HomeMy WebLinkAbout660022_Plan of Action_20190217PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION
Facility Number: 66-22 County: North Hampton
Facility Name: 8132
Certified Operator Name: Murphy -Brown LLC Operator #:
Note: A certified Sludge Management Plan may be submitted in lieu of this POA
Laoon 1 Lagoon 2
8132 P
La oon 3
Lagoon 4La
oon 5
Lagoon 6
a. Lagoon Name/ Identifier
2.83
b. Total Sludge Depth (ft)
c. Sludge Depth to be
.97
Removed for Compliance
ft
I
d. Sludge Volume to be
<2000000
Removed (gallons)
e._ Sludge PAN '
(lbs/1000 gal)
10
2
f Liquid PAN
(Ibs11000 gal')
g. PAN of Sludge (lbs)
20000
(d x e)11000
Compliance Timeframes:
If the s'udge level is equal to or higher than the stop pump level of the lagoon or if the sludge level
results in an elevated waste analysis, a sludge management plan that meets the requirements of SIB
Interagency Group Guidance Document 1,26 must be prepared by a technical specialist and submitted to
DWQ within 180 days. Work to reduce the sludge level must begin within another 180 days.
Compliance with NRCS Standard 359 must be achieved by the expiration date of the current permit.
If the sludge level is non-compliant but below the stop pump level of the lagoon, a POA must be filed
within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the
original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in
s.udge levels, DWQ may require the owner to develop a sludge management plan that meets the
requirements of SB Interagency Group Guidance Document 1.26
SPOA 3.22-2010 Page 1 of 2
NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge
depth. If microbe use Is planned, specify the product to be used.
Mechanical Removal By Pump and Haul—Land has been identified in the vicinity of the lagoon
that will allow for the agitation and mixing of the sludge layer, and subsequent land application of
the material on these acres. A sludge management plan will be developed prior to initiating these
activities, and records will be kept of these applications as required by permit.
Or
Sludge will be mechanically removed by a dredged or lagoon agitator pump then mixed with
polymer and pumped into geotextile tubes for dewatering of the solids. Solids will be harvested
from geotextile tubes after adequate drying and hauled to agricultural fields for agronomic
application.
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and
correct. 1 further certify and acknowledge that compliance with regard to sludge accumulation
must be achieved within two years of the original sludge survey indicating non-compliance.
Sludge Survey Date: 2117117. Compliance Due Date: 2117119
Murohv-Brown LLC
Facility Ownerl anagen (print)
Facilr_Owne—r/Manager (signature)
Phone: 910-293-3434
Date: 717117
Return this form to
Animal Feeding Operations Unit
NC Division of Water Resources
1636 Mail Service Center
Raleigh, NC 27699-1636
SPOA 3-22-2010 Page 2 of 2