HomeMy WebLinkAboutWQ0033483_Sewer Extension Permit Status Update_20190916 RECEIVED SEP 2 7 2019 September 16, 2019 NGDEQ/DWR/NPDES NCDEQ 512 N.Salisbury Street Raleigh, NC 27699-1617 To whom it may concern: Attached you will find a letter from your office addressed to Gary Hock, Hock Development Corporation that was delivered to our address at 4321 Medical Park Drive,Suite 100, Durham, NC 27704. Gary Hock died in October,2013 and it is my understanding that Hock Development has been dissolved. We are occupying the office space that his company once occupied and get mail for him or his company almost every week. This is the only reason I am responding to your letter—to let you know that he died six(6)years ago and his firm is no longer in business. Sincerely, AfritCedtalc-sr Linda Newhart , ,x,STATE.... . z,;. R/ • ROY COOPER . Cali.- % _ A aui o.- Governor t.� f i O ' 4 Z MICHAEL S.REGAN Secretary ''4'qw..0.0- LINDA CULPEPPER NORTH CAROLINA Director Environmental Quality September 6,2019 Gary Hock Hock Development Corporation , 4321 Medical Park Dr Ste 100 Durham, NC 27704 Subject: Engineering Certification Requested Hock Development Corporation Durham County Dear Permittee: Based on a review of our records, it appears that the Division of Water Resources (Division) has not yet received a final engineering certification in accordance with 15A NCAC 02T.0116,as well as the standard conditions of the permit,for the following Wastewater Collection System Extension Permit(s): • Permit No.WQ0033483:T.W.Alexander Properties issued on 10/15/2008 If the permitted facility has been constructed and is in operation,a complete and final engineering certification must be submitted as soon as possible in accordance with 15A NCAC 02T.0116. Please note that if any portion of the facility has been constructed and is in operation,a certification must be provided.A complete certification is one that includes a copy of the construction record drawings(plan and profile views of all sewer lines), pump station design calculations(if applicable),and the certification form as provided with the original permit. Please note that the Division may not acknowledge the receipt of certifications, however,the status can be viewed at any time using our online Sewer Extension Permit Tracker located on the PERCS Unit website. Please provide your response for each permit listed above within 30 days of the date of this letter. If you have previously received a letter from the Division requesting an Engineering Certification for other permits issued during the period of 2010 through 2015,and have not yet responded,please submit the required information at this time. It should be noted that failure to certify a non-discharge sewer extension permit appropriately in accordance with the provisions of 15A NCAC 02T.0116 may result in enforcement action. Operating a non-discharge system without a valid Wastewater Collection Permit may subject the responsible party to a civil penalty of up to$10,000 per day. Note:This current letter references permits issued by the Division,generally from 2007 through 2009, that remain open without the Final Engineer's Certifications on file. Additional certification request -�,_ North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 2 769 9-1617 a.memn metal alEtv 919.707.9000 letters are forthcoming that will address older permits dating back to initial issuance dates in 2002. Should a review of your files indicate permits older than 2007 that you wish to rescind, please proceed with requesting rescission at this time. If you need additional information concerning this matter, please contact Nyle Hothem via e-mail at Nvle.Hothem@ncdenr.gov. Sincerely, C i r , Christyn L. Fertenbaugh, P.E. Environmental Engineer Pretreatment, Emergency Response, and Collection Systems Unit Division of Water Resources cc: Raleigh Regional Office,Water Quality Section Regional Operations [electronic] Water Resources Central Files:WQ0033483 PERCS [electronic copy]/268 Requestfor Engineering Certification Date of Letter: September 6,2019 s• Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below and within 30 days of the date of this letter: NCDEQ/DWR WQPS—PERCS UNIT By U.S. Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem Raleigh, NC 27699-1617 Raleigh, NC 27604 Nyle.Hothem@ncdenr.gov ********************************************************************************************************** Permit No.: Permittee: Project Name: ********************************************************************************************************** Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) ❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. ❑ The Permitted project has been constructed and the required Engineer's Certification and supporting documents will be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active,in-service system niay result in enforcement action. ❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter. Name&Title(print): Signature: Date: Comments: *********************************************************************************************************** Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(Print): Signature: Date: Comments: ********************************************************************************************************** Contact Information Updates Updated Contact Person: Updated Mailing Address: Updated Email: