HomeMy WebLinkAbout20150634 Ver 1_Year 3 Monitoring Report_20190925ID#* 20150634
Select Reviewer:*
Katie Merritt
Initial Review
Completed Date
09/25/2019
Mitigation Project Submittal - 9/25/2019
Version* 1
Is this a Prospectus, Technical Proposal or a New Site? *
Type of Mitigation Project:*
r Stream r Wetlands W Buffer V Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:*
Jeff Schaffer
Project Information
Existing 20150634
(DWR) (nunbersonly ...nodash)
ID#:*
Project Type: f• DMS r Mitigation Bank
Project Name: UT to Falls Lake (McDaniel Farm)
County: Durham
Document Information
C' c�
Email Address:*
jeff.schaffer@ncdenr.gov
Existing
Version: (nurnbersonly)
Mitigation Document Type:*
Mitigation Monitoring Report
File Upload: UTFL_95389_MY3_2019.pdf 2.93MB
Rease upload only one RDF of the corrplete file that needs to be subr itted...
Signature
Print Name:* Jeff Schaffer
Signature:
YEAR 3 ANNUAL MONITORING REPORT
FINAL
Year 4 Post Planting
UT to Falls Lake (McDaniel Farm)
Riparian Buffer and Nutrient Offset Mitigation Project
Durham County, North Carolina
NC Division of Mitigation Services Project #: 95389
Neuse River Basin
03020201
DWR #: 2015-0634
Jr"
Mitigation Services
ENVIRONMENTAL QUALITY
Prepared for and by:
NC Department of Environmental Quality
Division of Mitigation Services
1652 Mail Service Center
Raleigh, NC 27699-1652
September 2019
TABLE OF CONTENTS
1.0 Project Summary ........................
2.0 Performance Standards ...............
3.0 Monitoring Plan ..........................
3.1 Reporting ...........................
3.2 Vegetation Monitoring...........
4.0 Maintenance & Contingency Plan.
5.0 Year 3 Annual Monitoring............
Appendices
Appendix A. Background Tables
Table 1 Project Components
Table 2 Project Activity & Reporting
Table 3 Project Contacts
Table 4 Project Attributes
Appendix B. Visual Assessment Data
Figure 1 Vicinity Map
Figure 2 Asset Map
Figure 3 Current Condition Plan View
Site Photos
Table 5 Vegetation Condition Assessment
Appendix C. Vegetation Plot Data
Table 6 Planted Tree Species
Table 7 Planted and Total Stems
...........................................1
............................................1
............................................2
............................................2
............................................2
............................................2
...........................................2
1.0 PROJECT SUMMARY
NC Division of Mitigation Services (DMS) implemented the UT to Falls Lake (McDaniel Farm) Project (Project) to fulfill
riparian buffer mitigation needs in the Neuse 03020201 Catalog Unit and nutrient offset mitigation needs in the Upper Falls
Lake Watershed in accordance with the NC Division of Water Resources (DWR) Temporary Buffer Mitigation Rule (15A NCAC
02B .0295) effective October 24, 2014.
This project site is located off Benny Ross Road in Durham County approximately 7.5 miles east of the City of Durham and is
within the Upper Falls Lake Watershed (Appendix B, Figure 1). The site is within the Lick Creek watershed (HU
3020201050030) which is comprised of sub -watersheds draining to Lick Creek, its tributary Rocky Branch, Laurel Creek, and
unnamed tributaries to Falls Lake. Falls Lake is a drinking water supply watershed with additional nutrient restrictions regulated
by the North Carolina Division of Water Resources. The site is in NC DWR's 03-04-01 sub -basin.
Riparian buffer mitigation activities occurred along the Project from top of bank and extending out to 200 feet, resulting in a
maximum of 9.67 acres (421,385 ft2) of riparian buffer and/or nutrient offset mitigation through planting and preservation of
10.86 acres of forested buffer easement along the main unnamed tributary to Falls Lake and several water conveyances that
flow to UT to Falls Lake. Refer to Appendix A, Table 1 for project mitigation components and Appendix B, Figure 2 for the
project component/asset map. Due to the site's location within the Upper Falls Lake Watershed, nutrient offset mitigation from
this site can only be provided to offset impacts from development within the Falls Lake Watershed. In addition, riparian buffer
mitigation from this site can be used to offset permitted impacts according to the Temporary Rule (15A NCAC 02B .0295)
effective October 24, 2014.
The following goals of this riparian buffer/nutrient offset mitigation project are to address stressors identified in the Project
watershed through the restoration of riparian buffers along the UT and its conveyances.
• Removing nonpoint sources of pollution associated with agricultural activities
• Reducing sedimentation onsite and downstream
The success of these goals are based on the following objectives;
• Removal of horses and goats from riparian areas;
• Reducing the application of agricultural materials into and adjacent to streams;
• Establishing a vegetative buffer adjacent to streams to treat surface runoff, which may contain pollutants such as
sediment and/or agricultural pollutants from the adjacent landscape;
• Reducing bank erosion associated with a lack of vegetative cover; and
• Planting a diverse hardwood vegetative buffer adjacent to Site tributaries.
Project restoration activities were completed in March 2016. Refer to Appendix A, Tables 2, 3 and 4 for detailed project activity,
reporting history, project contact information and project baseline information and attributes.
Directions to the Project from Raleigh: Take US 70 West/Glenwood Avenue toward Durham. Turn Right on NC 50
North/Creedmoor Road. Exit onto NC 98 West. Turn Right onto Southview Road and follow to T intersection. Turn Right onto
Baptist Road. Turn right onto Benny Ross Road Site. Travel approximately 0.3 mile to gate on the left. Access is by foot
through the gate and 50 ft. access easement See Appendix D, As -Built Sheets). Coordinates: 35.998142, -78.742794
2.0 PERFORMANCE STANDARDS
Performance standards were established for native forest development and diffuse flow through the riparian buffer in
accordance with DWR's Administrative Code 15A NCAC 02B.0295 (Mitigation Program Requirements for Protection and
Maintenance of Riparian Buffers) (NCDWR 2014 Temporary Rule). Performance standards are dependent upon the density
and survival of characteristic forest species. After five years of monitoring, an average density of 260 woody stems per acre
must be surviving and diffuse flow maintained.
3.0 MONITORING PLAN
3.1 Reporting
Annual monitoring data will be reported following DMS's Riparian Buffer and Nutrient Offset Buffer Annual Monitoring Report
Template (ver. 1.0) dated Feb. 2, 2014. The monitoring report shall provide a project data chronology and assist in decision
making regarding project close-out. The following table outlines monitoring requirements and parameters for this project.
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
1
Required
Parameter
Quantity
Frequency
Notes
Any remedial activities performed will be
Vegetation
Quantity and location of vegetation plots
documented in the annual monitoring reports.
Vegetation will be monitored for a period of five years or until
Yes
Vegetation
will be determined by Division of
Annual
success criteria are met. During years 2, 3 and 5 random plots will
the mitigation site and adjacent properties. Boundaries may be identified by
Mitigation Services
Site Boundary
be used. Visual monitoring of the site will be done all five years
Yes
Project
conditions and/or conservation easement. Boundary markers disturbed,
Annual
Locations of fence damage, vegetation damage, boundary
damaged, or destroyed will be repaired and/or replaced on an as needed basis.
boundary
encroachments, etc. will be mapped
3.2 Vegetation Monitoring
To monitor the vegetation at this site, the NC Division of Mitigation Services will use a combination of visual monitoring and
random vegetation plots. Visual monitoring will be conducted during all five years of monitoring to assess vegetative cover,
diffuse flow and easement integrity. DMS will monitor ten (10) rotating, random 1,500 square foot vegetation plots in years 2,
3 and 5 to assess vegetative success representative of the entire mitigation area from top of bank to 200 feet from each
tributary/conveyance. These ten (10) plots will provide coverage of 3% of the site each year used. In each sample plot,
monitoring parameters will include species composition and density. As it was done for the baseline data collection, the
vegetation plots will be randomly selected using a grid and random number generator or similar method for each of the
monitoring years 2, 3 and 5. Visual observations of the percent cover of shrub and herbaceous species, diffuse flow and
easement integrity will be documented by photograph and site visits.
Monitoring of site restoration efforts will be performed for five years or until performance standards are met. The first annual
monitoring assessment (MY1) was completed in the fall of 2016. The vegetation will be monitored for a total of five years,
with the final monitoring activities concluding in 2021. The close-out for the Project will be conducted in 2022 given that the
performance criteria has been met.
4.0 MAINTENANCE AND CONTINGENCY PLAN
DMS shall monitor the site and conduct a physical inspection of the site a minimum of once per year throughout the post -
construction monitoring period until performance standards are met. These site inspections may identify site components
and features that require routine maintenance. Routine maintenance should be expected most often in the first two years
following site construction and may include the following:
Component/Feature
Maintenance through project close-out
Remedial Measures
Vegetation shall be maintained to ensure survival. Routine vegetation
Any remedial activities performed will be
Vegetation
maintenance and repair activities may include supplemental planting. The site
documented in the annual monitoring reports.
will also be evaluated to ensure diffuse flow is still occurring.
Site boundaries shall be identified in the field to ensure clear distinction between
the mitigation site and adjacent properties. Boundaries may be identified by
Any remedial activities performed will be
Site Boundary
fence, marker, bollard, post, tree -blazing, or other means as allowed by site
documented in the annual monitoring reports.
conditions and/or conservation easement. Boundary markers disturbed,
damaged, or destroyed will be repaired and/or replaced on an as needed basis.
5.0 YEAR 3 MONITORING
Based on the results of Year 2 annual monitoring, and DMS's efforts to contract with a new planting contractor to replant the
Project and treat invasive vegetation, DMS did not conduct annual monitoring in 2018. The replanting of the site was
completed in late February 2019. A list of species planted during the replant of the site is provided in Appendix C. Invasive
treatments were completed in October 2018 and June 2019. Species treated included Tree of Heaven, Lespedeza and dog
fennel. Additional treatment of will be done as needed. Year 3 annual monitoring (MY3) was conducted in September 2019.
As stated in Section 3.0, year 3 monitoring activities included stem counts using ten (10) rotating, random 1,500 square foot
vegetation plots, visual monitoring of the project verifying the presence or absence of invasive species; checking the integrity
of the easement and fencing; and taking photographs at the established photo points. Two (2) of the ten (10) transects did
not meet success criteria of 260 stems per acre for planted stems, Visual monitoring and random vegetation transects
conducted by DMS staff revealed most planted stems are concealed by herbaceous vegetation and the areas with low stem
density are most likely due to competition from a dense herbaceous layer and low soil fertility. DMS is contacting the
planting contractor to conduct a warranty replant to address the low stem density issue. See Figure 3 in Appendix B for
areas of concern. The fence installed along the easement boundary is functioning as intended and all installed signage is
still in place.
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
2
APPENDIX A
BACKGROUND TABLES
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
Table 1: Project Mitigation Components
UT to Falls Lake (McDaniel Farm) DMS Project #95389
Mitigation
Components*
Stream
Riparian Wetland
Non -riparian
Wetland
Creditable
Buffer
(linear
feet)
(acres)
Riparian
(square
feet)
Nutrient
Nutrient
Riverine
Non-
Riverine
Restoration
Phosphorus (lbs/ac/30 yr)
Buffer
Offset
Offset
Existing
Restored
Creditable
Enhancement I
Mitigation
Mitigation
Credits
Credits
Enhancement II
Buffer
Buffer
Buffer
Restortion
Ratio
Credits
Nitrogen
Phosphous
Project Component
SF
SF
SF
Level
(X:1)
(SF)
(lbs)
(lbs)
Notes/Comments
Buffer
Riparian Buffer TOB -50'
Restored riparian buffer for buffer or Nutrient
(Reaches Al, A2 & B)
0
49,393
49,393
R
1
49,393
OR
2,577.48
166.00
Offset credit
Subject Rural
Riparian Buffer 51-100'
Restored riparian buffer for buffer or Nutrient
(Reaches Al, A2 & B)
0
82,083
82,083
R
1
82,083
OR
4,283.35
275.87
Offset credit
Subject Rural
Riparian Buffer 101-200'
Restored riparian buffer for Nutrient Offset
(Reaches Al, A2 & B)
0
149,557
149,557
R
1
7,804.36
502.64
credit only
Subject Rural
Riparian Buffer TOB -200'
Restored riparian buffer for Nutrient Offset
0
72, 392
72, 392
R
1
3, 777.65
243.30
Non -Subject Rural
credit only
Riparian Buffer TOB -100'
Preserved Riparain Buffer for Buffer Credit
(Reaches Al, A2 & B)
64,826
0
64,826
P
10
6,483
only
Subject Rural
Preserved Riparian Buffer for Buffer Credit
only. Area in this zone is less than 10% of
Riparian Buffer 101-200'
3,134
0
3,134
P
20
157
total Buffer Mitigation area. 20:1 ratio = 10:1
(Reach A2) Subject Rural
factoring in 50% reduction for preservation
on a Subject Non -Urban stream.
Totalsl
F-
421,385
1
1 138,115
1
118,442.85
1,187.82
All assets and credits generated in accordance withDWR Temporary Buffer Mitigation Rule (15A NCAC 02B .0295) effective October 24, 2014.
Length and Area Summations by Mitigation Category
Restoration Level
Stream
Riparian Wetland
Non -riparian
Wetland
Creditable
Buffer
(linear
feet)
(acres)
(acres)
(square
feet)
18,442.85
(Ibs/ac/30 yr)
Riverine
Non-
Riverine
Restoration
Phosphorus (lbs/ac/30 yr)
353,425
Enhancement
Enhancement I
Enhancement II
Creation
Preservation
67,960
High Quality Pres
Overall Assets Summary
Overall
Asset Category
Credits
Buffer'
138,115
Nutrient Offset Nitrogen
18,442.85
(Ibs/ac/30 yr)
Nutrient Offset
1,187.82
Phosphorus (lbs/ac/30 yr)
'Pursuant to 15A NCAC 02B .0295(n)(1)
(2014 Temporary Rule), buffer mitigation
credit used for buffer credit will not be
used for nutrient offset credit
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
Table 2. Project Activity and Reporting History
UT to Falls Lake (McDaniel Farm) DMS Project #95389
Activity or Deliverable
Data Collection
Complete
Completion or
Delivery
Institution Date
NA
Jun -13
404 permit date
NA
NA
Restoration Plan
Jul -15
Sep -15
Final Design — Construction Plans
Jul -15
Sep -15
Construction
NA
Mar -16
Planting
Mar -16
Mar -16
Mitigation Plan / As -built (Year 0 Monitoring — baseline)
May -16
Jun -16
Year 1 Monitoring
Oct -16
Oct -16
Year 2 Monitoring
Oct -17
Oct -17
Invasive Treatment
NA
Oct -19
Site Replant
NA
Feb -19
Invasive Treatment
NA
Jun -19
Year 3 Monitoring
Sep -19
Sep -19
Year 4 Monitoring
Year 5 Monitoring
Table 3. Project Contacts Table
UT to Falls Lake (McDaniel Farm) DMS Project #95389
Designer
NC Division of Mitigation Services
217 W Jones Street, Raleigh, NC 27603
Jeff Schaffer, DMS
(919) 707-8308
Construction Contractor
Wright Contracting, LLC
PO Box 545, Siler City, NC 27344
Andrew Dimmette
(704) 219-0486
Initial Planting Contractor
Bruton Natural Systems, Inc.
PO Box 1197, Fremont, NC 27830
Charlie Bruton
(919) 242-6555
Replanting & Invasive
Carolina Wetland Services, Inc.
Contractor
550 E Westinghouse Blvd, Charlotte, NC 28278
Gregory Antemann
(704) 408-1683
Monitoring Performers
NC Division of Mitigation Services
217 W Jones Street, Raleigh, NC 27603
Jeff Schaffer, DMS
(919) 707-8308
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
Table 4: Project Attributes Table
LIT to Falls Lake (McDaniel Farm) DMS Project #95389
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
Project Information
Project Name
UT to Falls Lake (McDaniel Farm)
County
Durham
Project Area (acres)
10.86
Project Coordinates (latitude and longitude)
35.998142, -78.742794
Planted Acreage (Acres of Woody Stems Planted)
10.86
Project Watershed Summary Information
Physiographic Province
River Basin
Neuse
USGS Hydrologic Unit 8 -digit
3020201 USGS Hydrologic Unit 14 -digit 03020201050030
DWR Sub -basin
03-04-01
Project Drainage Area (acres)
21.5
Project Drainage Area Percentage of Impervious Area
< 5%
CGIA Land Use Classification
Majority Forested, some pasture
Regulatory Considerations
Parameters
Applicable?
Resolved?
Supporting Docs?
Water of the United States - Section 404
No
Water of the United States - Section 401
No
Endangered Species Act
No
Historic Preservation Act
No
Coastal Zone Management Act (CZMA or CAMA)
No
FEMA Floodplain Compliance
No
Essential Fisheries Habitat
No
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
APPENDIX B
VISUAL ASSESSMENT DATA
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
Falls Rc■rreuli_
L ake
1�
Project
G7
a
ti
N
� G
�S
C
F �1, t'Itl:s e a
Wake F crest
W gke ore�t 11W'1
00
�d Souoes Esri,-HERE, DeLcrme. USGS, Intermap, increment P Corp.. NRCF.'.
.japan. METI, EsriChina IHorg KCrrg�. Esri IThe iWrid). MapmyInais.
OpenStFeetMap CcmtributM. and the GIS User CCmmuni y
FIGURE 1 ti
Project Location Map
UT TO FALLS LAKE (McaANIEL FARM) L 0.25 05 075 1 a
Durham County, NC Miles S
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
8
Reach Al
i +
777
'�Jtf�`.aiM' �as.�a_,-'.®41si3►�r��" .i�.Lfi��s.,':
f,, ��. ••'•- ;,'�• �, '�if�""'��J�/F 1, fr �., � � �JY k• �,
�+ `4� „' � �:f ^• + 4 � "• � , :art' N���' • �+i � r �: '1 I
��-- t y 3 — _ as ♦_ �. � �" i - � �
. • • Reach A2
r
!r t
Figure 2: Asset Map UT to Falls Lake (McDaniel Farm) I -'7win
Easement (10.86 ac) 51' - 100' (82,083 sq -ft) RB or NQ
Mowing Allowance 101' - 200'(149,557 sq -ft) NO only
Bridle Path Preservation TOB - 100' (64,826 sq -ft) RB only
- Subject Stream Preservation 3 100' (3,134 sq -ft) RB only
- Non -Subject Stream Nutrient Offset Only (72.392) sq -ft
TOB - 50'(49,393
sq -ft) RB or NO
of
Reach B
F
7!9
5
✓i• it # IMY#
-
..
..
110 22p' . 330
t
P.�? r u3=1'lor .:c,l��.irlr lyds,lrr.;�"orr �n].':ria
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
9
Reach Al
t
10 _
10y ~► x,,
Reach A2
� g
'00 J4F
-
_ � '�';•,� g '.� Reach B
* w
Figure 3: Current Condition Plan View -
UT to Falls Labe (McDaniel Farm)
A,
Photo Points
MY3 Transects
MY2 Transects
MY1 Transects
MYQ Transects
Mowing Allowance..
r ,
Bridle Path r
Subject Channel
Existing Mature Trees
Non -Subject Channel + � x e ,
Areas of observed low planted stem density
Transects 1 & 6 did not meet performance standard'
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
10
Site Photos
Photo Point 1
Photo Point 2B -NE
Photo Point 3B -NW
Photo Point 2A -NW
Photo Point 3A -SW
Photo Point 4
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
11
Photo Point 5
Photo Point 7A -SE
Photo Point 8A -NW
Photo Point 6
Photo Point 7B -E
Photo Point 8B -SE
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
12
Photo Point 9
Photo Point 10
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
13
Table 5: Vegetation Condition Assessment
LIT to Falls Lake (McDaniel Farm) DMS Project #95389
Planted Acreaae 10.86
Vegetation Category
Definitions
Mapping
Threshold
CCPV Depiction
Number of
Polygons
Combined
Acreage
%of Planted
Acreage
1. Bare Areas
Very limited cover of both woody and herbaceous material.
0.1 acres
Pattern and Color
0
0.00
0.0%
2. Low Stem Density Areas
Woody stem densities clearly below target levels based on MY3, 4, or 5 stem count criteria.
0.1 acres
Pattern and Color
2
0.93
8.6%
Total
2
0.00
0.0%
3. Areas of Poor Growth Rates or Vigor
Areas with woody stems of a size class that are obviously small given the monitoring year.
0.25 acres
Pattern and Color
0
0.00
0.0%
Cumulative Total
2
0.93
8.6%
Easement Acreage 10.86
Vegetation Category
Definitions
Mapping
Threshold
CCPV Depiction
Number of
Polygons
Combined
Acreage
%of Easement
Acreage
4.1 nvasive Areas of Concern
Areas or points (if too small to render as polygons at map scale).
1000 SF
Pattern and Color
0
0.00
0.0%
5. Easement Encroachment Areas
Areas or points (if too small to render as polygons at map scale).
none
Pattern and Color
0
0.00
0.0%
LIT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
14
APPENDIX C
Vegetation Plot Data
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
15
Table 6a: Planted Tree Species
UT to Falls Lake (McDaniel Farm) DMS Project #95389
Scientific Name
Common Name
Number
Planted
% of
Total
Acerrubrum
Red Maple
1,000
17.5%
Fraxinus pennsylvanica
Green Ash
1,000
17.5%
Platanus occidentalis
Sycamore
1,000
17.5%
Betula nigra
River birch
1,000
17.5%
Ulmus americana
JAmerican Elm 1
1,000
1 17.5%
Hamamelis virginiana
lWitch hazel 1
700
1 12.3%
Total
5,700 100%
Table 7: Planted and Total Stems - MY3
UT to Falls Lake (McDaniel Farm) DMS Project #95389
Table 6b: Supplemental Planted Tree Species
Scientific Name
Common Name
Number
% of
Liriodendron tulipefera
Tulip poplar
700
15.6%
Fraxinus pennsylvanica
Green Ash
700
15.6%
Platanus occidentalis
Sycamore
600
13.3%
Betula nigra
River birch
600
13.3%
Diosypros virginiana
Persimmon
600
13.3%
Nyssa sylvatica
Black gum
600
13.3%
Cercis Canadensis
Red bud
700
15.6%
T otal
4,500 100.0%
Type= Tree, Shrub, Livestake
P = Planted
T = Total
Color for Density
Exceeds requirements by 10%
Exceeds requirements, but by less than 10%
Fails to meet requirements, by less than 10%
Fails to meet requirements by more than 10%
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
16
VT1
VT2
VT3
V
Current Year (MY3)
V V
V
V
V
VT10
MY3 (2019)
Annual Means
MY2 (2017) MY1 (2016)
MYO (2016)
Scientific Name
Common Name Type
P T
P
T
P
T
P
T
P
T
P
T
P
T
P
T
P
T
P
T
P
T
P T
P T
P
T
Acer rubrum
Red Maple Tree
1 1
3 3
3
3
Fraxinus pennsylvanica
Green Ash Tree
3
3
1
1
2
2
3
3
1
1
1
1
1
1
1
1
2
2
2 2
1 1
3
3
Platanus occidentalis
Sycamore Tree
1 1
9
9
1
1
2
2
1
1
1
1
3
3
3
3
2 3
3 3
3
3
Betula nigra
River birch Tree
3
3
2
2
2
2
1
1
1
1
2
2
2
2
2
2
1 1
3 3
4
4
Ulmus americana
American Elm Tree
2
2
3
3
1
1
1
1
2
2
2
2
3 3
2 2
4
4
Hamamelis virginiana
Witch hazel Tree
1
1
2
2
12
12
8
8
13
13
5
5
2
2
6
6
3 3
2 2
3
3
Liriodendron tulipefera
Tulip poplar Tree
Diosypros virginiana
Persimmon Tree
3
7
6
6
4
4
1
1
4
5
Nyssa sylvatica
Black gum Tree
Cercis Canadensis
Red bud Tree
Pinus taeda
Loblolly pine Tree
1
4
14
7
5
32
27
67
8
18
10
9
5
Liquidambar styraciflua
Sweet gum Tree
2 1
1
2
7
15
11
11
7
7
8
9
8
10
Salix nigra
Black Willow Tree
2
Oak Tree
1
1
1
1
1
1
Sumac Shrub
2
1
Unknown Tree
2
8
1
Stem count
1 2
1 12
19
12
16
10
26
25
39
3
23
14
57
15
53
9
83
9
25
17
46
12 37
14 43
20
35
Plot size (acres)
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
Species Count
1 2
5
7
3
4
5
7
6
8
3
5
3
5
3
5
4
6
5
8
6
9
6 11
6 12
6
9
Stems per ACRE
29 58
348
552
348
465
290
755
726
1,132
87
668
407
1,655
436
1,539
261
2,410
261
726
515
1,341
353 1,088
412 1,265
581
1,016
Type= Tree, Shrub, Livestake
P = Planted
T = Total
Color for Density
Exceeds requirements by 10%
Exceeds requirements, but by less than 10%
Fails to meet requirements, by less than 10%
Fails to meet requirements by more than 10%
UT to Falls Lake (McDaniel Farm) Year 3 Annual Monitoring Report September 2019
16