Loading...
HomeMy WebLinkAbout20050861 Ver 2_Staff Comments_20070109 (41)Snow Creek Stream Restoration Subject: Snow Creek Stream Restoration From: Eric Kulz <eric.kulz@ncmail.net> Date: Tue, 09 Jan 2007 09:56:37 -0500 To: Ian McMillan <Ian.McMillan@ncmail.net>, Daryl Lamb <Daryl.Lamb@ncmail.net> CC: Larry Eaton <larry.eaton@ncmail.net> Ian: Larry looked over this project, and I have looked at it too. According to BIMS, this has not been issued yet. There are some very strange things in the design documents, including, but not limited to: The existing stream and proposed restored reach are both B4c, but the refernece reach is a C4. This appears to be a Priority I restoration; however the proposed entrenchment ratio (1.8) does not differ significantly from the existing ration (1.4). the reference is 12.4. The proposed bankfull cross-sectional area is larger than the existing; this is odd, as impacted streams are usually overwidened. Which brings up another point; there is very little discussion of the existing site conditions. The strangest thing is that the existing sinuosity is 1.15, and so is the sinuosity of the proposed reach!! There are other things as well. The box on public funds was checked "yes". Why no NEPA/SEPA? Does anyone know if they are doing this for mitigation credit?? the PCN does not say. Also, the total length of the restoration reach is not clear. Darryl, are you familiar with this project? Eric Eric W. Kulz Environmental Specialist 401 Oversight and Express Permitting Unit 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 Phone: (919) 715-9050 Fax: (919) 733-6893 1 1/11/2007 1:49 PM __