Loading...
HomeMy WebLinkAbout20191247 Ver 1_Shoreline Stabilization_20190917N. State of North Carolina C.- Resources Department of Environment and Natural Resources '� Division of Water Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form 2 0 1 9 1 2 4 7 Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Br6104�d'� 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Informatinn Name: Mailing Sectsoc �QCC111ta!�� Telephone Number:/ao.17Fax Number. E-mail Address: t o -P �'%�[�J,/�E�rTi`r'5,��Me-, , 0 , G' -q0 -t 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http-J/www.saw.usace.army.miI/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: M on aom-e/' Lake/ river/ ocean adjacent to property: Property size (acres): Nearest Town Directions to site - .,"atvvfIf-or T include road names and numbers, landmarks, etc.: -2 i 7?> /,V/YS TD Ah.111 l Latitude (in decimal degrees) Longitude (decimal degrees) S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): %e S%" iLe^?ra- / e;,.e 6. Describe proposed work (include discussion as to how_hardening of shoreline has been avoided, or why it is necessary): (aur lGln� Cj � S � 7. Will work be conducted from land? From water? ❑ 8. Total amount of impacts below the normal pool lake level/ Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 0-P rc� n `'iFT X 200 Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: S r X C 00 Fr A"'o rcz n Temporary impacts (temporary clearing, construction corridor) in_square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Ltl' 11. Signature Owner/Agent's Signatu [15A NCAC 02H .0502(fll Date Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) 1y,O 0I Full Pond/ Normal Water Level Shoreline "Opo p a Plan View Lake (nr wn vcw7 H«t„af Wam temp Existing Dock /30 ftx 7ft Full Pond/ Normal Water Lev -I reline 2 h. �150 ft. additi—a clearing if --ry E Plan View EAT 0 [0 'M k NA I , FORM: SSGP 02-2017 Page 3 of 4 lig ` > J s Lake o`, d j (At Full Pond/ Normal Water Level) m to =11 b Side View U- ...................._ _..._ _ -----_ - — .. _ --- _---------.-.- - 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing l I 'if necessary Existing bank 10 ft. bank height �Oa QO QUO Side Vi jW MPLE FORM: SSGP 02-2017 Page 4 of 4 • + ��=#°�y.� r ��1. > �._ .` `��'•".� +.fr,+ �,��� 1., � ,� €9�#p .+ °f• � wry` ' � • • h 'y A}a { ;� _ is h.`.. Y ,�!1 1 , - t� , v _ �. r e 'i' ^" "h J 1 ' 1 • •,{lag • � ��� � 's. . r - , r A s ' a `Y , y 4 t a,. lif • ` �" - + . 0,1 Y, 4 , r u 1 u� .. 4r # y Lf "fir IL 1 :,p' ,�..a i'`t�a' �� • 'ate ,. C' ^iia � ��A �:♦ � w r .%�i-+s'� �'� f . F � u r a r � i • yr i� - Hl u. IL , • ' m s E ilf r GR CHIC ScALE 12D THE LANDING A PROPOSED SMALL, EXCLUSIVE, PRI VA TE DEVELOPMENT ON