Loading...
HomeMy WebLinkAboutNCS000202_NOV Response_20190920September 18, 2019 Mr. Stanley E. Aiken, PE Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources Asheville Regional Office 2090 US 70 Highway Swannanoa, NC 28778-8211 Dear Mr. Aiken, In response to Notice of Violation NOV-2019-PC-0561, our on -site Operations Manager who oversaw the plant environmental program retired. We now have an employee trained on the requirements of the Permit, including the tiered response procedures and SWPPP documentation. Moving forward we will implement the following Plan of Action: • Maintain and implement a SWPPP on site as required by the permit, including all tiered response documentation. Regarding our Tier Three status, we have implemented the following Plan of Action: • Cleaned out the stormwater sediment trap to Outfall #1 & 2 • Repaired the stormwater drain pipe to Outfall #1 & 2 • Cleaned out the stormwater sediment trap to Outfall #4 • Repaired the stormwater drain pipe to Outfall #4 Please contact me with any questions or concerns you may have at (770) 454-1533. David 1. Price Plant Manager SEP 2 0 2019 I 'tr .. -Jan United States Gypsum Company 722 Altapass Hwy, Spruce Pine, NC 28777 t 828 765-9481 f 828 765-0628 usg.tom