Loading...
HomeMy WebLinkAbout20090566 Ver 1_Stormwater Info_20091001vMCKIM&CREED TO: NCDENR - DWQ 2321 Crabtree Boulevard Raleigh, NC 27699 ATTENTION: Ms. Annette Lucas 09 -oSLoLP LETTER OF TRANSMITTAL DATE: September 28, 2009 PROJECT NO: 01517-0194 T TASK NO: RE: Caterpillar Product Development Center TRANSMITTAL NO: PAGE 1 OF 1 WE ARE SENDING: ? Originals ® Prints ? Specifications ? Calculations ? Shop Drawings ? Samples ® Other Quantity Drawing No. Rev Description Status 2 Plan Set for BMP's and Erosion Control Drawings 1 Set of relevant stormwater calculations 2 Wet Detention Basin supplements 2 Stormwater BMP O&M Agreements (original) REMARKS: Hi Annette, Please find the enclosed information that you requested for the Caterpillar Core PDC site supplemental to the 401 approval. Please let us know if you need any additional information, or if you have any questions. 0 I CT 1 2009 WETWO AND STOORMW SPANN 1730 Varsity Dr., Suite 500, Raleigh, NC 27606 919/233-8091 Fax 919/233-8031 Cc: McKIM & CREED, PA Signed a."Ze Gareth Avant, El v MCKIM&CREED v September 28, 2009 P L A N N E R S Venture IV Building Suite 500 1 730 Varsity Drive Raleigh, NC 27606 919.233.8091 Fax 919.233.8031 www.mckimcreed.corn Ms. Annette Lucas NCDENR - DWQ - 401 Permitting Unit 2321 Crabtree Blvd, Suite 250 Raleigh, NC 27604 RE: Caterpillar Access Road comments dated August 19, 2008 Ms. Lucas: ENGINEERS S U R V E Y O R S M&C 01517-0194 In response to your comments received on August 19, 2009, we have revised the enclosed plans and we offer the following responses below. Original comments are shown in BOLD. 1. Please provide a BMP Supplement Form for each proposed best management practice that will be used on the site (including both worksheets, Design Summary and Required Items Checklist), as well as all of the required items. The BMP Supplement Forms are available on the DWQ web site at: http://h2o.enr.state.nc.us/su/bmp-forms.htm. The DWQ will conduct a detailed review of the BMP designs after this information has been submitted. A BMP Supplement Form, along with O&M Agreement has been provided for each proposed BMP. 2. The level spreader that is proposed downslope of BMP #1 must be relocated to an area that has appropriate slope and topography per Chapter 8 of the BMP Manual. The proposed level downstream of the emergency has been removed as directed through discussions with NCDENR-DWQ and NCDENR-DLR. The proposed level spreader downstream of the primary spillway has been relocated to an area that meets the requirements stated in Chapter 8 of the BMP Manual. Ms. Annette Lucas September 28, 2009 Page 2 of 2 3. Condition 7 states: "All areas on the site that shall be utilized for equipment testing shall be shown clearly on the plans. In addition, the testing processes themselves and their impacts on the natural land surface shall be described in detail. Any areas that will be left undisturbed on an ongoing basis shall be equipped with appropriate Sediment and Erosion Control measures... " Although the testing area has been shown clearly on the plans, the remainder of this condition does not appear to have been met. Please provide the requested description as well as plan details for the proposed sediment and erosion control measures. A detailed description of the testing area activities has been added to the project's narrative, included with this package. All sedimentation and erosion control devices have been designed for the 25-year storm and all the design of all devices has been approved by NCDENR-DLR. Plan details for these devices are shown on sheet C5102 of the attached "Issued for Construction" drawing set. If you have any questions during your review, please do not hesitate to give me a call at 919.233.8091. Thank you for your help. Sincerely, McKIM & CREED, P.A. Gareth Avant, El, LEED AP Engineer Intern Attachments: - 2 sets of REVISED stormwater and erosion control plans. - Relevant stormwater calculations - 2 BMP Supplement forms - 2 O&M agreements Copy to: Project file v? McKIM&CREED Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ? does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of Iona a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How 1 will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Re air or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4V5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads .35 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 207.50 Sediment Removal Bottom 204.00 P ane Pool --------------- - - Volue Sediment Removal Elevation 203.00 Volume 203.00 ft Min. -------------------------------------------- ------ Sediment Bottom Elevation 201.00 1-ft n Storage S unec Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Caterpillar Core PDC Site BMP drainage area number:# 1 Pri Tit Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. KA a Notary Public for the State of County of _20hOb-?p Qdo hereby certify that ,- personally appeared before me this d5-1h day of Ltok w?l C , 2 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires -)L(J • E ICAU I? Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ? does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential oblem: How I will remediate the problem: The entire BMP Trash debris is resent. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged, Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4?5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (till in the blanks) Sediment Removal Bottom Permanent Pool Elevation 205.50 202.00 P ane Pool -------------- -- Volume Sediment Removal Elevation 201.00 Volume 200.00 ft Min. --------------------------------------Liiimet Sediment Bottom Elevation 199.00 Storage Storage FOREBAV MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CatgMillar Core PDC Site BMP drainage area number:#2 Print name: .?CfiF,iN Oki a?'4t11 Title:1A1t(1 AJAA)-JW 41,1 r Address: 7 C V Phone: r1f ' ' ,? - anei i S Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, LRWO 1\A- &('CfJ , a Notary Public for the State of Ukh d i1(-k-6 County of :: hIY Ln , do hereby certify that personally appeared before me this v?? day of I , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires IU EJ t ?? Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit (to be provided by DWQ) OF WAT?cq _AWA ° NCDENR o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. IL PAOJECT INFORMATION Project name Caterpillar Core PDC Site Contact person Gareth Avant, McKim & Creed, PA Phone number 919.233.8091 Date 22-Sep-2009 Drainage area number #1 111. DESIGN INFORMATION Site Characteristics Drainage area 615,195 ftz Impervious area, post-development 374,224 ftz % impervious 60.83 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp, pool? Elevation of the top of the additional volume 30,630 ft3 OK 31,080 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) 2.9 in 0.40 (unitless) 0.80 (unitless) 4.94 in/hr OK 4.74 ft3/sec 19.86 ft3/sec 15.12 ft3/sec 209.20 fmsl 207.50 fmsl fmsl 208.00 fmsl 207.00 fmsl Data not needed for calculation option #1, but OK if provided. 203.00 fmsl 201.00 fmsl Data not needed for calculation option #1, but OK if provided. 2.00 ft N (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.9-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit N (to be provided by DWQ) q Pf$IGNINFORMATION Surface Areas Area, temporary pool 20,025 ft? Area REQUIRED, permanent pool 14,765 ftZ SA/DA ratio 240 (unitless) Area PROVIDED, permanent pool, Apermpod Area, bottom of 1 Oft vegetated shelf, Abot shelf Area, sediment cleanout, top elevation (bottom of pond), Abotpond Volumes Volume, temporary pool Volume, permanent pool, Vpermpool Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpermpml Area provided, permanent pool, Apermpool Average depth calculated Average depth used in SA/DA, deV, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Apermpod Area, bottom of 1 Oft vegetated shelf, Abol_shelf Area, sediment cleanout, top elevation (bottom of pond), Abotpond "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, deV, (Round to nearest 0.51t) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: 15,219 ft` OK 11,949 ft1 6,707 ft` 31,080 ft3 OK 47,519 ft3 10,413 ft3 21.9% % OK 85 % N (Y or N) Y (Y or N) 2.40 (unitless) (Y or N) 47,519 ft3 15,219 ft` 3.12 ft OK 3.0 ft OK (Y or N) 15,219 ft` 11,949 ft' 6,707 ftZ 3.00 It ft ft Y (Y or N) 2.00 in in2 0.60 (unitless) 0.57 ft N (Y or N) (unitless) (unitless) It ft 4.74 ft3/sec 19.86 ft3/sec 0.14 ft3/sec 2.50 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 2.0-:1 OK Y (Y or N) OK 1.5 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Gate valve at bottom of pond and pump if needed Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) Jul. REQUIREI3'ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. 64A GlZoO • 1. Plans (1" 50' or larger) of the entire site showing: atso3 - Design at ultimate build-out, GOOD Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. am CZlo? 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. dCA el. 3. Section view of the wet detention basin 0" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and - Inlet and outlet structures. 64A «Lo( 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 6" CA94 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. OG4 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. " 7. The supporting calculations. l LA& jti 8. A copy of the signed and notarized operation and maintenance (0&M) agreement . 6CA ?NA 9. A copy of the deed restrictions (if required) _ . i _ "C 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basi n-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit No .AWA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information, (to be provided by DWQ) ??o? W A T?9 G O o !. PROJECT INFORMATION Project name Caterpillar Core PDC Site Contact person Gareth Avant, McKim & Creed, PA Phone number 919.233.8091 Date 22-Sep-2009 Drainage area number #2 IL DESIGN INFORMATION Site Characteristics Drainage area 638,254 ft2 Impervious area, post-development 230,750 ft2 % impervious 36.15 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 19,966 ft3 OK 20,322 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) 2.9 in 0.40 (unitless) 0.72 (unitless) 4.94 in/hr OK 4.92 ft3/sec 16.41 ft3/sec 11.49 ft3/sec 205.75 fmsl 204.50 fmsl fmsl 205.00 fmsl 204.00 fmsl Data not needed for calculation option #1, but OK if provided. 201.00 fmsl 199.00 fmsl Data not needed for calculation option #1, but OK if provided. 2.00 It (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SA/DA ratio Area PROVIDED, permanent pool, Apermyod Area, bottom of 1 Oft vegetated shelf, Abd shelf Area, sediment cleanout, top elevation (bottom of pond), Abo wd Volumes 17,599 ft' 10,212 ftZ 1.60 (unitless) 13,870 ft` OK 10,818 ft` 4,607 ft` Volume, temporary pool 20,322 ft3 Volume, permanent pool, Vpenpod 42,429 ft3 Volume, forebay (sum of forebays if more than one forebay) 8,605 ft3 Forebay % of permanent pool volume 20.3% % SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vperm-pool Area provided, permanent pool, Apermyod Average depth calculated Average depth used in SA/DA, deV, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Aperm_pod Area, bottom of 1Oft vegetated shelf, Abol shelf Area, sediment cleanout, top elevation (bottom of pond), Abolyond "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, deV, (Round to nearest 0,5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cc) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: 85 % N (Y or N) Y (Y or N) 1.60 (unitless) Y (Y or N) 42,429 ft' 13,870 ft` 3.06 ft 3.0 ft N (Y or N) 13,870 ft` 10,818 ft` 4,607 ftZ 4.00 ft ft ft (Y or N) 2.00 in in2 0.60 (unitless) 0.42 ft (Y or N) (unitless) _ (unitless) ft ft 4.92 ft3/sec 16.41 ft3/sec 0.12 ft3/sec 2.50 days OK OK OK OK OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 2.0 :1 OK Y (Y or N) OK 1.5 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Gate valve at bottom of pond and pump if needed Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) III; REQUIREb ITEMIS,CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. CIA* 4 - 1. Plans (1" 50' or larger) of the entire site showing: e-aws Design at ultimate build-out, t./OOD Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, - Pretreatment system, - High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 6[ Olds 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. $44 411403 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. GILe? 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. ?i?C..a +GG 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, S to verify volume provided. GCA 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. GC.4 eA" 7. The supporting calculations. 641' INA"V60 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. e<A 9. A copy of the deed restrictions (if required). 6CA [ c 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County &8* soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 401 SUPPLEMENTAL STORMWATER NARRATIVE & SUPPORTING CALCULATIONS September 28, 2009 CATERPILLAR CORE PRODUCT DEVELOPMENT CENTER Clayton, Johnston County, North Carolina Prepared for: CATERPILLAR, INC. Prepared By: McKim & Creed, PA 1730 Varsity Drive Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M&C Project No. 01517-0194 PROJECT DESCRIPTTON The purpose of this project is to construct a product development center for Caterpillar, Inc. This facility is designed to provide real-world product testing capability that will enable Caterpillar to apply research to improve product performance, efficiency and safety. The first phase of the project will include construction of roadway and parking infrastructure from the termination of the Caterpillar Access Road Project through a 60' R/W obtained for this project. The access driveway will be approximately 2,000 feet long and will serve as a point of access to and from the site until the Clayton Parkway is extended. No timeline currently exists for the construction of the Clayton Parkway project. As a semi-temporary measure, six modular buildings, totaling approximately 27,000 square feet and a 4,000 square foot prefabricated building will serve as the center around which Caterpillar's product development will take place. The modular building facility will house approximately 170 employees. A +/- 10 acre portion of the overall tract to the north of the power line easement will serve as a testing area for Caterpillar Equipment (further description below). The second phase of the project will include construction of the Permanent Product Development Center. At that time, an approximate 1.0 acre building, served by 55 parking spaces will be constructed to serve as the permanent home for Caterpillar's product development. The third phase of the project will include construction of a Caterpillar corporate office building. The building footprint will spon approximately 31,800 sf and will be served by approximately 500 parking spaces. Upon completion, the modular units will be removed. SITE DESCRIPTION The existing site is a 245.5 acre tract located in Clayton, North Carolina. The northeastern boundary of the site is formed by an approximate 3,000' frontage along the Neuse River. The entire site drains directly to the Neuse River (WS-V; NSW) The tract has elevations ranging from 320' MSL in the southwest portion of the site to 150' MSL nearest to the Neuse River. The average slope over the site is around 4%, however several localized areas have existing grades in excess of 20%. TESTING AREA DESCRIPTION The proposed testing area will serve as the true product development portion of the project. Equipment under development will be driven and exercised to simulate the real-world applications of the machines. On a day-to-day basis, the testing area will serve the following functions: • To check out the machine to ensure all functions area operating properly • To tune the machine's internal operating software • To test the transient response of the machines • To perform smoke testing on the machines • To perform electrical load testing on the machines • To perform overall machine audits (i.e. for harness, lines, safety, serviceability) • To test the HVAC charge in the machine • To perform water systems and flow testing • To perform ride control tests • To perform sound testing Generally, the testing area will serve as a research and development area where engineers can test new equipment in real-world scenarios which will allow them to make adjustments and improvements to the design of the machines. The testing area has been designed with permanent swales and permanent sediment traps, with agreement from NCDENR-DLR, to capture sediment laden runoff based on the 25-yr storm event. SOILS According to the Johnston County Generalized Soil Survey, the majority of uplands within the site are classified as Cecil sandy loom (Ce) and Pacolet loom (Pa). Interspersed within the uplands ore small pockets of Urdorthents loamy. Along the banks of the Neuse River are the frequently flooded Wahadkee loam (Wt) and Chewacla loam (Ch). The following soil descriptions are associated with the soils found on the site: CeB - Cecil sandy loam at 2 to 6% slopes CeC - Cecil sandy loam at 6 to 10% slopes PaD - Pacolet loam at 10 to 15% PaE - Pacolet loam at 15 to 25% Ud - Urdorthents loamy Wt - Wahadkee loam frequently flooded Ch - Chewacla loam frequently flooded STORMWATER IMPROVEMENTS The first phase of the project will include construction of a permanent stormwater wet detention pond, designed to attenuate the peak runoff rate for the 1-yr and 10-yr storm events, as well as providing TSS and Nitrogen reduction per the Town of Clayton's standards. After completion of the first phase of construction, the pond will capture the impervious surfaces from the buildings, parking and most of the roadway after the termination of the access driveway. The runoff from the access driveway will be captured in swales and sent into the permanent natural draws that exist on the site. The pond has been designed to capture roughly half of the total runoff from the site impervious areas upon total buildout of the project. Upon design of areas that do not contribute runoff to the wet detention pond that will be built in phase 1, a second wet detention pond will be designed and built per the standards listed above. IMPERVIOUS CALCULATIONS IMPERVIOUS AREA BREAKDOWN Area Description Total Impervious Area ac Testing area 10.00 Pole barn 0.09 Modular Units 0.73 Parkin area for modular units and future corporate building 5.70 - Driveways to and around site 2.13 Future Core PDC building 0.99 Parkin area for future Core PDC building 1,97 Rear drives at future Core PDC building 0.48 Future Corporate building 1.70 Total Impervious Acreage 23.79 Total Site Acreage 245.50 Total impervious % 9.69% BMP #1 Permit No. (to be provided by DWO) ?? of w a rEry,? ** NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required infwmafian, I, PROJECT INFORMATION Project name Caterpillar Core PDC Site Contact person Gareth Avant, tAciGm & Creed, PA Phone number 919.233.8091 Date 22-Sep-2009 Drainage area number #1 II. DESIGN INFORMATION Site Characteristics Drainage area 615,195 fC Impervious area, post-development 374,224 ti % impervious 60.83 % Design rainfall depth 1.0 in Storage Volume: Non•SAWaters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-developmant 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flavr Calculations Is the prefposl control of the lyr 24hr storm peak flour required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flour PrelPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation Si elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top ei°valion (bottom of pond) Sedimentcleanout, bottom elevation Sediment storage provided is there additional volume stored above the skate-required temp. pool? Elevation of the top of the additional volume 30,630 ft3 OK 31,080 ft3 OK, volume provided is equal to or in excess of volume required. rya ft3 ft3 to ft3 Y (Y or N) 2.9 in 0.40 (unitless) 0.80 (unitless) 4.94 inlhr OK 4.74 ft3lsec 19.86 ft3lsec 15.12 ft3lsec 209.20 fmsl 207.50 fmsl fmsl 208.00 fmsl 207.00 fmsl Data not needed for calculation option #1, but OK if provided. 203.00 fmsi 201.00 fmsi Data not needed for calculation option 91, but OK if provided. 2.00 111 N (Y or N) fmsl Form SW401-Wet Catantion Basin-Rev.&9117109 Parts I. & 11. Design Summary, Page 1 of 2 Permit No (N b= prov;ded by DWQ) fl, DESIGN INFORMATION Surface Areas Area, temporary pool 20,025 ft2 Area REQUIRED, permanent pool 14,765 ft2 SAIDA ratio 2.40 (unitless) Area PROVIDED, permanent pool, A,-, ,,-a 15,219 fC OK Area, bottom of 10ft vegetated shelf, A5;,1 S-1 11,949 ft` Area, sediment cleanout, top elevation (bottom of pond), Ab,t .i 6,707 ft` Volumes Volume, temporary pool 31,080 ft3 OK Volume, permanent pool, V,? ,j 47,519 ft3 Volume, forebay (sum of forebays if more than one forebay) 10,413 ft3 Forebay % of permanent pool volume 21.9% % OK SAIDA Table Data Design TSS removal 85 Coastal SAIDA Table Used? N (Y or N) MountaWPledmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.40 (unitless) Average depth (used in SA/DA table): Caiculatl'on option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vran,,,r,A 47,519 ft° Area provided, permanent pool, Ar_T-p'„ r 15,219 ft` Average depth calculated 3.12 ft OK Average depth used in SA/DA, d,,, (Round to nearest 0.5ft) 3.0 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, A;em_P,,d 15,219 ft` Area, bottom of 1 Oft vegetated shelf, Ar.,t ft` 11,949 Area, sediment cleanout, top elavation (bottom of pond), A;,tjFd 6,707 ft2 "Depth' (distance bhv bottom of 101 shelf and top of sediment) 3 00 ft Average depth calculated ft Average depth used in SAIDA, d,, (Round to nearest 0.5ft) fi Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (Cc) 0.60 (unitless) Driving head (Ho) 0.57 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (Q (unitless) Length of weir (L) R Driving tread (H) ft Pre-development 1-yr, 24-hr peak flovi 4.74 Osec Post-development 1-yr, 24-hr peak Flow 19.86 folsec Storage volume discharge rate (through discharge orifice or weir) 0.14 ft3lsec Storage volume dra%vdown time 2.50 days OK, draws dovm in 2-5 days. Additional Information Vegetated side slopes Vegetated shelf slope Vegetaled shelf width Length of flcvapath to width ratio Length to width ra6'o Trash rack for overflow & onfice? Freeboard provided Vegetated filler provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism formainlenance oremerpricles is: 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 CK 2.0 :1 OK Y (Y or N) OK 1,5 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Gate valve at bottom of pond and pump if needed Form SW401-Wet Detention Basin-Rev.8-911 710 9 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by 0 W4) Ill. REQUIR X ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. GCA C1200 - 1. Plans (1" - 50' or larger) of the entire site showing: G12tol - Design at ultimate build-out, /d4d - Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, - Proposed drainage easement and public right of way (ROM, Overflow device, and - Boundaries of drainage easement. dleA e-yo! 2. Partial plan (1" = 30' or larger) and details for the wet detention basin shoving: - Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. G[A C'tJo 3. Section view of the wet detention basin 0 " = 20' or larger) showing: - Side slopes, 3:1 of lower, Pretreatment and treatment areas, and Inlet and outlet structures. 6eA E1145'f 4. If the basin is used for sediment and eroslon control during construct-ion, clean out of the basin is specified on the plans prior to use as a wet detention basin. 6" eouG 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, &09 to verify volume provided. GCA ? 6. A construction sequence that shows how the Bret detention basin Swill be protected from sediment until the entire drainage area is stabilized. GC 4*cd 7. The supporting calculations. S"t 6G4 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. GCA _NA_ 9. A copy of the deed restrictions (if required). 64-4 c*c.e 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County 'Ova*_ soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9117109 Part III. Required Items Check€ist, Page 1 of 1 Permit Number: (1o be provided by DIf1Q) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMR This maintenance record will be kept in a log in a known set location, Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMR The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): 0 does ? does not incorporate a vegetated filter at the outlet. This system (check one): ? does M does not incorporate pretreahnent other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (corrunonly six weeks). - No portion of the vet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. -- If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately, BMP element: Potential robtem: How I will remediate the problem: The entire BMP 'T'rash debris is result, Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer a licatiom Vegetation is too sh Maintain vegetation at a height of ion inches. Form Sw401-wel Detention Basin 0&M•Rev.4 Page 1 of 4 Permit Number: (to be provided by DJVQ) Drainage Area Number: 13MP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future roblems with erosion, The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the 13w. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to xevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem; soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-tithe fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or tile BMP. Algal growth covers over Consult a professional to remove 50%. of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray), the basin surface. Form SW401-' Vet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem, How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs, appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1756. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 455 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.55 feet in the forebay, the sediment shall be removed. BASIN DUGa2AM 011 in the blanks) Sediment Removal Bottom Permanent Pool Elevation 207.50 204.00 Pe manen -------------- -- Volume 203.00 -ft Min. Sediment Storage FOREBAY Pool ------Sediment-Removal Elevation 203.00- Volume --------- ------ Bottom Elevation Mr9 VI POND 1-ft Storage Form SW40I-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Nmmbcr; _ (to be prvvided by U!!'()) I acknowledge and agree by my signature Wow that 11111 responsible for the performalicu ofthe maintenance procedures listed aWvc. I agree to notify DWQ orally problems wilh tite system or prior to any changes to the system or responsible party. Project name,Catcrpillar Core PDQ Site BM1' drarfrcrge arew monbGrli I _ Note: The legally responsible party should riot be a homeoNvtrers association uniess more than S0% of the lots have been sold and a resident of the subdivision has been named the president. Notary Public for the State of' 4U11 ? S 1 S 1{, County of A, IV clo hereby certify that f )c ?? ] C -0(i personally appeared before the this ,)r day of d(i , '??"I , and acknowledge the due execution of 1110 forgoing wet detention basin maintenance requirements. Witness my hand and official sea I, SEAL My commission expires Form SM01-Wet Detention Basin O&M-Rov.4 Page 4 of 4 Print name; OK *, P) ow-// a. Title: _- rr) Address,_ 'i?t? il.f: ___? WATER QUALITY POND CALCULATIONS Project Name Caterpillar Core PDC Site BMP #1 Project Number 1517-0194 Date September 22, 2009 3rd revision 2nd revision 1st revision Water Quality Pond Drainage Area Data Project Caterpillar Core PDC Site BMP #1 Project No. 1517-0194 Date September 22, 2009 Total site area 615,195 square feet = 14.12 acres Drai nage area to pond Other Drainage Area Impervious areas Existing [sf] Proposed [sf] Change [sf] Existing [sf] Proposed [sq On-site buildings 0 374,233 374,233 0 0 On-site streets 0 0 0 0 0 On-site parking 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 0 0 0 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 374,233 374,233 0 0 Dra inage area to pond Other Drainage Area Non-impervious areas Existing [sf] Proposed [sf] Change [sf] Existing [sf] Proposed [sf] On-site grass/landscape 0 123,487 123,487 0 0 On-site woods 338,272 114,913 -223,359 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 338,272 238,400 -99,872 0 0 Total Drainage Area 615,195 615,195 0 3,167, 850 3,167,850 Percent Impervious 0.0 60.8 60,8 0.0 0.0 Notes: BMP #1.xls Site Drainage Area Data Page 1 of 1 Printed 9122/2009 10:39 AM Water Quality Pond Surface Area Calculations Project Caterpillar Core PDC Site BMP #1 Project No. 1517-0194 Date September 22, 2009 Total on-site drainage area to pond 615,195 square feet Total impervious area in drainage area 374,233 square feet Average water depth of basin at normal pool 3.0 feet Location of site Johnston County Site region Piedmont % Impervious cover 60.8 percent If the site is in a coastal area, will a vegetative filter be used? nla Surface Area/Drainage Area Ratios: For a site in the Piedmont 2.4 percent For a site in a Coastal County wl Vegetative Filter 5.1 percent For a site in a Coastal County wlout Vegetative Filter 7.1 percent Required surface area of pond: For a site in the Piedmont 15,020.0 square feet For a site in a Coastal County wl Vegetative Filter 31,280.0 square feet For a site in a Coastal County wlout Vegetative Filter 43,630.0 square feet Notes: BMP #1.xls Pond Surface Area Calcs Page 1 of 1 Printed 9122/2009 10:39 AM Water Quality Pond Stormwater Runoff Volume Calculations Project Caterpillar Core PDC Site BMP #1 Project No. 1517-0194 Date September 22, 2009 Drainage area 015,195 square feet Impervious area 374,233 square feet Rainfall depth 1.00 inches Percent Impervious 60.8 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient- R(v) 0.60 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 30,630.8 cubic feet Notes: BMP #1.xls Runoff Volume Calcs Page 1 of 1 Printed 9/22/2009 10:39 AM Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Temporary Pool Project Caterpillar Core PDC Site 8MP #1 Project No. 1517-0194 Date September 22, 2009 Contour ID Stage Area Is q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 207,5 0 15,219.0 0.349 15 219.0 0.3 0,0 0.0 0.0 00 208 0.5 17,957,0 0.412 21738.0 0.1 8,294.0 0.2 8,294.0 0.2 209 1.5 19 875,0 0.452 1 718.0 0.0 18 816.0 0.4 27,11 D.0 0.6 209,2 1.7 20 025,0 0.460 350.0 0.0 3 ,,970.0 0.1 31 080.0 0.5 210 2.5 21 450.0 0.492 1,425.0 0.0 16 590.0 0.4 47 670.0 0.5 211 15 23 281.0 0.534 1,831.0 0.0 22 365.5 0.5 70 035.5 0.9 212 4.5 26,168,0 0.578 1,887.0 0.0 24 224.5 0.6 94 260.0 1.1 213 5.5 27,113.0 0.622 1,945.0 0.0 26 140.5 0.6 120 400.5 1.2 214 6.5 29,115,0 0.668 2 002.0 0.0 281 14.0 0.6 148 514.5 1.2 215 7.5 31 171.0 0.716 2,056.0 0.0 30 143.0 0.7 178 657.5 1.3 216 8.5 33285.0 0.764 2,114.0 0.0 32 228.0 0.7 210 885.5 1.4 BMP #1.xls Stage Storage (Temp Pool) Page 1 of 1 Printed 9/2212009 10:39 AM Water Quality Pond Volume Calculations Stage-Storage Data for Pond • Permanent Pool Project Caterpillar Core PDC Site BMP #1 Project No. 1517-0194 Date September 22, 2009 Contour ID Stage Area (s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 201 0 2,362,0 0.054 2,362.0 0.1 0.0 0.0 0.0 00 202 1 3,405.0 0.078 11043.0 0.0 2853.5 0.1 2,883.5 0.1 203 2 5,124.0 0.118 1,719.0 0.0 4,264.5 0.1 7,148.0 0.2 204 3 6 .663,0 0.153 1,539.0 0.0 5.893.5 0"1 13 041.5 0.2 205 4 8,312.0 0.191 1,649.0 0.0 7,487,5 0.2 20 529.0 0.3 206 5 10 082.0 0.231 1,770.0 0.0 9,197.0 0.2 29 726.0 0.4 207 6 11,960.0 0.275 1,878.0 OA 11 021.0 0.3 40,747.0 0.5 2075 6.5 15 129.0 0.347 3,169.0 0.1 6,772,3 0.2 47 519.3 O.4 BMP #1.xls Stage Storage (Perm Pool) Page 1 of 1 Printed 9/22/2009 10:39 AM Water {duality Pond Volume Calculations Stage-Storage Data for Pond - Forebays Project Caterpillar Core PDC Site RMP #1 Project No. 1517-0194 Date September 22, 2009 Contour Ifl Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft] 203 0 633.0 0.015 633.0 00 0,0 0.0 0.0 00 204 1 1,412,0 0.032 779.0 0,0 1,C22.5 0.0 1,022.5 0.0 205 2 2,056.0 0.047 643.0 0.0 11733.5 0.C 21756.0 0.1 206 3 2,763.0 0.063 708.0 0.0 2-409.0 0.1 5.165.0 0.1 207 4 3,522.0 0.081 759.0 0.0 3,142.5 0.1 8,307.5 0.1 207,5 4.5 4,900.0 0.112 1,378.0 0.0 2,105.5 0.6 10 413.0 0.1 BMP #1.xls Stage Storage (Forebay) Page 1 of 1 Printed 9/22/2009 10:40 AM Water Quality Basin Dewatering Time Calculations Project Caterpillar Core PDC Site BMP #1 Project No. 1517-0194 Date September 22, 2009 Maximum surface area of basin 7,631 square feet Maximum head of water above dewatering hole 1.70 feet Orifice coefficient 0.60 Diameter of each hole 2.0 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = Volume Discharge Rate = 0.022 square feet 3.1 square inches 0.022 square feet 3.1 square inches 52.6 hours 2.19 days 0.14 cfs Notes'. Water Quality Pond Summary Information Project Caterpillar Core PDC Site BMP #1 Project No. 1517-0194 Date September 22, 2009 Drainage area to pond 615,195 square feet = Impervious area in drainage area 374,233 square feet = Bottom of pond elevation 210.00 feet Normal pool elevation 214.50 feet Pond volume at normal pool 7,780 cubic feet Required volume for design rainfall 30,631 cubic feet Required surface area for pond 15,020 square feet 14.12 acres 8.59 acres Volume provided for storage of design rainfall = 9,743 cubic feet at elevation 216 Surface area provided at normal pool 4,729 square feet BMP #1.xls Summary Data Page 1 of 1 Printed 9122/2009 10:40 AM BMP #1 Type 1124-hr Rainfall=2.89" Prepared by McKim & Creed, PA H droCADO 8.00 sln 004927 © 2006 H droCAD Software Solutions LLC 9/22/2009 Subcatchment 1S: (new Subcat) Runoff = 4.74 cfs @ 12.53 hrs, Volume= 0.666 af, Depths 0.57" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type 11 24-hr Rainfall=2.89" Area (ac) CN Description 14.120 70 Woods, Good, HSG C 14.120 Pervious Area Te Length Slope Velocity Capacity Description min feet ft/ft ftlsec cfs 36.3 150 0.0433 0.07 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.50" 11.2 904 0.0730 1.35 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 47.5 1,054 Total 00 ctii cu cr L N N f-- U J J U) C 0 -_ 0 CA m ILQ O N N U o3 ?C) 0 E° CU ? C p ?0:) -00 c` U LL Q Q mom= Cti J? V Vl 3 as c irs c d E s v L CL !! 0 Z 0 C 7 V m m W C C4 F t Q LO LO r E r II 4 N a O > G9 CN LO O O 4 J ~ o LL. LL. I.L. Li U. V (SID) M01=1 N r 00 Y r co Y LO r ('7 6 r ? 0 S N ? r 1r ti 0 •r co BMP #1 Type II 24-hr Rainfall=2.89" Prepared by McKim & Creed, PA HydroCAD® 8.00 sln 004927 © 2006 HydroCAD Software Solutions LLC 9122/2009 Pond 3P: (new Pond) Inflow Area = 14.120 ac, Inflow Depth > 1.82" Inflow - 19.86 cfs @ 12.36 hrs, Volume= 2.140 of Outflow 4.70 cfs @ 13.15 hrs, Volume= 1.323 af, Atten= 76%, Lag= 47.6 min Primary - 4.70 cfs @ 13.15 hrs, Volume= 1.323 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 210.32' @ 13.15 hrs Surf.Area= 22,025 sf Storage= 54;576 of Plug-Flow detention time= 180.3 min calculated for 1.323 of (62% of inflow Center-of-Mass det. time= 110.7 min ( 904.0 - 793.3 ) Volume Invert Avail.Storage Storage Description #1 207.50' 210,829 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area feet s -ft feet cubic-feet (cubic-feet) s -ft 0 207.50 15,219 532.0 0 0 15,219 208.00 17,957 563.0 8,285 8,285 17,934 209.00 19,675 582.0 18,809 27,094 19,758 210.00 21,450 601.0 20,556 47,650 21,641 211.00 23,281 620.0 22,359 70,009 23,586 212.00 25,168 639.0 24,218 94,228 25,591 213.00 27,113 658.0 26,134 120,362 27,656 214.00 29,114 676.0 28,108 148,470 29,680 215.00 31,171 695.0 30,137 178,606 31,864 216.00 33,285 714.0 32,222 210,829 34,107 Device Routing Invert Outlet Devices #1 Primary 205.00' 15.0" x 78.0' long Culvert RCP, square edg e headwall, Ke= 0.500 Outlet Invert= 204.50' S=0.00647 Cc= 0.9 00 n=0.013 #2 Device 1 207.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 209.20' 6,0" Vert. Orifice/Grate X 4.00 C= 0.600 #4 Device 1 210.25' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Secondary 214.00' 15.0' long x 18.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2 .64 2.64 2.63 Primary OutFlow Max=4.64 cfs @ 13.15 hrs HW=210.32' (Free Discharge) t--1 -Culvert (Passes 4.64 cfs of 11.55 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.17 cfs @ 7.96 fps) 3=OrificelGrate (Orifice Controls 3.52 cfs @ 4.49 fps) =Orifice/Grate (Weir Controls 0.94 cfs @ 0.86 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=207.50' (Free Discharge) t5=Broad-Crested Rectangular Weir (Controls 0.00 cfs) 00 (V I I C 4 U J J fA O O 7 O 0) Q ((D O N a) 'ti U rn °6 o E? - c U O a A co .f] Q T ? Q CL U iL p a ma- T O a 3 0. M Q a t? O ? O 0 E U Z'C c 0 [L v3 41 Wu00 (5IO) MOli N O') co T r C0 r Ln r T L C'7 ? r 0 L N ?C T E H T O r 63 n BMP #2 Permit No. (tp be provided by D1444) OF W A 71;,p? ?? NCDENR a STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed end submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I, PROJECT INFORMATION Project name Caterpillar Core PDC Site Contact person Gareth Avant, McKm & Creed, PA Phone number 919 233.B091 Data 22-Sep-2009 Drainage area number #2 II, DESIGN INFORMATION Site Characteristics Drainage area 638,254 ftz Impervious area, post-development 230,750 ftz % impervious 36.15 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flour Calculations is the prelposl control of the 1yr 24hr storm peak Flovi required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flo,.v Post-development 1 yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flour control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 19,966 ft3 OK 20'322 ft3 OK, volume provided is equal to or in excess of volume required. ft3 3 ft3 ft 3 ft3 Y {Y or N) 2.9 A 0.40 (unitless) 0.72 (unless) 4.94 inf'nr OK 4.92 ft3lsec 16.41 fOlseo 11.49 ft3lsec 205.75 fmsl 204.50 fmsl fmsl 20500 fmsl 20400 fmsl Data not needed for calculation option #1, but OK if provided 201 00 fmsl 199.00 fmsl Data not needed for calculation option #1, but OK if provided. 2.00 ft N (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.8.9r17109 Parts I. & II. Design summary, Page t of 2 Permit No. (ra be provrdnd by DWQ) II, DESIGN INFORMATION Surface Areas Area, temporary pool 17,599 fC Area REQUIRED, permanent pool 10,212 ftz SAIDA ratio 1.60 (unilless) Area PROVIDED, permanent pool. Ar.,,„_,i 13,870 ft' OK Area, bottom of 10ft vegetated shelf, A t_r 10,818 ft` Area, sediment cleanout, top elevation (bottom of pond), A%,y,,;i 4,607 ft` Volumes Volume, temporary pool 20,322 ft' OK Volume, permanent pool, Vr,,y,d 42,429 ft3 Volume, forebay (sum of fore bays if more than one forebay} 8,605 ft3 Forebay % of permanent pool volume 20.3%a % OK SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? IdountalnlPiedmontSAIDA Table Used? SA/DA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vr,_r,-_k,-A Area provided, permanent pool, Ar M_F,)d Average depth calculated Average depth used in SAIDA, dz.,, (Round to nearest MR) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ar,? Area, bottom of 101 vegetated shelf, A,„ i ,n, 7 Area, sediment cleanout, top elevation (bottom of pond), A,,Ij,,;., "Depth" (distance blei bottom of 101 shelf and top of sedimenl) Average depth calculated Average depth used in SAIDA, cl, (Round to nearest 0,5ft) Drawdown Calculations Drawdotvn through orifice? Diameter of orifice (If clrcu!ar) Area of orifice (if-non-circular) Coefficient of discharge (CO) Driving head (Ho) Dravrdovm through weir? Weir type Coefficient of discharge {0?.) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak 8ovr Storage volume discharge rate (through discharge orifice orweir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flo:vpath to width ratio Length to width ratio Trash rack for overfow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ul€imate build-out? Drain mechanism for maintenance or emergencies is: 85 % N (Y or N) Y (Y or N) 1.60 (unitiess) Y (Y or N) 42,429 ft' 13,870 ft` 3.06 ft OK 3.0 ft OK N (Y or N) 13,870 ft` 10,818 ft` 4,607 ftz 4.00 ft ft It Y (Y or N) 2.00 in in2 0.60 (unitless) 0.42 ft N (Y or N) (unilless) (unitless) It ft 4.92 ftslsec 16.41 Osec 0.12 fOlsec 2.50 days OK, draers down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 2.0 :1 OK Y (Y or N) OK 1.5 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Gate valve at bottom of pond and pump if needed Form SW401-Wel Detention Basin-Rev.8.9l17M Paris 1. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST 1 Please indicate the page or plan sheet numbers where the supporting documentation can be found, An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. C-4* L/14V - 1. Plans (1" - 50' or larger) of the entire site showing: 4ttv3 Design at ultimate build-out, e/GOD Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROVE, Overflow device, and Boundaries of drainage easement, de* 41_'04 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and train pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. Aft. C. !?.43 3. Section view of the wet detention basin (1" = 20" or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. exk 4:1Le1 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a viet detention basin. G,GA e*4 5, A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, JoAk to verify volume provided. J ? 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 4444 A 7. The supporting calculations. ?eA IAAC 60 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. CA 9. A copy of the deed restrictions (if required), aeA [Att. 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County J#ok soil maps are not an acceptable source of soils information. Form 5W401-Wet Detention Basin-Rev.8-9/17/09 Part Ill. Required Items Checklist, Page 1 of i PerinitNumber; (to be providers by DIVQ) Drainage Area Niiniber. Wet Detention Basin Operation and Maintenance Agreement 1 will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. 'These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ? does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin, - If the baser must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be niuuinized to the maximum extent practical. -- Once a year, a darn safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately, BMP element: Potential problem: How I will remediate the problem: The entire HMP Trash/debris is resent. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water taitil it is established, Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long, approximately six inches. Form SW401-Wet Detention Basin O&M•Rev,4 Page 1 of 4 Permit Number: (to be proNded by DJVQ) Drainage Area Ninanber: BMP element: Potential problem: How I will remediate the roblen The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe, otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to Swale, smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause unpacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The vegetated shelf Hest professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necess Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal owth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basins surface, Form SW40l-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Nnmber: (to be provided by DMQ) Drainage Area Number:_ BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by ari Make all needed repairs. appropriate professional shows that the embankment needs re air. if a licable The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is dama ed Re air or re lace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 2786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads L55 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM oil it; the blanks) Sediment Removal Bottom Permanent Pool Elevation 205.50 2020 I Pc n?alte?a'? --- ® Volume 204,00 -ft Min. Sediment Storage FOREBAY Pool 1- - - - - -Sediment Removal Elevation-201.00. ^ - - - _ - Voltum -*- Bottom Elevation MAIN POND 1-ft Mon. Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 ofd I'vi'mit NllillJler: (ln be p) vie/eel by 1) WQ) I acknowledge and agree by lily signature below that I am responsible foi- the perlilrmmce oftllc maintenance procechu•cs listed alxwe. I agree to notify DWQ ofany probloills with the system or prior to any cif{lakes to the system rn• responsible party. Prnjecl name:c.atcrpiilar core 111 C-Site BMI' davit age w -co n1P17 bei ;i12._. 0014 Print 11,11-11G: '? Note; Tlie legally responsible party should not be a homeowners association unless in ore than 50% of file lots have been sold and a resident ofthc subdivision hrrs been named the president. f, o _k ?n A . ,01` ('(-''() a Notaq Public for the State of \ Os county of do hereby ccrtify that personally appeared before me this s11 day of and acknowlccif;c the duc execution offfic forgoing wet detention basin maintenance recluiretlleilts. Wttr1CSS Illy h{lad told official seal, SEAL My commission expires X) -- Form SW,101-Wet Detention Basin O&M-Rcv.4 11;lgc 4 of 4 Title:---- -- ?IpC(a?ii 61 MA )q6eg Address'---_ (!` .?1- C A WATER QUALITY POND CALCULATIONS Project Name Caterpillar Core PDC Site BMP #2 Project Number 1517-0194 Date September 22, 2009 3rd revision 2nd revision 1st revision Water Quality Pond Drainage Area Data Project Caterpillar Core PDC Site BMP #2 Project No. 1517-0194 Date September 22, 2009 Total site area 638,254 square feet = 14.65 acres Drai nage area to and Other Drainage Area Impervious areas Existing [sf] Proposed [sf] Change [sf] Existing [sf] Proposed [sf] Future Corporate Bldg 0 74,145 74,145 0 0 Future Corporate Bldg Prkg 0 156,605 156,605 0 0 Future PDC Bldg 0 0 24,470 0 0 Future PDC Prkg 0 0 22,745 0 0 Other on-site 0 0 0 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 230,750 230,750 0 0 Drai nage area to pond Other Drainage Area Non-impervious areas Existing [sf] Proposed [sf] Change [sf] Existing [sf] Proposed jsfl On-site grass/landscape 0 407,504 407,504 0 0 On-site woods 638,254 0 -638,254 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 638,254 407,504 -230,750 0 0 Total Drainage Area 638,254 638,254 0 3,167,850 3,167,850 Percent Impervious 0.0 36.2 36.2 0.0 0.0 Notes: BMP #2.xls Site Drainage Area Data Page 1 of 1 Printed 9/22/2009 10:48 AM Water Quality Pond Surface Area Calculations Project Caterpillar Core PDC Site BMP ?Q Project No. 1517-0194 Date September 22, 2009 Total on-site drainage area to pond 638,254 square feet Total impervious area in drainage area 230,750 square feet Average water depth of basin at normal pool 3.0 feet Location of site Johnston County Site region Piedmont % Impervious cover 36.2 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 1.6 percent For a site in a Coastal County w/ Vegetative Filter 3.1 percent For a site in a Coastal County wlout Vegetative Filter 4.1 percent Required surface area of pond: For a site in the Piedmont 10,090.0 square feet For a site in a Coastal County wl Vegetative Filter 19,500.0 square feet For a site in a Coastal County w/out Vegetative Filter 26,270.0 square feet Notes: BMP #2.xls Pond Surface Area Calcs Page 1 of 1 Printed 912212009 10:48 AM Water Quality Pond Stormwater Runoff Volume Calculations Project Project No. Date Drainage area Impervious area Rainfall depth Percent Impervious Caterpillar Core PDC Site l3MF1 #2 1517-0194 September 22, 2009 638,254 square feet 230,750 square feet 1.00 inches 36.2 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.38 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 19,965.0 cubic feet Notes: BMP #2.xls Runoff Volume Calcs Page 1 of 1 Printed 9/22/2009 10:48 AM Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Temporary Pool Project Caterpillar Core PDC Sito BMP #2 Project No. 1517-0194 Date September 22, 2009 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. fi Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 205,5 0 13,870.0 0.318 13870.0 03 O 'D 0.0 0.0 0.0 206 0.5 16,407.0 0.377 2 537.0 0.1 7.569.3 0.2 7.569.3 0.2 208.75 1.25 17 599,0 0.404 1,192.0 00 12 752.3 0.3 20 321.5 0.5 207 1.5 18 004.0 0.413 405.0 0.0 4,450.4 0.1 24 771.9 0.4 208 2.5 19 658.0 0.451 1,654.0 0.0 18,831.0 0.4 43 602.9 0.5 209 3.5 21373.0 0.491 1 715.0 0,0 20515.5 0.5 64 118.4 0.9 210 4.5 23,140,0 0.531 1,767.0 00 22 256.5 0.5 86 374.9 1.0 211 5.5 24,963.0 0.573 1,823.0 0,0 24 051.5 0.6 110 426.4 1.1 212 6.5 26 843.0 0.616 1,880.0 0.0 25.9030 0.6 136 329.4 1.1 213 7.5 28 779.0 0.661 1,935.0 0.0 27 811.0 0.6 164 140.4 1.2 BMP #2.xls Stage Storage (Temp Pooh Page 1 of 1 Printed 912212009 10:48 AM Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Permanent Pool Project Caterpillar Core PDC Site BMP 92 Project No. 1517-0194 Date September 22, 2009 Contour ID Stage Area s . ft, Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incrementai volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 199 0 2,5240 0.058 2,524.0 0.1 0.0 0.0 0.0 0.0 200 1 3,243.0 0.074 719.0 0.0 21883.5 0.1 2185315 0.1 201 2 4,607.0 0.106 1,384.0 0.0 3,925.0 0.1 5,808.5 0.2 202 3 5 .356,0 0.123 749.0 0.0 4,981.5 0.1 11 790.0 0.2 203 4 71371 .O 0.169 2,C) 15.0 0.0 8,363.5 0.1 18,153.5 0.3 204 5 9,009,0 0.207 1,638.0 0.0 8,190,0 0.2 26 343.5 0.3 205 6 10 818.0 0.248 1,809.0 0.0 9,913.5 0.2 36 257.0 0.4 205.5 6.5 13 8717.0 0.318 3,052.0 0.1 6,172.0 0.1 42 429.0 0.4 BMP #2.xls Stage Storage (Perm Pool) Page 1 of 1 Printed 9/2212009 10:48 AM Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Forebays Project Caterpillar Core PDC Site BMP #2 Project No. 1517-0194 Date September 22, 20D9 Contour ID Stage Area [s q. ft. Area acres Incremental Area (s q. ft, Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 201 0 269.0 0.006 269.0 0.0 0.0 00 0.0 0.0 202 1 486.0 0.011 217.0 0.0 377.5 0,0 377.5 0.0 203 2 789.0 0.017 275.0 0.0 623.5 0.0 1001.0 0.0 204 3 1,092.0 0.025 331.0 0.0 926.5 0.0 1927.5 0.0 205 4 1,480.0 0.034 388.0 0.0 1,286.0 0.0 3,213.5 0.1 205.5 4.5 2,959.0 0.050 679.0 0.0 909.8 0.0 4123.3 0.1 BMP #2.xls Stage Storage (Forebay #1 - S) Page 1 of 1 Printed 9/2212009 10:48 AM Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Forebays Project Caterpillar Core PDC Site BMP #2 Project No. 1517.0194 Date September 22, 2009 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 201 0 314.0 0.007 314.0 0.0 0.0 0.0 0.0 0.0 202 1 546.0 0.013 232.0 0.0 430.0 0.0 430.0 0.0 203 2 836,0 0.019 290,0 0.0 691.0 0.0 1121.0 0.0 204 3 1,183.0 0.027 347.0 0.0 1.009.5 0.0 2.130.5 0.0 205 4 1,586.0 0.036 403.0 0.0 1,384.5 0.0 3,515.0 0.1 205.5 4.5 2,283,0 0.052 897.0 0.0 967.3 0.0 4.48213 0.1 BMP #2.xls Stage Storage (Forebay #2 - N) Page 1 of 1 Printed 9/2212009 10:48 AM Water Quality Basin Dewatering Time Calculations Project Caterpillar Core PDC Site SMP ##2 Project No. 1517-0194 Date September 22, 2009 Maximum surface area of basin 17,599 square feet Maximum head of water above dewatering hole 1.25 feet Orifice coefficient 0.60 Diameter of each hole 2.0 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = Volume Discharge Rate = 0.022 square feet 3.1 square inches 0.022 square feet 3.1 square inches 60.1 hours 2.50 days 0.12 cfs Notes: Water Quality Pond Summary Information Project Caterpillar Core PDD Site BMP #2 Project No. 1517-0194 Date September 22, 2009 Drainage area to pond 638,254 Impervious area in drainage area 230,750 Bottom of pond elevation 198.00 Normal pool elevation 204.50 Pond volume at normal pool 42,429 square feet = 14.65 acres square feet = 5.30 acres feet feet cubic feet Required volume for design rainfall 19,966 cubic feet Required surface area for pond 10,090 square feet Volume provided for storage of design rainfall = 24,772 cubic feet at elevation 205.75 Surface area provided at normal pool 13,870 square feet BMP #2.xls Summary Data Page 1 of 1 Printed 9122/2009 10:48 AM BMP #2 Type 1124-hr RainfaN=2.89° Prepared by McKim & Creed, PA HydroCAD® 8.00 sln 004927 © 2006 HydroCAD Software Solutions LLC 9/22/2009 Subcatchment'IS: (new Subcat) Runoff 4.92 cfs @ 12.53 hrs, Volume= 0.691 af, Depth> 0.57" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type 11 24-hr Rainfall=2.89" Area (ac) CN Description 14.650 70 Woods, Good, HSG C 14.650 Pervious Area Tc Length Slope Velocity Capacity Description min feet ftlft ftlsec cfs 36.3 150 0.0433 0.07 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.50" 11.2 904 0.0730 1.35 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 47.5 1,054 Total 03 cV II .C N ZZ ill Q ti U J J Q(c 0 a? co U N m g Eo c U <n °o ? o C'4 `U 0. Q. o a? -a mn CI , V c) 3 a? c VJ f? ro v cq t C. e 2 0 13 V m ? t Cfl Q o LO Q II C t Q? A r L c I! E 4 N L 0 0 CD E N al > a r- 0 LO >, M 0 0 © U z F- w w W L_ I-- U M N (s;o) molzi 0 N rn r co r r CO LO r [?] L r ? a r N r E r r 0 00 n 13MP #2 Type ii 24-hr Rainfaii=2.89° Prepared by McKim & Creed, PA H droCADO 8.00 sln 004927 © 2006 H droCAD Software Solutions LLC 9/22/2009 Pond 3P: (new Pond) Inflow Area = 14.650 ac, Inflow Depth > 1.43" Inflow - 16.41 cfs @ 12.37 hrs, Volume= 1.748 of Outflow = 4.58 cfs @ 13.09 hrs, Volume= 1.195 A Atten= 72%, Lag= 43.4 min Primary - 4.58 cfs @ 13.09 hrs, Volume= 1.195 of Secondary = 0.00 cfs @ 5.00 hrs, Volume- 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 207.82' @ 13.09 hrs Surf.Area= 19,351 sf Storage= 40,030 cf Plug-Flow detention time= 155.5 min calculated for 1.191 of (68% of inflow) Center-of-Mass det. time= 90.3 min ( 899.7 - 809.4 ) Volume Invert Avail.Storage Storage Description #1 205.50' 136,288 cf Custom Stage Data (Irregular) Listed below (Recale) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area feet s -ft feet cubic-feet cubic-feet s -ft 205.50 13,870 491.0 0 0 13,870 206.00 16,407 523.0 7,560 7,560 16,465 207.00 18,004 542.0 17,199 24,760 18,161 208.00 19,658 561.0 18,825 43,585 19,917 209.00 21,373 579.0 20,510 64,094 21,647 210.00 23,140 598.0 22,251 86,345 23,521 211.00 24,963 617.0 24,046 110,391 25,456 212.00 26,843 636.0 25,897 136,288 27,451 Device Routing Invert Outlet Devices #1 Primary 202.00' 24.0" x 66.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 201.50' S=0.0076? Cc= 0.900 n=0.013 #2 Device 1 205.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 206.75' 6.0" Vert. Orifice/Grate X 4.00 C= 0.600 #4 Device 1 207.75' 4.00'x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #5 Secondary 211.00' 15.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.49 cfs @ 13.09 hrs HW=207.82' (Free Discharge) 't--1=Culvert (Passes 4.49 cfs of 33.20 cfs potential flow) 2-00ficeiGrate (Orifice Controls 0.16 cfs @ 7.20 fps) 3=Orifice/Grate (Orifice Controls 3.42 cfs @ 4.35 fps) 4=Orifice/Grate (Weir Controls 0.92 cfs @ 0.85 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=205.50' (Free Discharge) L5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 00 CV II .<0 cr- U J J Q Q. O m? U0') 0? E ° ca CD 0 >, ad ?O ?? `U (L Q o m Q -r O a 3 as c a C 4 a r CL Q} V Sd a O ?OdC) LIudH (Sja) MOI=l O N 00 r ti r CO Lo L ? 7 O N dl E F O r 0) 00 ti LO GEOTECHNICAL REPORT AMACTEC engineering and constructing a better tomorrow December 19, 2008 Mr. Jeff Mann, P.E. McKim & Creed 1730 Varsity Drive Raleigh, North Carolina 27606 SUBJECT: REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION PROPOSED CLAYTON CATERPILLAR PROJECT - BUILDINGS/PRIVATE DRIVE CLAYTON, NORTH CAROLINA MACTEC PROJECT NO. 6470-08-2229 Dear Mr. Mann: MACTEC Engineering and Consulting, Inc. (MACTEC) is pleased to submit this report of our geotechnical exploration for the referenced project. Our services were provided in general accordance with MACTEC Proposal No. PROP-08-RAIL-349A dated September 12, 2008. This report presents a review of the information provided to us, a discussion of the site and subsurface conditions, and our recommendations. The Appendix contains a site location map, a boring location plan, and the results of our field and laboratory tests. The purpose of this exploration was to explore the subsurface conditions at the site and to provide recommendations for design of earth supported structures and road gravel thickness based on those conditions. The assessment of site environmental conditions or determining the presence of contaminants in the soil, rock, surface water or groundwater of the site is beyond the scope of this exploration. PROJECT INFORMATION We were provided with site plans showing the proposed property boundary, roadway alignments and building locations. McKim & Creed supplied MACTEC with multiple drawings generally titled: "CAT-PD, Scheme 2A -- 8128/08", "Caterpillar Entrance Road Plan and Profiles - Oct. 2008", and "Clayton Caterpillar Site Study - 7/9/2008". A site meeting held before drilling activities began included MACTEC, Bayer property owner, the Division of Water Quality (DWQ) and the Army Core of Engineers to review site access and environmental concerns that related to stream crossings and wettand/buffer zone delineation. The project site is contained within an approximate 195-acre tract of land (with multiple property owners) located near the intersection of NC-42 and Glen Laurel Road in Clayton, North Carolina. An approximate 1,800-foot long section of the entrance to the site will eventually become a portion of the Clayton Parkway with the start of the road section at the Northern intersection at NC-42. The 1800- foot section continues North beyond the current site boundaries. The limited geotechnical exploration report for this future connector was issued to McKim & Creed on December 9, 2008. Another 1,200-foot long section of the future entrance road to the Caterpillar buildings will connect from the future Clayton Parkway and proceed north and East to the proposed parking areas. Two MACTEC Engineering and Consulting, Inc. 3301 Atlantic Avenue • Raleigh, NC 27604 • Phone: 919.876.0416 • Fax: 919.831.8136 www.moctec.com McKim & Creed Caterpillar Project December 19, 2008 Clayton, North Carolina Page 2 of 10 MACTEC Project No. 6470-08.2229 rectangular-shaped buildings will be located near the end of the entrance drive at the northern part of the tract. Limited information has been provided to us at this time, but we assume that buildings will be single story steel-framed structures with slab-on-grade foundations and exterior footings. The exterior column loads are expected to be approximately 80 kips and the interior column loads are report as approximately 100 kips. We will assume other structural information for our analysis. From the topographic plans provided to us, it appears that cut depths for the entrance road will be less than 15 feet, with fill depths up to 20 feet; these maximum values are confined to small sections as the general cut and fill depths are to be minimal (5-8 feet) to try to follow the existing natural terrain. Cut depths for the buildings appear to be less than 15-18 feet with deeper cut depths possible at the exterior slopes for the building zones. Fill depths are expected to generally be less than 3 feet. There appeared to be conflicting information given to MACTEC concerning the final subgrade elevations for the parking and buildings. We were not provided with final finished elevations for the future office building, but were verbally given information that the two buildings floor elevations will be at or near present grade. We do not have detailed information regarding the elevations for the parking areas. Some of the borings may not accurately reflect existing elevations and subsequently our evaluations in this report may not reflect proposed final elevations for structures and parking. We are aware, however, that this report was initially intended to be a preliminary investigation and that future exploration may be needed before final design and construction can begin. According to the proposed gravel roadway plan and profile sections, the applicable station numbers range from 102+00 (at the intersection with the future Clayton Parkway) to 124+50. The roadway will cross over creeks and streams -- we do not have any information about possible culverts and bridge structures in these areas. EXPLORATION PROCEDURES Twenty-one soil test borings (labeled Roadway R-9 through R-19, and Building B-I through B- 10) were drilled at the site during the month of November, 2008. The approximate locations of the borings are shown on Figures 2 and 3 in the Appendix. Each roadway boring location was positioned at approximate 200-foot intervals along the proposed alignment (the boring depths were determined by MACTEC using the provided site data including existing topography and proposed final finished elevation information). The boring locations were located in the field by MACTEC personnel using GPS technology with coordinates supplied by McKim & Creed. Based on the GPS unit field readouts and user capability, the boring locations were considered to be marked within 5 feet of the exact coordinates that were provided to MACTEC. Access to the site was provided through clearing performed by Hydrocut. The borings were marked using wooden stakes and orange flagging with MACTEC lettering and labeling. Utilities were cleared by North Carolina One-Call prior to drilling activities. The borings were advanced to depths ranging from 10 to 42 feet below existing grade with track mounted drill rigs assigned with automatic hammers using hollow stem auger drilling procedures. The borings were terminated based on the assigned drilling depths or when a condition of auger refusal was encountered. Samples were taken in the test borings by driving a 1-318 inch ID split- spoon sampler in general accordance with ASTM D1586 specifications at routine intervals. Representative portions of all split-spoon samples were sealed in glass jars and returned to our A"MACTEC McKim & Creed Caterpillar Project December 19, 2008 Clayton, North Carolina Page 3 of 10 MAC7"CC Project No. 6470-08-2229 laboratory where they were visually classified in accordance with the Unified Soil Classification System (USCS). MACTEC will store the test boring samples, available for inspection, for a period of ninety days after which time they will be discarded unless requested otherwise. All the soil borings were backfilled with soil cuttings from the drilling activities after at least a 24-hour stabilization period to measure groundwater. Note., Testing and experience has shown that the Standard Penetration Test values (N-values) obtained with an automatic hammer are typically about 33 percent lower than those obtained with a safety drop hammer. The test boring records showing visual descriptions of soil strata, and the sampling and field test data are included in the Appendix of this report. A sheet defining the terms and symbols used on the boring records is also included in the Appendix along with the boring profiles. Elevations were provided by McKim & Creed through CAD drawings; some of the elevations were interpolated and therefore should be considered approximate. Eight jar samples from selected borings were sent to our laboratory for routine classification testing; Moisture Content, Percent Passing the #200 sieve and Atterberg Limits. Laboratory testing was performed in accordance with applicable ASTM specifications. The summary results of that testing are presented in the appendix. SITE AND SUBSURFACE CONDITIONS The project site is located in the southern portion of the Piedmont Physiographic Province, an area underlain by ancient igneous and metamorphic rocks. The virgin soils encountered in this area are the residual product of in-place chemical weathering of rock which was similar to the rock presently underlying the site. The typical residual soil profile may consist of clayey or silty soils near the surface where soil weathering is more advanced, underlain by sandy silts and silty sands that generally become harder with depth to the top of parent bedrock. More specifically, the area lies in the Raleigh Belt, which is characterized by rock layers of Gneiss and Schist within the residual soil. The proposed roadway alignment and building areas traverse through wooded terrain containing deciduous trees and pines with heavy brush. Lightly scattered trees are found in the areas surrounding the creeks and stream crossings. The terrain is relatively flat in the areas of B-1 through B-10, with the private drive borings lying in sloping hills and dips. A large stream crossing runs east and west and bisects the proposed private drive near boring B-18. The Neuse River crosses north of the project site boundaries, with the 100-year flood plain extending slighting into the land tract. The topographic relief is approximately 60 feet with existing elevations ranging from approximately 235 to 298 feet mean sea level (msl). Rock outcrops were noted near borings R-8 and R-9, and at borings B-5 and B-6. Subsurface Conditions The subsurface conditions encountered at the site were generally consistent with published geological mapping and our experience with other projects in the vicinity. AMACTEC McKim & Creed December 19, 2008 Page 4 of 10 Buildings (B-1 through B-10); Caterpillar Project Clayton, North Carolina b4A CTEC Project No. 4470-08-2229 There was approximately 3 to 4 inches of topsoil observed at the boring locations. Up to 6 inches or more are expected due to site observations of areas not within the pathways cleared by Hydrocut. Beneath the topsoil, the native residual soil (normally consolidated) is generally classified as moist, clayey silt or silty clay (USCS - CL, ML, CL-ML). Some clayey sand (USCS - SC) was observed in boring B-5 below 13 feet. Boring B-6 encountered high elastic silt (MH) for a short depth below 6 feet. The SPT N-values (blows per foot) ranged from 3 to 100. The lower N-values (<6) were noted in borings B-5 through B-7 at depths less than 2 feet below the existing ground surface1bgs). The N- values generally increase with depth with greater increases noted below depths of 10 to 20 feet. The boundary between soil and rock is not sharply defined. A transitional zone termed `partially weathered rock" (PWR) is normally found overlying the bedrock. Partially weathered rock is defined, for engineering purposes, as residual material with standard penetration resistances exceeding 100 blows per foot. PWR was encountered in borings B-8 and B-9 at depths below 24.5 feet. Boring B-8 terminated after a condition of auger refusal and spoon refusal was reached. Based on the results in the field, it is estimated that the other borings would have encountered auger refusal if advanced a little further into the ground. Private Drive (R-9 through R-19): Below the 3 to 4 inches of topsoil, the borings generally encountered native, residual moist silty clay and clayey silt, and clayey or silty sand. Highly elastic silt and high plastic clay (USCS - MH and CH) was observed in boring R-17 at depths less than 35 feet from the surface. The SPT N-values (blows per foot) ranged from 3 up to 100. The lower N-values (<6) were noted in many of the borings from depths less than 2 feet from the surface. PWR is noted in boring B-16 at a depth of 14.8 feet. The sample at this depth contained rock fragments indicating continuous hard drilling conditions below. Groundwater Conditions Groundwater depths were measured immediately after the completion of drilling at after at least a 24-hr period of stabilization. All of the borings were recorded as dry. Fluctuations in the depths of the water table may occur depending on variations in precipitation, evaporation and surface water runoff. RECOMMENDATIONS Following are our recommendations for preparation of the site, and for design and construction of foundations for the proposed structures, and roadway/parking. AMACTEC McKim & Creed December 19, 2008 Page 5 of 10 Seismic Evaluation Caterpillar Project Clayton, North Carolina MACTEC Project Na 6470-08-2229 The North Carolina Building Code requires knowledge of the subsurface profile to a depth of 100 feet for evaluation the seismic Site Class. Some of the borings drilled at the site terminated in partially weathered rock. The partially weathered rock represents the top of known geologic conditions; therefore, exploration to 100 feet was not required. The basis of the Site Class evaluation is the soil shear wave velocity; however, the code also provides conservative estimation methods based on N-valucs which were used in our evaluation. Applying the building code N- value methodology, the seismic Site Class for the proposed building structures ranges from C to D. Evaluating proposed cut depths, the Site Class determination remains the same. We recommend that a Site Class of D be used unless further exploration encounters stiffer or more dense soils. General Site Preparation All topsoil, vegetation, debris, and other unsuitable material should be removed from the construction area and either wasted from the site or used as topsoil in areas to be landscaped, We estimate approximately b inches of stripping will be required in the proposed road and building areas. There may be localized areas requiring greater stripping depths where organic concentrations are greater or where tree roots and stumps need to be removed. Care should be taken when working near creeks or streams. Proper procedures should be followed to minimize changes in natural channel features unless otherwise indicated by the proper construction approving entity. Following stripping in areas to receive fill and at subgrade elevation in cut areas, we recommend that the exposed subgrade be proofrolled to detect unsuitable soil conditions. Proofrolling should be done after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. Proofrolling should be performed with a heavily loaded dump truck or with similar approved construction equipment. The proofrolling equipment should make at least four passes over each section, with the last two passes perpendicular to the first two. We recommend that the exposed subgrade and proofrolling operation be observed and documented by the geotechnical engineer or his representative. If unsuitable conditions are encountered at the subgrade level, recommendations for dealing with the conditions should be provided to the owner's representative by the geotechnical engineer. Soils which rut or deflect excessively during proofrolling should be undercut to suitable soils and replaced with compacted soil fill or crushed stone. The on-site soils classified as USCS SC or CL are, in general, suitable for use as compacted fill. Soils containing minor amounts of root fibers can be used for fill. Site soils containing large concentrations of roots (greater than S percent by weight) or other organic matter should not be used for fill in the building or road areas. Elastic silts (MH) and plastic clays (CH), if encountered, should not be used for fill within 3 feet of finished grades. Any fill material imported to the site should be of a low plasticity soil (liquid limit less than 40, plasticity index less than 20), free of organic material or debris. The geotechnical engineer should assist in defining proper fill material or in locating and managing approved borrow pits. Fill should be placed in 8 to 10 inch loose lifts and compacted to a minimum 95% of the soil's standard Proctor maximum dry density (ASTM D 698) with the top 18 inches in road subgrade areas AMACTEC McKim & Creed Cateipillar Project Deceriber 19, 2008 Clayton, North Carolina Page 6 of 10 MACTEC Project No. 6470-08-2229 compacted to at least 98 percent of the standard Proctor maximum dry density. The soils should be aerated or moistened as necessary to maintain the moisture content within 3 percentage points of optimum moisture content. In-place field density tests should be performed by the geotechnical engineer or technician, We recommend that field density tests be performed every 2,500 square feet with at least one test performed on each lift of material. One out of every 10 tests should be performed using the Sand Cone method. In utility trench backfill, we recommend at least one test be performed per lift of backfill per 100 linear feet of trench. Rock outcrops were observed during our site visit, but based on the depths to PWR in the vicinity of those locations, and based on the site proposed finished grades, we do not anticipate that partially weathered rock will be encountered during general site grading. Groundwater is not expected to be encountered, but should be anticipated in all excavations near the low-lying elevations near existing creeks/streams. Shallow Foundations If the above described site preparation and fill placement procedures are carried out, the proposed buildings can be supported on shallow foundations, bearing on approved natural soils or on properly placed and compacted fill. The footings should be designed for a net allowable soil bearing pressure of 2,500 pounds per square foot. All exterior footings should be located at least 18 inches below final exterior grades to provide adequate frost protection. Interior footings may be embedded only a nominal depth if in an area that will not be subject to frost heave. Minimum footing widths of 16 inches for wall footings and 24 inches for column footings are recommended for lighter loaded sections. Based on a maximum load of up to 100 kips for interior columns, a much larger interior spread footing will be necessary. We recommend that the geotechnical engineer or technician observe the footing excavations immediately prior to placing concrete. He should compare the soils exposed with those encountered in the soil test borings to determine if the exposed soils are capable of supporting the design footing pressure. Any soft or loose soils should be undercut to suitable materials and backfilied with approved soil fill materials, clean stone, or lean concrete. Soil backfill should be compacted as described above. All foundation bearing areas should be level or suitably benched and free of loose soil, ponded water and debris. Exposure to the environment may weaken the soils at the footing bearing level if the foundation excavations remain open for long periods of time. If the bearing soils are softened by surface water intrusion or exposure, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. Based on the limited structural information we have and conflicting final grade elevations, but assuming single-story structures with maximum interior column loads of 100 kips per column and an allowable bearing capacity of 2,500 psf, we estimate that total settlement of footings should not exceed 1 inch. Depending on final design criteria, more detailed loading conditions and any ancillary structural equipment placement (humidifiers located outside of the building, specialized pipe $"' MACTEC McKim & Creed Caterpillar Project December 19, 2008 Clayton, North Carolina Page 7 of 10 MACTEC Project No. 6470-08-2229 connections to the exterior wall(s), etc) we can modify the settlement recommendation (total and differential) after performing a more detailed analysis. Slabs-on-Grade Floor slabs may be supported on properly placed and compacted fill or approved natural soils. The slab subgrade should be prepared in accordance with the procedures outlined above. We recommend that the floor slabs be designed using a subgrade modulus of 100 pounds per cubic inch until more detailed site grading and structural information can be obtained. A 44nch thick layer of washed stone or stone and coarse sand should be provided beneath the slab to prevent capillary rise and a damp slab; this should conform to ACI 3021R716, 4.1.4. In slab areas which have a vapor-sensitive covering or are humidity controlled, a vapor barrier is recommended. The installation of the vapor barrier should conform to recommendations contained in ACI 302.1R-15,4.1.4 and Addendum 302.1 R-96. Construction activities and exposure to the environment may cause deterioration of prepared subgrades. Therefore, we recommend that density and moisture content tests be conducted on the final subgrade soils immediately prior to grade slab construction to determine their condition. Gravel Access Road/Parking If the above site preparation procedures are followed, and based on our limited knowledge of traffic loading conditions or actual field California Bearing Ratio (CBR) values, the subgrade conditions at the proposed elevations should be capable of supporting a gravel base with the intended vehicular traffic. This statement should be re-evaluated if traffic loading and conditions can be provided and if CBR data can be obtained after general site grading. Many of the soft and unsuitable soils are expected to be removed during grading operations. However, borings R-14 and R-18 showed MH and CH material or traces of that soil type that should be promptly removed or undercut before fill activities. Based on the characteristics of the on site subgrade soils, we recommend that at least 10-inches of crushed stone (N.C. DOT Aggregate Base Course Type A or B) be placed over an approved subgrade for the entrance road. A base course thickness of at least 4-inches should be used in parking areas over a stable soil base. Due to the potential long-terra existence of this road, a geosynthetic should be placed over the approved subgrade in preparation for the stone base. This geosynthetic should be a type of geotextile (Mirafi 500X or equivalent) to help preserve separation of the stone base and the soil subgrade during varying weather conditions and normal traffic loading stress and vibration actions over time. This material will also help aid in the stabilization of the road over weaker soil material, If weak zones are observed during proofrolling, the soil subgrade should be undercut until stable conditions are encountered. The undercut material should be backfilled with stone over a layer of geotextile at the bottom of the excavation. If soil conditions do not warrant undercut then a stronger more appropriate geotextile such as a Mirafi 600X or equivalent (or a combination of a geotextile and geogrid) may be used at the geotechnical engineer's request. MACTEC McKim & Creed Catelpillar Project December 19, 2008 Clayton, North Carolina Page 8 of 10 MACTEC Project No. 6470-08-2229 The geotextile placement should include all areas within the zone of influence of the road. This may include extending the geosynthetics beyond the edge of the road and under the drainage swale (ditch). The road should be properly crowned and sloped on the sides to facilitate water draining into the actual drainage system. Proper compaction of the stone base should be achieved using conventional equipment (sheepsfoot roller with a vibrating drum). Compaction test methods should include the use of a nuclear density gauge or other equipment specified by NCDOT standards. The stone base should be compacted to 100% (+/- 1.5%) of its maximum dry density based on AASHTO T99 or T180. Slopes We recommend that finished cut and fill slopes be no steeper than 3H: IV and should slope away from the structures on all sides. Fill slopes should be constructed by over filling and then trimmed back to final configuration. Horizontal benches should be cut in existing slopes steeper than 5H; 1V as fill is being placed. All finished cut and fill slopes should be seeded and mulched as soon as possible after grading to minimize erosion. Ditches, berms and/or pipes should be used to minimize surface water from draining down slopes. Exterior finished grades generally should be at least one foot lower than the slab-on-grade subgrade elevation. CONSTRUCTION CONSIDERATIONS When soils similar to those at the site become saturated, they lose strength and become difficult to compact. Therefore, the contractor should promptly remove any surface water or groundwater from the construction area. This has been done effectively on similar construction projects by means of gravity drainage and sump pumping. The near surface soils at this site classify as Type B in accordance with current OSHA Trench Protection Guidelines. Trench excavations more than 4 feet deep should be supported with temporary shoring and bracing or cut back on slopes of l(H):1(V). For similar soil types that currently classify as Type B, but lie below the existing water table at the time of excavation should be classified as Type C in accordance with OSHA guidelines; with slopes cut back to 1.5(H):I(V) or greater. A "competent person", as defined by OSHA, working for the contractor should monitor construction excavations and determine suitable slopes. We recommend that construction begin in the drier months of the year to minimize difficulties in the soils, which will become wet, soft, and difficult to compact when rains occur. The surface soils should be protected from excessive infiltration and surface water by grading the site to promote the rapid removal of rainwater and surface runoff from the building areas both during and after construction. A' MACTEC McKim & Creed Caterpillar Project December 19, 2008 Clayton, North Carolina Page 9 of 10 MACTCC Project No. 6170-08-2229 ADDITIONAL SERVICES RECOMMENDED 1. Site Preparation and Proofroliing: The geotcchnical engineer or technician should observe the site after it has been stripped and excavated. The engineer should determine the extent of undercutting or in-place densification necessary to prepare the subgrade for fill placement or for slab support. 2. Fill Placement and Compaction; The geotechnical engineer or technician should observe any required filling operations and take sufficient in-place density tests, approve borrow materials used and determine if their existing moisture contents are suitable. Footing Excavation Examination: The geotechnical engineer or technician should examine the footing excavations for the building foundations. He should check that the design bearing pressures recommended are available and that no soft soils exist beneath the bearing surface of the footing excavations. Based on the examinations, the engineer would either approve the bearing surface or recommend that unsuitable soils be undercut to expose satisfactory bearing materials, 4. Road Subgrade System Examination: Subgrade soils and base materials should be examined by the geotechnical engineer or technician to determine that proper compaction has been achieved and that project specifications are being followed. California Bearing Ratio (CBR) tests should be performed on representative samples of the subgrade soils in order to develop a suitable and economical roadway section. CLOSING These analyses and recommendations are, of necessity, based on the concepts made available to us at the time of the writing of this report, and on-site surface and subsurface conditions that existed at the time of the exploratory borings. Further assumption has been made that the limited exploratory borings, in relation to both the area extent of the site and depth, are representative of conditions across the site. If, during the design phase, or later construction phases, conditions are encountered which differ significantly from those reported herein, we should be immediately notified so that our analyses and recommendations can be reviewed and/or revised as necessary. 0 "A MACTEC McKim & Creed December 19, 200& Page 10 of 10 Caterpillar Project Clayton, North Carolina MACTEC Project No. 6470-08-2229 We appreciate the opportunity of providing our services to you during the exploration phase of this project and look forward to assisting you during the construction phase as well. If you have any questions concerning this report or any of our testing, inspection design or consulting services please do not hesitate to contact us. Respectfully submitted, MACTEC ENGINEERING AND CONSULTING, INC. a4?4 Ayls"40 Christopher J. Fredette, E.I. Bill Deobald, A..l? L .4. L-?36-P' Project Engineer Senior Geologist /z 09 Registered, North Carolina A-19969 Registered, North Carolina /7s'o Gary if Taylor Project Manager Registered, North Carolina 18580 .\\A CAR0 a • SEAL 1858D 1010 Of 4tttllt???? Attachments: 1. Figures 2. Boring Logs and Profiles 3. Laboratory Summary Sheet A A MACTEC APPEANDIX LEGEND State Route Hwy Ramp Geo Feature Major SIru:URoad Town, Small City State Route e Hill US Highway US Highway Railroad Alrileld River County Boundary IntcnniltentRiver Population Center Airfield Street, Road Utility (powcrline) MACTEC SITE LOCATION MAP RALEIGH, NORTH CAROLINA CLAYTON CATERPILLAR PROJECT DRAWN: CJF DATE: Dec-08 MCKIM & CREED DFT CHECK: CJF SCALE: NTS CLAYTON, NORTH CAROLINA ENG CHECK: JOB: 6470-08-2229 APPROVAL: FIGURE: 1 fiEFERENCE: DELORME MAP EXPERT M .a ^ OFFICE B-1 1"Building outlines and boring locations are approximate CLAYTON CATEPILLAR PROJECT CLAYTON, NORTH CAROLINA go MACTEC RALEIGH, NORTH CAROLINA IIDRAWN: C. Fredette IDATE: Nov-08 CHECK: C. Fredette SCALE: NTS CHECK: JOB: 6470-08-2229 ROYAL: FIGURE: 2 m o .o 8 o o o CA ryil 4 L v G m N 0? M "?" C` sue.. O ? G' U O V r3 ? Ap .-•+ h w m a a.. z ° o [?4 z w o y w a? o°?? ^v o W 'S 73 U3? 3 ? ? o ? ? ? 0 0 0 0 8 a v / o o o cA saG A 44 ? 3 z Q U a O Qtr C7 Ln 0 r? A 94 0 "' ? '? ?r?' ? y ? ? VI ? ? V ? •C7 V .C ? cc>?.. •vf tiC vj g? ??„ ?G .n ?O ? •.. •tn ?.' .cif L4 OO ,n 'O N ?' cd X e ?? T y sn Qy •`?c?' O vi O k] D ? > ? •? H ?CC' > ? L p'C •O y •O 4.. E •fn ? ? ? qOj ? td ? U ? N ? V v ? N N O 'bR7q G u } 'b •Q L? w C O u ''v, O v A .0 51 2 f.. e OI} yy A Q R >, 1 •h ? ? . u •f? •". A •tQ ? SCI G N R 6 80 N GD ?x 8v px ?'?, ov ?, n so>? cn? o? `o ff C7 C7 ? I a As -.j :a o a ? ? ? ? rUr1 ? U O ? V O G N A w w O Cf C 0 C/} C i U o U t U s sl ' A? f c • ?Q ¢ \•C a Q 2 c ? IS z cC cn ? ? W d dd?+ y O y a wiz $N C• Q a ?? U? cQ? W W V]'^--? a Z 21 9 sa V ` Cn o ? Q U ? U Gp Q CC V1 O a o Q U O ? ? U M W 7 CIZ O Z oW ©a U W CG y-U N G ? W ? U^ CA kn c T "d U1 CU w£ a ................. ?..... ?.. ...... ..... ..... ..... .... .........f .............F..... ................... ...,. ........ .... 4 14 W 4 a y F. ¢y? C s? 4 oz a O W W 08 ? q a22 lF??j. ? m 2 C g= ? o a YS y .S ? s S ® [Ill ED 0 W Q O ct ? V ? ? pig N 0 LZ 0 ® ® ® ® 8® T tCt C V 41 .. Y. f f :O b h N N N iV N ? N N I s 2 ? 4 i fi f??l1? N [I < -? -- W a N rv ru 2 g m z? f?4 to O D E P T H (U) 5 10 l5 7U 25 70 e .r. a a t; 35 3 a a c7 ?c U z % F O c [3 40 45 fl- SOIL CLASSIRCATION L F SAMPLES pi, %) NM( LLB ) AND REMARKS E E 8 I T N•c«uN r A G O or FINES (%) V r Un Inc QI SEE KEY SYMBOL. SHEET FOR EXPLANATION OF N P ?0 ? ? 0 SPT(bpf) SYMBOLS AND ABBREVIATIONS BELOW, D 01? T T' 2 4 a 1{i 20 34 40 50 6{3 70 80 90 100 Topsoil ,. 6 .4 Stiff. moist, reddish-brown, silty CLAY (CL) SS-1 2.4-6 SS-2 3.3-5 Stiff, moist, gray-brown, clayey SILT (ML) 2 9 SS-3 6-6-7 5 .4 S Stiff to very stiff, moist, reddish-brown and black, slightly fine sandy, clayey SILT (ML) SS-4 10-11-12 2 4 0 SS-5 4-4-7 5 . !4 2 9 4 SS-6 4-4-8 , 4 13 2 0 SS-7 6-8.6 Boring tenuinate'd -,it 20.411. 44. 70 2.19 4 25 . 23 30 4.4 2 35 9,0 z 44 224.0 jinn DRTLLUR: D. Rhodes EQUIPMENT: CMF-45C METHOD: HS Augers BOLE DIA,- 6" REMARKS: Cave in at 153ft REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION, SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND KI' OTHER TIMES MAY DIFFER. INTERFACES B WEEN STRATA ARF: APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY 13E GRADUAL. U lit `1u tt) 9? -o tH! 70 RE] 90 IUi) I Project: Clayton Caterpillar Project Boring No.: B-1 Drilled: November 21, 2008 Project #: 6470-08-2229 Page 1 of 1 II SMAI.C.-TEC II D E P T H 5 10 1$ 20 25 31) 35 40 45 SOIL CLASSfHCATION L E SAMPLES PL (%) NM (%) LL 1`yO) AND REMARKS E L 1 T N-COUNT " 0 E [) or ®F1NES ( k) E V Y IW1(1RQD% SEE KEYS YMBOL SHEET FOR EXPLANATION OF N N P A c O SPT (bpf) SYMBOLS AND ABBREVIATIONS BELOW. D (11) r E K 259 0 10 20 30 40 50 60 70 SO 90 100 Topsoil . MedIUn1 Sttff to very stiff. 1110W. blaelf. slightly silty, fine SS-1 1-3.4 sandy CLAY (CL), with roots SS-2 7.10.18 Verystiff nlDist, reddish-brown, clayey SILT (CL ML) II 1 2 SS-3 4-&12 5 . 5 Stiff to very stiff, nio-ist, gray and whiti, slightiyvlayvy. Cure to Inediunt sandy SILT (ML) SS-4 4-7-7 -249 U 5S-5 1-3-6 } . €( 11 44 SS-6 =t-5-7 1 2 . 5 3 SS-7 7-5-9 ?0 2 9.D 2 SS-8 9.6.8 2 B[)rln5?,' (['.(1131natcd iit 25.Df1 34.0- 5 1 Z29,D . 0 35 224.1) 1 219.0 40 I[A n DRILLER: D. Rhodes EQUIPMENT. CME-45C METHOD: HS Augers HOLE DIA.: 6" REMARKS: Cave in at 23.2ft REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE COND€T€ONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER, INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. U IU Al 5U 4U ?U 0U !U 60 W IUU Project: Clayton Caterpillar Project Boring No.. B-2 Drilled: November 19, 2008 iPrQiect#: 6470-08-2229 Paste 1 of 1 MAEEC: J D E P T H (a} 5 !il E5 21) 25 30 l s- a 0 35 Es ii z 4o z 0 e 0 z c? f 45 SOIL CLASSINCATION L E SAMPLES PL (rk) NM (%) LL (°!c) AND REMARKS E G E L E V 1 1y E T Y N-COUNT or Rec` /RQD% ?- _- A FINES (%) SEE KEY SYMBOL SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS BELOW. N D (f[) N .1 P o n A SFf (bpf) 14 20 30 44 54 60 74 $0 90 140 To soil 255.0 Medium stiff, moist, reddish-brown, silty CLAY (Cl-) SS-1 2-3-4 SifiT moist, ri;ddkh-hroxvt3. chgvy SILT (ML-CL) SS-2 5.5.6 Stiff moist, reddish-brown, clayey SILT(MIJ 254 0 SS-3 a-7-s . S Verysti Ff. moist, gray. I ins; satu[y. cIa}vy S I I: C (MI.-Cl.) - SS-4 6-8 -9 4 245 SS-5 7-7-9 . 14 -240 0- SS-6 6-12-13 5 . 1 2 } SS-7 12-9.11! Baring Icrrlrinated at 20,4fI 35.( a 20 01 230 , 25 225 4 3 . 4 220 4 . 35 0 215 . 40 ?rnn DRILLER: D. Rhodes EQUIPMENT: CME-45C METHOD: [IS Augers HOLE DIA.: 6° REMARKS: Cave in at 16. tft REVIENVFD BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS ATTHL:EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. 0 10 "-20 30 40 till (A) /0 W W IM 7D Project: Clayton Caterpillar Project Boring No.: B-3 Drilled: November 19, 2008 Project #: 6470-08-2229 Page I of I M ACT?C D E P T H n) e 5 II} 15 20 25 30 Q v, F m 35 ^a L7 z 0 z 0 h 6 H O h H 40 45 SOILCLASSIHCATION L S AM PLES PL(% ) NM (%} L L (% ) AND REMARKS E L I 7' N•couNT ' (} E I3 or A FIN ES ( 7r) E V F Y Rcc%/RQD% SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N P a o o 0 SP T (bp f) SYMBOLS AND ABBREWATIOiwIS BELOW. D (A) f E '0 " = 0-- 245 ?] A4 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 1 00 Topsoil . Stiff to verystif€, moist, light brawn, slightly clayey, slightly SS-1 3.2-4 sandy SJUF (ML) SS-2 6-10-II SS-3 7.9.10 240.0 5 SS-4 3.0.8 SS-5 G-G-8 235.0 11I SS-6 I5-10-8 230.1} 15 Very stiff to hard, gray, very fin sandySILT(MI.) SS-7 17-I6-30 20 225.(3 SS-8 12-19-50 Boring Ecrtninat4cl;ts 25.Oti 220.0 25 30 215.0 210.0 35 40 205,0 uv5 n DRILLER: D. Rhodes EQUIPMEN'T': CME-45C METHOD: HS Augers HOLE DIA.: 6" REMARKS: Cave in z 23.Oit REVIEWED BY: THIS RECORD IS A REASONABU INTERPRETA11ON OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS UMVEEN STRATA MAY I1 E GRADUA L. to IU Str .7t7 NU DU DU 1I1 All -Al IVI; Project: Clayton Caterpillar Project Boring No.: B-4 Drilled: November 19, 2008 Proiect #: 6470-08-2229 1of 11 II SMAcTEC II D E P T H (0) S 10 15 20 25 3Q v m 3S n. c? z z tj 4a z 0 i~ e F h O Z Eas SOIL CLASSIFICATION L E SAMPLES PL (??o) NNI (9o) LL M AND REMARKS E E ) T N.Co um r E A FINES (%) E V Y ReCrAIRQD% SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N p 'a ? a c ? SPT (bpf) SYMBOLS AND ABBREVIATIONS BELOW. D (fl) I E ? 250 0 F-. 4 16 20 30 40 50 60 70 SO 90 IQU Topsoil ,. , . Soft to vary stiff, moist, reddish-brown, very silty CLAY (CL) SS I l-?-I SS-2 3-4-7 245 0 SS-3 3,0,10 . SS-4 2.4.6 Stitt, moist, reddish-brown, clayey SILT (ME: CL) _ -- 240 Q SS-5 3-4-5 . HI Mtdiunt stiff to stiff, moist, gray-brown, clayey SILT (ML) 0 SS-6 1.3-3 235. 15 230 0 SS-7 5.7-7 20 . 325 0 SS-8 8.5.8 7 Boring tcrntinatetl tit 25.Oft , 5 220.0 30 3 3 21 .If 5 210.0 4I) DRILLER: D. Rhodes EQUIPMENT: CME-45C METHOD; HS Augers HOLE DIA,: b^ REMARKS: Cave in ut 19,5ft REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OFSUBSURFACE CONDITIONS AT THE EXPLORAT1011i LOCATION. SUBSURFACP CONDITIONS AT OTHER LOCATIONS AND AT O(`IIL'R TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE, TRANSITIONS BETWEEN STRATA MAYBE GRADUAL. U 10 20 30 41) 50 60 70 80 VU LtXI Project: Clayton Caterpillar Project Boring No.: B-5 Drilled: November 20, 2008 Project #: 6470-08-2229 Page 1 of 1 D E P T H f0) 10 15 20 25 30 w 2 A U ac 35 F C 40 7., 0 4 45 SOIL CLASSIFICATION L E SAMPLES Pl:(K} %(ryo) LL mo AND REMARKS E I T N cc?cll? r o E E or e FIN ES (%) E V Y Rcc%fRQl)S'n SHE KEY SYMBOL SHEET FOR EXPLANATION OF N N P d :a ;o ;fl • SPI" (bpt) SYMBOLS AND ABBREVIATIONS BELOW. D (fo r [i -E -S 0 r rte. R 10 20 30 40 50 60 70 SO 90 100 Tn soil ,i 241 Safi, moist. brown, vary silly CLAY (Cf.) SS-1 1.2-1 Stiff, moist, reddish-brown, slightly silty CLAY (CL) S5-2 2-d-R Very stiff, moist, reddish-brown, silly CLAY (CL-MQ 242 (1 SS-3 5.7-Ift . S Stiff, moist, reddish-brown, very clayey SILT (Ml 1) SS-4 2-5-7 SOY, moist, lighf brown, silly CLAY (CL) 23] 0 SS-5 3-5-6 ON/A . - ID Medium dense, dry, gray and brown, slightly silty, slightly clayey fine to coarse SAND (SC), with gravel fragments EM 3 2. SS-6 6-14-15 , 3 15 Very stiff to hard, moist, gray, slightly fine sandy, clayey SUN (MIL) with mica 221 U SS-7 4.7-12 . 20 2 [ SS-8 9-16-IS 11s+ritsg t?nninatctl tit 25.Ofi . 23 1 25 217 D 30 . 212.0 35 2 0 4 01. 0 ari,j rt DRILLER: D. Rhodes EQUIPMENT: CME-45C METHOD: HS Augers HOLE DIA.: 6" REMARKS: Cave in at 22. [ft REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE. EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER, INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. 0 IU 1l} ;10 411 NJ m) /U w 'At ItRI Project: Clayton Caterpillar Project Boring No.: B-6 Drilled: November 20, 2008 Project #: 6470-08-2229 Page t of l AMA'"TEC D E P .T H (a 5 10 15 20 25 30 w d h tl f-' U cd 35 i 0- 40 z d ! 4- v v 45 SOIL CLASSIFICATION L E SAMPLES P1.{5 •) NCI () LI.(rk ) AND REMARKS E D , N-COUNT v"?------ G E t or A FINES (%) E V J Re IVRQDrk SEI KEY SYI4IBOI. SHEET FOR EXPLANATION OF N ? 0 SPT (bpf) SYMBOLS AND ABBREVIATIONS BELOW. D (tt) ?' - r i rh z ^ 10 20 30 40 50 60 70 80 90 100 '('l1 sod , r' •? -240.0 I muse, nioict, hmwn. Aghily silly, clayey liae SAND (SC) SS-I I-2-2 Very stiff, moist, reddish-brown, silty CLAY (CI.) SS-2 5-7-10 SS-3 3.10-11 - 1 0 235.0 5 Stiff, moist, gray, silty CLAY (Ci: MI.) SS-4 4.6.8 Stiffto hard. dry to moist, gray, line sandy.';WT (111,) SS-5 7-5-G 23U.0 10 225 0 SS-6 13-7-8 1 . 5 1) SS-7 9-13.21 .0 22 20 0 SS-9 11-12-19 2 Boxing tertninated at 26.0ft 215. 5 210.0 30 ( 20 - - 35 5, 1 40 200.Q rocn_ DRILLER: D. Rhodes EQUIPMENT: CME-45C METHOD: HS Augers HOLE DIA,: 6" REMARKS: Cave in at 2 Lift REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BF,TWEF..N STRATA MAY BE GRADUAL. 0 It) 20 10 41) )U OU AO W A) IM) ISUI L TEST BORING RECORD Project: Clayton Caterpillar Project Boring No.: B-7 Drilled: November 20, 2008 Project #: 6470-08-2229 Page 1 of L M A'TEG D E P T H (U) 5 i0 1S 20 25 3n a_ F O 35 m U 3 s U 40 z 0 P 4 O z c F 45 SOIL CLASSIFICATION L E SAMPLES 11.I%) NA9(%) LL AND REMARKS E L t N-COUNT 8 - - G E 1) T or A FNES (%) E V r Y Rec°/alRQD% SEE KEY SYMBOL SHEET FOR EXPLANATION OF N ' P D o ®SPT (bpF) SYMBOLS AND ABBREVIATIONS BELOW. D (ft) ? F. c 216 rr m c 10 20 30 40 50 60 70 80 €30 100 To ?i1 0 Medium stiff to very stiff, rnoist, reddish-brown, silty CLAY SS-I 2-3-4 (CI.) SS-2 4.6-10 231 0 SS-3 3-6 . 5 SS-4 2-5-6 226 0 SS-5 4-G-9 . 10 Whim stiff to hard, tnoisl, miidish-hrmvn and gray, cla)vy SILT (ML), wills mica 2 SS-6 ?-3-6 21.U 15 - 1 SS-7 2-3-4 6.0- 2 -2 - 11,0 25 1u SS-9 I4-24-27 E ,.u z 3( Partially weather rock sampled as dry, gray Schist (PWR) SS-10 24-5010.5 1 201.0 ' 5 Partially weather rack sampled as dry, gray Gniess (PWR) SS-It 5010.1 19 40 6.0 Auger refusal at 42.Oft Boring terminated at 42.0]1 €oi n DRILLER: D. Rhodes EQUIPMENT: CME-45C METHOD: HS Augers HOLE DIA.: 6" REMARKS: Cave in at 35.Ofl REVIEWED BY: THIS RECORD IS A REASONAIILL INTERPRETATION OF SUBSURFACE CONDITIONSATTIIEEXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSETtONS BF WE:E.N STRATA MAY BE GRADUAL, U 111 10 JU V 1)0 (to rl) MU 1u rim SOll.`'ITEST BORING RECORD Project: Clayton Caterpillar Project Boring No.: B-8 Drifted: November 21, 2008 Project #: 6470-08-2229 Page I of 1 II SMACTEC II D E P T H i 15 20 25 30 35 40 0 SOIL CLASSIFICATION L F S AM PLES P[1 1 10) NM (%) L L(7o ) AND REMARKS E L I { N-COUNT ,9 - .? 4 Q,,,,,,,,,,,,,,, , q G E D or A FIN ES ( o) F V li Y ReC%1RQD% SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N P n a ;o o 0 SP T (bp f) SYMBOLS AND ABBREVIATIONS BELOW. D (fl) T I c r1 r) -} 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 1 00 'rup,`oil Medium stiff to very stiff, moist, reddish-brown, silty CLAY SS-1 WOH-3-6 (CL) SS-2 2-6.9 SS-3 4.12-I1 227.0 5 Stiff, ntpist, gray-hrown, slightly clayey SILT (,NIL), with iraa Gltc sand SS-4 5-7-5 Very stiff to hard, dry, gray, slightly clayey, slightly fine sandy SIl P(AIL) 222 0 SS-5 5-10-13 . 10 217 0 SS-6 6.18-23 5 . 1 SS-7 12-22-46 2( 212.0 } 5010 4 2 3R riy Gniess (PWR) Partial wcatix rcd rack sutra icd as d SS-8 9- - . 25 ry, 207,0 Boring tenninated al 24 9ft 3 202.0 0 3 NTO 5 40 192.0 IQ7 n DRILLER: D. Rhodes EQUIPMENT: CMF-45C METHOD: HS Augers HOLE DIA.: G, REMARKS: Cave in at 21.28 REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDI'T'IONS AT OTHER LOCATIONS AND AT O-I I , R TIMES MAY DIFFER. INTERFACES HEW EEN STRATA ARE APPROXIMATE. TRANSITIONS BFTWEEN STRATA MAY BE GRADUAL.. Al RF L11 -511 911 X0 nU !U nu 'Ju f%A; SOIL TEST BORING RECORD Project: Clayton Caterpillar Project Boring No.: B-9 Drilled: November 20, 2008 Project #: 6470-08-2229 Page I of I ?. MAr7EC D P T H (t3) H1 15 2{} 25 3{) A v, a U ci 3S 3 ^a c? ?C u 0 F d F O z 40 as ..... ............. SOIL CLASSIFICATION L E SAMPLES PL k) NM (?> LL (%) AND REMARKS E L I T N•COUNT G E or A FINES (?a) E V Y Recf,'c/IZQDI/e SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N N n 'n `o SI'T (bpl) SYMBOLS AND ABBREVIATIONS BELOW. D (ft) T r1 m 4 10 20 30 40 50 60 70 80 90 t00 To .okl ? ,-r ?C7 230 © Medium stiff to very stiff, moist, reddish-brown, very silty SS-1 1-2.5 CLAY (C1.) 55-2 4-5-5 225 0 SS-3 5.9-12 . 5 Stiff, moist, reddish-brown, clayey SILT (ML-CL) SS-4 2.6.7 220 0 SS-5 2.6.8 . 10 Very stiff, moist. gray. clayey SILT (ML) 215 0 SS-6 11-14-15 . ] 4 SS-7 0.7.10 Boring lettninated at 20.0ft 210.0 20 11 205 . 25 2111} U . 3U 195 0 , 35 190 0 40 , 14c n DRILLER: D. Rhodes EQUIPMENT: CNIE-45C METHOD: HS Augers HOLE DIA,: 6" REMARKS: Cave in at 16. t tt REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. 0 10 20 30 40 50 60 70 80 90 100 Project: Clayton Caterpillar Project Boring No.: B-10 Drilled: November 20, 2008 Project #: 6470-08-2229 Page 1 of 1 ?_ ArTEC D E P T H 5 II1 15 20 25 30 e F O U ao 35 q U t 3 a a U C? 40 z 0 i= t¢ ti 0 9- t' "' 45 CLASSIFICATION S011 L E SAMPLES PL (%) NM (%) Ll, %) - AND REMARKS 1 L 1 T N-COUNT o- e?o O E I) or A FINES ( ) E V I; Y R'ee lRQD% SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N P a D ! SPT (bpf) SYMBOLS AND ABBREVIATIONS BELOW. D (R) r ri a P1 IQ 26 30 40 50 60 70 80 90 l00 1'v sail , . , 277.8 Safi to stiff, moist, reddish-brown, silty CLAY fCa.) SS-1 I-t-2 SS-2 4.4-7 Stiff to very stiff, moist, reddish-brown, dayey SILT (MI.-CL) T- 272 8 SS-3 4-7-II . 5 - SS-4 5-5-7 i 2G k SS-5 3.4-5 7, 10 8- -202 SS-6 3-4-j , i 15 SS 7 T-k-f1 Boring terminated at 20.0fl 257'8 20 2 52 fi . . 25 2 7 k 0 . 4 3 242 8 35 . 4 237,8 i» u 0 DRILLER: D. White EQUIPMENT: CME-45C METHOD. HS Augers HOLE DIA.: 6" REMARKS: Cave in at 18.0ft REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER T[MES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE, TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. it) 41I N) Mr !U W Jir 1IR? SOIL TEST BORING RECORD Project: Clayton Caterpillar Project ------------ Baring No.: R-9 Drilled: November 19, 2008 Project #: 6470-08-2229 Page I of i II SIMArTEC II D E P T lI (I() 5 €0 IS 20 25 30 35 40 45 SOIL CLASSIFICATION L E SAMPLES PL (n?) NNI I%) LL AND REMARKS SEE KEY SYMBOL SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS BELOW. E G E N D L E V (B) I t) F N .1 T Y P f^. N co?t+n' or Rec%/RQD11o ? ? a p v ?t r"n v W e --- A FINES (T7o) W SPT(bpf) 10 20 30 40 50 60 70 80 90 100 "rapwil 1 +' +' 252.6 base, Neel, grt thrawn, clayey, silty finc SAND (SKI) SS-1 I.2-2 Stiff, moist, gray-brown, very silty CLAY (CL) with gravel fragments gS_? X 44.5 Mediun3 dense, moist, gray, s€ity, clayey fine 10 tnediutn SAND (SC), with roots e 247 6 SS-3 5-7-11 S N-Ic:(litmt stiff: Inoist, gray. fine sandy CLAY (CL), with gravel fragments SS-4 3-3.4 Medium stiff, moist, reddish-brown, slightly clayey SILT (M1.) ( 242 SS -5 2 2 5 . 1 l0 SS-6 2-3-5 Boring trrntitrat4tl at 15,0fE 237.6 15 232 6 . 20 227 6 . 25 6 222 0 . 3 217 6 35 . 212 6 4 . 0 9157 6 DRILLER: D. White EQUIPMENT; CME-45C METHOD: HS Augers HOLE DIA.: 6" REMARKS: Cave in at I Loft REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES ,JAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS 11MVEEN STRATA MAY BE GRADUAL. U IU Z(? it) Ill :A? (4) 71) Litt A) HKI SOIL TEST BORING RECORD Project: Clayton Caterpillar Project Boring No.: R-10 Drilled: November 20, 2008 Project #: 6470-08-2229 Page I of 1 SMACTEC D E P T H (€1 5 I {} I$ 21) 25 30 x a` F p U ca 35 S r; F z L O F Q F O Z O F 40 45 SOIL CLASSIFICATION L E SAMPLES PL (%) NA1(%) LL (%) AND REMARKS SEE KEY SYMBOL SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS BELOW. G G E N D L E V (ft) I l? E N T T Y P F N-COUNT or Rec%1RQD% °n a , ,c -E ? PINES M ® SP7-(bpf) 10 20 30 40 SO 60 70 80 90 100 1`Q 7cn1I ? ? Very loos, ntpESt, gray-brawiE, shg[ttly cIa)s y, sally iuty SAND ISM) SS-1 2-1-1 Very stiff to hard, moist, reddish-brawn, silty CLAY (Cl.) SS-2 6.10-1[ SS-3 10-14-17 267.7 5 SS-4 9-14-21 Medium dense, dry, whin and gray, silty, clayvy fine to coarse SAND (SC), with gravel fragments 262 7 SS-5 I2-6-5 . 10 Medium stiff. inoim, reddish-brown, clayey SILT (MI.) Ss-6 3-?-? Boring tt!rtninated at 15.01`1 257.7 15 352.7 20 247 7 25 . 242 7 30 . ? X7.7 35 0 232.7 'f 77 T .1 DRILLER: D. White EQUIPMENT: CME-45C METHOD: HS Augers HOLE DIA.: 6° REMARKS: Cave in at 12.0€a REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONSATTFIF EXPLORATION LOCATION. SUBSURFACE CONDITIONS ATOTHERLOC:ATIONS AND ATOTHERTIMES MAY DIFFER. INTERFACES BEWEENSTRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. U IU LU .40 4V 3U W -!t? WJ `.!U IM SOIL 'TEST BORING RECORD Project: Clayton Caterpillar Project Boring No.: R-l I Drilled: November 20, 2008 Project #: 6470-08-2229 Pagel of 1 04 MA CTEC D E P T H S 10 Ii 20 21, 30 35 40 45 SOIL CLASSIFICATION L F SAMPLES PL (%) NM LL 0/0 AND REMARKS E L , NOUN, G E ly T or A FINES (9c) F. V Y RecnInlRQllna SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N P o (a a n 0 SPT (bpI) SYMBOLS AND ABBREVIATIONS BELOW. D (ft) 'r M y -2 -?i 10 20 30 40 50 60 70 80 JO 100 3'n psoil t 278.fi Stiff: moist, reddish-brown, silty CLAY (CL) SS-1 3.4.5 Very stiff, moist, redd€sh-brown, clayey SILT (MI. CI,) SS-2 5-8-13 Stiff to vcry stiff, moist, reddish-brown, clayey SILT (ML) with trace Bete sand 2716 SS-3 8-9-10 i SS-4 4-8•S 2G8 G SS-5 4-&9 1 . 0 - 263 6 SS-6 3-5.6 Horing terminated aL 15.01`1 ' IS 258 6 . 20 253 6 , 30 243 6 . 35 23x 6 0 . ; '72'2 F 4 DRILLER: D. Rhodes EQUIPMENT; CME-45C MFTHOD: HS Angers HOLE DIA.: 6" REMARKS: Cave in at 12.OfI REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDIT€ONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER, INTERFACES BEWEEN STRATA ARE APPROXIMATE;. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL, u tit 'LtI $u 9U 1U nU 11) rm 'A) Iut] [ SOIL TEST BORING RECORD Project: Clayton Caterpillar Project Baring No.: R-12 Drilled: November 20, 2008 Project #: 6470-08-2229 Page i of 1 NlACTEC D R P T H (0) 5 l0 15 20 25 30 0 v. r? E D U 35 V ?F W U L3 40 z 0 F- 45 SOIL CLASSIFICATION L E SAMPLES PI' J/') NN1(rlr.) LI- Vk ) AND REMARKS E L 1 T N COUNT O G E I) or ®FTNES (90) E V 1 Rec%iRQD% SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N P ;Q ?D - ;o 0 SPT (bpo SYMBOLS AND ABBREVIATIONS BELOW. D (ft) T r i a .c of ? m LD 20 30 40 54 GO 70 80 90 [00 To :oi T% +? r 9 S 25 Soft to very stiff, moist, teddish-brown, silty CLAY (CL) SS-1 t-1-2 SS-2 4-5-8 214 8 SS-3 6-10) 9 5 . SS-4 7-7-9 Very stiff, moist, brown, clayey SILT (MLICL) _ - 249 8 - SS-5 7-7-9 . 10 _ SS-G 8-[2-10 Buriilg terminated at 15.0ft 244,8 15 -239 - .s -234 8- . 25 229 8 0 . 3 224 8 35 . 219.8 40 1I €52 DRILLER: D. White EQUIPMENT, CME-45C METHOD: HS Augers HOLE DIA.: 6" REMARKS: Cave in atI2.0ft REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATTON OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT EITHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. U IIJ LU SU W M 4U !U 2MU `M ILA) Project: Clayton Caterpillar Project Boring No.: R-13 Drilled: November 20, 2008 Project #: 6470-08-2229 Page 1 of 1 ?MACTEC D E P T H. 5 to 15 20 25 30 0 h a_ F O C7 ai 35 a a a F•: z 40 z 0 F Q F d z F 45 SOIL CLASSIFICATION L E SAMPLES PL (?a) NM (%) LL (?) AND REMARKS SEE KEY SYMBOL SHEET FOR EXPLANATION OF SYMBOI S AND ABBREVIATIONS BELOW. E G E N D L F V (ft) 1 I) E N .11 f Y N F: 1.•tuNT or Rm%1RQD%r a n E g - rl rr -e?? A FINES (?k) • SPT (bpf) 10 20 30 40 50 60 70 80 90 100 Tn cqi) %).. 'IL 247.0 Very soft to soft, moist, reddish-brown, silty CLAY (CL) SS-1 1-2-1 SS-2 WOH-1-2 Wry stiff, moisl, brown and gray, fine sandy, Silty CI.AY (CI.) 242 0 SS-3 2-9-5 , 5 SS-4 5-7-7 Very stiff, moist, gray-brown, slightly clayey SILT (ML) ?3 SS-5 4-S-IQ 7.0 --- If) 2 2 0 SS-6 7-10-II Baring terminated at 15.0h 3 , 15 227 0- . 20 -22 - 2.0 - - 217,0 30 212 0 3$ . -2( 7 ( 40 ) . )- wv) n DRILLER; T. Hahn EQUIPMENT; CME-55 METHOD; HS Augers HOLE DIA.; 6" REMARKS: Came in at 10.6ft REVIEWED BY; THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BCIWEEN STRATA MAY BE GRADUAL, U Ill 211 ;itt 41) 10 01) M 811 'At 1W SOIL TEST BORING RECORD Project: Clayton Caterpillar Project Boring No.: R-14 Drilled: November 19, 2008 Project 6470-08-2229 Page I of I A,?/J M A Tx%CJTEC D E P T H (0} S H) 15 20 25 :sO a F Q U ui 35 i U C7 z n O z 40 45 SOII. CLASSIFICATION L E SAMPLFS Pl (°??) I?n? (?P) LI, c??? AND REMARKS E L I T N,COUNT -? Cs E D or A FINES (90) E V Y Rer-%IRQD% SEE KEY SYMBOL SHEET FOR EXPLANATION ' OF N N P & ?0 ;n o 0 SPT (bpf) SYMBOLS AND ABBREVIATIONS BELOW. D (ft) -r } 7 a 6 2 r,4 " 10 20 30 40 50 60 70 80 90 100 Tnin??il ' 61.5 Stiff to very stiff, moist, reddish-brown, silty CLAY (CL) F SS-1 2-3-6 E/z P - SS-2 7-11.11 r4 356 5 SS 3 8.7.8 . 5 Stiff, 11toisi. fight brown. Chgty SILT (MI,CL). whit mica - i SS-4 5-6.6 - 251 5 SS-5 11.5-6 . I0 -24 5 SS-6 6.7•T 6. 15 11 5 - -? SS-7 4-6-T 0 Boring terminated at 20.0111 . • 2 236.5 25 231 5 . 30 226 5 3 . 5 - 221 s 0 . X1 DRILLER: T. Hnhn EQUIPMENT: CNIF-55 METHOD: HS Augers HOLE D1A,: 6" REMARKS: Cate in at I4.Oft REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS A'r'rHE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER, INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BMAVLEN STRATA MAY BE GRADUAL. I) W 10 3U 4U lu tw fU sv w 1UU SOIL TEST BORING RECORD Project: Clayton Caterpillar Project Boring No.: R- 15 Drilled: November 19, 2008 Project #: 6470-08-2229 Page 1 of l SMAYCiTEC D F- P T H I0 5 ill IS 211 2s ;10 0 ca 35 3 .3 a ti r U 0 N 4 O 40 45 SOIL CLASSIFICATION L E SAMPLES PL(ha) NM (%a) LL ('o) AND REMARKS E L I T N.COUNT e?v 9/ G 8 D or A, FINES ( o) E V li Y Kec'n/RQD7c SEE KEY SYMBOLSHEET FOIL EXPLANATION OF N N P o a n 0 SPT ftf) SYMBOLS AND ABBREVIATIONS BELOW. D (11) T 1, 7) v 2 = ci M 'r 10 200 30 40 50 60 70 80 90 100 To sail ' 52, I -. Stiff, moist. redclish•brirwn. silly CLAY (Cf,) SS-1 24-6 stiff, moist, brown. cluyy SII: r (Mi,) SS-2 4-6.7 Stiff, inuist, brown. silty CLAY (CI.) 247 1- SS-3 3.6.7 . 5 Stiff, moist, brown, clayey SILT (ML) SS-4 3-4.5 Wry stiff, moist, light brown. Sthy CLAY (CL) 24? I SS-5 X 4.6. 10 . 10 Very dense, dry, gray, slightly silty, slightly clayey fine to coarse SAM) (SC) SS-6 26.15.5010 25 37 I . Pnrtiall wealhcrcd rock sam tact as dry. gray (Guess (PWR) . 15 Buriog teteninaied at 14,75(1 232 1 20 . 227 I 25 , 22 30 7 .1 21 l 35 7. 41 212. k ) im e DRILLER: T. Hahn EQUIPMENT: CME-55 METHOD: HS Augers HOLE DIX: 6" REMARKS: Cuve in at 9,611 REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRI: PATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION, SUBSURFACE CONDHJONS AT OTHER LOCATIONS AND AT OTHER TIMFS MAY DIFFER. INTERFACES BEWF.BN STRATA ARE APPROXIMATE, TRANSITIONS BE•IWEEN STRATA MAY BE GRADUAL. U IU 2U iu qu JU UIl ltJ 6tl `u Itm Project: Clayton Caterpillar Project Boring No.: R-16 Drilled: November 19, 2008 Project ##: 6470-08-2229 Page 1 of 1 II MMAr EC II D E P T 14 (0) 5 10 I5 20 25 3fi 35 40 45 SOIL, CLASSIFICATION . E SAMPLES PL () N,1-, (M?) LL () AND REMARKS SEE KEY SYMBOL, SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS BELOW. 0 C N D 11 E V (ft) 1 D T `r Y N-cou;`r,' or Rec%JR D7: A FINES (Ja) ®SPT (bpt} 10 20 30 40 50 60 70 80 90 100 Tapscfi, 254.8 Soft. moist, reddish-brawn, sillyCL.AY (CH) SS-1 1.1-2 Stiff, moist, reddish-brown, silty CLAY (CL) SS-2 3-G-G 249 8 SS-3 3-5.6 . 5 Nkditmt stiff to miff, moist, gray-brown, clayey SILT (M,) SS-4 2.4.4 244 Ii S5 S 2 3-4 Boring terminated at IUri . 10 239 8 , 15 234 8 , 20 -329 8- . 220- X) 219 8 35 . 214 8 . 40 ?rxi s DRILLER; T. Hahn EQUIPMENT: CME-55 METHOD: HS Augers HOLE. DIA,: 6" REMARKS: Cave in at 7.1lt REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OFSTJBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS A'I'OTHER LOCATIONS AND ATOTHGR'[IMES MAY DIFFER, INTERFACES 13EWEEN STRATA ARE APPROXIMATE. 'TRANSITIONS 13GTWEEN STRATA MAY BE GRADUAL. 0 IU 20 31) 411 51) 61) 70 NO 90 100 SUILTEST BORING RECORD ?I I Project: Clayton Caterpillar Project Boring No.: R-17 Drilled: November 19, 2008 Project #: 6470-08-2229 Page I of 1 II JrMACTEC II D E P T 11 £1) 5 10 15 20 25 34 v, 7 F tl C7 ci 1$ p JI 4 i% C7 s7 40 O M C F n Q e, 45 SOIL CLASSIFICATION L E SAMPLES PI, (?o) NM (L) LL (a) AND REMARKS E E I T N-COUNT G E 13 or ®FINES () E V Y Rec,%JRQD% SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N P ;fl ? = SF'T (bpt) SYMBOLS AND ABBREVIATIONS BELOW, D (ft) T 'V T? le 2 - W 20 30 40 50 60 70 80 90 100 "Topsoil ? 56.6 - Stiff to very stiff, tnoist, rzddish-brawn, silty CI,AY (CL) SS-1 2-5-8 SS-2 6.10-15 Very stiff, moist, light brown, clayey Sll:1' (M1. CI-) -251 6- SS-3 8-9-11 . SS-4 5.10-12 - 24 SS-5 5-7-8 6.6 10 Stiff, (fry, 113111 brown, slightly tine satnly, r1a)zy S11T (Nil l1) SS-6 3.3.7 Boring terminated at 15.0ft 241.6 I$ 236 6 0 . 2 231 6 . 25 726 6 30 . 221 6 35 . 216 6 40 . DRILLER: T, Hahn EQUIPMENT: CME-55 METHOD: HS Augers HOLE DIA,: 6" REMARKS: Cave in at t0.2ft REVIEWED BY: THIS RECORD IS A RFASONABLF, INTERPRET FATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND Kr OTHER TIMES MAY DIFFER. INTERFACES BEWEENSTRATAARE. APPROXIMATE. TRANSITIONS BETWEEN STRATA 3IMAY BE GRADUAL. 0 10 20 30 40 50 04) 741 80 90 101) I SOIL' 1`1( T BORING RECORD Project: Clayton Caterpillar Project Boring No.: R-18 Drilled: November 19, 2008 Project #: 6470-08-2229 Page I of I D E P T H S 10 15 20 25 30 ti ai 35 n U ?I a. L'l i v 40 'r. O i~ Y. Q 45 SOIL CLASSIFICATION 1 E SAMPLES PI .(S4} NI?m) LI,Irk) AND REMARKS E L 1 N coutvf ` U E or • FINES ( Yo) E V Y Rec{)1IRQD% SEE KEY SYMBOL SHEET FOR EXPLANATION OF N N P a o °a ®SPT (hpt} SYMBOLS AND ABBREVIATIONS BELOW. D (ft) T fi y a 'n rl ?. 10 20 30 40 50 60 70 80 40 100 CopsaiE k + 1, 257,5 Medium stiff. moist, brown, silty CLAY (CL) ss I 4 2 Louse, moist, gray-brown, Blighty clayey. silty fine SAND (SM) SS-2 31-5 SI10. ntotst. rcrJdixh-bra+vik. slightlyrl:kyuy. line cmx1y51LT (14t1) w52 5 SS-3 2-4.6 . 5 Stiff to very stiff, moist, gray, slightly fine saudy, clayey SILT (ML) SS-4 4.6-7 ZITS SS-5 ?•5-7 10 242 5 SS-6 4-5.5 , 15 237 5 SS-7 4.8.11) 2 . 0 2 2 SS-8 6J)-12 Haring tr€niiu;Ftad it 26.0 ; .5 25 2 3 27.5 0 ?22 5 35 . 2 4 17.5 9iO Q 0 DRILLER: D. Rhodes EQUIPMENT: CME-45C METHOD: HS Augers HOLE DIA., 6" REMARKS: Cave in as 16.7ft ------------ REVIEWED BY: THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS ATTHE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BLS GRADUAL. Il 10 20 30 4U 51) 6U 711 80 W 1W Solt. TEST BORING RECORD Project: Clayton Caterpillar Project Boring No.: R-19 Drilled: November 21, 2008 IF'roject #: 6470-08-2229 Page l of i i5 d m Z ? rn (? H Lu C;j N co ?? oo i5 O0T VJ o N U C3 P o Z to Z LLI ii tW C) LLB W H L W Z2© Za k vz W? © W3U U CCO cc a U ? W U Q 0 e ? ? U J J J = J . U) U z to 't LO Z ? Z Z N d N N ? CO 00 d d r r (") ( N a a N ? i C ( It ( c(D Y) w i0c (!y o. N Lo a) d t? cD tD M LO C") cn CO 2 tC) LO LO LO to 2 LU 6 r (n (D N d }.. C ?1 CV C ?3 CV d' m CL v n Cb Ch n i co co ( co U) a V O M d CQ a3 p C? - CE m m oo m w 0 0 Z i1) Y cr Q W cr c 0 c 0 m' rn W J m °w m {n