Good afternoon Alaina,
Attached and below are lat longs for each of the streambank stabilization sites in Hendersonville, NC. On the original
permit,we used the Patton Park Site lat long to generalize the location of all the projects since its location is fairly
central. However, I did provide individual lat/longs for each site in the attached table.
Please let me know if you have any questions.
Thanks!
Proposed Impacted
Site Name Proposed Stream Recommendation (LF) Potential
Stream re-alignment, in stream
structures (riffle, vanes, J-hooks), bank
Cherry Branch Site grading and planting and stabilization 840
(brush toe with lifts, brush mattress)
Stream Re-alignment, in stream
structures (riffle), bank grading and
Comet Drive Site planting and stabilization(brush toe 231
with lift, brush mattress)
stream re-alignment, in stream structures
Meadowbrook Terrace Site (riffle), bank grading and planting and 202
stabilization(brush toe with lift)
Retrofit flashboard riser and lower pond
water surface. Bank grading, in stream 510 (The Oak
structures (vane, riffles), minor stream Site) / 168
The Oaks Site/Haywood Townes Site realignment, bank stabilization(brush
toe) (Haywwod Townes
Site)
i
Pond retrofit grading for stormwater
Patton Park Site wetland 570
Bank Grading, in stream structures
Maple Street Site (Vane,rock step),minor stream 85
realignment
Bank grading, in stream structures
(cross vane,riffles,vanes, log drops),
Allen Branch @ Lakewood Road Site bank stabilization(geolift), and riparian 3904
planting
includes supplemental planting of live-
stakes and riparian seed mix along UT
Allen Branch @ US64 Site to Allen Branch along Old Chimney 803
Rock Rd
Add constructed riffle to armor the
Jordan Street Site stream bed over a buried sanitary sewer 31
crossing
Wash Creek Site Geolift installation along left bank 200
Geolifts along both banks to stablize
Fitzsimmons Street Site banks at an aerial santiary 33
crossing. Herbaceous planting in sewer
easement.
Establish stone toe along both banks by
moving existing onsite riprap and live
Spartanburg Highway Site stake right bank. Install rock Aprons 155
below existing stormwater outfalls
TOTAL IMPACTS 7732
Scott Gregory, GISP, PLS I Environmentol Scientist
0: 828.774.5547 M: 704.451.2177
Wildlands Engineering, Inc.
167-B Haywood Road
Asheville, NC 28806
From:Jake McLean <jmclean@wildlandseng.com>
Sent:Tuesday, September 17, 2019 2:01 PM
To: Scott Gregory<sgregory@wildlandseng.com>
Subject: Fwd: NCG01 NOI 15959
Sent from my iPhone
Begin forwarded message:
From: "Morman,Alaina" <alaina.morman@ncdenr.gov>
Date: September 17, 2019 at 1:58:39 PM EDT
To: "jmclean@wildlandseng.com" <0mclean@wild landseng.com>
Subject: NCG01 NOI 15959
2
Hi Jake,
Thank you for returning my call. The table you described in your voicemail would be really helpful to
have on file to verify that all locations do, indeed, drain to Mud Creek. Additionally, can you explain why
you picked the coordinates you used—is that a central location to the project?
Thanks,
Alaina
Alaina Morman
Environmental Specialist
Stormwater Program
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
919-707-9236 (0)
919-807-6494 (F)
alai na.morman@ncdenr.Pov
DEMLR Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be
disclosed to third parties.
3