Loading...
HomeMy WebLinkAbout20191115 Ver 1_SAW-2019-01479 _ Abner Wayne Staples No Permit Required_20190920From: Stygar, Krystynka B A21 SAW To: George Wood; Kathy Cagiano Cc: Scarbrauah, Anthony; Pullinger, Robert C Subject: [External] SAW -2019-01479 : Abner Wayne Staples (Camden NWP 14 : NPR) Date: Friday, September 20, 2019 3:32:17 PM Attachments: Staoles PJD.Ddf NPR Abner Staples.pdf Abner Wayne Staoles - Plats (Fill Permit Plat Revised).odf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam e.nc.gov> George, Good afternoon, attached you will find a NPR, as well as the PJD for the PCN that was submitted for Abner Wayne Staples. The activity as described falls under the exemption for Farm Roads. I have received concurrence from FWS-Raleigh office in regards to the location of the project being in a RED HUC for the NLEB. As long as the activity is preformed not during the timeframe of June 1- July 31 , this activity remains exempt. Please advise your client that : Roads and associated construction must abide by the following: - They must be constructed and maintained in accordance with best management practices to assure that flow and circulation patterns and chemical and biological characteristics of waters of the U.S. are not impaired and that the reach of the waters of the U.S. is not reduced, and that any adverse effect on the aquatic environment are minimized. Roads and trails shall be held to the minimum feasible number, width, and total length consistent with the purpose of specific farming, silverculture or mining operations, and local topographic and climatic conditions. -Roads shall be located sufficiently far from streams and other water bodies to minimize discharges of dredged or fill material into waters of the U.S. -Road fill shall be bridged, culverted or designed to prevent restriction of expected flood flows -Fill shall be properly stabilized and maintained during and following construction to prevent erosion -Discharges shall be made in a manner that minimizes the encroachment of construction equipment in waters of the U.S. outside of the fill area -Vegetative disturbance shall be kept to a minimum -Construction and maintenance of crossing shall not disrupt the migration or other movement of aquatic life -Borrow material shall be taken from upland sources where feasible -The discharge shall not take, or jeopardize the continued existence of, a threatened or endangered species, or adversely modify or destroy the critical habitat of such species -Discharges into breeding and nesting areas for migratory waterfowl, spawning areas, and wetlands shall be avoided -The discharge shall not be located in the proximity of a public water supply intake -The discharge shall not occur in areas of concentrated shellfish production -The discharge shall not occur in a component of the National Wild and Scenic River system -The discharge of material shall consist of suitable material free from toxic pollutants in toxic amounts. -All temporary fills shall be removed in their entirety and the area restored to its original elevation. Please let me know if there are any questions or modifications to this PCN. At this time USACE will not require mitigation for the proposed activity. Regards, Krysta Krystynka B. Stygar Regulatory Specialist US Army Corps of Engineers Wilmington District Washington Field Office (910) 251-4619 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 <Blockedhttp://corpsmapu.usace. army.mil/cm_apex/f?p=13 6:4:0> Thank you for taking the time to visit this site and complete the survey. U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW -2019-01479 County: Camden County NO DEPARTMENT OF THE ARMY AUTHORIZATION REQUIRED Property Owner: Abner Wayne Staples Address: 1358 South 343 Shiloh NC, 27974 Telephone Number: 252-333-4100 Size and Location of Property (waterbody, road name/number, town, etc.): The property for this NPR is approximately 188 acres in total off of Garrington Island Road, Shawboro, Camden County, North Carolina. It is directly adiacent to the North River, a known Traditional Navigable Waterbody. Description of Activity: The construction of a Farm Road to be installed over wetlands with a top width of 25 feet (to allow for farm equipment) and side slopes of 2:1 to the approximate height of 3 feet. The amount of fill is 8,708 SF of clean fill with two 40-18" culverts to not restrict the flow and circulation of waters of the U.S. Your work as proposed does not require Department of the Army authorization for the following reason(s): _ The entire property is composed of high ground. Therefore, your proposed activity will not occur in any aquatic resources. _ The proposed activity will occur in non jurisdictional waters and/or wetlands. _ The proposed activity is not regulated and/or does not include regulated discharges of dredged or fill material. A jurisdictional determination was not completed with this request. This letter does not address nor include any consideration for jurisdiction on aquatic resources and shall not be interpreted as such. This is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. X The proposed activity is exempt from Department of the Army regulations. A jurisdictional determination was not completed with this request. This letter does not address nor include any consideration for jurisdiction on aquatic resources and shall not be interpreted as such. This is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. Remarks: Work on this farm road needs to be completed outside of the time period of June 1- July 31. As the location of the property is known maternity roost sites for the Northern Long -Eared Bat. This Department of the Army determination does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. For any activity within the twenty coastal counties, before beginning work, you must contact the N.C. Division of Coastal Management in Elizabeth City, North Carolina, at (252) 264-3901 to discuss any required State authorization. Any changes in the above described work must be coordinated with the Corps of Engineers prior to commencement. If you have any questions regarding the Corps of Engineers regulatory program, please contact #PM_FULLNAME at telephone number 910-251-4619 or Krystynka.B.Stygar@usace.army.mil. Regulatory Project Manager Signature Date: September 20, 2019 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://corpsmapu.usace.army.mil/cm apex/Pp=136:4:0. A. Determination of Jurisdiction: 1. ® There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are no waters, including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued . Action ID: SAW - B. Basis For Jurisdictional Determination: This site exhibits wetland criteria as described in the 1987 Corps Wetland Delineation Manual and Atlantic and Gulf Coast Regional Supplement and is hydrologically connected to the North River a tributary to the Albemarle Sound a Traditional Navigable Water. C. Remarks: D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by NA . It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Corps Regulatory Official: Krystynka Stygar Date of JD: September 20, 2019 Expiration Date of JD (if applicable): NA Copy furnished: Agent: Environmental Professionals, Inc GeorEe Wood Address: Post Office Box 3368 Kill Devil Hills, NC, 27949 A"062 -Staples Gamingion Island Road Properties - Camden b �2 °o cawwy� CNN Z 2 Z O �g m2 am ov X20 m lr� a) o00�wco01 4 IDI o a n m m H N O H O m m Q oti � W m C) � a�-m 0 o 0 0 m ° ° 07, —yM wo'<w y 0 O o ° 1A m N rn Z C V A m m xA z0 D m 3 m 'O w IT aW Vim Z> 'M °o OF 0o 2 m D ��E r o°°° O ° O 0 0 0° O co 0 0 o o O° O O o O O° O O° O M{mr N °° O o ° o Z r a o 0 00D Z oo m C) ?m,mgwmm� N c" C b O D X m D Z O N V7 _ °CayyO 1 2O N (a it \ m. D3'n(A O o r D DO i au NN a z Hamm LrLT O z m Z o y omnia 43 N O x T o° aN m �m ° o 0 0 0 0 0 0 a o 0 0 0 O 0 0 0 0 0 0 O 0 0 0 0 0 o° 0°° 0 0 0 0 0 0 0 0 m so b �2 °o 2 o ooFit O N �g m2 am ov X20 m lr� -0 Z 2 m o a n m m H N o�pr � H O o tmii n ° ITT io In b i�om as m 22C m0z OaCoA�mInr- — R1 �2z2mz2amA G1A-cmmmr -I m<m< m II0 III o O O I 0 l r I;0 II0�I I a 21�„s z V � o a W m 0 TIZm 2 m m lr� -0 Z 2 m yy H N H J H O a m Q oti � W m m 0 o 0 0 °dao ° ° ° 0 wo'<w m 0 O o ° 1A m N rn Z C V A m m xA z D m 3 m 'O w IT aW Vim < 0o m ° I M N o°°° O ° O 0 0 0° O n 0 0 o o O° O O o O O° O O° O I N °° O o ° o Z r 3 ° ° 0 v oo m n FA 10'.51 AM m V a crit ra 1- �i 2 m m lr� r J 2 m yy H N H J H O 0 0 0 0 0 m Q 'Tah rA Oe m m 0 rm° 0 0 ° ° ° 0 m m 0 O o ° 1A m m m° 0 I ° z 0 o ° 0 ° I 0o o°° 00 O°° o o° 0 0 0 ° O O°° °° O O O° ° I o°°° O ° O 0 0 0° O o o O° O O o O O° O O° O I °° O o ° ^ ° ° 1 Yn+ v o 0 1 I 2 N c" C b 4a ti Z O N V7 _ °CayyO 0 0 , o 010 00 OI O 0 O 0 0 0 0 0 0 1 0° 0 to O O ° O 0 0 0 0 0 0 0 0 ° ° ° 0 0 O o ° I o ° ° 0 0 0 0 I ° 0 o ° 0 0,0 I 0o o°° 00 O°° o o° 0 0 0 ° O O°° °° O O O° ° I o°°° O ° O 0 0 0° O o o O° O O o O O° O O° O I °° O o ° ^ ° ° 1 Yn+ o 0 1 I 2 y a 3 °CayyO 1 2O it \ m. D3'n(A DO i r v Hamm Z omnia 43 fA O 02CCn � a°abm CA 3 AyCp� °a �ymT-I -ta CA CA wm13 a mZyycan A oa°z° m om$- my�zc m' xm-°m n yy�OA gmomo3 m mmcmA a A 1'oOy mabx, i aomn,i O A�nvT m O y O ch a 0 yooma C) -0 y A1ytn i tl ?boa nIT' z-1 to a mO�X OT + OOm C mcg ACA I°*I c °x<mc SO zo miS3 "fib i 2µ I , e� c �D z:D L �% N . F r °: O �! �O 0 9� ------ 'OEV5 _ - `�_ _ �-� s A z O N� N12 IT, � C) 3 ° y A r O T ma�ib�O�l s,� 2b2mmai �i G)bm mac: —Im yIt u, mbdc�iM,mz fAct O rn Om it �mQTyyaxrm, 75--j 5 C:: ° r b A m n n 0 t�`a rm'C PIT O�DODO -jm- O~mAAO co omxooi3mm 2 y 2y2cly 2o�muo!-,tj IT, M ayzm� <m r2goy�-los mZ�OAmC� v y C a C z m 2 c2�A2N �cAccm-Im 5S Ju 6,- ??aa�Opa i2 �mFri mn O-O,I�OOZyA tRn y0� ya yao m THIS DRAWING PREPAREp • 0 FTC E ELIZABETH •OU0.SONa[HIeEDHROHOgPL22�.0FUnit GROUP T5503A274wwmmns North Carol[na 2 0 r mFri � 2 0 n D 174 `2 y wo m O A 0 ca rn � O a P A m Zo 3nmOm AA mm � zmo ao tiamr moa x°mm oat °oma-" mm �r NA�+ymmr� r G)n A22212nn :0rtl c�a<mmmrym«< m 0 • Q 0 o a 98'49 ]W9E�S"L9` ,94.89 r _ _ W a N ti 0 . 0 Z m -0Z m X oom f tiD e �m�� T rti 0av Ariz wv'6cn n"in nVmZX mm nr.7im a �N WQ) N csim�I� v a 0 u 0< cm No -+-0X 02 P 3 Om m n N! d o ;gyp pR PA�• . 0 Z m T rti In Ariz K< mZm �: con q Om m r ti Cb INJ om$p \ N d o ;gyp pR PA�• . 0 Z 22 oomo ovaA �vmo � 0 0 m ti Cb INJ om$p \ oOaA o tmn< Pn °pm `CSA \ 80 ca gg mr �m zi � Zm oOCA F m $D N < O m c� :0 N N W t O C) \ d o ;gyp pR PA�• . 0 Z r — -� 4L���lfz��' 11 at/021 aNd7S1 NOLO ISITYD m T I M M O N S GROUP .• •• y—Fl.U0.VISIONACHIEVED H0.OWHOU. THIS DRAWING PREPARED AT THE ELiL1EETN CITY OFFICE 1805 West City DHve, u,E I Ellaabe[h% NC 2]909 TEL 252.621.5030 FAX 252.562.6974 www.tlmm9ns" North C mllna U-11 No C-1652 Qo / ITE WETLAND LINE \(Typ) VICINITY MAP �/' ,•• N.T.S Zg f PR POSED PATPo Koevm�Y A 2 �LX2S'W SENMES/'i..,� A CESS ROAD D.B. 3'w PG. Sw 0 w tKI t f j N .8. 33227, PPG.SM 25.0' CL WETLAND LIN WETLAND FLAG, (TMP) PROJECT NOTES: TOTAL FILL AREA— 8,708 S.F. 15 30 80 211 �— GRAPHIC SCALE: 1" = 90' SECTION A—A r-= ro• FILL PERMIT ABNER WAYNE STAPLES PROPERTY DESCRIBED IN D.B. 327, PG. 508 CARRINGTON ISLAND ROAD SHILOH TOWNSHIP, CAMDEN COUNTY, N.C. 1.3C 71MAD onAwo K0. raaecras �o-aae i a• 1 &4Vf"V%%/L PRO A+ Planning for a Better Environment 1404 S Virginia Dans Trap P.O. BOX 3368 — KILL DEVIL HILLS, NC 27948 PRA'NE lxW I�90 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: September 20, 2019 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: George Wood, Post Office Box 3368, , NC, 27949. C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, Abner Wayne Staples/Camden/NWP 14, SAW - 2019 -01479 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Camden County City: Shawboro Center coordinates of site (lat/long in degree decimal format): Lat.: 36.30324° Long.: -76.0168580 Universal Transverse Mercator: Name of nearest waterbody: North River E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ® Office (Desk) Determination. Date: September 20, 2019 ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site Number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resources in review area (acreage and linear feet, if applicable Type of aquatic resources (i.e., wetland vs. non- wetland waters) Geographic authority to which the aquatic resource "maybe" subject (i.e., Section 404 or Section 10/404) Wetland 1 36. 30324 -76.016858 188 acres Wetland Section 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWT) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: George Wood for Abner Wayneples ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale:_ ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ® U.S. Geological Survey Hydrologic Atlas: USGS NHD 2019 USACE Mapper ❑ USGS NHD data. ® USGS 8 and 12 digit HUC maps. ❑ U.S. Geological Survey map(s). Cite scale & quad name: ® Natural Resources Conservation Service Soil Survey. Citation:WebSoilSurvey NRCSGoogle Earth Pro 2019 ® National wetlands inventory map(s). Cite name: NWIMapper :USACE 2019 ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100 -year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): Google Earth Pro 2019, 2018, 2017 or ❑Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Signature and date of Regulatory staff member completing PJD Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action.