1 Project Name Dollar General - Salisbury (Store #21350)
2 Pro
'ect Area ac 2.25
3 Coastal Wetland Area ac 0
4 Surface Water Area ac 0
5 Is this project High or Low Density? High
6 Does this project use an off -site SCM? L No
OMPLIANCE WITH 02H .1003(4)
7 Widthofvegetated setbacks provided feet NIA
8 Will the vegetated setback remain vegetated? Yes
9 Is BUA other that as listed in .1 0034 c-d out of the setback? Yes
10 Is streambank stabilization proposed on this project? I No
NUMBER AND TYPE OF SCMs:
11 Infiltration System 0
12
Bioretention Cell
0
13
Wet Pond
0
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
1
17
1 Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
IStormFilter
0
24
Silva Cell
0
25
Ba alter.
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Justin Church, PE I Principal Engineer
28
Organization:
BREC, P.A.
29
Street address:
126 Executive Drive, Suite 220
30
Cii , State Zi :
Wilkesboro, NC 28697
31
Phone numbers :
336,844,4088
32
1 Email:
justin@brec.biz
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and:
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here. n -
\`ty111il1/!!!
SEAL r
0357'36
/,T�N C. CHJ�G �.
1 I -W1 x
�(7Ic,—
Date 1 !
D R?,AR NACU E AREAS
1 Is this a high density ro'ect? Yes
2 If so, number of drainage areasISCMs 1
Is all/part of this project subject to previous rule
3 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION
4 Type of SCM
Entire Site .
NIA
1
Sand Filter
5
Total BUA in p ro'ect sift.)
31842 sf
30243 sf
6
New BUA on subdivided lots (subject to permitting)
s ft
NIA
NIA
7
New BUA outside of subdivided lots (subject to
permittin�c�(sf� _
31842sf
_
30243sf
8
Offsite - total area �sq ft)�253861
sf
22125 sf_
9
Offsite BUA (sq ft
33347 sf
420'sf
10
Breakdown of new BUA outside subdivided lots:
- Parking (sq ft)
_
20927 sf.-.
19328 sf
-Sidewalks ft
1815 sf
1815 sf
_
_
- Roof (sq ft)
9100 sf
9100 sf
RoadWRLCSS ft).,__,_
_
sf
sf
- Future (sq M __
sf
_
sf T
- Other, please specify in the comment box
beIow�sg it
sf
sf
111
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots(sq ft)
sf
sf
13
Exisitng BUA that will remain (not subject to
ermittin s ftt_
sf
sf
14
Existing BUA that is already permitted s ft
_ sf
_
sf
15
Existinq BUA that will be removed Lsg ft _
6508 sf
_
sf
16
Percent BUA
33%
43%'
17
Design stogn lnches
NIA
1 in
18
❑esinvolume of 5CM (cu ft)
NIA
2600 of
19 Calculation method for design volume NIA
ADDITIONALINFORMATION
V Schueler
20
Please use this space to provide any additional information about the
drama a area(s):
DRAINAGE AREA INFORMATION
4 T e of SCM
Entire Site .
NIA
.1
5
Total BUA from project (sq ft)�
Y1995
6
rules
Y
8L 2006-246
---
2008 rules
2017 rules
7
New BUA on subdivided lots (subject to
permitting) (sq ft)
_
1995 rules
Sl 2006-246_-
2008 rules
2017 rules
---
8
New BUA outside of subdivided lots (subject to
permitting) (sf)
1995 rules _
SL 2006-246
2008 rules
2017 rules-
9
loffalte -total area (sq ft)
11995 rules_
SL 2006-246
�2008
rules
2017 rules_
BUA (sq ft)
1995 rules__ --
SL 2006-246
2008 rules —-- --
2017 rules
-r-
11
Design storm (inches)
1995 rules
SL 2006-246
2008 rules
2017 rules
12
Breakdown of new BUA:
- Parkin s
—
Sidewalk (sq ft)
- Roofs ft T.
- Roadway s ft
---
_
- Future (sq ft
- Other, please specify in the comment box
below (sq ft
13
New Infiltrating permeable pavement on
subdivided lots (sq ft
14
_
New infiltrating permeable pavement outside of
subdivided lots s ft
15
Exisitng BUA that will remain (not subject to
ermittin s ft
-
16
Existing BUA that Is already ermltted s ft
_
17
Existing BUA that will be romoved sq it),,,_
18
Percent BUA
19
Desi n volume of SCilll cu ft ���
_ -
20
Calculation method fordesign volume
ADDITIONAL: INFORMATION
Please use this space to provide any additional
121 information about the drainage area(s):
SAND FILTER
18
SHWT elevation (fmsl)
800
19
Type of sand filter (open or closed)
Open
20
If closed, will the filter will be pre -cast or pour -In -place?
21
If closed, top of grate elevation (fmsl)
22
Is this sand filter designed to attenuate peak flows?
Yes
I Sediment Chamber
23
Volume that can be retained in the sediment chamber (cubic feet)
1325 cf
24
Will there be a permanent pool in the sediment chamber?
Yes
25
bottom of the sediment chamber (fmsl)
817.00 .
26
Area of the sediment chamber (square feet)
1010 sf
27
Physical depth of the sediment chamber (Inches)
24.6 in
28
Ponding depth In the sediment chamber, above any permanent pool
{inches}
12.6 in
29
Elevation of top of weir between chambers (fmsl)
819.05
ISand Chamber
30
Volume that can be retained in the sand chamber {cubic feet)
1325 cf
31
Bottom of the sand chamber (fmsl)
818.00
32
Area of the sand chamber (square feet)
.1000 sf
33
Physical depth of the sand chamber (inches)
. 12.6 Mn
34
Ponding depth in the sand chamber, above any permanent pool
(inches)
12.8 in -
35
Elevation of the bypass device (fmsl)
819.05
36
Type of bypass device
orifice
37
Mechanism for distributing flow over the sand surface
stone dam
38
Sand specification for sand chamber
astm c33
39
Depth above underd rain pipe (inches)
12 in
40
Will fhe media be maintained to drain at least two inches per hour at the
sand surface? _
Yes
41
Is at least one clean -out pipe provided at the low point of each
underdrain line?
Yes
42
Will clean -out pipes be capped?
Yes