Loading...
HomeMy WebLinkAbout20140762 Ver 4_September Sites Inspection_20190924Wetland Inspection Report Project Num: 20140762 Project Name: NCDOT- US 221 (R-2915B) County: Watauga Location: NCDOT- US 221 (R-2915B) Latitude: +35' 16' 05" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 9/17/2019 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: 0 Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Version: 4 Status: Issued Project Type: Road/Highway Widening Region: Central Longitude: -81 ° 30' 10" Title: Phone: ❑ Not Compliant Phone: 336-776-9703 page: 1 Site Number: 20140762 Owner: Thorpe, Gregory Inspection Date: 9/17/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: We reviewed several sites across the project including: Sites 3 and 11 on A Section; Site 1A on B Section; Sites 13, 16 and Miller waste mountain on C Section; and, Site 6 on D Section. The Corps and DOT were present. Much was discussed and some issue left unresloved at this point at Site 6 D-Section; Waste Mountain and Culvert inlet at Site 11. More follow-up will occur over the next several weeks to finalize a plan moving forward. More details can be found in the file. page: 2