HomeMy WebLinkAboutNCG030326_Compliance Inspection_20190823ROY COOPER
Governor
MICHAEL S. REGAN
.Secretary
S. DANIEL SMITH
Directur
W&WIAFCO Steel
Attn: Roger Breeden
341 Corbett Road
Nashville, NC 27856
NORTH CAROLINA
Environmental Quality
September 23, 2019
Subject: COMPLIANCE EVALUATION INSPECTION
WBWfAFCO Steel
Nashville Facility, Certificate of Coverage-NCG030326
NPDES Stormwater General Permit-NCG030000
Nash County
Mr. Breeden:
On August 23, 2019 a site inspection was conducted for the W&W/AFCO Steel facility located at the 341
Corbett Road, Nash County, North Carolina. A copy of the Compliance Inspection Report is enclosed for
your review. The site visit and file review revealed that the subject facility is covered by NPDES
Stormwater General Permit-NCG030000, Certificate of Coverage-NCG030326. Permit coverage
authorizes the discharge of stormwater from the facility to receiving waters designated as Stoney Creek,
a Class C;NSW waterbody in the Tar -Pamlico River Basin.
As a result of the inspection, the facility was found to be in compliance with the conditions of the
NCG030000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments
and observations made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil
penalty assessment of up to $25,000 per day for each violation. If you or your staff has any
questions, comments, or needs assistance with understanding any aspect of your permit, please contact
me at (919) 791-4200 or by e-mail at Thad. vaientine@ncdenr.aov.
Sincerely,
Thad Valentine
Environmental Senior Specialist
Nurth Carolina Dcparuncnf of Envlronmtrnal Quality I Divisirrn of f:nrryy, hlinerat and Land Resources
5;Z North Sa6bury Street 11612 Mail 5crvic.e Caner I Inl2
IWun+vm alkm•iom�xw Ou�� �� 9197070200
Compliance Inspection Report
Permit: NCG030326 Effective: 11/01/18 Expiration: 05131/21 Owner: Carolina Steel Group LLC
SOC: Effective: Expiration: Facility: Carolina Steel Corp - Nashville
County: Nash 341 Corbett Rd
Region: Raleigh
Nashville NC 27856
Contact Person: Roger Breeden Title: Phone: 252-459-7116
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s)-
Related Permits:
Inspection Date: 08/23/2019 Entry Time: 10.00AM
Primary Inspector: Thaddeus W Valentine
Secondary Inspector(s):
Certification:
Phone:
Exit Time: 12 0OPM
Phone:
Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: Compliant [] Not Compliant
Question Areas:
■ Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030326 Owner - Facility: Carolina Steel Group LLC
Inspection Dale: 08123/201 S Inspection Type : Compliance Evaluation Reason for Visit: Follow-up
Inspection Summary:
This facility is required to develop and maintain a SWPPP in accordance with Part II, Section A of the permit. All qualitative
and analytical monitoring records are required to be maintained with the SWPPP for a minimum of five (5) years. Records
appear to be current and complete.
Parameters for Zinc have caused the facility to fall into Tier II and then Tier III for analytical monitoring. The Plant Manager,
Roger Breeden, has monitored onsile and offsite stormwater, upstream and downstream at the property, to provide samples
for comparison. Results showed that almost all zinc samples exceeded benchmark parameters. It does not appear that
industrial activities at this site are a significant factor in the exceedance of the parameter. Roger Breeden will sample
downspouts to determine if the facility's roof is the cause of the zinc exceedances. Soil samples will also be provided to see
if zinc is naturally present in soil. The facility was found to be compliant with its industrial stormwater permit.
Page 2 of 3
Permit: NCG030326 Owner - Facility: Carolina Steel Group LLC
Inspection Date: 0812312019 Inspection Type: Compliance Evaluation Reason for Visit: Follow-up
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
N ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
N ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ r]
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
N ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0 ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0 ❑ ❑ ❑
Comment: The facility was directed to improve the site man in the SWPPP and to add a site boundary_
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment: Has takers sanles ConsistantlY since 2014
Analytical Monitoring
Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑
Comment: Has taken sakples consistantly since 2014
Permit and Qutfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0❑ ❑ ❑
# Were all outfalls observed during the inspection? 0❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 []
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment: Additional out falls identified in the walk through inspection will need to be sampled and submitted
DEQ for review and down spout samples should be taken as requested.
Page 3 of 3