HomeMy WebLinkAbout20191280 Ver 1_BR-0110_PERMITS_BUFFER_9-20_201909264)
DETOUR Trt
See Steet IA For Index of Sheets
I
U
VICINITY MAP
aCer�
STATE OF NORTH CAROLINA
IDdVISdON !a1F HIGHWAYS
BEA UFOR T COUNTY
LOCATION. BRIDGE 060072 ON SR 1127 (POSSUM TRACK RD)
OVER CHOCOWINITY CREEK
TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE
STATE
STATE PROJECT REFERENCE NO.
S.EOT
AL
SHEETS
N.0
BR-0110
STATE PR.-
F.A.PROJ.NQ
DESCRIPTION
48819.1.1
WA
PE
48819.2.1
WA
RAN, UTILITIES
48819.3.1
WA
CONSTRUCTION
BUFFER IMPACTS
PERMIT
09/232019
BUFFER DRAWING
SHEET 1 OF 5
BEGINR/ N m 4
_m I m l TIP P T R- lI
-L / f _L _ STA i f
BEGINTIP M4fST R- 11
—/ — STA//P500
SR 1127 (POSSUM TRACK SD.I SR 1121 (POSSUM T RD.)
2e•EST -L — -- zrRs TO NC HWY 33
oy
1 0
2 RI
\ n
TA14+22.91
N Pmm�
THIS IS NOT A CONTROL OF ACCESS PROJECT.
GRAPHIC SCALES
50 25 0 50 100
PLANS
50 25 0 50 100
PROFILE (HORIZONTAL)
10 5 0 10 20
PROFILE (VERTICAL)
DESIGN DATA PROJECT LENGTH
ADT 2016 = 610 LENGTH ROADWAY TIP PROJECT BR-0110 = 0.078 MILES
V = 55 MPH
T = 6%* LENGTH STRUCTURES TIP PROJECT BR-0110 = 0.018 MILES
(*TTST 3% + DUALS 3%)
LOCAL TOTAL LENGTH TIP PROJECT BR-0110 = 0.096 MILES
FUNC CLASS = RURAL
SUB —REGIONAL TIER
NCDOT CONTACT. DAVID STUTTS, PE
SMU PROJECT MANAGER
PRELIMINARY PLANS I DOCUMENT NOT CONSIDERED FINAL
DO NOT USE FOR CONSTRUCTION UNLESS ALL SIGNATURES COMPLETED
Prepared /n Me Offlce of: HYDRAULICS ENGINEER
KCA NO FIRM LICENSE N.: C-1506
301 Fayett Ville St.,
Suite 150Z
KIISINGER AMEs RaleigM1• xC 601
(919)582-7839
2018 STANDARD SPECIFICATIONS
P.E.
SIGNATURE:
RIGHT OF WAY DATE: JONATHAN LANGSTON, PE
821/2019 PROJECT ENGINEER ROADWAY DESIGN
ENGINEER
LETTING DATE: JASON DEBONE
OM M 0,2 0 PROJECT DESIGN ENGINEER
NBC
� I
oxr
X<
m�
olv
dei
Nei
oil
\
PROJECT REFERENCE NO. I SHEET NO.
KW SHEET NO.
P) S10 /2+47.43
= 6e 32' OOA' (RT)
/ ! \ \
ALLOWABLE
IMPACTS ZONE 1 ROADWAY DESIGN HYDRAULICS
D = I*45'OOV
v \
ENGINEER ENGINEER
L = 373.3Y/
T = 186.87'
TOPHFER B. HILL &
\
' \
CHRI5
JAN MCRCIY HILL
\ ®
ALLOWABLE
IMPACTS ZONE 2
R = 3274A4'
SE = 47
_ �,
�� DE,1 234
PB A PCC 164A
A
D ATY � �
j
ti A 164A
PRELIMIN4kRY PLANS
W NOT USE CONSTRUCTION
2
—
SIT �
('
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PSEPMES IN ^ XG FIR M LICENSE Na: C-1506
PUE PUE
(1 �V/
XE OFFICE OF: M4A 301 Fayetteville St.
a 1KISO2
47
UE
yy
- . j _I P E BMI W
I
Rels,i
fi01
& ASSEOCI i (919)933-T339
BL-5
_
BL-3
■
yz B�B11C _
-EL-
_ _ - -
r 9z 1 22' BST I SR 1127 !POSSUM LLXK RDJ
- L- -L- N 7Y2rOWE TO NC hW 33
BUFFER DRAWING
_sR NZT IPossuM rR R
ro uS � 17 z4 Bsr
l
--
IRIS
SHEET 2 OF 5
E 91G R/X
/ � Kill N
421 W
`"ROB 8PG 2677...)��
r PB 721 PO 419 • /
R B. HILL
HILL
CHRI08
JAN MCROY
/
1485E
OB 1485 PG 234
\ e
PB A PG 164A
r \
jg`
m
r
cn
BEGIN BRIDGE
13+25.53
WLB—I1
END APRAACH SLAB /
-L--
/ ^ � /
-L-STA. 13+14.65
/
1
- WLB �,� l
• Dom. —WTYPE I BL-�i
a=o pl GREU TL-3
lU
K.
�J $•
— d > GRELL T) U
TYPE III k5—
BMI -- -
-L- SR 1127 (OVER CHOCOW/N/TY CREEK)
H iiii IIITFFF
-BL- STA/4+0400,18 LT gtF
L-
-L- STA.I7+70.84,3271'LT o ��
'o- -EL-
------EL = 20.08
_
BRIDGE SPIKE SET /N POWER POLE
>
GREU TL-3
- - ---
- - - - - - � TYPE -III
GREU TL
— -� -3
uJa
—
a>
--
\-`�
--—
PE III �
-
- - _ _ / /\ �W[B� /
��•,
y
\
ND BRIDGE
- - -
-
PI = 12+45.00
-
P1= I4+05.00
- - -
. STA. 14+22.91 \
_
EL = 2/A5'
_
EL = 22A9'
VC = l30'
VC = 190'
-
- - -
K = 123
-- - P/ _ /5+75A0 ---
K = //5
-
- - -
E
V = 55 MPH
V = 55 MPH EL = 2039'
TA 11 80. 0
- VC = 150'
h-
4TRT
1
-
K - 115 -Mg- - STRUCTURE HYDRAULIC DATA BRIDGE
-7 V = 55 MPH -ff�
4
DESIGN DISCHARGE = 1406 CFS
DESIGN FREp/fNCY - 25 YRS
B GIN RID E
END BRI GE . DESIGN HN ELEVATION -Ira CF
BASE DISCHARGE - 20I 5
S A.13 25.5
STA.14+ 2.91 BASE FREQUENCY = 100 YRS
30
E = 21 64'
EL = 21. 5' BASE HW ELEVATION = 2110 FT
OVERTOPPING DISCHARGE = 1950 CFS
30
-- -- -
---
-
III -- --- - -- --
OWES CHOI D
--
---..........---
--- -- -------- --- --- --- -- OVERTOPPING FREQUENCY = 50+ YRS
OVERTOPPING ELEVATION = 20S FT
- --- -- -- -
LOWEST SIDE
- -
-
- - -
2
—--— —
2
-
-
+
RCP
SED
-
YR
LQ_
-
--
-
--
--
--I
VL�AjN
--
-
_-
_
--
-
-
25
YR WS
L= 194'
10
-
�I
�^
LASS 11 RIP_RAP
_
10
BENCH EL. I5.
'
`NWSEL
=14.0'
E
D
GRADE
-
-
S
A.16+90.0■
OBSE
VED WSEL
.8' :
I
ON
3-13-19_FJ
-'In
I
I
TF
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
I
I
I
10 11
12 13
14 15 16 17
NBC
� I
oxr
X<
m�
olv
rLe i
Nei
oil
\
PROJECT REFERENCE NO. I SHEET NO.
P/ Slo /2+47.43
\
\
R- //
KW SHEET NO.
= G 32' 00.0' (RT)
!
\\
ALLOWABLE IMPACTS ZONE 1 ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
D = I*45'OOA'
L = 37333'
T = 18687'
CHRISTOPHER B. HILL &
U N MC OY HILL
A R
/ ���
2
/ / \
/ \\ ®
ALLOWABLE
IMPACTS ZONE 2
R = 3274A4'
SE = 47
� _ ��
\ \� OB 1485 PG 234
pB A PG 164A
\
j y / (1
/ BOARD OF RC "ON
N '. BEAUFORT C NTY
O , -
OB 1003 PG 158
1
` - - -
�� ry E` PS A PG 164A �,Iv
PRELIMIN RY PLANS
\
DO NOT USE F CONSTRUCTION
`-
i I SITE f e
DOCUMENT NOT CONSIDERED FINAL
e
/ \ \
UNLESS ALL SIGNATURES COMPLETED
G
PUE PUE
E PUE
T.E O FigexoE: K 4A xe aoi iayeeiesiiie sc 1506
PVE
S(p-WLB-I
_PS[Wle.
„ 7 ` III
KISINGER A WeleigN,
Ism
NC 2'Ififit
E yy
BMI
a nssoIWI W1eW2 TWas
a In s
R/W
W
L_4 10 E — _ 8 •. DI
BL-S
E%RTRW DI
_ _-b-�PVC�
BL-3
PVC
BRIDdE U 72 m 22'BST SR 1127 !POSSUM TRACK RDJ
■
_ - =EL'
- L- -L- Al 7j ppOW-E TO NC M1Y 33
BUFFER DRAWING
__
SR 1127 (POSSUM TRICK R0.1
�
SHEET 3 OF 5
HE
TO US H
l
U 24 SrBr
N — - - - -Re- - -
- - -
E
- 1,, ING R/W
`-
E DE^ EE
\
ROY L. EDWARDS /
\ PS 721 PG 419 `1 /
CHRISTOPHggR B. HILL
&
N
JAN MCROY HILL
OB W85 PG 234
PB A PG 164A
\\ \ 4e
\
rra \
N
` /
BEGIN BRIDGE
\ -L- STA. 13+25.53
�
— — — - — WLB—
END AP ACH LAB /
-L- Ja+33.7 •
//y ^ /
BEG
-L-STA. 13+14.65
/ /
/ /
WLB �,� l
1
• Dom.—WTYPE I BL�i
DI GREU TL-3 -
Ill
�J $•
GRE kS T) U
a=o
BMI
-L- SR 1127 (OVER CHOCOW/N/TY CREEK)
-BL - STA/4+04,00,18' LT o of
o
-Lo
8/
oo—
-EL
__-
EL = 20.08
_
BRIDGE SPIKE SET /N POWER POLE
>
IIIREU TL-3
- - ---
- - - - - - � TYPE -III
TL-3
—
--
Wh
y
P/ = I2+45.00
PI = 14+05.00 ��„
\
ND BRIDGE
- - -
EL - 2/A5'
EL - 22A9'
STA.14+22.91 \
VC = /30'
VC = 190'
-
K = 123 - -
-
- - K = l/5 — PI = /5+75A0 ---
-
- - -
h E V = 55 MPH
V = 55 MPH EL = 2039'
TA 11 80. 0
- VC = 150'
4
1
K - 115 - STRUCTURE HYDRAULIC DATA BRIDGE
4
-
- V = 55 MPH - -
DESIGN DISCHARGE = 1408 CFS
DESIGN FREp/fNCY - 25 YRS
B GIN RID
E
END BRIDGE DESIGN HW ELEVATION - 19.4 FT
BASE DISCHARGE - 20/ CF5
S A.13 25.5
STA.14+ 2.91 BASE FREQUENCY = 100 YRS
E = 21 64'
EL = 21. 5' BASE HW ELEVATION = 2110 FT
-- -- -
--- - -- --- - --
--
--- -- OVERTOPPING DISCHARGE _ /950 CFS
--- -- -------- --- --- --- -- --- ---- OVERTOPPING FREQUENCY = 50+ YRS
--- - --- -- -- -
nn
OWES CHOI D
OVERTOPPING ELEVATION = 20.6 FT
LOWEST SIDE
-
+
RCP
SED
t
-
-
-
--
-
--
--
--
--
--
I
-
YR
-
-
_-
-
-
-
- -P
POSED
-I
=
`I
25
YR WS
L= 194'
10
-
�I
�^
LASS IIRIP_RA_P
_
10
ENCH EL. I5.
'
sEL
=14.0'
END
GRADE
-
-
S
A.1
F)+90.0■
OBSE
VED WSEL
.8' :
I
ON
3-13-19
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
10 11 12
13
14 15 16 17
RIPARIAN BUFFER IMPACTS SUMMARY
IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
TYPE
ALLOWABLE
MITIGABLE
BUFFER
REPLACEMENT
ROAD
CROSSING
BRIDGE
PARALLEL
IMPACT
ZONE 1
(ft)
ZONE 2
(ft)
TOTAL
(ft)
ZONE 1
(ft)
ZONE 2
(ft)
TOTAL
(ft)
ZONE 1
(ft)
ZONE 2
(ft)
1
12+94 to 14+50
95' Prop Bridge
X
2341
730
3071
TOTALS*:
2341
730
3071
0
0
0
0
0
•10•n=1
2018 Feb
WETLANDS IN BUFFER IMPACTS SUMMARY
WETLANDS IN
BUFFERS
SITE
STATION
ZONE 1 ZONE 2
NO.
(FROM/TO)
(ft2) (ft')
1
12+94 to 14+50
1429 243
TOTAL:
1429 243
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
995
Beaufort
BR-0110
48819.1.1
Revised 2018 Feb
SHEET
5 OF 5
ev. jan 2000