HomeMy WebLinkAboutNCG080979_BIMS Compliance Inspection Report_20190919Compliance Inspection Report
Permit: NCG080979 Effective:
SOC: Effective:
County: Pender
Region: Wilmington
Contact Person: Brenden Rose
Expiration: Owner: Fedex Freight Inc
Expiration: Facility: FedEx Freight Inc- WMN
374 Corporate Dr
Title:
Wilmington NC 28401
Phone: 870-365-4087
Directions to Facility:
Follow 1-40 to US-421 N in Currie, merge onto 1140, take the exit toward US-421 N turn left onto US-421 N, turn left onto Corporate
Drive. Keep on Corporate Drive and Facility will be on the left.
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 09/19/2019 EntryTime: 10:OOAM Exit Time: 10:30AM
Primary Inspector: Brian P Lambe Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Transportation w/Vehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG080979 Owner - Facility: Fedex Freight Inc
Inspection Date: 09/19/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Site is very clean and stormwater is managed very well. No anticipated issues with the site with stormwater.
SPPP has been prepared and implemented.
Page 2 of 3
Permit: NCG080979 Owner - Facility: Fedex Freight Inc
Inspection Date: 09/19/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ ❑ ❑
# Does the Plan include a BMP summary?
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ ❑ ❑
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment: Monitoring has not begun.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑
Comment: Monitoring has not begun.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑
Comment:
Page 3 of 3