Loading...
HomeMy WebLinkAbout20040472 Ver 1_Complete File_20040326OF WATF9 Michael F. Easley, Governor T. William G. Ross Jr., Secretary 01 North North Carolina Department of Environment and Natural Resources (0 C Gregory J. Thorpe, Ph.D. iP + > -i - � Y Acting Director Division of Water Quality April 2, 2004 Rockingham County DWQ Project #: 04-0472 Project Name: Reidsville Industrial Park _ Southern Tract — Lot 2 APPROVAL OF IMPACT TO ISOLATED WETLANDS " Partnership for Economic and Tourism Developmentr Of EHNR 371 NC 65, Suite 205 N.C. F ' Wentworth, NC 27375-0205 APR 0 4 2004 Attn: Ms. Lisa Perrry Dear Ms. Perry: Winston-Salem Regional Office You have our approval, in accordance with the attached conditions and those listed below, to impact 0.10 acres of isolated wetlands for construction of a portion of the Reidsville Industrial Park, Southen Tract — Lot 2 located at NC 87 near Reidsville, NC , as you described in your application dated March 19,2004 (received March 26, 2004). After reviewing your application, we have decided that this fill is deemed permitted in accordance with 15A NCAC 2H .1305 (b) as long as you comply with the conditions of that rule (see. conditions 1 to 4 below). In addition, you should get any other federal, state or local permits before you go ahead with your 'project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non - Discharge and Water Supply Watershed regulations. This approval will expire five (5) years from the date of this approval/. This approval is only valid for the purpose and design that you described in your application except as modified below.. For this approval to be valid, you must follow the conditions listed in the attached certification and any special or site-specific conditions listed below. DEEMED PERMITTED CONDITIONS 1. Erosion and sediment and erosion controls shall equal or exceed those required by the N.C. Division of Land Resources or its local delegated program for the Sedimentation Pollution Control Act and shall be in full compliance with all specifications governing the proper design, installation, operation and maintenance of such Best Management Practices in order to help assure compliance with the appropriate turbidity and other water quality standards; All erosion and sediment control practices placed in isolated wetlands or isolated classified surface waters must be removed and the natural grade restored within two months after the Division of Land Resources or local delegated program determines that the land disturbance project is completed and the file is closed out; 3. Live or fresh concrete shall not come into contact with surface water until the concrete has hardened, and; 4. Measures shall be taken to ensure that the hydrology of any remaining isolated wetland or isolated classified surface waters is not affected by the discharge. SPECIAL CONDITIONS: N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone); 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetlands ft 1. Deed notifications or similar mechanisms shall be placed on all remaining jurisdictional wetlands and waters on this Lot to notify the state in order to assure compliance for future wetland and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). 2. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate .of Completion Form" to notify DWQ that all the work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality. 3. If you change your project, you must notify us in writing and you may be required to send us a new application. 4. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. 5. If total wetland fills for this project (now or in the future) exceed one acre or stream impacts exceed 150 linear feet, then compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). 6. The stormwater plan that accompanies the application shall be implemented as designed. In addition, a signed Operation and Maintenance agreement should be provided to DWQ within one month of the date of this approval. 7. The applicant must maintain full compliance with DWQ's NPDES Stormwater Permit conditions . upon approval of the Erosion and Sedimentation Control Plan. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 1506 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786 or Daryl Lamb at our Winston-Salem Regional Office at 336-771-4600. Attachments: lJ rmy Corps Daryl Lamb, W ii Denise PouJo�§; File c entral Files or m etion of ngineers Raleigh Field Office aston-Salem DWQ Regional Office ECS, Ltd., 6909 International Drive, Suite 103, Greensboro, NC 27409 va NCDENR North Carolina Department of Environment and Division of Water Quality Michael F. Easley, Governor August 2, 2005 Ms. Lisa Perry Partnership for Economic and Tourism Development 371 NC 65, Suite # 205 Wentworth, NC. 27375 William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director DWQ Project # 04-0472 Rockingham County Subject Property: Reidsville Industrial Park, Southern Track, Phase 1, & 2 APPROVAL OF STORM WATER MANAGEMENT PLAN Dear Ms. Perry: On August 2, 2005, the Division of Water Quality (DWQ) received the revised storm water management plan prepared by your engineer, Mr. J. Neal Tucker, P.E. of Stimmel Associates, P.A. This Plan has been reviewed and satisfies the isolated wetlands conditions of the 401 Water Quality Certification issued on April 2, 2004. The structural storm water practices as approved by DWQ as well as drainage patterns must be maintained in perpetuity. No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality. Storm water easements shall be recorded for a distance of at least 10 feet on each side of all storm water conveyances on all lots containing these structures including future access for maintenance. The storm water easements shall allow for the ability to maintain the structures, perform corrective actions as described above and shall provide protection of the structures from potential alternations by future property owners. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Samuel A. Aghimien, at 919-733-3574. Sincerely, C di Bell Karoly, Program Manager DWQ, 401 Oversight/Express Permitting Unit CBKlsaa cc: DWQ Winston-Salem Regional Office USACE Asheville Regulatory Field Office File Copy Central Files J. Neal Tucker, Stimmel Assoc; PA, 601 N Trade Street, Suite # 200, Winston-Salem, NC 27101 04-0472 Reidsville Ind Park, (Rockingham) BMP Approv 8-2-05 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 One 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 NOrthCarohna Phone: 919-733-1786 / FAX 919-733-6893 / Internet: htto://h2o.enr.state.ne.us/ncwetiands An Equal opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper ;Vaturallay Natural Resources sapa Stimmel Associates, PA Landscape Architecture Civil Engineering Land Planning August 2, 2005 North Carolina Department of Environment and Natural Resources Division of Water Quality 401 Wetlands Certification Unit 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604 Attn: Mr. Sam Aghimien Re: Reidsville Industrial Park, Southern Tract, Phase 1, Lot 2 Project #04-0472 Dear Mr. Aghimien: P,^jJ A f Attached please find revised 401 Wet Detention Basin Worksheets for Pond #1 & Pond #2 of the above referenced project. The following revisions have been made: Pond #1: Forebay volume has been revised to 20,000 cubic feet Drawdown orifice size has been revised to 4.25" diameter Pond #2: Permanent Pool Volume has been revised to 55,000 cubic feet Forebay volume has been revised to 11,500 cubic feet I have also included a planting plan for both ponds as requested. Thank you for your attention to this project. Please call me at (336) 723-1067 if you have any questions. Sincerely: J. Neal Tucker, P.E. Stimmel Associates, P.A. Attachments Cc: File 601 N. Trade Street, Suite 200 Winston Salem, NC 27101 P: 336.723.1067 F: 336.723.1069 Project No. (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name: Reidsville Industrial Park-Southern Tract-Pond #1 Lot 2E Contact Person: J_ Neal Tucker, P _ E Phone Number: ( 3 '4 6) 7 2 i -1 n 6 7 For projects with multiple basins, specify which basin this worksheet applies to: Pond #1 Basin Bottom Elevation 762. 0 0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 765.7 5 ft. (elevation of the orifice invert out) Temporary Pool Elevation 767 S 0 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 3 2 , 0 2 9 sq. ft. (water surface area at permanent pool elevation) Drainage Area 20, 1 7 ac. (on-site and off-site drainage to the basin) Impervious Area 1 3. 8 5 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 101 , 470 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 1 6 4 , 4 5 2 cu. ft. (volume detained on top of the permanent pool) Forebay Volume 20,000 cu. ft. SA/DA used 2.880% (surface area to drainage area ratio) Diameter of Orifice 4 .; 2 5 " in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. I fa requirement has not been met, attach an explanation of why. A li ants Initials The temporary pool controls runoff from the 1 inch storm event. ?? The basin length to width ratio is greater than 3:1. SWG100 The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. / The permanent pool depth is between 3 and 6 feet (required minimurn of 3 feet The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. (W.'e-L.oui Peep. ) Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site speck operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. 09/97 Page 1 of 1 ti REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT STORMWATER MANAGEMENT PONDS #1 & #2 PLANTING PLAN Species Trees: Balled & Burlap River Birch (Betula nigra) 1.5" caliper min., multi-stem Water Oak (Quercus nigra) 2" caliper min. Sweet Bay (magnolia virginiana) 1.5" caliper min. Location 1 Spacing Trees shall be placed from the littoral shelf elevation up to 3 feet above the shelf elevation (temp water quality depth is 1.75' in Pond #1, 2.25' in Pond #2). Tree species shall be in alternating groupsof like kind at a spacing of 50 feet on ceneter in cut zones of pond side slopes. Under no circumstances shall trees be planted on the pond dams. Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : Reidsville Industrial Park - Southern Tract - Pond #_2 Tot 2E Contact Person: J_ N P a 1 T, i c k P r, P F. ^ Phone Number: (336) 723-1067 For projects with multiple basins, specify which basin this worksheet applies to: Pond #.!2 Basin Bottom Elevation 7 5 0 . 0 0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 7 5 3 . 7 5 ft. (elevation of the orifice invert out) Temporary Pool Elevation 756-00 ft. (elevation of the outlet structure invert `in) Permanent Pool Surface Area 1 9 , 3 8 4 sq. ft. Drainage Area 13. 89 ac. Impervious Area A P l ac. Permanent Pool Volume 5 5, 0 0 0 cu. ft. Temporary Pool Volume 1I9*81 cu. ft. Forebay Volume 11", 5 04) cu. ft. SAIDA used 2.880% Diameter of Orifice 311 in. (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (combined volume of main basin and forebay) (volume detained on top of the permanent pool) (surface area to drainage area ratio) (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of wh_v. ADDlicants Initials The temporary pool controls runoff from the 1 inch storm event. 15f_ L% /?rc?t>> The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. 9)MrLL_ Vegetation to the permanent pool elevation is specified. V An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20%0 of the total basin volume. 4T Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30 foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in. the O&M plan. (an A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FO SWG100 09/97 Page 1 of 1 Project Name: Reidsville Ind Project No. DWQ 04-0472 Pond No. SUBMITTED DESIGN: 1 REQUIRED DESIGN: 8/8/2005 elevations 3. average depth status Bottom of Basin (ft) 762 Permanent Pool (ft) 765.75 3.75 ft. depth ok Temporary Pool (ft) 7675 1.75 ft. depth ok areas Permanent Pool SA (sq ft) 32029 20653 sq. ft. ok Drainage Area (ac) 20.17 m.. 19 22 -5- based on avg depth ok Impervious Area (ac) 13.85 68.7 % - volumes Permanent Pool (cu ft) 101470 Temporary Pool (cu ft) 164452 48909 cu. ft. ok Forebay (cu ft) 20000 19.7 % ok other parameters SA/DA 2.88 2.35 - Orifice Diameter (in) 4.25 0.44 cfs drawdown - Design Rainfall (in) T 4.3 day drawdown ok Linear Interpolation of Correct SAIDA *** 3.75 ft. Permanent Pool Depth Im ervious SA/DA fron (Avg Depth) Next Lowest 60 2.032.03 1.870336882 ` 1.08 Project Impervious 68.7 _ 2.35 I 1.38 Next Highest 70 2.4 2.236975553 1.43 3ft 4 C??g1g?? Project Name:' Reidsville Ind Project No. DWQ 04-0472 Pond No. SUBMITTED DESIGN: 2 REQUIRED DESIGN: 8/8/2005 elevations T ? average depth status Bottom of Basin (ft) 750 Permanent Pool (ft) -753.75 3.75 ft. depth ok Temporary Pool (ft) 756 2.25 ft, depth ok areas Permanent Pool SA (sq ft) 19384 14698 sq. ft. ok Drainage Area (ac) 13.89 `15992, based on avg depth ok Impervious Area (ac) 9.83 70.8 % - volumes Permanent Pool (cu ft) 55000 Temporary Pool (cu ft) 102381 34636 cu. ft. ok Forebay (cu ft) 11500 20.9 % ok other parameters SA/DA 2.88 2.43 - Orifice Diameter (in) 3 0.25 cfs drawdown - Design Rainfall (in) I 4.7 day drawdown ok Linear Interpolation of Correct SAIDA * * * 3.75 ft. Permanent Pool Depth Im ervious SA/DA fron (Avg. Depth) Next Lowest 70 2.4 2.614643005 1.08 Project Impervious 70.8 2.43 '. ; 64 1,11 Next Highest 80 2.78 2.999521255 1.43 3ft 4 T Project Name: Reidsville Ind Project No. DWQ 04-0472 Pond No. SUBMITTED DESIGN 1 REQUIRED DESIGN: 8/2/2005 elevations 3 average depth status Bottom of Basin (ft) 762 Permanent Pool (ft) 3.75 ft. depth ok Temporary Pool (ft) 765.75 767.5 1.75 ft. depth ok areas Permanent Pool SA (sq ft) 32029 20653 sq. ft. ok Drainage Area (ac) 20.171922 based on avg depth ok Impervious Area (ac) 13.85 68.7 % - volumes Permanent Pool (cu ft) 101470 Temporary Pool (cu ft) 164452 48909 cu. ft. ok Forebay (cu ft) 20000 19.7 % ok other parameters SA/DA 2.88 2.35 - Orifice Diameter (in) 4.25 0.44 cfs drawdown - Design Rainfall (in) 1 4.3 day drawdown ok Linear Interpolation of Correct SAIDA*** 3.75 ft. Permanent Pool Depth Impervious SA/DA fron (Avg. Depth) Next Lowest 60 2.03 1.870336882 1.08` Project Impervious 68.7 2.35 ,, ? 1.38 Next Highest 70 2.4 2.236975553 1.43 3 ft 4` u// Project Name: Reidsville Ind Project No. DWQ 04-0472 Pond No. SUBMITTED DESIGN: 2 8/2/2005 elevations Bottom of Basin (ft) 750 Permanent Pool (ft) 753.75 Temporary Pool (ft) 756 areas Permanent Pool SA (sq ft) 19384 Drainage Area (ac) 13:89 Impervious Area (ac) 9.83 volumes Permanent Pool (cu ft) 55000 Temporary Pool (cu ft) 102381 Forebay (cu ft) 11500 other parameters SA/DA 2.88 Orifice Diameter (in) 3 Design Rainfall (in) Linear Interpolation of Correct SAIDA ** * Impervious Next Lowest 70 Project Impervious 70.8 Next Highest 80 REQUIRED DESIGN average depth status 3.75 ft. depth ok 2.25 ft. depth ok 14698 sq. ft. ok 9 based on avg depth ok 70.8 % - 34636 cu. ft. ok 20.9 % ok 2.43 - 0.25 cfs drawdown - 4.7 day drawdown ok 3.75 ft. Permanent Pool Depth SA/DA fron (Avg. Depth) 2.4 2.614643005 1.08 2.43 V 1.11 2.78 2 999521255 1.43 3ft 4 3367615069 P.1 s 4 apa ltimmel Associstes, PA Landscape Architecture Civil Engineering Lend Planning August 2, 2005 North Carolina Department of Environment and Natural Resources Division of Water Quality 401 Wetlands Certification Unit 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604 Attn: Mr. Sam Aghimien Re: Reidsville Industrial Park, Southern Tract, Phase 1, Lot 2 Project #04-0472 Dear Mr. Aghimien: Attached please find revised 401 Wet Detention Basin Worksheets for Pond #1 & Pond #2 of the above referenced project. The following revisions have been made: Pond #1: Forebay volume has been revised to 20,000 cubic feet Drawdown orifice size has been revised to 4.25" diameter Pond #2: Permanent Pool Volume has been revised to 55,000 cubic feet Forebay volume has been revised to 11,500 cubic feet I have also included a planting plan for both ponds as requested. Thank you for your attention to this project. Please call me at (336) 723-1067 if you have any questions Sincerely: J. Neal Tucker, P.E. Stimmel Associates, P.A. Attachments Cc: File 601 K. Trade Street, Suite 200 Winston Salem, NC 27101 P: 336.723.1067 R 336.723.1069 AUG-2-2005 TUE 08:58 TEL:9197336893 NAME:DWQ-WETLANDS P. 1 3367615069 p.2 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 441 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name: Reidsville Industrial Park-Southern Tract-Pond #1 Lot 2E Contact Person: J- Neal Tucker, P- E Phone Number: (3 3 h) 7 2-3-1 n fi 7 For projects with multiple basins, specify which. basin this worksheet applies to: Pond #1 Basin Bottom Elevation 7 6 2.0 0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 7 6 5.7 5 ft. (elevation of the orifice invert out) Temporary Pool Elevation 767 _ 9 n ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 3 2 , 0 2 9 sq. R, (water surface area at permanent pool elevation) Drainage Area 2 0 , 17 ac. (on-site and off-site drainage to the basin) Impervious Area 13 . a 5 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 101 , 4 7 0 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 164,452 cu. ft. (volume detained on top of the permanent pool) Forebay Volume 20 , 000 cu. ft. SA/DA used 2.880% (surface area to drainage area ratio) Diameter of Orifice 4.2-5 " in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why,. 100 The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is gth greater than 3: 1. The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided- Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. Tte Sediment storage is provided in the permanent pool.(1?L.-Ovi Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specked in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. 09197 Page 1 of 1 AUG-2-2005 TUE 08:58 TEL:9197336893 NAME:DWQ-WETLANDS P. 2 3367615069 p.3 Project No. DWQ (to be provided by DWQ} AUG-2-2005 TUE 08:59 TEL:9197336893 NAME:DWQ-WETLANDS DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name: Reidsville Industrial Park - Southern Tract - pond 4.2 rot 2E Contact Person: J.toea1 Tilckpr, P-E. Phone Number: (336) 723-1067 For projects with multiple basins, specify which basin this worksheet applies to: Pond 4'2 Basin Bottom Elevation 750.00 ft. (average elevation of the. floor of the basin) Permanent Pool Elevation 753.75 ft. (elevation of the orifice invert out) Temporary Pool Elevation 796-00 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 19,384 sq. ft. (water surface area at permanent pool elevation) Drainage Area 1 3. 0 9 ac. (on-site and off-site drainage to the basin) Impervious Area _ _ q_83 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 5 5 , a0 0 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 109,381 cu. ft. (volume detained on top of the permanent pool) Forebay Volume 1 1,_E 5.041- cu. ft. SAJDA used 2.880% (surface area to drainage area ratio) Diameter of Orifice 311 in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. I fa requirement has not been met, attach an explanation of why. Applicants Initials The forebay volume is approximately equal to 20% of the total basin volume. A;r JPwm 'Jn t_ C-A The temporary pool controls runoff from the 1 inch storm event. 4rvtFat? The basin length to width ratio is greater than 3:1. <_The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 et). The temporary pool draws down in 2 to 5 days. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. Sediment storage is provided in the permanent pool. Cfi-?etir? ?x1 ?4? A vegetation management/mowing schedule is provided in the O&M plan . Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every s A torm event. specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FO SWG100 09(97 Page 1 of 1 P. 3 3367615069 REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT STORMWATER MANAGEMENT PONDS #1 & #2 PLANTING PLAN Species Location I Spacing Trees: Balled & Burlap Trees shall be placed from the littoral shelf elevation up to 3 feet River Birch (Betule nigra) " above the shelf elevation (temp water quality depth is 1 75' in 1.5 caliper min., multi-stem Water Oak (Quercus nfgra) . Pond #1, 2.25' in Pond #2). Tree species shall be in alternating groupsof like kind at a spacing of 50 feet on cenet r i t 2' caliper min. Sweet Bay (magnolia virginiana) e n cu zones of pond side slopes. Under no circumstances shall trees be planted on the pond dams. 1.5" caliper min. Shrubs: Container Inkberry shall be placed in the same zone as the trees from the Inkberry (flex glabra) " , littoral shelf elevation up to 3 feet above the shelf elevation Wax 24 height min. Wax Myrtle (Myrica indica) " . myrtle shall be placed from 3 feet above the littoral shelf elevation up to 6 feet above the shelf elevation. Shrubs shall be 36 height min. placed in alternating clusters of like kind (inkberry - 4'o.c., wax myrtle - 6' o.c.), spaced between trees in cut zones of the pond side slopes. Sedges f Rushes: Container Common Rush (Juncos effusus) Switchgrass (Panicum vergatum) Common rush & switchgrass shall be full containers, placed from the littoral shelf elevation to 1 foot below the shelf elevation. Common rush shall be placed in clusters 18" o.c. Switchgrass shall be placed in clusters 30" o.c. FA03-2581SVVKafg-pndretrolR1P Ponds 1 & 2 Planting Plan.doc p.4 AUG-2-2005 TUE 08:59 TEL:9197336893 NAME:DWQ-WETLANDS P. 4 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor December 20, 2004 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Ms. Lisa Perry Partnership for Economic and Tourism Development 371 NC 65, Suite 205 Wentworth, NC 27375-0205 William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director DWQ Project # 04-0472 Rockingham County Subject Property: Reidsville Industrial Park, Southern Tract, Phase I, Lot 2 REQUEST FOR MORE INFORMATION-Stormwater Management Plan On December 6, 2004, the Division of Water Quality (DWQ) received the revised stormwater management plan prepared by your engineer, Mr. J. Neal Tucker, P.E., of Stimmel Associates, PA, to comply with the conditions of the 401 Water Quality Certification issued on April 2, 2004. The following additional information is needed before the Plans can be approved: 1. Condition Number 4 of Water Quality Certification No. 3402 (corresponding to Nationwide Permit No. 39) requires that "...in watersheds within one mile and draining to 303(d) listed waters, as well as watersheds that are classified as nutrient sensitive waters (NSW), water supply waters (WS), trout waters (Tr), high quality waters (HQW), and outstanding resource waters (ORW), the Division shall require that extended detention wetlands, bio-retention areas and ponds followed by forested filter strips (designed according to latest version of the NC DENR Stormwater Best Management Practices Manual) be constructed as part of the stormwater management plan when a site-specific stormwater management plan is required." The Reidsville Industrial Park is located in a Nutrient Sensitive Watershed. • Please redesign the orifice of Pond Number 1; DWQ has calculated a drawdown of 8.6 days with the size specified in your plans. • Please provide forested filter strips. Please respond within three (3) weeks of the date of this letter by sending three (3) copies this information in writing. This letter only addresses the Stormwater Management Plan review and does not authorize any impacts to wetlands or streams until the plans are approved. Please call Ms. Cynthia Van Der Wiele, Ph.D. at 919-715-3473 if you have any questions regarding these issues. CBK/cvdw Sind Cyndi B. Karoly DWQ, Wetlands / 401 Unit cc: DWQ Mooresville Regional Office USACE Asheville Regulatory Field Office fgfft6py Central-Files J. Neal Tucker, Stimmel Assoc., PA, 601 N. Trade St., Suite 200, Winston-Salem, NC 27101 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 One 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 NofthCarohna Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/nowetlands Natzmally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper sapa Stimmel Associates, PA Landscape Architecture Civil Engineering Land Planning D ? ? 19 an V/T? ` D December 4, 2004 DEC 0 6 2004 DENR - WATER QUAUTV NCDENR - Division of Water Quality VYERANIXAND81 1BtWAN1N Wetlands Unit 2321 Crabtree Boulevard Raleigh, NC 27604 Attn: Ms. Cynthia Van der Wiele Re: Stormwater Quality Ponds for Reidsville Industrial Park - Southern Tract - Phase 1 (Lot 2) DWQ Project # 04-0472 Dear Ms. Van der Wiele: Attached you will find a submittal package for stormwater quality ponds for the above referenced project. The project will include 2 stormwater quality ponds to treat runoff from Lot 2 of this phase of the development as well as from the roadway serving this phase. As development continues in the future, additional stormwater facilities will be constructed to treat runoff from those sites. Included for your review and approval are the following: One Copy of a Pond Design Report containing: ? Dam Design Narrative ? Site Location Map ? Soils Survey Map ? Drainage Area Map ? FORM SWG100 09/97 for each pond ? Curve number calculations, water quality calculations and pre-, post-, and routed hydrographs for each ponds One Copy of Pond Construction Drawings One Copy of the Emergency Action Plan and Operation and Maintenance Plan The Operation and Maintenance Plan included is not signed by the Owner, however it is in his hands now for signatures and will be forwarded to within a few days. Please call me at (336) 723-1067 if you have any questions, or need additional information. Sincerely- J. Neal Tucker, P.E. Stimmel Associates, P.A. Enclosures Cc: File 601 N. Trade Street, Suite 200 Winston Salem, NC 27101 P: 336.723.1067 F: 336.723.1069 Project Name: Reidsville Industrial Park Project No. DWQ 030258 Pond 1 SUBMITTED DESIGN. REQUIRED DESIGN: elevations } 2 average depth status Bottom of Basin (ft) 762 Permanent Pool (ft) 765.75 3.75 ft. depth ok Temporary Pool (ft) 769.5 1.75 ft. depth ok areas Permanent Pool SA (sq ft) 32029 24741 sq. ft. ok Drainage Area (ac) 20.17' ' () -_' 6 based on avg depth ok Impervious Area (ac) 13.85 68.7 % - volumes Permanent Pool (cu ft) 101470 Temporary Pool (cu ft) 164452 48909 cu. ft. ok Forebay (cu ft) 23066 22.7 % check forebc other parameters SA/DA 2.88. 2.82 - Orifice Diameter (in) 0.22_cfs drawdown - Design Rainfall (in) 1 8.6 day drawdown check drawn Linear Interpolation of Correct SAIDA"* 3.75 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 60 2.4 2.178152290 1.08 Project Impervious 68.7 2.82 ?.; 1.38 Next Highest 70 2.88 2.636303662 1.43 3 ft 4 - J Project Name: Reidsville Industrial Park Project No. DWQ 030258 Pond 2 SUBMITTED DESIGN: REQUIRED DESIGN. elevations ,S average depth 750 753.75 Temporary Pool (ft) 756 areas Permanent Pool SA (sq ft) 19384 Drainage Area (ac) 13.89 Impervious Area (ac) 9.83 volumes Permanent Pool (cu ft) 54256 Temporary Pool (cu ft) 102381 Forebay (cu ft) 12825 other parameters SA/DA 2.8$ Orifice Diameter (in) 3 Design Rainfall (in) 1 Linear Interpolation of Correct SAIDA*** 010 Impervious Next Lowest 70 Project Impervious 70.8 Next Highest 80 3.75 ft. depth 2.25 ft. depth 16174 sq. ft. , 07,X based on avg depth 70.8 % 34636 cu. ft. 23.6% 2.67 0.25 cfs drawdown 4.7 day drawdown 3.75 ft. Permanent Pool Depth SAIDA fron (Avg. Depth) 2.64 2:953545192 2.67 qq, 3.07 3.39902443-- 3 ft status ok ok ok ok ok checkforebc ok 1.08 1.11 1.43 4 ?3 Protect Name: Reidsville Ind Park Project No. DWQ 04-0472 Pond No. SUBMITTED DESIGN: 0 6/17/2005 elevations Bottom of Basin (ft) Permanent Pool (ft) Temporary Pool (ft) -762 765.75 767.5 areas Permanent Pool SA (sq ft) Drainage Area (ac) Impervious Area (ac) volumes Permanent Pool (cu ft) Temporary Pool (cu ft) Forebay (cu ft) other parameters SA/DA Orifice Diameter (in) Design Rainfall (in) A.85 101470 164452 20000 2.88 4.25 T REQUIRED DESIGN: 3T average depth 3.75 ft. depth 1.75 ft. depth 24741 sq. ft. based on avg depth 68.7 % 48909 cu. ft. 19.7 % 2.82 0.44 cfs drawdown 4.3 day drawdown Linear Interpolation of Correct SA/DA * * * Next Lowest Project Impervious Next Highest Cpu1 3.75 ft. Permanent Pool Depth status ok ok ok ok ok ok ok Impervious SA/DA fron (Avg. Depth) 60 ` 2.4 2.178152299 1.08 68 7 2 1.38 . 70 2.88 _ 2.636303662 1.43 3ft 4 be- F m???c , S^ ?, 4 Project Name: Reidsville Ind Park Project No. DWQ 04-0472 Pond No. SUBMITTED DESIGN: 2 REQUIRED DESIGN: 6/17/2005 elevations w average depth status Bottom of Basin (ft) 750 Permanent Pool (ft) 753.75 3.75 ft. depth ok Temporary Pool (ft) 756 2.25 ft. depth ok areas Permanent Pool SA (sq ft) 19384 17649 sq. ft. o Drainage Area (ac) 13.89 based on avg depth check surf Impervious Area (ac) 9.83 70.8 % - volumes Permanent Pool (cu ft) 54256 Temporary Pool (cu ft) 1023,81 34636 cu. ft. ok Forebay (cu ft) 12825 23.6% (:c eckforebc other parameters SA/DA 2.88 2.92 - Orifice Diameter (in) 3 0.25 cfs drawdown - Design Rainfall (in) 1 4.7 day drawdown ok Linear Interpolation of Correct SAIDA*** 3.75 ft. Permanent Pool Depth Im ervious SA/DA fron (Avg. Depth) Next Lowest 60 2.4 2.66530747 1.08 MIS, 1.27 Project Impervious 70.8 2.92 Next Highest 80 3 36 3.74791168 1:43 .3 ft 4 ! (t 5a rN 0 I ? (17 /0-5-- A Project Name: Reidsville Ind Park Project No. DWQ 04-0472 Pond No. SUBMITTED DESIGN. 2 6/17/2005 elevations Bottom of Basin (ft) Permanent Pool (ft) Temporary Pool (ft) EA756 areas Permanent Pool SA (sq ft) Drainage Area (ac) Impervious Area (ac) volumes Permanent Pool (cu ft) Temporary Pool (cu ft) Forebay (cu ft) other parameters SA/DA Orifice Diameter (in) Design Rainfall (in) 1 19384 13.89' 9.83 55000 102381 11000 2.88 3 Linear Interpolation of Correct SAIDA"* REQUIRED DESIGN: average depth 3.75 ft. depth 2.25 ft. depth 17649 sq. ft. ?1 based on avg depth 70.8 % 34636 cu. ft. 20.0 % 2.92 0.25 cfs drawdown 4.7 day drawdown status ok ok ok ok ok ok ok 3.75 ft. Permanent Pool Depth Impervious SA/DA fron (Avg. Depth) Next Lowest 60 2.4 2.614643005 1.008 Project Impervious 70.8 1.27 Next Highest 80 3.3f L 3.67383409 1.43 aft 4 v ?t?z/mss `o?Or .... , c9QG co r C9 "C William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality April 2, 2004 Rockingham County DWQ Project #: 04-0472 Project Name: Reidsville Industrial Park - Southern Tract - Lot 2 APPROVAL OF IMPACT TO ISOLATED WETLANDS Partnership for Economic and Tourism Development 371 NC 65, Suite 205 Wentworth, NC 27375-0205 Attn: Ms. Lisa Perrry Dear Ms. Perry: You have our approval, in accordance with the attached conditions and those listed below, to impact 0.10 acres of isolated wetlands for construction of a portion of the Reidsville Industrial Park, Southen Tract - Lot 2 located at NC 87 near Reidsville, NC , as you described in your application dated March 19, 2004 (received March 26, 2004). After reviewing your application, we have decided that this fill is deemed permitted in accordance with 15A NCAC 2H .1305 (b) as long as you comply with the conditions of that rule (see conditions 1 to 4 below). In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non- Discharge and Water Supply Watershed regulations. This approval will expire five (5) years from the date of this approval/. This approval is only valid for the purpose and design that you described in your application except as modified below.. For this approval to be valid, you must follow the conditions listed in the attached certification and any special or site-specific conditions listed below. DEEMED PERMITTED CONDITIONS 1. Erosion and sediment and erosion controls shall equal or exceed those required by the N.C. Division of Land Resources or its local delegated program for the Sedimentation Pollution Control Act and shall be in full compliance with all specifications governing the proper design, installation, operation and maintenance of such Best Management Practices in order to help assure compliance with the appropriate turbidity and other water quality standards; 2. All erosion and sediment control practices placed in isolated wetlands or isolated classified surface waters must be removed and the natural grade restored within two months after the Division of Land Resources or local delegated program determines that the land disturbance project is completed and the file is closed out; 3. Live or fresh concrete shall not come into contact with surface water until the concrete has hardened, and; 4. Measures shall be taken to ensure that the hydrology of any remaining isolated wetland or isolated classified surface waters is not affected by the discharge. SPECIAL CONDITIONS: rte N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetlands 1. Deed notifications or similar mechanisms shall be placed on all remaining jurisdictional wetlands and waters on this Lot to notify the state in order to assure compliance for future wetland and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). 2. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion Form" to notify DWQ that all the work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality. 3. If you change your project, you must notify us in writing and you may be required to send us a new application. 4. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. 5. If total wetland fills for this project (now or exceed 150 linear feet, then compensatory NCAC 2H .0506 (h) (6) and (7). i the future) exceed one acre or stream impacts mitigation may be required as described in 15A 6. The stormwater plan that accompanies the application shall be implemented as designed. In addition, a signed Operation and Maintenance agreement should be provided to DWQ within one month of the date of this approval. 7. The applicant must maintain full compliance with DWQ's NPDES Stormwater Permit conditions upon approval of the Erosion and Sedimentation Control Plan. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 1506 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John. Dorney at 919-733-1786 or Daryl Lamb at our Winston-Salem Regional Office at 336-771-4600. 12, irector Attachments: Certificate of Completion cc: US Army Corps of Engineers Raleigh Field Office Daryl Lamb, Winston-Salem DWQ Regional Office Denise Poulos; ECS, Ltd., 6909 International Drive, Suite 103, Greensboro, NC 27409 File copy Central Files f Stimmel Associates, PA Landscape Arch@ectura Chill Engineering Land Planning April 29, 2005 North Carolina Department of Environment and Natural Resources Division of Water Quality 401 Wetlands Certification Unit 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604 Attn: Ms. Cyndi Karoly Re: Reidsville Industrial Park, Southern Tract, Phase 1, Lot 2 Project #04-0472 Dear Ms. Karoly: AMY 1 0 zoos DENR DSANDSgrQ L/7-Y Bwo. I am wring in response to your letter dated December 20, 2004, to address the review comments of the subject project. You and I spoke on the telephone about the difficulty we would have in meeting the NWP 39 condition to provide a forested filter strip at the pond discharge point. As recommended by you, I contacted Mr. Darryl Lamb to meet me onsite to evaluate whether standard forested filter strip at the discharge points of the ponds are feasible at this site. Mr. Lamb, Bill Penn of the City of Reidsville and I met onsite on Tuesday, April 12 to walk the site. Prior to the site visit, I put together an exhibit representing the area between the outlet points of the ponds and Little Troublesome Creek, the 303d. listed stream. The exhibit shows that the Pond #1 outlet point is 5,436 feet from Little Troublesome Creek and the Pond #2 outlet is 4,729 feet from Little Troublesome Creek, therefore Pond #1 exceeds the distance within which the forested strip is required. During the site visit Mr. Lamb &I discussed the following: • The stormwater ponds are upland facilities, and their outlets are at least 250'- 300' from the receiving stream. The area between the pond outlets and the receiving stream is well established with vegetation. This area will remain as a vegetated buffer. • The pond outlets will be re-designed as plunge pool outlets, 2 - 3 feet deep, with level spreaders to release flow in a non-erosive manner for a 10 - year design storm. • No future development will occur around the ponds. There are currently no impervious areas draining directly into the ponds via overland means, and this will not change in the future. All runoff will enter the ponds through existing storm drain pipes and channels. • Existing rill and rut erosion on the side slopes of the ponds will be repaired and stabilized. Mr. Lamb indicated that with the provision of the outlet plunge pool and level spreader mentioned above directing the pond discharge through the existing vegetated buffer, forested filter strips would not be required. I hereby request your concurrence with Mr. Lamb's assessment of the site and approval of his recommendations. Your letter stated that your calculations indicate the 3" drawdown orifice releases the temporary water quality pool over an 8.6 day period. I checked the orifice size calculations and disagree with your 601 N. Trade Street, Suite 200 Winston Salem, NC 27101 P: 336.723.1067 F: 336.723.1069 10 assessment. I have included hand calculations that show the specified 3" orifice size releases the temporary water quality pool in 4.86 days, therefore the orifice size was not changed. The attached drawings have been revised to reflect the addition of the plunge pool. The level spreader outlet device is in the form of a 25 foot long weir across the end of the plunge pool. The flow velocity over the weir is 2.36 fps (see calculations). Also attached is the exhibit showing the distances from the pond discharge points to Little Troublesome Creek. Upon completion of construction of the stormwater ponds, I will contact Mr. Lamb to make a site visit as he requested. Thank you for your attention to this project. %Wgip hall me at (' '?3-1067 if you have any questions. Sincerely: e?°??••••..•A B .• sS0 S EP • 1? Neal Tucker, P.E. a ° O Stimmel Associates, P.A. Attachments Cc. File Darryl Lamb 010 11% A - Reidsville Industrial Park - S. Tract Plunge Pool Stilling Basin Design Plunoe Pool Calculations: Pipe Diameter (D) 15 In 1.25 Ft Rip Rap d50 (RRd) 6 In 0.67 Ft Rip Rap Liner Thickness (a) 18 In 1.5 Ft Q10 15.5 cfs Crown to Max Stage (p) 15 In 1.25 Ft Maximum Water Depth (m) 3.00 Ft Pipe Discharge Velocity (v) 12.6 fps Depth (h) = 1.09 Ft Dist End of Pipe to max Depth (x) _ Stilling Basin Volume (V.) _ Weir Flow Calculations: Minimum Weir Length: Weir Coeff. CW: Driving Head: Discharge Velocity Over Weir: 7.10 Ft 147.79 cf 25 2.50 Through Rip Rap 0.39 ft. 2.36 fps . Stimmel Associates, PA sapa Landscape Architecture Civil Engineering Land Planning 601 N. Trade Street date: ?Zq 625 job #: Suite 200 Winston Salem, NC project: lb SV?u,?. I f-?n vSrw ?ri 27101-2916 Ts-z A C7- P: 336.723.1067 by: ouD F: 336.723.1069 memo pad I I I I 1 I -- I --? 1 I I I 1 .a NC 87 FREEWAY DRIVE ?E 4 ? 1 7 .... - M- r.N / ? I 1 ee? - _--?- - 4 rt?i / r f eeea ?- UNNAMED TRIBUTARY . LITTLE TROUBLESOME ' CREEK POND 1= 5436 LF POND 2= 4729 LF LOT 2E STORMWATER PONDS 3128105 CONCEPT 1" = 300' PREPARED BY: 6At Stimmel N. Trade Street 01 N. TO VHnslon Sekm, NC Landscape Architecture 27101-2916 Civil Engineering P'3767271067 North Stlmmel Associates, PA Land Planning F:7%.727.1069 HCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor December 20, 2004 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Ms. Lisa Perry Partnership for Economic and Tourism Development 371 NC 65, Suite 205 Wentworth, NC 27375-0205 William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director DWQ Project # 04-0472 Rockingham County CG?? :{z 7kf ?' Subject Property: Reidsville Industrial Park, Southern Tract, Phase I, Lot 2 REQUEST FOR MORE INFORMATION-Stormwater Management Plan On December 6, 2004, the Division of Water Quality (DWQ) received the revised stormwater management plan prepared by your engineer, Mr. J. Neal Tucker, P.E., of Stimmel Associates, PA, to comply with the conditions of the 401 Water Quality Certification issued on April 2, 2004. The following additional information is needed before the Plans can be approved: 1. Condition Number 4 of Water Quality Certification No. 3402 (corresponding to Nationwide Permit No. 39) requires that "...in watersheds within one mile and draining to 303(d) listed waters, as well as watersheds that are classified as nutrient sensitive waters (NSW), water supply waters (WS), trout waters (Tr), high quality waters (HQW), and outstanding resource waters (ORW), the Division shall require that extended detention wetlands, bio-retention areas and ponds followed by forested filter strips (designed according to latest version of the NC DENR Stormwater Best Management Practices Manual) be constructed as part of the stormwater management plan when a site-specific stormwater management plan is required." The Reidsville Industrial Park is located in a Nutrient Sensitive Watershed. Please redesign the orifice of Pond Number 1; DWQ has calculated a drawdown of 8.6 days with the size specified in your plans. Please provide forested filter strips. Please respond within three (3) weeks of the date of this letter by sending three (3) copies this information in writing. This letter only addresses the Stormwater Management Plan review and does not authorize any impacts to wetlands or streams until the plans are approved. Please call Ms. Cynthia Van Der Wiele, Ph.D. at 919-715-3473 if you have any questions regarding these issues. Sincerely, CBK/cvdw cc: DWQ Mooresville Regional Office USACE Asheville Regulatory, Field Office File Copy Central Files J. Neal Tucker, Stimmel Assoc., PA, 601 N Cyndi B. Karoly DWQ, Wetlands / 401 Unit Trade St., Suite 200, Winston-Salem, NC 27101 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: htto://h2o.enr.state.nc.us/ncvvetlands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper NorthCarolina Aahmaliff Reidsville Industrial Park Subject: Reidsville Industrial Park From: Cynthia Van Der Wiele <cynthia.vanderwiele@ncmail.net> Date: Mon, 16 May 2005 11:01:41 -0400 To: Sam Aghimien <Sam.Aghimien@ncmail.net> Sam, Neil Tucker called to check the status of the project. Apparently he sent more information. Phone: 336-723-1067 Last correspondence that I wrote was December 2004. It is not in my pile; I only have Express Review projects here. Cynthia 040472ReidsvillelndustrialPk(Rockingham)Storm MoreInfo.doc', Content-Type: application/msword I Content-Encoding: base64 1 of 1 5/16/2005 2:51 PM 14, uED ENGINEERING CONSULTING SERVICES Geotechnical - Construction Materials - Environmental Mr. John Dorney North Carolina Department of Environment and Natural Resourcs Division of Water Quality Wetland/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Subject: Construction Notification Application Reidsville Industrial Park Southern Tract - Lot 2 Reidsville, Rockingham County, North Carolina ECS Project G-9201 Dear Mr. Dorney: March 18, 2004 WETLANDS /401F.;fP MAR 2 6 2004 WATERQ;" i'0saviON Please find seven copies of the Pre-Construction Notification Application for the above referenced site. The site is approximately 68.88 acres in area and is located on the south side of NC Highway 87 in Reidsville (Figure 1). The site consists of Lot 2 of the Reidsville Industrial Park Southern Tract. A portion of Lot 2 is being developed with AFG Wipes, Inc. As shown on the Lot 2 Overall Wetland Impact Exhibit prepared by Stimmel Associates, PA, 4,365.21 square feet (0.10 acres) of isolated, non jurisdictional wetlands are present on the site. In order to develop the site, Technology Drive South will be constructed. Technology Drive South will provide access to the site and to Lots 2A, 2B and 2C (located to the west of the site) when they are developed. In addition, a stormwater detention pond will be constructed that will treat runoff from impervious surfaces. Information concernin the construction of the and is included with this application. Technology Drive South a access road to the sto water p6nd will impact 4,365.21 square s of iOTated, non jurisdictional wetlands. Other non-isolated wetlands and stream channels located on the site will not be impacted by this proposed development. ------ - We are requesting a 401 Water Quality Certification to authorize the impact to 4,365.21 square feet (0.10 acres) of isolated, non jurisdictional wetlands. Due to the minimal impact, mitigation should not be required and none is proposed. Please feel free to contact me at (336) 856-7150 if you have any questions concerning this request or if additional information is required. Thank you in advance for your timely consideration of this matter. Sincerely, XNGLUERING CONSULTING SERVICES, LTD. C enise oulos, LSS Principal Scientist Attachment: Pre-Construction Notification Application 6909 International Drive, Suite 103 - Greensboro, NC 27409 - (336) 856-7150 - Fax (336) 856-7160 Offices: Aberdeen, MD - Atlanta, GA - Austin, TX - Baltimore, MD - Chantilly, VA - Charlotte, NC - Chicago, IL - Cornelia, GA - Dallas, TX Danville, VA - Frederick, MD - Fredericksburg, VA - Greensboro, NC - Greenville, SC - Norfolk, VA - Orlando, FL - Raleigh, NC Richmond, VA - Roanoke, VA - San Antonio, TX - Williamsburg, VA - Wilmington, NC - Winchester, VA f Dec, 17 04 01:58p SRPR2 sa a 601 N.Trade Street Suite 200 p W nston Salem, NC 27101-2916 Landscape Architecture Civil Engineering P: 336.723.1067 Stimmel Associates, PA Land Planning F: 336.723.1069 3367615069 v- V-T I A" p.3 date: 121812004 job #: 03-258 project: Reidsville Industrial Park Southern Tract - Phase 1 letter of transmittal attn: Ms. Cynthia Van der Wiele to: NCDENR-Division of Water Quality 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604 sent via: f: Attached r Under Separate Cover U.S. Mail r By Hand r Over Night Service F For Pick-Up r Fax# # of pages total = We are sending you the following items: r Prints r Calculations r Base Drawings I- Reproducibles Information r Correspondence r originals F- Specifications r Change Order/ Addendum r Diskette/CD r Email with Attachments r copies sheet dated description 3 Signed Operation and Maintenance Manual F T remarks, comments, & details: If noted enclosures are not received, please notify us. Copies to: File by: J. Neal Tucker, P.E. DEC-17-2004 FRI 13:34 TEL:9197336893 NAME:DWQ-WETLANDS P. 3 Deb: 17 04 01:57p SAPA2 3367615069 p.2 x Page 7 of 6 Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 Emergency Action Plan / Operation and Maintenance Schedule November 29. 2004 RECORD KEEPING The owner should maintain records of inspection and maintenance at all times. Any remedial activities that are taken should also be recorded and kept on file. These records can help ensure that no problems are arising within the dam or to pinpoint the causes of any problems and the time frames during which they occur. The following pages contain suggested forms for record keeping as published in the Dam Operation Maintenance and Inspection Manual prepared by the North Carolina Department of Natural Resources and Community Development, Division of L7// Resources, Land Quality Section in 1985. ? r Owner's Representative: Date: 6-0 a Notary Public of the County of State of North Carolina, hereby certify that Appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness m and and notarial seal this day of 200 Notary O My Commission expires ````??F?GOt i70 pd3`° ° •°,?yN S.•GUf?, ° t%C A-Rv, • o M r, 0\1 OdJ?1Si181?40 DEC-17-2004 FRI 13:34 TEL:9197336893 NAME:DWQ-WETLANDS P. 2 Dec 17 04 01:57p SAPR2 3367615069 p.1 ?. t 601 N. Trade Street date: r f4 , G'4' job #: sapa Suite 200 Winston Salem, rvc project: f4-M0,S0u.,9 27101-2916 Landscape Architecture Civil Engineering P: 336.7211067 Stimmel Associates, PA Land Planning F: 336.723.1069 letter of transmittal attn: Vt?o dnr= Vfw-w-: sent via: Attached to: C. Under Separate Cover r U.S. Mail I- By Hand Oyer Night Service r7 For Pick-Up ax ## 1? 7?3 _ G8`?3 # of pages total We are sending you the following items: r- Prints F Calculations Base Drawings ` Diskette/CD r7 Reproducibles 17 Information i- Correspondence F Email with Attachments Originals Ir Specifications ' Change Order/ Addendum r-1 copies sheet dated description DEC-17-2004 FRI 13:33 TEL:9197336893 NAME:DWQ-WETLANDS P. 1 Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit X Isolated Wetland Permit from DWQ ? 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Isolated Wetland Permit 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Partnership for Economic and Tourism Development Mailing Address: 371 NC 65, Suite 205 Wentworth, North Carolina 27375-0205 Attn: Ms. Lisa Perry Telephone Number: 336-342-8138 Fax Number: 336-342-8375 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Denise M. Poulos WE U Company Affiliation: ECS, Ltd. Mailing Address: 6909 International Drive Suite 103 Greensboro, North Carolina 27409 MAR a U 6a i hip! QM,L i Y e;iEC T1014 Telephone Number: 336-856-7150 Fax Number: 336-856-7160 E-mail Address: dpoulos(a)ecslimited.com Page 1 of 8 M. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Reidsville Industrial Park-Southern Tract-Lot #2 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Rockingham Nearest Town: Reidsville Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): From Greensboro: Highway 29 North to Reidsville. West on Highway 87. The site is on the south side of Highway 87. 5. Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): Approximately 68.88 Acres 7. Nearest body of water (stream/river/sound/ocean/lake): Little Troublesome Creek 8. River Basin: Haw/Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mais/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: A portion of the site is being prepared for development with AFG Wipes, Inc. The surrounding properties are being developed with industrial facilities. Page 2 of 8 10. Describe the overall project in detail, including the type of equipment to be used: The site consists of Lot 2. A portion of the lot is being developed with AFG Wipes, Inc. and a detention pond. Trucks, loaders, pans, dozers, etc. will be used to construct the project. 11. Explain the purpose of the proposed work: A portion of the site is being developed with AFG Wipes, Inc. and a stormwater detention pond. Technology Drive South will be constructed to provide access to Lot 2 and to a stormwater management pond that will be constructed on the site. The construction of Technology Drive South and the pond access road will impact approximately 0.10 acres of isolated, non-jurisdictional wetlands. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. The site is located on the south side of NC Highway 87 in Reidsville. There have been no permits requested or obtained for this project. Permits have been issued in the past to authorize impacts to streams and wetlands on the north side of NC Highway 87. Since these properties have historically been under separate ownership and are currently independent of each other, it is our opinion that they are separate projects. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. There are no future permit requests anticipated for this project at this time. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 3 of 8 1. Provide a written description of the proposed impacts: 4,365.21 ft2 (0.10 acres) of isolated, non-Jurisdictional wetlands will be impacted by the construction of Technology Drive South and the access road to a stormwater management plan to be constructed on the site. 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** #1 Fill 0.10 No 3001f Isolated/Forested * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://Nvww.fem&aov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 18,447 ft2 Total area of wetland impact proposed: 4,365.21 ft2 (0.10 acres) of isolated wetland 3. Individually list all intermittent and perennial stream impacts below: There are no impacts to streams associated with this project. Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Im act Perennial or Intermittent? especify) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.uses.2ov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com www.mapquest.com etc.). Page 4 of 8 Cumulative impacts (linear distance in feet) to all streams on site: NA 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: There are no open water impacts associated with this project. Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): X uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Details of the pond construction are given in the Dam Design Report prepared by Stimmel Associates, PA. Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Stormwater requirement. Size of watershed draining to pond: 68.88 acre Expected pond surface area: 36,728 ft2 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The facility, road and pond access were Dlaced based on topographic constraints and space requirements. The chosen layout avoids impacts to non-isolated, jurisdictional wetlands and stream channels. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Page 5 of 8 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Due to the minimal impact (0.10 acres of isolated, non-jurisdictional wetlands), mitigation should not be required and none is proposed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 6 of 8 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes X No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No X If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No X If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total " Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 7 of 8 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. When developed, the site will contain approximately 69.99% impervious surfaces. A storm- water detention pond will be constructed to treat runoff from impervious surfaces. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewage disposal will be through the municipal sanitary sewer system. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No X Is this an after-the-fact permit application? Yes ? No X XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 3/ fr/0 Applicant/Agent's Signature / Date ( (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 EMERGENCY ACTION PLAN OPERATION AND MAINTENANCE SCHEDULE REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT - Lot 2E Ponds #1 & #2 Reidsville, NC Rockingham County Owner: City of Reidsville -? 230 West Morehead Street Reidsville, NC 27320 SEAL 14 85 % ????lotl l lilt°°'<<??? Prepared By: 601 N. Trade Street Suite 00 inston Salem, NC sapa W 27101-2916 Landscape Architecture Civil Engineering P: 336.723.1067 Stimmel Associates, PA Land Planning F: 336.723.1069 Project # 03-258 November 29, 2004 0 TABLE OF CONTENTS Emergency Action Plan General Dam Emergency Indicators Notification Flowchart Downstream Hazard Operation and Maintenance Schedule General Operation Maintenance Record Keeping ATTACHMENTS Embankment, Dike and Levee Inspection Checklist Spillways, Drains and Outlets Inspection Checklist Miscellaneous Areas Inspection Checklist Page 1 1 2 3 Page 4 4 5 7 0 Page 1 of 6 Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 Emergency Action Plan / Operation and Maintenance Schedule November 29, 2004 EMERGENCY ACTION PLAN GENERAL The purpose of this Emergency Action Plan (EAP) is to provide guidelines for the protection of life and property downstream Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 in the event of a potential failure of the dams. The ponds are located on an unnamed tributary of Little Troublesome Creek in Rockingham County, North Carolina. In the event that one of the following "Dam Emergency Indicators" is observed (or for any reason it is felt the dams are in danger of failure), the owner or authorized representative shall contact the entities listed in the "Notification Flowchart" on page two of this EAP. DAM EMERGENCY INDICATORS The following conditions indicate an existing or potential emergency situation. If any of the following emergency indicators are observed, you should initiate contact with the following agencies and/;or people listed in the Notification Flowchart on page two of this . EAP. Emergency Indicators include but are not limited to the following: • Muddy water flowing from the downstream slope, toe or abutment areas. • Cracks or depressions forming on the dam slopes or crest. • Movement or sliding of soil on the surface of the dam or extensive erosion on either slope of the dam embankment. • Water flowing over the top of the dam, or rapidly approaching overflow of the dam crest. • Significant increases in seepage from any location on or adjacent to the dam in a short period of time. • Concentrated seepage or flow emerging from or near the dam embankment. • Boils in the area downstream of the dam or on the downstream face of the dam. • Depressions or sinkholes on the face of the dam or the dam crest. If in doubt regarding the seriousness of the problem or if the situation threatens the integrity of the dam, notify Mr. Matthew E. Gantt,' P.E., Land Quality Section (LQS) Regional Engineer at telephone number (336) 771-4600 or Mr. Max Fowler, P.E., State Dam Safety Engineer at telephone number (919) 733-4574. 0 Page 2 of 6 Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 Emergency Action Plan / Operation and Maintenance Schedule November 29, 2004 NOTIFICATION FLOWCHART If one of the previous Emergency Indicators has been observed, the owner or authorized representative shall contact the following: 1. Mr. Matthew E. Gantt, P.E. Winston-Salem Regional Engineer Land Quality Section NC Department of Environment and Natural Resources (336) 771-4600 2. Mr. J. Neal Tucker, P.E. Stimmel Associates, P.A. 601 North Trade Street, Suite 200 Winston-Salem, North Carolina 27101 (336) 723-1067 Telephone (336) 723-1069 Facsimile The State Warning Point and Local Emergency Management will be contacted at the discretion of Land Quality personnel and/or Stimmel Associates, P.A. If dam failure is occurring or is in imminent danger of failure, the owner or authorized representative shall contact the following: 1. Rockingham County Emergency Management (336) 634-3000 2. State Warning Point 1-800-858-0368 3. Mr. Matthew E. Gantt, P.E. Winston-Salem Regional Engineer Land Quality Section (336) 771-4600 Upon receiving notification of an emergency situation, the State Warning Point shall contact: 1. Mr. Max Fowler, P.E. State Dam Safety Program The above-listed personnel may be contacted during normal business hours at telephone number (919) 733-4574. 2. Rockingham County Emergency Management (336) 634-3000 ? If after normal business hours, the State Warning Point will contact the • appropriate Land Quality Section personnel. 0 • Page 3 of 6 Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 Emergency Action Plan / Operation and Maintenance Schedule November 29, 2004 Upon receiving notification of an emergency situation or potential emergency situation, the Land Quality Section's Winston-Salem Regional Office will contact the Central Office in Raleigh. If deemed necessary, the State Warning Point and Rockingham County Emergency Management will also be contacted. This notification process is intentionally redundant to ensure that all parties are notified in the event of an emergency situation regarding the dam at any time. DOWNSTREAM HAZARDS Currently there are no downstream hazards. If any structures were to be constructed downstream of and below the top elevations of the dam, these structures would require evacuation in the event of a dam emergency situation that threatens the integrity of the dam. However, no structures are presently located in these areas. This Emergency Action Plan may require updating if development occurs downstream of these dams. C: Page 4 of 6 Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 Emergency Action Plan / Operation and Maintenance Schedule • November 29, 2004 OPERATION AND MAINTENANCE SCHEDULE Owner: City of Reidsville Contact Person: Mr. Michael Pearce, Director of Community Development Mailing Address: 230 W. Morehead Street, Reidsville, NC 27320 Phone: (336) 349-1066 Responsible Party for all Maintenance Items: City of Reidsville GENERAL The Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 dams are earthfill structures. The dams fall within the small size classification based on height and impoundment capacity. On both ponds, the principal spillways are circular, aluminized steel riser structures with aluminized steel outlet barrels. The risers are fitted with trash racks and anti-vortex devices. The risers also have reservoir drain valves to facilitate draining the ponds if necessary. Below is summary data relating to each pond: Pond #1 Dam Height 10.74 Feet Impoundment Capacity 7.6 Acre-Feet Hazard Classification LOW Size Classification SMALL Spillway Riser 24" C.A.S.P. Spillway Barrel 15" C.A.S.P. Emergency Spillway 10 Feet C.A.S.P. = Corrugated Aluminized Steel Pipe OPERATION Pond #2 10.20 Feet 4.09 Acre-Feet LOW SMALL 24" C.A.S.P. 15" C.A.S.P. 10 Feet 1. Reservoir Level The reservoir level should remain at or near the water quality drawdown orifice on the spillway riser. Lowering the reservoir level can be accomplished by opening the reservoir drain valve located on the upstream side of the spillway riser. Lowering of the reservoir level should be limited to approximately one foot vertically per day. 2. Riser Trash Guard The trash guard is a circular, skirt style with a grate on top and should be relatively self-cleaning. It will be necessary to check the trash guard monthly and after each rainfall event that produces significant runoff, and clean it as needed to remove accumulated debris. E Page 5 of 6 Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 Emergency Action Plan / Operation and Maintenance Schedule • November 29, 2004 3. Vandalism The ponds are a part of the Reidsville Industrial Park. They are not located in high traffic areas, and could therefore be subject to vandalism of some of the appurtenant works. Any vandalism that should occur shall be repaired as soon as possible. An engineer experienced in dam engineering and construction should be contacted regarding any repairs. The North Carolina Department of Environment and Natural Resources - Land Quality Section - Dam Safety Program (919) 733-4574 shall be contacted regarding any significant repairs. 4. Winterizing Bare areas on the dams should be seeded with rye grain to assure established vegetation through the winter. Any erosion rills or gullies that form should be repaired and these areas seeded with rye grain. Permanent seeding should be conducted in these areas as soon as possible in the appropriate season. 5. Mechanical Equipment The reservoir drain valves shall be operated at least twice annually through the full operating range to confirm satisfactory operation. 6. Riprap at Barrel Outlet The riprap at the spillway barrel outlets shall be inspected • monthly and after each rainfall event that produces significant runoff. Any riprap that is missing or displaced shall be repaired or replaced as soon as possible. MAINTENANCE ROUTINE MAINTENANCE - Routine maintenance shall include minor upkeep such as mowing, debris removal, minor slope repair, periodic inspections, inspection of the valves and gates, tree and brush removal, and annual inspections. These maintenance items may be performed by the owner without the review of a Professional Engineer. NON-ROUTINE MAINTENANCE - Non-routine maintenance shall include such items as sediment clean-out, channel stabilization, problems regarding the principal spillway conduits, emergency spillways, dam failure, and seepage. These items require a Registered Professional Engineer to prepare a plan and/or details and to certify completion of the maintenance. All revisions and repairs to permanent runoff control structures other than the dam and its appurtenances shall be done in accordance with CITY OF REIDSVILLE guidelines and specifications, NCDENR BMP's Manual and good engineering judgement. The dams of ponds #1 and #2 are not under the jurisdiction of the NCDENR Dam Safety Section, however modifications and/or repairs to the dams and/or their appurtenances that become necessary shall be done in strict accordance with the North Carolina Dam Safety Law of 1967 only after the proposed work has been approved through the State Dam Safety Office. Page 6 of 6 Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 Emergency Action Plan / Operation and Maintenance Schedule • November 29, 2004 1. Monthly, or after every rainfall: A. Mowing of side slopes will be accomplished according to the season. Maximum grass height will be 9". (Routine) B. Remove debris from the trash rack. (Routine) C. Check and clear the drawdown orifice of any obstructions. (Routine) D. Check the pond side slopes; remove trash; repair eroded areas before the next rainfall. (Routine) 2. Every 6 months, or after major storm event (more than 2 inches of rainfall): A. Inspect the collection system (i.e., catch basins, piping, grassed swales) for proper functioning. Clear accumulated trash from basin grates and basin bottoms, and check piping for obstructions. (Routine) B. Pond inlet pipes will be checked for scour, rip-rap will be replaced, and broken pipes will be repaired. (Non-routine) C. Check the operation of the drain valve. All valves should be operated from the fully closed to the fully open position. (Routine) D. Remove trees and brush from embankment surfaces and vegetated spillways. (Routine) 3. Yearly: A. Remove accumulated sediment from the bottom of the outlet structure. Check • rip-rap and replace if necessary. (Non-routine) B. Check pond depth at various points in the pond. If the average depth of the sediment is below the normal pool elevation shown below then the sediment will be removed to at least the original design depth. (Non-routine). Sediment Depth Below Top of Sediment Pond Normal Pool Elevation #1 3.0 Feet 762.75 #2 3.0 Feet 750.75 C. Check riser and barrel for improper alignment, elongation and displacement of joints, cracks, leaks, loss of protective coating, corrosion and blockage; repair as required. Any repairs to the riser or barrel may require a permit from the Dam Safety Section. (Non-routine) D. Check the emergency spillway and repair as necessary. (Non-routine) Note that the spillway barrel and riser are confined spaces and a confined space entry permit is required for entry. No person should enter the spillway riser and l or barrel without proper safety precautions and equipment in place. Miscellaneous Items Excessive plant growth, algae blooms, odors, discoloration, perceived animal pests, etc. should be addressed on an as needed basis. Solutions to these types of • problems should be non-chemical and deemed safe for drinking water supply reservoir application. • Page 7 of 6 Reidsville Industrial Park Southern Tract - Lot 2E - Ponds #1 & #2 Emergency Action Plan / Operation and Maintenance Schedule November 29, 2004 RECORD KEEPING The owner should maintain records of inspection and maintenance at all times. Any remedial activities that are taken should also be recorded and kept on file. These records can help ensure that no problems are arising within the dam or to pinpoint the causes of any problems and the time frames during which they occur. The following pages contain suggested forms for record keeping as published in the Dam Operation Maintenance and Inspection Manual prepared by the North Carolina Department of Natural Resources and Community Development, Division of Land Resources, Land Quality Section in 1985. T j Owner's Representative: Date: 12 6, b? a Notary Public of the County of of North Carolina, hereby certify that • Appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. J'a Witness m hand and notarial seal this day of , 200 Notary My Commission expires. 692,2 /O}, ``°°1eee10teiippaOf? N S.•BIJJ4 11 a dd HAM C0v 1J"j: 7ieeW°°° 0 • • 9 DAM INSPECTION CHECKLIST Date Time NAME OF DAM COUNTY CLASS WEATHER & SITE CONDITIONS INSPECTORS OTHERS Y C III V EMBANKMENT* DIKE • LEVEE ACTION W r W a CL U Z CHECK/CIRCLE 0 a C7 ~ W - = N OBSERVATIONS CONDITION NOTED z 0 w ' UQ ¢ z vegetation/riprap a beaching/slides/cracks N 0 undermining/erosion MN ruts/erosion ~ N cracks/settlement W ? poor alignment U vegetation/erosion rodent burrows a slou hs/slides/ r k g c ac s Cn 0 seepage/wetness ? N co vegetation/riprap z erosion O seepage/wetness . O N vegetation/erosion = Z sloughs/slides/cracks FE W seepage/ wetness Q cracks/slumps embankment drains W O seepage/wetness H GENERAL COMMENTS, SKETCHES & FIELD MEASUREMENTS GENERAL INSTRUCTIONS 1. HEADING Class refers to hazard classification as defined in North Carolina Administrative Code Title 15 Subchapter2K Rule .0105 (low hazard, intermediate hazard, or high hazard). Inspectors and Others should include names and affiliations. Weather and Site Conditions should include weather conditions and the condition of the ground surface (wet, snow-covered, muddy, dry, etc.) at the time of the inspection. 2. CHECKLIST Check the appropriate box along the left-hand side as that AREA is inspected. Check the appropriate box if that CONDITION/ITEM is noted and/or inspected. The specific item should be circled. Further description should be provided under OBSERVATIONS. Check the appropriate box for the required ACTION. Obvious problems will require repair. Monitoring will be recommended if there is potential fora problem to occur in the future. Investigation is necessary if the reason the problem is occurring is not obvious. More than one box can be checked. 3. OBSERVATIONS A brief description of any noted irregularities, needed maintenance or problems for each CONDITION/ITEM checked orcircled should be made. Use blank row for any ITEMS not listed. Abbreviations and short descriptions are recommended. Examples: VEGETATION - Dense brush and trees. SEEPAGE/WETNESS -10 foot diameter area, at toe near left abut., cattails, no flowing water. EROSION -3 feet deep gullies at both d/s groins. If more room is needed for a description, the bottom of the page may be used. 4. GENERAL COMMENTS, SKETCHES, AND FIELD MEASUREMENTS Explanatory sketches, measurements of cracks, slides and settlement, and additional explanation of observations should be placed in this section. Definitions U/S - Upstream D/S - Downstream Gallery - Inspection/Access hall inside of concrete dam Groin - Intersection of embankment face with the valley abutment C7 • • DAM INSPECTION CHECKLIST Date Time NAME OF DAM INSPECTORS p ACTION Wv SPILLWAYS • DRAINS • OUTLETS W Q Ya ° V Z CHECK/CIRCLE OBSERVATIONS Q z w = N CONDITION NOTED 0 'z 10- Pri nci al Spillway Type: trash rack/debris W gates/flashboards W J (n cracks/deterioration LE Z cc improper alignment 3 cracks/deterioration JO Q joint deterioration LL 3 W type J cracks/deterioration seepage/piping Z o undercutting .J ? erosion J Q debris 0 co Emer gency Spillway Type: vegetation/cover Q erosion J W? obstructions Q Q Lake Drains/Other Outlets Type: gates/valves joints/flow surface N W inlet tower Z J outlet area operability p0 Z flow amounts OW flow clear/muddy H p GENERAL COMMENTS, SKETCHES & FIELD MEASUREMENTS GENERAL INSTRUCTIONS 1. HEADING Class refers to hazard classification as defined in North Carolina Administrative Code Title 15 Subchapter 2K Rule S .0105 (low hazard, intermediate hazard, or high hazard). Inspectors and Others should include names and affiliations. Weather and Site Conditions should include weather conditions and the condition of the ground surface (wet, snow-covered, muddy, dry, etc.) at the time of the inspection. 2. CHECKLIST Check the appropriate box along the left-hand side as that AREA is inspected. Check the appropriate box if that CONDITION/ITEM is noted and/or inspected. The specific item should be circled. Further description should be provided under OBSERVATIONS. Check the appropriate box for the required ACTION. Obvious problems will require repair. Monitoring will be recommended if there is potential for a problem to occur in the future. Investigation is necessary if the reason the problem is occurring is not obvious. More than one box can be checked. 3. OBSERVATIONS A brief description of any noted irregularities, needed maintenance or problems for each CONDITION/ITEM checked or circled should be made. Use blank row for any ITEMS not listed. Abbreviations and short descriptions are recommended. Examples: VEGETATION - Dense brush and trees. SEEPAGE/WETNESS -10 foot diameter area, at toe near left abut., cattails, no flowing water. EROSION - 3 feet deep gullies at both d/s groins. If more room is needed for a description, the bottom of the page may be used. 4. GENERAL COMMENTS, SKETCHES, AND FIELD MEASUREMENTS Explanatory sketches, measurements of cracks, slides and settlement, and additional explanation of observations should be placed in this section. Definitions U/S - Upstream D/S - Downstream Gallery - Inspection/Access hall inside of concrete dam Groin - Intersection of embankment face with the valley abutment • U L' 0 DAM INSPECTION CHECKLIST Date Time NAME OF DAM INSPECTORS C ACTIO N W 1141 MISCELLANEOUS AREAS C W Q Q Wa CC 0 V NZ CHECK/CIRCLE BSERVATIONS a a z co =N CONDITION NOTED ¢ 2 z O- -j a piezometers ' Z weirs Z 00 monuments ? F N rainfall LU pool level Q stream C7 erosion/ground cover W a z development Z i i Q W r cross ngs reservo J = sedimentation OO = water quality G. N slopes W p land use Q W other impoundments stream channel Q W channel crossings Q flood plain co development O notification list evacuation plan W Z materials/equipment 2 J access road to dam W CL GENERAL COMMENTS, SKETCHES & FIELD MEASUREMENTS GENERAL INSTRUCTIONS 1. HEADING Class refers to hazard classification as defined in North Carolina Administrative Code Title 15 Subchapter2K Rule, .0105 (low hazard, intermediate hazard, or high hazard). Inspectors and Others should include names and affiliations. Weather and Site Conditions should include weather conditions and the condition of the ground surface (wet, snow-covered, muddy, dry, etc.) at the time of the inspection. 2. CHECKLIST Check the appropriate box along the left-hand side as that AREA is inspected. Check the appropriate box if that CONDITION/ITEM is noted and/or inspected. The specific item should be circled. Further description should be provided under OBSERVATIONS. Check the appropriate box for the required ACTION. Obvious problems will require repair. Monitoring will be recommended if there is potential for a problem to occur in the future. Investigation is necessary if the reason the problem is occurring is not obvious. More than one box can be checked. 3. OBSERVATIONS A brief description of any noted irregularities, needed maintenance or problems for each CONDITION/ITEM checked orcircled should be made. Use blank row for any ITEMS not listed. Abbreviations and short descriptions are recommended. Examples: VEGETATION - Dense brush and trees. SEEPAGE/WETNESS -10 foot diameter area, at toe near left abut., cattails, no flowing water. EROSION -3 feet deep gullies at both d/s groins. If more room is needed for a description, the bottom of the page may be used. 4. GENERAL COMMENTS, SKETCHES, AND FIELD MEASUREMENTS Explanatory sketches, measurements of cracks, slides and settlement, and additional explanation of observations` should be placed in this section. Definitions U/S - Upstream D/S - Downstream Gallery - Inspection/Access hall inside of concrete dam Groin - Intersection of embankment face with the valley abutment Q12@110wmp POND DESIGN REPORT DEC o e 2004 DEW - WATER QUAUTY YYEiLA 0AW ST+ORIVMI M 8%%U REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT - Lot 2E Ponds #1 & #2 Reidsville, NC Rockingham County Owner: CITY OF REIDSVILLE 230 WEST MOREHEAD STREET REIDSVILLE, NC 27320 • • Stimmei Associates, PA K-- A ?? v ?; ?liftV'? L T\ IMIA Prepared By: sapa Landscape Architecture Civil Engineering Land Planning 601 N. Trade Street Suite 200 Winston Salem, NC 27101-2916 P: 336.723.1067 F: 336.723.1069 Project # 03-258 November 29, 2004 r 1?1 TABLE OF CONTENTS PROJECT NARRATIVE SITE LOCATION MAP SOILS SURVEY MAP DRAINAGE AREA MAP POND #1 CALCULATIONS Pre-Development Curve Numbers Post-Development Curve Numbers Water Quality Calculations DWQ - 410 Wet Detention Basin Worksheet Pond Report - Stage - Storage - Discharge Table 10 Yr. - Pre-Development Hydrograph 10 Yr. - Post-Development Hydrograph 10 Yr. - Post-Development Hydrograph Routing 100 Yr. - Pre-Development Hydrograph 100 Yr. - Post-Development Hydrograph 100 Yr. - Post-Development Hydrograph Routing POND #1 CALCULATIONS Pre-Development Curve Numbers Post-Development Curve Numbers Water Quality Calculations DWQ - 410 Wet Detention Basin Worksheet Pond Report - Stage - Storage - Discharge Table 10 Yr. - Pre-Development Hydrograph 10 Yr. - Post-Development Hydrograph 10 Yr. - Post-Development Hydrograph Routing 100 Yr. - Pre-Development Hydrograph 100 Yr. - Post-Development Hydrograph 100 Yr. - Post-Development Hydrograph Routing 0 DAM DESIGN NARRATIVE REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT -PONDS #1 & #2 INTRODUCTION The project is located on NC Hwy 87, near the intersection of NC Hwy 87 and Business US Hwy 29 in Reidsville, NC. The site is located on the USGS Quad Map "Reidsville, NC". The ponds will be constructed to comply with local pre-post detention and state water quality stormwater management requirements. The ponds are sized to treat runoff from the AFG Wipes site and from South Technology drive. The ponds are designed for development of the drainage areas to a maximum 70% impervious area. Storm drainage systems from the AFG Wipes site and the street drainage system, will serve as collectors and direct all stormwater runoff from impervious surfaces to the stormwater management ponds discussed below. METHODOLOGY Existing and proposed hydrologic computations were performed using methodology found in the Soil Conservation Service's Technical Release No. 55' (TR-55) and the Soil Conservation Service's National Engineering Handbook, Section 4-Hydrology 2 (NEH-4). Time of concentration (Tc) for the predeveloped condition was calculated using the TR-55 method. The TR-55 method characterizes runoff flow as sheet, shallow concentrated, or channel flow. Stormwater runoff begins in the upper reaches of the drainage basin as sheet flow. Sheet flow is considered to continue for no more than 300 feet. At 300 feet, runoff transitions to shallow concentrated flow and continues as this mode until it is channelized in a natural channel or other conveyance system. Flow times are calculated along the longest flow path from the uppermost point in the drainage basin to the basin outlet or the point of design. Flow times are calculated for each mode of flow and added together to determine Tc. Time of concentration (Tc) for the post-developed condition is the inlet time for the most remote drainage inlet plus the storm drainage pipe travel time to the design point. The inlet time for the most remote drainage inlet is assumed to be 10 minutes. The travel distance from the most remote drainage inlet to the design point equals 1,500 linear feet and the average velocity for the storm drainage system is assumed to be of 5 ft/sec; therefore the post-developed Tc equals 15- mins. Runoff curve numbers (CN) were taken from TR-55 as well. The USDA Soil Conservation Service's Soil Survey of Rockingham County, North Carolina 3 (Soil Survey) was used to determine the existing soil group classifications. Soils present on this site are of hydrologic soils group classification "C". The composite post-developed curve numbers were calculated based on an impervious percentage of 70% for the AFG Wipes site and the impervious area within South Technology Drive. A soils map of the site and composite curve number calculations with references are included in this report. The SCS Unit Hydrograph Method and the SCS 6-hour rainfall distribution was used in calculating the inflow hydrographs. Hydrographs were calculated based on the using a shape factor of 484. The SCS Unit Hydrograph Method is outlined in NEH-4. Rainfall data used in the hydrologic analysis for the project was taken from Technical Paper No. 40 - Rainfall Frequency Atlas of the Unites States a (TP-40), published by the U.S. Department of Commerce. E DESIGN PARAMETERS The design parameters of the ponds comply with NCDENR - Dam Safety Program requirements for spillway design storm, City of Reidsville stormwater detention requirements, and NCDENR - Division of Water Quality's 401 Water Quality Certification requirements. DAM SAFETY: The spillway design storms, required and actual, are as follows: Dam Hazard Required Spillway Actual Spillway Classification/Size Design Storm Design Storm Ponds #1 & #2 Low/Small 50-Year 100-Year PEAK REDUCTION: The City of Reidsville Stormwater Management Rules requires reduction of the 10-year post-developed discharge flow rate to the 10-year pre-developed discharge flow rate. WATER QUALITY CONTROL: The stormwater management pond will be designed to remove 85%a of the total suspended solids (TSS) in accordance with the NCDENR - Stormwater Best Management Practices Manual 5 (State Manual). POND DESIGN Ponds #1 & #2 are existing sediment basins constructed as part of the AFG Wipes sedimentation and erosion control measures. Both ponds will be widened and lengthened, and the existing outlet structures will be removed and replaced with structures designed to provide the necessary water quality temporary storage and drawdown. Riser/ barrel structures will serve as the primary spillway for both ponds. The top of the risers are set at an elevation that controls the 10-year discharge rate to comply with the peak storm reduction requirement. The risers will be fabricated from corrugated aluminum alloy pipe. The risers will be provided with a skirt-type trash rack fabricated from corrugated aluminum alloy pipe and aluminum bar stock. The trash rack incorporates an anti-vortex plate into the devices. The riser design includes a pipe stub at the bottom with a shear gate so that the pond can be drained if necessary. The outlet barrels will be fabricated from corrugated aluminum alloy pipe with banded connectors and neoprene rubber gaskets. Anti-seep collars will be provided on the outlet barrels. The risers will have an orifice cut into the wall at the permanent pool level. This orifice serves as the drawdown device for the temporary water quality pool, releasing the runoff from the first 1- inch of rainfall over a 2 to 5 day period. The purpose of this drawdown device is to satisfy the water quality requirements set forth in the State BMP Manual. The orifice will be protected by extending the trash rack skirt to 6 inches below the permanent pool level to guard against the orifice being plugged with trash and debris. The risers and outlet barrels are sized to satisfy the peak reduction requirements set forth in the City of Reidsville Stormwater Management rules. The riser was analyzed as both weir and orifice flow to determine which governs. The barrel was analyzed as both inlet and outlet control to determine which governs. The riser and barrel flow are then compared to determine which component of the structure controls the total outflow. Storm hydrograph routing through the ponds was performed using the Storage Indication Method as outlined in NEH4. A brief summary of the. routing results is outlined below. Detailed routing calculations are included in the report. In the Reservoir Report for each pond, under Culvert / Orifice Structures - [A] is the barrel; [B] is the drawdown orifice set at permanent pool; under Weir Structures - [A] is the top of the riser, [B] is the emergency spillway. ?i An emergency spillway is provided as shown on the drawings. The emergency spillways are set just above the 50-year storm event peak stage. At least 1-foot of freeboard is provided during the 100-year storm event. SUMMARY OF DESIGN CALCULATIONS Routing Results POND #1 Design Storm Predeveloped Runoff Rate Post-developed Runoff Rate Routed Discharge Peak Elevation 10-Year 15.51 cfs 40.91 cfs 9.49 cfs 768.19 ft 25-Year 21.64 cfs 50.10 cfs 10.01 cfs 768.75 ft 50-Year 27.14 cfs 57.77 cfs 10.39 cfs 769.26 ft 100-Year 33.64 cfs 66.19 cfs 10.97 cfs 769.85 ft. POND #2 Design Storm Predeveloped Runoff Rate Post-developed Runoff Rate Routed Discharge Peak Elevation 10-Year 12.91 cfs 29.58 cfs 9.24 cfs 756.58 ft 25-Year 17.85 cfs 35.99 cfs 10.31 cfs 757.05 ft 50-Year 22.20 cfs 41.32 cfs 10.67 cfs 757.52 ft 100-Year 27.15 cfs 47.17 cfs 13.21 cfs 757.99 ft • Detailed design computations for the system follow this narrative. REFERENCES 1. Technical Release No. 55, USDA Soil Conservation Service, December 1993 2. National Engineering Handbook Section 4-Hydrology, USDA Soil Conservation Service, 1972 3. Soil Survey of Rockingham County, North Carolina, USDA Soil Conservation Service, December 1992 4. Technical Paper No. 40 - Rainfall Frequency Atlas of the Unites States for Durations from 30 Minutes to 24 Hours and Return Periods from 1 To 100 Years, U.S. Department of Commerce, May 1961 5. Stormwater Best Management Practices, NCDENR, Division of Water Quality, April, 1999 0 • 0 0 N () (n Q n i w ?i SOUTHERN WAY C1] . N C wi CM) ,S,L?r• ?fiy? +i ?.. S ..CY! K}. Y +s,'' 1 ? ? '.. ??•'?TV•>•? 1??•'?5''•"?,(?fR+".;? 1 ?S'?p'c'? ^+?M. f jt?.. ss , ,r t 3? 7 + ` . 3 V cl- a r ' oo? 07 4 ie ,ya A y - e 6l t r S r - - -.?a? ? k Lb"'?.as#.#'t?{?,•..;.:i:;T `,^a'S Jj' f x i i3?"??.°?? ? :n.% sc Y t ? y" . f i L jEeG yam. fff co F f r()' 'a N yr F ' C-1 C\j /'•o C-A Sri . ( Xl Ir ` r p? CL . Q? • • Project : Reidsville Industrial Park - Southern Tract - Pond #1 on Lot 2E Sheet : 1 Project No.: 03-258 Date : 11/29/04 Designed by: TEG Checked by: JNT PREDEVELOPM ENT SGS RU NOFF CURV E NUM BERS BASIN LAND USE SOIL NAME HYDRO. GROUP AREA (AC.) AREA (%) CURVE N (CN) ON x AREA lOnsite Woods - Fair Condition VaB C 20.17 100.00% 73 1472 TOTALS 20.17 100.00% 1472.41 WEIGHTED CN = 73 1 C7 0 • Project : Reidsville Industrial Park - Southern Tract - Pond #1 on Lot 2E Sheet : 1 Project No.: 03-258 Date : 11/29104 Designed by: TEG Checked by: JNT POST-DEVELOPM ENT SGS R UNOFF CUR VE NU MBERS BASIN LAND USE SOIL NAME HYDRO. GROUP AREA (AC.) AREA (%) CURVE N (CN) CN x AREA Onsite l Technology Drive Pervious VaB C 0.74 3.67% 74 55. Onsite Technology Drive Impervious VaB C 1.25 6.20% 98 123 Onsite Lot Pervious VaB C 4.99 24.75% 74 369 Onsite Lot Impervious VaB C 11.66 57.84% 98 1143 Onsite Area over Pond VaB C 0.94 4.66% 98 92 Onsite Lot 2A Pervious VaB C 0.58 2.88% 74 43 TOTALS 20.16 100.00% 1824.24 WEIGHTED CN - 90 0 • 0 Project: Reidsville Industrial Park - Southern Tract - Pond #1 2E Project No.: 03-258 Designed By: TEG Checked By: JNT Date: Revised: 11/27/2004 WATER QUALITY POND DESIGN DESIGN DATA ?N-SITE DATA )n-Site Drainage Area to Pond = )n-Site Proposed Impervious Area = )n-Site Future Impervious Area = otal On-Site Impervious Area = otal Project Site Area = 20.17 acres 13.85 acres 0.00 acres 13.85 acres 68.88 acres Offsite Drainage Area to Pond = 0.00 acres Offsite Impervious Area = 0.00 acres Offsite Future Impervious Area = 0.00 acres Total Offsite Impervious Area = 0.00 acres Total Watershed Area to Pond = 20.17 acres Graded Area to Pond = 20.17 acres Temporary Sediment Storage Used = Y Temporary Sediment Storage = Permanent Sediment Storage = Current Composite Impervious Percentage = Design Maximum Impervious Percentage = Permanent Water Quality Pool Depth (3'min.) _ Surface Area / Drainage Area Ratio = Temporary Water Quality Depth to be Controlled = (POND ELEVATION-SURFACE AREA DATA Elevation at Bottom of Pond = 762.00 Elev. at Bottom of PSS and PWQ = 762.00 Elevation at Top of PSS = 762.75 Elevation at Bottom of TWQ = 765.75 Elevation at Top of TWQ = 767.50 WATERSHED INFORMATION Watershed = N/A Classification = N/A 68.67% On-Site Pond Impervious Percentage 20.11% On-Site Project Impervious Percentage 0.50.ac-in. 0.125 ac-in. 68.67% 70.00% 3.00 FT 2.880% 1.0 Inch Based on Max. Impervious % Based on Max. Impervious % Surface Area = 22,950 SF Surface Area = 22,950 SF Surface Area = 24,610 SF Surface Area = 32,029 SF Surface Area = 37,556 SF Elevation at Bottom of Pond = 762.00 Elevation at Bottom of TWQ = 765.75 Surface Area = 22950 Square Feet Surface Area = 32029 Square Feet Allow 75% of Basin Volume To Water Quality Orifice = 11 601 North Trade Street, Suite 200 Thorne (336) 723-1067 5timmel A55ociate5, F .A. Winston Salem, NC 27101 Fax (336) 723-1069 • E • Elevation at Bottom of PSS = 762.00 Elevation at Middle of PSS = 762.38 Elevation at Top of PSS = 762.75 Surface Area = 22950 Square Feet Surface Area = 23552 Square Feet Surface Area = 24610 Square Feet Volume Provided = 17721 PERMANENT WATER QUALITY SURFACE AREA REQ'D = 25304 Square Feet Normal Pool Elevation = 765.75 Surface Area Provided = 32029 Square Feet OK Rv= Elevation at Bottom of TWQ = 765.75 Elevation at Middle of TWQ = 766.63 Elevation at Top of TWQ = 767.50 Surface Area = 32029 Square Feet Surface Area = 36083 Square Feet Surface Area = 37556 Square Feet Volume Provided = 62392 0.680 in/inl Elevation at Top of Riser = Elevation at Bottom of Water Quality Release Hole = Maximum Release Rate = Minimum Release Rate = Maximum Hole Size = 0.101848462 Minimum Hole Size = 0.040739385 767.50 765.75 2 Days 5 Days 4.32 in. dia. 2.73 in. dia. Elevation at Normal Pool = Elevation at Bottom Of Pond = Release Rate = Maximum Hole Size = 765.75 762.00 1 Days 0.298181766 7.39 in. dia. F:\03-258\SWM\afg-pndretro\[PND #1 Water Quality Worksheet.xls]Water Quality Pond Design 601 North Trade Street, Suite 200 Phone (336) 723-1067 5timmel Associates, F.A. Winston Salem, NC 27101 Fax (336) 723-1069 Project No. DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: • • A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. (to be provided by DWQ) 1. PROJECT INFORMATION (please complete the following information): Project Name: Reidsville Industrial Park-Southern Tract-Pond #1 Lot 2E Contact Person: J_ Neal Tuekern P_E_ Phone Number: (-4 36) 72i-1067 For projects with multiple basins, specify which basin this worksheet applies to: _Pond #1 Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation 762.00ft. 765.7 ft. 767 , _5nft. (average elevation of the floor of the basin) (elevation of the orifice invert out) (elevation of the outlet structure invert in) Permanent Pool Surface Area Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume SA/DA used Diameter of Orifice 32,029 sq. ft. 20.17ac. 13,RSac. 101 , 470 cu. ft. 164,452 cu. ft. 23,066 cu. ft. 2.880% 3" in. (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (combined volume of main basin and forebay) (volume detained on top of the permanent pool) (surface area to drainage area ratio) (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of win). The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. AT- Ter-Al • ?cn t,.. Sediment storage is provided in the permanent pool. (79.-_L-our Penn. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. tEA site specific operation and maintenance (O&M) plan is provided. A vegetation managenment/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. SWG100 09/97 Page 1 of 1 Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 1 - Pond #1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) Sunday, Nov 28 2004,1:33 PM 0.00 762.00 22,950 0 0 1.00 763.00 24,428 23,689 23,689 2.00 764.00 26,601 25,515 49,204 3.00 765.00 30,806 28,704 77,907 3.75 765.75 32,029 23,563 101,470 4.00 766.00 34,894 8,365 109,836 5.00 767.00 36,662 35,778 145,614 6.00 768.00 38,688 37,675 183,289 7.00 769.00 40,642 39,665 222,954 8.00 770.00 42,686 41,664 264,618 9.00 771.00 44,711 43,699 308,316 9.50 771.50 45,635 22,587 330,903 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 15.00 3.00 0.00 0.00 Crest Len (ft) = 6.28 10.00 0.00 0.00 Span (in) = 15.00 3.00 0.00 0.00 Crest El. (ft) = 767.50 769.85 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.00 0.00 0.00 Invert El. (ft) = 762.00 765.75 0.00 0.00 Weir Type = Riser Broad -- - Length (ft) = 62.00 0.00 • 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 2.00 0.00 0.00 0.00 N-Value = .024 .009 .000 .000 Orif. Coeff. Multistage 0 = 0.60 = n/a 0.60 Yes 0.00 No 0.00 No 000 in/hr (Contour) Tailwater Elev Exfiltration = 0 = 0 00 ft . . . Stage I Storage I Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 0.00 0 762.00 0.00 0.10 2,369 762.10 0.00 0.20 4,738 762.20 0.00 0.30 7,107 762.30 0.00 0.40 9,476 762.40 0.00 0.50 11,845 762.50 0.00 0.60 14,213 762.60 0.00 0.70 16,582 762.70 0.00 0.80 18,951 762.80 0.00 0.90 21,320 762.90 0.00 1.00 23,689 763.00 0.00 1.10 26,240 763.10 0.00 1.20 28,792 763.20 0.00 1.30 31,343 763.30 0.00 1.40 33,895 763.40 0.00 1.50 36,446 763.50 0.00 1.60 38,998 763.60 0.00 1.70 41,549 763.70 0.00 1.80 44,101 763.80 0.00 1.90 46,652 763.90 0.00 2.00 49,204 764.00 0.00 2.10 52,074 764.10 0.00 2.20 54,944 .764.20 0.00 2.30 57,815 764.30 0.00 2.40 60,685 764.40 0.00 2.50 63,555 764.50 0.00 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cis cfs cfs cis cfs cfs cfs cfs cfs 0.00 - --- 0.00 0.00 - - - 0.00 0.00 - --- 0.00 0.00 -- - - 0.00 0.00 --- --- 0.00 0.00 --- --- --- 0.00 0.00 -- --- 0.00 0.00 - -- - 0.00 0.00 -- -- 0.00 0.00 -- -- -- 0.00 0.00 - --- 0.00 0.00 - - - 0.00 0.00 - -- 0.00 0.00 --- -- -- 0.00 0.00 --- --- 0.00 0.00 --- -- - 0.00 0.00 --- -- 0.00 0.00 - -- -- 0.00 0.00 -- - 0.00 0.00 0.00 0.00 -- --- 0.00 0.00 -- --- - 0.00 0.00 - --- 0.00 0.00 --- --- -- 0.00 0.00 -- --- 0.00 0.00 -- --- - 0.00 0.00 -- -- 0.00 0.00 --- -- -- 0.00 0.00 - - 0.00 0.00 -- --- - 0.00 0.00 --- --- 0.00 0.00 --- --- -- 0.00 0.00 --- -- 0.00 0.00 --- -- -- 0.00 0.00 --- --- 0.00 0.00 - --- -- 0.00 0.00 - - 0.00 0.00 - - - 0.00 0.00 --- -- 0.00 0.00 --- -- - 0.00 0.00 --- --- 0.00 0.00 --- - -- 0.00 0.00 - --- 0.00 0.00 - -- 0.00 0.00 --- -- 0.00 0.00 -- - -- 0.00 0.00 -- - 0.00 0.00 - -- - 0.00 0.00 --- --- 0.00 0.00 --- --- -- 0.00 0.00 --- --- 0.00 0.00 -- --- --- 0.00 Continues on next page... Pond #1 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cuft ft CfS CfS CfS CfS cfs CfS cis cis CfS cfs 2.60 66,426 764.60 0.00 0.00 -- - 0.00 0.00 -- -- -- 0.00 2.70 69,296 764.70 0.00 0.00 -- -- 0.00 0.00 -- - - 0.00 2.80 72,166 764.80 0.00 0.00 --- - 0.00 0.00 -- --- -- 0.00 2.90 75,037 764.90 0.00 0.00 -- -- 0.00 0.00 -- -- --- 0.00 3.00 77,907 765.00 0.00 0.00 -- -- 0.00 0.00 - --- --- 0.00 3.08 80,263 765.08 0.00 0.00 -- -- 0.00 0.00 -- - -- 0.00 3.15 82,620 765.15 0.00 0.00 -- - 0.00 0.00 - --- - 0.00 3.23 84,976 765.23 0.00 0.00 - --- 0.00 0.00 - -- - 0.00 3.30 87,332 765.30 0.00 0.00 -- -- 0.00 0.00 - -- - 0.00 3.38 89,689 765.38 0.00 0.00 --- --- 0.00 0.00 - -- --- 0.00 3.45 92,045 765.45 0.00 0.00 -- -- 0.00 0.00 - -- - 0.00 3.53 94,401 765.53 0.00 0.00 --- -- 0.00 0.00 - -- -- 0.00 3.60 96,758 765.60 0.00 0.00 - -- 0.00 0.00 - -- - 0.00 3.68 99,114 765.68 0.00 0.00 -- - 0.00 0.00 - -- --- 0.00 3.75 101,470 765.75 0.00 0.00 -- -- 0.00 0.00 - --- 0.00 3.78 102,307 765.78 0.00 0.00 -- - 0.00 0.00 -- - - 0.00 3.80 103,143 765.80 0.01 0.01 -- -- 0.00 0.00 -- -- -- 0.01 3.83 103,980 765.83 0.01 0.01 -- -- 0.00 0.00 - --- -- 0.01 3.85 104,816 765.85 0.02 0.02 -- - 0.00 0.00 -- -- -- 0.02 3.88 105,653 765.88 0.03 0.03 - -- 0.00 0.00 -- - -- 0.03 3.90 106,489 765.90 0.04 0.04 -- -- 0.00 0.00 -- - -- 0.04 3.93 107,326 765.93 0.06 0.05 -- -- 0.00 0.00 - - - 0.05 3.95 108,162 765.95 0.07 0.06 --- --- 0.00 0.00 - --- -- 0.06 3.98 108,999 765.98 0.08 0.08 -- --- 0.00 0.00 - -- - 0.08 4.00 109,836 766.00 0.08 0.08 - - 0.00 0.00 - - - 0.08 4.10 113,413 766.10 0.12 0.11 - -- 0.00 0.00 - - - 0.11 4.20 116,991 766.20 0.14 0.13 - - 0.00 0.00 - -- - 0.13 4.30 120,569 766.30 0.16 0.15 - -- 0.00 0.00 -- --- - 0.15 4.40 124,147 766.40 0.17 0.17 -- - 0.00 0.00 - -- - 0.17 4.50 127,725 766.50 0.19 0.19 - --- 0.00 0.00 - -- - 0.19 4.60 131,302 766.60 0.20 0.20 - - 0.00 0.00 - -- - 0.20 4.70 134,880 766.70 0.21 0.21 - --- 0.00 0.00 - -- - 0.21 4.80 138,458 766.80 0.23 0.23 - - 0.00 0.00 -- --- -- 0.23 4.90 142,036 766.90 0.24 0.24 - - 0.00 0.00 - - - 0.24 5.00 145,614 767.00 0.26 0.25 - --- 0.00 0.00 - - -- 0.25 5.10 149,381 767.10 0.26 0.26 - 0.00 0.00 - -- - 0.26 5.20 153,149 767.20 0.27 0.27 - - 0.00 0.00 -- --- -- 0.27 5.30 156,916 767.30 0.29 0.28 - --- 0.00 0.00 - -- -- 0.28 5.40 160,684 767.40 0.29 0.29 - - 0.00 0.00 - -- -- 0.29 5.50 164,451 767.50 0.31 0.30 -- --- 0.00 0.00 - - - 0.30 5.60 168,219 767.60 0.97 0.31 --- --- 0.66 0.00 -- --- - 0.97 5.70 171,986 767.70 2.21 0.32 --- --- 1.87 0.00 --- -- --- 2.19 5.80 175,754 767.80 3.77 0.33 --- -- 3.43 0.00 - - - 3.76 5.90 179,521 767.90 5.62 0.34 -- --- 5.29 0.00 -- -- -- 5.62 6.00 183,289 768.00 7.73 0.34 -- 7.39 0.00 - - - 7.73 6.10 187,255 768.10 9.28 0.16 -- --- 9.13 0.00 - -- --- 9.28 6.20 191,222 768.20 9.50 0.12 --- - 9.38 0.00 -- -- --- 9.50 6.30 195,188 768.30 9.65 0.10 -- - 9.55 0.00 -- --- --- 9.65 6.40 199,155 768.40 9.73 0.10 --- - 9.64 0.00 - -- -- 9.73 6.50 203,121 768.50 9.81 0.10 --- -- 9.72 0.00 -- - - 9.81 6.60 207,088 768.60 9.89 0.10 -- --- 9.80 0.00 -- --- --- 9.89 6.70 211,054 768.70 9.97 0.10 - - 9.88 0.00 - -- --- 9.97 6.80 215,021 768.80 10.05 0.09 --- --- 9.95 0.00 -- -- -- 10.05. 6.90 218,987 768.90 10.12 0.09 --- -- 10.03 0.00 -- --- --- 10.12 7.00 222,954 769.00 10.20 0.09 --- --- 10.10 0.00 --- -- --- 10.20 7.10 227,120 769.10 10.27 0.09 -- -- 10.18 0.00 --- --- --- 10.27 7.20 231,286 769.20 10.35 0.09 - -- 10.25 0.00 -- - --- 10.35 7.30 235,453 769.30 10.42 0.09 - --- 10.33 0.00 - - -- 10.42 7.40 239,619 769.40 10.49 0.09 --- --- 10.40 0.00 --- -- -- 10.49 7.50 243,786 769.50 10.57 0.09 --- -- 10.47 0.00 --- --- --- 10.56 7.60 247,952 769.60 10.64 0.09 --- --- 10.54 0.00 -- - -- 10.64 7.70 252,118 769.70 10.71 0.09 --- - 10.61 0.00 - - - 10.71 7.80 256,285 769.80 10.78 0.09 - -- 10.68 0.00 - --- -- 10.78 7.90 260,451 769.90 10.85 0.10 --- --- 10.75 0.33 - - -- 11.18 8.00 264,618 770.00 10.92 0.10 -- - 10.82 1.74 - - -- 12.66 8.10 268,987 770.10 10.99 0.10 --- --- 10.89 3.75 --- -- -- 14.74 8.20 273,357 770.20 11.06 0.10 --- --- 10.96 6.21 -- --- - 17.27 8.30 277,727 770.30 11.12 0.10 11.03 9.05 20.18 8.40 282,097 770.40 11.19 0.10 11.10 12.23 23.43 8.50 286,467 770.50 11.26 0.10 - -- 11.16 15.72 -- - -- 26.98 Continues on next page... Pond #1 Stage I Storage I Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs • 8.60 290,837 770.60 11.33 8.70 295,206 770.70 11.39 8.80 299,576. 770.80 11.46 8.90 303,946 770.90 11.52 9.00 308,316 771.00 11.59 9.05 310,575 771.05 11.62 9.10 312,833 771.10 11.65 9.15 315,092 771.15 11.69 9.20 317,351 771.20 11.72 9.25 319,609 771.25 11.75 9.30 321,868 771.30 11.78 9.35 324,127 771.35 11.82 9.40 326,385 771.40 11.85 9.45 328,644 771.45 11.88 9.50 330,903 771.50 11.91 ... End 17-? Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.10 -- - 11.23 19.48 -- - -- 30.81 0.10 --- -- 11.30 23.50 --- - - 34.90 0.10 -- -- 11.36 27.77 -- -- -- 39.23 0.10 --- -- 11.43 32.27 - - -- 43.79 0.10. --- - - 11.49 37.00 --- - -- 48.59 0.10 --- --- 11.52 39.44 --- -- --- 51.06 0.10 -- --- 11.55 41.93 --- - -- 53.58 0.10 - -- 11.59 44.47 -- - - -- 56.15 0.10 - --- 11.62 47.06 -- -- --- 58.77 0.10 -- --- 11.65 49.69 - --- -- 61.44 0.10 --- 11.68 52.38 -- - -- 64.16 0.10 - -- 11.72 55.11 -- - -- 66.92 0.10 -- 11.75 57.89 -- - - 69.73 0.10 -- -- 11.78 60.71 --- -- - 72.59 0.10 - -- 11.81 63.59 -- -- - 75.50 25 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Nov 22 2004,2:54 PM OHyd. No. 1 Pond #1 Pre Hydrograph type = SCS Runoff Peak discharge = 15.51 cfs Storm frequency = 10 yrs Time interval = 5 min Drainage area = 20.17 ac Curve number = 73 Basin Slope = 3.6% Hydraulic length = 1432 ft Tc method = LAG Time of conc. (Tc) = 27.48509 min Total precip. = 3.60 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Hydrograph Volume = 94,180 cuft Q (cfs) 18.00 0 15.00 9 12.00 9.00 6.00 3.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 1 1 I 1 1 1 1 1 rl- 1 0.00 0.0 0.8 1.7 2.5 3.3 4.2 5.0 5.8 6.7 7.5 Hyd No. 1 Time (hrs) Pond #1 Pre Hyd. No. 1 -- 10 Yr Q (cfs) 26 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Nov 22 2004,2:54 PM *Hyd. No. 2 Pond #1 Post Hydrograph type = SCS Runoff Peak discharge = 40.91 cfs Storm frequency = 10 yrs Time interval = 5 min Drainage area = 20.16 ac Curve number = 90 Basin Slope = 5.0% Hydraulic length = 1500 ft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 3.60 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Hydrograph Volume = 174,378 cult Q (cfs) 50.00 1040.00 30.00 20.00 Pond #1 Post Hyd. No. 2 -- 10 Yr 10.00 0.00 ' 0.0 0.8 Hyd No. 2 Q (cfs) 50.00 40.00 30.00 20.00 10.00 000 1.7 2.5 3.3 4.2 5.0 5.8 6.7 Time (hrs) 6 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. '3 Pond #1 - Routed Post Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 2 Reservoir name = Pond #1 Storage Indication method used. Wet pond routing start elevation = 765.75 ft Q (cfs) 50.00 Pond #1 - Routed Post Hyd. No. 3 --10 Yr Saturday, Nov 27 2004,4:3 PM Peak discharge 9.49 cfs Time interval = 5 min Max. Elevation = 768.19 ft Max. Storage = 190,891 cuft Hydrograph Volume =173,543 cult 040.00 0 30.00 20.00 10.00 0.00 ' 0 8 17 25 33 - Hyd No. 3 Hyd No. 2 42 50 58 67 75 83 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 92 Time (hrs) 61 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Nov 22 2004,2:54 PM Hyd. No. 1 Pond #1 Pre Hydrograph type = SCS Runoff Peak discharge = 33.64 cfs Storm frequency = 100 yrs Time interval = 5 min Drainage area = 20.17 ac Curve number = 73 Basin Slope = 3.6% Hydraulic length = 1432 ft Tc method = LAG Time of conc. (Tc) = 27.48509 min Total precip. = 5.25 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Hydrograph Volume = 187,099 cult Pond #1 Pre Q (efs) Hyd. No. 1 -- 100 Yr Q (efs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 35.00 30.00 25.00. 20.00 15.00 10.00 5.00 0.00 0.0 0.8 1.7 2.5 3.3 4.2 5.0 5.8 6.7 7.5 Hyd No. 1 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Nov 22 2004,2:54 PM Hyd. No. 2 Pond #1 Post Hydrograph type = SCS Runoff Peak discharge = 66.19 cfs Storm frequency = 100 yrs Time interval = 5 min Drainage area = 20.16 ac Curve number = 90 Basin Slope = 5.0% Hydraulic length = 1500 ft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 5.25 in Distribution = SCS 6-Hr Storm duration = 6 hrs Shape factor = 484 Hydrograph Volume = 282,506 cuft Pond #1 Post Q (cfs) Hyd. No. 2 -- 100 Yr 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Q (cfs) 0.0 0.8 Hyd No. 2 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1.7 2.5 3.3 4.2 5.0 5.8 6.7 Time (hrs) 62 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Saturday, Nov 27 2004, 4:3 PM Hyd. No. 3 Pond #1 - Routed Post Hydrograph type = Reservoir Peak discharge = 10.97 cfs Storm frequency = 100 yrs Time interval = 5 min Inflow hyd. No. = 2 Max. Elevation = 769.85 ft Reservoir name = Pond #1 Max. Storage = 258,243 cuft Storage Indication method used. Wet pond routing start elevation = 765.75 ft. Hydrograph Volume = 281,663 cult Q (cfs) 70.00 60.00 50.00 • 40.00 30:00 20.00 10.00 Pond #1 - Routed Post Hyd. No. 3 -- 100 Yr Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 11 , : ---- 0.00 0 8 17 25 33 42 50 58 67 75 83 Time (hrs) Hyd No. 3 Hyd No. 2 12 • Project : Reidsville Industrial Park - Southern Tract - Pond #2 on Lot 2E Sheet : 1 Project No.: 03-258 Date : 11/29/04 Designed by: TEG Checked by: JNT PREDEVELOPM ENT SGS RU NOFF CURVE NUMBERS BASIN LAND USE SOIL NAME HYDRO. GROUP AREA (AC.) AREA ( % ) CURVE N (CN) CN x AREA Onsite Woods - Fair Condition VaB C 13.89 100.00% 73 1014 TOTALS 13.89 100.00% 1013.97 I WEIGHTED.CN = ".. 73 % • 0 • Project : Reidsville Industrial Park - Southern Tract - Pond #2 on Lot 2E Sheet : 1 Project No.: 03-258 Date : 11/29/04 Designed by: TEG Checked by: JNT POST-DEVELOPM ENT SGS R UNOFF CUR VE NU MBERS BASIN LAND USE SOIL NAME HYDRO. GROUP AREA (AC.) AREA ( % ) CURVE N (CN) CN x AREA Onsite l Lot Pervious VaB C 4.06 29.23% 74 300 Onsite Lot Impervious VaB C 9.32 67.10% 98 913 Onsite Area over Pond VaB C 0.51 '3.67% 98 50 TOTALS 13.89 100.00% 1263.78 WEIGHTED CN = " 91 • • Project: Reidsville Industrial Park - Southern Tract - Pond #2 2E Project No.: 03-258 Designed By: TEG Checked By: JNT Date: Revised: 12/3/2004 WATER QUALITY POND DESIGN )N-SITE DATA ?n-Site Drainage Area to Pond = )n-Site Proposed Impervious Area = in-Site Future Impervious Area = otal On-Site Impervious Area = otal Project Site Area = 13:89 acres 9.83 acres 0.00 acres 9.83 acres 68.88 acres WATERSHED INFORMATION Watershed = N/A Classification = N/A 70.77% On-Site Pond Impervious Percentage 14.27% On-Site Project Impervious Percentage Offsite Drainage Area to Pond = 0.00 acres Offsite Impervious Area = 0.00 acres Offsite Future Impervious Area = 0.00 acres Total Offsite Impervious Area = 0.00 acres Total Watershed Area to Pond = 13.89 acres Graded Area to Pond = 13.89 acres Temporary Sediment Storage Used = Y Temporary Sediment Storage = Permanent Sediment Storage = Current Composite Impervious Percentage = Design Maximum Impervious Percentage = Permanent Water Quality Pool Depth (3'min.) _ Surface Area / Drainage Area. Ratio = Temporary Water Quality Depth to be Controlled = ND ELEVATION-SURFACE AREA DATA Elevation at Bottom of Pond = 750.00 Elev. at Bottom of PSS and PWQ = 750.00 Elevation at Top of PSS = 750.75 Elevation at Bottom of TWQ = 753.75 Elevation at Top of TWQ = 756.00 0.50 ac-in. 0.125 ac-in. 70.77% 70.00% 3.00 FT Based on Max. Impervious % 2.880% Based on Max. Impervious % 1.0 Inch Surface Area= 11,1888F Surface Area = 11;188 SF Surface Area= 12,218 SF Surface Area= 19,384 SF Surface Area = 23,062 SF Elevation at Bottom of Pond = 750.00 Elevation at Bottom of TWQ = 753.75 Surface Area = 11188 Square Feet Surface Area = 19384 Square Feet Allow 75% of Basin Volume To Water Quality Orifice = 601 North Trade Street, Suite 200 Phone (336) 723-1067 5timmel Associates, P.A. Winston Salem, NC 27101 Fax (336) 723-1069 • • • Elevation at Bottom of PSS = 750.00 Elevation at Middle of PSS = 750.38 Elevation at Top of PSS = 750.75 Surface Area= 11188 Square Feet Surface Area = 11629 Square Feet Surface Area = 12218 Square Feet Volume Provided = 8740 Cul PERMANENT WATER QUALITY SURFACE AREA REQ'D = 17425 Square Feet Normal Pool Elevation = 753.75 Surface Area Provided = 19384 Square Feet OK Elevation at Bottom of TWQ = 753.75 Elevation at Middle of TWQ = 754.88 Elevation at Top of TWQ = 756.00 ° 34286 Cubic F Rv= 0.680 i Surface Area = 19384 Square Feet Surface Area = 21458 Square Feet Surface Area = 23062 Square Feet Volume Provided = 48104 Cubic F Elevation at Top of Riser = Elevation at Bottom of Water Quality Release Hole = Maximum Release Rate = Minimum Release Rate = Maximum Hole Size = 0.069891882 Minimum Hole Size = 0.027956753 756.00 753.75 2 Days 5 Days 3.58 in. dia. 2.26 in. dia. Elevation at Normal Pool = Elevation at Bottom Of Pond = Release Rate = Maximum Hole Size = 753.75 750.00 1 Days 0.180460063 5.75 in. dia. ???-cao?.wvrvna?y-Nnuicuugrrvv iF/- vvaier uuanty vvoncsneet.xisjvvater Quality Pond Design 601 North Trade Street, Suite 200 Phone (336) 723-1067 5timmel Aooociateo, P.A. Winston Salem, NG 27101 Fax (336) 723-1069 Project No. A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : Reidsville Industrial Park - Southern Tract - Pond # 2 T,ot 2E Contact Person: J_NPal TiinkPr? P F, Phone Number: Ci261 723-1067 For projects with multiple basins, specify which basin this worksheet applies to: Pond 4,'2 DIVISION OF WATER QUALITY 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: Basin Bottom Elevation 750.00 • ft. Permanent Pool Elevation 753.75 ft. Temporary Pool Elevation 756-00 ft. • 0 Permanent Pool Surface Area 1 9 , 3 8 4 sq. ft. Drainage Area 1 3. 89 ac. Impervious Area 9 1 ac. Permanent Pool Volume 54,256 cu. ft. Temporary Pool Volume 109"IR1 cu. ft. Forebay Volume 1 2, 8 2 5 cu. ft. (to be provided by DWQ) (average elevation of the floor of the basin) (elevation of the orifice invert out) (elevation of the outlet structure invert in) (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (combined volume of main basin and forebay) (volume detained on top of the permanent pool) (surface area to drainage area ratio) (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of whv. SA/DA used 2.880% Diameter of Orifice 311 in. ADDlicants Initials IBS The temporary pool controls runoff from the 1 inch storm event. 5EL' AT_rp ,:t e The basin length to width ratio is greater than 3:1. b The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). 4-f The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. sal" Aim ROt? Sediment storage is provided in the permanent pool. CT ?Ves P Access is provided for maintenance. A minimum 30 foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FO SWG100 09/97 Page 1 of 1 46 Supplement to 401 Wet Detention Basin Worksheet The basin length to width ratio is slightly over 2:1. This is due to the original geometry of the sediment basin that is being retrofitted into the water quality pond. The overall pond is however oversized for the drainage and impervious area draining to it. The permanent sediment storage zone is oversized by approximately 39%, the permanent water quality surface area is oversized by approximately 11 %, and the temporary water quality storage zone is oversized by approximately 40%. With these components of the pond being oversized to the degree that they are, we feel that the pond will perform as well as it would if it were designed without the excess size but with a length to width ratio of 3: 1.. 9 0 Pond Report Hydraflow Hydrographs by Intelisolve Sunday, Nov 28 2004, 11:24 AM Pond No. 2 - Pond #2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft) 0.00 750.00 11,188 0 0 1.00 751.00 12,348 11,768 11,768 2.00 752.00 14,046 13,197 24,965 3.00 753.00 17,142 15,594 40,559 3.75 753.75 19,384 13,697 54,256 4.00 754.00 20,216 4,950 59,206 5.00 755.00 21,536 20,876 80,082 6.00 756.00 23,062 22,299 102,381 7.00 757.00 24,532 23,797 126,178 8.00 758.00 26,063 25,298 151,476 9.00 759.00 27,605 26,834 178,310 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 15.00 3.00 0.00 0.00 Crest Len (ft) = 6.28 10.00 0.00 0.00 Span (in) = 15.00 3.00 0.00 0.00 Crest El. (ft) = 756.00 757.82 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.00 0.00 0.00 Invert El. (ft) = 750.00 753.75 0.00 0.00 Weir Type = Riser Broad --- -- Length(ft) = 60.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 2.00 0.00 0.00 0.00 N-Value = .024 .009 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 It Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage / Storage / Discharge Tabl e Stage Storage Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs efs cfs 0.00 0 750.00 0.00 0.00 - --- 0.00 0.00 -- --- - 0.00 0.10 1,177 750.10 0.00 0.00 --- --- 0.00 0.00 - --- - 0.00 0.20 2,354 750.20 0.00 0.00 -- -- 0.00 0.00 - --- -- 0.00 0.30 3,530 750.30 0.00 0.00 -- - 0.00 0.00 - -- -- 0.00 0.40 4,707 750.40 0.00 0.00 --- - 0.00 0.00 --- --- -- 0.00 0.50 5,884 750.50 0.00 0.00 - - 0.00 0.00 - -- - - 0.00 0.60 7,061 750.60 0.00 0.00 -- - 0.00 0.00 - --- -- 0.00 0.70 8,238 750.70 0.00 0.00 -- -- 0.00 0.00 - --- - 0.00 0.80 9,414 750.80 0.00 0.00 --- --- 0.00 0.00 -- --- -- 0.00 0.90 10,591 750.90 0.00 0.00 --- -- 0.00 0.00 --- --- --- 0.00 1.00 11,768 751.00 0.00 0.00 -- --- 0.00 0.00 -- --- - 0.00 1.10 13,088 751.10 0.00 0.00 - -- 0.00 0.00 --- -- - 0:00 1.20 14,407 751.20 0.00 0.00 -- --- 0.00 0.00 - --- -- 0.00 1.30 15,727 751.30 0.00 0.00 - --- 0.00 0.00 -- --- - 0.00 1.40 17,047 751.40 0.00 0.00 -- -- 0.00 0.00 -- --- - 0.00 1.50 18,367 751.50 0.00 0.00 - - 0.00 0.00 - -- - 0.00 1.60 19,686 751.60 0.00 0.00 --- - 0.00 0.00 --- -- --- 0.00 1.70 21,006 751.70 0.00 0.00 -- - 0.00 0.00 - --- --- 0.00 1.80 22,326 751.80 0.00 0.00 --- --- 0.00 0.00 - - -- 0.00 1.90 23,645 751.90 0.00 0.00 --- - 0.00 0.00 -- --- - 0.00 2.00 24,965 752.00 0.00 0.00 --- - 0.00 0.00 --- -- - 0.00 2.10 26,524 752.10 0.00 0.00 -- - 0.00 0.00 -- -- - 0.00 2.20 28,084 752.20 0.00 0.00 -- - 0.00 0.00 - -- -- 0.00 2.30 29,643 752.30 0.00 0.00 -- -- 0.00 0.00 -- --- --- 0.00 2.40 31,203 752.40 0.00 0.00 -- -- 0.00 0.00 --- --- --- 0.00 2.50 32,762 752.50 0.00 0.00 - --- 0.00 0.00 -- --- -- 0.00 2.60 34,321 752.60 0.00 0.00 --- - 0.00 0.00 --- --- --- 0.00 Continues on nex t page... Pond #2 Stage / Storage / Discharge Table Stage Storage Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfl Total ft cult ft cfs cis CfS CfS cfs CfS cis CfS cis CfS 2.70 35,881 752.70 0.00 0.00 0.00 0.00 0.00 2.80 37,440 752.80 0.00 0.00 --- -- 0.00 0.00 - -- - 0.00 2.90 39,000 752.90 0.00 0.00 -- - 0.00 0.00 -- --- - 0.00 3.00 40,559 753.00 0.00 0.00 -- -- 0.00 0.00 --- -- -- 0.00 3.08 41,929 753.08 0.00 0.00 -- - 0.00 0.00 - -- -- 0.00 3.15 43,298 753.15 0.00 0.00 - - 0.00 0.00 -- -- - 0.00 3.23 44,668 753.23 0.00 0.00 -- -- 0.00 0.00 --- --- -- 0.00 3.30 46,038 753.30 0.00 0.00 - -- 0.00 0.00 - - - 0.00 3.38 47,408 753.38 0.00 0.00 - -- 0.00 0.00 - - - 0.00 3.45 48,777 753.45 0.00 0.00 -- -- 0.00 0.00 - -- - 0.00 3.53 50,147 753.53 0.00 0.00 - - 0.00 0.00 - - - 0.00 3.60 51,517 753.60 0.00 0.00 - - 0.00 0.00 - - - 0.00 3.68 52,887 753.68 0.00 0.00 - - 0.00 0.00 - --- - 0.00 3.75 54,256 753.75 0.00 0.00 -- - 0.00 0.00 -- --- -- 0.00 3.78 54,751 753.78 0.00 0.00 -- - 0.00 0.00 -- -- -- 0.00 3.80 55,246 753.80 0.01 0.01 - - 0.00 0.00 -- - - 0.01 3.83 55,741 753.83 0.01 0.01 - - 0.00 0.00 -- --- - 0.01 3.85 56,236 753.85 0.02 0.02 -- -- 0.00 0.00 - -- - 0.02 3.88 56,731 753.88 0.03 0.03 --- - 0.00 0.00 - -- - 0.03 3.90 57,226 753.90 0.04 0.04 - - 0.00 0.00 - - - 0.04 3.93 57,721 753.93 0.06 0.05 - - 0.00 0.00 - - - 0.05 3.95 58,216 753.95 0.07 0.06 - - 0.00 0.00 - - - 0.06 3.98 58,711 753.98 0.08 0.08 --- - 0.00 0.00 - --- -- 0.08 4.00 59,206 754.00 0.08 0.08 - - 0.00 0.00 -- -- - 0.08 4.10 61,294 754.10 0.12 0.11 - - 0.00 0.00 -- -- - 0.11 4.20 63,381 754.20 0.14 0.13 - - 0.00 0.00 - - - 0.13 4.30 65,469 754.30 0.16 0.15 - -- 0.00 0.00 - - - 0.15 4.40 67,557 754.40 0.17 0.17 -- - 0.00 0.00 -- --- - 0.17 4.50 69,644 754.50 0.19 0.19 - - 0.00 0.00 - -- - 0.19 4.60 71,732 754,60 0.20 0.20 - - 0.00 0.00 - - - 0.20 4.70 73,819 754.70 0.21 0.21 -- - 0.00 0.00 - - - 0.21 4.80 75,907 754.80 0.23 0.23 -- - 0.00 0.00 - -- - 0.23 4.90 5.00 77,995 80,082 754.90 755.00 0.24 0.26 0.24 0.25 _ 0.00 0.00 0.00 0.00 - -w = 0.24 0.25 5.10 82,312 755.10 0.26 0.26 0.00 0.00 0.26 5.20 84,542 755.20 0.27 0.27 - - 0.00 0.00 - -- - 0.27 5.30 86,772 755.30 0.29 0.28 - - 0.00 0.00 -- --- - 0.28 5.40 89,002 755.40 0.29 0.29 - - 0.00 0.00 - - - 0.29 5.50 91,232 755.50 0.31 0.30 - - 0.00 0.00 - --- - 0.30 5.60 93,462 755.60 0.31 0.31 -- - 0.00 0.00 -- -- - 0.31 5.70 95,692 755.70 0.33 0.32 - -- 0.00 0.00 - --- -- 0.32 5.80 97,921 755.80 0.33 0.33 --- -- 0.00 0.00 - --- - 0.33 5.90 100,151 755.90 0.35 0.34 -- - 0.00 0.00 - -- - 0.34 6.00 102,381 756.00 0.35 0.34 --- - 0.00 0.00 - --- - 0.34 6.10 104,761 756.10 1.01 0.35 -- -- 0.66 0.00 -- --- -- 1.01 6.20 107,141 756.20 2.26 0.36 -- - 1.87 0.00 - - - 2.23 6.30 109,520 756.30 3.80 0.37 --- - 3.43 0.00 - -- - 3.80 6.40 111,900 756.40 5.66 0.38 -- - 5.29 0.00 -- - 5.66 6.50 114,280 756.50 7.77 0.38 -- - 7.39 0.00 -- - - 7.77 6.60 116,660 756.60 9.70 0.17 --- - 9.53 0.00 - --- -- 9.70 6.70 119,039 756.70 9.96 0.13 -- - 9.83 0.00 - - - 9.96 6.80 121,419 756.80 10.11 0.11 - - 10.01 0.00 - --- - 10.11 6.90 123,799 756.90 10.20 0.10 --- - 10.09 0.00 - --- - 10.20 7.00 126,178 757.00 10.28 0.10 --- - 10.17 0.00 -- - 10.27 7.10 128,708 757.10 10.35 0.10 --- -- 10.25 0.00 --- -- 10.35 7.20 131,238 757.20 10.43 0.10 -- -- 10.33 0.00 -- --- - 10.43 7.30 133,768 757.30 10.51 0.10 -- - 10.41 0.00 -- --- -- 10.51 7.40 136,297 757.40 10.58 0.10 - -- 10.48 0.00 - -- -- 10.58 7.50 138,827 757.50 10.66 0.10. --- -- 10.55 0.00 -- --- - 10.65 7.60 141,357. 757.60 10.73 0.10 --- - 10.63 0.00 --- --- - 10.73 7.70 143,887 757.70 10.80 0.10 -- - 10.70 0.00 -- - - 10.80 7.80 146,416 757.80 10.87 0.10 - - 10.77 0.00 - --- - 10.87 7.90 148,946 757.90 10.95 0.10 -- -- 10.84 0.68 -- --- - 11.62 8.00 151,476 758.00 11.02 0.10 --- --- 10.91 2.29 --- -- - 13.31 8.10 154,159 758.10 11.09 0.10 --- -- 10.99 4.44 --- --- -- 15.53 8.20 156,843 758.20 11.16 0.10 -- -- 11.06 7.03 --- -- - 18.18 8.30 159,526 758.30 11.23 0.10 - 11.13 9.97 21.20 8.40 162,209 758.40 11.30 0.10 ^ - 11.19 13.25 - 24.54 8:50 164,893 758.50 11.36 0.10 11.26 16.82 28.18 8.60 167,576 758.60 11.43 0.10 --- - 11.33 20.66 - -- - 32.09 Continues on next page... Pond #2 Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cult ft Cfs 8.70 170,260 758.70 11.50 8.80 172,943 758.80 11.57 8.90 175,626 758.90 11.63 9.00 178,310 759.00 11.70 ...End • Clv B Clv C Clv D Wr A Wr B Wr C Wr D ELI Total Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs 0.10 - -- 11.40 24.76 --- - 36.26 0.10 -- -- 11.47 29.10 -- -- -- 40.66 0.10 --- - 11.53 33.66 -- -- 45.29 0.10 -- - 11.60 38.45 - -- - 50.15 0 29 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Pond #2 Pre Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.89 ac Basin Slope = 5.8% Tc method = LAG Total precip. = 3.60 in Storm duration = 6 hrs Monday, Nov 22 2004, 2:54 PM Peak discharge = 12.91 cfs Time interval = 5 min Curve number = 73 Hydraulic length = 689 ft Time of conc. (Tc) = 12.06022 min Distribution = SCS 6-Hr Shape factor = 484 Hydrograph Volume = 58,961 cuft Q (cfs) 14.00 12.00 • 10.00 . 8.00 6.00 4.00 2.00 0 00 Pond #2 Pre Hyd. No. 5 -- 10 Yr 0.0 0.8 Hyd No. 5 Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 1.7 2.5 3.3 4.2 5.0 5.8 6.7 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve • Hyd. No. 6 Pond #2 Post Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 14.04 ac Basin Slope = 5.0% Tc method = USER Total precip. = 3.60 in Storm duration = 6 hrs Monday, Nov 22 2004, 2:54 PM Peak discharge = 29.58 cfs Time interval = 5 min Curve number = 91 Hydraulic length = 1500 ft Time of conc. (Tc) = 10 min Distribution = SCS 6-Hr Shape factor = 484 Hydrograph Volume =125,945 cult Q (cfs) 30.00 Pond #2 Post Hyd. No. 6 -=10 Yr • 25.00 20.00 0 15.00 10.00 5.00 0.00 ' 0.0 0.8 Hyd No. 6 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 i E ' ' ' ' nh ' 0.00 1.7 2.5 3.3 4.2 5.0 5.8 6.7 Time (hrs) 30 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Pond #2 Routed Post Hydrograph type = Reservoir. Storm frequency = 10 yrs Inflow hyd. No. = 6 Reservoir name = Pond #2 Storage Indication method used. Wet pond routing start elevation = 753.75 ft Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 -L 0 0 Pond #2 Routed Post Hyd. No. 7 --10 Yr Sunday, Nov 28 2004,12:9 PM Peak discharge = 9.24 cfs Time interval = 5 min Max. Elevation = 756.58 ft Max. Storage = 116,092 cuft Hydrograph Volume = 125,586 cult Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 6 12 18 23 29 35 41 47 53 58 64 Time (hrs) Hyd No. 7 Hyd No. 6 Hydrograph Plot Hydraflow Hydrographs by IMelisolve I* Hyd. No. 5 Pond #2 Pre Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 13.89 ac Basin Slope = 5.8% Tc method = LAG Total precip. = 5.25 in Storm duration = 6 hrs Pond #2 Pre Hyd. No. 5 -- 100 Yr Hydrograph Volume =117,132 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 n nn Monday, Nov 22 2004, 2:54 PM Peak discharge = 27.15 cfs Time interval = 5 min Curve number = 73 Hydraulic length = 689 ft Time of conc. (Tc) = 12.06022 min Distribution = SCS 6-Hr Shape factor = 484 Q (cfs) 0.0 0.8 Hyd No. 5 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 1.7 2.5 3.3 4.2 5.0 5.8 6.7 Time (hrs) 65 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Nov 22 2004, 2:54 PM Hyd. No. 6 Pond #2 Post Hydrograph type = SCS Runoff Peak discharge = 47.17 cfs Storm frequency = 100 yrs Time interval = 5 min Drainage area = 14.04 ac Curve number = 91 Basin Slope = 5.0% Hydraulic length = 1500 ft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 5.25 in Distribution = SCS 6-Hr. Storm duration = 6 hrs Shape factor = 484 Hydrograph Volume = 201,864 cuft a (cfs) 50.00 040.00 30.00 20.00 10.00 0 00 Pond #2 Post Hyd. No. 6 -- 100 Yr a (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.0 0.8 1.7 2.5 3.3 4.2 5.0 5.8 6.7 Hyd No. 6 Time (hrs) • 66 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Pond #2 Routed Post Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 6 Reservoir name = Pond #2 Storage Indication method used. Wet pond routing start elevation = 753.75 ft. Q (cfs) 50.00 •40.00 30.00 20.00 10.00 0.00 _ h_ 0 5 10 Hyd No. 7 Sunday, Nov 28 2004,12:9 PM Pond #2 Routed Post Hyd. No. 7 --100 Yr Q (cfs) 50.00 Peak discharge = 13.21 cfs Time interval = 5 min Max. Elevation = 757.99 ft Max. Storage 151,330 cuft Hydrograph Volume = 201,505 cuft 15 40.00 30.00 20.00 10.00 - - _- -? 0.00 20 25 30 35 40 45 50 55 Hyd No. 6 Time (hrs) 0 PARTNERSHIP FOR ECONOMIC and TOURISM DEVELOPMENT Partnering for Economic Progress in Rockingham County, N.C. March 15, 2004 Ms. Denise Poulos ECS LTD 6909 international Drive, Suite 103 Greensboro, NC 27409 Ref: Reidsville Industrial Park Dear Ms. Poulos, This letter is to confirm your authorization to act as our agent in obtaining the 401 Water Quality Certification for impacts to wetlands associated with the construction of Technology Drive South in the Reidsville Industrial Park and the stormwater detention pond. Sincerely, O'Li'sa."Perry President 371 NC 65, Suite 205 Phone: 336-342-8138 PO Box 205 Fax: 336-342-8375 Wentworth, NC 27375-0205 Email: info@northstar.com J ! ? ? ? ?? r i • r1J? + I eF h fV `. ,. y Soath P rl f \ E} ` l ! 1 ?t \? t Ot ?-- r a _ ? 1 Y c i " i A Ors?iosal\ r. >r r } ti. r 7 ?? 'a 4W 1 t .. \\ F 'N r )+ /? nR I J ? ? t3M. r ? i , StCy?- -?, • • .p ?{ r '? • SITE -- ?•' \'I ) - ? - r' - ? ? ? ?+•? - ?? . :1:-3 I I i I4 t ? ? tl ? t C .?f? t : 7?Bf jar ?rp V r b l Au rm ark c *, C j ?r s b • 'x ??4r tf;r t ?, t 1 ? {{ - /2y } y' . / Fpm [rrooe „?%esiG5 j. 7r Iler N SOURCE: FIGURE I r r ¦I USES TOPOGRAPHIC MAP SITE LOCATION MAP s REIDSVILLE, NC QUADRANGLE Scm REIDSVILLE INDUSTRIAL PARK DATED 1972 AND REVISED 1994 SOUTHERN TRACT - LOT 2 ENGINEERING REIDSVILLE, NORTH CAROLINA C0I'NSULTING SCALE: I"= 2,000' SERVICES, LTD ECS PROJECT G-9201 601 N. Trade Street date: 3101104 job #: 03-258 sapa Suite zoo Winston Salem, NC project: Reidsville Industrial Park South 27101-2916 Landscape Architecture scale: 1 "=60' sheet 1 of 1 Civil Engineering P: 336.723.1067 Stimmel Associates, PA Land Planning F: 336.723.1069 description: Wetland Fill Exhibit fax form ? .:,: ors ? I a? ? ? ``,, _.__, - ^ SCALE: 1 " - 60' rn v7 +; - - J 0o N IN C? .1 --S S • 4-t j 110 t \ ? ?s,'\% ••• ?t1`(i12 ` IsbIrED 1 , i. 10 AFB;- WIPES, IN N ' N-JURI'SD , 0 ^ +,• ?H"'"" 1 t} h WE , CP 1 76.23 SQl J X t f IS01-krED woo _ ?? IVON-J?IRISDI ? ?s `59 57Q. Ffl ; ' T t NON-J URISDICTI(NAL- ; WE"D 3,02 .47 S(?,\ FT. ?? zW4? ;, s\ o ^ yj '? ?0' ACC+ESS R06 , ` ms's T0- POND 60' ACCESS ' EASEMENT I r I ` ?' PROP 411.7y 8? \ UN &0 'w ; l t,t ftft !! >s4 >66 1 \ AM .t J? i ? ,3 f l a _ ti/ `I ?' a N f /% \ `760 , > ! i # ` SWM ,Pq, !) 2E'*- DAM DESIGN REPORT REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT DAM 2E Reidsville, NC Rockingham County Owner: CITY OF REIDSVILLE 230 WEST MOREHEAD STREET REIDSVILLE, NC 27320 Prepared By: ???sssv 0 1 ev Stimmel Associates, PA 0279 • • • °s !( '51 J ? ' K x?a+i ?ui{ '0"a sapa Landscape Architecture Civil Engineering Land Planning Project # 03-258 601 N. Trade Street Suite 200 Winston Salem, NC 27101-2916 P: 336.723.1067 F: 336.723.1069 DAM DESIGN NARRATIVE REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT - DAM 2E INTRODUCTION The project is located on NC Hwy 87, near the intersection of NC Hwy 87 and Business US Hwy 29 in Reidsville, NC. The site is located on the USGS Quad Map "Reidsville, NC". The pond will be constructed to comply with local pre-post detention and state water quality stormwater management requirements. The site will be developed into various sized lots of commercial type use with a maximum 70% impervious area. Storm drainage systems on the individual lots will discharge into the street storm drainage systems, which will serve as a collector and direct all stormwater runoff from impervious surfaces to the stormwater management pond discussed below. Stormwater management Pond 2E will be constructed to capture and treat stormwater runoff from Tract 2 of Reidsville Industrial Park Southern Tract. A hazard classification form was submitted to NCDENR -Land Quality Section - Dam Safety Program on January 22, 2004. Stimmel Associates recommended a low hazard classification. We have not received a response to date and therefore the dam was designed to this designation. METHODOLOGY Existing and proposed hydrologic computations were performed using methodology found in the Soil Conservation Service's Technical Release No. 55' (TR-55) and the Soil Conservation Service's National Engineering Handbook, Section 4-Hydrology 2 (NEH-4). Time of concentration (Tc) for the predeveloped condition was calculated using the TR-55 method. The TR-55 method characterizes runoff flow as sheet, shallow concentrated, or channel flow. Stormwater runoff begins in the upper reaches of the drainage basin as sheet flow. Sheet flow is considered to continue for no more than 300 feet. At 300 feet, runoff transitions to shallow concentrated flow and continues as this mode until it is channelized in a natural channel or other conveyance system. Flow times are calculated along the longest flow path from the uppermost point in the drainage basin to the basin outlet or the point of design. Flow times are calculated for each mode of flow and added together to determine Tc. Time of concentration (Tc) for the post-developed condition is the inlet time for the most remote drainage inlet plus the storm drainage pipe travel time to the design point. The inlet time for the most remote drainage inlet is assumed to be 10 minutes. The travel distance from the most remote drainage inlet to the design point equals 1,500 linear feet and the average velocity for the storm drainage system is assumed to be of 5 ft/sec; therefore the post-developed Tc equals 15- mins. Runoff curve numbers (CN) were taken from TR-55 as well. The USDA Soil Conservation Service's Soil Survey of Rockingham County, North Carolina 3 (Soil Survey) was used to determine the existing soil group classifications. Soils present on this site are of hydrologic soils group classification "C". The composite post-developed curve numbers were calculated based on an impervious percentage of 70% for the lots and the impervious area within Technology Drive South. A soils map of the site and composite curve number calculations with references are included in this report. The SCS Unit Hydrograph Method and the SCS 6-hour rainfall distribution was used in calculating the inflow hydrographs. Hydrographs were calculated based on the using a shape factor of 484. The SCS Unit Hydrograph Method is outlined in NEH-4. Rainfall data used in the hydrologic analysis for the project was taken from Technical Paper No. 40 - Rainfall Frequency Atlas of the Unites States 4 (TP-40), published by the U.S. Department of Commerce. DESIGN PARAMETERS The design parameters of the ponds consist of NCDENR - Dam Safety Program requirements for spillway design storm, City of Reidsville stormwater detention requirements, and NCDENR - Division of Water Quality's 401 Water Quality Certification requirements. DAM SAFETY: The spillway design storms, required and actual, are as follows: Dam Hazard Required Spillway Actual Spillway Classification/Size Design Storm Design Storm Dam 2E Low/Small 50-Year 100-Year PEAK REDUCTION: The City of Reidsville Stormwater Management Rules requires reduction of the 10-year post-developed discharge flow rate to the 10-year pre-developed discharge flow rate. WATER QUALITY CONTROL: The stormwater management pond will be designed to remove 85% of the total suspended solids (TSS) in accordance with the NCDENR - Stormwater Best Management Practices Manual 5 (State Manual). POND DESIGN Dam 2E is a new dam that will be an embankment structure of homogeneous fill material. The dam will have a cut-off trench and toe drain to control seepage. Riser / barrel structure will serve as the primary spillway. The top of the riser is set at an elevation that controls the 10-year discharge rate to comply with the peak storm reductin requirement. The riser is a sectional precast concrete structures with steps on the inside and outside for maintenance access. The joints in the structures are sealed using a preformed butyl rubber sealant and shall be parged inside and out with non-shrink grout. At the top of the riser is a trash rack fabricated from aluminum bar stock. The trash rack incorporates an anti vortex plate into the devices. The riser design includes a pipe stub at the bottom with a gate valve so that the pond can be drained if necessary. The outlet barrel is ductile iron pipe with push on joints suitable for pressure applications. A seepage diaphragm is provided along the outlet barrel. The diaphragm extends 18 inches out from the outlet barrel on-thetop and sides. The diaphragm drainage medium is NCDOT 2S drainage sand with two 4 inch #10 screen PVC pipes along the bottom for drainage. The precast riser has a PVC pipe sleeve cast into the wall at the permanent pool level. This PVC pipe serves as the drawdown device for the temporary water quality pool, releasing the runoff from the first 1-inch of rainfall over a 2 to 5 day period. The purpose of this drawdown device is to satisfy the water quality requirements set forth in the State BMP Manual. This pipe will be fitted with a 90-degree bend and pipe section turned down and extending to 6 inches below the permanent pool level to guard against being plugged with trash and debris. The precast concrete riser and ductile iron barrel is sized to satisfy the peak reduction requirements set forth in the City of Reidsville Stormwater Management rules. The riser was analyzed as weir flow. The barrel was analyzed as both inlet and outlet control to determine which governs. When the riser and barrel flow are calculated they are then compared to determine which component of the structure controls the total outflow. Storm hydrograph routing through the ponds was performed using the Storage Indication Method as outlined in NEH-4. A brief summary of the routing results is outlined below. Detailed routing calculations are included in the report. In the Reservoir Report for each pond, under Culvert / Orifice Structures - [A] is the barrel, [B] is the drawdown orifice set at permanent pool; under Weir Structures - [A] is the top of the riser, [B] is the emergency spillway. An emergency spillway is provided as shown on the drawings. The emergency spillway operates in the 50-year storm event and provides 1-foot of freeboard during he 100-year storm event. SUMMARY OF DESIGN CALCULATIONS Routing Results Design Storm Predeveloped Runoff Rate Post-developed Runoff Rate Routed Discharge Peak Elevation 10-Year 69.73 cfs 234.87 cfs 67.82 cfs 767.35 ft 25-Year N/A 284.54 cfs 103.55 cfs 767.96 ft 50-Year N/A 325.84 cfs 130.34 cfs 768.49 ft 100-Year N/A 371.15 cfs 173.74 cfs 769.00 ft Detailed design computations for the system follow this narrative. REFERENCES 1. Technical Release No. 55, USDA Soil Conservation Service, December 1993 2. National Engineering Handbook Section 4-Hydrology, USDA Soil Conservation Service, 1972 3. Soil Survey of Rockingham County, North Carolina, USDA Soil Conservation Service, December 1992 4. Technical Paper No. 40 - Rainfall Frequency Atlas of the Unites States for Durations from 30 Minutes to 24 Hours and Return Periods from 1 To 100 Years, U. S. Department of Commerce, May 1961 5. Stormwater Best Management Practices, NCDENR, Division of Water Quality, April, 1999 Project: Reidsville Industrial Park - Southern Tract - Dam 2E Project No.: 03-258 Designed By: KLH Checked By: KLH Date: Revised: 1/29/2004 3/3/2004 I WATER QUALITY POND DESIGN I N DATA On-Site Drainage Area to Pond = 68.88 acres On-Site Proposed Impervious Area = 48.21 acres On-Site Future Impervious Area = 0.00 acres Total On-Site Impervious Area = 48.21 acres Total Project Site Area = 68.88 acres WATERSHED INFORMATION Watershed = N/A Classification = N/A 69.99% On-Site Pond Impervious Percentage 69.99% On-Site Project Impervious Percentage to Drainage Area to Pond = 0.00 acres to Impervious Area = 0.00 acres to Future Impervious Area = 0.00 acres I Offsite Impervious Area = 0.00 acres Total Watershed Area to Pond = 68.88 acres Graded Area to Pond = 0.00 acres Temporary Sediment Storage Used = N Temporary Sediment Storage = Permanent Sediment Storage = Current Composite Impervious Percentage = Design Maximum Impervious Percentage = Permanent Water Quality Pool Depth (3'min.) _ Surface Area / Drainage Area Ratio = Temporary Water Quality Depth to be Controlled = Elevation at Bottom of Pond = 756.00 Elev. at Bottom of PSS and PWQ = 756.00 Elevation at Top of PSS = 757.00 Elevation at Bottom of TWQ = 762.00 Elevation at Top of TWQ = 765.00 0.50 ac-in. 0.125 ac-in. 69.99% 70.00% 6.00 FT Based on Max. Impervious % 1.790% Based on Max. Impervious % 1.0 Inch Surface Area = 34,802 SF Surface Area = 34,802 SF Surface Area = 36,728 SF Surface Area = 59,033 SF Surface Area = 69,223 SF Elevation at Bottom of Pond = 756.00 Elevation at Bottom of TWO = 762.00 Surface Area = 34802 Square Feet Surface Area = 59033 Square Feet Allow 75% of Basin Volume To Water Quality Orifice = 001 North Trade Street, Suite 200 Phone (336) 723-1007 5timmel Aooooiate5, P.A. Winston Salem, NC 27101 Fax (330) 723-1009 Elevation at Bottom of PSS = 756.00 Elevation at Middle of PSS = 756.50 Elevation at Top of PSS = 757.00 I OKI PERMANENT WATER QUALITY SURFACE AREA REQ'D = 53707 Square Feet Normal Pool Elevation = 762.00 Surface Area Provided = 59033 Square Feet OK Elevation at Bottom of TWO = 762.00 Elevation at Middle of TWQ = 763.50 Elevation at Top of TWO = 765.00 Surface Area = 34802 Square Feet Surface Area = 35765 Square Feet Surface Area = 36728 Square Feet Volume Provided = 35765 Cubic _ .170023 Cubic Feet Rv 0.680 in/in Surface Area = 59033 Square Feet Surface Area = 64066 Square Feet Surface Area= 69223 Square Feet Volume Provided = 192260 Cubic Feet Elevation at Top of Riser = Elevation at Bottom of Water Quality Release Hole = Maximum Release Rate = Minimum Release Rate = Maximum Hole Size = 0.245780574 Minimum Hole Size = 0.09831223 765.00 762.00 2 Days 5 Days 6.71 in. dia. 4.25 in. dia. Elevation at Normal Pool = Elevation at Bottom Of Pond = Release Rate = Maximum Hole Size = 762.00 756.00 1 Days 0.695172444 11.29 in. dia. 601 North Trade Street, Suite 200 Fhone (336) 723-1067 5timmel ASaociateo, F.A. Winston Salem, NC 27101 Fax (336) 723-1069 XTACH A' `0 REUW THIS SWEMEW flf ?; .? OED 6 N M,,* ? OF rEyS pESCjwp EEOW f NOT COfECT PLEASE NOTIFY US PROMPTLY NO RECEIPT DESIRED. Engineering Consulting Services LTD. DATE ACCOUNT DESCRIPTION AMOUNT Doh .D40472 ?,?, 67 a??a C i NO. DATE OF 1 r Q w fi F R1 C3 44- CID REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT STORMWATER MANAGEMENT PONDS LOT 2E GENERAL NOTES: POND CONSTRUCTION SPECIFICATIONS: INSPECTION SCHEDULE ROAD D -C T —PASS NC I SITE PREPARATION V CONCRETE IT IS CRITICAL FOR SEVERAL ITEMS TO ,.rINSPECTED AT THE RE I DSV I LLtz 1. HE CONTRACTOR SHALL VISIT THE SITE TO INFORM AND SATISFY HIMSELF OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. ANY APPROPRIATE TIME DURING CONSTRUCTION. IT IS HE CONTRACTOR'S VICINITY MAP* AREAS DESIGNATED FOR BORROW AREAS, EMBANKMENT, AND STRUCTURAL CONCRETE SHALL MEET THE REQUIREMENTS OF NORTH CAROLINA RESPONSIBILITY TO NOTIFY THE ENGINEER AT LEAST 2 DAYS PRIOR TO DISCREPANCY BETWEEN THE SITE AND THOSE CONDITIONS REPRESENTED ON WORKS SHALL BE CLEARED, GRUBBED AND STRIPPED OF TOPSOIL. ALL DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, SECTION BEGINNING WORK ON HESE ITEMS TO SCHEDULE INSPECTIONS. HE AMCOUNTY THE DRAWINGS SHALL BE BROUGHT TO HE ATTENTION OF THE OWNER AND TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL SHALL 1000, CLASS A. ITEMS ARE AS FOLLOWS: R CKNGH THE ENGINEER IMMEDIATELY. BE REMOVED. CHANNEL BANKS AND SHARP BREAKS SHALL BE SLOPED NTS 2. ALL DIMENSIONS, RADII, AND NORTHING &FASTING COORDINATES ARE TO TO NO STEEPER THAN 1:1. AREAS TO BE COVERED BY THE RESERVOIR ANY ITEMS CONSTRUCTED AND COVERED UP PRIOR TO OBSERVATION WILL CENTER OF STRUCTURES SUCH AS INLETS, MANHOLES, ETC., OR END OF PIPE WILL BE CLEARED OF ALL TREES, BRUSH, LOGS, FENCES, RUBBISH AND VI ROCK RIP RAP BE UNCOVERED OR TESTING WILL BE PROVIDED AS APPROPRIATE AT THE RUNS AS APPLICABLE UNLESS NOTED OTHERWISE. OTHER OBJECTIONABLE MATERIAL UNLESS OTHERWISE DESIGNATED ON HE CONTRACTORS EXPENSE. PLANS. TREES, BRUSH AND STUMPS SHALL BE CUT APPROXIMATELY LEVEL ROCK RIP RAP SHALL MEET HE REQUIREMENTS OF NORTH CAROLINA 3. ALL EXISTING UTILITIES OR STRUCTURES INDICATED ON HE DRAWINGS ARE IT THE GROUND SURFACE. FOR DRY STORM WATER MANAGEMENT PONDS, DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, SECTION 1 EXCAVATION FOR ANTI -FLOTATION ANCHOR PRIOR TO PLACING CONCRETE. A MINIMUM OF A 50 FOOT RADIUS AROUND THE INLET STRUCTURE SHALL 1042. THE RIP -RAP SHALL BE PLACED TO THE REQUIRED THICKNESS IN BASED ON AVAILABLE INFORMATION OF RECORD. THE CONTRACTOR IS BE CLEARED. ALL CLEARED AND GRUBBED MATERIAL SHALL BE DISPOSED ONE OPERATION. HE ROCK SHALL BE DELIVERED AND PLACED IN A 2 BARREL PLACEMENT BEFORE AND DURING BACKFILL. REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES OF OUTSIDE AND BELOW THE LIMITS OF HE DAM AND RESERVOIR AS MANNER THAT WILL INSURE THE RIP- RAP IN PLACE SHALL BE SHOWN ON THESE PLANS. HE CONTRACTOR SHALL BE RESPONSIBLE SHOWN HEREON AND ANY OTHER EXISTING LINES NOT OF RECORD B NOTLE FOR DIRECTED BY THE OWNER OR HIS REPRESENTATIVE. WHEN SPECIFIED, A REASONABLY HOMOGENEOUS WITH THE LARGER ROCKS UNIFORMLY 3 FINAL INSPECTION. LEGEND, A UTILITIES AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES • SUFFICIENT QUANTITY OF TOPSOIL WILL BE STOCKPILED IN A SUITABLE DISTRIBUTED AND FIRMLY IN CONTACT ONE TO ANOTHER WITH THE MAKING ARRANGEMENTS FOR HE RELOCATION OR REMOVAL EXISTING LOCATION FOR USE ON THE EMBANKMENT AND OTHER DESIGNATED AREAS. SMALLER ROCKS FILLING THE VOIDS BETWEEN THE LARGER ROCKS. RESULTING FROM HIS FAILURE TO LOCATE AND PRESERVE ANY AND ALL FILTER CLOTH SHALL BE PLACED UNDER ALL RIP RAP AND SHALL MEET UNDERGROUND UTILITIES. BEFORE STARTING WORK THE CONTRACTOR SHALL II EARTH FILL THE REQUIREMENTS OF NORTH CAROLINA DEPARTMENT OF CONTACT ULOCO AT 1 (800) 632-4949 TO HAVE ALL EXISTING UTILITIES A MATERIAL TRANSPORTATION, STANDARD SPECIFICATIONS, SECTION 1056, TYPE 2. EXISTING CONTOURS 0 2' INTERVALS LOCATED. THE FILL MATERIAL MAY BE TAKEN FROM AN ONSITE BORROW AREA. IT SHALL "" _=} -- -- -- ~� EXISTING CONTOURS ®10' INTERVALS BE FREE OF ROOTS, STUMPS, WOOD, RUBBISH VII CARE OF WATER DURING CONSTRUCTION 4. LOCATION AND ELEVATIONS OF IMPROVEMENTS, TO BE MET OR CROSSED BY STONES GREATER THAN 6", FROZEN OR OTHER OBJECTIONABLE MATERIALS. PROPOSED CONTOURS ® 1' INTERVALS WORK, SHALL BE CONFIRMED BY FIELD MEASUREMENT, SUFFICIENTLY AHEAD OF FILL MATERIAL FOR THE EMBANKMENT AND CUT OFF TRENCH SHALL BE ALL WORK ON THE PERMANENT STRUCTURES SHALL BE CARRIED OUT IN CLI ENT• CONSTRUCTION TO PERMIT REVISIONS TO THE PLANS, TI REVISIONS ARE APPROVED (AS MEETING THE SPECIFICATIONS FOR FILL MATERIAL BY THE AREAS FREE FROM WATER. THE CONTRACTOR SHALL CONSTRUCT AND 750 PROPOSED CONTOURS ® 5' INTERVALS NECESSARY DUE TO ACTUAL LOCATION OF EXISTING UTILITIES. GEOTECHINCAL ENGINEER PRIOR TO PLACEMENT. MAINTAIN ALL TEMPORARY DIKES, LEVEES, COFFER DAMS, DRAINAGE 5. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE CHANNELS, AND STREAM DIVERSIONS NECESSARY TO PROTECT THE AREAS �� RIGHT-OF-WAY s B PLACEMENT - --� TO BE OCCUPIED BY THE PERMANENT WORKS. THE CONTRACTOR SHALL CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND CITY OF REIDSVILLE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING HE COURSE OF AREAS ON WHICH FILL IS TO BE PLACED SHALL BE SCARIFIED ALSO FURNISH, INSTALL, OPERATEAND MAINTAIN ALL NECESSARY PUMPING rg — - - - — CENTERLINED PROPERTY AND THAT HIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND PRIOR TO PLACEMENT OF FILL. FILL MATERIALS SHALL BE PLACED IN AND OTHER EQUIPMENT REQUIRED FOR REMOVAL OF WATER FROM THE 230 W. MOREHEAD STREET NOT BE LIMITED TO NORMAL WORKING HOURS AND THAT THE CONTRACTOR MAXIMUM 8 -INCH THICK (BEFORE COMPACTION) LAYERS WHICH ARE TO BE VARIOUS PARTS OF THE WORK AND FOR MAINTAINING THE EXCAVATIONS, D — — PROPOSED LOTLINE SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER CONTINUOUS OVER THE ENTIRE LENGTH OF THE FILL. THE MOST PERMEABLE FOUNDATION, AND OTHER PARTS OF THE WORK FREE FROM WATER AS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION BORROW MATERIAL SHALL BE PLACED IN THE DOWNSTREAM PORTIONS OF REQUIRED OR DIRECTED BY THE ENGINEER FOR CONSTRUCTING EACH MAY 1 0 2005 — — PROPERTY BOUNDARY REIDSVILLE, NC 27320 NH PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY THE EMBANKMENT. THE PRINCIPAL SPILLWAY MUST BE INSTALLED PART OF THE WORK. AFTER HAVING SERVED THEIR PURPOSE, ALL ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. CONCURRENTLY WITH FILL PLACEMENT AND NOT EXCAVATED INTO THE TEMPORARY PROTECTIVE WORKS SHALL BE REMOVED OR LEVELED AND DENR-WATER QUALITY — — — — — — — — — — EASEMENT LINE EMBANKMENT. GRADED TO THE EXTENT REQUIRED TO PREVENT OBSTRUC11ON IN ANY WEMMAND STORMMiATERWNCH 6. THE CONTRACTOR SHALL VERIFY THAT ALL REQUIRED PERMITS AND DEGREE WHATSOEVER OF THE FLOW OF WATER TO THE SPILLWAY OR APPROVALS HAVE BEEN OBTAINED FROM THE APPROPRIATE AUTHORITIES C COMPACTION OUTLET WORKS AND SO AS NOT TO INTERFERE IN ANY WAY WITH THE '' �` EXISTING TREELINE BEFORE BEGINNING WORK ON THE PROJECT. ALL DAM FILL SHALL BE COMPACTED TO NOT LESS THAN 98% OF HE OPERATION OR MAINTENANCE OF THE STRUCTURE. STREAM DIVERSIONS STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) NH A MOISTURE SHALL BE MAINTAINED UNTIL HE FULL FLOW CAN BE PASSED THROUGH CLEARING LIMITS 7. ALL CONSTRUCTION, MATERIALS, AND WORKMANSHIP SHALL CONFORM TO CONTENT WITHIN +/-2 % OF THE OPTIMUM. EACH LAYER OF FILL SHALL BE THE PERMANENT WORKS. THE REMOVAL OF WATER FROM THE REQUIRED NCDOT STANDARDS AND SPECIFICATIONS, NCDENR - LAND QUALITY SECTIONS COMPACTED AS NECESSARY TO OBTAIN THAT DENSITY, AND IS TO BE EXCAVATION AND THE FOUNDATION SHALL BE ACCOMPLISHED IN A "EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL", AND CERTIFIED BY THE GEOTECHINCAL ENGINEER AT THE TIME OF CONSTRUCTION. MANNER AND TO THE EXTENT THAT WILL MAINTAIN STABILITY OF THE • . • • . • • CREEK / WATER SURFACE THE CITY OF REIDSVILLE STANDARDS AND SPECIFICATIONS. IN THE EVENT OF TESTING WILL BE THE OWNER'S RESPONSIBILITY. NO COMPACTION EQUIPMENT EXCAVATED SLOPES AND BOTTOM OF REQUIRED EXCAVATIONS AND WILL CIVIL ENGINEER. A CONFLICT BETWEEN.. THE DRAWINGS AND THESE STANDARDS, THE MORE SHALL TRAVERSE ANY PIPE UNTIL MINIMUM COVER IS PLACED OVER PIPE TO ALLOW SATISFACTORY PERFORMANCE OF ALL MATERIAL IN RE OPERATIONS. —• —■—• • • STRINGENT REQUIREMENT SHALL APPLY AS DETERMINED BY THE ENGINEER. PREVENT DAMAGE TO THE PIPE. COMPACTION TESTING FOR EMBAN{MENT DURING HE PLACING AND COMPACTING OF MATERIAL IN REQUIRED EXISTING WATERLINE SHALL BE PERFORMED AT A FREQUENCY OF ONE EST PER 2000 SQUARE EXCAVATIONS, HE WATER LEVEL AT HE LOCATIONS BEING REFILLED 8. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING HIS WORK WITH THE FEET PER VERTICAL FOOT OF FILL. COMPACTION FETING ALONG PI'z)S SHALL BE MAINTAINED BELOW THE BOTTOM OF THE EXCAVATION AT SUCH —■ ■—• • •— PROPOSED WATERLINE 601 N. Trade Street WORK OF OTHER CONTRACTORS ON THE PROJECT TO AVOID CONFLICT. PLACED THROUGH THE DAM SHALL BE REQUIRED AT A FREQUECI :?� ONE LOCATIONS WHICH MAY REQUIRE DRAINING THE WATER TO SUMPS FROM ti m m e Suite 200 TEST PER 25 LINEAR FEET OF PIPE PER VERTICAL FOOT OF FILL. WHICH THE WATER SHALL BE PUMPED, EXISTING FIRE HYDRANT Winston Salem, NC ENVIRONMENTAL N D CUTOFF TRENCH VIII STABILIZATION PROPOSED FIRE HYDRANT Landscape Architecture 27101-2916THE CUTOFF TRENCH SHALL BE EXCAVATED INTO IMPERVIOUS MATCRIAL ALONG OR PARALLEL TO THE CENTERLINE OF THE EMBANKMENT AS SHOWN ALL BORROW AREAS SHALL BE GRADED TO PROVIDE PROPER DRAINAGE IB91 EXISTING GATE VALVE Civil Engineering ON THE PLANS. THE BOTTOM WIDTH OF HE TRENCH SHALL BE GOVERNED AND LEFT IN A SIGHTLY CONDITION. ALL EXPOSED SURFACES OF THE P: 336.723.1067 BY THE EQUIPMENT USED FOR EXCAVATION, WITH THE MINIMUM WDTH BEING EMBANKMENT, SPILLWAY, SPOIL AND BORROW AREAS, AND BERMS SHALL TNI PROPOSED GATE VALVE Stimmet Associates PA Land Planning F: 336.723.1069 THIS PROPERTY CONTAINS WETLANDS AND/OR WATERS OF THE US (STREAMS) � g TEN FEET. THE DEPTH SHALL BE AT LEAST FIVE FEET BELOW EXISTING GRADE BE STABILIZED BY SEEDING, LIMING, FERTILIZING AND MULCHING IN THAT ARE UNDER JURISDICTION OF THE U.S. ARMY CORPS OF ENGINEERS AND OR AS SHOWN ON THE PLANS. THE SIDE SLOPES OF HE TRENCH SHALL BE ACCORDANCE WITH THE SPECIFICATIONS AS SHOWN ON HE PROPOSED 45' BEND THE NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 1 TO 1 OR FLATTER. THE BACKFILL SHALL BE COMPACTED WITH ACCOMPANYING DRAWINGS. DISTURBANCE TO THESE JURISDICTIONAL AREAS SHALL NOT EXCEED THAT CONSTRUCTION EQUIPMENT, ROLLERS, OR HAND TAMPERS TO ASSURE SHOWN ON THE PLANS. MAXIMUM DENSITY AND MINIMUM PERMEABILITY. STING SANITARY SEWER LINE THE CONTRACTOR SHALL BE LIABLE FOR ANY DAMAGES TO THE OWNER AND III BACKFILL ADJACENT TO PIPES & STRUCTURES IX EROSION AND SEDIMENT CONTROL " " • PROPOSED SANITARY SEWER UNE ENGINEER THAT RESULT FROM THE DISTURBANCE OF THE EXISTING WETLANDS? EXISTING SANITARY SEWER MANHOLE AND/OR WATERS OF THE US (STREAMS) BEYOND THAT SHOWN ON THE PLANS. BACKFILL ADJACENT TO PIPES OR STRUCTURES SHALL BE OF THE TYPE AND CONSTRUCTION OPERATIONS WILL BE CARRIED OUT IN SUCH A MANNER THE DAMAGES MAY INCLUDE THE FOLLOWING, BUT ARE NOT LIMITED TO: QUALITY CONFORMING TO THAT SPECIFIED FOR THE ADJOINING FILL MATERIAL. THAT EROSION WILL BE CONTROLLED AND WATER AND AIR POLLUTION WING INDEX. FINES CONSULTANT FEES, CONSTRUCTION COSTS, MITIGATION FEES, AND LEGAL THE FILL SHALL BE PLACED IN HORIZONTAL LAYERS AT A THICKNESS HAT IS MINIMIZEDPROPOSED SANITARY SEWER MANHOLE DRA� FEES. THE CONTRACTOR, AT HIS DISCRETION, MAY PROVIDE ADDITIONAL . STATE AND LOCAL LAWS CONCERNING POLLUTION ABATEMENT COMPATIBLE WITH THE COMPACTION EQUIPMENT BEING USED TO ACHIEVE WILL BE FOLLOWED. CONSTRUCTION PLANS SHALL DETAIL EROSION AND PROTECTIVE MEASURES ABOVE AND BEYOND WHAT IS SHOWN ON THIS PLAN TO THE SPECIFIED COMPACTION. THE MATERIAL SHALL FILL COMPLETELY ALL SEDIMENT CONTROL MEASURES TO BE EMPLOYED DURING THE _ _ .. _. _ EXISTING STORM DRAINAGE LINE INSURE NO DISTURBANCE TO THE WETLANDS AND STREAMS. COORDINATE ANY SPACES UNDER AND ADJACENT TO THE PIPE. AT NO TIME DURING THE CONSTRUCTION PROCESS. ADDITIONAL MEASURES WITH THE ENGINEER AND EROSION CONTROL INSPECTOR. BACKFILLING OPERATION SHALL DRIVEN EQUIPMENT BE ALLOWED TO OPERATE PROPOSED STORM DRAINAGE LINE C-1.0 POND RETROFIT PLAN CLOSER THAN FOUR FEET, MEASURED HORIZONTAL, TO ANY PART OF A STRUCTURE. UNDER NO CIRCUMSTANCES SHALL EQUIPMENT BE DPIVEN OVER EXISTING STORM DRAINAGE MANHOLE C-1.1 POND ACCESS ROAD PLAN ANY PART OF A CONCRETE STRUCTURE OR PIPE, UNLESS THERE IS A X MAINTENANCE SCHEDULE STORM DRAINAGE NOTES • COMPACTED" SEE DOCUMENT ENTITLED "EMERGENCY ACTION PLAN AND OPERATION AND D FILL OF 24 OR GREATER OVER THE STRUCTURE OR PIPE. OO PROPOSED STORM DRAINAGE MANHOLE C-2.0 STANDARD DETAILS AND NOTES MAINTENANCE SCHEDULE, REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT 0 EXISTING CATCH BASIN C-2.1 POND DETAILS IV PIPE CONDUITS 1 ALL STORM DRAINAGE PIPE SHALL BE HDPE DOUBLE WALL PIPE WITH SMOOTH A ALL PIPES SHALL BE CIRCULAR IN CROSS SECTION. DAM 2E". ■ PROPOSED CATCH BASIN INTERIOR UNLESS NOTED OTHERWISE. PIPE JOINTS SHALL BE SILT TIGHT USING. B A. CORRUGATED METAL PIPE - ALL OF THE FOLLOWING CRITERIA SHALL APPLY MANUFACTURER'S STANDARD RUBBER GASKET.INLET PROTECTION CORRUGATED METAL PIPE: 2 UNDER DRAINS TO BE CONSTRUCTED AS REQUIRED BY THE ENGINEER TO 1. MATERIALS - (ALUMINUM ALLOY) - THIS PIPE AND ITS APPURTENANCES SHALL SILT FENCE STABILIZE SUBGRADE. CONFORM TO THE REQUIREMENTS OF AASHTO M-196 ASTM B-745. AND AASHTO / ftiFKfEEEE(EEfEEEEEEEfEEEEffEE(EEEEEEEE(E(EKK((E(EE(EKKEKEEKEEE( 3 STORM DRAINAGE MANHOLES SHALL BE PRECAST CONCRETE CONFORMING M-197 / ASTM -B-744, WITH WATERTIGHT BANDS OR FLANGES. ALUMINUM TEMPORARY DIVERSION TO NCDOT STANDARD 840.31. MANHOLES SHALL ALSO BE CONSTRUCTED SURFACES THAT ARE TO BE IN CONTACT WITH CONCRETE SHALL BE PAINTED WITH a— a— _ IN ACCORDANCE WITH ASTM C-478, ASTM A-615, AND ASTM A-185, ONE COAT OF ZINC CHROMATE PRIMER. TREE PROTECTION FENCING ASTM C-990. MANHOLE CASTINGS SHALL BE PROVIDED IN ACCORDANCE •` p` WITH THE SPECIFICATIONS. 2. COUPLING BANDS, ANTI -SEEP COLLARS, END SECTIONS, ETC. MUST FABRICATED FROM THE SAME MATERIAL AS THE PIPE. METALS MUST BE INSULATED FROM DISSIMILAR MATERIALS WITH THE USE OF RUBBER OR PLASTIC INSULATING MATERIALS AT LEAST 24 MILS IN THICKNESS. STAINLESS STEEL BOLTS SHALL BE USED FOR CONNECTIONS. 3. CONNECTIONS - ALL CONNECTIONS WITH PIPES MUST BE COMPLETELY PERMANENT SEEDING WATERTIGHT. THE BARREL CONNECTION TO THE RISER SHALL BE WELDED ALL SURVEY DISCLAIMER. AROUND WHEN THE RISER IS METAL. ANTI -SEEP COLLARS SHALL BE CONNECTED TO THE PIPE IN SUCH A MANNER AS TO BE COMPLETELY WATERTIGHT. DIMPLE BANDS ARE NOT CONSIDERED TO BE WATERTIGHT. SURVEY PROVIDED BY: ALL DISTURBED AREAS TO BE SEEDED WITH AN EVEN MIXTURE OF REBEL 4. ALL CONNECTIONS SHALL USE A RUBBER OR NEOPRENE GASKET WHEN JOINING II, FALCON AND JAGUAR FINE FESCUES AT A RATE OF 5-6 LBS./1,000 SECTIONS.PIPE OF EACH PIPE SHALL REGIONAL LAND SURVEYORS S.F. SO AS TO PRODUCE A THICK, FIRM STAND OF GRASS. FERTILIZE AT NUMBEROFF CORR GATIO SETO ACCOMMODA THE BAND WID H.` ADEQUATEP.O. BOX 35341 A RATE OF 10 LBS./1,000 S.F. WITH A SLOW-RELEASE FERTILIZER (USE STRAW AND ASPHALT EMULSION TO COVER SEED UNTIL STABLE.) APPLY 5. THE FOLLOWING TYPE CONNECTIONS ARE ACCEPTABLE FOR PIPES LESS THAN GREENSBORO, NC, 27425 LIME ACCORDING TO SOIL EST, OR APPLY 4,000 LBS./ACRE SLOW- 24" IN DIAMETER: FLANGES ON BOTH ENDS OF THE PIPE; A 12 -INCH WIDE RELEASE PELLETIZED AGRICULTURAL LIMESTONE. SEEDING DATES: AUG. 20 STANDARD LAP TYPE BAND WITH A 12 -INCH WIDE BY 3/8 -INCH THICK CLOSED (336) 665-8155 THROUGH OCT. 25 AND FEB. 1 THROUGH MAY. CELL NEOPRENE SLEEVE TYPE GASKET; A 12 -INCH WIDE HUGGER TYPE BAND SEEDBm PREPARAM WITH 0 -RING GASKETS HAVING A MINIMUM DIAMETER OF 1/2 -INCH GREATER THAN THE CORRUGATION DEPTH. 1 REMOVE ANY UNDESIRABLE GROUND COVERS INCLUDING ANY TEMPORARY 6. PIPES 24" IN DIAMETER AND LARGER SHALL BE CONNECTED BY A 24 -INCH SEALS -0 REVISIONS. SEEDING. LONG ANNULAR CORRUGATED BAND USING RODS AND LUGS WITH A 24 -INCH WIDE 2 RIP THE AREA TO BE SEEDED TO A MIN. DEPTH OF 4"-6." BY 3/8 -INCH THICK CLOSED CELL NEOPRENE SLEEVE TYPE GASKET'. It" I I 111#818 3 REMOVE ALL LOOSE ROCKS. ROOTS, ETC. LEAVING SURFACE SMOOTH AND 7. HELICALLY CORRUGATED PIPE SHALL HAVE EITHER CONTINUOUSLY WELDED BEFORE YOU DIG I ��% •P?�..... �.,� 0,0RpOR4;;N�5,' �,� ��.• "(� � �.,� UNIFORM. SEAMS OR HAVE LOCK SEAMS WITH INTERNAL CAULKING OR A NEOPRENE BEAD. .� ��• �� 4 APPLY SEED, AGRICULTURAL LIME, AND FERTILIZER UNIFORMLY AND MIX 8. BEDDING - THE PIPE SHALL BE FIRMLY AND UNIFORMLY BEDDED THROUGHOUT CALL 1-800-632-4949 r G F .,A WITH THE SOIL. ITS ENTIRE LENGTH. N.C. ONE—CALL CENTER - - SEAL - = - _ 1 85 5 MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 9. BACKFILLING SHALL CONFORM TO SECTION III "BACKFILL ADJACENT TO PIPES AND STRUCTURES"..., ' 1 ITS THE LAW q. v C-g9� ��•' ••~�'•�•��,, ,��'�.; 10. OTHER DETAILS (ANTI -SEEP COLLARS, VALVES, ETC.) SHALL BE AS SHOWN ON ��n��nun��` ci�l •.•`��,, '�����n�i���•• THE DRAWINGS. 1 TE'vHN~ IL~)`71 DRNE OUTH 87 29 ° 29 POND 2E i _ ExISnND A POND Z ~-PASS A D EELER ROAD r F n r1 ~ ; • r J • • _ _ _ . _ 1. THE CONTRACTOR SHALL VISIT THE SITE TO INFORM AND SATISFY HIMSELF I SRE PREPARATION V T 4 OF ALA EXIS LNG CONDITION- PRIOR TO SUBMITTING HIS BID. ANY AREAS DESIGNATED FOR BORROW AREAS, EMF-ANKMENT, AND STRUCTURAL V CONCRETE IT IS CRITICAL FOR SEVERAL fTEMS TO BE INSPECTED AT T HE APPROPRIATE TIME DURING CONSTRUCTION. 11 IS THE CONTRAC' _ DISCREPANCY BETWEEN THE SITE AND THOSE CONDITIONS REPRESENTED ON C( CONCRETE SHALL MEET THE REQUIREMENTS OF NORTH CAROLINA RE'~.P~;~NSIBILITY TO NOTIFY THE ENr,~INEER AT LEAST ~ DAY; P~~:w THE !1PAWINGS SHALL BE BROUGHT TO THE ATTENTION F TH W R WORKS SHALL BE CLEARED, GRUBBED AND STRIPPED OF lOPS01L. ALL DE 0 E O NE AND TREE5, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL SHALL 1( THE ~,N(.INEER IMMEDIATEL'r'_ DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, SECTION BEGINNING WORK ON THESE ITEMS TO SCHEDULE INSPECTI~,iNS 1000, CLASS A. ITEM ARE AS FOLLOWS, BE REMOVED. CHANNEL BANKS AND SHARP BREAKS SHAH BE SLOPED 2. ALL DIMENSIONS, RADII, AND NORTHING & FASTING COORDINATES ARE TO TO NO STEEPER THAN 1:1. AREAS TO BE COVERED 8Y THE RESERVOIR ANY rrE~s NTS ODMSIRUCTED AND COVERED UP PRIOR TO OBSERVATION Wr,E VI ROCK RIP RAP BE UNCOVERED OR TE'StiNC IMIl BE PROVIDED AS APPROPRIATE AT CENTER OF STRUCTURES SUCH AS INLETS, MANHOLES, ETC., OR END OF PIPE WILL BE CLEARED OF ALL TREES, BRUSH, LOGS, FENCES, RUBBISH AND ~ R( RUNS AS APPLICABLE UNLESS NOTED OTHERWISE. OTHER OBJECTIONABLE MATERIAL UNLESS OTHERWISE [IESIGNATEO ON THE ODINTRACTOR'S EXPE?15E. ~ PLANS. TREES, BRUSH AND STUMPS SHALL BE CUT APPROXIMATELY LEVEL F ROCK RIP RAP SHALL MEET THE REQUIREMENTS OF NORTH CAROLINA 3. ALL EXISTING UTILITIES OR STRUCTURES INDICATED ON THE DRAWINGS ARE IT 7HE GROUND SURFACE, FOR DRY STORM WATER MANAGEMENT PONDS, L BASED ON AVAILABLE INFORMATION OF RECORD. THE CONTRACTOR IS A MINIMUM OF A 50 FOOT RADIUS AROUND THE INLET STRUCTURE SHALL 1 DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, SECTION 1 THE ~~~JTOFF TRENCH SHALL BE INSPECTED AFTEF EXCAVATION AN~ 1042. THE RIP-RAP SHALL BE PLACED TO THE REQUIRED THICKNESS IN f'RIUk TO PLACING BACKEILL. REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES BE CLEARED. ALL CLEARED AND GRUHBED MATERIAL ~HALI BE OISPO~ED ~ ONE OPERATION. THE ROCK SHALL BE DELIVERED AND PLACED IN A SHOWN HEREON AND ANY OTHER EXISTING LINES NOT OF RECORD OR NOT OF OUTSIDE AND BELOW THE LIMITS OF THE DAM AND RESERVOIR AS tv SHOWN ON THESE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DIRECTED BY THE OWNER OR HIS REPRESENTATIVE. WHEN SPECIFIED, A F MANNER THAT WILL INSURE THE RIP- RAP IN PLACE SHALL BE 2 RI~Ek STRUCTURE BASE PRIOR TO PLACING CGNCRETE (BOTH PJ~ REASONABLY HOMOGENEOUS WITH THE LARGER ROCKS UMFORMLY MAKWG ARRANGEMENTS FOR THE RELOCATION OR REMOVAL OF EXISTING SUFFICIENT QUANTITY OF TOPSOIL WILL BE STOCKPILED IN A SUITABLE C DISTRIBUTED ANC FIRMLY IN CONTAr,T ONE TO ANOTHER WITH THE 3 BARREL PLACEMENT BEFORE AND DURING BACKFILL UTILITIES ANO AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES LOCATION FOR USE ON THE EMBANKMENT AND OTHER UESGNATED AREAS. c MAR ~ ~ „ RESULTING FROM HIS FAILURE TO LOCATE AND PP,ESERVE ANY AND ALL F SMALLER ROCKS FILLING THE VOIDS BETWEEN THE LARGER ROCKS. FILTER CLOTH SHALL BE PLACED UNDER ALL RIP RAP AND SHALL MEET 4 TOE DRAIN AND BARREL SEEPAGE DIAPHRAGM- - ~,~4 ~ II EARTH Fill UNDER„ROUND UTILITIES. BEFORE STARTING WORK THE CONTRACTOR SHALL T THE REQUIREMENTS OF NORTH CAROLINA DEPARTMENT OF CONTACT ULOCO AT i (800) 632-4949 TO NAVE ALL EXISTING UTILITIES LOCATED. A MATERIAL TRANSPORTATION, STANDARD SPE.CIfICATIONS, SECTION 1056, TYPE 2. 5 CONCRETE COLLAR AT OUTLET STRUCTURE PRIOR TO PLACING; CON~:nI'E XI E STING CONTOURS ®2' INTERVALS THE FILL MATERIAL. MAY BE TAKEN FROM AN ONSITE BORROW ARIA. IT SHALL .L 6 FINAL INSPECTION 4. LOCATION AND ELEVATIONS OF IMPROVEMENTS, TO BE MET OR CROSSED BY BE EPEE OF ROOTS, STUMPS, WOOD, RUBBISH, VII G VII CARE OF WATER DURING CONSTRUCTION EXISTING CONTOURS o 10' INTERVALS WORK, SHALL BE CONFIRMED 8Y FIELD MEASUREMENT, SUFFICIENTLY AHEAD OF STONES GREATER THAN 6", FROZEN OR OTHER OBJECTIONABLE MATERIALS CONSTRUCTION TO PERMIT REVISIONS TO THE PLANS, IF REVISIONS ARE FILL MATERIAL FOR THE EMBANKMENT AND CUT OFF TRENCH SHALL BE ALI ALL WORK ON THE PERMANENT STRUCTURES SHALL BE CARRIED OUT IN 750 PROPOSED CONTOUR ~ NECES;ARY DUE TO ACTUAL LOCATION OF EXISTING UTILITIES. APPROVED (AS MEETING THE SPEUFICATIONS FUR FILL ~1ATERIAL BY THE AR AREAS FREE FROM WATER THE CONTRACTOR SHALL CONSTRUCT AND GEOTECHINCAL ENGINEER PRIOR TO PLACEMENT MA 5. THE CONTRACTOR AGREES THAT NE SHALL ASSUME SOLE ANO COMPLETE CH AIN AIN ALL TEMPORARY DIKES, LEVEES, COFFER DAMS, DRAINAGE ~ ~ RIGHT-OF-WAY CHANNELS, AND STREAM DIVE=RSIONS NECESSARY TO PROTECT THE AREAS RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF B PLACEMENT TO TO BE GCCUPIED BY THE PERMANENT WORKS. THE CONTRACTOR SHALL ~ CENTERLINE CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND AREAS ON WHICH FiLI. IS TO BE PLACED SHALL BE SCAkIFIED AL' PROPERTY AND THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT PRIOR TO PLACEMENT OF FILL FILL MATERIALS SHALL Bf PLACED IN AN ALSO FURNISH, INSTALL, OPERATE AND MAINTAIN ALL NECESSAPY PUMP,NG AND OTHER EQUIPMENT REQUIRED FOR REMOVAL OF WATER FROM THE - - PROPOSED LOTUNE BE LIMITED TO NORMAL WORKING HOURS AND THAT THE CONTRACTOR SHALL MAXIMUM 8-INCH THICK iBEFORE COMPACTION) LAYERS IVHICH ARE TO BE VAI VARIOUS PARTS OF THE WORK AND FOR MAINTAINING THE EXCAVATIONS, 1 THE tC~NiRACiOR SHALL BE RESPONSIBLE FOR ALL S!'AVFrIN6 RE ~l I~~• • DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER HARMLESS CONTINUOUS OVER THE ENTIRE LENGTH OF THE FILL. TNF. MOST PERMEABLE FO FROM ANY AND ALL LIABIUTr, REAL OR ALLEGED IN CONNECTION WITH BORROW MATERIAL SHALL 8E PLACED IN THE DOWNSTREAd PORTIONS OF RE' FOUNDATION, AND OTHER PARTS OF THE WORK FREE FROM WATER AS BY 1HL cONSTRUCT10N DOCUMENTS. THIS SHALL INCL~ - - PROPERTY BOUNDARY REQUIRED OR DIRECTED By THE ENGINEER FOR CONSTRUCTING EACH UMITEi1 i0 THE FOLLOWINGS GRADING RI TP~~r i TDE BUT NOT PS PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING THE EMBANKMENT. THE PRINCIPAL SPILLWAY MUST BE IN`iTALLED PAI PART OF THE WORK. AFTER HAVING SERVED THEIR PURPOSE, ALL DRAIN, ;FORM GRAINAGE qC~, ~ SER S ~-ORE. BAPREI T_ - _ ~ _ LESS ROAGWAY, BOPF. ~w AREA & ETA EASEMENT LINE ~ FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. CONCURRENTLY WITH FILL F'IA~~EMENT AND NOT EXCAVAED INTO THE TEf TEMPORARY PROTECTIVE WORKS SHALL BE REMOVED OR LEVELED AND GRADED TO THE EXTENT REQUIRED TO PREVENT OBSTRUCTION IN ANY 2 THE C~~NTRACTOR SHALL BE RESPONSIBLE FOR A FINAL A_;--BUILT EXISTIN T EMBANFMENT. GR. 6. THE CONTRACTOR SHALL VERIFY THAT ALL REQUIRED PERMITS AND DEi DEGREE WHATSOEVER OF THE FLOW OF WATER TO THE SPILLWAY OR CURVE` OF THE POND. THE AS-BUILT SURVEY SHA I rig ~ r G REELINE APPROVALS HAVE BEEN OBTAINED FROM THE APPROPRIATE AUTHORITIES BEFORE C COMPACTION OU OUTLET WORKS AND SO AS NOT TO INTERFERE IN ANY WAY WITH THE FOLLOWING ITEMS ~L N__JDE fN, BEGINNING WORK ON THE PROJECT- ALL DAM FILL SHALL BE COMPACTED TO NOT LESS TFAN 98% OF THE OP STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) WITH A MOISTURE SHE OPERATION OR MAINTENANCE r~F THE STRUCTURE. STREAM DIVERSIONS ~ Y~Y~r ~ ~1"~l - CLEARING LIMITS SHALL BE MAINTAINED UNTIL THE FULL FLOW CAN BE PASSED THROUGH A PGND/ DAM GRADING WITH 2 FOQT CONTOURS AND SP T ~ r~ 7. ALL CONSTRUCTION, MATERIALS, AND WORKMANSHIP SHALL CONFORM TC CONTENT WITHIN +/-2 % OF THE OPTIMUM- EACH LA,EL OF FILL SHALL BE THI THE PERMANENT WORKS. THE REMU.AL OF WATER FROM THE REQUIRED 0 ELE,Va - _ . AiONi~ CENTER TOP OF DAM iN 50 F001 INTER',ALS NGDOT STANDARDS AND SPECiFICATiONS, NCDENR -LAND DUALITY SECTION; CUMPA_~TED AS NECESSARr TO OBTAIN THA7 DENSITr, A!WD IS TO BE EX( EROSION AND SEDfMENTAT10N CONTROL PLANNING AND DESIGN MANUAL", AND CERTIFIED dr THE GEOTECHINCAL ENGINEER AT THE SUE OF CONSTRUCTION. MAI EXCAVATION AND THE FOUNDATION SHALL BE ACCOMPLISHED IN A CREEK ~ WATER SURFACE MANNER AND TO THE EXTENT THAI WILL MAINTAIN STABILITY OF THE B TOP ~~F RISER ELEVATION AND UPSTREAM AN:~ %~~~+YNSTR AM THE CITY OF REIDSVILLE STANDARDS AND SPECIFICATIONS. IN THE EVENT OF A EXi TESTING WILL BE THE OWNERS RESPONSIBILITY. NJ Y~.iPACTI~N EQUIPMENT ALL EXCAVATED SLOPES AND BOTTOM OF REQUIRED EXCAVATIONS AND WILL OF ~IARREL E INVE- CC~I'Ll(-~~ BETWEEN THE DRAWINGS AND THESE STANDARDS, THE MORE SHALL TRAVERSE ANY PIPE UNTIL MINIMUM COVER Pi}1CED OVER PIPE TO ~ CUI _ ;,Tf;! ~dT REOIJIREMENT ~>HALL APPLY A,~ ~_~_TERMINED 8Y THE ENGINFe PREVENT pAM~r ~ ;C Tf;E PIPE. COMPACTION TE~TI^ FOR EMBANKMENT EX( ALLOW SATISFACTORY PERFORMANCE OF ALL CONSTRUCTION OPERATIONS, ~ EXISTING WATERLINE DURING THE PLACING AND COMPACTING OF MATERIAL IN REQUIRED C INVERT o>• DRAw DowN PIPE SHAt L BE PEC< r ~ ~U AT A FRE4UENCY OF ONE TM " E'ER 2000 SQUARE SHi EXCAVATIONS, THE WATER LE'~EL AT THE LOCATIONS BEING REFILLED YV PROPOSED WATERLINE 8. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING HIS WORK WITH THE FEET PER VERTICAL FOOT OF FILL. COMPACTION iES~~ ,ALONG PIPES LO( WORK OF OTHER CONTRACTORS ON THE PROJECT TO AVOID CONFLICT PLACED THROUGH THE DAM SHALL BE REOUIRED AT A FREQUENCY OF ONE WHI SHALL BE MAINTAINED BELOW THE BOTTOM OF THE EXCAVATION AT SUCH G INVERT AND WIDTH OF EMERGENCY SPILLWAY ` LOCATIONS WHICH MAY REQUIRE DRAINING THE WATER TO SUMPS FROM EXISTING FIRE HYDRANT TES' PER 25 LINEAR FEET OF PIPE PER VERTICAL E-DOT DF Fill. WHICH THE WATER SHALL BF P!JMPED. E LOCATION, ELEVATION, AND WIDTH OF MAINT r r 601 N. Trade Street ENAN,E BEN~H ~ PROPOSED FIRE HYDRANT Sude 200 ~ o cuTOFF TRENCH VIII Sl VIII STABILIZATION F LocAnoN of ToE D~,IN ouTLE~s WI n I m N THE CUTOFF TRENCH SHALL BE EXCAVATED INTO IMPERI'I~JUS MATERIAL nsta Sae C _ _ _ ALONG OR PARALLEL TO THE CENT R IN F T NI EXISTING GATE VALVE ALL BORROW AREAS SHALL BE GRADED TO PROVIDE PROPER DRAINAGE G BOi~OM OF POND ELEVATION 21101-2916 - E L E 0 HE E BAhKMENT AS SHOWN ALL ON THE PANS THE BOTTOM WIDTH OF THE TRENCH SHALL BE GOVERNED AN[ Landscape Architecture BY THE EOUIPMENT USE(A FOR EX AVATI WITH INI PROPOSED GATE VALVE AND LEFT IN A SIGHTLY CONDITION. ALL EXPOSED SURFACES OF THE H LOCAII~~N F R THIS PROPERTY CONTAINS WETLANDS AND/OR WATERS OF THE US (STTtEAMSi C ON, THE MNIMUM WIDTH BEING EME Civil Engineering P; 336,123.1067 THAT ARE UNDER JURISDIrT10N OF THE U.S AP.MY CORPS OF ENGINEERS AND TEN FEET. THE DEPTH SHALL BE AT LEAST FIVE FEET BELOW EXISTING GRADE gE EMBANKMENT, SPILLWAY, SPOIL AND BORROW AREAS, AND BERMS SHALL ~ 0 IPRAP DISSIPATOR PAD(S) E BE STABILIZED BY SEEDING, LIMING, FERTILIZING AND MULCHING IN r PROPOSED 45' BEND THE NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. THE DESIGN OR AS SHOWN ON THE PLANS. THE SIDE SLOPES OF THE TRENCH SHALL BE ACC $~mmel Associates, PA Land Planning F' 336.723.1069 1 TO 1 OR FLATTER. THE BACKFILL SHALL BE COMPACT(0 WITH - ACCORDANCE WITH THE SPECIFICATIONS AS SHOWN ON THE I LOCATIpN AND ELEYATIDN OF SOIL/RIPRAP BAFFLES INTENT OF THIS PROJECT IS TO NOT DISTURB EITHER OF THE TWO AND ACC THEREFORE, IMPACT PERMITS HAVE NOT BEEN OBTAINED. CONSTRUCTION EQUIPMENT, ROLLERS, OR HAND TAMPERS TO ASSURE ACCOMPANYING DRAWINGS. EXISTING SANITARY SEWER LINE 3 IF THE AS-BUILT SURVEY DOES NOT COMPLY WITH THE CONSTRUCT~C~r` MAXIMUM DENSITY AND MINIMUM PERMEABILITr. DOCUMENTS THE CONTRACTOR wILL BE REQUIRED TO CORRECT THE - SS PROPOSED SANITARY SEWER LINE THE CONTRACTOR SHALL BE LIABLE FOR ANY DAMAGES TO THE OWNER AND III BACKFlLL ADJACENT TO PIPES & STRUCTURES IX ERI DEFICIENT ITEMS. THE CONTRACTOR WILL RESPONSIBLE FOR REViS!N IX EROSION AND SEDIMENT CONTROL THE As -BUILT suRVEY EXISTING SANIT ENGINEER THAT RESULT FROM THE DISTURBANCE OF THE EXISTING WETLANDS AND/OR WATERS OF THE US (STREAMS). THE DAMAGES MAY INCLUDE THE BACKFILL ADJACENT TO PIPES OR STRUCTUR HALL F T ARY SEWER MANHOLE FOLLOWING, BUT ARE NOT LIMITED TO FINES, CONSULTANT FEES, ES S BE 0 HE TYPE AND C0~ QUALITY CONFORMING TO THAT SPECIFIED FOR THE ADJOINNG FILL MATERIAL THA CONSTRUCTION OPERATIONS WILL BE CARRIED OUT IN SUCH A MANNER 4 CONTRACTOR SHALL PROVIDE ANU AUTOCAD DRAWING AND SEALED ~ PROPOSED SANITARY SEWER MANH HARD%OPY TO ENGINEER OLE THAT EROSION WILL BE CONTROLLED AND WATER AND AIR POLLUTION ~ CONSTRUCTION COSTS, MITIGATION FEES, AND LEGAL FEES. THE CONTRACTOR, THE FILL SHALL 8E PLACED IN HORIZONTAL LAYERS AT A THICKNESS THAT IS MINI ~ AT HIS DISCRETION, MAY PROVIDE ADDITIONAL PROTECTIVE MEASURES ABOVE COMPATIBLE WITH THE COMPACTION EQUIPMENT BEING USED TO ACHIEVE Wlll ~ MINIMIZED. STATE AND LOCAL I HWS CONCERNING POLLUTION ABATEMENT s}: EXISTIN T ~ _ AND BEYOND WHAT IS SHOWN ON THIS PLAN TO INSURE NO DISTURBANCE TO THE SPECIFIED COMPACTION. THE MATERIAL SHALL FILL Ca1PLETELY ALL SED G S ORM DRAINAGE LINE WILL BE FOLLOWED. CONSTRUCTION PLANS SHALL DETAIL EROSION ANC THE WETLANDS ANO STREAMS COORDINATE ANY ADDITIONAL MEASURES WI1H SPACES UNDER AND ADJACENT TO THE PIPE. AT NO 11MfDURING THE CON THE ENGINEER AND EROSION CONTROL INSPECTOR. BACKFILI_ING OPERATION SHALL DRIVEN EQUIPMENT BE All)WED TO OPERATE SEDIMENT CONTROL MEASURES TO BE EMPLOYED DURING THE ~ ~ tILS.~ PROPOSED T CONSTRUCTION PROCESS. S ORM DRAINAGE LINE C-1.0 GRADING, DRAINAGE & EROSION CONTROL PLAN CLOSER THAN FOUR FEET, MEASURED HORIZONTAL, TO ANY PART OF A STRUCTURE, UNDER NO CIRCUMSTANCES SHALL EOUIPMENI BE DRIVEN OVER EXISTING STORM DRAINAGE MANHOLE C-2.0 DAM DETAILS AND SECTIONS ANY PART OF A CONCRETE STRUCTURE OR PIPE. UNLESS THERE IS A X ldAli X MAINTENANCE SCHEDULE 0 PROPOSED STORM DRAINAGE MANH OLE COMPACTED FILL OF 24" OR GREATER OVER THE STRUCTIRE OR PIPE. C-3.0 RISER STRUCTURE DETAILS sEE SEE DOCUMENT ENTITLED "EMERGENCY ACTION PLAN AND OPERATION ANC EXISTING CATCH BASIN N PIPE CONDUITS MAIr MAINTENANCE SCHEDULE, REIO°~VILLE INDUSTRIAL PARK SOUTHERN TRACT C-4.0 TRASH RACK & MISC. DETAILS DAM DAM 2E". ¦ PROPOSED CATCH BASIN 1 ALL STORM DRAINAGE PIPE SHALL BE CLASS III REINFORCED CONCRETE A ALL PIPES SHALL BE CIRCULAR IN CROSS SECTION C-5.0 BORROW AREA, EROSION CONTROL DETAILS & NOTES UNLESS NOTED OTHERWISE. PIPE JOINTS SHALL BE SEALED USING RGPE TYPE BUTYL RUBBER SEALANT CONFORMING TO ASTM 0990. B DUCTILE IRON PIPE -ALL OF THE FOLLOWING CRITERIA SNLL APPLY FOR INLET PROTECTION DUCTILE IRON PIPE' ~ ~ ~ SILT FENCE 2 UNDER DRAINS TO BE CONSTRUCTED AS REQUIRED BY THE ENGINEER TO 1 MATERIALS -THIS PIPE AND ITS APPURTENANCES SHA~, BE DUCTILE STABILIZE SUBGRADE IRON PIPE CONFORMING TO ANSI ~AWWA C150 A21 50 .VD ANSI AWW 1 STRU / / A Q1" 1 STRUCTUR ~ ~ E DESIGN SPECIFICATI DNS SHALL CONFORM TO LATEST ASTM _ t ~ TEMPO _ RARY DIVERSION C913 SPECIFICATIONS FOR "PRECAST CONCRETE WATER AND WASTEWATER a a- 3 STORM DRAINAGE MANHOLES SHALL BE PRECAST CONCRETE CONFORMING C151/A21 51 THICKNESS CLASS OR PRESSURE CLASS)F THE PIPE C_ TO NCDOT STANDARD 840.52. MANHOLES SHALL ALSO BE CONSTRUCTED SHALL BE AS FOLLOWS: STRL STRUCTURES" AND NCDOT SiANpARDS. IN ACCORDANCE W(TH ASTM C-478, ASTM A-6i5, AND ASTM A-185, 36" DIP -THICKNESS CLASS 50 - rPF-- rrr--_- TREE PROTEC110N FENCING ASTM C-990. MANHOLE CASTINGS SHALL BE PROVIDED IN ACCORDANCE 2 CON( WITH THE SPECIFICATIONS. 2 CONNECTIONS -ALL CONNECTIONS WITH PIPES MUST E COMPLETELY 3 STEE 2 CONCRETE COMPRESSIVE STREN4aTH 4,000 PSI MINIMUM. WATERTIGHT. THE PIPE CONNECT10N5 SHALL BE PUSH-N JOINTS IN 3 STEEL REINFORCING DESIGN lu CONFORM TO THE REQUIREMENTS OF ACCORDANCE WITH AWWA C 111. ASTIJ WATE ASTM C890 SPECIFICATIONS fL`R" STRUCTURAL DESIGN LOADING FOR WATER AND WASTEWATER STRUCTURES" AND SMALL UTILIZE GRADE 60 3 BEDDING -THE PIPE SHALL BE FIRMLY AND UNIFORML BEDDED RE-f RE-BARS CONFORMING TO THE REQUIREMENTS OF ASTM A615 OR WWF THROUGHOUT ITS ENTIRE LENGTH. CONE CONFORMING TO THE REQUIREMENTS OF ASTM A185 OR BOTH. 4 LAYING PIFE -PUSH-ON JOINT PIPE SHALL BE P[ACEIWITH THE BELL 4 PROV 4 PROVIDE ADDITIONAL REINFORCING AT OPENINGS. END UPSTREAM. JOINTS SHALL BE MADE IN ACCORDANCE WITH RECOMMENDATIONS OF THE MANUFACTURER. AFTER THE)INTS ARE 5 STRU SEALED FOR THE ENTIRE LINE, THE BEDDING SHALL BE LACED SU THAT FRA 5 STRUCTURE TO BE DESIGNED FOR FULL HYDROSTATIC LOADING RESULTING FROM WATER LEVELS TO THE TOP pF THE DAM OR HS-20 TRAFFIC ALL SPACES UNDER THE PIPE ARE FILLED. CARE SHALUE EXERCISED LOAD ALL DISTURBED AREAS TO BE SEEDED WITH AN EVEN MIXTURE OF REBEL TO PREVENT ANY DEVIATION FROM THE ORIGINAL LINE A) GRADE LOADING, WHICHEVER IS GREATER II, FALCON AND JAGUAR FINE FESCUES AT A RATE OF 5-6 LBS./1,000 OF THE PIPE. THE FIRST JOINT FROM THE RISER MUST BE LOC>;D AS SHOWN 6 STEP 6 STEPS REQUIRED AS SHOWN. STEPS SHALL BE STEEL REfNFORCED S F. SO AS TO PRODUCE A THICK, FIRM STAND OF GRASS. FERTILIZE AT ON THE STRUCTURE DETAILS. COPC A RATE OF 10 LBS./1,000 S.F. WITH ASLOW-RELEASE FERTILIZER (USE ASTM COPOLYMER POLYPROPYLENE PLASTIC AND MEET THE REQUIREMENTS OF STRAW AND ASPHALT EMULSION TO COVER SEED UNTIL STABLE.) APPLY A KFI HA f NF R T " 5 B C LLING S LL ~0 O M 0 BACKFILL ADJACENT 1PIPES & ASTM C478. LIME ACCORDING TO SOIL TEST, OR APPLY 4,000 LBS./ACRE SLOW- STRUCTURES" AS SHOWN IN SECTION III. 7 JOINT 7 JOINT DESIGN TO CONFORM TO ASTM C -418. JOINTS TO BE SEALED WITH RELEASE PELLETIZED AGRICULTURAL LIMESTONE. SEEDING DATf_S: AUG. 20 BUTYL THROUGH OCT. 25 AND FEB. 1 THROUGH MAY. 6 OTHER DETAILS (TOE DRAIN, DRAINAGE DIAPHRAGM, VALE', ETC. SHALL ASTM BUTYL RUBBER JOINT SEALANT CONFORMING TO THE REQUIREMENTS OF ASTM C990. PARGE JOINTS INSIDE AND OUT USING NON-SHRINK GROUT. BE AS SHOWN ON THE DRAWINGS. 1 REMOVE ANY UNDESIRABLE GROUND COVERS INCLUDING ANY TEMPORARY SEEDING. • ~ ~ ~ • 2 RIP THE AREA TO BE SEEDED TO A MIN. DEPTH OF 4°- (i." 3 REMOVE ALL LOOSE ROCKS, ROOTS, ETC. LEAVING SURFACE SMOOTH AND 5`URVG UNIFORM. RFFnRF Ynll ~I(: SURVEY PROVIDED Y. 8 , PAC ~ CIV~ NUM. DESCRIPTION a~in?~~ IC011A~11~ ~ •un a-?i~~~ t~...+•»~r.'yit`~ , INITIAf S neT~ v~r vr.` iVV YrV '~~I' 4 APPLY SEED, AGRICULTURAL LIME, AND FERTILIZER UNIFORMLY AND MIX CALL 1-800-632-4)49 ' IUNAL LANU SUKVLTUKS ~if,.•o~POR~;~' ESS••~ P. WITH THE SOIL. Q P.. F , OX 35341 t GREE 5 MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. N.C. ONE-CALL CENTER GREE ITS THE LAW ! 336 1 R SEAL 0 NC 27425 . , ~9 O, r 2 336 6 z z5 0~ - 1 -8155 f CA~l 'unnii ,,,mnu POND NOTES: EXISTING 42" RCP .q, . GENERAL SEQUENCE OF MAJOR CONSTRUCTION ACTIVITIES BY OTHERS (NIC) 1. NO DAM CONSTRUCTION SHALL BEGIN UNTIL AUTHORIZATION IS RECEIVED ARTM F M NT AN NATURAL RESOURCES NCDENR - LAt, DEP ENT 0 ENVIRON E D { ) 4TION IS RECEIVED FROM THE NORTH CAROLINA t. OBTAIN DAM CONSTRUCTION PERMIT AND SEDIMENTATION AND EROSION CONTROL PERMIT FROM THE NCDFNR -LAND I~AIAUTY ~E~i10N PRIOR TU BEGINNING ANI WORK ON THE DAM. ~ {NCDFNR) -LAND QUALITY SECTION. I 2. THE AFC WIPES CONTRACTOR 'MLL BE RESPONSIBLE FUR REMOVING THE SEDIMENT WITHIN SEDIMENT BASIN A AND B AN[i iHF Fxi5T1NG ROCK DAM FOR PREPARATION OF GRADING 2. NO WATER SHALL 8E IMPOUNDED PRIOR TO ISSUANCE OF THE PERMIT T I LAND QUALITY SECTION. OF THE PERMIT TO IMPOUND BY NCDFNR - OPERATION BY THE POND CONTRACTOR. f ...J 3. CLEAR TO LIMITS SHOWN ON THE PLAN AND INSTALL EROSION CONTROL DEVICES IMMEDIATELY. CALL NCDFNR WINSTON SALEM REGIONAL OFFICE FOR ENSPECTION uF MEASURES PRIOR TO ("1 3. THE CONTRACTOR IS RESPONSIBLE fOR HANDLING ALL GROUNDWATER AI I v DAM CONSTRUCTION SITE THROUGHOUT THE CONSTRUCTION PROCESS. GROUNDWATER AND STORM FLOW THROUGH THE BEGINNING ANY LAND DISTURBING ACTIVITY. iN PROCESS. V1 O 4. GRUB SITE AFTER ALL EROSION CONTROL DEVICES ARE INSTALLED. MAINTAIN EROSION CONTROL DEVCES IN ACCORDANCE 'MTH MAINTENANCE SCHEDULE UN SHEE1 C-5A ~ 4. SEE SHEET C-2.0, 3.0 & 4.0 FOR DETAILS RELATING TO POND CONSTRI ' Z TO POND CC4JSTRUCTION. 5. BUILD A BERM WITHIN SEDIMENT BASIN "A", JUST EAST OF THE SEDIMENT BASIN 'A' RISER, DIVIDING THIS BASIN INTO TWG SECTii~NS THIS BERM WILL DIVERT RUNOFF AWAY FROM THE StIiT11T1@I ASSOCIBt@S, PA W PROPOSED CONSTRUCTION AREA AND THIS BERM WiLL ALLOW SED. BASIN "A" TO CONTINUE TO OPERATE AS AN ERUSI(lN CONTROL DEVICE. THIS WILL ALLOW ExCAVAT10N OF THE EASTERN Landscape Architecture SDMH ~3 ~ TOP 791.00 U ' SECTION OF THE SEDIMENT BASIN "A" AND CONSTRUCTION OF THE EASTERN HALF OF THE POND. STORM RUNOFF WILL BE DIVERTED THROUGH rHE EXISTING ~~FDIMFNT BASIN "A" RISER. Civil Engineering INV IN 780.12 6. EXCAVATE THE CUTOFF TRENCH FOR THE EASTERN SEC?lON OF THE DAM AND HAVE IT INSPECTED BY THE ENGINEER, PLACE THE CUTOFF TRENCH FILL Land Planning INV OUT 780.02 , t 7. EXCAVATE THE EASTERN HALF OF SEDIMENT BASIN "A" FORMING THE BODY OF THE NEw POND AND BEGIN PLACING THE DAM EMBANKMENT FILL. 601 N. Trade Street, Sufte 200 i MANHOLE OVER ~ ~ I Q BU LD I EXISTING 42" RCP. Winston Salem, NC 27101.2916 REMOVE EXISTING RIPRAP ~ 8. PLACE THE EMBANKMENT FILL FOR THE EASTERN SECTION OF 1HE NEW DAM UP TO AT LEAST 2 FEET ABOVE THE TOP OF THE 'SPILLWAY BARREL P: 336.723,1067 F: 336.723.1069 9. INSTALL NEW SPILLWAY RISER AND BARREL STRUCTURE IN THE LOCATION AND AT THE ELEVATIONS INDICATED ON THE DRAWIN~~F, SCHEDULE THE NECESSARY INSPECTIONS. DO NOT CLOSE $EAL$; v~~~O~'~uiii~'b~~i TIE EXISTING CHANNEL ~ ¦ ¦ ¦ THE BOTTOM DRAIN. ~ f~^'~ TO NEW CLEANWATER CHANNEL y 10. INSTALL THE TOE DRAIN SYSTEM AND SEEPAGE DIAPHRAGM AS DETAILED FOR THIS SECTION OF THE DAM. SCHEDULE THE NECESSARY INSPECTIONS ~v :~'DµPOR4t ~ ~ F it INSTALL THE EASTERN STORM DRAINAGE LINE AND RIPRAP ~ J" v r - EXISIIN~> CHANNEL (NIC) i SEAL 12. CONTINUE TO EXCAVATE THE EASTERN HALF OF SEDIMENT BASIN 'A" FORMING THE BODY OF THE POND AND THE DAM EMBANKMENT t f L 192 LF OF 42" 13. CONSTRUCT A TEMPORARY DIVERSION CHANNEL DIRECTING RUNOFF FROM THE WESTERN SECTION OF THE EXISTING SEDiMENI BASIN 'A" TO THE NEWtY IONSTRUCTED RISER~BARREL. NOTE, : 0_ g ;r~ RCP ®1.319 ~ ~ ~ I ~ ~ 20' GRADED ACCESS ROAD/ EASEMENT ~ THE STORM DRAINAGE SYSTEM WiLL NEED TO TIE INTO THIS TEMPORARY CHANNEL. ~~i~ ~.6..«''~~'\\\ L ~ -WITH 18' WIDE GRAVEL ROADWAY. GRAVEL 14. INSTALL THE WESTERN STORM DRAINAGE LINES AND RIPRAP AS SHOWN ON SHEET C-1.0. ~uuu~~~~ 'v TO BE C~" OF COMPACTED ABC STONE. x ~ . 15. REMOVE THE REMAINING DAM AND RISER STRUCTURE FuR SEDIMENT BASIN "A" AND EXCAVATE THIS AREA TO THE NFW PnND C!IMENSIONS AND ELEVATIONS- v~x~~~~uuu~ii~b~i n ~~i 16. CONTINUE WITH FILL PLACEMENT FOR THE NEW DAM. f ~J~~4 ~ 1 17 COMPtETE EXCAVATION AND SHAPING AROUND PERIMETER OF POND, GRADE MAINTENANCE BENCHES, BUILD FOREBAY BAFTI.E, ~>RADE ACCESS ROAD, INSTALL EMERGENCY SPILLWAY, ETC. V EL ; 18 IT IS RECOMMENDED THAT THE CONTRACTOR VERIFIES THE POND CONTOURS AGAINST THE PROPOSED CONTOURS PRiOP TO SEEL,:N~,- 27 1 WETLAND IMPACT PERMIT SHALL BE n x~ 2 ~25~04 ' ; 19. PROVIDE THE ENGINEER WiTH AN ASBUILT SURVEY AS DESCRIBED ON THE COVER SHEET. titi fQ~ OBTAINED PRIOR TO DISTURBANCE ~ ~ Q`' VERIF7 1MTH ENGINEER PRIOR TO DISTURBING ~ 20. SEED, FERTIL12E AND MULCH ALL DISTURBED AREAS. i~~~ ~~v 1. HQ,,,,. WETLAND IMPAE_1 PERMIT SHALL BE 21 UPON ESTABLISHMENT OF PERMANENT VEGETATIVE CQVEP AND APPROVAL FROM 1HE NCDFNR -LAND QUALITY INSPECTOR, REM^vE ALL TEMPORARY EROSION CONTROL MEASURES- I N I ~ OBTAINEE PRA ;R Tcj DISTURBANCE CLEAN WATER DIVERS 0 ~ BOTTOM WIDTH=8.0 FT ~ ~ VERIFY WITH ENGINEER PRIOR TO DISPJRBING 22 UPON RECEIPT OF WRITTEN APPROVAL TO IMPOUND FROM NCDFNR -LAND QUALITY SECTION, THE POND DRAIN VALVE MAr BE CLOSED FOR THE IMPOUNDMENT OF WATER THE ~~CT: SIDE SLOPES= 3~ 1 CONTRACTOR MALI BE RESPONSIBLE FOR CLOSING THIS VALVE DEPTH= 1 FT , : SLOPE= 1.00-2.00% , LINE WITH CURLEX 1 MATTING SDMH #2 AFC +MPES ~ ? ~ AFG WIPES, INC TOP 785.90 ~ STORM SYSTEM (NIC) INV w 777.50 ~ } LOT 2D { EXISTING AFG INV OUT 777.30 ~y J K EROSION CONTROL (TYPO fYP) N . ~ EXISTING SEDIMENT CONTRUCT BERM OVER R w. ~ _ STOCKPILE TO BE EXISTING CHANNEL TO J REMOVED BY ROUTE ALL RUNOFF TO r F , ~ 3 ~ , AFG CONTRAC i0R ~ YI ~1. REMOVE EXISTING C ro WG CLASS 1 RIPRAP PAD ~ ~ S T~ RIPRAP D ~ ti D50= 12" CLASS i RIPRAP ~ C CONSTRUCT DIVERSION D " ~i YI ~1 _ BERM TO DIVERT ~ W IVERSION Dmax= 18" ~ D50= 12" EXISTING DIVERSIQN BERM :RT THICK= 27" (2 LAYERS) Dmax= 18" TO REMAIN INPLACE TO _ l r>>{~~ ~,p THROAT 769.00 SURFACE RUNOFF AWAY D OFF AWAY DIMS= 40'L x 44'W THICK= 27" (2 LAYERS} DIVERT SURFACE RUNOFF `I% ~ INV OUT 763.00 FROM POND SLOPE U ~ ~ ~ N LOPE ` UNDERLINE WITH I = ~ x 'yr AWAY FROM POND SLOPE ' G NCDOT TYPE 2 D MS 25 L 28 - UNDERLINE WITH A GEOTEXTILE FABRIC GEOTEXTILE FABRIC SDMH 4 ~ Z ~ ,~r TOP 768.00 ~ ' o INV OUT 163.00 ~ EXISTIN SEDIMENT EXISTING AFG WIPES ',TiJh'Fd >>STEM (NICj SEDIMENT ~ y. ~ ' ~ BASIN A BASIN "A n W r ~ ...r PARTNERSHIP ,~i ~ M ~ FOR ECONOMIC ~ ,r ' Z _ PROPERTY LINE ° ~ .fir. DEVELOPMENT 176 LF OF 48' - ~ - r ¦rr ~ ~ ercwre s +~r C U Y' LOT ?C RCP 0 1.76f ~ ~ ~ 113 LF OF 3b' G ~ ~ '`re RCP 0 6.20r ~ ,V 36" FES W z 81 LF OF 36" ~ 1 ~ ~ INV 755 Ob t~~ ~ -r :f: y~J. RCP ®8.647. . ~ w 1 w . ~ , f; ~~j ,;y., ~:fr 12' TOP Q 12' TOP OF DAM WIDTH SDMH ~1 ~ t~. ~ f ~t :y ~ ~ 7 C 7 4. ? ~ ~ ~ TAP 8 00 ~ ti 4 - r INV IN 774.20 ~ H INV OUT 774.00 r •r. _ i ~ J rr' Q 78 r - ~ I -REMOVE EXISTING RISER, BARR NG RISER BARREL AND RIPRAP '0' 1, fY U r^ r - - 1 + + b' EXISTING 1 L o / ~ 7 0 0 7 ~ °o ~ SEDIMENT W 7 ;o { m ~ BASIN "8" - m n r ~ Q 238 LF OF 48" R P 7.. 8% o C ® 5 0 I ry J L.L.. J o;a , J v q V EXISTING RISER rn~ 60' ACCESS EASEMENT ~ ~ 20 ~ CLASS B W V 36' FES ~ , REMOVE EXIST. _ ~ z FOR ADJACENT PROPERTY~~,,,~i'"" R,IPRAP INV 75fi.00 II v ~ v SILT FENCE _ ~ f a v - ~ ~ ~ . 'jp ~ BOTT0IA OF POND BOTTOM ?F POND N ~ v N //yy ~ LL ELEV. 756.00 ELEV. 756.00 - ~P } } B TOfd OF POND I v ~ U 0 ~ ~ ~ > ~ i ~ EL V 756.00 x CLASS 8 RIPRAP BERM CLASS B ,;b, RIPR _ 0 f V F RM 757.0 AP I TOP 0 BE 0 tn r^ ~ \ ~ R / a s • V! VI _ PRECAST RISER oQ ,1 ~ o SEE SHT. C-3.0 ~ o ~ 1 ~ $ ~ ~ / r o a % a, ..--7 1 ~ ~ ~ ~ - GRA55 LINED ~ ~ + + - • gJENT: 1 FMERC,ENCr SPILLWAr - ~ ~ ~ + _ ~ SEE SHEET C-: G ' ~ ~ ~a ~ 1 EXISTING ROCI' DAM NCN I; , ~ SED BASIN TO REMAIN 48" FES ~ - ,z Ac CITY OF REIDSVILLE } } ®IN PLACE AND MAINTAINED ~ INV ?5E 00 } BY THE POND CONTRACTOR. \ 20 WEST MOR H A T. ~e8- 3 E E D S ~ - 70.0 REIDSVILLE NC 27320 I M ELEVA'i~ 7 ~ --..1 _ MINIMJ (336) 349-1065 YAT)~ EXISTING TREELINE CLEARING L)MITS • 'TOP OF DAM ~ 1pg lF OF " 12 ~ r OQ \ t~r' -`_"`1 ~ •f••• ~ ~ DRAWN: JKH Q~ - ~ r---- ~ - _ _ _.1 - _ - - - - ~ _ - ` oAr~: 2/25/04 2 W X 3 D TOE DRAIN SEE SHT. - REVISIONS. _ C-2.0 FOR DETAILS RAIN ' 7 TOED f_ ~ A _q OUTLET AT aIN ~ AT ~ ~ TOE OF SLOPE PE 36" DIP _ - EXISTING WETLANv • NO DISTURBAN~: INV 754.00 __t}.___-{}- ' (2)- TOE DEhh 7 3~' r0E ~~F ~ -4. REMOVE EXISTING H2 y ~ ' ~ SEDIMENT BASIN ' ~ _ CLASS 1 RIPRAP ~ \ EXISTING WETLANDS DAM DOWN TO ~ ~ppERTY LINE - ~ NO DISTURBANCE RESIDUAL MATERIAL. ,Ipg, N0: D3-258 d50- 12 CONSTRUCT CUT-OFF . ~ ~M dmax= 18" SILT FENCE, CLEARING LIMITS TRENCH AND FILL TO SHEET T1TI.E; thick`~27" (2 LAYERS) ~ dt DISTURB LIMITS ALONG PROJECT SPECIFICATIONS ~ DtMS= 25'L x 28'W PROPERTY LINE UNDERUNE 'M TH A GEOTEXTIL FABRIC ~ A i , ' EXISTING WETLANDS PROVIDE A GAP IN ~ AINA EXISTING POND SHOWN NO DISTURBANCE TAKEN FROM AERIAL SURVEY - V SILT FENCE TO V ALLOW FLOW . R I N . FROM BARREL - ' • - N LAN ~ _ _ EXISTING STREAM SHEET NO.: SANDY SANDS SCALE: 1" = 40' 40 0 40 I m I - c s ®STIMMEL ASSOCIATES, P.A. EMERGENCY SPILLWAY 12' -12' - CREST ELEV. 768.00 TOP. OF . DAM_ 770.00 e1I,', lOQYR. PEAK STAGEJ69.00. 4 50 YFZ P~,K S'T'AGE. 765.49 O - _ _ - - _ _ _ I~ „ 25 YR.P_FAKSTAGE767.8fi 4 _ '!~-='11_ - ` ~ ~ Stimmel Associates, PA 10_YR. PEAK STAGE 76235. 4 r - 1 I ~ I Landscape Architecture TOP OF RISER 766.00 ~ i . _ ~ _ i ~ S Givil Enyineering p Land Planning TOP OF TEMPORARY WATER QUALITY 765.00 SHOP, i I i ~ ~ ~ ' - ` - - - - _ _ _ _ TEMPORARY WATER QUALITY 3'• I ' i~ ~ ~ ~ I -III -III ~I N - ` - - - - _ _ _ , 1 " RAINFALL NORMAL POOL HOMOGE OUS DAM FILL - XIS DAM Flu AFTER STRIPPING TOPSOIL 601 N Trade Street, Suite 200 - ~I I SEE COVER SHEET FOR ~ 12' ACCESS BENCH--? ~ ~ -~I I I-_ 6" I - - - _ _ _ _ I I ~ MATERIAL AND PLACEMENT R SHEET FOR AND PLACEMENT & ORGANICS, SCARIFY ~ Winston Salem, NC 27101-2916 P: 336 723.1067 F: 336.723.1069 .NORMAL POOL __ELEV. 762.00 ~ ~ ~ _ ~ i _ _ _ -z _ _ _ _ _ _ _ _ ~ _ _ _ _ _ _ _ _ _ _ _ _ _ SPECIFlCAT)ONS noNS SURFACE PRIOR TO PLACING FIL~ - - - - _ _EXISTING A 25' OUTSIDE TOE Td END Ste' ~~`~~~~t11111~~~~'~~, PERMANENT WATER 5 - ~ - _ _ _ _ _ - - - - - P~ ASTM C 33 2' COVER OF DIAPHRAGM POR~ S QUALITYPOOL ----1---- DRAINAGE SAND _ _ 0~ '~l 2' ~ 12 - _ - - 757.00... 108 LF OF 36" D.I. PIPE (THICK, CLASS 50) 0 1.85% - - - - _ _ ' 18" RIP RAP APRON - SFjti,L BOTTOM OF POND ELEVATION 756. PERMANENT SEDIMENT STORAGE SEE COVER SHEET FOR BEDDING SPECIFICATIONS 1 _ _ 6" 36" D.I. S 5' ~ --------_-_!<XISTING_CLRA~~-_ INV 754.00 "r~ 1~ -1 ~ - . ti C-g9 ,r~t. . CLASS B PROPOSED SLOPE 1 _ ~l -~I I~ -1 I--~~i-- - RIPRAP BEYOND OUTLET PIPE BAFFLE - 10' MIN. -10' MIN. 4" SCH 40 PVC TOE DRAIN OUTLET #10 SCREEN DRAIN PIPE WITH RODENT GUARD 6" THICK X57 WASHED ~ ~S~'~ / STONE BEDDING Yti ~ NCDOT STD. TYPE 2 = _ ~r r GEOTEXTILE UNDERLINER SE L ' 27912 ' SCALE: 1 =10 ~ ~ ` -~A; ZZSb+ ,r ~ 7y - _ _ - 1. tt0 ''~+nnun` PROJECT: TOP OF PROPOSED ~ DAM El 7 0. , i i n ~ . o ~ ~ 770 i ~ i i EXISTING ~ ~ SED. BAST \ ` f \ \ PR SED ` ~ D Fl~1 . ~ ~ . NORMAL POOL ~ I I ELEV. 762.00 / i i~' .X~/ i~, 4 . ~ . ~ ~ X;~. ; 1 III: 1 , 'ii (I~ ~I / iii li-~ f1 'I ~Y y, is ~~I :ICI _ I .i I 1--1i~ ~<< it W - ~ ~ ~ ~ ~ - 760 780 - _ - _ - - - _ - _ ~-~l-U~_.,- - _ . _ - - - - - _ _ _ _ - I III- -l__II iil III_ ~1 EXISTING GROUND ~II~_~Ilw_III_ ~ ~ ~ i i_-1! ~ ~ ~a N ill.- i ill i i 'I 11 1* ..Ili III ~ III it ~ 'r' ~ n u ,r rf' I ; ~ I- ,,-~,~-I -~i i i i==i l i i L-li n II ll .li ~i i -I ~-~,T i ~ -III- `T ~ - *rT i lii ~ II""~ ' ir,~ .r' I i I it - , , _ ~ ~ ~ , ~ ~ _1. i i-~~-.1. II. i ' I .r 111 __i!I _!I= ~~II ~il_11i~.~' I I~,~il' I 'I~,~ ~ N ~II ~I ICI ~ ~ I~~~~ , ~ I ~ _ I ~ If ~ ~I~-_ III III ~ II ~II_-~ ' - I_ t ii I ~.I ~ ~ ii ~ i ii i i ~ lil:: ~-li I-.-- --r* -li II I II 111 ~l .Ii, 11 II i ~ - ~i lil _III I I ( II ~T ii II~- ~ iii ',-!i.iil ~ it it ~ II I ' i i II- II I,I I . i ~ I, ~ , ail III _ 0 ~il ,11~= IfI--~LII II ~11~ 36" . i ~i, ~II 1111 ~ III iii ~ I i , II,_ ~ ~I_ a I-= III III .II I ii~, I i i'~; i ~ ~ii ~ I' I ~I I ~ ''I- -III i lily 111 Iii L( ' I ~ I I I ~ - I I I I~ t. i I -II I I ~ i I ~ ~ 11 1 ICI ii II I~ • ATM Z III __~II 111 {Ir I I ~ III- G.I. iIC ~ I ICI i i ICI, ,f C-33 ~ I I I i ~ II t li' ' i III II ' iIl) II_. II , ~ I I I; I~ _I1 I il~ I~ I~ lil-~III iii _iii~ I I PiPE - ,i .l ~ _.~~I_ ~ ~ ~ ' ~ .I._ I~ ~I -11i Ili G !!1-~' =~1, I_=- -I r - - _ - - _ _ _ - - - _ _ _ CORE PROPO ED DAM 50 _ - - _ - _ - - - _ _ FILL INTO EXI TING GRADE...---- - - - _ _ _ _ - 750 A MINIMUM 0 5' (1YP.) Z CORE TRENC SHALL BE WIDE I ENOUGH TO CCOMADATE 6" ~ _ _ ~.1~ COMPACTION QUIPMENT OR 4" SI~H 40 PVf U A MINIMUM 10 FEET WEE CREEN RA PIP ARi~'~1N1 ~ ~i51DE S D IN E z - _ _ _ - r W ~ t +oo ~ 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 NOTE: Q _ z CONTRACTOR SHALL NOTIFY THE ENGINEER AND THE TESrNG FIRM WHEN CORE TRENCH EXCAVATION IS COMPLETE PRIOR TO PLACING CORE TRENCH FILL FOR ~ RT. 1 "=6' NTS Z I- SCALE. HORIZ. 1 60 VE INSPECTION OF EXISTING SOILS. FAILURE TO DO SO WILL RESULT IN CORE Q U ~ TRENCH BEING RE-EXCAVATED AT THE CONTRACTOR'S EXPENSE. ' Q O ~ U 2' MIN. COVER OVER TOE DRAIN I - W ~ 2' MIN OVER 2' MIN. COVER OVER E DRAIN Z ~ Q Q 3 r r~ o W V ASTM C-33 I DRAINAGE SAND . - - - ` . 760 , j s. e ; _ E OV R TREN i DRAIN ~ ~ FLOW - ~ ~ P1 - _ ~ , OPT TOE DR iN p1PE O U TOE DRAIN 4" SCH 40 PVC - ' ~ ~.J PIPE SLOP ~ -t TEXIShN. Gf?Ai~E._,T _ ; $10 SCREEN PIPE 36" DI E - - _ FLOW v 1 v , 0 0.50X MiN. gAR IPE SLOPE---- - -,r-- _ _ 750 4" 40 PVC f PIPE SLOPE 4 SCH 4( (1)- TOE RAIN 10 SC EN PIPE (2)- TOE DR IN 4 SCH 40 PVC X10 SCREE PIPE o OUTLET WITH ~ ~ OUTLETS W H X10 SCREI RODENT ARD 0 0 OX MIN. ' RODENT GU 0 0 0.50x I 0 0.50x N. ~ 36" POND ~ BARREL ClJENf: I 3' _ _ _ _ ToE of CITY OF REIDSVILLE p{,00 1+00 2+00 3+00 4+00 5+00 M-00 7 7+0o SLOPE 203 WEST MOREHEAD ST. ~ TOE DRAIN ~ REIDSVILLE N 7 ounET wlrH C 2 320 -4• RODENT GUARD (336) 349-1065 O 0 'i~ O ~~,~i ot~wN: JKH ~ ~ ~ ~ - SCALE: HORIZ. 1 =40 VERT. 1 =10 DATE 2/25/04 REVISIONS: - RISER STRUCTURE SEE C-3.0 FOR DETAILS - ~il~, 1,'; i~ ~'~ir~ I ; ~ Jae. No: 03-258 r1 SHEET TRIE TOp OF 0 , i AM 2' MIN. 3' ~ S . OF pAM COVER ~OpE TOP OF OAM ~ FINISH DAM FMB TOP = • _ Si.O ~KME~ 12 PE ; 770.00 ~ GRADE - -._.:::p EM~KMENT SLO 12" FREEBOARD ASTM C-33 _ _ _ ] B _ ~ DRAINAGE 1L IOOYR ELEV. 769.00 J SAD 3 2, _:-_4...1. ~ ~z 4-- o --b.-_Y P--.:.-3---_ 3 TOE DRAIN CREST ELEV. 768.00 B 2 -TOE DRAIN 7 EXISTING GROUND 4"SCH 40 PVC T - - - TOE DRAIN OUTLET WITH _4 / / 1(11- TOE DRAIN OUTLET RODENT GUARD cre~c. unTrn #10 SCREEN ~.u -4. WITH RODENT GUARD NOTE: ARROWS INDICATE nvlPIPE FLOW DIRECTION SHEET NO.: 20' DRAIN PIPE MIN. EMERGENCY SPILLWAY SECTION B-B TOE DRAIN TOE DRAIN PLAN C-2,0 N7S NTS N I S ©STIMMEL ASSOCIATES, P.A. ~ c:~ ~ s ~ Vii.:, ` i ~k ` E~ j -ore. I. d i fig. F i`f j - _ - P, _ o~ y.-. - ~1. , - ~ ~ - - . ~4~' , ~ \ ? \ l /r . ~•Y`...i~r r r '~i r r ~ri~• r ti 7 1. M,,,. f j~'' ' ~ C t ~ rt 1~! •.~•~•r. ~iw ~ ~ ~ .~~4..~ .r r r aT ° ~ > > Vii, ~ 1 ~ .~r+rt!~'•R. _ 1 '~f~ ...fir`-•~.~~ ~r r a ~ ~ ~ ~ . mow' _ : i _ r . - _ _ - - _ _ . _ . ~iH ~ ~ _ . _ _v..f , _ . . .w..~ . 1 , . r ~ ~ a :w.~ ~ ~ ~ ~ 1 1 • ~ ~ ~p u.:. i 1 w ' N r a ' i , ~ ~ s ~ , _ - - -'---------fix ------+C--~ _ _ . _ _ . _ : _ _ ----+c-----~-^------ - - - _ - - i - _ _ ..K _ e.~ r. -_-t- ' < _ . _ i .r. . r . _ _ ~ , . i 4 1 - iN r _ ~ ~ f ~ ~ - ~ , ~ 3 i ~ \ _ f ~ i i ~ ~ , h~ 29 ~ FM ~ ~m~ f ~ r ~ ~ ~ dy; , t ~ ~ w~a\ , I l ~ ~ i . ~ . m 29 q , r ' / ~ ~ ~ I ,I ~ I ~ ~ ! ~ 4 ~ , ~ . 1 ~ ~ i { t , ~ 8Y-PASS . _ ~ _ . y I _ i ~ -1 , 1- ~ l ~ ! , ; ~ 1 i . i r ' ~ _ EELER ROAD f l .r_ ~ ~ E ~ ~ 1 ~ _ ~ a ~ ) 6 , 4, ~ ~ ~ ~ 4 ~ 1 ~ ~ - st'•' d D e ! ~ _ ~ A _ y 1 S f i ~ 4, ' ~ \ ~ . i f i ~ / . ~ ~ . r ~ l ~ , ~ ~ (n ~ ~ NOT TO SCALE ~ ; r ~ t ~ ~ I s J # i ! \ J f r ~ i - r ~ l l~ r - - ~ - ~ ` EX ST1NG WERAN~ 4 r~ r:~ ~ f ~ ~ 1 S r !v I ~ • ~ ~ 1 f ~ i , I - ~ i I ~ ~ ~ ~ ~ ~ _ ~ . ~ 1 L0~' 2A ~ . ~ ~ i ~ , 1, i ~ ! ~ ; , 1 ~ ~ ~ , ~ ~ . . r ~ ~ , ; r _ ~i , ~ ' . : . ~ t ~r? - r' ~ ~ _ , ~ ~ ~ ~ ~ f ~ ~ 1 • ~ ` ~ ~ , f ~ ~ ~ { ~a ~ ~ ,r ~ r ~ ~ 1 ~ + ~ '`ti _ . _ , - ~ ~ ~ . _ ~ i ~ O ~ ~ - n ~fil~ ~ IUI AFG, WIPES, INC. - '~l ~ C. r ~ ~ ~ _ r .o i r' ~ ~ ~ ~ 1 0, ~ -w ~ - , ~ / ~ , ' V ' , ~ ~ \ ~ 1. wo ~ . ~ ~ , . ~ ~ , ~ ~ ~ _ t i ``4-~ ~ O p ~ F ~ \ ~ rt ~C . ` ~ X f ~ I ' \ ~ 1 I y - ~ ~ i ` _ , _ ? _ / i ~fi., . ~ _ _ _ r~ , n i, ~ , \ / of I ~1 ~ ~ \ - _ _ , ~ _ > r r -~F - r 1 ~ , f~, - ~ ~ , ~ ~ ~ - , , - - _ , , i ~ { ~ ~ _ y I ~ ~ , ~Q , M' ~ _ ~ . w .,.pyl1~ ? ~ r I ( ~ J i r ~ ~ 5: ,+r~', ~ i ` ~ ~ ! I r ~ ~ , _ _ ~ . NDARY ~ ~ , ~ BOU ~ i + r----,----- - - t , • ~ ~ , ti , f 1 ' _ i' _ ."ri.rr ~ ~ ~ ~ _ _ ~ ~ { ~ _ ~ f ~ f ~ ~ ~ ~ - \ . ~ ~ ,~e ` ~ ~ f i - f . , f i• - , ? - - ~ 1 ....r... NON-JURISDICTIONAL , ' f ~ w f . - ~ ~ ~ / ` ' T 1N . • r ,r„' ' i , WETLAND ~ ~ ~ i °h~~~~ - / - r lure . ~ •~•r r ~ - - , ~ . ' ( ~ ~ - ~ / ' i ~ / ~ ~ t... • • ~..---ry'" 769.23 $f?. FT,' , 1 ( , i - r { ~ i . j \ "'f' _ - ~ 11 ~ ti ~ NON~JUR15DICTMpNA1. W~fIAN _ .'r - _ ~ . 559.57 SO. Ff. _ l ~'e r -T'~ TM_-i f , / ~ ~ ~ l ~ ~ - T_,_ yl , ~ ~ T± j' . 1 ~ ~ ~1SOtATED - r ~ , - REIDSVILLE, NC 3 01 04 l i ~ ~ - ~ r _ NON-JURISDICTIONAI, r ~ f ~ ~ - . _ i WETLAND _ ~ - ~ , A _ _ ~ ~ ~ ~ ~ ~ 3,02'7.47 SQ. FT. - ~ ~ - ' a' _ ~ f~ i i a~ ~ k. ~ E 1 i I ~ 20' ACCESS ROAD' l f~,v ~ . _ . _ y, r ~ , ~ . ~ ; ' ~ j ~ - ~ ~ w ~ i ~ t \ ~ - 1. ~ PREPARED FOR. _ r ~ _ 1 ' - ~ ~ CITY OF REIDSVILLE 1 ~ r,. ~ ~ ~ c ~ ~,~,,,,r,,,» ~ ~ ~ ~ r ~ ~ I _ y, ~ - . , ~ - . - , ~ ~ 230 WEST M R H A TR T 4 t ~ ~ ( ' I ~ DEEDS EE . i ~ ,r - , tOT 2C - 1 ~ I , ~ _ . ~ _ . - - : ' ~ REIDSVILLE, NC 27320 ~ f x ~ I ~ - sWM POND . ~ . ~ ~ ~ t _ ~ _ _ : . ~ ~ ~ ~ t 5 ~ ~ A - - ' ^ I 1 - ~ 33E 349-1065 ~ ~ ~ r I ~ ~ l ~ A fem. ~ ~ , _ , _ _ - " 1 . tw- Jr , it t i F l ~ 1 ~ ' ~ _ - i1~,,,,.. - f . . ; y PROJECT : 03-258 - ' ~ i _ - ~ - ~ ~ ~ . - _ , y,F ~ 1 t J r ~ - , ~ - - - ~ PREPARED BY. ~ s s ~ ~ _ _ _ - ~ r , - ~ { , ~ - r ~ ~ i ~ ~ 4 ~ . ..1" ~r , ~ ~ ~ ~ _ - , : ' 601 N. Trade Street , n t - ,1 ~ ~ - ~ Suite 200 ~ ~ - i ~ ~ - ~ - ~ . . Winston Salem, NC i - ~ 1 L ~ ~ 1 - . A - 4 - i ~ ~ ~ • ' ' _ . _ , ' _ 27101-2916 / ~ _ , _ - landscape Architecture . - \ I' I - 1 i , : . , . - - - ~ ' ~ ~ ~ ~ ~ , - ~ . ~ ~ ~ Civil Enflineeriny P. 336.723.1067 _ LP _ Stimmel ASSOC1a~tes, PA lard Planning F: 336.723.1069 . _ _ - ':u ~ : ~ - ' ~ i 1 D(ISTING WERAND , - - ~ i a t _ ~ r, .,ti ~ . t r t' ~ ~ ~ \ ~ I - --~l. _ - . , ~ r , ; ~ . - ~ - 4 ~ ' .nom e _ 0 100 200 300 D(I5f1NG POND • •J ~ 1 1 l L _ SCALE: 1 =100 r TECHNOLOGY DRIVE SOUTH 7 29 0 29 POND 2E ~ G EXISTING ~ BY-PASS POND Z D EELER ROAD ~ n -c • • • • 1. THE CONTRACTOR SFIALL VISIT THE SITE TO INFORM AND SATISFY HIMSELF I SITE PREPARATION V CONCRETE CONCRETE IT IS CRITICAL FOR SEVERAL ITEMS TO BE INSPECTED AT THE OF ALL EXISTING CONDI110NS PRIOR TO SUBMITTING HIS BID. ANY APPROPRIATE TIME DURING CONSTRUCTION. IT IS THE CONTRACTOR'S DISCREPANCY BETWEEN THE SITE AND THOSE CONDITIONS REPRESENTED ON AREAS DESIGNATED FOR BORROW AREAS, EMBANKMENT, AND STRUCTURAL CONCRETE SHi THE DRAWINGS SHALL I3E BROUGHT TO THE ATTENTION OF THE OWNER AND WORKS SHALL BE CLEARED, GRUBBED AND STRIPPED OF TOPSOIL. ALL DEPARTMENT t CONCRETE SHALL MEET THE REQUIREMENTS OF NORTH CAROLINA RESPONSIBILITY TO NOTIFY THE ENGINEER AT LEAST 2 DAYS PRIOR TO • THE ENGINEER IMMEDIAYELY. TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL SHALL 1000, CLASS i DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFlCAl10NS, SECTION BEGINNING WORK ON THESE ITEE~iS TO SCHEDULE INSPECTIONS. THE • 1000, CLASS A. ITEMS ARE AS FOLLOWS: BE REMOVED. CHANNEL BANKS AND SHARP BREAKS SHALL BE SLOPED 2. ALL DIMENSIONS, RADII, AND NORTHING & FASTING COORDINATES ARE TO TO NO STEEPER THAN 1:1. AREAS TO BE COVERED BY THE RESERVOIR CENTER OF STRUCTURES SUCH AS INLETS, MANHOLES, ETC., OR END OF PIPE WILL BE CLEARED OF ALL TREES, BRUSH, LOGS, FENCES, RUBBISH AND VI ROCK RIP F ANY ITEMS CONSTRUCTED N TS AND COVERED UP PRIOR TO OBSERVATION WILL ROCK RIP RAP BE UNCOVERED OR TESTING Wlli. BE PROVIDED AS APPROPRIATE AT THE RUNS AS APPLICABLE UNLESS NOTED OTHERWISE. OTHER OBJECTIONABLE MATERIAL UNLESS OTHERWISE DESIGNATED ON THE PLANS. TREES, BRUSH AND STUMPS SHALL BE CUT APPROXIMATELY LEVEL ROCK RIP RA CONTRACTOR'S Ef~ENSE 3. ALL EXISTING UTILITIES OR STRUCTURES INDICATED ON THE DRAWINGS ARE IT THE GROUND SURFACE. FOR DRY STORM WATER MANAGEMENT PONDS, DEPARTMENT ROCK RIP RAP SHALL MEET THE REQUIREMENTS OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, SECTION 1 EXCAVATION FOR ANTI-FLOTATION ANCHOR PRIOR TO PLACING CONCRETE. BASED ON AVAILABLE !iJFORMATION OF RECORD. THE CONTRACTOR IS A MINIMUM OF A 50 FOOT RADIUS AROUND THE INLET STRUCTURE SHALL 1042. THE RII 1042. THE RIP-RAP SHALL BE PLACED TO THE REQUIRED THICKNESS IN REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTIUTY LINES BE CLEARED. ALL CLEARED AND GRUBBED MATERIAL SHALL BE DISPOSED ONE OPERATI SHOWN HEREON AND ANY OTHER EXISTING LINES NOT OF RECORD OR NOT OF OUTSIDE AND BELOW THE LIMITS OF THE DAM AND RESERVOIR AS MANNER THA' ONE OPERATION. THE ROCK SHALL BE DELIVERED AND PLACED IN A 2 BARREL PLACEMENT BEFORE AND DURING BACKFILL. SHOWN ON THESE PL.~1NS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DIRECTED BY THE OWNER OR HIS REPRESENTATIVE. WHEN SPECIFIED, A REASONABLY MANNER THAT WILL INSURE THE RIP- RAP IN PLACE SHALL BE REASONABLY HOMOGENEOUS WITH THE LARGER ROCKS UNIFORMLY 3 FINAL INSPECTION. MAKING ARRANGEMENTS FOR THE RELOCATION OR REMOVAL OF EXISTING SUFFICIENT QUANTITY OF TOPSOIL WILL BE STOCKPILED IN A SUITABLE DISTRIBUTED UTILITIES AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES LOCATION FOR USE ON THE EMBANKMENT AND OTHER DESIGNATED AREAS. SMALLER RO( DISTRIBUTED AND FIRMLY IN CONTACT ONE TO ANOTHER WITH THE • RESULTING FROM HIS FAILURE TO LOCATE AND PRESERVE ANY AND ALL FILTER CLOTH SMALLER ROCKS FILLING THE VOIDS BETWEEN THE LARGER ROCKS. • FILTER CLOTH SHALL BE PLACED UNDER ALL RIP RAP AND SHALL MEET UNDERGROUND UTILITIES. BEFORE STARTING WORK THE CONTRACTOR SHALL II EARTIi FILL THE RE UIR I Q E CONTACT ULOCO AT 1 (800) 632-4949 TO HAVE ALL EXISTING UTILITIES TRANSPORTAI THE REQUIREMENTS OF NORTH CAROLINA DEPARTMENT OF LOCATED. A MATERIAL TRANSPORTATION, STANDARD SPECIFICATIONS, SECTION 1056, TYPE 2. - - - - EXISTING CONTOURS ®2' INTERVALS r,; THE FILL MATERIAL MAY BE TAKEN FROM AN ONSITE BORROW AREA. IT SHALL 4, LOCATION AND ELEVATIONS OF IMPROVEMENTS, TO BE MET OR CROSSED BY BE FREE OF ROOTS, STUMPS, WOOD, RUBBISH, VII CARE OF Ih WORK, SHALL BE CONFIRMED BY FIELD MEASUREMENT, SUFFICIENTLY AHEAD OF STONES GREATER THAN 6", FROZEN OR OTHER OBJECTIONABLE MATERIALS. I CARE OF WATER DURING CONSTRUCTION ~ WHO ' EXISTING CONTOURS ~ 10' INTERVALS • CONSTRUCTION TO PERMIT REVISIONS TO THE PLANS, IF REVISIONS ARE FILL MATERIAL FOR THE EMBANKMENT AND CUT OFF TRENCH SHALL BE ALL WORK ON PROPOSED CONTOURS ®1' INTERVALS ALL WORK ON THE PERMANENT STRUCTURES SHALL BE CARRIED OUT IN • NECESSARY DUE TO ACTUAL LOCATION OF EXISTING UTILITIES. APPROVED (AS MEETING THE SPECIFICATIONS FOR FILL MATERIAL BY THE AREAS FREE F GEOTECHINCAL ENGINEER PRIOR TO PLACEMENT. MAINTAIN ALL AREAS FREE FROM WATER. THE CONTRACTOR SHALL CONSTRUCT AND 750 ' MAINTAIN ALL TEMPORARY DIKES, LEVEES, COFFER DAMS, DRAINAGE PROPOSED CONTOURS ®5 INTERVALS 5.~THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE CHANNELS A N CHANNELS, AND STREAM DIVERSIONS NECESSARY TO PROTECT THE AREAS ~ ~ - ' RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF B PLACEMENT TO BE OCCUPII CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND AREAS ON WHICH FILL IS TO BE PLACED SHALL BE SCARIFIED ALSO FURNISH, TO BE OCCUPIED BY THE PERMANENT WORKS. THE CONTRACTOR SHALL RIGHT-OF WAY PROPERTY AND THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND PRIOR TO PLACEMENT OF FILL. FILL MATERIALS SHALL BE PLACED IN AND OTHER EC ALSO FURNISH, INSTALL, OPERATE AND MAINTAIN ALL NECESSARY PUMPING AND OTHER EQUIPMENT REQUIRED FOR REMOVAL OF WATER FROM THE - - - - - CENTERLINE NOT BE LIMITED TO NORMAL WORKING HOURS AND THAT THE CONTRACTOR MAXIMUM 8-INCH THICK (BEFORE COMPACTION) LAYERS WHICH ARE TO BE VARIOUS PART SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER CONTINUOUS OVER THE ENTIRE LENGTH OF THE FILL. THE MOST PERMEABLE FOUNDATION, E VARIOUS PARTS OF THE WORK AND FOR MAINTAINING THE EXCAVATIONS, HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION BORROW MATERIAL SHALL BE PLACED IN THE DOWNSTREAM PORTIONS OF REQUIRED OR I FOUNDATION, AND OTHER PARTS OF THE WORK FREE FROM WATER AS - - PROPOSED LOTLJNE REQUIRED OR DIRECTED BY THE ENGINEER FOR CONSTRUCTING EACH WITH PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY THE EMBANKMENT. THE PRINCIPAL SPILLWAY MUST BE INSTALLED PART OF THE ~ ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE EN CONC PART OF THE WORK. AFTER HAVING SERVED THEIR PURPOSE, ALL - - PROPERTY BOUNDARY GINEER. URRENTLY WITH FILL PLACEMENT AND NOT EXCAVATED INTO THE TEMPORARY PF EMBANKMENT. GRADED TO TH TEMPORARY PROTECTIVE WORKS SHALL BE REMOVED OR LEVELED AND GRADED TO THE EXTENT REQUIRED TO PREVENT OBSTRUCTION IN ANY " - - - - - - - - - EASEMENT LINE 6. THE CONTRACTOR SHALL VERIFY THAT ALL REQUIRED PERMITS AND DEGREE WHATS DEGREE WHATSOEVER OF THE FLOW OF WATER TO THE SPILLWAY OR APPROVALS HAVE 8EE'N OBTAINED FROM THE APPROPRIATE AUTHORITIES C COMPACTION OUTLET WORKS BEFORE BEGINNING WORK ON THE PROJECT. ALL DAM FILL SHALL BE COMPACTED TO NOT LESS THAN 98% OF THE OPERATION OR OUTLET WORKS AND SO AS NOT TO INTERFERE IN ANY WAY WITH THE EXISTING TREELINE OPERATION OR MAINTENANCE OF THE STRUCTURE. STREAM DIVERSIONS STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) WITH A MOISTURE SHALL BE MAID SHALL BE MAINTAINED UNTIL THE FULL FLOW CAN BE PASSED THROUGH 7. ALL CONSTRUCTION. MATERIALS, AND WORKMANSHIP SHALL CONFORM TO CONTENT WITHIN + -2 % OF THE OPTIMUM. EACH LAYER OF THE PERMANEt` NCDOT STANDARDS AND SPECIFlCATIONS, NCDENR -LAND QUALITY SECTIONS / FILL SHALL BE EXCAV THE PERMANENT WORKS. THE REMOVAL OF WATER FROM THE REQUIRED ~ CLEARING LIMITS EXCAVATION AND THE FOUNDATION SHALL BE ACCOMPLISHED IN A „ COMPACTED AS NECESSARY TO OBTAIN THAT DENSITY, AND IS TO BE ATION AI "EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL , AND CERTIFIED BY THE GEOTECHINCAL ENGINEER AT THE TIME MANNER AND MANNER AND TO THE EXTENT THAT WILL MAINTAIN STABILITY OF THE THE CITY OF REIDSVILLE STANDARDS AND SPECIFICATIONS. IN THE EVENT OF OF CONSTRUCTION. EXCAVATED SL • TESTING WILL BE THE OWNER'S RESPONSIBILITY. NO COMPACTION EQUIPMENT ALLOW SATISFA A CONFLICT BETWEEN! THE DRAWINGS AND THESE STANDARDS, THE MORE SHALL TRAVERSE ANY PIPE UNTIL MINIMUM COVER IS PLA " " - " ' - CREEK /WATER SURFACE EXCAVATED SLOPES AND BOTTOM OF REQUIRED EXCAVATIONS AND WILL • STRINGENT REQUIREMENT SHALL APPLY AS DETERMINED BY THE ENGINEER. PREVEN CED OVcR PIPE TO DURING THE PL T DAMAGE TO THE PIPE. COMPACTION TESTING FOR EMBANKMENT EXCAVATIONS, ALLOW SATISFACTORY PERFORMANCE OF ALL CONSTRUCTION OPERAl10NS. DURING THE PLACING AND COMPACTING OF MATERIAL IN REQUIRED EXISTING W ~ 8. THE CONTRACTOR RESPONSIBLE FOR COORDINATING HIS WORK WI SHALL BE PERFORMED AT A FREQUENCY of ONE TEST PER 2000 SQUARE SHALL BE MAID EXCAVATIONS, THE WATER LEVEL AT THE LOCATIONS BEING REFILLED ATERLINE 601 N. Trade Street , TH THE FEET PER VERTICAL FOOT OF FILL COMPACTION TESTING ALONG PIPES WORK OF OTHER CON. ACTORS ON THE PROJECT TO AVOID CONFLICT. LOCATIONS WHI SHALL BE MAINTAINED BELOW THE BOTTOM OF THE EXCAVATION AT SUCH LOCATIONS WHICH MAY REQUIRE DRAINING THE WATER TO SUMPS FROM PROPOSED WATERLINE SUlte 200 PLACED THROUGH THE DAM SHALL BE REQUIRED AT A FREQUENCY OF ONE WHICH THE WA TEST PER 25 LINEAR FEET OF PIPE PER VERTICAL FOOT OF F1LL. WHICH THE WATER SHALL BE PUMPED. Winston Salem, NC EXISTING FlRE HYDRANT Landsca a Archite t D CUTOFF TRENCH p cure 27101-2916 ~ VIII STABILIZAII • THE CUTOFF TRENCH SHALL BE EXCAVATED INTO IMPERVIOUS MATERIAL II STABILIZATION PROPOSED FIRE HYDRANT Civil En ineerin ALONG OR PARALLEL TO THE CENTERLINE OF THE EMBANKMENT AS g g SHOWN ALL BORROW A ALL BORROW AREAS SHALL BE GRADED TO PROVIDE PROPER DRAINAGE INI EXISTING GATE VALVE P. 336.723.1067 ON THE PLANS. THE BOTTOM WIDTH OF THE TRENCH SHALL BE GOVERNED AND Stimmel Associates PA Land Plannln BY THE EQUIPMENT USED FOR EXCAVATION, WITH THE MINIMUM WIDTH LEFT IN A AND LEFT IN A SIGHTLY CONDITION, ALL EXPOSED SURFACES OF THE ~ g F: 336.723.1069 THIS PROPERTY CONTi;INS WETLANDS AND/OR WATERS OF THE US STREAMS BEING EMBANKMENT , THAT ARE UND ( ) TEN FEET. THE DEPTH SHALL BE AT ER JURISDICTION OF THE U.S. ARMY CORPS OF ENGINEERS AND LEAST FIVE FEET BELOW EXISTING GRADE BE STABILIZED EMBANKMENT, SPILLWAY, SPOIL AND BORROW AREAS, AND BERMS SHALL INI PROPOSED GATE VALVE BE STABILIZED BY SEEDING, LIMING, FERTILIZING AND MULCHING IN THE NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. OR AS SHOWN ON THE PLANS. THE SIDE SLOPES OF THE TRENCH SHALL BE ACCORDANCE V ACCORDANCE WITH THE SPECIFICATIONS AS SHOWN ON THE ~ PROPOSED 45' BEND DISTURBANCE TO THESE JURISDICTIONAL AREAS SHALL NOT EXCEED THAT 1 TO 1 OR FLATTER. THE BACKFILL SHALL BE COMPACTED WITH ACCOMPANYING SHOWN ON THE PLANS. CONSTRUCTION EQUIPMENT, ROLLERS, OR HAND TAMPERS TO ASSURE ACCOMPANYING DRAWINGS. MAXIMUM DENSITY AND MINIMUM PERMEABILITY. ~ EXISTING SANITARY SEWER LINE G THE CONTRACTOR SH,1LL BE LIABLE FOR ANY DAMAGES TO THE OWNER AND III BACKFILL ADJ ENGINEER THAT RESULT FROM THE DISTURBANCE OF THE EXISTING WETLANDS ACENT TO PIPES & STRUCTURES IX EROSION AN EROSION AND SEDIMENT CONTROL PROPOSED SANITARY SEWER LINE AND/OR WATERS OF THE US (STREAMS) BEYOND THAT SHOWN ON THE PLANS. BACKFI THE DAMAGES MAY IN;,LUDE THE FOLLOWING, BUT ARE NOT LIMITED T0: LL ADJACENT TO PIPES OR STRUCTURES SHALL BE OF THE TYPE AND CONSTRUCTION • DEC 0 6 2004 FINES, CONSULTANT Fr_ES CON QUALITY CONFORMING TO THAT SPECIFIED FOR THE ADJOINING FILL MATERIAL. STRUCTION COSTS, MITIGATION FEES, AND LEGAL THAT EROSION CONSTRUCTION OPERATIONS WILL BE CARRIED OUT IN SUCH A MANNER ~ EXISTING SANITARY SEWER MANHOLE THE FILL SHALL BE PLACED IN HORIZONTAL LAYERS AT A THICKNESS THAT IS MINIMIZED. STA' FEES. THE CONTRAC~;OR, AT HIS DISCRETION, MAY PROVIDE ADDITIONAL COMPATIBLE THAT EROSION WILL BE CONTROLLED AND WATER AND AIR POLLUTION MINIMIZED. STATE AND LOCAL LAWS CONCERNING POLLU110N ABATEMENT ~ PROPOSED SANITARY SEWER MANHOLE PROTECTIVE MEASURE. ABOVE AND BEYOND WHAT IS SHOWN ON THIS PLAN TO THE COMPACTION EQUIPMENT BEING USED TO ACHIEVE WILL BE FOLLOI INSURE NO DISTURBA^'CE TO THE WETLANDS AND STREAMS, COORDINATE ANY THE SPECIFIED COMPACTION. THE MATERIAL SHALL FILL COMPLETELY ALL SEDIMENT CONI WILL BE FOLLOWED. CONSTRUCTION PLANS SHALL DETAIL EROSION AND ADDITIONAL MEASURES WITH THE ENGINEER AND EROSION CONTROL INSPECTOR. SPACES UNDER AND ADJACENT TO THE PIPE. AT NO TIME DURING THE CONSTRUCTION SEDIMENT CONTROL MEASURES TO BE EMPLOYED DURING THE ~ EXISTING STORM DRAINAGE LINE CONSTRUCTION PROCESS. C-1.0 POND RETROFIT PLAN BACKFILLING OPERATION SHALL DRIVEN EQUIPMENT BE ALLOWED TO OPERATE CLOSER THAN FOUR FEET, MEASURED HORIZONTAL, TO ANY PART OF A PROPOSED STORM DRAINAGE LINE C-1.1 POND ACCESS ROAD PLAN STRUCTURE. UNDER NO CIRCUMSTANCES SHALL EQUIPMENT BE DRIVEN OVER ANY PART OF A CONCRETE STRUCTURE OR PIPE, UNLESS THERE IS A X MAINTENANCI MAINTENANCE SCHEDULE EXISTING STORM DRAINAGE MANHOLE C-2.0 STANDARD DETAILS AND NOTES COMPACTED FILL OF 24" OR GREATER OVER THE STRUCTURE OR PIPE. • 5EE DOCUMENT 5EE DOCUMENT ENTITLED "EMERGENCY AC110N PLAN AND OPERA OO PROPOSED STORM DRAINAGE MANHOLE 110N AND IV PIPE CONDUITS MAINTENANCE ; C-2.1 POND DETAILS - „ MAINTENANCE SCHEDULE, REIDSVILLE INDUSTRIAL PARK SOUTHERN TRACT DAM 2E . DAM 2E". ~ EXISTING CATCH BASIN 1 ALL STORM DRAIN;! GE PIPE SHALL BE HDPE DOUBLE WALL PIPE WITH SMOOTH A ALL PIPES SHALL BE CIRCULAR IN CROSS SECTION. INTERIOR UNLESS NOTED OTHERWISE. PIPE JOINTS SHALL BE SILT TIGHT USING. ¦ PROPOSED CATCH BASIN MANUFACTURER'S STANDARD RUBBER GASKET. B A. CORRUGATED METAL PIPE -ALL OF THE FOLLOWING CRITERIA SHALL APPLY TO CORRUGATED METAL PIPE: 2 UNDER DRAINS TO BE CONSTRUCTED AS REQUIRED BY THE ENGINEER TO INLET PROTEC110N STABILIZE SUBGRADE. 1. MATERIALS - (ALUMINUM ALLOY) -THIS PIPE AND ITS APPURTENANCES SHALL r' SILT FENCE CONFORM TO THE REQUIREMENTS OF AASHTO M-196 /ASTM B-745, AND AASHTO 3 STORM DRAINAGE MANHOLES SHALL BE PRECAST CONCRETE CONFORMING M-197 /ASTM-B-744, WITH WATERTIGHT BANDS OR FLANGES, ALUMINUM TO NCDOT STANDARD 840.31. MANHOLES SHALL ALSO BE CONSTRUCTED SURFACES THAT ARE TO BE IN CONTACT WITH CONCRETE SHALL BE PAINTED WITH fH(((((KEf(((((f(Ef((((f((f(((((EE~f((((E(EE(f((((EKf(((((Kff(((((• ~MpORARY DIVERSION IN ACCORDANCE WITH ASTM C-478, ASTM A-615, AND ASTM A-185, ONE COAT OF ZINC CHROMATE PRIMER. ASTM C-990. MANIJOLE CASTINGS SHALL BE PROVIDED IN ACCORDANCE WITH THE SPECIFICATIONS. 2. COUPLING BANDS, ANTI-SEEP COLLARS, END SECTIONS, ETC. MUST FABRICATED -''"-'TM`-'"'-'°F- 1REE PROTEC110N FENCING FROM THE SAME MATERIAL AS THE PIPE. METALS MUST BE INSULATED FROM DISSIMILAR MATERIALS WITH THE USE OF RUBBER OR PLASTIC INSULATING MATERIALS AT LEAST 24 MILS IN THICKNESS. STAINLESS STEEL BOLTS SHALL BE USED FOR CONNECTIONS. 3. CONNECTIONS -ALL CONNECTIONS WITH PIPES MUST BE COMPLETELY WATERTIGHT. THE BARREL CONNECTION TO THE RISER SHALL BE WELDED ALL • I • AROUND WHEN THE RISER IS METAL. ANTI-SEEP COLLARS SHALL BE CONNECTED TO THE PIPE IN SUCH A MANNER AS TO BE COMPLETELY WATERTIGHT. DIMPLE BANDS ARE NOT CONSIDERED TO BE WATERTIGHT. ALL DISTURBED AREA SURVEY PI S TO BE SEEDED WITH AN EVEN MIXTURE OF REBEL JRVEY PROVIDED BY: II, FALCON AND JAGUAR FINE FESCUES AT A RATE OF 5-6 LBS./1,000 4. ALL CONNECTIONS SHALL USE A RUBBER OR NEOPRENE GASKET WHEN JOINING REGIONAL S.F. 50 AS TO PRODUCE A THICK, FIRM STAND OF GRASS. FERTILIZE AT PIPE SECTIONS. THE END OF EACH PIPE SHALL BE REROLLED AN ADEQUATE GIONAL LAND SURVEYORS A RATE OF 10 LBS./1,000 S.F. WITH ASLOW-RELEASE FERTILIZER (USE NUMBER OF CORRUGATIONS TO ACCOMMODATE THE BAND WIDTH. P.O. BOX .0. BOX 35341 STRAW AND ASP>-iALT EMULSION TO COVER SEED UNTIL STABLE.) APPLY 5. THE FOLLOWING TYPE CONNEC LIME ACCORDING TO SOIL TEST OR APPLY 4 000 LBS TIONS ARE ACCEPTABLE FOR PIPES LESS THAN GREENSBO , ./ACRE SLOW- 24 IN DIAMETER: FLANGES ON BOTH ENDS OF THE PIPE• A 12-INCH WIDE RELEASE PELLEi~IZED AGRICULTURAL LIMESTONE. SEEDING DATES. AUG. 20 STANDARD ~EENSBORO NC 27425 THROUGH OCT. ~5 AND FEB. 1 THROUGH MAY. LAP TYPE BAND WITH A 12-INCH WIDE BY 3/8-INCH THICK CLOSED 336 665 CELL NEOPRENE SLEEVE TYPE GASKET; A 12-INCH WIDE HUGGER TYPE BAND i36 665-8155 SEEDBED PREPARAIlbN: WITH 0-RING GASKETS HAVING A MINIMUM DIAMETER OF 1/2-INCH GREATER THAN THE CORRUGATION DEPTH. 1 REMOVE ANY UNDESIRABLE GROUND COVERS INCLUDING ANY TEMPORARY „ SEEDING. 6. PIPES 24 IN DIAMETER AND LARGER SHALL BE CONNECTED BY A 24-INCH LONG ANNULAR CORRUGATED BAND USING RODS AND LUGS WITH A 24-INCH WIDE 2 RIP THE AREA TO BE SEEDED TO A MIN. DEPTH OF 4"-6." BY 3/8-INCH THICK CLOSED CELL NEOPRENE SLEEVE TYPE GASKET. 3 REMOVE ALL LOOSE ROCKS, ROOTS, ETC. LEAVING SURFACE SMOOTH AND 7. HELICALLY CORRUGATED PIPE SHALL HAVE EITHER CONTINUOUSLY WELDED ~ ~ o`.. AS~CI,e~~.. .ova CARn.'%. UvirUllm. J=AW) UK HAVt LUCK ttAMS WITH INIERNAL CAULKING OR A NEOPRENE BEAD. BEFORE YOU DIG ! c`';•'~PORq~:~`s''•, ~o' Q~`,,'•""' S v NUM. utSC;KIN IION INITIALS DATE 4 APPLY SEED, AGRICULTURAL LIME, AND FERTILIZER UNIFORMLY AND MIX 8. BEDDING - THE PIPE SHALL BE FIRMLY AND UNIFORMLY BEDDED THROUGHOUT o'o r•~• .0• I•. CALL 1-800-632-4949 = b s WITH THE SOIL. ITS ENTIRE LENGTH. • SEAL 5 MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 9. BACKFILLING SHALL CONFORM TO SECTION III "BACKFILL ADJACENT TO PIPES N.C. ONE-CALL CENTER SEAL : ' 14 85 ; AND STRUCTURES". I IT'S THE LAW . = c 1,0 - 69 I, 10. OTHER DETAILS (ANTI-SEEP COLLARS, VALVES, ETC.) SHALL BE AS SHOWN ON THE DRAWINGS. CARD AL w** POND CONSTRUCTION SEQUENCE 1. THE AFG WIPES CONTRACTOR IS RESPONSIBLE FOR REMOVING THE SEDIMENT FROM THE 10. BUILD TEMPORARY BERM AROUND NEW RISER SEDIMENT BASIN PRIOR BEGINNING WORK. NEW OUTLET STRUCTURE IS BEING INSTALLED. BE UND NEW RISER TO PREVENT RELEASE OF ANY WATER FROM BASIN WHILE INSTALLED. BERM MAY BE PLACED WHERE THE PLANS SHOW THE RIP RAP ~ DOUGHNUT AND IS TO BE A MINIMUM OF 4 FEET UM OF 4 FEET HIGH, 2. CLEAR ADDITIONAL AREA REQUIRED FOR CONSTRUCTION AND INSTALL NEW MEASURES / ADJUST EXISTING MEASURES AS SHOWN ON PLANS. CALL NCDENR WINSTON-SALEM 11. INSTALL NEW OUTLET STRUCTURE. COMPACT URE. COMPACT BACKFILL IN ACCORDANCE WITH POND CONSTRUCTION REGIONAL OFFICE FOR INSPECTION OF MEASURES PRIOR TO BEGINNING ANY LAND SPECIFICATIONS. PLACE RIP RAP AT BARREL OUTI AT BARREL OUTLET. DISTURBING ACTIVITY. 12. REMOVE TEMPORARY BERM AND INSTALL RIP VD INSTALL RIP RAP DOUGHNUT. 3. BEGIN ACCESS ROAD, POND AND BORROW AREA GRADING AS DESCRIBED BELOW. KEEP RUNOFF DIVERTED TO EROSION CONTROL DEVICES AT ALL TIMES. MAINTAIN EROSION 13. BUILD TEMPORARY BERM AROUND EXISTING R FUND EXISTING RISER TO PREVENT RELEASE EXISTING OUTLET STRUCTURE IS BEING REMOVED, BERM IS TO BE A CONTROL DEVICES IN ACCORDANCE WITH THE MAINTENANCE SCHEDULE ON SHEET C-1.1. OF ANY WATER FROM BASIN WHILE EXISTING OUTLI MINIMUM OF 4 FEET HIGH. POND ~1: 14. REMOVE EXISTING OUTLET STRUCTURE AND D 4• BUILD TEMPORARY BERM AROUND NEW RISER TO PREVENT RELEASE OF ANY WATER FROM WITH POND CONSTRUCTION SPECIFICATIONS• REMC ~UCTURE AND DISPOSE OF OFFSITE. COMPACT BACKFILL IN ACCORDANCE Stimmel Associates, PA (CATIONS. REMOVE TEMPORARY BERM. BASIN WHILE NEW OUTLET STRUCTURE IS BEING INSTALLED. BERM MAY BE PLACED WHERE THE PLANS SHOW THE RIP RAP DOUGHNUT AND IS TO BE A MINIMUM OF 4 FEET HIGH. 15. EXCAVATE FOR BENCH AND SIDE SLOPE ON ' Landscape Architecture BENCH ON THE WEST SIDE, AND FOR THE FOREBA SIDE SLOPE ON THE NORTH AND EAST SIDES OF POND. PLACE FlLL FOR Civil Engineering 'OR THE FOREBAY BAFFLE. PLACE RIP RAP FILTER IN BAFFLE. Land Plannin 5. INSTALL NEW OUTLET STRUCTURE. COMPACT BACKFILL IN ACCORDANCE WITH POND 9 CONSTRUCTION SPECIFICATIONS. PLACE RIP RAP AT BARREL OUTLET. 16. REMOVE EXISTING 36" HDPE STORM DRAINAGI PLACE RIP RAP AT SWALE ENTRANCE INTO EAST E STORM DRAINAGE PIPE BACK TO TOE OF SLOPE AND PLACE RIP RAP PAD. 601 N, Tratle Street Suite 200 ~E INTO EAST END OF POND. Winston Salem, NC 27101-2916 6. REMOVE TEMPORARY BERM AND INSTALL RIP RAP DOUGHNUT. 17. IT IS RECOMMENDED THAT THE CONTRACTOR 7. BUILD TEMPORARY BERM AROUND EXISTING RISER TO PREVENT RELEASE TO SEEDING THE POND. IE CONTRACTOR VERIFY THE POND CONTOURS CONFORM TO THE PLANS PRIOR P: 336.723.1067 F: 336,723,1069 OF ANY WATER FROM BASIN WHILE EXISTING OUTLET STRUCTURE IS BEING REMOVED. BERM SEALS: ~~~~unnq?q IS TO BE A MINIMUM OF 4 FEET HIGH. 18. PROVIDE THE ENGINEER WITH AN AS-BUILT ~ AN AS-BUILT SURVEY OF THE INTERIOR OF THE POND AS DESCRIBED ON THE COVER SHEEP. 8. REMOVE EXISTING OUTLET STRUCTURE AND DISPOSE OF OFFSITE• COMPACT BACKFILL IN ACCORDANCE WITH POND CONSTRUCTION SPECIFICATIONS, REMOVE TEMPORARY BERM. 19. SEED, FERTILIZE AND MULCH ALL DISTURBED ~j i ; ALL DISTURBED AREAS. ~ , 9. PLACE FILL FOR PERIMETER BENCH, FOREBAY BAFFLE AND RIP RAP FILTER. 20. UPON ESTABLISHMENT OF PERMANENT VEGET, • ~r _ DEAL RMANENT VEGETATIVE COVER AND APPROVAL FROM THE NCDENR LAND ~ QUALITY INSPECTOR, REMOVE ALL TEMPORARY ERO , ; _ 0 EROSION CONTROL MEASURES.~...._~ f ~ s• ~ , - . . _ _ r EXISTING TEMPORARY ' << EXISTING ''.SLOPE}DRAINS l _ _ - _ _ _ _ _ - _ . _ r... STORM PIPE F: ~ - , TO BE REMOVED BY' ~ ~ ;ti • A AFG CONTRACTOR ~ ~ ' ~ - , ~ _ ; . _ _ _ _ - _ - r: ~ CARP''',,. i ~ ~ - ~ , , i r t --170- • EXISTING 0.• SS EXISTING TEMPORARY _ ,~w~.,._ __......._~r.~ _~..._.k~.~ _ ~ f ~ ~ F ~ m~_ STORM PIPE ~t, ~ ~ 0 ~L . / SLOPE DRAINS Q- , EXISTING A F , G IP EXISTING DIVERSION BERM S I C ~ DIVERSION BERM _.~~t~t~" ~ ~ ~ , w,..~.~ TO BE REMOVED L rt _ TO REMAIN IN PLACE TO REMAIN j m~., q TO DIVERT SURFACE RUNOFF ~ L .a 2 OT j ; ~ BY AFG-CONTRACTOR - - 14 85 ' - - D AWAY FROM POND SLOPE'' ,..a - - € D~' : ; fi n ~ti ~ ' EXISI1NG CLASS. "B° ' ~ ~ i RIPRAP APRON _.w_ ,__r.._- , ' i I 4~ _ . ~ - ~ ~ v , , ' , .m.. ; TO REMAIN:, _ q~ - ~ ~ , ' ~ • t / / % EXISTING- ' ~ ~ . _ _....0 - \ _ 776... _ . EXIST( E~IPRAP APRON NG PROJECT: r' ' ~ TO DIVERSION BERM BE REMOVED, TO REM ~ CLEAN, SALVAGEABLE AIN 774 ~ ACCESS ROAD . ; ` RIPRAP MAY BE SEE' SHEET C1.1 N 772 _ ~ ~ _ 77 _ , ,r REUSED WHERE NEEDED 1 768 ~ - - r a _ _ _ ..BENCH , - e~_...,,.,,~ , 4 3 „ 5 X 5 18 SLOPE;DRAIN " - ~ W C-2. C-2.o ~ CLASS 8 - ~__a ' LOT LINE _ . . 1;.. _ N RIPRAP PAD a_h.} ~ _EDGE-Of BENCH _ - ' _ _ . ~i _ _ ~ - . EXISTING 10' WIDE , -764 ~ ~ ~iirruu ~ ~ , : ~ i t r rtir.. z 764 _ . INED 6 , _ 762 EMERGENCY SPILLWAY' ( , 762 . - E(E ~ ~ - ~2 ' i CREST EL 769,851 ' ~-2.1 ; (E EE E -•;v 78 758 CONTRACTOR TO REMOVE 10 LF , , N E 756 b ` { 3 ~ / ' SHAPE AS NECESSARY ~ ~ I ~ c-2.1 756 ` EXISTING 36 HDPE;:TO TOE OF SLOPE 756 ° I EDGE OF NCH EL. 753.75 / ~ , - _ ~ j 63' - / ' ' ~ - ..BENCH N - ~ , _ . - - _ _ ~ ti 20 ' ~ CLASS °B" RIPRAP 7 ! ~ 1 ' ' ~ i ~n - ~ r".r 3:1 _ - w ~ 3:1 CLASS "B" RIPRAP ~ ~ i TO TOP OF DAM ~ I ~2ti ` , i I . ,~d t 752 50 ' _ , , 7 I i ~ in ~ 1. ~ ~ 1 2 ~ ,.`i ~ " i POND EXISTING BOTTOM 4 j ~ ~ FOREBAY --THICK=18 I / i ~ 35 ~ ' DIMS=.10 Lx10 W LL ~ 3'1 Z ~ 3a EL 762.00 C-2.1 w,~ w I TO REMAIN ~ ~ I 117 „ „ ~UNbERLINE WITH 0] ~ ~ ~ ~ U I'', ~~EXISTING 10' WII I j BERM ® ~ ~ Z i ' CLASS B RIPRAP 2 J L NCDOT TYPE 2 EXISTING 10' WIDE -12'-` j r TO TOP OF BERM GEOTEXTILE FABRIC 3;1 GRASS LINI j i TOP EL 764.75 1 24" C.A.A.P. RISER I m ~ ~ EMERGEN( ~ ~ " 3.1 { y GRASS LINED ' •t ! , ~ 3. oD EMERGENCY _ POND #2 EXISTING I m C-2.1 W/48 TRASH RACK C-2. SPILLWI EXISTING ~ ! 4 270' I I ~ ~ CREST EL 757.1 SPILLWAY , ; 80TTOM EL 750.00 ~ ro J Z - W DIVERSION,BERM ~ ~ 5 ' ~ ~ / SHAPE AS NECESSAf w ~ o I(7 CREST EL 757.82 ~ TO REMAIN ~ i ~ BERM 'E AS NECESSARY m i C-2. ; °''z ! I C-2 ~ ~ ! ~ \ ~ V ~ ! _ - - - - INV 762.00 ~ ~ ~ ; TOP EL 752.75 1 ~ - ' ~ ~ I INV 750.00 FOREBAY 3:1 ; 3:1; . _ - c ~ ~ 6 _ - - _ - 1 _ _ i 3 W .,4 ' / - a 8 r~ ~.h0" ' ~ I 4 24" C.A.A.P. RISER 2 4 ~ ~ ~ ~ C-2.1 W/48 TRASH RACK C-2.1 C-2 ' .c~ ? 10' EXISTING TEMPORARY f"' ~ ~ j t52' ' ' ' ' SQIL'STOCKPILE ' \ EXISTING - 770-_- - _ _ ~ ` t , \ EXISTING 62 LF LOT N~ I i 5 ` i ~ ~ I r RISER & BARREL i Z E ~ ~ TO BE REMOVED TOP OF DAM 771.50 1 15~ C.A.A.P. _ - - - TO REIrfAIN C-2. BARREL ~ ~ 6~ ~ / % ~ I~ z COMPACT BARREL- ~ ~ - - - _ _ , - - ; . . - _ I` _.TO 95~ STANDARD 770_..._ ~_.00% ~ ' w~-, . PROCTOR - ~ _..mN._.. I , ; - ;4-- 756 - - _ - - I - - - EXISTING - _ , - - rF 75 ~ - _ ;;e SILT FENCE f 1 ,w ~ i _ - _ - , _ TO BE RELOCATED,,.:. , ~ ` ~S. ~ - - - - - TOP d~ i ~ ~ ~ ~ 60 LF TOP OF OAM 759.00 _ q _ - ~ 'TO B X , Z i\ ~ ~ ~ 15 C.A.A.P. -T E E TENDED - - ~ EXISTING 1-~~ e\ ~ - ~ - - -BARREL 758 AS SHOWN ~ J SILT FENCE ~ f ~ s., _ _ I _ ~a CLASS "B" RIPRAP -f ; ~ / r~ TO BE RELOCATED - - ~ FILTER (ACED WITH _Y"{~t"' ~ , ~ ~`-Y,~• i - - - . - W eye , . _ W _ 2 ODx - - ~ ~6- - Xr T1N- ~y , ~ ~ _ , i EXISTING ~ WASHED #57 STQNE~-(~~~ ~ ,'°y°y • E S G , „ - ...RISER & BARREL-- ~g ; ,.~w , ~ J _ ~ ~ ~ ~ SILT FENCE INV 760.76 TOP,El.~7¢4<u'7~~--~~-' ~ ~I.1 ~ . ~~.~..~.,r° t_~ EXISTING , ~NV_ 748.80 i1 _ ' TO BE REMOVED ~ - - ~'v' r ~r ~ TREELINE ~ k ~ : ~ ,-Y-.~^ ~ - _ " " ~ tw -COMPACT BARREL ~ - - ; ~ CLASS B RIPRAP _ m~.m ~u_. TO 95~ STANDARD-- Y { ' 2 s e ' FILTER FACED WITH ? ~ - PROCTOR ' ` - k'°~ ~.-Y EXISTING j CLEAN,-SALVAGEABLE~~ ~ ~ ~ ; ,.Y..~~-~y-~ SILT FENCE - ~ _ r ~ WASHED #57 STONE , E - ~ ~ . ' TOP EL 752.75 a --r~ i _ _~<{~7"~ , \ RIPRAP~MAY BE TO BE RELOCATED ~ i REUSED WHERE NEEDED - i ~ I _ ~ ~ 0 ; ~ _ - _ „ , _ , ~ - EXISTING _ ; ~ ~ TAIL DITCH ' ~ . ~ . z, , 3' BOTTOM WIDTH SILT T'ENCE ~ ` ' ~ r"X~' _ ' W ~ BE RELOCATED _,.~,.,~-~,~_Y,~'/-~ EXISTING „ , , " " ' -7g 3:1 SIDE SLOPES , CLASS B RIPRAP ~ ~ - , / ~ = " SILT FENCE TO REMAIN CLASS "B" RIPRAP ~ .'CLEAN, SALVAGEABLE - , : . ,~..h"" _ " i RIP ~ - d50-8 i RAP MAY BE / THICK=18" CLEARING t ~ . _ _ / _ a-_.. `Mµ- DIMS=20'Lx15'W LIMITS dMAX= 2" REUSED WHERE NEEDED _ ; ~ / CLIENT: - _ . _ _ - _ _ - UNDERLINE WITH- ~ ~~~_,.NCDOT TYPE 2 , - ~ ~ THIC 18" ~ ~ ; _ . ~ - , DIMS=12Lx14 W ' UNDERLINE WITH ~ ' GEOTEXTILE FABRIC EXTEND RIPRAP _ ,,I., , ~NCDOT TYPE 2. ~ ~ / ~ _ CITY OF REIDSVILLE I G~TEXTILE FABR~~ - . - - , , 2' VERTICALLY UP , ~ - _ ,,.r _ . ~ - 230 W. MOREHEAD ST. EACH 51DE SLOPE ~ ~,n / - - _ REIDSVILLE NC 27320 ~ EXISTING _ ~ - - . - C/L STREA ; ~ - - - • 336 349-1066 r,~ ' ~ ~ ~ 1 .~k •1 ~ ~ ~ , _ G~~~' ~ ~ , . , . , , ~ . DATE: 9/22/04 _ ~ . ~ 1 ' ~ ~ i REVISIONS. , , M 1 , , , ; , % ~x_- ~ 1Q 1D/7/04 BENCH/SLOPE GRADING = ~ - - - - _ ' ~ ERTY LINE.-..~ ~ ~ ' ! REVISIONS r; PROP ~ r ~ 11/15/04 SLOPE REVISIONS, MAT'L ~ . - _ ~ - SPEC. REVISIONS ~ , - ~ I. r ; ~l j ; ~ r ~ ~ EXISTING _ ~ WETLANDS, TYP . _ J / ~ ~ ~ ~ y . ~ , , - JoB. No: 03-258 ' ' , SHEET TITLE: ~ ' I 's"; ~ , - ~ , ~ i ,v , ~ „ ~ ' . ~ r SCALE: AS NOTED SHEET NO.: SCALE: 1" = 30' 30 0 30 c - 1 0 © STIMMEL ASSOCIATES, P.A. I ~ ¦ i mm~ I xi 3 f % ~ E~(ISTING ~ M} 'TEMPORARY ~ ~ i ~ ~ CUk-DE-SAC ~ I ` v _.I i I ~ W f j ~ ~ j ~ ~ ~ _ ~ f i _.I r ( ' Stimmel Associates, PA ~ _.I Q ~ 1 Landscape Architecture ~ j- I ea ~ .~m. I f i ~ ? L Civil Engineering OT 2 D U~ .k ~ I I r.~ ~ f Land Planning I 601 N. Trade Street Suite 200 (I O i I II ~ I I p 1 I~ 0 Winston Salem, NC 27101-2916 I i ~E ~ II ~ o ~ I -i ~ ~ ; ;°`b o P: 336.723.1067 F: 336.723.1069 I I ._J b SEALS: ~q~~wur~~~ t ~ 9 ~ I ~ ~ 00 ,o`' PSSOC/ ~ I II i ~ . - ~ .II _ c Fs~o ; z 1 T~MPORARY~ > v~j r 's 9 S• . ~ . ' C-3.0 CONSTRUCTION D ` ~ _ l1 _ y.. • SEAL • {s ' ENTRANCE _ II _ _ E EXISTING I ~ _ !1 U .w _ 42" RCP ~ W . . N ~ ~ ~ ~ - _ _ ~ •••~....9.•• ~P~. ~...v . _ _ ~ ~~~~?niiut~O ~~~~~uu~u~~~q _~o .1 _ _ ~ I _ _ ~ , _ , LOT _ ~ F I, 2B . _ ,n Ii _ _ ~ , C ,b i , ~ I :i....... t , O••• ~ • ? 2~0 II ~ ~ I 1 t~ n III ~ ~ ~ • ~ - ~ I , y ~ y i ~ d. ~ ~ O ~ ~ AL r 1498 ; y I ~ I .L. ~ I \ ~ 1 0 II I i ' j II ~b ~ v•., , I j; o ~ V AL ,o~° ~ I~ I ~ I I ~ ~ . w._...__ ~ II ~ . _ . _ I . _ OJECT: ~ ~f, ~ , III ~ LOT LINE n I I ~ ` f ~ ~ ~ ~i r PROPOS a ED JUNCTION BOX ~ I i 1 ~ ? ~ i, " NCDOT STD. 840.31 ~ r ~ ~ I RIM 785.50 ` ~ ~ ~ tl, U III INV IN 780.12. ! ~ I ~ I I W i ~ INV OUT 779.50 N ~ 32 LF 42" ~ ~ ~ ~ ' ~ I II` I I ~ ! HDPE ®1L56q 1 , ~ + I EX STORM PIPE i .1 I I 'iNV .775.80 ' :I ~ ~ I (TYP.) ~ ~ I ~ j 1, CLASS°B" RIPR_ AP OUTLET. PROTECTION I ' ~ 1 12 W X 25'L X 24 ,,THICK t I J ~ ~~"I ~ ~~W~ GEOTEXTILE UNDERLINER ` ~ r~ ~ ACCESS ROAD NOTES ~ MAY REUSE RIP RAP AT ~ ~ ~ ~ „ i ~ T ~ ~ 1. ACCESS ROAD SHALL BE 12 WIDE WITH 4 COMPACTED A 1 END OF, EXISTING PIPE'. ~ ~ 1 I I" COMPACTED ABC SURFACE. > i;. I ` \ d ~ ' ~ I E* r / ~ t- ~ ~ i 2. COMPACT ALL FILL TO 95~ STANDARD PROCTOR. ~ ~ ,f ~ - Pf OCTOR. ( Z ' ~ ' 3. SEED, FERTILIZE & MULCH ALL DISTURBED AREAS AT COiv AREAS AT COMPLETION OF ~ ~ ~ ~ ~ ~ GRADING, ~ ~ ; ~ CLEARING ~ ~ ~ ~ ~ ~ i ~ , LIMITS ~ ~ \ ~ r (TYP.) ~i , 1 \ V ~ ~1 i Z ar W ~ ~ . ~ ~ ~ , ~ i I ~ _ - ' ~ . } 1 i FUTURE 1I ~ , ~ , _ . ~ S$" ~ CUL-DE-SAC _ _ ~ , , . . CURB & GUTTER ~ ~ ~ ~ ~ - _ _ _ Itf I I ~ - _ 'i ~ al , , ~~~I~~jt ~ `j' F I ~ ~ ~ . I ` ` ~ . _ - _ l , , _ _ Z ~ . _ s _ _ - - - _ _ , _ _ _ _ _ - M.a, ~ . ~ _ _ ~ ~ _ CLEAN WATER DIVERSION ~ ° _ _ _ z - _ _ , BOTTOM WIDTH = 4.0 FT: ~V ~ ~ ~ ~ ~ - SIDE SLOPES = 3:1 ~ ~ ~ ~ DEPTH = 2 FT.. ~ ~ ~ . ~ ~ - ~ I LINE WITH CURL X I MATTING ~ ~ ~ _ `a. ~ ~ ~ ~ ~ ~ :a J - J ~ ~ V ~ i~ J 1( t ~ ~ ~ . ~ ~ f ~ i~ . ~ ~ ~ ~ „y' ~ - = ~ ` _ (n ~ ~P`~ , ~ ~ , , ~ ' I gy ~ ~ G~' I° ~G W \ , EX. DIVERSION W , - ~ ~ ~ f BERM (TYP.) - -'`780 1 S ~ ' i 1 1 ~ ~ } ` ~ , ~ ~ ~ ~ ~ , ~ ' ~ a' . _ , 3 _ CLIENT: ii I ~ p ~ ~ ~ ~ ~ J t~~b rd ~ t {(~SI~i f- ~ ,i ~ t„ , rs ~ ~ ~ ' ~ , . CITY OF REIDSVILLE ~ v _ .77s _ i 1 - \ - ~ - ~ 774 ' 230 W. MOREHEAD ST. . .......772 _ - ; 4-- - - ' ~ _ - ~ rv- _ . REIDSVILLE NC 27320 i i ~ , : A ~ t , 1 ` L~ LINE ~ 768 (336) 349-1066 . EX; SOIL ~ ~ t,~ f ; - _ _ ' ~ STOUKPILE ~ ~ - "^""--7 - ra*~~ , _ r,R-._. , i , ~ V A r r s . ~ ~ . - _ . oRAwN: TEG - _ _ , 764 . , _ _ . DATE: 9 22/04 ~ - ~ t Z - , 762 i REVISIONS: - '~-~Z ; j V ~ ~ ~ 'fir 1~,~~- ~ 'f ~ i Q1 10/7/04 BENCH/SLOPE GRADING ~ (iti i `r - ~ i r 76g~ e i REVISIONS I ~1 ~ I ~ ~ j'~,., b~ i~~ >2 \ c~ III c> d Iii I, ,ii OND #1 P ~ ~ I SEE SHE ~ ' ~ ET C1.0 ~ ~ ~ , ~ ~ i i FOR RETR F ! I ~ OIT LOT ~ , 2D , Q i JOB. No: 03-258 REQUIREMENTS ! ~ ~ ~ ~ ~ ~ I , i L `Y~ SHEET TITLE: OT 2 , E I~ ~ ~ ~ ~ ~ i ' ii ~ . F; ~ ~ , . I n EX. SILT , i ;E FE E . EASEMENj ~ q ~ s _ _ - _ 0~ ACCESS ; PROPER r ~ 68 - D~pCE ~ ~ r i ' p _ OR ~ ~ F ~_m _ _ I~ „t, ,t ~ _ f _ i " 770-- ~ ; - ~?4 i/ EX "NG ROCK AM DIM SE.. EN. B SIN` TO REMAJN IN PLACE- - , SCALE: AS NOTED SCALE: 1 = 30 AND BE MAINTAINED BY - r3--_ SHEET NO.: _ 30 0 30 THE POND C0 TRACTOR • r : -c r... - © STIMMEL ASSOCIATES, P.A. ¦ Stimmel Associates, PA Landscape Architecture Civil Engineering Land Planning 4' STEEL POST 8' O.C. 601 N. Trade Street Suite 200 WITH 12 GAUGE WIRE MESH Winston Salem, NC 27101-2916 (6" MAX. SPACING) AND P: 336,723,1067 F: 336.723.1069 FILTER FABRIC SEALS: ~~~,uuu„q~ TRENCH 4" X 8" DEEP, PSSOt:I EXTEND FILTER FABRIC ••,.o~pORgr.,•S AND WIRE MESH, BACKFILL ~ G F ~O AND COMPACT = ~ ~ ~ ~ ~ ~T s ~ S t~l~ N E P° FCOw ; ~O * " " P~c• S STONE SIZE-USE 2 -3 WASHED STONE. F Q 0 MIN, * LENGTH-AS EFFECTIVE, BUT NOT LESS THAN 50 FEET. Q 0 * THICKNESS-NOT LESS THAN 8 INCHES. G~ * WIDTH-NOT LESS THAN FULL WIDTH OF ALL POI T ~,0 N S OF INGRESS -1T_I-III_III_II - - - I; I I ~I I ~I I I-TI=1 I f= 1=1 11=~~ OR EGRESS, BUT NOT LESS THAN 12' I-III- I I-III-I I I I III=1 11- * WASHING-WHEN NECESSARY WHEELS SHALL BE CLEANED TO ~I I ~I 11=~=1 11=1 I I_ _ CAR i I = _ _ ~ 0 _ III I I I_I I l i ~I I I I_I I I , , . ' ~~4 REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC R/W. WHEN " WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA _IIII=11 11=III 1=III= ; p•,.F SS 8 MIN. PSR STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN III=11I I -I I I I I I1=1 ; 2• o ti• ~I I I- 1= 1= I 1=-~f APPROVED SEDIMENT TRAP. ALL SEDIMENT SHALL BE PREVENTED coMPACTED ~ .I I ~I I ~I I III=1 ~ = : , L ~ 14985 : FI L -I ~ ~I I I=1 I I- ~=1 ~ 1= 2-3" COARSE FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE AGGREGATE THROUGH USE OF SAND BAGS, GRAVEL, BOARDS, OR OTHER -I - -I D~' ~I I ~I I I-I 1(- EXTENSION OF FLTER .I - -I ~ ~ i APPROVED METHODS... 4'MIN. ISLANI ISLAND OVER INLET II-III-III vS. SIN. FABRIC AND WIRE , i . DIVERSION BERM MESH INTO TRNECH , ~ 1.5' MIN. •,ry~ A< ir~i I 1=1 11- HOLD-DOWN STAKES _ I=I I =i I 1=111- 'mil l ~I I PROJECT: _ III- - =1 11=III=III=1 I I=1 I~ ~ 1=I I r N TS I-I I I.I I I=1 I I=1 11=1 I r o I-1I I. NTS PLASTIC CORRUGATED PIPE (=I1' P -III- HAND COMPA( HAND COMPACTED =III TOP OF FILL ISLAND FlLL ISLAND W ~=III DIVERSION 4'MIN I=~ I BERM 4'MIN N ~1 " NATURAL 6 MIN GROUND STABILIZED OUTLET 4 MIN. = ~ I- 1 MIN ,;;,,,`,1.5 MIN u` . 1.5 MIN ~ ~ LENGTH= 4 TIMES PIPE DIA. =III- THICKNESS= 12" CL. B RIP RAP LEVE = III- FLOW FLOW WIDTH= 4' MIN. = I ~ I- ~ - ~ J _=1I1- =III- _ = DIVERSION CHANNEL S TION B _I _ _ _III. SECTION B-B II_ _ _III-III-III-III= =1 I I=1 I I=11 I=1 I ~I I I=1 I r B PLASTIC CORRUGATED PIPE 3 Z 3 SECTION A-A 0 ~ PIPE If SLOPE ~ PIPE INLET 0 0 ml v LL A o to I -n J A I- I J z W o ~ I SLOPE STABILIZED OUTLET m m W HOLD-DOWN STAKES 3 0 3 0 B Z N TS Z W J I- W J J J U) 1. A GRADING PERMIT SHALL BE OBTAINED FROM NCDENR LAND QUALITY SECTION PRIOR TO TEMPORARY DIVERSIONS 1. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ASSUMING THE RESPONSIBILITY OF INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE MAINTAINING THE EXISTING EROSION CONTROL DEVICES THAT WERE INSTALLED BY OTHERS. TY OF ' ANY LAND DISTURBING ACTIVITY ON THE SITE. SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS HERS. W AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, 2. CLEARING LIMITS SHALL BE CLEARLY DEFINED PRIOR TO BEGINNING CLEARING OPERATIONS. ERATIONS. 2. CLEARING LIMITS SHALL BE CLEARLY DEFINED PRIOR TO BEGINNING CLEARING OPERATIONS. CLEARING DEBRIS SHALL BE PROPERLY DISPOSED OF OFFSIIE IN A PERMITTED LANDFILL REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND CLEARING DEBRIS SHALL BE PROPERLY DISPOSED OF OFFSITE IN A PERMITTED LANDFILL FACILITY. APPROPRIATELY STABILIZE IT. TREES OUTSIDE OF THE CLEARING LIMITS SHALL BE PROTECTED DURING CONSTRUCTION. !FILL FACILITY. FACILITY. TREES OUTSIDE THE CLEARING LIMITS SHALL BE PROTECTED DURING CONSTRUCTION. ION. 3. NO CLEARING OR GRADING WORK SHALL COMMENCE UNTIL SEDIMENTATION AND EROSION ROSION 3. THE EROSION AND SEDIMENTATION CONTROL PLAN IS INTENDED AS A GUIDE. AFTER )N AND GRADING BEGINS, ADDITIONAL MEASURES MAY BE NECESSARY TO CONTROL SEDIMENTATION TEMPORARY SEDIMENT TRAPS CONTROL APPROVAL AND GRADING PERMIT HAS BEEN ISSUED AND ALL SEDIMENTATION AND EROSION CONTROL MEASURES TOR THE AREA TO BE DISTURBED ARE IN PLACE. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE AND EROSION ONSITE. IF S0, ADDITIONAL MEASURES SHALL BE INSTALLED AS DIRECTED BY CLIENT: THE NCDENR, LAND QUALITY SEC110N INSPECTOR. SEDIMENT AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS 4. ALL CONSTRUCTION FOR EROSION CONTROL STRUCTURES SHALL BE IN ACCORDANCE WITH ICE WITH 4. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED AND ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY 5. GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL PRACTICES REQUIRED TO - I s c l R CITY OF REIDSVILLE MAINTAINED IN ACCORDANCE WITH THE NCDENR LAND QUAL TY E T ON S E OSION AND CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT BELOW THE LOW MINIMIZE EFFECTS ON ADJACENT PROPERTIES DURING CONSTRUCTION. EROSION CONTROL tEQUIRED TO SEDIMENTAl10N CONTROL PLANNING AND DESIGN MANUAL. 230 W. MOREHEAD ST. rROL REIDSVILLE, NC 27320 POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO PRACTICES SHALL BE CONTINUED IN ACCORDANCE WITH THE DETAILS AND ARE TO BE MAINTAINED ~E MAINTAINED 5. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED IN ACCORDANCE WITH THE PERMANENT SEEDING SCHEDULE WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS, (336) 349-1066 SLIGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED UNTIL CONTRIBUTING AREAS ARE STABILIZED. ~pJg~;l, AFTER ALL SEDIMENT-PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, WHICHEVER IS SHORTER, AFTER COMPLETION OF CONSTRUCTION OR DEVELOPMENT. ALL REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE 6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FOLLOWING THE EROSION CONTROL 1NTROL SLOPES SHALL BE SEEDED AND MULCHED WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS, WHICHEVER IS SHORTER, AFTER COMPLETION OF ANY PHASE OF GRADING. ADJOINING AREAS AND STABILIZE PROPERLY. SEQUENCE. DRAWN: TEG 7. PRIOR TO PLACING FILL, ALL FILL AREAS SHALL BE STRIPPED AS RECOMMENDED BY THE BY THE 6. ALL SLOPE SURFACES SHALL BE ROUGHENED USING TRACKED EQUIPMENT TO MINIMIZE EROSION UNTIL SEEDING IS DONE. DATE: 9/22/04 SILT FE CE GEOTECHINCAL ENGINEER TO REMOVE TOPSOIL, STUMPS, ROOTS, ORGANICS AND OTHER UNSUITABLE MATERIAL. STRIPPINGS SHALL BE STOCKPILED AS SHOWN ON THE PIAN STRIPPINGS TER STRIPPINGS 7. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION CONTROL PRACTICES REQUIRED TO REVISIONS: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY MAY BE USED FOR BERMING AS REQUIRED BY OWNER. CLEAN TOPSOIL FREE OF HEAVY AVY MINIMIZE EFFECTS ON ADJACENT PROPERTIES DURING CONSTRUCTION. EROSION CONTROL REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, VEGETATION SHALL BE USED AS BACKFILL FOR CURB AND IN LANDSCAPE AREAS. DECOMPOSE OR BECOME INEFFECTIVE, REPLACE Tf PROMPTLY. REPIACE BURLAP EVERY 60 DAYS. PRACTICES SHALL BE CONTINUED IN ACCORDANCE WITH DETAILS AND ARE TO BE MAINTAINED REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME TOR THE 8. STRUCTURAL FILL FOR ACCESS ROAD SHALL BE COMPACTED TO 95% OF THE STANDARD 4NDARD UNTIL CONTRIBUITNG AREAS ARE STABLE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE PROCTOR MAXIMUM DRY DENSITY (ASTM D-698), EXCEPT THE UPPER 12" SHALL BE COMPACTED FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS TO 98% PROCTOR MAXIMUM DRY DENSITY, UNLESS OTHERWISE NOTED ON THE PLANS, IN THE COMPACTED 8. PROPERTY OWNER IS RESPONSIBLE FOR ALL PERMANENT MEASURES AFTER CONSTRUCTION AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS SPECIFICATIONS, OR GEOTECHNICAL REPORT. COMPACTION TESTS IN PAVED AREAS SHALL BE IS, IN THE IS COMPLETE AND CONTRACTOR IS RELEASED. BALL BE BEEN PROPERLY STABILIZED. TAKEN TO SUBBASE AND A MINIMUM OF 10 FEET BEYOND THE LIMITS OF PAVED AREAS. '~S' 9. ALL DISTURBED AREAS NOT OTHERWISE DELINEATED FOR BUILDING, PAVING, SOD, STONE, 9. THE DISPOSAL OF DEBRIS IS NOT ALLOWED ON SITE. OR RIPRAP SHALL BE PERMANENTLY SEEDED AS SOON AS POSSIBLE IN ACCORDANCE WITH SEDIMENT BASINS PERMANENT SEEDING SPECIFICAl10NS SHOWN ON THE PLANS. CHECK SEDIMENT BASINS AFTER PERIODS OF SIGNIFICANT RUNOFF. REMOVE SEDIMENT AND 10. ALL AREAS TO RECEIVE PAVEMENT SHALL BE GRAVELED IMMEDIATELY UPON COMPLETION OF FINE GRADING. IPLETION OF 10. INSPECT AND REPAIR ALL EROSION CONTROL DEVICES ON A WEEKLY BASIS AND INSPECT JOB. NO: 03-258 RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. 11. ENCROACHMENT PROTECTION OF EXISTING TREES AND COMMON AREAS TO BE ACCOMPLISHED AND REPAIR IMMEDIATELY FOLLOWING ANY RAINFALL. SHEET TITLE: CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET TOR EROSION DAMAGE, AND INSPECT THE WITH ENCROACHMENT PROTECTION FENCE AS SHOWN ON THE PLANS & DETAILS. THE ~COMPLISHED 11. ANY BORROW SHALL COME FROM A SITE OR SPOIL SHALL BE PLACED ON A SITE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ENCROACHMENT PROTECTION MEASURES SHALL BE PROPERLY MAINTAINED DURING SITE E APPROVE BY THE PROPER JURISDIC110N HAVING APPROVAL AUTHORITY OVER THE SITE. TE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. DEVELOPMENT AND SHALL NOT BE REMOVED PRIOR TO FINAL LANDSCAPING. SCALE: AS NOTED SHEET NO.: 4 C-2*0 ©STIMMEL ASSOCIATES, P.A.