HomeMy WebLinkAboutNCC192022_ESC Approval Submitted_20190924h
TOWN 1
WAKE FOREST
EROSION AND SEDIMENT CONTROL
LAND DISTURBING PERMIT
LETTER OF APPROVAL
Forestville Partners, LLC
3008 Anderson Dr
Raleigh, NC 27609
RE: Project Name: Forestville Towns
Location: 535, 537, & 545 Forestville Rd.
Wake Forest, NC 27587
Submitted By: John A. Edwards & Co
Date Approved: June 28, 2019
Dear Sir/Madam:
301 S. Brooks Street
Wake Forest, NC 27587
1919.435.9400
IAAV VAN'Ikefo e str�( 0()''
Date: September 23, 2019
Permit No: 2018-00002066
Acres Approved: 10.2
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the
Town of Wake Forest, as well as, a digital copy at least one week prior to the preconstruction
meeting. The land disturbance permit shall expire two (2) years from the date of approval and can be
renewed in one-year increments.
Per the Unified Development Ordinance (UDO), a copy of the approved erosion control plan shall
be on file at the job site. Also, this letter gives the notice of our right to periodically inspect the
jobsite to insure compliance with the approved plan as outlined in the UDO.
The Town of Wake Forest Erosion and Sediment Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet the
requirements of the Town of Wake Forest Erosion and Sediment Control Ordinance, this office
may require revisions to the plan and implementation of the revisions to insure compliance with the
UDO.
Acceptance arid approval of this plan Is conditioned upon your compliance with Federal, State, and
Local water quality laws, regulations, and rules. Till's approval does not supersede any other pern"at
or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Fillancial Responsibility Form, You are requested to file an amended form if there are any changes
in the information. Please set up a preconstruction conference with all parties involved through the
Planning Department. A preconstruction meeting must be held with the Town prior to starting any
work, including installation of erosion control measures, demolition, any clearing and grubbing or
earth moving activities.
Be aware that your project is subject to the NPDES General Stormwater Permit NC GO1000
(Construction Activities). The Town will no longer distribute the NC GO1 permit, you will have to
obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an
electronic Notice of Intent with this approval letter: y/�`(2,n'.ns/,N(,'(jO I -NO1
You will also need to have copies of the compliance plans sheets, ((around Stabilization and Material
Handling, and Inspection, Recordkeeping, and Reporting), if they were not included ill the approved
erosion and sediment control plan onsite.
Sincerely,
Carrie Mitche 11, PE
Environmental Engineer
Town of Wake Forest