HomeMy WebLinkAbout20140762 Ver 4_September Sites Inspection_20190924Wetland Inspection Report
Project Num: 20140762
Project Name: NCDOT- US 221 (R-2915B)
County: Watauga
Location: NCDOT- US 221 (R-2915B)
Latitude: +35' 16' 05"
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 9/17/2019
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Version: 4 Status: Issued
Project Type: Road/Highway Widening
Region: Central
Longitude: -81 ° 30' 10"
Title: Phone:
❑ Not Compliant
Phone: 336-776-9703
page: 1
Site Number: 20140762 Owner: Thorpe, Gregory
Inspection Date: 9/17/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: We reviewed several sites across the project including: Sites 3 and 11 on A Section; Site 1A on B
Section; Sites 13, 16 and Miller waste mountain on C Section; and, Site 6 on D Section. The Corps and
DOT were present. Much was discussed and some issue left unresloved at this point at Site 6 D-Section;
Waste Mountain and Culvert inlet at Site 11. More follow-up will occur over the next several weeks to
finalize a plan moving forward. More details can be found in the file.
page: 2