�b//�` a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED m. Is the marina/docking facility proposed within a primary or secondary nursery area? AUG 2 8 2019 ❑Yes []No DCM-MHD CITY 252.808-2808 :: 1-888.4RCOAST :: v .nccoastalmanagement.net revised: 12/27106 Form DCM MP -4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? []Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3.'BOATHOUSE (including covered figs) ❑This section not appliggbia .� a. (i) Is the boathouse structure(s): ❑Commercial ❑PublidGovernment ®Private/Community (ii) Number 1 (iii) Length 18 (Drip Line) (iv) Width 13 (Drip Line) Note: Roofed areas are calculated from dripline dimensions. 4.0 ROIN' (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) E9 This section hot appliC,704 a. (i) Number (ii) Length (iii) Width 5, BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not appica61e a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands B. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑PublidGovernment ❑Private/Community C . Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. e. Arc of the swing _ 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252-808-2808:: 1-8884RCOAST :: www.nccoastalmanagement.net AUG 2 S 2019 rr ll-mhun r1TY revised: 12/27/06 Form DCM MP -4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of slructure(s) to adjacent docking facilities. 38' (East) 43.4' (West) 55.7' (East) 66.2' (West) Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 188' d. Water depth at watenvard end of structure at NLW or NWL 1.5 Feet Deep 0 NLW (Existing) 4.5 Feet Deep 0 NLW (Proposed) e. (i) Will navigational aids be required as a result of the project? ❑Yes ❑No [INA (ii) If yes, explain what type and how they will be implemented. B. OTH R Thls $6, tIon got app b(e,'r a. Give complete description: 8121 1 I°I Rete Pier Rgpjacement Dredging 113 Maxwell pl!Ye, Markers Island, North Carolina Project Name Joan MacNair Petty/Glenn Thomas Petty Applicant Name ApPicantjSigtlsture SECENED 4UG 2 6 2019 (}{ 'tJl-NIHD CITY 252.808-2808 :: 1-888.4RCOAST :: ww_w.nccoastalmanagement.net revised: 12/27/06 PROJECT NARRATIVE Pier Replacement and Dredging 113 Maxwell Drive Harkers Island, North Carolina The owners of the property located at 113 Maxwell Drive in Harkers Island, Carteret County, North Carolina, Mrs. Joan MacNair Petty and Mr. Glenn Thomas Petty are proposing to replace the existing pier and boat lift facilities that are located adjacent to their residence on Brooks Creek. The existing pier and boat lift facilities were damaged by recent and past storm events and are in a state of disrepair. It is proposed that the existing timber pier and single boat lift be removed in its entirety. All timber piles will be completely removed by pulling with a barge mounted excavator. No bottom disturbance is proposed to occur associated with the planned demolition activities. Following demolition, it is proposed that dredging activities as outlined on the project plans be completed. The dredging activities are required to increase water depths at the pier facilities to allow proper access for boating activities. The extent of dredging depicted on the project plans was minimized to the extent possible to ensure full access to the adjacent channel area and access to the proposed boat lifts. All dredging will be completed with a barge -mounted excavator. Dredge spoil will be stockpiled within a secure enclosure on the barge. The spoil will be transported to a remote unloading area where it will be unloaded into dump trucks and transported to an approved dredge spoil disposal area. A total of approximately 432 cubic yards of dredge spoil will be generated by the excavation. All dredging activities will be completed by a competent local dredging contractor who will be selected after the CAMA permitting process has been completed. Following the dredging operation, a new timber -framed and concrete decked (Hog Slat Decking) pier walkway and platform will be constructed. A sheltered area covering a total of 234 SF (drip line) will be constructed over a portion of the platform area. Two boat lifts will be installed as shown on the project plans. Piles for the new pier and the boat lifts will be installed utilizing a barge -mounted pile driver. Decking installation will be completed from the barge and from upland areas of the site. Normal hand tools will also be employed to complete the construction. All construction waste will be collected on upland areas of the site and will be properly disposed of. It is proposed that no coastal wetland areas or coastal vegetation be disturbed to complete the project. RECEIVED AUG 2 S 2019 DCM-MHD CITY FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Glen Petty 2. LOCATION OF PROJECT SITE: 113 Maxwell Dr., Harkers Island Latitude: 34°42'40.83"N Longitude: 76°34'56.89"W 3. INVESTIGATION TYPE: CAMA, D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit -9/10/19 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received — 8/28/19 2294ft2 Application Complete- 8/28/19 995112 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Carteret County Land Classification from LUP — Limited Transition (B) AEC(s) Involved: EW, PTA (C) Water Dependent: (yes) (D) Intended Use: Private (E) Wastewater Treatment: Existing — Community Planned — NA (F) Type of Structures: Existing — Residents, Dock Planned — New Excavation (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: 1) 7INZl1M A) Open Water 2294ft2 657ft2 995112 (B) Coastal Wetlands 300112 (D) Total Area Disturbed: 3589ft2 (E) Primary Nursery Area: No (F) Water Classification: SA (G) Shellfish Classification: closed 8. PROJECT SUMMARY: The applicant is proposing to excavate around their proposed dock and create a channel to connect to the existing channel leading into the Harker's Island Harbor of Refuge. Field Investigation Report: Glenn Petty Page 02 9. NARRATIVE DESCRIPTION: The Glenn Petty project is located at 113 Maxwell Dr. on Harkers Island adjacent Brooks Creek. Brooks Creek connects to Back Sound and has an existing federal channel connecting to Harker's Island Harbor of Refuge. This property is .69 ac in its entirety and has an existing single family home. Extending off of high ground is a two slip docking facility. A 50' fringe of high and low marsh exists along the shoreline. There are oysters in the intertidal zone along the shoreline. The bottom of Brooks Creek in this area is mostly sand and silt with patches of SAV near shore. The channel leading into the Harkers Island Harbor of Refuge is approx. 30' offshore of the existing dock. A new channel West of this project was excavated and authorized under CAMA Major Permit #29-19. Water depths around the existing dock are -1' to -2' at NLW. Water depths in the harbor of refuge channel are -4' to -6'. The Division of Water Resources classifies this area of Core Sound as SA waters. This is not a Primary Nursery Area. This portion of Brooks Creek is closed to harvesting shellfish. The parcel is classified in the Carteret Co. LUP as Limited Transition. 10. PROJECT DESCRIPTION: Glenn Petty is proposing to construct a new dock in the same footprint of the existing dock. The new dock would have a 17'X21' covered platform. A 13'X13' boatlift would be placed on each side of the platform. No additional shading impacts to Coastal Wetlands would occur. The docking facility would have a total of two slips. Additionally, Mr. Petty wishes to excavate a new basin surrounding the dock. The proposed basin would extend off the existing harbor of refuge channel. It would be 47.5' long and 48.3' wide with a final depth of -4.5' at NLW. A total of 213 cubic yards of material would be excavated during this project. Spoils would be trucked offsite to an approved location to be determined. Offloading of barges would occur in Brooks Basin. No additional slips would result from the project. There are patches of SAV existing along the shoreline but none were noted in the excavation area at the time of site visit. Excavation would occur 35' away from nearest Coastal Wetlands. Applicant has chosen not to connect to basin to the West because of connecting water depths. 11. ANTICIPATED IMPACTS: Excavation will result in the disturbance of 2294sq ft of shallow bottom habitat that has not been previously excavated. Turbidity impacts can be expected during the removal of the 213 cubic yards of material. Final bottom soundings will be -4.5' NLW connecting to -6' NLW and greater. Intended use of this project is for boating ingress and egress to an existing two slip docking facility that will be replaced in the same footprint. The 300ftz of Coastal Wetland shading would remain the same. The dock would usurp 995ftz of PTA and shade 657ftz. Name: Ryan Davenport Date: 9/11/19 Morehead City Gem MP -1 APPLICATION for Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) - Applicant 1: First Name Joan MI M Last Name Petty Avolis Engineering, Pa Applicant 2: First Name Glenn MI T Last Name Petty Agent/ Contractor 1: First Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address - 776 Ransdell Road PC Box City Louisburg State NC ZIP 27549 Country USA Phone No. 919 - 669 - 9877 ext. MI FAX No. - - Street Address (if different from above) City State ZIP Email PC Box City 2. Agent(ContractorInformation Business Name Avolis Engineering, Pa Agent/ Contractor 1: First Name MI Last Name J. Kevin Avolis Agent/ Contractor 2: First Name MI Last Name Mailing Address PC Box City State 15564 New Bern NC ZIP Phone No. 1 Phone No. 2 28561 252-633-0068 ext. 252-671-9333 ext. FAX No. Contractor # C-0706 Street Address (if different from above) City State ZIP 5405 Morton Road New Bern NC 28562 - Email avolisengineering@embarqmail.com <Form continues on back> REGtI V w AUG 0 S Z019 252-808-2808 .. 1.888-4RCOAST ., www.nccoostatmauagemer3`i1M-MHD Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 113 Maxwell Drive 151.2 Subdivision Name City State Zip Harkers Point Harkers Island NC 28531 - Phone No. Lot No.(s) (if many, attach additional page with list) 919 - 669 - 9877 ext. 23, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Brooks Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown North River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 151.2 30,086 SF, 0.69 AC c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NW L (normal water level) (If many lot sizes, please attach additional page with a list) 6 ®NHW or ❑NWL e. Vegetation on tract Grass vegetation in yard area, coastal grasses and shrubby vegetation along shoreline. f. Man-made features and uses now on tract Lot is occupied by residential dwelling. Existing pier and boat lift is located in Brooks Creek servicing this property. g. Identify and describe the existing land uses adiacent to the proposed project site. Single-family residential dwellings about the property on each side. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? [--]Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. [--]Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No [INA National Register listed or eligible property? <Form continues on next page> RECEIVED AUG 0 S 2019 252.808.2808 :: 11.888.41RCOAST :: www.nccoastalmanagemen©OM-MID CITY Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ®Yes ONO (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater disposed is to public sewer system servicing Harkers Point Subdivision. o. Describe existing drinking water supply source. Existing well on site. p. Describe existing storm water management or treatment systems. All stormwater runoff occurs through sheet flow action to vegetated areas off site. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed pier and boat lifts will allow for the storage and use of boats for recreational purposes on the adjoining coastal waters. The dredging activities will ensure proper access to adjoing channel areas. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Dredging - Excavator (1), Barge (1), Dump Truck (1) Pier- Barge (1), Pile Driver (1) See also attached Narrative. d. List all development activities you propose. Construction of pier walkway, platform and shelter area. Construction of two (2) boat lifts. Completion of dredging in area of new dock facility. e. Are the proposed activities maintenance of an existing project, new work, or both? Both I. What is the approximate total disturbed land area resulting from the proposed project? 100 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No [INA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The only runoff from the proposed project will be from rainfall runoff from the pier structure. No concentrated runoff will occur. i. Will wastewater or stormwater be discharged Into a wetland? [--]Yes ®No [INA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes (-]No ❑NA j. Is there any mitigation proposed? ❑Yes ®No [INA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED 08 2019 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net DCM.MHD CITY Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (n are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other Instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail, Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name John Kevin AVolis Phone No. 252-671-9333 Address 102 Creekview Road, New Bern, NC 28562 Name Josh Lane Phone No. Address 10590 Highway 55 West, Dover, NC 28526 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Not Known h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name Joan MacNair Petty & Glenn Thomas Petty Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information RECEIVED G 0 8 2019 252.808.2808 :: 1.888.4RCOAST :: www.nccoastalmanagement.notDCWMIAD CITY Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 432 Cubic Yards c. (1) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ®SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: Allow proper access to pier facilities. 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. Approved Contractor Disposal Area c. (i) Do you claim title to disposal area? ❑Yes ®No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: E] This section not applicable b. Type of material to be excavated. Silty Sand d. High -ground excavation in cubic yards. None []This section not applicable b. Dimensions of disposal area. To be determined. d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No [INA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (ii) If yes, how much water area is affected? RECEIVED AUG 0 8 2019 ncM-MHD CITY 252-808.2808 :: 1.888.4RCOAST :: www.nccoastTlmanadement_net revised: 12!26106 Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL stabilization Length 47.5 Width 48.3 Avg. Existing 2' NA NA Depth Final Project 4.5' NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 432 Cubic Yards c. (1) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ®SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: Allow proper access to pier facilities. 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. Approved Contractor Disposal Area c. (i) Do you claim title to disposal area? ❑Yes ®No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: E] This section not applicable b. Type of material to be excavated. Silty Sand d. High -ground excavation in cubic yards. None []This section not applicable b. Dimensions of disposal area. To be determined. d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No [INA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (ii) If yes, how much water area is affected? RECEIVED AUG 0 8 2019 ncM-MHD CITY 252-808.2808 :: 1.888.4RCOAST :: www.nccoastTlmanadement_net revised: 12!26106 Form DCM MP -2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP -4 — Structures) a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑Breakwater/Sill []Other:_ Width: _ c. Average distance watenvard of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill_ Riprap _ Breakwater/Sill Other I. Source of fill material. f. (i) Has there been shoreline erosion during preceding 12 months? [_]Yes ❑No []NA (it) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes []No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or (ii) Amount of material to be placed in the water _ other wetlands (WL)? If any boxes are checked, provide the number of square feel affected. (iii) Dimensions of fill area ❑CW ❑SAV _ ❑SB (iv) Purpose of fill []WL []None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equil controlled? backhoe, or hydraulic dredge),. No upland excavation/fill will occur. Excavator, Barge, Dump Truck c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No [INA (ii) If yes, explain what type and how they will be implemented. Dale Pier Replacement & Dredging 113 Maxwell Drive, Harkers Island, North Carolina Project Name d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No [INA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Joan MacNair Petty & Glenn Thomas Petty Applicant Name Applicant Signature RECEIVhD AUG 0 S 2019 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net DCM-9Hk9V M6106 Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 117' (100' Walkway) (iv) Width 5' (v) Floating []Yes ®No e. (i) Are Platforms included? ®Yes ❑No If yes: (ii) Number 1 (iii) Length 21 (iv) Width 17 (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dnpline dimensions. g. (i) Number of slips proposed 2 (ii) Number of slips existing 2 I. Check the proposed type of siting: ❑ Land cut and access channel ®Open water; dredging for basin and/or channel []Open water; no dredging required ❑Other; please describe: k. Typical boat length: 25 m. (i) Will the facility have tie pilings? []Yes ®No (ii) If yes number of tie pilings? El This section not applicable b. (i) Will the facility be open to the general public? []Yes ®No d. (i) Are Finger Piers included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width _ (v) Floating ❑Yes ❑No f. (i) Are Boatlifts included? ®Yes ❑No If yes: (ii) Number 2 (iii) Length 18' IN) Width 12' h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips') only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (i) Will the faci�lityy be open to the general ,quWirr?EIVED ❑Yes Q9No AUG 062019 DCM-MHD CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmqanaggment.net revised: 12/27/06 Form DCM MP -4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge' signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the madnaidocking facility proposed within a primary or secondary nursery area? ❑Yes ❑No AUG 0 8 2019 252-808.2808 :: 1.888.4RCOAST :: www.nccoastalmanaruement.net revised; 12127/00 Form DCM MP -4 (structures, Page 3 of 4) n. Is the madna/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes []No Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feel affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ❑This section not applicable a. (1) Is the boathouse structure(s): ❑Commercial ❑PubliclGovernment ®Private/Community (ii) Number 1 (iii) Length 18 (Drip Line) (iv) Width 13 (Drip Line) Note: Roofed areas are calculated from ddpline dimensions. 4, GROIN (e.g., wood, sheetpile, etc. ff a rock groin, use MP -2, Excavation and Fitt.) ®This section n=ot ppl a. (i) Number (ii) Length _ (iii) Width _ 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length _ b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑PubliGGovernment ❑Private/Community c. Distance to be placed beyond shoreline J. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL RECEIVED AUG 0 8 2019 ^CAA-DAHD CITY 252.808-2808 :: 1.888.4RCOAST :: www.nccoastalmanagement.net revised: 12/27106 Form DCM MP -4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of struclure(s) to adjacent docking facilities. 38' (East) 43.4' (West) 55.7' (East) 66.2' (West) Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body e. (I) Will navigational aids be required as a result of the project? []Yes []NO ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 1.5 Feet Deep (M NLW (Existing) 4.5 Feet Deep (c) NLW (Proposed) 8. OTHER ®This section not applicable a. Give complete description: Date Pier Replacement Dredging 113 Maxwell Drive, Harkers Island, North Carolina Project Name Joan MacNair Pelty/Glenn Thomas Petty Applicant Name Applicant Signature RECEIVED AUG 0 8 2019 Mvi-mIAD CITY 252.808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12127/06 PROJECT NARRATIVE Pier Replacement and Dredging 113 Maxwell Drive Harkers Island, North Carolina The owners of the property located at 113 Maxwell Drive in Harkers Island, Carteret County, North Carolina, Mrs. Joan MacNair Petty and Mr. Glenn Thomas Petty are proposing to replace the existing pier and boat lift facilities that are located adjacent to their residence on Brooks Creek. The existing pier and boat lift facilities were damaged by recent and past storm events and are in a state of disrepair. It is proposed that the existing timber pier and single boat lift be removed in its entirety. All timber piles will be completely removed by pulling with a barge mounted excavator. No bottom disturbance is proposed to occur associated with the planned demolition activities. Following demolition, it is proposed that dredging activities as outlined on the project plans be completed. The dredging activities are required to increase water depths at the pier facilities to allow proper access for boating activities. The extent of dredging depicted on the project plans was minimized to the extent possible to ensure full access to the adjacent channel area and access to the proposed boat lifts. All dredging will be completed with a barge -mounted excavator. Dredge spoil will be stockpiled within a secure enclosure on the barge. The spoil will be transported to a remote unloading area where it will be unloaded into dump trucks and transported to an approved dredge spoil disposal area. A total of approximately 432 cubic yards of dredge spoil will be generated by the excavation. All dredging activities will be completed by a competent local dredging contractor who will be selected after the CAMA permitting process has been completed. Following the dredging operation, a new timber -framed and concrete decked (Hog Slat Decking) pier walkway and platform will be constructed. A sheltered area covering a total of 234 SF (drip line) will be constructed over a portion of the platform area. Two boat lifts will be installed as shown on the project plans. Piles for the new pier and the boat lifts will be installed utilizing a barge -mounted pile driver. Decking installation will be completed from the barge and from upland areas of the site. Normal hand tools will also be employed to complete the construction. All construction waste will be collected on upland areas of the site and will be properly disposed of. It is proposed that no coastal wetland areas or coastal vegetation be disturbed to complete the project. RECEIVED AUG 0 8 2019 DCM-MHD CITY [� � I SMAJOR PERMIT FEE MATRIX E1t(}�,�Q�� """'�1Applicant E- I-eoh civ ►13M MI Dr,Hr, Selection Development Type Fee DCM % DWQ % (14300 16014351000931625 6253) (24300 11602 435100095 2341) I. Private, non-commercial ❑ development that does not $250 100%($250) 0%($0) involve the filling or excavation of any wetlands oro en water areas: Il. Public or commercial development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands oro en water areas: Major Modification to a $250 100%($250) 0%($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B. C, or D below applies: III(A). Private, non- cEl ommercial development, if $250 100%($250) 0%($0) General Water Quality Certification No. 4097 (See attached) can be applied: III(B). Public or commercial E] development, if General $400 100%($400) 0%($0) Water Quality Certification No. 4097 (See attached) an be applied: (C). If General Wateruality Certification No. $400 ( 60%($240) 40%($160) M 097 (see attached) co d \e applied, but DCM staDetermined that additional view and written DWQ 2 2019 S concurrence is needed AUG because of concerns related to water quality or DCM_MHD CITY aquatic life: III(D). If General Water Quality Certification No. $400 60%($240) 40%($160) 4097 (see attached) cannot be applied: IV. For development that El involves the filling and/or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and/or open water areas: SITE DATA: OWNER: Joan MacNair Petty & Glenn Thomas Petty 776 Ransdell Road Louisburg, NC 27549 (919) 669-9877 OVERALL SITE AREA: 30,086 SF, 0.69 ACRES SITE ADDRESS: 113 MAXWELL DRIVE, HARKERS ISLAND, NC TAX PARCELID: 732507684846000 DEED REFERENCE: FILE 1641125 SITE ZONING: NONE UTILITY SERVICES: WATER - PRIVATE WELL SEWER - PUBLIC HARKERS ISLAND SEWER CO. ELECTRIC - CART RET EMC GENERAL NOTES: 1. THE RECEIVING WATER COURSE FOR THIS PROJECT IS BROOKS CREEK, SURFACE WATER CLASSIFICATION SA, NSW, HAVING A STREAM INDEX OF 27-35-1-13. SPECIAL SCHEDULING NOTE: 1. National Marine Fisheries Service has established general guidelines for pier and dock work that involve noise. The Contractor is to post observers along the creek near the job site while dredging, etc. in the water. If a marine mammal (a bottlenose dolphin or a manatee) is observed within 100 meters of the project, the activity should be stopped until the animal has left the area. If there is no loud noise anticipated in the water (i.e. no pile driving), this 100 meter rule is not necessary. 2. The Contractor shall manage and control construction activities to minimize interference with and damage to fish and wildlife. Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat related to the project and critical to the survival of fish and wildlife. x -3.74 PVC PIPE \j� EX. PIER x -4.38 \ \ x -1.68 X 5.02 - _ _ x4-4- \\ \ \\ \ \\ x -1.77 x -4\77 _ _ I I 1 1 x -1.44 \x -1.76 / \ \ II I II I I \IX -1.94 / I x -1.40 I x -1.60 \ I I \ \ x -1.62 / \ x -1.83 ° II 1 \\ \ \\ \ 1 \\ \ \ x -1.32 \ x -1.62 x -1.90 \ \ \ \ \\x-1.79 \\ x1 -1.45x-1.75 X -6.14 \ \ \ \ \ EX. PIER \\ \ \\ \ \ 1-, � -1.62\� I x -1.92 X -1.16 x X - .29 x -1.94 x -1.22 4 An \ ° x X1.04 x -0.88 -0.10 x \ \ \ \ \\ \ �x -2.42 \� � / o -1.38 X - X 1.14 \ \ \ \ X/1.30 x-1.7ji-�� x-1.47 \ �%7 x \ x -1.80 \x -1.38 x 1.59 \\ \ \ \\ \ \\ \,1 -2), �2 / / x _1 g� BOAT LI OBSERVED SAV /0.52 W W/� / A/1.56 \ \ \ ( ° -1.25 / x -1.26 / W /� / X\\ 6.09 \\ � I / / _ _ x -1.59 / �' -l.�i� �. � _� 1 � / 1 \ u�r -2.98 I / / x' -2.02 I \ x -1.67 / I/ �/ W xW 0.82 / W /� W/W W / 60 \ \ _ 1 / 1 x / \ x -1'15 LIMITS OF COASTAL VEGETATION 1.46 2.27 \ \ \ x -2.22 I �- -L-1.30 1 J.3O X -1.4i \ \ \ \ \ x -1-62- - / / W W X 1.85 / � - x - -1-62-� - / .7� W / W � W W/ W 4.63 X 1.3 X 1.3 5.31 \ \ \\ x X3.65 \ \ / 1 51 / \ x --K1-81.40 _-0.78/ / RIPARIAN LINE W W \ \ \ I� i X -5.9� \\ \ \\ \ \X -2.82 \\ X -158 x -1.15x - \ /I 1.0'x/ x -0.96 - .24%W/'�/ W W 3.09 \ \ \ \ \ x -1.72 I I 1.92 x 41.63 x / x -12'63 / �/� / W 1 W W W x A88 \\ �= % /X-1.40 /,0/ W WWWWWWWWxW1 W 7W 1 8BROOKS CREEK \\x -5.Q4 -3.43\ 1.9 \X x -1.89 X -1.70 co "�CLASS: SA, NSW, INDEX: 27-35-1-13. 8 �* =1147 X /09 O x W W W \ \ 1 1 \ I x -134 X I �� W W WATER DEPTHS SHOWN ARE AT NORMAL LOW WATER \ X .0 \ \ \\ II - \\ \ �z.2s X.�O I X -11x8 x -1'77 EXISTING PILE / x -0/7o ® �/ ��1 �� �� W W W W WWW 2.39 (� W .y W W X /1718`. W W W W W W W x -5.87 _ _ _x -W8 \ 3.9VVV1 \ \ \\ / X _1. TO BE REMOVED'27 ��/ �/ �W /W I �., W W W W W WWW 2.46 X 2.87 \\ I / / W /W ,� W I W W x ,2 4 cl-I \ I \ X - 78 \ . W \ \ \ \ \ I x -1.55 �7 -1.59 // x -� .�.� / x/-0.55 '0 W/W� W� WjT�78 W 1.82. W 2.16 X 2.73 X 2.26 \ 1 x -2.37 / X-1.�/-1.� '✓ W / W W W W W x -5.62 \/ x _6. 1 \\ \ I EXISTING PIER /\ \ 161 NORMAL HIGH WATER LEVEL / ,� i W /W ! W W W W 2.28 .3s X 30 \ \ I X -1.7 x -1.22 x_ / W W W/ /W W W W W W 40V / \ \ \ \ \ \X TO REMOVED -6/ f X171 / ,W W�1. �W x W W W W XW2.4� \ / .� i � p.9f3 W 2 X47 2.271. W 2.15 x 2.49 \\ \\ + \ \ \\ \\ \ X 7O \ -1•\ I // /x / X -1. \ X -1.22 �Bib2-0.4J �W Wx 1" "x 1.42 X 1 53 W V•/ W W W (� W X 5 \ x�-1.53 , / / W W W W W W W W L,�T ,�, W %L 2.Fi6W W \ \ x -6.31 \ \ \ \ \ \ \ �' / Ob X'�0. WX 078 W W W W 2.21 2.09 -1.33 / ��ZJ/•y/W W W W x 1.31.y W W W 2.24 W W W W W W \ \ X`\ \ \\ -2.94 I I / / / % / Y W W W W W I W1 X.0.75 W �.92� W W W 2.22 J / �/ R W x -5.171 i \ \ x\1 I -11.62 - -/ x b.�5�& . W W W 1.3 W W W W .86W \ \ \ I t4`�� X \ x - . EX. PIER W W.78 W 5 W ! W .21 W X I x -5.77 \ \ l \ \ \ - \ cS II \\�\ -Ix -1.98 /Xt \ X -5.82 / x\-4•§7 x -1.84 Imo- W W W W W W W Wx 1W9� W W W'W W W W �.43 X .72 .19 .02 /BOAT LIFT I X -O W/ � W O.3J W W W W / X -5.2 \\` X-O.'B�O. 8 W �/W W/ W W W W W 486 W W W x 2.73 X 2.59 X 2.38 I x -5.�9 . \ \ \X -2. 1_ -1.1� -1'09- /� W W � °- / \ I \ � \ \ � X �•\5. X �%� W �. W W W 1.98. W .4 LLJ � ?8� �s Ch1 -4 �\ 3�\ \ \ EXISTING BOAT LIFT./ W W W W W W W W W �1� x 679 x 2.25 x 4.75 x -5.89 1y x- \ \ \ -1.92 \ TO BE REMOVED W W W W W W W W W ,L, I - F' `Y 7 W W X. 1- W W W W x 1.93 ° \x-5.05 \ I x-4.89 I xX4.2\ \\ \\ x- // x -L �u1.35 W 'x14rWWWW 0 2 CD X1.79 I n 0.*63 W x 2.61 WOODS I � -1,98 I /'L6 / W 'i W W W W W W W W /�/ll11 v/ x -4,74.55 I x -5 82 I I I I I Oi I W) I / /W W W W W W W W W X 40 IIX -5 02 I / W W W W W W W W W W `i x- - 5.09 I x -5.66 x -`I .68 x_ 1 4\53 I I IX -1.88 1 I Q. B// W W W W W W W W 1 x 2.08 / 4.96 \ \ I -OAA y/W Ly 1W xy 0.�4W W W W .y LL x -5.17// 1 (` 5.08 _ X 9.83yCD xx=Af-RIPAR IAN LINE\ \ 1 x -1 33 �` / V W W W W W W •00 X 2.52 x -5.55 1 / 1 85 I -2.19 ° / / 1.80 X -4. T � .�� � W W �. 3.52 I x X4 I I I 1.11 / W W W W W W W W W W X X 2.23 W W x 2.44 & -0 4r, W W W SITE PLAN -EXISTING CONDITIONS & DEMOLITION SCALE: 1 "=20' x 1.24 x 2.37 x 2.26 LOT 22 \ JOSH & KRISTEN LANE DB 1551, PAGE 121 X 4.25 ^ 4 WOODS x 6 x 3.15 x 2.90 x 3.16 x 2.58 x 2.94 x 3.05 -130.55' x 2.68 x 2.80 x 2.56 2.49 x 3.08 ED x 2.58 2.85 x 3.95 / r.7 1 I I I I r Jx -p x -1.0 / .38W/W ' W W W WAS 1w3Q W 1.99 x 4.26 x -5.191 I I x -11 `;� .07 1.92 x1-5.56 x 1 5.171 I I I I � r W W W W x -5.42 xx t�� rX/ 0.53 x/ /W W1/W 1 WX.1 � / -J(� / X -4 6/ I W W W W 2.03 x/ .23 1 m/ ,37 / W /W / W / W W W W W W W L O T 24 I1 -, 490 13 O.v• .lel%WWW WWW KEVIN & KIM AVOLS I EX. G0 'y2* x 2.17 DB 1443, PAGE 219 J I \ PIER \ X .8 BOAT LIFT'\ I / -0 0.14 -XI -l!7 0.33 x 5.34 3.11 x 3.82 3.51 3 x 3.53 x 3.16 x 3.12 x 3.63 x LOT 23 x 2.89 x 3.09 x 4.55 x 3. x x 4.15 x 3.81 x 3.94 RELEASE FOR PERMITS 5.02 812812019 4.16 4.79 1-11.. 11 \ IDENCE w 4.19 ^ 4.63 LLJ 4.65 a .1527 5.0728 28 w Q 28 4.29 4.38 4.35 4.22 .54 20 0 10 20 40 11111111111111111 GRAPHIC SCALE: 1" = 20' Q4 Q E � 0��' E, Q �UDQ�Q 0 ti • 0 U � O O 00 O Z N LO N O Z ¢ I LU z U J T F Q) O Co ¢ N U u7 � � N U X w C z w E00 M--1 C Ld w O �J O m O CLd ro C w ro W z co N U� LC) N I--1 X w ® MO O w I O_ I- O ~ E- r:::) O � �i O� \ WCn E- C 1 I� w W � E - MORGAN x-3.74 RELEASE FOR PERMITS PVC PIPE\ \ \ `\ 1 �\ EX. PIER x -4.38 ``O \ \ x -1.68 x -5.02 - _ _ x -4\77 x �4�4_ \`\x -1.77 8/28/2019 1 I 1 \ IL- x -1.44 \ 1 11 1 11 1 I \Ix -1.94 / I x -1.40 I x -1.60 1 I 1 \ \ x -1.62 / \ x -1.83 ° 11 \ \\ \ 1 \\ \\ x -1.32 \ x -1.62 x -1.90 \ 11 \ \ \ \ x -6.14 x -1.79 x\-1.45 \\ \ x -1.75 EX. LIMITS OF DREDGING \ \ \\ \ \ \\ \ \\ \ \ PIER .16 x - 3,396 S F, 0.078 ACRES F F x -1 \\ \ \\ \\ \\ \ \ x -1.62\IIx -1.92 -- \\ \ \\ \\ \\ \\ �x -2.42 \\\ � � - / x .73� 29 x - -11 x /1� - � \ \ \ .30 x -1.80 \� x -1.38 x -18� x -1.59 / I x\�- 6.09\ / / 2 -2.02 I \ -2.98 I I x -1.67 \- �- _L 1.30 i x -J�30 �yy x -2.22 i \\ \\ \�\x\,\5 \\ \ \151 I \� \x -2.82 \ x -11.8 x -+.15 \ x -5.95 � � \� \\ \\ \ \ \ x -1.72 1T I x -1.9 \\ \ \ \\\ \ BROOKS CREEK �x -4,88 \ \ \ � / x -,.7 x -5.1Q4 -3.43\ \x x -1.89 CLASS: SA, NSW, INDEX: 27-35-1-13. ` 1 1 \ I 1 -1.98 WATER DEPTHS SHOWN ARE AT NORMAL LOW WATER 1 \ 1 \ \ \ \ \ \ 1\ 29 -2. 0 x -5.87 _ �` -5\9 -3.98 x 2.5 3 - 1 \ \ � 4.5- x -5.62 \ \\\ \\ \\ I x -2.37 / \/ x -6.k9 1 / x �5 \ \\ \x -2.87\ \\ \ \ \ \ \ \ \ \ �70 \ \\ x -6.31 \\ \ \ \\\\\ \\\ \ x -5A7\\ , >-6� \ \ \ \ \\\ -2.94I I x -5.77 � x -5.82 \ cSS / \ -4V I 1 1 � / 1 / x-5.2 \ \'S / x -519 I \ • 4 4 x- 4.3 X -4.75 \� x -5.89 x -11 \ \ .3� x -5.05 I i i 1\ I x -4.89 I X4.2 ° I I IIh I 1 x -.55 I x -5.82 I x -5.02 x -41.7 5-09 I x -5.66 x -,kt. .58 x -4.96 -41,53 1 x 5.17/% 4,45.08 \ /x -5.55 I / 1 x - .85- I j I x -5.19 x1-,5.56 x5.1 � I I x -5.42 xx--- q# I I I I x -�.23 -4 6 / O � rA --)SITE PLAN -NEW WORK s� ��CSCALE: 1 "=20' SPECIAL SCHEDULING NOTE: 1. National Marine Fisheries Service has established general guidelines for pier and dock work that involve noise. The Contractor is to post observers along the creek near the job site while dredging, etc. in the water. If a marine mammal (a bottlenose dolphin or a manatee) is observed within 100 meters of the project, the activity should be stopped until the animal has left the area. If there is no loud noise anticipated in the water (i.e. no pile driving), this 100 meter rule is not necessary. 2. The Contractor shall manage and control construction activities to minimize interference with and damage to fish and wildlife. Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat related to the project and critical to the survival of fish and wildlife. x -1.47 \ BOAT LI /I OBSERVED SAV °-1.25/ x-1.26 x-1.15x� 1.LIMITS OF COASTAL VEGET/ i 1 I I\ -1.88 I o8 I -0� / \ � ��x-1/�RIPA�N LINE \ _ I -2.19 flI I �W/ W I I xt1 J!4k F, 1 1 \ & -0,45Y.7 PIER SUMMARY TOTAL WALKWAY AREA = 5'W x 100'L =500 SF TOTAL PLATFORM AREA = 17'x21' = 357 SF TOTAL COVERED WALKWAY AREA = 234 SF (DRIP LINE) TOTAL NUMBER OF BOAT LIFTS = 2 DREDGING SUMMARY: TOTAL DREDGING AREA = 4,244 SF, 0.097 AC, TOTAL DREDGING VOLUME = 432 CUBIC YARDS 4.16 20 0 10 20 40 GRAPHIC SCALE: 1" = 20' E � co 0 ti U L onn • 0N0 O LO� ��--i 0) Q CLUz U J �► O co Q N 0-) U u7 � � N w O X E00 O o m O CLi ro C w ro w z O C CD N LLO N M--1 1- U X w ® MO O a- a_ a_ E - w � w � w � a C 2 MORGAN x-2.82\ �\ x -1 X58 - I �� /' x -0.96 W x 1.15 - I x -1.0 /"�4/ x - I x 1.92 x 1 � x \ \ 1.72 I T1.63 / , x - \ \ / � x -4\88 \ \ �� `\ - \ ,' x -1.70 , 1.40 -5.04 ` \x -3.43 \x x 1.89 \ , _,� 1 1 I -1.98 \ `\ _� : 7I x T.09 /� y - x,/ 7/ 1 1\ I \\ \\ I \\41 I - x - I LIMITS/ OF COASTAL VEGETATION-,,""",, I \ \ I I 1.77 LIMITS OF DREDGING I' x'29 -2' 0 \ 4,244 SF, 0.097 ACRES I / x -y70 /0.12 �" // / \ \ \ 1 x - \ \ 2.5 432 CY TOTAL I x -1.27 x/ / � y� / x �a. 718* `6 7 -5 X98 \ \ 3.90\ 3 x - x i-1.60 \\ \ 3.5 ; , x 2 4.5 4 y X14, I \ i / , x 17 8 , x -2.3 \� X _ 59 ��' x -1.33 r' xi' --0.55 y �� y� �� �-� i� `I � `\ _ � N /\\ LIFT 2 � 1. 1 �/ II x -,�' � , � , 9 I � \ CONTROL DREDGE DEPTH -4.5 (C� NLWL) � � / \ 17 / � 0.89 \� \\x- D`\ \ \\ I\ \\ /x� x-1.76/ x-1.22 x_,'17 \ \ \ \x -2.87 \ \ / / / NORMAL HIGH WATER LEVEL ��,��� 1 5� x � 96' x -�70 \ - - 1 1.47 / - ,/ x,-{j>>.b2-0.47/ /� �x 1� *x 1:42 �x 1*53- \ \ � y x 1. � �, � � x 1.22 / /� / , � , �� , �' � �, �, , , \ \ \ \ \PLATF RM AREA c`S\� ; Y 0.�� x/ - 357 SF x _ �� -1.53 .�x 0478 ` \ \ \ -1.43 1 33 �5 WIDE x100 LONG WALKWAY �' x \ 6'� \ `\ \ -2.94 I `� I I i COVERED AREA / 500 SF, �' �- x 0.75 I I 234 SF (DRIP LINE) / i� =,,, Im \ `\ xi X4.1 \ x 11 Ir - x 1.22 ' x -0.91 x -0 X14 1 x x 5 ' BROOKS CREEK \ \ �13°�I \ , x 0.78 ,"x � ' 21 CLASS: SA, NSW, INDEX: 27-35-1 \13. \I i \\ \ \\ I WATER DEPTHS SHOWN ARE AT NORMAL LOW WATER1 \ \� \ - - \ I \ \ x- / / / � 3 x -5.82:1 \ \ I :1 S 0 E / / 11 ' - �, �, 9.43 \-4�7 I I �84 1 LIFT #1 1.9 \ 0.3.E , 2. 18' I I x x X5.2\ `� `\ x�I8 x Q�86�, x 2.73 I .5 4 - -1.1 -1.6-9- I ,� � � ;,� � , � \ I , >� 1.98 1.4x 1.34 z 1 / x 4.93 \\ �� \ 32.5 I i �, / i �' x 1�. x 6.79 x 5.89 /� � 14, 14Cn 1 x -5.11 �� ��-a�.38\ _ i ��w \ / �- , 1.19 092 \ I A T4.2 x ,0.63 �� 1.3.5 �, F- A ENLARGED SITE PLAN -NEW WORKs� C3 C3 SCALE: 1))= 10) 5" 12" ROUND 12" ROUND WOOD PILE (TYP.) WOOD PILE (TYP.) 61 4' 6" 4"x6" EDGE CONCRETE TREATMENT CONCRETE CONCRETE DECKING TOP OF DECKING ELEVATION =3.0'± DECKING DECKING • II II II II • 4"x12" GIRDER - EACH 2"x8" CROSS BRACING • SIDE OF WOOD PILE • - - 4"x12" GIRDER - EACH SIDE OF WOOD PILE NORMWAL HIGH WATER ELEVATION =+0.96' SPECIAL SCHEDULING NOTE: 1. National Marine Fisheries Service has established general guidelines for pier and dock work that involve noise. The Contractor is to post observers along the creek near the job site while dredging, etc. in the water. If a marine mammal (a bottlenose dolphin or a manatee) is observed within 100 meters of the project, the activity should be stopped until the animal has left the area. If there is no loud noise anticipated in the water (i.e. no pile driving), this 100 meter rule is not necessary. 2. The Contractor shall manage and control construction activities to minimize interference with and damage to fish and wildlife. Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat related to the project and critical to the survival of fish and wildlife. PIER SUMMARY TOTAL WALKWAY AREA = 5'W x 100'L =500 SF TOTAL PLATFORM AREA = 17'x21' = 357 SF TOTAL COVERED WALKWAY AREA = 234 SF (DRIP LINE) TOTAL NUMBER OF BOAT LIFTS = 2 DREDGING SUMMARY: TOTAL DREDGING AREA = 4,244 SF, 0.097 AC, TOTAL DREDGING VOLUME = 432 CUBIC YARDS � TYPICAL CONCRETE DECK PANEL C-3 C-3 NOT TO SCALE RELEASE FOR PERMITS 812812019 1 0 0 5 10 20 GRAPHIC SCALE: 1" = 10' MORGAN • • � z N - NORMWAL LOW WATER ELEVATION ==1.32' EXISTING BOTTOM ELEVATION = VARIES Z - - 2"x8" CROSS BRACING 1.5' DEEP AT END OF EXISTING DOCK Y U Z w � w Z w � o O Q � 0 m M w z w m M w LIJ_ PROPOSED BOTTOM ELEVATION = VARIES Q �_ LJ LL - 4.5' DEEP AT END OF PROPOSED DOCK o Y U LO O C .L O Z Cn W X w Q CROSS SECTION w ELEVATION w 0 0 w Cn O 0 - CD B TYPICAL WALKWAY 0- �C-3rNOT TO SCALE SPECIAL SCHEDULING NOTE: 1. National Marine Fisheries Service has established general guidelines for pier and dock work that involve noise. The Contractor is to post observers along the creek near the job site while dredging, etc. in the water. If a marine mammal (a bottlenose dolphin or a manatee) is observed within 100 meters of the project, the activity should be stopped until the animal has left the area. If there is no loud noise anticipated in the water (i.e. no pile driving), this 100 meter rule is not necessary. 2. The Contractor shall manage and control construction activities to minimize interference with and damage to fish and wildlife. Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat related to the project and critical to the survival of fish and wildlife. PIER SUMMARY TOTAL WALKWAY AREA = 5'W x 100'L =500 SF TOTAL PLATFORM AREA = 17'x21' = 357 SF TOTAL COVERED WALKWAY AREA = 234 SF (DRIP LINE) TOTAL NUMBER OF BOAT LIFTS = 2 DREDGING SUMMARY: TOTAL DREDGING AREA = 4,244 SF, 0.097 AC, TOTAL DREDGING VOLUME = 432 CUBIC YARDS � TYPICAL CONCRETE DECK PANEL C-3 C-3 NOT TO SCALE RELEASE FOR PERMITS 812812019 1 0 0 5 10 20 GRAPHIC SCALE: 1" = 10' MORGAN - - N LOT 22 N 22°41'54' E _ _ 228-61- w cm Zd \ me a / w N � M S 18015'54' W 308.16' l LOT 24 CURVE RADIUS ARC LENGTH CHS LENGTH CHORD BEARINGDELTA ANGLE CI 1313.83' 100.04' 100.01' S 64030'02' E -4 4°21'45' DEED REF• Wort PACE 789/591rr s BOUNDARY RETRACEMENT PHYSICAL SURVEY WaFtBnWMa29124 FOR rax P1k7M76&WM0DnShW OF I GEORGE MORGAN WOMBLE, IV 1,� { 113 MAXWELL DR DATE OF FiaD suVff.6-z9 tors MTE of rcaPPlW+"18 LOT 23 HARKERS POINT S%D HARKERS ISLAND TOWNSHIP apmBYJIP WAWN9UP cmcr�mBrIP JAMES I. PHILLIPS LAND SURVEYING q CARTERET COUNTY, N.C. � SCALE 1"=30' PO BOX 2103,379 ARRINGTON RD., BEAUFORT, N.C. 2851 252-728-5848 PHONE EMAIL J1000ASTALNET.COM r 976 rn a 1 W. r I � ren 1 A Q\ J — O --i z -Eo w o Z-5 rn I --i z -Eo w o Z-5 rn