Loading...
HomeMy WebLinkAbout20041810 Ver 1_Mitigation Evaluation_20090325CY m, t. nr??S V--+?•?..? Mitigation Project Evaluations: Information Table NC Division of Water Quality Date of Office Review: 3723k-2,Wq Evaluator's Name(s): Date of Report. - Report for Monitoring Year: Date of Field Review: - - Evaluator's Name(s): Other Individuals/Agencies Present: (?f r . 7X [YICLiCl1r?Cn??? rcq. OVA 2> Weather Conditions (today & recent): L Directions to Site: coordinate agency review visits with Airport Direcf 4aa fait P_a ?-3re-crt?c i I le- tJ-C_. 21 ?3? 1. Office Review Information: C 2527 Project Number: 20041810 Project History Project Name: Pitt-Greenville Airport Event Event Date County(ies): Pitt 401 Issued 5/25/2005 Basin & subbasin: Tar-Pamlico Nearest Stream: Tar River Water Quality Class of Nearest Stream: WS4,N i Mitigator Type: Private DOT Status: non-DOT Total Mitigation on Site Wetland: 1.07 acres Stream: Buffer: Approved mitigation plan available? Yes No Monitoring reports available? Yes No Problem areas identified in reports? Yes No Problem areas addressed on site? Yes No Mitigation required on site: *Add significant project-related events: reports, Associated impacts (if known): received, construction, planting, repairs, etc. - During office review, note success criteria and evaluate each component based on monitoring report results. Record relevant data in Sections II and III. - On back of sheet, note other information found during office review and/or to be obtained during site visit. II. Summary of Results: Monitoring Success Success Mitigation Component Year (report) ((field) Resolved 20041810-1 Wetland (Non-riparian, wetter) Restoration "I Version 1.0 (August 22, 2007) Page 1 of 2 Mitigation Project Evaluations: Information Table NC Division of Water Quality MITIGATION SUCCESS: Compared to the approved mitigation plan, this project is: su ce ful partially successful unsuccessful List specific reasons for lack of success for this project: Additional comments (e.g. DWQ follow-up actions, recommendations, etc.): Version 1.0 (August 22, 2007) Page 2 of 2 J Wetland Mitigation Project Evaluations: Information Table NC Division of Water Quality Component: Wetland (Non-riparian, wetter) Restoration Component ID: 20041810-1 Description: relocation of ditch; broad, flat bottom will have WL functions Location within project: III. Success Criteria Evaluation: HYDROLOGY - Approved Success Criteria: Wetland Hydrology Indicators: ? Inundated Saturated in upper 12 inches Monitoring report indicates success Yes No Drift lines Observational field data agrees? Yes No Drainage patterns in wetlands based on mitigation plan? Yes No Sediment deposits based on wetland type? Yes No Water marks List any remaining hydrology issues to address (e.g. remaining ditches, excessive water, etc.): SOILS - Approved Success Criteria. io/Dlw Are soils hydric or becoming hydric. List indicators of hydric soils: List any remaining soil issues to address (e.g. erosion, upland areas, etc.): VEGETATION - Approved Success Criteria: Dominant Plant Species Per FAA guidance, only maintained low herbaceous veg Species Story TPA/'/ cover allowed; annual photos monit growth/success of planted , n , S jec- (fl(? hydrophytic veg for 5 years; UPL grass (Fescue) planting `-C OK'ed on sides of ditch, Lespedeza planting OK'ed >50' 0t? -?(ju?9?1?1AU.0 DJlrl? Monitoring report indicates success? Yes No Average TPA for entire site (per report): I ` AA 'k S b r ??y? Observational field data agrees? Yes No based on community composition? Yes No based on TPA and/or % cover? Yes No Vegetation planted on site? Yes No Date of last planting: lh Cl?-.? LyLt?a'u:LQ a-?-s2.. Vegetation growing successfully? Yes No - Specific vegetation plots or site locations with little to no vegetation: Estimated acreage or site percentage of unvegetated areas: Invasive species on site (species, location(s), and % cover): List ntsy maining vegetation issues to address (e.g. plant survival, concerns, etc.): Version 1.0 (August 22, 2007) Page 1 of 2 Wetland Mitigation Project Evaluations: Information Table NC Division of Water Quality NCWAM - Approved Success Criteria or Evaluative Tec niques: NCWAM Type on Site: Monitoring report indicates success? Observational field data agrees? Attach NCWAM analysis results to this n List any remaining NCWAM issues t & Coastal Riverine Yes No Riparian Yes No Non-riparian (wetter) Non-riparian (drier) (e.g. functionality, developing wetland type, etc.): MITIGATION SUCCESS: Compared to the approved mitigation plan, this component is: su ce 'ful List specific reasons for lack of success for this component: partially successfu Additional comments (e.g. DWQ follow-up actions, recommendations, etc.): (\?)\- bL& jam- df?- ?N I unsuccessful During site visit, document representative conditions and areas of concern. Observe preservation and enhancement areas that may not have specific success criteria. Label and attach photos to this report. Attach maps showing photo locations, areas of concern, and important field observations. - Additional es related to this c` ^ /o C oln`Yenlt? Or dca? re? , C 1 M--? CZ5? U)C6* yroo -Oz cO"J=(mLan un bum o? -' 66. rn, ? bpec 3? U_L 9) CarLq red m . Version 1.0 (August 22, 2007) Page 2 of 2