Loading...
HomeMy WebLinkAbout420010_Compliance Evaluation Inspection_20190916Facility Number L/ - U Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Co,qqyrtance Inspection 0 Operation Review 0 Structure Evaluation O Technical Assistance Reason for Visit: 16Routine O Complaint 0 Follow-up 0 Referral O Emergency 0 Other 0 Denied Access Date of Visit: FT Arrival Time: Departure Time: County: Region: Farm Name: _ a Wl �Z -. Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: eV� 2�& N e e rL Certified Operator: Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. Wean to Finish Wean to Feeder fjw&r to Finish Farrow to Wean 7• I IS Farrow to Feeder Farrow to Finish Gilts Soars Other Other Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Wet Poultry Capacity Pop. k a er I I :::]on -Layer Pullets Other Poults Design Current Design Current Cattle Capacity Pop, Dairy Cow Dairy Calf DaiEy Heifer Dry Cow ,Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts I . Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes, ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes gNo 7[[] NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 2/4/2015 Continued Faeffl Number: tl Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ YesVNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):{, 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ YesNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes No [:]NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmZNo rent, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes OrNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ YesNo ' ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): y) ►7,1 i A r o V 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ YesVN ❑ NA [:]NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 0 NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o E:]NA [:]NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? [] Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes EyNo ❑ NA ❑ NE ❑ Waste Application [_j Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Weather Code ❑ Rainfall ❑Stocking ❑Crop Yield ❑ 120 Minute Inspections E] Monthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yesw,4❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: (/I--- Date of Inspection: 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesN ❑ NA [:]NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Yes No ❑ NA ❑ NE the appropriate box(es) below, 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No .'A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 1:7, J ,-,e-s- 31. Do subsurface tile drains exist at the facility9 if yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ LagoonlStorage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer'Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations di- any other comments. Use drawings of facility to better explain situations (use additional pages as necessary).. (1, J5 e Ste r1)at z•p3 Reviewer/Inspector Name: Reviewer'Inspector Signature: 0 t.. f e to 7G,y-e i ( Page 3 of 3 Phone: _�I I ` ydt O O Date: 2—f7 —19 2/4!1015 12 r Ve 1:7, J ,-,e-s- Reviewer/Inspector Name: Reviewer'Inspector Signature: 0 t.. f e to 7G,y-e i ( Page 3 of 3 Phone: _�I I ` ydt O O Date: 2—f7 —19 2/4!1015