Loading...
HomeMy WebLinkAboutNCC192030_ESC Approval Submitted_20190926ROY COOPER Governor VICVIEL,"�EP-41! Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality September 20, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Mr. Tim Phelps P.O. Box 64 Windsor, NC 27983 RE: Project Name: Phelps Wet Yard & Storage Project ID: Berti-2020-001 County: Bertie Address: 350 Hoggard Mill Road River Basin: Roanoke Date Received by LQS: September 18, 20115 Submitted By: Mr. Tim Phelps Plan Type: New/Express City: Windsor This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date Of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG,O 10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at dea.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette. lucas@ngdenr.gov or Paul Clark at Paul .cLqdi@,ncdenr, ov. After you submit a complete andcorrectNOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413.01 18(a) and the NCG01 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division Of Energy, mineral and Land Resources Washington Regional office 1 943 Washington square Mail I Washington, North Carolina 27889 251946.6481 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO I permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G. S. 11 3A.6 1. 1 (a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. if, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Sincerely, Samir Dumpor, PE Regional Engineer cc w/o enc: Tim Phelps, Phelps and White Construction Company, Inc. (email) WaRO Division of Water Resources The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54. 1 (e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (I 5A NCAC 04B .0 113), 2. The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval. 3. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on - site natural watercourse or adjoining property. (NCGS 113A•5i)