HomeMy WebLinkAbout20160406 Ver 1_USACE Record Drawing Review_20190925Strickland, Bev
From:
Browning, Kimberly D CIV USARMY CESAW (USA)
Instituted:
<Kimberly.D.Browning@usace.army.mil>
Sent:
Wednesday, September 25, 2019 9:28 AM
To:
Haupt, Mac; Davis, Erin B; Tugwell, Todd J CIV USARMY CESAW (US); Wilson, Travis W.;
David.E.Bailey2@usace.army.mil; kathryn_matthews@fws.gov; Wells, Emily N; Merritt,
Katie; Munzer, Olivia; Bowers, Todd; Gibby, Jean B CIV USARMY CESAW (USA);
McLendon, C S CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW
(USA)
Cc:
Dow, Jeremiah J; Jason Lorch; John Hutton; Allen, Melonie; Stanfill, Jim; Schaffer, Jeff
Subject:
[External] Notice of NCDMS Record Drawing Review / Buckwater Site / Orange County
/ SAW -2016-00873 (UNCLASSIFIED)
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
CLASSIFICATION: UNCLASSIFIED
The below referenced FINAL Record Drawing Report review has been requested by NCDMS. Per Section 332.8(0)(9) of
the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15
calendar days from this email notification. Please provide any comments by 5 PM on the 15 -day comment deadline
shown below. When providing comments please indicate if your concerns are great enough that you intend to request a
site visit prior to the initial credit release. Comments provided after the 15 -day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
Buckwater Mitigation Site
IMS#: 97084
RFP: 16-006477
RFP Issued:
6/24/2015
Instituted:
3/22/2016 - Full Delivery
River Basin:
Neuse
CU#:
03020201
County: Orange
Proposed Mitigation Plan Assets:
12,620 SMUs (Warm)
1,108,495 WMUs
As -Built MYO Project Credits:
12,621.936 SMUs (Warm) - difference due to rounding
1,099,775.073 WMUs
Designer: Wildlands Engineering, Inc. - WEI Contact: Chris Roessler, croessler@wildlandseng.com (919) 851-9986 x 111
(office); (919) 624-0905 (mobile) DMS PM: Jeff Schafferjeff.schaffer@ncdenr.gov (919) 707-8308 (office) or (919) 812-
2634 (mobile) or Jeremiah Dowjeremiah.dow@ncdenr.gov (919) 707-8280 or (919) 218-0226 (mobile)
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the portal here:
https://ncconnect.sharepoint.com/sites/deq_ext/dwm_irt/AsBuilt Report
Drawing/Forms/Allitems.aspx?viewid=67ea36a3-256b-4549-a71a-7d849a0a5d10&&id=/sites/deq_ext/dwm_irt/AsBuilt
Report Drawing/Buckwater 97084
15 -Day Comment Start Date: September 25, 2019 15 -Day Comment Deadline: Oct 10, 2019 45 -Day Credit Release
Approval Deadline: November, 2019
*NOTE: If a site visit is requested by the IRT, comments are due 15 days after the site visit is complete.
Mitigation Plan lengths may vary from the record drawing.
2019 is Monitoring Year 1.
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60