Loading...
HomeMy WebLinkAboutNCC192009_ESC Approval Submitted_20190925It is a direct violation of your approved plan to initiate any land disturbing activities PRIOR to holding a scheduled Pre -Construction Conference (Pre -Con.). To prepare for this Pre -Con follow these steps: 1. Complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC under the NCG010000 Construction Stormwater General Permit. See attached approval letter for link to apply. 2. Receive your COC within 3 business days from DEMLR. (Email a copy of the COC to Danielle mR.udisill: drudisill lincolncount .or ) 3. Contact our office at 704-736-8501 to schedule your Pre -Construction Conference prior to any land disturbance. (A pre -con cannot be scheduled without first obtaining a COC from DEMLR) Your copy of the approved plan and grading certificate will be delivered to you and/or your grader onsite at the meeting. ����UU ��8�����U���� ����^� ������U������~���77N���� ������������� ����n�� ��������x��m� ~~.~�� SEDIMENTATION CONTROL ��*�'�~ Lincoln COUDh/ Natural Resources FleDarfO0enf 11SWest Main Street, Unnn|nbon.NC28O92 704-730-8501 Fax:704-73G-85U4 _�ro'ect Nanic: Rivercross Subdivision Submitted By: Urban Design Partners Location: N. NC 16 Business Ilwy/Triangle Rd., Denver, NC Plan T pe: Residential Watershed: Catawba River Basin Acres pproved: 61.0 acres Contact Office to Schedule Pre -Construction Conference Prior t2 Any Land Disturbance Date: 8115/19 AMHRivercmmyDevelopment TRS,LLC c/o Hamilton Stolpem 1O005NorthnmsaDrive, Suite 2OD HunteeaiUe.NC28O70 Dear Mr. HomiKonStodpon. This office has reviewed the subject Soil Erosion and Sedimentation Control Plan. We find the plan to be acceptable and hereby issue this Letter of Plan Approval, If any modifications, performance reservations, or recommendations are applicable, a list is enclosed and incorporated as a part of this letter of approval. If any modifications are not incorporated into the plan and implemented inthe field, the site will be in violation nfthe Soil Erosion and Sedimentation Control Ordinance of Lincoln County. This plan approval shall expire two (2) years following the date of approval, if no land -disturbing activity has been undertaken, moiarequired by Lincoln County Soil Erosion and Sedimentation Control Ordinance Section 0(b). As of April 1, 2019, all new construction activities are required to complete and submit anelectronic Notice mfIntent (NO|)form requesting Certificate of Coverage (COC) under the NCGO1 0000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.g2v/NCG01. Please direct questions about the NOI form to Annette Lucas at Aninette.lucas@ncdenr.gov or Paul Clark at PauI.cIa.rk(�D_ncdenr..qo . After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after August 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh, Title 15A NCAC 4B 011 8(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1.The approved E&SCplan aawell aoany approved deviation, 2.The NCGD1 permit and the COC.once i\iareceived. 3.Records ofinspections made during the previous 3Odays. Also, this letter gives the notice required byG.8. 113A~&1.1(a)and Lincoln County Soil Erosion and Sedimentation Control Ordinance Section 11 (f) of our right of periodic inspection to insure compliance with the approved plan. Lincoln County's Soil Erosion and Sedimentation Control Ordinance is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the Soil Erosion and Sedimentation Control Plan is inadequate to meet the requirements of the Sedimentation Pollution Control Actmf1Q73 (North Carolina General Statute 112A- 1thmugh60amdLinuo|nCoun1ySoi|Emnioneod3odimuntadiomContm| Ordinance Section 9(d), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturb,ing activity. This approval does not supersede any other permit orapproval. Please note that this approval iabased impart onthe accuracy uf the information provided inthe Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change inthe information included onthe form. Your cooperation in appreciated and we look forward to working with you on this project. If there are any queutions, please donot hesitate tocontact this office at the above number. 4 Kc rely Erosion and Sedimentation Control Administrator Lincoln County Soil and Water Conservation District