From: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>
Sent: Tuesday, September 24, 2019 2:52 PM
To: Rivenbark, Chris; Dilday, Jason L
Cc: Steenhuis, Joanne; Herndon, T. Mason
Subject: [External] RE: Permit application for B-4635 Sampson County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
Chris/Jason,
NC DEQ-DWR and the Corps have both reviewed the application for B-4635 in Sampson County. Both agencies
understood there was a push to get this permit issued in short time hence why we are responding in one response as
opposed to dual responses. The items below represent concerns and or items that need to be clarified in the
preconstruction notification. Again the items are combined and are not separated by agency. If you need clarification for
any items please respond to both agencies.
- the Corps ID assigned to this project is SAW-2015-01191.
- a PJD has been completed for this project therefore please upload this document with the PCN.
- please upload the final SEPA/NEPA final approval letter.
- whereas this is not the main run of the River it still represents a stream channel, therefore please correct the stream
impact table accordingly, note TB falls water ward of the OHWM.
- 2h states there are no streams on site, the PJD shows approximate channels for the South River and South River
overflow.
- along the north side of the project where permanent fill is called for HC is noted. Within Division 3, MC has always been
requested along the slopes of permanent fill. This has been confirmed with Division please correct throughout the
package. If less than 10' of fill 5' of MC is appropriate and greater than a 10' fill height 10' has been the standard.
- In Etc - the statement if DWR requires compensatory mitigation - if impacts less than 1 acre DWR does not require
mitigation (as it is 0.77 acres now, no mitigation will be required but if additional regulated activity occurs (MC) and the
cumulative total exceeds 1 acre mitigation would be required).
-no topo or soils map in the application.
-county not identified in application form.
- no discussion exists concerning the construction of the temporary impacts, no discussion regarding the steps taken to
support the temp fill thus avoiding long term compaction impacts, no recovery, replanting and or monitoring discussed.
-there is no slope listed in the cross section drawings regarding the temp detour which leads to the question, could the
slope be steeper than 3:1 since it would most likely be constructed with a rock base thus reducing the amount of
temporary impact?
-currently there is greater than 1 acre of hand clearing for utility line movement which should require mitigation. There
reads a statement that not all of the HC would occur in forested areas but it needs to be noted how much forested
wetlands would be permanently converted. If this amounts exceeds 0.5 acres the Department would be expected to
provide mitigation for this conversion impact.
If you have any questions regarding this list if items to address in the application please be sure to copy both agencies on
the response.
Thanks,
Brad
-----Original Message -----
From: Rivenbark, Chris [mailto:crivenbark@ncdot.gov]
Sent: Friday, September 20, 2019 1:48 PM
To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne
<joanne.steenhuis@ncdenr.gov>
Cc: AI-Dhalimy, Nadia A <naaldhalimy@ncdot.gov>; Fitzpatrick, Linda F <Iffitzpatrick@ncdot.gov>; AI-Ghandour, Majed N
<malghandour@ncdot.gov>; Barclay, Carl A <cbarclay@ncdot.gov>; Collette, Karen E. <kecollette@ncdot.gov>;
fritz.rohde <fritz.rohde@noaa.gov>; gary_jordan@fws.gov; Hanks, Brian <bhanks@ncdot.gov>; Herndon, T. Mason
<tmherndon@ncdot.gov>; NCDOT Service Account - Roadway Design <roadwaydesign@ncdot.gov>; Staples, Shane
<shane.staples@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Twyla Cheatwood - NOAA
<twyla.cheatwood@noaa.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Peterson, Tierre R
<trpeterson@ncdot.gov>; Dilday, Jason L <jldilday@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov>; Lauffer,
Matthew S <mslauffer@ncdot.gov>
Subject: [Non-DoD Source] Permit application for B-4635 Sampson County
The permit application for B-4635 has been prepared. The electronic copy can be viewed/downloaded here
<Blockedhttps://xfer.services.ncdot.gov/pdea/PermApps/B-
4635%20General%20Sampson%20September%2020%202019.pdf> .
Chris Rivenbark
Environmental Analysis Unit
North Carolina Department of Transportation
919 707 6152 office
crivenbark@ncdot.gov <mailto:crivenbark@ncdot.gov>
1598 Mail Service Center
Raleigh, NC 27699-1598
1020 Birch Ridge Drive
Raleigh, NC 27610