Loading...
HomeMy WebLinkAboutSW5190901_9 - 2019-09-17 Civil Plans - Deliverance_9/27/2019CIVIL SITE DEVELOPMENT PLANS FOR US HWY 64 CHATHAM COUNTY - SILER CITY - NORTH CAROLINA CHAUDHRY ��- HALAL MEAT CAROLINA STOCKYARD 0 Q PROJECT SITE 0 WNCA RADIO STATION US HWY 64 D Z Z �To ti � �o DIRECTIONS: FROM INTERSECTION OF US HWY 64 AND GREENSBORO AVE. IN SILER CITY HEAD WEST ON US HWY 64 FOR 1.7 MILES. THE PROJECT SITE WILL BE ON THE RIGHT JUST PAST WNCA RADIO STATION. VICINITY MAP SCALE: 1 "=1,000' PROJECT NO.: E-S09 / SEPTEMBER 2019 Q p 6447 - NG I N E� �ummcg LI-i9ineeringAssociates, PLLC Lngincen-ng - Land f' o. E:) ox 9 68 Asheboro, NC 2J20-1- pb: C336) 328-0902 fx: C336) 328-0922 email. mack0summeyengineering.com SHEET INDEX C-0 COVER SHEET C-1 GENERAL NOTES C-2 EXISTING CONDITIONS C-3 PROPOSED SITE AND UTILITY C-4 EROSION CONTROL PLAN C-5 GRADING PLAN C-6 EROSION CONTROL DETAILS - 1 C-7 EROSION CONTROL DETAILS - 2 C-8 STANDARD DETAILS C-9 LANDSCAPE PLAN C-10 LANDSCAPING DETAIL C-11 SANITARY SEWER DETAIL C-12 WATER DETAILS GENERAL SITE NOTES: UTILITY NOTES: (IF APPLICABLE) 1. THE INFORMATION SHOWN HEREIN WAS TAKEN FROM BOUNDARY AND TOPOGRAPHIC SURVEY PROVIDED BY: SURVEY CAROLINA, PLLC, 154, S. FAYETTEVILLE ST. SUITE B, ASHEBORO NC 27203. PHONE: (336) 625-8000 1. UTILITY INFORMATION SHOWN HEREON WAS OBTAINED FROM THE BEST AVAILABLE SOURCE AND MAY OR MAY NOT BE EITHER ACCURATE OR COMPLETE. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXACT LOCATIONS OF EXISTING UTILITIES AND IS RESPONSIBLE FOR ANY DAMAGE TO ANY UTILITIES, EITHER 2. THE LOCATIONS OF ALL UTILITIES SHOWN ON THESE PLANS ARE BASED ON THE AVAILABLE INFORMATION. THE CONTRACTOR PUBLIC OR PRIVATE, SHOWN HEREON OR NOT SHOWN HEREON. ANY REPAIRS SHALL BE DONE TO THE SATISFACTION OF THE APPROPRIATE UTILITY COMPANY. SHALL VERIFY THE EXACT LOCATION OF UTILITIES WITH THE UTILITY OWNERS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2. THE GENERAL CONTRACTOR SHALL CONFIRM ALL NEW UTILITY TAP LOCATIONS WITH THE UTILITY OWNERS. ALL FEES SHALL BE THE RESPONSIBILITY OF 3. ALL HANDICAP SITE FEATURES SHALL BE CONSTRUCTED TO MEET ALL FEDERAL, STATE AND LOCAL CODES. CONTRACTOR OR GENERAL CONTRACTOR. 4. ANY DISCREPANCY IN THIS PLAN, ARCHITECTURAL PLANS, AND/OR ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE 3. SEE ELECTRICAL ENGINEERING SITE PLAN FOR LOCATION OF ALL SITE LIGHTING AND REQUIREMENTS ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, 4. ALL NEW LOT LIGHTS AND THE MAIN IDENTIFICATION SIGN SHALL HAVE A MINIMUM 10 FEET CLEARANCE FROM ALL OVERHEAD UTILITIES. EASEMENTS, AND DIMENSIONS SHOWN HEREIN BEFORE BEGINNING CONSTRUCTION. 5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PERMITS AND/OR APPROVALS NECESSARY FOR ANY WORK IN ROADWAY OR RIGHT-OF-WAY. 5. THE CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES, AND R.O.W.'S. PUBLIC OR PRIVATE, PRIOR TO 6. MINIMUM COVER FOR CONDUITS SHALL BE 36" UNLESS OTHERWISE SHOWN OR NOTED IN THESE PLANS. WORKING IN THESE AREAS. 7. ALL MANHOLES, VALVES, AND MONUMENT FRAMES SHALL BE SET TO FINISH GRADE AFTER PAVING. 6. ACCESS TO UTILITIES, FIRE HYDRANTS, STREET LIGHTING, ETC., SHALL REMAIN UNDISTURBED, UNLESS COORDINATED WITH 8. THE CONTRACTOR SHALL COMPLY WITH THE RULES AND REGULATIONS OF THE STATE CONSTRUCTION SAFETY ORDERS. TRENCHES SHALL BE SHORED IN RESPECTIVE UTILITY COMPANY. ACCORDANCE WITH OSHA. 7. DO NOT SCALE THIS DRAWING AS IT IS A REPRODUCTION AND SUBJECT TO DISTORTION. 9. THE MINIMUM SLOPE FOR SANITARY SEWER LINES SHALL BE AS FOLLOWS: 1) 1 /4"/FT FOR 4" LINES AND 2) 1 /8"/FT FOR 6" LINES. CLEANOUTS SHALL BE 8. THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING ITEM AND/OR MATERIAL DUE TO CONSTRUCTION PLACED AT 75INTERVALS OPERATIONS. ALL STREET SURFACES, DRIVEWAYS, CULVERTS, CURBS AND GUTTERS, ROADSIDE DRAINAGE DITCHES, AND 10. ALL SEWER LINES SHALL HAVE A FINAL COVER DEPTH 4'-0 IN NON -TRAFFIC AREAS AND 5-0 MINIMUM IN TRAFFIC AREAS UNLESS SPECIFICALLY NOTED OTHER STRUCTURES THAT ARE DISTURBED OR DAMAGED IN ANY MATTER AS A RESULT OF CONSTRUCTION SHALL BE OTHERWISE ON THE PLANS. REPLACED OR REPAIRED IN ACCORDANCE WITH THE SPECIFICATIONS 11. CABLE TV SERVICE ROUTING IS NOT PART OF THIS PLAN, CONTRACTOR TO COORDINATE WITH CABLE COMPANY. 9. ALL PERMITS RELATIVE TO PROJECT MUST BE OBTAINED PRIOR TO CONSTRUCTION. ALL CONSTRUCTION TO BE IN 12. EXISTING MANHOLES SHOULD BE FIELD VERIFIED FOR RIMS AND INVERTS. ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE TO STATE, COUNTY, AND LOCAL CODES. 13. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. 10. THE CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES. THE LOCATION OF ALL EXISTING 14. THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THIS CONSTRUCTION MEANS/METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. UTILITIES IS NOT NECESSARILY SHOWN ON PLANS AND WHERE SHOWN ARE ONLY APPROXIMATE. THE CONTRACTOR ON HIS 15. OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL RULE 29CFR PART 1926, SUBPART "P" APPLIES TO INITIATIVE AND AT NO EXTRA COST SHALL HAVE LOCATED ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. NO ALL EXCAVATIONS EXCEEDING 5 FEET IN DEPTH. CLAIMS FOR DAMAGES OR EXTRA COMPENSATION SHALL ACCRUE TO THE CONTRACTOR FROM THE PRESENCE OF ITEMS SUCH 16. EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRES THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. AS PIPE OR OTHER OBSTRUCTIONS OR FROM ANY DELAY DUE TO REMOVAL OR REARRANGEMENT OF THE SAME. THE 17. CONTRACTOR SHALL MAINTAIN AN "AS BUILT" SET OF DRAWINGS TO RECORD THE EXACT LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO UNDERGROUND STRUCTURES. CONTRACTOR SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF THE PROJECT WITH A COPY OF THE TRANSMITTAL LETTER TO THE ENGINEER. RESPONSIBLE FOR CONTACTING ALL NONSUBSCRIBING UTILITIES. THE CONTRACTOR(S) SHALL CALL 811 FOR ASSISTANCE IN 18. ONLY SEWAGE NOT CONTAINING GREASE IS ALLOWED TO BYPASS THE GREASE TRAP. LOCATING EXISTING UTILITIES. CALL AT LEAST 48 HOURS PRIOR TO ANY DIGGING. 19. WATER PIPING SHALL BE CONNECTED TO BUILDING STUBS, VERIFY LOCATIONS PRIOR TO BEGINNING WATER PIPE INSTALLATION. 11. SEEDING TO BE INSTALLED TO NCDEQ REQUIREMENT & STANDARD PRACTICES. 20. WASTE PIPING SHALL BE CONNECTED TO BUILDING STUBS, VERIFY LOCATIONS AND INVERTS PRIOR TO BEGINNING ANY WASTE PIPE INSTALLATION. 12. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL REQUIRED PERMITS AND 21. ALL UTILITY CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF SILER CITY PUBLIC WORKS AND CROSS CONNECTION CONTROL, REGULATIONS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION OF ANY ITEM SHALL BEGIN UNTIL THE CONTRACTOR STANDARDS. HAS RECEIVED ALL PLANS AND ANY OTHER DOCUMENTATION FROM ALL OF THE PERMITTING AND ANY OTHER REGULATORY 22. SITE UTILITY CONTRACTOR TO PROVIDE WATER AND SANITARY SEWER TO WITHIN 5 FEET OF THE BUILDING, CONTRACTOR SHALL COORDINATE SITE PLAN AUTHORITIES. FAILURE OF THE CONTRACTOR TO FOLLOW THIS PROCEDURE SHALL CAUSE THE CONTRACTOR TO ASSUME FULL CONNECTIONS WITH THE ARCHITECTURAL BUILDING PLANS. RESPONSIBILITY FOR ANY SUBSEQUENT MODIFICATION OF THE WORK MANDATED BY ANY REGULATORY AUTHORITY. 23. SANITARY CLEANOUTS SHALL BE PLACED NO MORE THAN 75 FEET APART. CLEAN OUTS LOCATED IN PAVEMENT AREAS SHALL HAVE A HEAVY DUTY 13. VISIT SITE AND BRING TO THE ENGINEER'S ATTENTION IN WRITING ANY PROBLEMS OR DISCREPANCIES WITH THE SITE OR TRAFFIC RATED CONSTRUCTION. 24. CONNECTION OF SANITARY SEWER SERVICE TO AN EXISTING MANHOLE SHALL COMPLY WITH THE CITY OF ASHEBORO PUBLIC WORKS STANDARDS, INCLUDING: PROJECT PRIOR TO CONSTRUCTION. CORE DRILL FOR OPENING INTO MANHOLE AND INSTALL WITH FLEXIBLE BOOT. IF PAVEMENT CUT IS REQUIRED, CONTRACTOR SHALL PATCH PAVEMENT WITH 14. CHECK ALL "VERIFY" DIMENSIONS NOTED ON PLANS. REPORT ANY DISCREPANCIES TO THE ENGINEER IN WRITING PRIOR TO A SECTION TO MATCH EXISTING PAVEMENT ANY FURTHER CONSTRUCTION. 25. ALL WORK SHALL BE GOVERNED BY THE LATEST EDITIONS OF THE STATE MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION, BUILDING CODE, ENERGY 15. USE THE ARCHITECT'S DRAWINGS FOR BUILDING DIMENSIONS. CONSERVATION, HANDICAPPED ACCESSIBILITY, NATIONAL ELECTRICAL CODES, AND NATIONAL FIRE PROTECTION ASSOCIATION CODES AS APPLICABLE AND AS ADOPTED BY THE AUTHORITIES HAVING JURISDICTION AND LATEST VERSION OF NC DOT POLICIES & PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS -OF -WAY. 26. LOCATIONS OF EXISTING UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE OR SCHEMATIC. THE LOCATIONS ARE BASED ON ACTUAL FIELD SURVEYS AND AVAILABLE RECORDS, CONTRACTOR SHALL FIELD VERIFY LOCATION OF ALL EXISTING UNDERGROUND UTILITIES AND UNDERGROUND STRUCTURES AND VERIFY REQUIRE COVER AND CLEARANCES PRIOR TO CONSTRUCTION AND REPORT ANY CONFLICTS TO THE ENGINEER. 27. CONTRACTOR SHALL CALL 811 AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE UTILITIES LOCATED. CONTRACTOR SHALL CONTRACTOR NOTES: CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENTLY. 28. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND/OR RELOCATION OF ALL EXISTING UTILITIES IN COORDINATION WITH THE APPROPRIATE UTILITY, 1. ALL DIMENSIONS AND RADII ARE OUTSIDE FACE OF BUILDING OR TO FACE OF CURB, OR TO THE CENTER OF AGENCY, OR COMPANY. STRUCTURES SUCH AS INLETS, SIGN POSTS, ETC., UNLESS OTHERWISE NOTED. 29. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE ACTUAL LOCATION AND AVAILABILITY OF ALL EXISTING AND PROPOSED UTILITIES IN THE FIELD PRIOR 2. CONTACT ENGINEER FOR OBSERVATION OF CONSTRUCTION RELATED TO REQUIRED FEDERAL, STATE, OR LOCAL TO GROUND BREAKING. CERTIFICATIONS INCLUDING BUT NOT LIMITED TO PROOF ROLL AND ASPHALT PLACEMENT. PROVIDE 24 HOUR NOTICE TO 30. ALL UTILITIES MUST BE LOCATED UNDERGROUND AND COORDINATED WITH THE TOWN OF SILER CITY OR LOCAL UTILITY COMPANY. ENGINEER FOR REQUIRED CONSTRUCTION OBSERVATION RELATED TO CERTIFICATION OF ROADWAY, WATER SYSTEM, PAVEMENT, ETC. 3. KEEP ALL PLANTING AND GRASS AREAS FREE OF DEBRIS, STONES, CONSTRUCTION MATERIALS, ETC., RESPONSIBLE FOR NOT DAMAGING EXISTING PLANTING TO REMAIN. 4. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND AVOIDING ALL UNDERGROUND UTILITIES WHETHER SHOWN ON THE SITE PLAN OR NOT. THOSE SHOWN ARE BASED ON THE SURVEY PROVIDED AND MAY NOT BE ALL INCLUSIVE. CONTACT UTILITY LOCATION SERVICE OR OTHER APPROPRIATE UTILITY LOCATION SERVICE FOR UTILITY IDENTIFICATION PRIOR TO ANY WORK. CONTRACTOR TO PROTECT ALL UTILITIES TO REMAIN - TYPICAL. CONTACT ALL UTILITY COMPANIES TO INSURE THE UTILITIES ARE SHUT DOWN PRIOR TO THE START OF ANY DEMOLITION AND/ OR SITE WORK. 5. PATCH / REPAIR STREETS, STRUCTURES, ETC. AS NECESSARY AFTER CONNECTION OF PROPOSED UTILITIES. 6. SEE PLAN SET FOR PROPOSED GRADES AND EROSION CONTROL. 7. CIVIL/SITE CONTRACTOR SHALL FIELD VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. CIVIL/SITE CONTRACTOR SHALL SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH THE TOWN OF SILER CITY AND ARCHITECT PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. CONTRACTOR SHALL CALL 811 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION. 8. CONTRACTOR SHALL NOTIFY THE TOWN OF SILER CITY PUBLIC WORKS PRIOR TO ANY CONSTRUCTION ON STREET RIGHTS -OF -WAY 919-742-4732. 9. ANY CONSTRUCTION WITHIN THE TOWN OF SILER CITY RIGHTS -OF WAY ARE TO BE IN ACCORDANCE WITH THE TOWN OF SILER CITY STANDARDS AND SPECIFICATIONS REGARDING MATERIALS, INSTALLATION, AND TESTING, UNLESS OTHERWISE IN THE CONTRACT DOCUMENTS. ANY CONSTRUCTION WITHIN THE RIGHT-OF-WAY SHALL BE 10. PROTECTED WITH SIGNAGE AND TRAFFIC SAFETY DEVICES IN ACCORDANCE WITH THE NORTH CAROLINA STANDARDS AND GUIDELINES ALSO THE CONTRACTOR SHALL HAVE "UTILITY WORK AHEAD" SIGNS LOCATED AT ALL LOCATIONS WHEN ENTERING THE RIGHTS -OF -WAY. *10 .a U Q�r z - wm._ �. cq Q - N10 10 d U i 1 d m E o C � m N N z W 0 O .Z_ vz W W iz o0 o z L' 3a oz W W as as � N o 0 � Z � N V z J 2 V 3 Z J � Ov v=i z � z o00 � = W � W v J J W N N s O z N m c m -0 a S ° u c O a Sheet No. i 1 /OWNER: CAROLINA STOCKYARD CO 4 / \ — \ �— — ��� /� r-j/ ( � � � PARCEL ID: 12841 � REAR DEED BOOK/PAGE: 347/500 TBACK — C 7 3,2il4.5,, Ground S S�grvey eet I (, �/ / I �Q ^ �� E: 1,�53, 09.53 round ks Survey eet l y `` S 89i4"3T" E _ ( S 9' 24� _ r \ , ADJOI'11 PiG 1 / I 1 0.71 L V 35.52 2� EIP�UP/6' PROP RTY LIE (TYP.) \11 rIv- , Z� � �% Ln UNNAMED C ) )\ / / J I I I I I• �' l \ \ �PERINNE, ,L STRE®M- I PNF I C \ \ SMH p R07: 591.02,41 14/ 14/ \ I \ \Se) III \ In . In: 584.12 Out: 58�02SB \ l \ \ \ 14/ I ' \ �� 1 EXISTING SANITA Y SEWER \ 1 os \ I MAIN AND MANHOLE (TYP.) \ \\ \ I\ J \ \ \ - UN�IAM� �' �, �,0' SIDES, \ I I 1 \ \ INTER SITREN7 SETBACK �N I \ I < 1 \ o �L \ \ � s �� '\ \� �_ ^ �WNER: JOHN ARK ELLINGTON 1 DELIVE ANC CHURCH 0y CH RISV, �I �.!/ PAR ID: 13�764 1 (� l ISCIRLES OF tHRIST ED OK/PAGE. 814/ 28 / O�ER. P fV ECOSTAL VICTORY TEMPLE , i \ C r% � ��RCEL ID: 61453 I � \ I DB/�G: 1711 90� J �` / PIN: 1875 33 2844 L / \ / 1 � � � D B-0 PAGE: 524/752 \ ( / o 1 I PLAT OK PAGE—'kOl 450 \ \ � �� L_ �' I ,O l ! nj^ / 50' NREAK BUF E I �J I I IZ i C l 1�/ram �� �� ��� •/ �\ \ cn IEXISTING � I BUILDINGS \ o / J a / /huh \ \ SMH J \ \ \ J ( I / J / / _ I S Top Rim: 89.48 1 UPS ` C 1 / \ Inv. In.5 .58 4 � Inv. Out: 83.48I \ 4 \ 1 l 1 ( � J � ` � J I ( l I� .✓ � \ \ � 1 �j l � � % 10C� STREAM BUFFER ..... �...� ..... \1 / PROPOSED . . . `n/��� . . . TREE-INE� ( oo N . �• / / C CLEAR . ND GRUB. o� \ \ 1 .) �� PNS I l \ > (APPROX. RA -HATCHED) ) . . . ,. . . . . . .I I • I ✓\ ........ ( io ~� �- / o �. r\\ \ I / �1STING . . . . . . . . . . . . I \ I I II �5 /� / l}JLDIN r � EXISTING 16 � -� � \ ( —� I � �1 / -� l WATER MAIN > I J I � t" OWNER ANC'_ ROPERT ES, LLC \ NARCEL ID: 136 I moo' FRONT SE�ACK I I I \ �, �, �, DEE6 BOOK/PAGE. 1�95/1083 \ isoo —� 600— } I I I PLAT BOOK/PAGE: 20%/29 722,435.87 round US Survey Feet , \ I u — ♦— ' ��^'c \ % : 1,853,450.4�Ground US Survey Feet I \ W EIP FLUSH �IMITS \\\ / / / l r �a DISTURBANCE �ropTLEet o im: S W �- 95 te-59+ 8 v.: 5 SMH 589.21 ^ 73 \ N1M US H N OTES: 1. PROPERTY LINE, EXISTING ROADWAYS, UTILITIES, TOPOGRAPHIC DATA, AND PERENNIAL STREAM TOP OF BANKS ARE SHOWN PER FIELD SURVEY PERFORMED BY SURVEY CAROLINA, PLLC OF ASHEBORO, NC 336-625-8000. 2. ALL WETLANDS LOCATIONS AND STREAMS ARE SHOWN PER FIELD SURVEY AND WETLAND DELINEATION REPORT PROVIDED BY PILOT ENVIRONMENTAL DATED APRIL 5TH, 2019. 3. THE ENTIRE PARCEL IS VACANT AND CURRENTLY WOODED. DRAWING LEGEND EXISTING PROPOSED — — PROPERTY LINE ADJOINING PROPERTY LINE MAJOR CONTOUR MINOR CONTOUR SETBACK LINE TREELINE e LIMITS OF DISTURBANCE S SANITARY SEWER LINE ® SANITARY SEWER MAHOLE STREAM BUFFER SB • PERENNIAL STREAM — — INTERMITTENT STREAM F I JURISDICTIONAL WETLANDS CLEAR AND GRUB AREA — — W — EXISTING WATER MAIN U < 0' 40' 80' 120' / ^� \ \ DRAWING SCALE z s o C14 Q �J o C � m N N Z W O or �Z W W `n O Z LLJ' 30 oZ CLn o0 z N Z V z J 0 CL V �Z W 3� — V No o� Z r Q ~ 00 W W V J J LJ N 0 N s O z N m � m Y O Ln p p U Sheet No. 20' SIDE SETBACK t-1 DRAWING LEGEND EXISTING PROPOSED - - PROPERTY LINE ADJOINING PROPERTY LINE '600� i MAJOR CONTOUR MINOR CONTOUR SETBACK LINE WOOD LINE S SS SANITARY SEWER LINE ® SANITARY SEWER MAHOLE - W WATER LINE yw.� v FIRE HYDRANT ST STORM PIPE SB STREAM BUFFER JURISDICTIONAL STREAM F I JURISDICTIONAL WETLANDS L.�'-- 14/--J a6-8" CABC STONE BASE *COMPACTED 100% F 116" SUBGRADE COMPACTED 100% E CONCRETE PAVEMENT SECTION NOT TO SCALE 1.5 46" CABC STONE BASE *COMPACTED 100%I 11 6" SUBGRADE *COMPACTED 100% 9 GRAVEL PAVEMENT SECTION NOT TO SCALE p�p GRAVEL PAVING v�J p p CONCRETE PAVING d CONCRETE SIDEWALK d a. .. G NEW PROPOSED TREELINE (TYP.) ADJOINING W IN IN -W -W - EXISTING 16" WATER MAIN THAT IS CURRENTLY INACTIVE W I I i I � i I i i I i PROPERTY LINE (TYP.) 24' 80' 5' C p� �p p RAILROAD TIES USED AS p WHEEL STOPS s p (TYP.) A p a . p� a1 �C p < ( p� V ± 8, 400 SF p `n o� 105' CHURCH r�oJ FFE=602.5' �� p U) op s �c ` 2 s p 9 P S a p CONCRETE PAVING s p AT HANDICAP p BARKING LOCATIONS ' C d d"ul PROPOSED ' 5' CONCERETE l ' SIDEWALK u +Y (TYP.) n 1 a CLEAN OUT SS C� R=3' T PERIMETER OF PARKING AREA SHALL BE DEFINED BY RAILROAD TIES STREAM BUFFER �jv p w SS p� (TYP.) �- 4" SANITARY SEWER K SS p SERVICE LINE 1 % SLOPE (TYP.) w GRAVEL PAVING BEHIND THE US HWY 64 R/W �p p SS 3' WIDE X 3' TALL 2" DOM STIC SERVICE wWATER WOODEN SIGN WATER LINE. METER/BFP �p Cep SS CONCRETE DRIVEWAY � \ APRON PAVED TO THE US 20' WIDE HWY 64 R_ _ p DRIVEWAY ACCES .S SS\ PROPOSED FIRE � (TYP.) HYDRANT (TYP.) S W - W W W _ W :... m W- W- W W 2" TAP ON EXISTING MAIN WATER MAIN PER :,.' `. 10' X 70' TOWN OF SILER CITY SIGHT TRIANGLE REQUIREMENTS WATER �m LINE I 10, X 70' ...'. =. . SIGHT TRIANGLE R=25Ln «Y' . 03 PROPOSED DRIVEWAY PIPE SEE SHEET C-5 I US 64 WEST N EXISTING STORM PIPE TO REMAIN (TYP.) Ln m 11 11 1 1 1 cxl 1 I JURISDICTIONAL I WETLANDS TYP.) Cu I I I I i I EXISTING SANITARY SEWER 1 MAIN AND MANHOLE 1 (TYP.) -1 1 1 q 40' F T SETBA TAP INTO MAIN SEWER LINE /w / I / 5 _ 1 OFFSET FROM Ivlfi \ S -� S Top Rim: 589.52 S S Inv.: 582.52 \ . I 1 TOWN OF SILER CITY NOTES: 1. CALL 811 BEFORE DIGGING TO LOCATE UNDERGROUND UTILITIES* 2.FOLLOW APPENDIX E GUIDE TO LANDSCAPING FOR ALL TREE AND SHRUB INSTALLATION 3.ALL ON SITE DRIVEWAYS, SIDEWALKS, PARKING LOTS, AND ENTRANCES/EXITS TO BUILDINGS SHALL BE SUFFICIENTLY AND ADEQUATELY LIGHTED TO ENSURE THE SECURITY OF PROPERTY/BUILDINGS AND THE SAFETY OF PERSONS. 4.ON SITE LIGHTING SHALL NOT UNNECESSARILY ILLUMINATE ANY OTHER LOT OR PUBLIC STREET. 5.TO THE EXTENT PRACTICABLE, THIS DEVELOPMENT SHALL CONFORM TO THE NATURAL CONTOURS OF THE LAND AND NATURAL AND PREEXISTING MANMADE DRAINAGE WAYS SHALL REMAIN UNDISTURBED. 6.THIS DEVELOPMENT MUST BE PROVIDED WITH A DRAINAGE SYSTEM THAT IS ADEQUATE TO PREVENT THE UNDUE RETENTION OF SURFACE WATER ON THE DEVELOPMENT SITE. 7.NO SURFACE WATER MAY BE CHANNELED OR DIRECTED INTO A SANITARY SEWER.* &WHENEVER PRACTICABLE, THE DRAINAGE SYSTEM OF THIS DEVELOPMENT SHALL COORDINATE WITH AND CONNECT TO THE DRAINAGE SYSTEMS OR DRAINAGE WAYS ON SURROUNDING PROPERTIES OR STREETS. 9.CONSTRUCTION SPECIFICATIONS FOR DRAINAGE SWALES, CURBS AND GUTTERS, AND STORM DRAINS ARE CONTAINED IN APPENDIX C. 10. THIS DEVELOPMENT SHALL BE CONSTRUCTED AND MAINTAINED SO THAT ADJACENT PROPERTIES ARE NOT UNREASONABLY BURDENED WITH SURFACE WATERS AS A RESULT OF SUCH DEVELOPMENTS* 11. NO DEVELOPMENT MAY BE CONSTRUCTED OR MAINTAINED SO THAT SUCH DEVELOPMENT UNREASONABLY IMPEDES THE NATURAL FLOW OF WATER FROM HIGHER ADJACENT PROPERTIES ACROSS SUCH DEVELOPMENT, THEREBY UNREASONABLY CAUSING SUBSTANTIAL DAMAGE TO SUCH HIGHER ADJACENT PROPERTIES* 12. NO DEVELOPMENT MAY BE CONSTRUCTED OR MAINTAINED SO THAT SURFACE WATERS FROM SUCH DEVELOPMENT ARE UNREASONABLY COLLECTED AND CHANNELED ONTO LOWER ADJACENT PROPERTIES AT SUCH LOCATIONS OR AT SUCH VOLUMES AS TO CAUSE SUBSTANTIAL DAMAGE TO SUCH LOWER ADJACENT PROPERTIES. 13. STORMWATER CONTROL FACILITIES SHALL BE MAINTAINED BY THE DEVELOPER. 14. ALL SIGNS REQUIRE SIGN PERMIT APPROVAL PRIOR TO INSTALLATION 15. ANY VARIATION TO THE APPROVED PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE TOWN OF SILER CITY DIRECTOR OF PLANNING AND COMMUNITY DEVELOPMENT FOR EVALUATION AND REVISED PLAN SUBMITTED FOR REVIEW AND APPROVAL. 16. VEHICLE ACCOMMODATION AREAS OF ALL DEVELOPMENTS SHALL BE DESIGNED SO THAT SANITATION, EMERGENCY, AND OTHER PUBLIC SERVICE VEHICLES CAN SERVE SUCH DEVELOPMENTS WITHOUT THE NECESSITY OF BACKING UNREASONABLE DISTANCES OR MAKING OTHER DANGEROUS OR HAZARDOUS TURNING MOVEMENTS. 17. EVERY VEHICLE ACCOMMODATION AREA SHALL BE DESIGNED SO THAT VEHICLES CANNOT EXTEND BEYOND THE PERIMETER OF SUCH AREA ONTO ADJACENT PROPERTIES OR PUBLIC RIGHTS -OF -WAY. SUCH AREAS SHALL ALSO BE DESIGNED SO THAT VEHICLES DO NOT EXTEND OVER SIDEWALKS OR TEND TO BUMP AGAINST OR DAMAGE ANY WALL, VEGETATION, OR OTHER OBSTRUCTION. 18. CIRCULATION AREAS SHALL BE DESIGNED SO THAT VEHICLES CAN PROCEED SAFELY WITHOUT POSING A DANGER TO PEDESTRIANS OR OTHER VEHICLES AND WITHOUT INTERFERING WITH PARKING AREAS. 19. VEHICLE ACCOMMODATION AREA SURFACES SHALL BE KEPT IN GOOD CONDITION (FREE FROM POTHOLES, EROSION, DUST, ETC.). 20. NO OBSTRUCTIONS ARE ALLOWED WITHIN THE 10'X70' SIGHT DISTANCE TRIANGLES LOCATED AT DRIVEWAY EXITS 21. VEGETATIVE BUFFERS ARE TO BE LEFT IN THEIR NATURAL STATE AND UNDISTURBED. 22. PRIOR TO ANY FINAL PLANNING APPROVAL: I. SUBMIT ACTUAL AS -BUILT PLAN FOR ALL STORMWATER MANAGEMENT FACILITIES OR PRACTICES AFTER FINAL CONSTRUCTION COMPLETE* II. EXECUTE AND RECORD WITH THE REGISTER OF DEEDS A STORMWATER MANAGEMENT FACILITY OPERATION AND MAINTENANCE AGREEMENT PER§249.* III. SUBMIT WRITTEN FINAL INSPECTION APPROVAL FOR DRIVEWAY AND ENCROACHMENTS FROM NCDOT* IV. WHENEVER A DEVELOPER INSTALLS ANY PUBLIC UTILITY LINE, THE DEVELOPER SHALL AFTER INSTALLATION IS COMPLETE, AND BEFORE ACCEPTANCE OF ANY WATER OR SEWER LINE, FURNISH THE TOWN WITH A COPY OF AN AS -BUILT DRAWING THAT SHOWS THE EXACT LOCATION OF SUCH UTILITY LINES. V. SUBMIT WRITTEN FINAL INSPECTION APPROVAL FOR PUBLIC WATER AND SEWER UTILITY INSTALLATION FROM TOWN PUBLIC WORKS & UTILITIES DIRECTOR* VI. SUBMIT VOLUNTARY ANNEXATION PETITION PER UTILITY EXTENSION POLICY 23. OBTAIN FINAL ZONING INSPECTION APPROVAL PRIOR TO USE/OCCUPANCY ►111mato] Iall 1. PROPERTY INFORMATION OWNER: DELIVERANCE CHURCH OF CHRIST PIN NUMBER: 8752-03-32-2844 PARCEL ID: 0013065 PARCEL SIZE: 7.18 AC ZONING: A-R LAND USE: VACANT SITE ADDRESS: 18020 US 64 WEST, SILER CITY, NC 27344 OWNER ADDRESS: 17935 US HWY 64, SILER CITY, NC 27344 2. THE PROJECT IS LOCATED WITHIN SILER CITY ETJ. 3. PARCEL BOUNDARIES, TOPOGRAPHIC DATA, EXISTING ROADWAYS AND SANITARY SEWER ARE SHOWN PER FIELD SURVEY PERFORMED BY SURVEY CAROLINA, PLLC. 4. EXISTING STREAM IS SHOWN PER CHATHAM COUNTY GIS. 5. ALL EXISTING TREELINES AND EXISTING BUILDING LOCATED ON ADJOINING PARCELS HAVE BEEN ESTIMATED PER AERIAL IMAGERY. 6. PARKING REQUIRED: 1 SPACE PER 4 SEATS 120 SEATS PROVIDED 30 REQUIRED SPACES (INCLUDING 2 HANDICAP SPACES) 30 SPACES PROVIDED (INCLUDING 2 HANDICAP SPACES) 7. SETBACKS: FRONT= 40 FT; SIDE & REAR= 20 FT. 8. TOTAL SITE AREA: 288,008 SF (6.61 AC) 9. DISTURBED AREA: 71,177 SF (1.63 AC) 10. EXISTING IMPERVIOUS: 0 SF (0.00 AC) 11. PROPOSED IMPERVIOUS: 20,011 SF (0.459 AC) 12. PROPOSED % IMPERVIOUS AREA: 6.95% 13. HANDICAP SPACES SHALL BE PAVED WITH CONCRETE PAVING PER DETAIL ON THIS SHEET. 14. MAXIMUM SEPARATION BETWEEN SANITARY SEWER CLEANOUTS SHALL BE 75'. 15. DISTURBANCE INSIDE STREAM BUFFER FOR SEWER CONNECTION : 1,246 SF 16. MAXIMUM BUILDING HEIGHT: 30' 17. THERE IS NO PROPOSED OUTDOOR LIGHTING AT THIS TIME. 0' 20' 40' 60' DRAWING SCALE %0 c =a U Q�r z �= - "' �- W Cq = d �J O N q V v N c m N N Z W 0 O v Z W W L cu O O 30 oZ a a a a � N � O O Z N V z air J O¢¢ l.i Z V Z W 3z VL o O Z O� N O C Q 0 oc W v U J Lu W J N N s O z N Q � �, m c m v a S ° Y c O a Sheet No. i EROSION CONTROL NOTES SEDIMENT BASIN #1 - SKIMMER I 1. AT ALL TIMES DURING CONSTRUCTION, THE NC DEMLR SELF INSPECTION AND MONITORING FORM MUST BE KEPT ON SITE AND UP TO DATE. THE FORM SURFACE AREA REQ'D= 2 268 SF - - ` CAN BE OBTAINED AT HTTP: //DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY MINERAL -LAND RESOURCES/ / I I 1 / VOLUME REQ'D= 2,376 CF EROSION-SEDIMENT-CONTROL/FORMS SURFACE AREA PROV'D= 2,584 SF I 61 CF 2. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL SKIMMER SIZE: 1.5" I EVENT GREATER THAN 0.5 INCHES PER 24 HOUR PERIOD. � DEPTH=2' I / 3. ALL STORMWATER DISCHARGE OUTFALLS (SDO S) MUST BE INSPECTED AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL SPILLWAY ELEV=592' EVENT GREATER THAN 0.5 INCHES PER 24 HOUR PERIOD. SPILLWAY WIDTH = 10' I 4. GROUND STABILIZATION MUST BE RECORDED AFTER EACH PHASE OF GRADING. REFER TO GROUND STABILIZATION CRITERIA TABLE ON THIS PAGE FOR ><� / �V TOP OF DAM ELEV 593.5' / STABILIZATION TIME FRAMES. FOR TEMPORARY AND PERMANENT SEEDING, FERTILIZATION, AND MULCHING RATES REFER TO THE TABLES PROVIDED ON \ TOP OF DAM WIDTH = 5' / �5 EROSION CONTROL DETAILS SHEET. BOTTOM ELEVATION = 590' / 5. CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS TO AVOID THE SILTING OF STREAMS, LAKES OR OTHER WATER COURSES DUE TO THE SEED AND STABILIZE ALL ( I I CONSTRUCTION OF THIS PROJECT. BASIN SIDESLOPES WITH / 6. EFFECTIVE EROSION CONTROL MEASURES SHALL BE INITIATED PRIOR TO THE COMMENCEMENT OF CLEARING, GRADING, EXCAVATION, OR OTHER \ ✓ N.A.G. SC150 OR EQUIV. \ ■ ■ TEMPORARY SILT FENCE / � \ l� � � � � ■ � � X X-I � STONE OUTLET (TYP.) / / OPERATIONS THAT WILL DISTURB THE NATURAL PROTECTION. THE EROSION CONTROL DETAILS SHOWN HEREIN ARE FOR THE CONTRACTOR'S REFERENCE. is / THE DETERMINATION OF WHICH DETAIL IS APPLICABLE AS THE WORK PROGRESSES SHALL BE AS SHOWN ON THE PLANS OR MADE BY THE ENGINEER. SEED AND STABILIZE ALL L /^ ■ ■ / I / 7. ALL DITCHES SHALL BE STABILIZED AS SOON AS PRACTICAL TO MINIMIZE EROSION. \ \ DISTURBED DITCH AREAS / \ / WITH N.A.G. SC150 OR EQUIV. ■ ■ / \ 8. THE CONTRACTOR SHALL REFER TO THE DETAILED SPECIFICATIONS FOR A DESCRIPTION OF ADDITIONAL EROSION CONTROL REQUIREMENTS. \ / ' ■ � ■ � / � � ��, / �/ � \ \ _■� �_ Z / I 9. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES IN A GOOD, WORKING STATE OF REPAIR UNTIL THEIR USE IS NO LONGER J WARRANTED. AT THAT TIME, THE EROSION CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF SO AS TO CAUSE NO STREAM SILTATION. DIVERSION ■ r� ■ ■ �, \ 10' \ / o, /J 10. THE TOTAL DISTURBED ACREAGE FOR THIS PROJECT IS 2.0 ACRES. DITCH #1 i ■ 591 56 595 " • / 11. LOCATION OF SILT FENCE OUTLETS MAY BE ADJUSTED PER FIELD CONDITIONS AS NEEDED. ADDITIONAL SILT FENCE STONE OUTLETS MAY BE ADDED IF 23' ( / ) / I/, NEEDED. 596 597 L I � � • 3:1 SLOPE / w 598 X i i // CONSTRUCTION SEQUENCE / { ( 59_ 597 L() : / \ 1. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPETE THE \ \ TEMPORARY r 00 FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE STOCKPILE/STAGING \ ` \>116' I CD / HTTPS://FILES.NC.GOWN CDEQ/ENERGY%20MINERAL%20AND%20LAND%20RESOURCES/STORM WATER /NPDES%20GENERAL%20PERMITS/ AREA x o \ 60DEMLR-CSW-MONITORING-FORM-REV-APRIL-1-2019.PDF. TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND 0 % 4WIDE ENTRY l ' / � o � / AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX." (GS113A-54.1 (E), 15A NCAC 601 I i I � � 5' LONG X 6' EXIT RIP 04B.0131, NCG01 SECTION IIB (3))HH J \ :1 SLOPE x / 'A RAP APRON / ( �p C / 12" THICK 2. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING f 602 ■ / ACTIVITIES OCCUR. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLAN MUST BE KEPT ON SITE, PREFERABLY IN A I 1 p \ IX ■ / / PERMITS BOX, AND ACCESSIBLE DURING INSPECTION. p i N 3. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR O O I I �p 590 � ■ / / / DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO / O 591 ■ / / MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A I / �' RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING 592 I N ■ '�/ �/ �/ l �p _ / ) - 4. WHEN THE PROJECT IS COMPLETE, THE PERMITTEES SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN." AFTER DEMLR INFORMS THE TOP 0 �A� m / PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. An 5. OBTAIN LAND DISTURBANCE PERMIT FROM NCDEQ, AND ALL OTHER APPLICABLE PERMITS FROM FEDERAL, STATE AND LOCAL AGENCIES.. 6. NCDEQ LAND QUALITY SECTION 919-971-4200 AND THE TOWN OF SILER CITY 919-742-4731 AT LEAST 5 BUSINESS DAYS PRIOR TO r n p X COMMENCING LAND DISTURBING ACTIVITIES TO SCHEDULE APRE-CONSTRUCTION MEETING. �� p p ^p 1 > I ■ ■ I \ 7. CALL NC ONE CALL TO LOCATE ALL EXISTING UTILITIES PRIOR TO ANY LAND DISTURBING ACTIVITIES. IF ANY UTILITIES ARE IN CONFLICT WITH 8 ) 40 0 S F a ` ,l PLANS CONTACT THE ENGINEER. 1 ^ p l \ ` ,8. CLEAR AND GRUB NECESSARY AREAS AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE AND ASSOCIATED DRIVEWAY PIPE WITH ROCK INLET CHURCH M] EXISTING TREELINE PROTECTION AND RIP RAP APRON. p p ( F F E - 6 0 2 . �p p > .� 1 (T) 9. STABILIZE ANY DISTURBED AREAS. 10. CLEAR AND GRUB NECESSARY AREAS TO INSTALL PERIMETER EROSION CONTROL MEASURES. © I / I 1 I 11. INSTALL ALL PERIMETER SILT FENCE AND SILT FENCE STONE OUTLETS. / I 1 12. INSTALL SEDIMENT BASIN #1 WITH SKIMMER AND ASSOCIATED COIR FIBER BAFFLES. � � I TEMPORARY � p c I � � O \ I \ \ 13. INSTALL TEMPORARY STOCKPILE AREA PER PLANS AND ENSURE SILT FENCE IS INSTALLED AT THE PERIMETER OF THE STOCKPILE/STAGING �q CONCRETE C /� AREA. WASHOUT p \ r m 1 14. 1 �U INSTALL PERMANENT DIVERSION DITCHES #1 AND #2 WITH ASSOCIATED TEMPORARY 15" HDPE PIPE. INSTALL ROCK INLET PROTECTION AND RIP O s p ��p I RAP APRON AT TEMPORARY HDPE PIPE OUTLET. STABILIZE PERMANENT DIVERSION DITCHES AND LINE WITH N.A.G. SC150 MATTING OR \ / Cfl ; pGO� Co p 1 I I EQUIVALENT. I W \ 15. INSTALL ROCK CHECK DAMS PER PLANS AND NCDEQ SPECIFICATIONS. . � p ( In 602 p \ x' \ I 16. CLEAR AND GRUB THE REMAINDER OF THE SITE. L i p rn I a� e �� p � \ I ) 17. INSTALL CONCRETE WASHOUT PER PLAN DETAIL. u ri I a a �O� 4s. p p p I x C0 1 I 18. BEGIN GRADING OF THE SITE. ENSURE THAT SPECIAL STILLING BASIN IS ON SITE TO DEWATER UTILITY TRENCHES IF NEEDED. rn I JURISDICTIONAL 1� I / \ ODIITCHSI#2 J WETLANDS 19. CONTINUE GRADING OF THE SITE TO FINISHED GRADE. STABILIZE ALL DISTURBED AREAS AS SOON AS POSSIBLE WHEN FINISHED GRADE IS a _ J I / (TYP.) REACHED. REFER TO THE GROUND STABILIZATION CRITERIA ON THIS SHEET FOR MINIMUM STABILIZATION TIMELINES. I 20. COMPLETE GRADING AND INSTALL ALL UNDERGROUND UTILITIES. 21. COMPLETE ALL SIDEWALK CONSTRUCTION. a ' 22. STABILIZE ALL DISTURBED AREAS OUTSIDE OF BUILDING PAD, DRIVEWAYS AND PARKING AREAS. - _ n W i a RIP RAP APRON /h I , l I \ 23. INSTALL STONE BASE ON PARKING AND DRIVEWAY AREAS AND STABILIZE ALL DISTURBED AREAS. 60 \ © 4' WIDE X 6' LONG h / h�� r� \ 24. GRADE DIVERSION DITCH #2 TO PROPOSED PERMANENT STATE PER SHEET C-5 AND REMOVE TEMPORARY 15" HDPE PIPE. SEE SHEET C-5 FOR 12' THICK 'hog I l I / ADDITIONAL INFORMATION. ' •® 50 9 `HDPE PIPE TEMPORARY TEMPORARY 15" • I I 25. WHEN ENTIRE SITE IS STABILIZED AND WITH SPECIFIC APPROVAL FROM NCDEQ REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. DITCH #2 h0) DIVERSION � , I � �/ SILT FENCE 26. STABILIZE ANY RESULTING AREAS DISTURBED AREAS. DRAWING LEGEND •. S ��� \ } ` \ (TYP.) I EXISTING PROPOSED I / PROPERTY LINE ROCK CHECK � ( STREAM 'BUFFER / \ DAM (TYP) �� 595 h / \ \ (TYP.) 1 ADJOINING PROPERTY LINE �. INV=594.0 ( __600- �60g�� MAJOR CONTOUR CLEANOUT LOCATION (TYP.) 1 -_604-___-, MINOR CONTOUR / \ INV=594.5' / / / I I I I / I �/ / �/ SETBACK LINE I ■ I � I I / PROPOSED % SS/ ■ l I % - 6 O O \ - \ SIGN WOOD LINE X TEMPORARY SILT FENCE 00 � • TEMPORARY SILT FENCE STONE OUTLET - w - _ ♦♦ _ _ SS /+, / \ O TEMPORARY ROCK CHECK DAM - - / _ w _ TEMPORARY ROCK INLET PROTECTION ♦ - - -/ \ -S TEMPORARY ROCK "r.` ' m \ ��•♦� ST STORM DRAIN PIPE INLET PROTECTION T n - - (TYP.) -■- Sg5 ��` ` �= \ S SS SANITARY SEWER LINE © ■ ®� L _ ® SANITARY SEWER MAHOLE (\ ■ 4.. '� _ - SB STREAM BUFFER aw JURISDICTIONAL STREAM -- SEED AND STABILIZE ALL N - - - - J JURISDICTIONAL WETLANDS DISTURBED DITCH AREAS RIP RAP APRON � � TEMPORARY 4' WIDE X 6' LONG GROUND STABILIZATION CRITERIA WITH N.A.G. SC150 OR EQUIV. CONSTRUCTION 12" THICK / \ ENTRANCE \ \ l \ US 64 WEST \ C > -�- ZO � M� W / 0' 20' 40' 60' SEE EROSION CONTROL DETAILS FOR SEEDING SPECIFICATIONS DRAWING SCALE SITE AREA STABILIZATION STABILIZATION DESCRIPTION TIMEFRAME TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, & SLOPES IF SLOPES ARE 10' OR LESS IN SLOPES STEEPER THAN 3:1 7 DAYS LENGTH & ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES > 50 FEET IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE SLOPES FLATTER THAN 4:1 10 U z , ISO s o `��_� 4P 0 ON o�• N Q �J U �j O � C C � m N N Z Lu v O v Z or W W `n O 30 Z LCC O Z ac CL n a a N o� O O Z N V z J 0 z � � g cl- oC V O >Z- oc W 3 Z v 2 Ov O v� V Z O¢ N = Z O O °° Q � v W o � � w v J J W N z N Q � m c m Y c O a Sheet No. i 59 1 5g6 g5 l / _ 596 5g7 / 1 T1 / \ 600 cd 601 d 1 _ Q ± 8, 400 SF CHURCH F,7, I 0 o Lp G0� Q ( I I \ JURISDICTIONAL I( I I m 1 WETLANDS 2 Q \ I (TYP.) o � Q Q r(T) \l% � I sS Q — �� • � � � I I t (�� I \� \� \STREAM BUFFER I (TYP.) \ 1 I I4" SANITARY SEWER SERVICE LINE 1% SLOPE I MIN COVER: 3' \ \ 1 (TYP.) kc' _ 6 0 0 6 �� / / I SAN. SEWER / J — -- 6 Q -� / - S I TIE IN = W — — - — _ s9s 8 '12'3V IA/ sS �, /� /11\ \ INV=f5931M \ — \ — — S S\ INV=f594'.:. - FG=597.6'— \' \ EG=597.02' FG=597.2 cn 54 LF 15" RCP \ DRIVEWAY PIPE \ � / EG=594.8 \ US 64 WEST \ / N l DRAWING LEGEND EXISTING PROPOSED PROPERTY LINE ADJOINING PROPERTY LINE _600-- �605�� MAJOR CONTOUR —_604____/ MINOR CONTOUR SETBACK LINE WOOD LINE WATER LINE SANITARY SEWER LINE ST STORM DRAIN PIPE SANITARY SEWER MAHOLE gB STREAM BUFFER JURISDICTIONAL STREAM F JURISDICTIONAL WETLANDS 0 �D 00 0 �(A 0' 20' 40' 60' DRAWING SCALE z U i 1 d m , m N N Z Lu v O or �Z W W `n O Z LLJ' 30 oZ ac c1c C Lu as � o 0 O Z N Z V z J Z U 3 oc Z CL LJJ 3 � v 2 z �Oo Z Q O Q rN O 00 = v LLJ � V J J LJ N 0 N s O z c\ Q � m 00 u O c a Sheet No. i d L VENT--/ COMPACTED SOIL FLOAT OUTLET END O EXISTING CONNECTED TO GRADE STORM STRUCTURE e j INLET SCREEN/DOOR' BARREL PIPE OR "ARM" ORIFICE INSIDE NOT INCLUDED WITH SKIMMER NOTE: INLET SCREEN SUPPLIED BY USER SCH 40 PIPE VARIES ON LARGER SKIMMERS SEE CALCULATIONS FOR SKIMMER SIZE SKIMMERS TO BE FAIRCLOTH SKIMMERS OR APPROVED EQUAL. SKIMMER DETAIL PIPE OUTLET TO FLAT, NON -DEFINED CHANNEL NTS NOTES 1. La IS THE LENGTH OF RIPRAP APRON 2. d=1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP ON THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TALLWATER DEPTH OR TO TOP PF THE BANK, WHICHEVER IS LESS. La 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED � o BETWEEN THE RIP -RAP AND PIPE OUTLET TO WELL-DEFINED CHANNEL II 1,=1 II Il all .�.y.y.� ������ • L, ,II; ,II, "� '!� �, °I°I[ II�II°IIu II II II Ii i c II II III; II II'IL=IL=IL=L=L=II- II:'L'L'Ihr,9IL-IIL=L=II=IIr N.T.S. OUTLET do Lo W d5o dMAX d 1 2" DIP 3' 8' 6.5' 0.2' 0. 4' 0. 5' 15" RCP 3.75' 8' 7' 0.2' 0. 4' 0. 5' 6" PVC 1.5' 3' 1.7' 0.2' 0. 4' 0. 5' METAL FENCE POSTS 1.25 LB/LF MIN REINFORCING WIRE FENCE MINIMUM 14 GAUGE WIRE MAX. MESH SPACING OF 6" SILT FENCE FABRIC ATSM 6461 OR EQUIV. WIRE OR ZIP TIES MIN. STRENGTH OF 50 PSI .FLOW BACKFILL TRENCH AND COMPACT THROUGHLY 18"-24" 1 5' 4» 124" MIN I OWN CROSS SECTION 8' MAX W WIRE FENCE 6' MAX W/O WIRE FENCE WIRE FENCE FABRIC FENCE 2' MIN. 1 ?s'7 AP' `Sips S l pA� „B» CONSTRUCTION SPECIFICATIONS REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONAL MATERIAL. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION. ENSURE DIVERSION IS STABILIZED WITHIN 7 DAYS OF CONSTRUCTION. MAINTENANCE INSPECT TEMPORARY DIVERSION ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL END APPROPRIATELY STABILIZE IT. DESCRIPTION "A" FT DEPTH "B" FT BOTTOM WIDTH LINER PERM. DIVERSION DITCH 1 1.5 5 STRAW MATTING-N.A.G. SC150 OR EQ. ROADSIDE DITCH 1.25 1 - STRAW MATTING N.A.G. SC150 OR EQ. KEY IN 8" DOWN AND 4" FORWARD WIRE OR ZIP TIES EXISTING GRADE MAINTENANCE REQUIREMENTS: - INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. - SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIAL AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TEMPORARY SILT FENCE NTS WIRE OR ZIP TIES METAL FENCE POSTS MIN. STRENGTH OF 1.25 LB/LF MIN 50 PSI REINFORCING WIRE FENCE MINIMUM 14 GAUGE WIRE SILT -FENCE MAX. MESH SPACING OF 6" / WIRE FENCE ' SILT FENCE ■ 1.0 FT. ■ MIN. FRONT VIEW VARIES (SEE PLAN) 4' MAX CLASS B RIP RAP N SILT FENCE METAL FENCE POSTS 1.25 LB/LF MIN SILT FENCE ALL STONE TO --/ L NCDOT #5 OR BE PLACED AT #57 WASHED A 2:1 SLOPE WIRE OR ZIP TIES STONE MIN. STRENGTH OF 50 PSI TOP VIEW MAINTENANCE REQUIREMENTS: - INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. - SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. - REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. - REMOVE ALL FENCING MATERIAL AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. NOTE: - REFER TO SILT FENCE DETAIL FOR MORE INFORMATION. SILT FENCE STONE OUTLET N.T.S. DIVERSION DITCH DETAIL. NTS I� 50' MIN - EXISTING PAVEMENT CONSTRUCTION SPECIFICATIONS 1. STONE - USE COARSE AGGREGATE (2-3 INCH STONE) 2. LENGTH - 50' MIN 3. THICKNESS - NOT LESS THAN SIX(6) INCHES 4. WIDTH - NOT LESS THAN FULL WIDTH OF ALL POINTS OF INGRESS OR EGRESS 5. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE. THROUGH USE OF SAND BAGS, GRAVEL, BOARDS OR OTHER APPROVED METHODS. 6. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. TEMPORARY CONSTRUCTION ENTRANCE NTS PLAN VIEW STEEL POST CAD STAKE TO 4' O.C. TYP.--7SUPPORT ROPE OR WIRE TO SUPPORT WIRE, TYP. PREVENT SAGGING N. Ts. Im ►.....,............►......►.......................►......►......►IVAIVI ... ,I�VAV� &VAVA� �AVAVA �VAV�� ►�AVA�I ,I�VAV� ��AVA� NAVA�� MMAV�� �AVA�I ,ITV/ STEEL POST MIN. 2 4 " IN _� COIR MESH OR SIMILAR, GROUND BELOW BOTTOM STAPLED OR TRENCHED OF SED. TRAP SECTION Y INTO BOTTOM OR SIDE, TYP. BAFFLES MADE OF 700 G/M COIR EROSION BLANKET SIMILAR TO AND INSTALLED AS SEDIMENT FENCE. TYP OF 3 EA. BASIN, (2 IF BASIN IS 20' OR LESS IN LENGTH.) SKIMMER WITH PXP� RETRIEVAL ROPE AS NOTED ON PLANS 35% OF 25% OF 25% OF 15% OF LENGTH LENGTH LENGTH LENGTH - - - - - - - - - - - - - - - - - 6" PVC DRAIN LINE CROSS SECTION TEMPORARY SKIMMER BASIN N.T.S. GENERAL NOTES/MAINTENANCE REQUIREMENTS 1. AREA UNDER EMBANKMENT TO BE CLEANED, GRUBBED AND STRIPPED OF ANY VEGETATION AND ROOT MAT. 2. FILL MATERIAL FOR THE EMBANKMENT SHALL BE FREE OF ROOTS OR OTHER WOOD/VEGETATION AS WELL AS OVER -SIZED STONES, ROCKS, ORGANIC MATERIAL OR OTHER OBJECTIONABLE MATERIAL. THE EMBANKMENT SHALL BE COMPACTED IN NOT GREATER THAN 9" LIFTS BY TRAVERSING WITH EQUIPMENT. 3. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO IT ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE BASIN. THIS DEPTH SHALL BE MARKED IN THE FIELD. 4. REMOVED SEDIMENT SHALL BE PLACED IN A DESIGNATED DISPOSAL AREA AND PROTECTED AGAINST EROSION. 5. THE WEIR MUST BE CONSTRUCTED LEVEL AND TO GRADE TO ASSURE DESIGN 6. STONES SHALL BE MACHINE PLACED AND SHOULD BE HARD, ANGULAR AND WEATHER RESISTANT. 7. EMERGENCY SPILLWAY SHALL BE DIRECTED TO NATURAL, STABLE AREAS. 8. ALL CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER. 9. ALL DISTURBED AREAS SHALL BE STABILIZED IMMEDIATELY UPON COMPLETION OF CONSTRUCTION OF THE BASIN. WITH LINER, NO GRAVEL APPROACH ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER 10'-0" MIN. A O CD C D CD O SANDBAGS (TYP.) O O OR STAPLES z 10 MIL 1:1 PLASTIC SANDBAGS (TYP.) 0 0 SIDE SLOPE LINING OR STAPLES o (TYP.) 0 0 0 CD CD0 0 - oZXQ A -C11- CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUT DETAIL Co m Z N N a r co D N Z M D r� r� � v z n a0 V� m ry z C) 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL. 4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH A 6" OVERLAP. USE A DOUBLE ROW OF STAGGERED STAPLES 4" APART TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4 OVER THE CENTER BLANKET AND STAPLED 2 FOR C350 MATTING. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT INTERVALS. USE A ROW OF STAPLES 4PP APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. DITCH LINING/MATTING INSTALLATION GUIDE TEMPORARY SEEDING SPECIFICATIONS PIEDMONT REGION Application Rates (lb/ac) Recommended Species 10-10-10 Agriculural Straw Seeding Dates Seed Fertilizer Limestone Jan. 1 - May 1 Winter Wheat Annual Lespedeza 120 50 750 2,000 4,000 (Kobe) May 1 - Aug 15 German Millet 40 750 2,000 4,000 Aug 15 - Dec 30 Ryegrain 120 1,000 2,000 4,000 NOTES USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. PROVIDE STABILIZED OUTLET TO STREAM BANK. WOOD PALLETS MAY BE USED IN LIEU OF STONE AND GEOTEXTILE AS DIRECTED. A SUFFICIENT NUMBER OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE SPECIAL STILLING BASIN ABOVE: NATURAL GROUND. NOT TO SCALE SPECIAL STILLING BASIN DETAIL Z oN �a H OI--I Q8-Z lL J O O � x WazU-x H O ¢ O H (nHU.OJ 0 0 z oLU � 0 Z U- �N �a CO �Z o N J ¢ J o Z Q N Un J = N - 0 J W oa w fA PERMANENT SEEDING DEFINI TION Seeding disturbed areas with perennial grasses and (or) legumes to provide a permanent vegetative cover to lessen runoff and soil erosion. PURPOSE To lessen soil erosion and permanently stabilize disturbed areas created by grading of construction sites. CONDITIONS WHERE PRACTICE APPLIES All bare soil areas on construction sites which are not covered by structures or other erosion control devices. PREPARA TION Prepare seedbed by ripping, chiseling, harrowing or plowing to depth of six inches so as to produce a loose, friable surface. Remove all stones, boulders, stumps or debris from the surface which would prohibit germination or plant growth. Spread topsoil in a layer 3" - 6" depth. Incorporate into the soil 800 to 1,000 pounds of 10-10-10 fertilizer plus 500 pounds of twenty percent (207.) superphosphate per acre and two tons of dolomitic lime per acre unless soil tests indicate that a lower rate of lime can be used. Mulch after seeding with 1.5 tons of grain straw per acre and either crimp straw into soil or tack with liquid asphalt at 400 gallons per acre or emulsified asphalt at 300 gallons per acre. PLANTS & MIXTURE PLANTING RA TE/ACRE PLANTING DATES Tall Fescue 100-150 lbs. Aug. 15 - Oct. 15 (Low Main ten an ce) Feb. 15 - May 1 Tall fescue 200-250 lbs. Aug. 15 - Oct. 15 Waterways and Feb. 15 - May 1 Lawns (High Main t.) Blend of two turf- 200-250 lbs. Aug. 15 - Oct. 15 type tall Fescues Feb. 15 - May I (90%) and two or more improved Kentucky bluegrass varieties (10%) (high maintenance) Tall Fescue 100 lbs. Feb. 15 - May I and and Aug. 15- Oct. 15 Kobe or Korean 20-25 lbs. Lespedeza Tall Fescue 50 lbs./acre Nov. 1 - Feb. 1 (Unscarified) Tall Fescue and 60 lbs. July and August German Mille t or and Sudangrass 2 30 lbs. Tall Fescue 70 lbs. No v. 1 - Jan. 30 and and Ryegrain 2 25 lbs. Common Bermudagrass 8 lbs. (hulled) April 15 - June 30 15-20 lbs. (unhulledd) Feb. 1 - March 30 1 For spring seedings, use Scarified Lespedeza seed. For late fall and winter seed/ngs, use unscarified seed. 2 Annuals such as Millet, Sudan grass and Rye grain must be kept at 10-12" maximum h eigh t. PERMANENT GROUNDCO VER Permanent groundcover is to be provided for all disturbed areas within 15 working days or 30 calender days (whichever is shorter) following completion of construction or de velopm en t. ' �i �' "a a� NO c- s �o N Q �J U �j C O 0 vJ Q s; " ° a� (� O U� ,n u �L-j C � IU Ei "`-J m N N Z W O U O V Z W W cu U- o ZU 30 OOZ W W a a 2� � N o 0 O Z � N V Z J O J w V z 4 5"L O W �Z Ov 2 z O W I- c.n O J � J w W z N Q � 03 m v ° u cu O a Ln p p U Sheet No. n P`/10 1 was a stone Natural Ground Riprap Headwall, 1' min 3' ---� height from road shoulder Pipe Invert _1001111 . CONSTRUCTION SPECIFICATIONS: - CLEAR AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. - INSTALL CLASS B OR CLASS 1 RIPRAP INA SEMICIRCLE AROUND THE PIPE INLET. STONE SHOULD BE - BUILT UP HIGHER ON EACH END WHERE IT TIES INTO EMBANKMENT. - A 1' THICK LAYER OF NCDOT #57 OR #5 STONE SHOULD BE PLACED OUTSIDE OF THE SLOPE OF THE RIPRAP. - THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED OUTSIDE OF THE HORSESHOE 18" BELOW NATURAL GRADE. - WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSED AREA AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER MAINTENANCE REQUIREMENTS: - INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH SIGNIFICANT (0.5 INCHES OR GREATER) RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. - REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORGAE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF OF THE DESIGN DEPTH OF THE TRAP. - PLACE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. - CHECK STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. - AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND STABILIZE ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. TEMPORARY ROCK INLET PROTECTION N TS GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet: may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:3. -7 days for perimeter dikes swales (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope p Note:.After the permanent cessation of construction activities, any areas with temporary round stabilization shall be converted to permanent round stabilization as soon as g p g practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Tern porary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLI NA 5 l Environmental Quality ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER Ia 6 OM mop o T 0 ar 11 W4111i mro E WL 0 I mr� 0 en oR n.rus 0 A$ 0 0 Alit IW �g OR STAKU , M11) l�AITIDI K7W0m 01 L fCTIMI 1i W HM Vi0 W n6D rEVI' � Q ImN G M Nit VG9Ort e ne None Wwwr E7WC71E[E axu O7WG7I auu .c w�wrwcn v,sx na: u•a •mine N.m E ImnR�nm VIEII 11E l.ann Mm/A nGmn3 T.Ot nr 11E SI E"TE s4m ue�oers m er na: zran:russ e/v�mrr m rrwus: •oEOwa eAri ,anus � vnx A semue ELyI U13111 E VIii STR C7U[ Hi m E BAK u asHEs W rrR/0Na eErwer ewe® vme msoe wrnm ncv�. &CONOR >E WAyp,r BELOW GRADE WASHOUT STRUCTURE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance may be required ad in front of the washout. Additional controls b the p Y q Y approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC: WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILI� .ATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDCs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECOR.DKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement: not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. EFFECTIVE: 04/01 / 19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must hie Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • within 24 hours, an oral or electronic notification. deposition in a o Within 7 calendardays, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill cr release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendardays, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendardays, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. ;'Y,r.:..,,}'I NORTH CAROLINA 5fr Environmental Quality NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19I :a C arC.�� . U LLI , Z C9 0 d �J U i 1 d 0 0 � bra `'�. O m l7 l7 N N Z W OU O .Z_ UZ W W cu O O 30 OO Z W W a a a a � N o 0 � Z � N V Z N � J J W V Z o W �Z Z Z Ln O Z � o W 0 DC J J w W N s O z N Q m m a S ° u c O a Ln p p U Sheet No. — VARIES - SEE SITE PLAN N. T.S. RESERVED PARKING 12" SIGN R7-8 SIGN APPROVED FOR USE UNDER GENERAL STATUTE 20-37.6 STANDARD COLORS (ALL SIGNS): BACKGROUND - WHITE LETTERING/BORDER - GREEN ARROW - GREEN FIGURE - WHITE ON BLUE FIELD CORNER RADIUS - 1 1/2" (TYPICAL) RESERVED PARKING MAXIMUM PENALTY cS 20-3 50 12" SIGN R7-8E THIS SIGN MAY BE USED IN PLACE OF SIGNS R7-8/R7-8D MAXIMUM PENALTY 3/8" (TYP) $ 2 5 0 3/8" (TYP) GS 20-37.6 12" SIGN R7-8D SIGN APPROVED FOR USE UNDER GENERAL STATUTE 20-37.6 VAN CCESSIBLE 12" VAN ACCESSIBLE SIGN SIGN APPROVED FOR USE UNDER GENERAL STATUTE 20-37.6 VAN ACCESSIBLE SIGN (AS REQUIRED) z O _ 7- 0 z 0 U z O R 0 z 0 CIAR7-8 � U .R7-8D F FINISHED GI LuJ LuJ CONDITION 1: PEDESTRIAN PATH DOES NOT PASS UNDER OR AROUND SIGN. CONDITION 2: PEDESTRIAN PATH GOES BY, UNDER, OR AROUND SIGN. GENERAL NOTES: 1. REGARDLESS OF AGE, ALL ACCESSIBLE SPACES SHALL BE IDENTIFIED BY ABOVE- GROUND SIGNS ONLY. (SEE N.C.G.S.) 2. NEW SPACES SHALL NOT USE GROUND - PAINTED SYMBOLS. 3. ACCESSIBLE SPACES ARE REQUIRED TO BE STRIPED OFF ONLY; BLUE COLORING IS NOT NECESSARY NOR REQUIRED. 4. STRIPING IS WHITE ON DARK PAVEMENT; BLACK ON LIGHT PAVEMENT. (N.C.D.O.T.) HANDICAP SIGN DETAILS N.T.S. z O R 0 z 0 CIAR7-8 � U .R7-8D F FINISHED GI LuJ LuJ CONDITION 1: PEDESTRIAN PATH DOES NOT PASS UNDER OR AROUND SIGN. CONDITION 2: PEDESTRIAN PATH GOES BY, UNDER, OR AROUND SIGN. GENERAL NOTES: 1. REGARDLESS OF AGE, ALL ACCESSIBLE SPACES SHALL BE IDENTIFIED BY ABOVE- GROUND SIGNS ONLY. (SEE N.C.G.S.) 2. NEW SPACES SHALL NOT USE GROUND - PAINTED SYMBOLS. 3. ACCESSIBLE SPACES ARE REQUIRED TO BE STRIPED OFF ONLY; BLUE COLORING IS NOT NECESSARY NOR REQUIRED. 4. STRIPING IS WHITE ON DARK PAVEMENT; BLACK ON LIGHT PAVEMENT. (N.C.D.O.T.) HANDICAP SIGN DETAILS N.T.S. 0� ► .a U Q�r z - "' �- _ co147 d �J E o °L-j m l7 l7 N N Z W OU O .Z- V Z W W iz cu o0 LLJ 30 oZ W W ai O O � Z � N V Z J Lon J V Z W >- o LLJ o V 30 Ul z W Lon J J LJ N N s O z N ;, m c m -0 u c O a Sheet No. i LANDSCAPE LEGEND / I I / / / I / I � / / I / / I — ± 8, 400 SF CHURCH FFE=602.5' BORDER FORSYTHIA � .? Nils 1 JUDD VIBURNUM I � SOFT TOUCH HOLLY IE w---w — — — w -- — w — — — w — - -w-- 411. j a a e . 10 j CA ,-QFF ER 10' MIN DISTANCE FROM HYDRANT 341 L.F. OF LANDSCAPE BUFFER 141 L.F. EXISTING WOODED AREAS 20 DRIVEWAY 180 L.F. LANDSCAPE BUFFER TO BE PLANTED. REQUIRED PLANTING = SMALL TREE 50' O.C. = 3 REQUIRED SHRUBBERY 25' O.C. = 6 REQUIRED PROVIDED: 3 RIVER BIRCH 8 BORDER FORSYTHIA VIBURNUM d d w, 0 W —w — Dro Top ra Invert Out: 590.0 Ucl US 64 WEST N W I / I 0� I • I / 00000, / ,• Coo �� I / • / I 11 \I/ \I/ \I/ \I/ / • 1 W W W W • I / I I N + co W II W I I I I • II OWNER: ANC PROPER —I PARCEL D:130 COO DEED BOOK/PAGE: 1 F / PLAT BOOK/PAGE: 2 �• 0 •/ W �• — _ s� /mow _ � I MMls ��—— ---w im: 589.52 s S\ s s w — — — w s �SMH • Top Rim: 589.21 W I I 1 cn PLANTING COMMON NAM BOTANICAL NAME HEIGHT SPREAD HEIGHT # ° RIVER BIRCH BETULA NIGRA 20'-40' 8'-16' 3 4-ABOLIER(MEASURED 6- 3 AD GLOSSY ABELIA ABELIA GRANDIFLORA 4'-6' 3'-5' 15" 10 CARISSA HOLL Y 3'-4 4'-6' 15" 5 Drop Inlet I 0' 20' 40' DRAWING SCALE z F4 A�' � � o o � 0 N N k L N C W v o rye m N N z W V O .� V Z W W S o0 cu o Zd 30 oZ C� (31,� o0 c Z N Z V z 0 C Z LLJ CL- V z V 3 o �J Z 300 Q w Lon LLJ CL O ' v C J W LJ N 0 N s O z N m m u O a S ° c a Sheet No. i z 0 Ln I a CONSTRUCT EARTH SAUCER WITH 4" H FORM— FLOOD WITI- WATER TWICE IN FIRST 24 HOURS 18" MIN. FOR PLAI\ UP TO 4' HIGH. 20" MIN. FOR PLAI` OVER 4' HIGH. -HIN OUT INTERIOR BRANCHING )F PLANT MATERIAL / TREE AS 'ER SPECIFICATIONS. /4" BLACK RUBBER HOSE 0. 12 GAUGE DOUBLE TRAND GALVANIZED WIRE ROTECTIVE TREE WRAPPING EFER TO SPECIFICATIONS - 2"X2" SOUND HARDWOOD TAKES OR APPROVED METAL F' STAKES " HIGH SAUCER WITH A 4" AYER OF SHREDDED PINE ARK MULCH. OIL MIX AS SPECIFIED REE ROOTBALL TYPICAL TREE PLANTING N.T.S. DfCC/1Y\ JUD—JUIL WITH A PICK. DRONE 1 /5 OF LEAF AREA, BUT RETAIN \,IATURAL FORM. 2" PEAT MULCH 6" FOR PLANTS UP TO 4' HIGH— 8" FOR PLANTS OVER 4' HIGH. SHRUB PLANTING DETAIL N.T.S. WATER WISE PLANTING TECHNIQUES: 1. SOIL PREPARATION FOR THE ENTIRE LANDSCAPE YARD INCLUDES THE ADDITION OF ORGANIC AMENDMENTS TILLED TO A DEPTH OF EIGHT (8) TO TWELVE (12) INCHES. 2. ALL PLANTINGS IN THE LANDSCAPE YARDS SHALL BE MULCHED, INCLUDING INTERIOR PARKING LOT ISLANDS LESS THAN FIVE HUNDRED (500) SQUARE FEET TO A DEPTH OF THREE (3) TO FOUR (4) INCHES. THE MULCH SHALL BE FREE OF TRASH AND MAINTAINED WEED FREE THEREAFTER. 3. EARTHEN BASINS SHALL BE CONSTRUCTED AROUND THE INSTALLED PLANTS. 4. PLANTS, AS PERMITTED BY THIS ORDINANCE, ARE GROUPED TOGETHER WHERE POSSIBLE. 5. FOR ESTABLISHMENT AND SURVIVAL, PLANTS SHALL BE WATERED IN THE FIRST YEAR OF PLANTING. 6. IRRIGATION: IT IS SUGGESTED THAT DRIP IRRIGATION, WHICH INCLUDES DRIP MASTERS, BE USED FOR REQUIRED LANDSCAPING PLANTING BEDS DURING THE REQUIRED ESTABLISHMENT PERIOD. AFTER ESTABLISHMENT, SUPPLE- MENTAL WATERING CAN BE REDUCED AND USED ON AN AS NEEDED BASIS. TRADITIONAL SPRAY IRRIGATION IS PROHIBITED EXCEPT ON TURF AREAS. LANDSCAPE NOTES 1. THE LANDSCAPE CONTRACTOR SHALL MAKE HIMSELF AWARE OF EXISTING UTILITIES. HE SHALL NOTIFY THE RESPECTIVE PUBLIC UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 2. PLANTING BEDS AND PLANT LOCATIONS SHALL BE STAKED BY THE CONTRACTOR AND APPROVED BY THE OWNER OR OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. 3. PLANTING BEDS SHALL BE CLEARED OF ALL GRASS AND WEEDS PRIOR TO INSTALLATION OF PLANTS, AND SHALL BE CULTIVATED AS SHOWN ON THE PLANTING DETAILS. 4. ALL DISTURBED AREAS TO BE SEEDED UNLESS OTHERWISE NOTED. 5. PLANTING BEDS SHALL HAVE 4" SHREDDED HARDWOOD BARK MULCH IN ENTIRE BED UNLESS OTHERWISE NOTED ON DRAWINGS. 6. ALL PLANTED AREAS SHALL BE TREATED WITH A WATER-SOLUBLE HERBICIDE FOR THE NON -SELECTIVE CONTROL OF ANNUAL AND PERENNIAL WEEDS PRIOR TO PLANTING. 7. ALL TREE AND SHRUB PITS SHALL BE BACKFILLED WITH A PLANTING SOIL MIXTURE OF 1 PART PEAT MOSS, 3 PARTS TOP SOIL AND 1 PART SAND, THOROUGHLY MIXED. 8. ALL PLANTED AREAS TO BE FERTILIZED WITH GRANULAR FERTILIZER. CONTRACTOR TO PROVIDE SOIL TEST AND FERTILIZER APPLICATION RATES IF REQUIRED FOR APPROVAL. 9. SPRAY TREES AND SHRUBS WITH AN ANTI -DESICCANT IF FOLIAGE IS PRESENT. 10. EVERGREEN TREES AND SHRUBS SHALL BE PLANTED THE SAME AS DECIDUOUS MATERIAL. 11. DO NOT PRUNE ANY MATERIAL UNTIL IT HAS BEEN VIEWED AND ACCEPTED BY THE OWNER OR OWNER'S RESPRESENTATIVE. 12. ALL PLANT MATERIAL TO BE NURSERY GROWN AND TO COMPLY WITH AMERICAN STANDARD FOR NURSERY STOCK ANSI-Z60-1-1986. 13. ALL MATERIALS INSPECTED AT THE SITE AND FOUND NOT TO BE ACCEPTABLE SHALL BE REMOVED FROM THE SITE ON THE DAY OF REJECTION. 14. IMMEDIATELY AFTER A TREE IS PLANTED, IT SHOULD BE SUPPORTED WITH STAKES AND GUY WIRES TO FIRMLY HOLD IT IN PLACE. (SEE DETAIL -THIS SHEET) REMOVE STAKES AND TIES AFTER ONE YEAR. 15. THE LOWER TRUNKS OF NEW TREES SHOULD BE WRAPPED WITH BURLAP OR PAPER TO PREVENT EVAPORATION AND SUN SCALD. THE WRAPPING SHALL REMAIN ON THE TREE AT LEAST ONE YEAR. 16. PLANT ALL TREES AT LEAST 3 1 /2 FEET FROM THE END OF HEAD- ON PARKING SPACES TO PREVENT DAMAGE FROM CAR OVERHANG. Know what's below. Call before you dig. 0' 20' 40' 60' DRAWING SCALE 0��0 L .a U Q�r z - w(0. �. cq 0 - N01 d 10 U �j N O 0 N N C � N C m l7 l7 N N Z W OU O .Z_ vZ or W iz O O cu Z L' 3a oZ W W as as cu o� � o 0 � Z � N V z J cn V oc z W � o W �z CL 3 U N Q z � V J LU J W N N s O z N 00 c 00 -0 u O Ln p p c U a Sheet No. 0 24" INS. OLA. STANDARD MANHOLE PRE -LUBRICATED MANHOLE GASKET FRAME AND COVER DROP MANHOLE TO BE MAXIMUM ADJUSTMENT W17H CONSTRUCTED FOR ALL } FLOW I NOTES 1. PAVEMENT SHALL BE CUT TO TRUE LINE AND REMOVED BEFORE TRENCH /S CUT. GRADE RINGS TO BE 1 FOOT F/N/SHED GRADE DROPS OVER 30" 2. DIMENSION FOR TRENCH MOM MAY VARY AS REQUIRED TO ACCOMODATE PROVIDE 1/2" MORTAR ,'.t." EXCAVA770N, SHORING AND COMPAC77ON EQUIPMENT. 12" Max. O/NT BETWEEN GRADE 3. W/OTH OF TRENCH FOR PIPE BEDDING 7i7 BE AS SHOWN UNLESS A GREATER W/OTH /N UNPAVED GRAVEL AREAS, REPLACE GRAVEL W1771 �t''r AGGREG47E AS REOUIRED TO MATCH EXISTING ° RINGS /S RECOMMENDED BY PIPE MANUFACTURER OR REOUIRED FOR USE OF EQUIPMENT ON SITE. SURFACE COMPACTED TO 6" 7HICKNE55 GROUT INVERT 1/2 THE PAVT CUT TO EXTEND 6" BEYOND EDGES OF 7RENCH AS SHOWN. MANHOLES ALONG OUTFACE `O '= MASTIC SEALANT HEIGHT OF THE EFFLUENT 4. CONTiACTOR SHALL OBTAIN TESTING SERVICES ON COMPAC77ON OF THE BACKRLL FROM A F/RM W/TH AN APPROVED NCDOT PAVT SHALL BE CUT TO TRUE LINE AND REMOVED BEFORE 7RENCH /S CUT. LINES SHALL EXTEND 18" MIN. - °:aa',- PIPE EXTEND STONE 4" BEYOND CER77RED TECHNICIAN, AND PRONDE REPORTS (WITH THE CER77RC477ON TESTING NUMBER) VERIFYING THAT THE COMPACAON ALL PA VT REPAIRS TO BE /N ACCORDANCE WITH N.C.D.O.1.. SPECS o "� CONFORMS WITH THE LA7EST EDITION OF THE NCDOT STANDARD SPECIRC477ONS ABOVE GRADE UNLESS SHOWN '"' !`'fi ' • a "� *s,;'N PAVT CUT m EXTEND 6" BEYOND EDGES OF TRENCH AS SHOWN. OTHERWISE ON THE PLANS. CONCRETE ENCASEMENT TRENCH SHALL VE BOF STONE. AND THOROUGHLY TAMPED WITH SUITABLE WHERE EXIS77NG PAVEMENT /S INSUFFICIENT THICKNESS 70 w MATERNAL 70 LEVEL OF STONE. DEVELOP 77GHT SEAL WITH NEW SURFACE, NEW PAVEMENT JOINT DETAIL LL 'f�:, (SEE NOTE 2) SHALL LAP EXISTING SURFACE. ° _ 4 ^'`••' 1' 3' TRENCH WIDTH 1' STONE &PAVT 7i7 BE REPLACED BY CONTR4C7i7R WITH LEAST ALL PAVT REPAIRS TO BE IN ACCORDANCE W/7FI N.C.D.O.T. SPEC. ..•, . INTERFERENCE WITH TRAFFIC. TEPS AT 16" PAVEMENT CUT 2" S9.5B ASPHALT D.l. OR Cl. PIPE MAY NOT ENTER PIPE O.D. + 16" (SEE No 1J PD RDW LV BEFBE ORE 101R£NLCH IS CUr PROVIDE FLAT TOP q cur N CONCAM fa" COMPACTED REPAIR z" TYPE s-v ae OR SECT/ON WHEN GRADE W MANHOLE THROUGH CONE SECTION 'x. "` ' ;: K.: ro eE sewm Aec smNE OR As = OR ✓DINT. ' ';, u AV£M �•�'�•�' aee�•�e« •�e•:•aee« •�e�•�e•:•aee« •� 5-9.58 ASPHALT PANMG DOES NOT PERMIT USE 6" OF 119.OB OR BIN TWO ASPHALT PLACED oneEcftn BY ENciNEER AND COMPACTED /N TWO (2) 3" LIFTS EX/S7NJG PAVT OF CONE SECTION. Q ° D.l. OR C. TEE s;;; : } ��:', STRU - -I SELECT B4CKF7Lt OR 6 6 Ln = PRECAST CONC MANHOLE a - = ABC STONE PLACED AND IXap PAVT Z n W MONOL17HIC BASE. �.:•.:.<.':;:,..:.`.,:;1:..:;.,,,.:..::.,...,,:.-/2:-^.::.::...:. V 4B" Min. INS/DE OL4. 5" c °. : y •!'.i :.;,,.•..;:,; ":" 3' MINIMUM DEPTH S COMPACTED /N 6" L/F75 :-. AS SHOWN ON PLANS IN CONFORMANCE W/7H THE LATEST 6 6 8" ED177ON OF THE NCDOT STANDARD SPEC/F/C4T/ONS REPLACE PAVT, J" W " THICKER 7M N CUT PAVT L7" S70AE PIPE MAY NOT ENTER y = (SEE N07E 4) MANHOLE THROUGH CONE n ° a' Mmwm DEPnf D14FED MCAM SEC77ON OR ✓OINT. U - - PIPE BEDDING MA7ER[AL (SEE N07E 3) OR AS SHOWN ON PLANS W FLEXIBLE WATERTIGHT CONNECTOR EXTEND STONE 12" BEYOND - O USE SAND AROUND ALL PLAS77C W47ER LINES AMMMUM ON z SLEEVE W� STA/NLESS STEEL BAND .° •'°d ; BASE OF MANHOLE I PIPE USE 167 STONE AROUND CLAY AND 8" AND LARGER PLAS77C SEWER PIPE PIPE AS may Qy P n ' ' D.I. OR C.I. PIPE SECTION X = Y = 4" AROUND ALL PL4S77C WATER LINES, CLAY AND 8" AND DW o GROUT TO /N I LARGER PLASTIC SEWER PIPE PIPE ti' ... 8" X = Y = 0" AROUND ALL DUCTILE IRON AND COPPER PIPE, AND 4" & 6" L mcr m & mawt GIKY rANPSEAL ALL L/FT HOLES AND aSCHEDULE 40 PLASTIC SEWER PIPE JIM SUITABLE ANIERNL ° •fit." CONCRETE ENCASEMENT �I Y = 6" UNDERCUT REQU/RED AT ANY INSTALLATION WHERE ROCK /S 7D LEIa of S70W 84CA L & THORO rAY TAW SPACES AROUND PIPE INVERTS co �' ° : 7RENcw 7D BE fe" M7DER 7I14N PIPE Lbl IM7H surrALUE wu7ERLAc WITH HYDRAULIC CEMENT OR N y MASTIC SEALANT (3000 P.S.I.) PLAN PRESENT AT BASE OF 7RENCH OR IMDER REQUIRED FOR TAMPwW 70 LEVEL OF S70AE 12'• IN SHAPE BED 70 F/T AT LEAST IOX OF OUTSIDE DIAMETER OF PIPE EQUOWENT M USE AT SIE 7R£AG'H TO BE IB• M7pap TMN PIPE DIA MASTIC AS APPROPRIATE FOR D n ° t OR OVER IF REOLARED FOR TAMPING EW"ENr IN USE AT S"F A WATERTIGHT INSTALLATION. STONE BASED O-RI USE O-RING & 2 1/2" !" °.' -.. ,.. 90• D.I. OR CL BEND PAVEMENT REPAIR TYPICAL TYPICAL TRENCH SECTION TYPICAL TRENCH SECTION IN BITUMINOUS 12" Min. MASTIC SEALANT 1/2 PIPE DIA. '. ::. ':".':'t': •::r:' `:.. ,.;:...a .': :".' ' D.I. OR C. PIPE OPEN CUT OF NCDOT SECONDARY ROAD IN CONC. PA VED AREA SURFACE PAVED AREA MAKE INVERT OF PIPE ALTERNATE JOINT DETAIL FOR 12" DIAMETER AND SMALLER PIPE FLUSH WITH PRECAST INVERT. THESE SECTIONS ARE N/A ON NEW STREET CONST. SECTION STANDARD DROP MANHOLE STANDARD PRECAST CONCRETE MANHOLE R 77ME (MIN. SEC) REQUIRED FOR PRESSURE DROP FROM 3 1/2 TO 2 1/2 PSIG WHEN TES77NG ONE PIPE DIAMETER ONLY. INCREASE PRESSURE AS REQUIRED BY ENGINEER /F GROUNDWATER /S PRESENT. PIPE DIAMETER, INCHES 4 6 8 10 12 15 18 21 24 25 0-05 0.11 0:18 0:23 0.27 :32 0.•36 0:45 0:54 50 O.•09 0.21 0:36 0:45 0.54 1:03 1:12 1:30 1:48 75 0•• 14 0.•32 0:54 1:23 1.21 1:35 1:48 2:15 2:42 100 0.18 0:42 1:12 1:30 1:48 206 224 3.•00 3.•36 125 O.•23 0:53 1:30 1:53 2:15 2:38 3.•00 3:45 4:30 150 0.•27 1:03 1:48 2:15 2:42 3:09 3:36 4:30 5:24 175 O.•32 1:14 2:06 2:38 3.•09 J:41 4:12 1 5:15 6:18 200 0.•36 1.24 224 3:00 3.•36 4:12 4:48 6:00 7:12 225 0.41 1:35 2:42 3.•23 4:03 4:44 5:24 6:45 1 8:06 250 0.45 1:45 3.•00 3.•45 4:30 5:15 6:00 7.•30 9:00 275 0.•50 1:56 3.18 4:08 4:57 5:47 6:36 8:15 9:54 300 0-54 2:06 3.36 4: 30 5:24 6:18 7.• 12 9:00 10:48 350 1:03 2:27 4:12 5:15 6:18 7:21 8.•24 10:30 12:36 400 1:12 2:48 4: 48 6:00 1 7• 12 8:24 9:36 1200 14:24 450 1.21 3.•09 5:24 6:45 8.06 9.•27 10.48 13.•30 16:12 500 1:30 13:30 6:00 7:30 9.00 10:30 12.00 15:00 18:00 AIR TEST TABLE INSECT VENT FLEA! TO BE SET 1 O MIN. ABOVE 100 YR. FLOOD LEVEL PER 100 YR. FLOOD PLAIN STUDY INFO. OR AS REQUIRED BY THE ENGINEER. FIN/SHED PAVEMENT OR GRADE t• 5" IJI1�dXi�tJ i STAINLESS 57FEL BANDS PIAC SADDLE & GUTTER MIN. GRADE OF 1/4 " PER FT. 45' OR 22.5' BEND I •- TAP TO BE MADE ON THE MAIN TOP QUARTER OF THE MAIN. SUPPORT TAP & BEND W/ WASHED STONE 167 * ON NEW CONSTRUCTION INSTALL WYES OF LIKE MATERIAL � II I NO GRAVEL ON SCH 40 STANDARD SERVICE CONNECTION MORTAR TO WITHIN 1 1/2" OF TOP OF FRAME. FRAME AND CORER WHEN 2" SCH. 40 GAL TOP OF MANHOLE /S LOW 100 YR FLOOD LEVEL. STEEL VENT PIPE STANDARD MANHOLE FRAME ELEVATE FRAME AS REQ D AND COVER DESIGNED FOR ':' W17H CONCRETE OR BRICK H-20 LOADING W/310 LB. `: ; &MORTAR TO MAKE LID MINIMUM WEIGHT. USE 33 / FLUSH WITH PAVEMENT OR MANHOLES ALONG OUTFALL 12" DEWEY BROTHERS MH-RCR-2001 OR EQUAL. SEAT FRAME ON 1/2" MIN. GRADE UNLESS SHOWN OTHERWISE ON PLANS L/NCS SHALL EXTEND GRADE a ''' OF CEMENT MORTAR 18 MIN/MUM ABOVE GRADE UNLESS SHOWN OTHERWISE d ON PLANS ,.j " III_ _ 6" t d 'I°. MANHOLE COVER TO HAVE THE WORDS /N FLOOD PRONE AREAS, d v "SANITARY SEWER" USE WATERPROOF FRAME . ONTO COVER. ^' AND COVER, DEWEY BROTHERS AND 4 UH-RCR-2001W OR EQUAL. d 0 ST9. MANHOLE $ ° ° MANHOLE FRAME & COVER ON ' STD. M.H. SEAL AROUND PIPE WITH HYDRAULIC ° CEMENT OR MASTIC. NEW INSTALLATIONS TYPICAL MANHOLE VENT DETAIL NOTES: I. WHERE CONSTRUC77ON EASEMENT IS 40' WIDE CONSTTUCT/ON OR PERMANENT EASEMENT AVAILABLE FOR EMBANKMENT, GENERALLY GRADE ENTIRE PERMANENT EASEMENT AT 2-T MAX CROSS SLOPE. /N ANY EVENT, PROVIDE 2% MAX SLOPE FOR 10' MIN. EACH SIDE OF MANHOLES. 2• PLACE EMBANKMENTS /N CONS7RUC77ON EASEMENT. WHERE CONS7RUCTlON EASEMENT /S NOT BASE AVAILABLE, PLACE EMBANKMENTS /N OUTER PORT/ON OF PERMANENT EASEMENT. EMBANKMENT SLOPE SHALL NOT EXCEED 3.• 1 EXCEPT WHERE SPECIFICALLY N07ED ON PLANS OR SUFFICIENT EASEMENT /S NOT AVAILABLE TO MAINTAIN A 12' MIN. TRAVELWAY AT 29 MAX CROSS SLOPE. 3. SLOPE OF FINISHED GRADE ALONG PIPE LINE SHALL NOT EXCEED 209: 4• PROVIDE CULVERTS OR FORDS AT CREEK CROSSINGS SO THAT EASEMENT WILL BE ACCESSIBLE FOR MAINTENANCE EQUIPMENT. - TYPICAL SANITARY SEWER EASEMENT CROSS SECTION CONCRETE ENCASEMENT GOOD PS/ M/X) FULL PERIMETER FINISHED GRADE\ 18" d a d z o m COURSE 4: lco c' a COMPACTED BACKFILL 4 o RAISE FRAME AS REOUIRED W17H CONCRETE OR BRICK & n a 77LT FRAME AS REQ D TO MORTAR TO MAKE LID FLUSH CONFORM TO PAVEMENT W17H FINISHED PAVEMENT. SLOPE. 570. MANHOLE MANHOLE FRAME & COVER ADJUSTMENT ON STREETS BEING RESURFACED Manhole 18" INSTALL CLEANOUT PLUG IN A CAST IRON BOX WHEN CLEANOUT IS IN A PAVED AREA,IN THE SHOULDER OF THE ROAD OR OTHER AREA SUBJECT TO TRAFFIC. USE: RUSSELL MBX-2, VULCAN V8404-2 OR SUMTER MACHINE MB2-MBC2 CAST IRON BOX. Q: WATER 77GHT PLUG W O SEWER CLEANOUT CONC COLLAR R INSTALLED TO C.O.A. SPECIRCA77ONS SEE CONC. COLLAR DETAIL 7_��4:5'- CLEANOUT WATER/AIR 77GHT PLUG WYE Y EXTEND SERVICE LINE BEYOND CLEANOUT. k COMBIA6477ON (WYE AND BEND) RT77NGS WILL NOT BE ACCEPTED ON SERVICE CONNECTIONS. Schedule 40 Pipe W/ Glue Cap. Approx. 18" Long. Pipe Size As Shown On Plan C Install Washed Stone Under Pipe t PLUG FOR FUTURE SEWER LINE CONNECTION AT MANHOLE Stub Proposed Pipe 3" into M.H. Grout on Inside of M.H. Around Connection W/ Hydraulic Cement IS' Core Hole And Install Rubber Boot If Possible Proposed Connection Existing Concrete Shelf -11 - 4 d a e a d d d a a I a- D Washed 'dD .Q d D D Stone MAIN LINE CONNECTION TO EXISTING MANHOLE PIPE DIA. +18" COMPACTED EARTH- g /HAND PLACED �N I` O Qk v GRANULAR STONE RLL GRANULAR STONE FILL NOT REOUIRED WITH DUC77LE IRON PIPE. P. V C. PIPE FOR RESIDENTIAL USE ONLY. SINGLE WALL(SDR J5) PVC PIPE BEDDING 1/2" ANCHOR BOLT 077 4" PROJECTION & NUT. PIPE DIA. +18" /COMPACTED EARTH HAND PLACED IN 112 DIA. GRANULAR STONE F/LL A.B.S. PIPE FOR RESIDENTIAL USE ONLY. A. B. S. TRUSS PIPE OR PVC PIPE CENTERED ON PIER } w m m a Z It BRICK R /� /�/� g�Nro CABRYSOLF�/DpT/JA1DAT/B.ROCK END VIEW TRUSS PIPE BEDDING 3/8" x 2" F.B. STRAP WITH 2 �Ylil�%la:� BRICK PIER FOR EXPOSED PIPE S B 45' BEND . g S WYE�s PIPE DIA. +18" PIPE DIA. +18" g COMPACTED EARTH-� COMPACTED EAR TI� /HAND PLACED /HAND PLACED � / W -T m m Q W ° a Q d. k O m R , GRANULAR STONE FILL GRANULAR STONE FILL CRUSHED STONE DETAIL OF CLA Y PIPE BEDDING - ENCASEMENT FOR CLAY PIPE 14 -20 FT. DEEP APPLY BITUMINOUS COATING 4 >{14 BARS VERT (BENT) ,43 BARS ® 12" O.C. TO ALL EXPOSED METAL. PIERS OVER 3'-O" /N HEIGHT TO BE REINFORCED. 1/2" ANCHOR BOLT WITH 4' PRO✓EC77ON & NUT. SECT/ON 3"� J. BATTER I' PER FT ,. 3/8" x 2" F.B. STRAP WITH ' 4 //4 BARS BENT I �2 1/2" LEGS 3" m 9" 43 BARS 0 12" O.C. aN 1:2:4 CONC. . 3 3" rom 1 9" I II I I VA RA CARRY F0077NG TO BED ROCK II OR SOLID FOUNDAT/ON. END VIEW SIDE VIEW CONC. PIER FOR EXPOSED PIPE WATER 77GHT PLUG Ng a= 1' PROVIDE ADD177ONAL DEPTH AS -p 1 REQUIRED FOR GRAVITY FLOW. I 45' BEND T PROVIDE WATERTIGHT SEAL AT CONNECT/ON x N D AECONE SECTION ONOT � O ENTER MANHOLE THROUGH O D Do ' vp n SERVICE DROP INTO MANHOLE TEMPORARY WATER r77GHT PLUG i MIN. GRADE OF 1/4" PER FT. WATER 77GHT PLUG EXTEND SERVICE BEYOND CLEANOUT. Ng 45' SENn EXTEND SERVICE BEYOND CLEANOUT. TEMPORARY WATER WYE—- TIGHT PLUG MIN. GRADE OF114- PER FT. 1 H 6" vvv MIN. PROVIDE ADDITIONAL DEPTH AS REQUIRED FOR GRAVITY FLOW. x T `O 145' BEND -8"x4" WYE B � _I 4"MIN _ENCASE V.C. WYES /N I CONCRETE ONE FOOT EACH SIDE OF FIT77NG. SEWER MAIN o SERVICE DROP INTO SEWER MAIN DROP TYPE SERVICE CONNECTION Know what's below. Call before you _ toN �CO d 44, OAVI `•'tea � 0 o 0 � N 17T CZ �U ° Z z fw (Z cQ o a� e ' Iv i C U E 3 � I C i; �n rZ L" m l7 l7 N N Z W 0 �O .Z_ U Z or W W Ln O O 30 OOZ W W Cl- In a a hi o, � O O Z N W Z C)C) _ � � r� U Q Z Q w O om W W � cn W W , N Z C) _ Z a Z W O z S Q m m hS vCU Q hi v 3 U v s O Z o Ln p p U Sheet No. i P 577C �-UNDISTURBED EARTH PLASTIC PLASTIC O . PLASTIC PLAS77C CONCRETE THRUST BLOCKING SCHEDULE Rtlin9 Min. Blocking Area ft.` Min. Concrete Re o d S&. Tee 90' 45' j j4. 7EE 90, 45' 1 A, 4 1 2 1 1 0.1 0.1 ai 0.1 6 2 3 2 1 a/ 0.1 0.1 0.1 8 4 5 3 2 01 a2 0.1 0.1 10 6 8 4 2 a2 0.3 0.1 0.1 12 8 11 6 3 0.3 a5 a2 0.1 14 1 11 15 8 4 a5 a8 0.3 0.1 16 14 19 11 6 a7 1.1 a5 a2 18 17 24 13 7 0.9 1.5 a 0.3 20 21 30 16 9 1.2 2.1 a8 a 24 31 43 23 1 12 1 2.2 1 3.5 1 1.4 a 6 30 48 67 36 19 4.2 6.8 2.7 1.1 36 68 96 52 27 7.0 11.7 4.7 1.B INCREASE BLOCKING AREA AND CONCRETE QUANTITY FOR PRESSURES ABOVE 200 PSI. OR POOR SOIL CONDITIONS. KEEP CONCRETE AWAY FROM JOINTS. PLACE CONCRETE FAIRLY DRY AND FORM IF REQUIRED FOR MAXIMUM AREA AGAINST UNDISTURBED SOIL. ALL FITTINGS AND ACCESSORIES TO BE WRAPPED WITH 10 MIL POLYETHYLENE PRIOR TO POURING BLOCKING. USE 3000 F.S.I. CONCRETE. EXTEND PIPE FOR PLUGS ON ALL TEES AND CROSSES USE RESTRAINED JOINT FITTINGS AND/OR CLAMPS ON ALL JOINTS OF PLUG INSTALLA7ON CONCRETE THRUST BLOCKING PROVIDE JOINT RESTRAINT CLAMP ON EXIS77NG LEAD JOINT RT771VGS AS AVAILABLE FROM LAWS METER AND SUPPLY OR EQUAL. \ TAMPED PROVIDE MECHANICAL JOINT PLUG AT END OF PIPE 4' WEDGE-ACADN RETAINER GLAND I, DIMENSION A" PLUS TRENCH DIMENSION O DIMENSION A" PLUS UNDISTURBED SOIL •a ; TRENCH DIMENSION MECHANICAL JOINT SLIP SLEEVE . .4W/ WEDGE AC77ON RETAINER GLAND A PLUS . SECTION TRENCH DIM J REINFORCING : 6 "--16" P/PE, 12 17 BARS, 24 "-36" P/PE, 12 /8 BARS, 3 ON EACH SIDE r� UNDISTURBED SOIL ---," OIL � _ _ II - IIlip x H c ° TAMPED BACKFILL PIPE x <a z <�a Z °.4 a . -III-III a ° •-III-III-III a a. ----'UNDISTURBED SOIL ' SCHEDULE PIPE DLA. CONC. THRUST BLOCK A. B" 6",8",12" 12" 12" 16" 16" 12" 20" 16" 12" 24" 16" 12" 30. 16" 14" 36" 16" 16" SIZE OF CONC THRUST BLOCK AROUND PIPE TO BE DETERMINED BY DITCH (TRENCH) DIMENSION PLUS EXTENSION �4" INTO SIDES AND BOTTOM AS SHOWN IN SCHEDULE. CONC INTO SIDES OF DITCH TO BE POURED AGAINST FIRM, UNDISTURBED GROUND. FILL AGAINST CONC. BLOCKING TO BE COMPACTED TO 95Z PROCTOR FOR LENGTH ALONG PIPE OF AT LEAST 6'-O" EACH SIDE. WHERE THRUST BLOCKING OCCURS, THE 7RENCH SHOULD BE AT MIN/MUM WIDTH. THRUST COLLAR INSTALLATION 1 '-6" MIN4r", HYDRANTS SHALL BE MUELLER CENTURION A-423, / DRESSER M&H STYLE 929 OR AMERIC.AN A 2780. HYDRANT TO BE PLACED WITH PAINT BARREL RED W17H WIHTE TOP AND CAPSPUMPER NOZZLE FACING CLOSESTCURB OR STREETINSTALL HYDRANT SO BREAKAWAY FLANGE IS NOT LESS THAN 2" NOR MORE THAN 6" ABOVE FINISHED GRADE.REMOVE CHAINS FROM HYDRANT - z CURB & GUTTER IRON VALVE B RESTRAINED / JOINTS \ UNDISTURBED SOIL I CONCRETE THRUST BLOCK ��♦�♦�♦�♦�♦�♦�♦�♦�♦�♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦j♦♦♦♦♦♦♦♦♦TAMPED S4CKFLL ♦♦♦♦♦♦♦♦♦� `��rrMIN OF 11J C Y WASHED STONE ♦ .� A�J 1 11` � UND/STURBED SOIL -I I -III 6" DUC77LE IRON PIPE J' I I ffff I -III -III -I I - "III=III- 6" G47F VALVE (BRICK OR CONCRETE BLOCK) CONCRETE BLOCKING. TOP OF BLOCK/NG TO BE 2" FROM HYDRANT WEEP HOLES. USE RE57RAINED JOINT FITTINGS ON ALL JOINTS OF HYDRANT INSTALLA7ON FIRE HYDRANT INSTALLATION CORPORA7ON STOPS METER SETTERS CORPORATION STOPS SHALL BE ALL BRASS METER SETTERS SHALL BE ALL BRASS MANUFACTURED CURB STOPS WITH AWWA C800 STANDARD THREADS MANUFACTURED IN THE FOLLOWING SIZES AND MODELS -CURB /N THE FOLLOWING SIZES AND MODELS. STOPS SHALL BE ALL BRASS MANUFACTURED SIZE MUELLER McDONALD FORD /N THE FOLLOWING SIZES AND MODELS - SIZE MUELLER McDONALD FORD 3/4" B-2404-24 20-209WDDD33 V5HC72-9W-11-33 SIZE MUELLER McDONALD FORD 3/4" H-15008 4701T F-1000-3-0 1" B-2404-24 20-412✓UDD44 V9HC74-12W-11-44 3/4" B-25172 6102WT B41-333-Q 1" H-15008 4701T F-1000-4-0 1 1/2" H-1423-2 2086150DFF666 V9HH76-128-11-66 1" B-25172 6102WT B41-444-0 1 1/2" H-15013 4701T F8-1000-6-0 2" H-1423-2 208715WDFF776 VBHH77-128-11-77 1 1/2" B-25172 6102WT B41-666-Q 2" H-15013 4701T FB-1000-7-0 2" B-25172 6102WT B41-777-0 SERVICE PIPE SERVICE PIPE SHALL BE SEAMLESS COPPER TYPE K" AS SPECIFIED BY ASTM BBB. SERVICE LINE TO BE INSTALLED AT SAME DEPTH AS WATER MAIN. WATER LINE DEPTH TO BE DEPTH AS SHOWN A MIN. OF 48" FROM TOP ON PLANS. OF PIPE TO FINISHED GRADE, UNLESS OTHERWISE SHOWN ON PLANS \ I I SERVICE SADDLE WITH DOUBLE STRAP & NEOPRENE GASKET. REQUIRED FOR ALL TAPS ON A. C. OR P. V C. PIPE. REQUIRED FOR 2" AND 1 TAPS ON DUC77LE IRON PIPE AND CAST IRON PIPE CURB & METER BOX LOCA77ON WITH SIDE WALK. METER(BY CITY) \ O CORPORA7ON STOP W17H COPPER P AWWA STD. TAPERED THREAD TYPE %C" SO SOFT METER BOX LOCA77ON WITHOUT SIDEWALK REQUIRED SHOULDER SIDEWALK e Q.6 - 9A ° III TAMPED BACKFILL r- /1 /1 A / A / r-/1 T/ /l A / RN/SHED GRADE zµ ZSZ N �Q�W SERVICE LINE 3' MIN. F EXTEND WATER SERVICE \ AS INDICATED ON TYPICAL METER BOX INSTALLA7ON DETAIL. UND/STURBE WATER LINE NOTES 1. PAVEMENT SHALL BE CUT TO TRUE LINE AND REMOVED BEFORE TRENCH IS CUT. 2. DIMENSION FOR TRENCH WIDTH MAY VARY AS REQUIRED TO ACCOMODATE EXCAVATION, SHORING AND COMPACTION EQUIPMENT. IN UNPAVED GRAVEL AREAS, REPLACE GRAVEL WITH J. WIDTH OF TRENCH FOR PIPE BEDDING TO BE AS SHOWN UNLESS A GREATER WIDTH /S RECOMMENDED BY PIPE MANUFACTURER OR REQUIRED FOR USE OF EQUIPMENT ON SITE. AGGREGATE REQUIRED MATCH EXISTING PAV'T CUT TO EXTEND 6" BEYOND EDGES OF TRENCH AS SHOWN. SURFACE COMPACTED TO 6" THICKNESS 4. CONTRACTOR SHALL OBTAIN TESTING SERVICES ON COMPACTION OF THE BACKFILL FROM A FIRM WITH AN APPROVED NCDOT PAWT SHALL BE CUT TO TRUE LINE AND REMOVED BEFORE TRENCH IS CUT. CERTIFIED TECHNICIAN, AND PROVIDE REPORTS (WITH THE CERTIFICATION TESTING NUMBER) VERIFYING THAT THE COMPACTION ALL PAV'T REPAIRS TO BE IN ACCORDANCE WITH N.CD.O.T. SPECS CONFORMS WITH THE LATEST EDITION OF THE NCDOT STANDARD SPECIFICATIONS PAV'T CUT TO EXTEND 6" BEYOND EDGES OF TRENCH AS SHOWN. TRENCH SHALL BLED AND THOROUGHLY TAMPED WITH SUITABLE WHERE EXISTING PAVEMENT /S INSUFFICIENT THICKNESS TO MATERIAL TO LEVEL OF OF STONE. (SEE NOTE 2) DEVELOP TIGHT SEAL WITH NEW SURFACE, NEW PAVEMENT 1' 3' TRENCH WIDTH 1' STONE & PSHALL LAP EXISTING SURFACE. V'T TO BE REPLACED BY CONTRACTOR WITH LEAST ALL PAV'T REPAIRS TO BE IN ACCORDANCE WITH N.C.D.O.T. SPEC. PAVEMENT CUT INTERFERENCE WITH TRAFFIC. (SEE NOTE 1) �2" S9.5B ASPHALT PAVT SHALL BE CUT 70 TRUE LINE CUT IN CONCRETE 12" COMPACTED AND REMOVED BEFORE 7RENCH IS CUT. TO BE SAWED ABC STONE OR AS REPAIR W17H 2" TYPE S-9.54 OR EXISTING .e.e°e°e.e.e.e.e.e.e°e°e.e.e 6" OF 119.0E OR B25.0B ASPHALT PLACED DIRECTED BY ENGINEER 5-9.58 ASPHALT PAVING PAVEME AND COMPACTED IN TWO (2) 3" LIFTS STRUGT - - EXIS77NG PAVT -1 I I I SELECT BACKFILL OR 6 6' I I- ABC STONE PLACED AND EYISTNG PAVT X MINIMUM DEPTH OR -I COMPACTED IN 6" LIFTS AS SHOWN ON PLANS IN CONFORMANCE WITH THE LATEST IF=6 6 EDITION OF THE NCDOT STANDARD SPECIFICATIONS REPLACE PAV7 3" 1= (SEE NOTE 4) 7HICKER THAN CUT PA II e" STONE '' 3' MINIMUM DEPTH i` TAMPED BACKFILL PIPE BEDDING MATERIAL (SEE NOTE 3) OR AS SHOWN ON PLANS USE SAND AROUND ALL PLASTIC WATER LINES PIPE USE 167 STONE AROUND CLAY AND 8" AND LARGER PLASTIC SEWER PIPE PIPE I X = Y = 4 AROUND ALL PLASTIC WATER LINES, CLAY AND 8" AND I I I I LARGER PLASTIC SEWER PIPE I X = Y = 0" AROUND ALL DUCTILE IRON AND COPPER PIPE, AND 4" & 6" BACKFILL & 7HOROUGHLY TAMP -I SCHEDULE 40 PLASTIC SEWER PIPE WITH SUITABLE MATER14L 9'I Y = 6" UNDERCUT REQUIRED AT ANY INSTALLATION WHERE ROCK IS L TO LEVEL OF S70NE PRESENT AT BASE OF TRENCH TRENCH TO BE 18" WIDER THAN PIPE DLA. OR WIDER /F REQUIRED FOR TAMPING SHAPE BED TO FIT AT LEAST 109' OF OUTSIDE DIAMETER OF PIPE EOUIPMENT IN TYPICAL TRENCH SECTION AT SITE PA VEMENT REPAIR TYPICAL OPEN CUT OF NCDOT SECONDARY ROAD IN CONC. PAVED AREA T-/l r7 7 /7 11 r) / A A AT-TT-m A A / r) (- A A A / / r-n n / r-) r- PARALLEL WATER & SANITARY SEWER PIPE DETAIL NISHED GRADE FI2' SQUARE - 3000 PS/ CONCRETE -,fff`' ENCASEMENT AT 6" M/N/MUM THICKNESS MAKE CONCRETE MATCH PAVING THICKNESS IN CONFORM TO SLOPE ON F/NISHED GRADE. S7REETS BEING RESURFACED. 1/2" IN AREAS NOT PAVED' INSTALLATION ON SLOPE VALVE BOX COVER � Ilj FINISHED GRADE BASE COURSE ♦♦♦♦♦♦♦ TAMPED BACKRLL SCREW P' :i PROW.PROWDE S7FM EX7ENSIONe . TO EXTEND OF i VALVE BOX SHOULD NOT CONTACT MAIN OR VALVE ♦♦♦♦♦♦♦♦♦ ♦ ♦ ♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ ......................... U TAMPED 84CKRLL - 3' MINIMUM DEPTH OR AS SHOWN ON PLANS PIPE BACKFILL & 7HOROUGHLY TAMP WITH SUITABLE MATERIAL TO LEVEL OF STONE TRENCH TO BE 18" WIDER THAN PIPE DLA. OR WIDER /F REQUIRED FOR TAMPING EQUIPMENT W USE AT S17E TYPICAL TRENCH SECTION IN BITUMINOUS SURFACE PAVED AREA THESE SECTIONS ARE NIA ON NEW STREET CONST. CAST IRON METER BOX RUSSELL NO. MBX-2 OR VULCAN NO. V8404-2. 2" BRASS CURB S-MP W/ BRASS PLUG. - USE MUELLER B-25172, McDONALD 6102K - - 2" COMPRESS/ON x MALE COUPLING OR FORD 841-777-0. - 2"x6" BRASS NIPPLE 2" COPPER PIPE 71 COEC.D HRUST ETAICOLLAR \ TYPE K" SOFT TYPICAL BLOW OFF AT END OF VER LINE ✓ 7 3" AND LARGER • A \\\ " AND LARGER WATER MAINS WATER LINE MECH. JOINT PLUG W/2" TAP CAST IRON METER BOX ^RUSSELL NO. MBX-2 OR VULCAN NO. 148404-2 1" BRASS CURB STOP W/ BRASS PLUG. I" COMPRESS/ON x MALE ADAPTOR USE MUELLER B-25172, McDONALD 6102WT, OR FORD 641-444-Q. I' COPPER PIPE TYPE K" SOFT 2 "x 1 " BRASS REDUCER -CONCRE7E BLOCKING 2" PVC WA7ER LINE 2" D.I. BELL X MALE THREAD ADAPTER 2" BRASS TEE 2" BRASS PLUG TYPICAL BL OW OFF A T END OF 2 " WA TER MAIN ^^� 2" BRASS FLARED OR I CAST IRON METER BOX COMPRESSION FITTINGS. RUSSELL NO. MBX-5 2' SQUARE 300 P.S./. CONCRETE OR VULCAN NO. VMB-3 ENCASEMENT. REQUIRED /N STREETS 2" CORPORA7ON STOP BEING RESURFACED. NOT REQUIRED 2" BRASS CURB STOP W/ BRASS PLUG ON NEW INSTALLATIONS IN PAVEMENT. USE MUELLER B-25172, McDONALD 6102WT OR FORD B41-777-0 -TAMPED BACKFILL I I �-2" TYPE K" COPPER TUBING /F ADD177ONAL ADJUSTMENT /S I I I NEEDED USE 6" D.I. PIPE 2" SERVICE SADDLE AA 7 - MA NR - - SPECIRCA77ONS FOR COMPONENTS ARE THE II SAME AS FOR SERVICE CONNEC7ONS 2 " AIR RELIEF ASSEMBL Y III III III III III I I III III III III III III -BLOCKING (BRICK OR CONC. BLOCK) I II 1 VAL UE T J. W/ RESTRAINT JOINT UNDISTURBED SOIL USE RE57RAlNED JOINT FITTINGS OR HYDRANT TEE GATE VALVES SHALL BE: MUELLER A - 2360 - 20, MUELLER A - 2370 - 20, MULLER A - 2380 - 20, M & H 67 - 01, M & H 3067 - 01, OR AMER/CAN AVK SERIES 2500. (SIZE 3" - 12). VALVE INSTALLATION I" BRASS FLARED OR COMPRESS/ON FITTINGS. I CAST IRON METER BOX RUSSELL NO. M6X-2 OR VULCAN NO. V8404-2. SERVICE SADDLE WITH DOUBLE STRAP & NEOPRENE GASKET REQUIRED FOR 1" BRASS CURB STOP W/ BRASS PLUG ALL TAPS ON A. C. OR P. V C. PIPE USE MUELLER B-25172, McDONALD 6102WT i I I I I i I I i I -III- OR FORD -Q (1' II TYPE K COPPER TUBING I II I = MAIN III I 1" CORPORATION STOP WITH -III-I AWWA STD. TAPERED 7HRE4D. III USE MUELLER H-15008, -III- IIII McDONALD 4701T, OR FORD F-1000-4-0. I " AIR RELIEF ASSEMBL Y TAMPED BACKFILL zv Z g SAND BED �O /10 COPPER WIRE REQUIRED FOR LOCA770AI OF PLASTIC PIPE c Z �r g ATTACH WIRE TO ATTACH WIRE TO EACH PIPE W/DUCT TAPE 6" PIPE 6" VALVE BOX W/ 1/4" DIA. EVERY 10 FEET. MIN. DIA. MIN. BRASS BOLT DRILLED AND TAPPED INTO VALVE BOX. TYPICAL TRENCH SECTION FOR 2 " P. V, C. PIPE ONL Y 2" CURB STOP W/VALVE BOX 2" CORPORATION STOP I I -I I I- CORPORAT/ON STOPS AS CORPORATION SPECIFIED /N SERVICE 2" TYPE K" COPPER _- CONNECTIONS I -III PIPE (5 FT. LONG) 2" CURB STOPS SHALL -III BE ALL BRASS BALL -II TYPE CURB VALVES I MANUFACTURED BY _III WATER MAIN MUELLER 8-25170, _ McDONALD 6102W7; I -III 2" PIPE OR FORD 841-777-0. 2" D./. BELL X MALE THREAD ADAPTER -III-II 2" SERVICE SADDLE ON NEW INSTALLA7ONS 2" BRASS NIPPLE & DRESSER COUPLING SIMILAR INSTALLATION I -III -III_ FOR SMALLER PIPE TO CONNECT EXISTING PIPE 2 " WA TER LINE CONNECTION TAP 2" CURB STOP W/VALVE BOX 2"x12" BRASS NIPPLE CONC. THRUST COLLAR (SEE DETAIL) 2" PlIE 3"AND LARGER WATER UNE 2" D.I. BELL X MALE THREAD ADAPTER ON NEW INSTALLA77ONS MECH. JOINT PLUG W/2" TAP 2" BRASS NIPPLE & DRESSER COUPLING TO CONNECT EXISTING PIPE 2" WATER LINE CONNECTION TO PLUG SERVICE SADDLES MBX 5 METER BOX (Flush with Grade) METER SETTER ETER ER FURNISH AND INSTALL DOUBLE STRAP SERVICE SADDLES FOR ALL TAPS MADE BE S ET AS ON A. C. OR AVC. MAINS, AND ON ALL 1 1/2" AND 2" PS MADE ON DUCTILE TA METER LEVEL IRON PIPE SADDLES FURNISHED SHALL BE MANUFACTURED FOR TYPE OF PIPE POSSIBLE INTO WHICH TAP IS MADE IN THE FOLLOWING SIZES AND MODELS AND SHALL METER SETTER 9" INCLUDE A GASKET- TO BE SET AS COMPACTED LEVEL AS BACKFILL SIZE D.I PIPE SMITH-BLAIR MUELLER FORD POSSIBLE 3/4" NOT REQUIRED 317 BR2 F202 9" METER COMPACTED 1. NOT REQUIRED 317 BR28 F202 BACKFILL 1 1/2" SERVICE SADDLE WITH 1 1/2" CC (O.D.X 1 1/27 317 BR2B F202 2" SERVICE SADDLE W/TH 2" CC (O.D.X 2) 317 BR2B F202 CURB STOP CTS x MPT (REQUIRED FOR SIZE 2" PVC PIPE SM/TH-BLA/R ROMAC FORD EACH METER) CURB STOP �SETTER� 3/4" SERVICE SADDLE WITH 3/4" cc (O.D. X 3/49 315-025607-000 101S-250-3/4cc FC101-250-cc3 (REQUIRED FOR EACH METER) 1" SERVICE SADDLE WITH 1" cc (0.A X 1 ) 315-025609-000 101S-250-lcc FC101-250-cc4 BRASS SOR 9 160 PSI PE LARGER SERVICES FOR PVC PIPE WILL REQUIRE A TEE FITTING INSTALLED /N THE MAIN LINE. UNION SDR 9 160 PSI PE PLASTIC PIPE OR TYPE SETTER PLASTIC PIPE OR TYPE K" COPPER TAIL PIECE 'Y" COPPER TAIL PIECE METER BOXES III METER BOXES SHALL BE MANUFACTURED IN THE FOLLOWING I - 3' MIN. I� SIZES AND MODELS: 3' MIN. [- 2" LONG BRASS NIPPLE PLUG END SIZE RUSSELL VULCAN SUMTER MACH/NE PLUG END OF PIPE 3/4" MBX-2 V8404-2 MB2-MBC2 OF PIPE <IZBRICK BRASS BARBED COUPLING 1. MBX-2 V8404-2 MB2-MBC2 BRICK ON EACH CORNER ON EACH CORNER W/ STAINLESS STEEL 1 1/2" MBX-5 VUB-3 MB8-MBC6 CLAMP ON PLAS77C PIPE 2" MBX-5 VMB-3 MB8-MBC6 TYPICAL I % " & 2 " METER BOX INS TALLA TION TYPICAL 3/ " & I" METER BOX INSTALLATION =a 7 z �= _ to N C14 CO d N pz `-� O E I c lu h � I C m N N Z W OU �O U Z W W L O O Z O' LLJ 30 0Z hi o� O O � Z � N W Z O -' V Z ton Z i OQ W O m 0 O W w W� Q w , F- N L � o U O a Z W z Q m 00 u hS v� hi v 1` 3 C3 Y v cu s O Z o Ln p p U Sheet No. 2 i