Loading...
HomeMy WebLinkAboutNCC191959_Email RE Project Details_20190917 Morman, Alaina From: Scott Gregory <sgregory@wildlandseng.com> Sent: Tuesday, September 17, 2019 2:41 PM To: Morman, Alaina Cc: Jake McLean Subject: [External] RE: NCG01 NOI 15959 Attachments: HendersonvilleStabilizationSites_LatLong.xlsx Follow Up Flag: Follow up Flag Status: Flagged External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon Alaina, Attached and below are lat longs for each of the streambank stabilization sites in Hendersonville, NC. On the original permit,we used the Patton Park Site lat long to generalize the location of all the projects since its location is fairly central. However, I did provide individual lat/longs for each site in the attached table. Please let me know if you have any questions. Thanks! Proposed Impacted Site Name Proposed Stream Recommendation (LF) Potential Stream re-alignment, in stream structures (riffle, vanes, J-hooks), bank Cherry Branch Site grading and planting and stabilization 840 (brush toe with lifts, brush mattress) Stream Re-alignment, in stream structures (riffle), bank grading and Comet Drive Site planting and stabilization(brush toe 231 with lift, brush mattress) stream re-alignment, in stream structures Meadowbrook Terrace Site (riffle), bank grading and planting and 202 stabilization(brush toe with lift) Retrofit flashboard riser and lower pond water surface. Bank grading, in stream 510 (The Oak structures (vane, riffles), minor stream Site) / 168 The Oaks Site/Haywood Townes Site realignment, bank stabilization(brush toe) (Haywwod Townes Site) i Pond retrofit grading for stormwater Patton Park Site wetland 570 Bank Grading, in stream structures Maple Street Site (Vane,rock step),minor stream 85 realignment Bank grading, in stream structures (cross vane,riffles,vanes, log drops), Allen Branch @ Lakewood Road Site bank stabilization(geolift), and riparian 3904 planting includes supplemental planting of live- stakes and riparian seed mix along UT Allen Branch @ US64 Site to Allen Branch along Old Chimney 803 Rock Rd Add constructed riffle to armor the Jordan Street Site stream bed over a buried sanitary sewer 31 crossing Wash Creek Site Geolift installation along left bank 200 Geolifts along both banks to stablize Fitzsimmons Street Site banks at an aerial santiary 33 crossing. Herbaceous planting in sewer easement. Establish stone toe along both banks by moving existing onsite riprap and live Spartanburg Highway Site stake right bank. Install rock Aprons 155 below existing stormwater outfalls TOTAL IMPACTS 7732 Scott Gregory, GISP, PLS I Environmentol Scientist 0: 828.774.5547 M: 704.451.2177 Wildlands Engineering, Inc. 167-B Haywood Road Asheville, NC 28806 From:Jake McLean <jmclean@wildlandseng.com> Sent:Tuesday, September 17, 2019 2:01 PM To: Scott Gregory<sgregory@wildlandseng.com> Subject: Fwd: NCG01 NOI 15959 Sent from my iPhone Begin forwarded message: From: "Morman,Alaina" <alaina.morman@ncdenr.gov> Date: September 17, 2019 at 1:58:39 PM EDT To: "jmclean@wildlandseng.com" <0mclean@wild landseng.com> Subject: NCG01 NOI 15959 2 Hi Jake, Thank you for returning my call. The table you described in your voicemail would be really helpful to have on file to verify that all locations do, indeed, drain to Mud Creek. Additionally, can you explain why you picked the coordinates you used—is that a central location to the project? Thanks, Alaina Alaina Morman Environmental Specialist Stormwater Program Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 919-707-9236 (0) 919-807-6494 (F) alai na.morman@ncdenr.Pov DEMLR Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 3