Loading...
HomeMy WebLinkAbout20010586 Ver 1_Site Plan_20010428 - . .< ., .' PROJECT CODE: JL-HOL9 ('Sf~\ 1(.. ~ HOLLY SPRINGS, ...------.--- --------------..-- .._~----_.._.^ NORTH CAROLINA ENGINEERING PLANS PIN #: 0658.02-77-5872 DWQ #: 010596 OWNER/ DEVELOPER: .. TOWN OF HOLLY SPRINGS PARKS & RECREATION DEPARTMENT P.o. BOX 8 128 SQUTH MAIN STREET HOLLY SPRINGS, NORTH CAROLINA 27540 TEL: (919) 557-3934 CONTACT: Mr. Len Bradley f " . ~.. ---- - ....., - CONSULTANT I AGENT: .. I \ .; THOMPSON AND ASSOCIATES CONSULTING ENGINEERS 5821 HOLLY SPRINGS ROAD RALEIGH, NORTH CAROLINA 27606 TEL: (919) 854-9500 FAX: (919) 859-2143 CONTACT: Mr. Joseph J. Lyle Mr. Vernon Hershberger ; I .. DATE: April 26, 2001 Revisions . '. ...... ~~"'- .> VICINITY MAP NOT TO SCALE ~, 't4t . ''}',.. _..'1: ,... '\: , !.f 1'\ <?-~ APPENDIX: .----..-..-------..---------- ~- -- -------- "'---- SHEET C-2: SITE PLAN ENLARGEMENT - PART 1 SHEET C-3: SITE PLAN ENLARGEMENT - PART 2 SHEET C-4: DREDGING PLAN ENLARGEMENT - PART 1 SHEET C-5: DREDGING PLAN ENLARGEMENT - PART 2 r _ .~~OAt.4~t~. ....~..... NA TURE CONSERVANCY BOUNDARY (TYP.) LITTORAL SHELF STUDY AREA # 1 @ 0.07 AC TOTAL AREA. n I o I- W W I if) W W if) VICINITY MAP NOT TO SCALE ~~ N.C. GRID (NAD 83) ALL DISTANCES ARE HORIZONTAL GROUND MEASURED IN FEET ~ HOLLY SPRINGS TOWNSHIP TOWN OF HOIJ.Y SPRINGS JURtSDlCTlON SITE LOCATED IN WAKE COUNTY, He FISH HABITAT AREA #7 - GRAVEL BEDS 0 6" DEPTH @ :1:0.14 AC TOTAL (ALTERNATE HS-7: TYP. ALL AREAS) NEW 2,33 AC HABITAT ISLAND. (ALTERNATE HS-3, 6) LITTORAL SHELF STUDY AREA #4 o 0.03 ACRES TOTAL AREA HARDWOOD LOG EDGING 113 o :1:75 LF FISH HABITAT AREA #6 - GRAVEL BEDS 0 S" DEPTH @ :1:0.08 ACRES (ALTERNATE HS-7: TYP. ALL AREAS) FISH HABITAT AREA #5 - GRAVEL BEDS 0 6" DEPTH 0 :1:0,31 ACRES (CONSTRUCTED FROM GRAVEL OF TEMPORARY HAUL ROAD. SEE NOTE 5, THIS SHEET) CUT WILLOWS AND TREE VEGETATION TO LEVEL OF EXISTING LAKE BOTTOM JUST PRIOR TO RE -FILLING OF BASS LAKE TO REMOVE VEGETATION AND PREVENT RE -SPROUTING (ALTERNATE HS-4) TYPE 1 :tB17 LF TYPE 2 :t 1,542 LF TYPE J :t281 LF TYPE 4 :t899 LF (THIS SHEET) :t2,579 LF TOTAL 00000000000 *********** ................ _11_11_11-11- TREATMENT TYPE 1 f):0.75 AC) NATIVE TREE/SHRUB SHORELINE VEGETATION TREATMENT; LIVE STAKING; LUNKER LEAN-TO/HARDWOOD LOG EDGING; PERMANENT EROSION CONTROL FABRIC TREATMENT TYPE 2 f;J:0.71 AC) NA TIVE TREE/SHRUB SHORELINE VEGETATION TREATMENT; STACKED HARD- WOOD LOG EDGING; PERMANENT EROSION CONTROL FABRIC TREATMENT TYPE J f):0.19 AC) FOCAL POINT - PEDESTRIAN ZONES; SAND BEACH AREA WITH NATIVE WETLANDS VEGETATION IN ADJACENT LITTORAL ZONES; CARRY SAND TO WATERS EDGE AT POINT; NATIVE TREE/SHRUB VEGETATION BEHIND PATHWAY; COIR FIBER ROLLS; STACKED HARDWOOD LOG EDGING; EROSION CONTROL FABRIC TREATMENT TYPE 4 (:I: 1.79 AC) UPPER ZONE: PERMANENT EROSION CONTROL FABRIC; PERMANENT SEEDING ONLY ALTERNATE: WIDELY SPACED WOODY VEGETATION (SEE PLANT WTAL lIYNOYATl'iE SHO~EUtiE STABILIZATION - H.888 LF; J,~~ AC INCLUDES TREATMENT TYPES 1 - 4) -- ..........- .....-"..~ FOREBA Y /SEDIMENT BASIN # 1 @ 0,07 AC TOTAL FUTURE FISHING PIER/ PEDESTRIAN OVERLOOK #4 LITTORAL SHELF STUDY AREA #2 @ 0.24 ACRES TOTAL AREA. 6"xS" TIMBER EDGING @ 160 LF 4" SAND @ :l:: 25 CY (0.05 AC) I I 1 HARDWOOD LOG EDGING # 1 o 354 LF / i , SCCOOH C-C1 FUTURE FISHING PIER/ PEDESTRIAN OVERLOOK #3 SECOOH 0-01 TYPICAL FISH HABITAT #1 - GRAVEL SPAWNING BEDS 0 6" DEPTH @ 0.07 AC (ALTERNATE HS-7: TYP. ALL ARtAS) 6"xS" TIMBER EDGING @ 150 LF 4" SAND @ :l:: 24 CY (0.045 AC) I ! / / / ,/ / ,/ /' ./' LITTORAL SHELF STUDY AREA #3 @ 0.25 ACRES TOTAL AREA. ../ HARDWOOD LOG EDGING #2 @ :1:215 LF: SEE PROFILES, _/ /' SEcnOH 8-81 TYPICAL FISH HABIT A T #2 - GRAVEL SPAWNING BEDS 0 6" DEPTH @ 0.07 AC EXISTING 50' SEWER LINE && EASEMENTS TYPICAL FISH HABITAT 1i3 GRAVEL SPAWNING B.ECJS @ 6" DEPTH @ 0.06 AC (ALTERNATE HS-7) FUTURE FISHING PIER/ PEDESTRIAN OVERLOOK #2 w Z -...l I o I- <!: ~ ."",.... ../ /' ../ NEW 8' WIDE PATH - PAVE WITH 4" ASPHALT PATH AL7~tyATE HS-2: 1" STONE DUST FINES) OVER -1" CRUSHER RUN NEW FISH HABIT A T 14 GRAVEL SPAWNING B.EDS 0 S" DEPTH @ 0.09 AC (ALTERNATE HS-7) OLD LAKE EDGE NEW LAKE EDGE FUTURE SAND BEACH CANOE LAUNCH FUTURE BOATHOUSE & DOCK FUTURE CONCRETE BOAT RAMP AND STORAGE AREA - 8" CONCRETE C 3200 PSI . \ \ . \ \ \ \ . \ \ . \ \ . \ \ EXISTING BOATHOUSE TO BE REMOVED BY TOWN OF HOLLY SPRINGS ALTERNATE HS-1: PROPOSED ASPHALT PARKING 2" 1-2 ASPHALT & 8" ABC TO NCDOT STANDARDS FUTURE 12' ENTRANCE LANE 100' STORAGE/ 180' TAPER (NOT REQUIRED FOR THIS PHASE OF PROJECT - NOT IN CONTRACT) ALTERNATE HS-1: CONCRETE CURB & GUTTER lQIES: 1. 4" DOUBLE SHREDDED HARDWOOD MULCH SHALL BE USED FOR ALL NEW PEDESTRIAN PATHWAYS, UNLESS OTHERWISE INDICATED. ALTERNATE HS-2 SHALL BE 1" STONE DUST OVER 4" ABC CRUSHER RUN. 2, ZONE J SAND BEACH SHALL CONSIST OF 4" CLEAN, WASHED SAND OVER MIRAFI 140-NL NON-WOVEN EROSION CONTROL FABRIC. 3. TIMBERS AT SAND BEACH EDGE SHALL BE S"xS" CCA PRESSURE TREATED TIMB~RS, AND SHALL BE TOE-NAILED TOGETHER WITH 40-PENNY NAILS. #3 REBAR (I 24"-36" LENGTH SHALL BE USED TO ANCHOR TIMBERS. 4. ALTERNATE HS-1: ASPHALT PARKING LOT SHALL BE TO CURRENT NCDOT AND TOWN OF HOLLY SPRINGS STANDARDS de SPECIFICATIONS. 5. FISH HABITAT SHALL BE 6-INCHES CLEAN WASHED GRAVEL @ 20' WIDTH ALONG SHORELINES. TEMPORARY HAUL ROADS SHALL BE UTILIZED, IF POSSIBLE, FOR THE CONSTRUCTION OF FISH SPAWNING AREAS ALONG THE WESTERN SIDE OF THE HABITAT ISLAND. ALL OTHER GRAVEL SPAWNING BEDS SHALL BE 6" CLEAN, WASHED GRAVEL (I 20' WIDTH, LOCATED IN LESS THAN 24" MAXIMUM WATER DEPTH. 6. EXISTING 50' SEWER EASEMENT SHALL BE UTILIZED FOR EQUIPMENT AND MATERIAL ACCESS AND MOVEMENT THROUGHOUT THE SITE. CONTRACTOR SHALL REPAIR ANY EXISTING STRUCTURES THAT ARE DAMAGED, AT NO COST TO THE OWNER, 7. EXTREME CARE SHALL BE USED TO PROTECT EXISTING TREE BUFFER AREAS ALONG EXISTING SHORELINE EDGE. EXISTING BUFFERS TO REMAIN UNDISTURBED. 8. DEMOUTION SHALL INCLUDE REMOVAL AND DISPOSAL OF EXISTING BOAT HOUSE AND DOCK, AS WELL AS ANY VEGETATION WITHIN PRIMARY LAKE BED GRADING AREAS. 9. FILL MATERIAL SHALL NOT BE DEPOSITED OR DISCHARGED INTO WETLANDS OR FLOODPLAIN AREAS. 10. SEE RIPARIAN BUFFER CROSS-SECTIONS, SHEETS C-7 FOR SPECIFIC CONSTRUCTION AND PLANT ZONES, SEE SHErr C-B FOR ZONE PLANTING OPTIONS, ". SEE SHEET C-3 FOR SITE PLAN ENLARGEMENT CONTINUATION, '. \ \ EXISTING SEWAGE PUMP STATION / ~~ T~~}lfCWtlfwlLK FLUSH WITH BACK OF CURB - 4" THICK @ 2800 PSI @ 28 DAYS AL TERNA TE HS -5: CONNECT EMERGENCY SPILLWAY DRAINAGE CHANNEL TO EXISTING DRAINAGE CHANNEL BELOW EXISTING DAM / OWNER: TOWN OF' HOLLY SPRINGS P.O. BOX 8 HOLLY SPRINGS. Ne 27S40 ;0 ;0/ SITE PLAN ENLARGEMENT - SHEET 1 BASS LAKE RESTORATION & SHORELINE STABILIZATION HOLLY SPRINGS TWP. OWNER TOWN OF 100 0 50 100 200 / HOLLY PRINGS I I I I I / WAKE CO. NORTH CAROUNA ZONED R-40 , ......... / " '" DATE 4/26/01 DRAWN VLH JOB NO. JL-HOL9 SCALE 1-. 100' / " SCALE 1- · 100' SURVEYED DRAWING DWQSITE / " REVISIONS PIN 0658.02-77-5872 -..---..---------...- .~'''r'~.~' --.----~----_._--- \ VICINITY MAP NOT TO SCALE ~ ~ ~ FUTURE FISHING PIER/PEDESTRIAN OVERLOOK #5 (NOT IN CONTRACT) FUTURE PIER TO BE ATTACHED TO BOARDWALK AND ACCESS CUT INTO BOARDWALK RAILING BETWEEN POSTS I \ FUTURE CONNECTION TO TOWN GREENWA Y SYSTEM EXISTING LAKE BED TO REMAIN UNDISTURBED EXCEPT FOR FISH SPAWNING AREAS FISH HABITAT AREA #8 - GRAVEL BEDS @ 6" DEPTH @ :to.13 ACRES (ALTERNATE HS-7: TYP. ALL AREAS) N.C. GRID (NAD 83) ALL DISTANCES ARE HORIZONTAL GROUND MEASURED IN FEET \ FISH HABITAT AREA #10 - GRAVEL BEDS @ 6" DEPTH @ :i:0.14 ACRES (ALTERNATE HS-7: TYP. ALL AREAS) FISH HABITAT AREA #9 - GRAVEL BEDS @ 6" DEPTH @ :to.10 ACRES (ALTERNATE HS-7: TYP. ALL AREAS) - ~ -. --: ---=:.:::-. -. .::. .::: ...:: .:: - -- ... -- - "............... ~ -... ------. ----- --.. --- .............. - --- -- - """-- ...... '-- -........ ,---....--- -'-- --- -. -- -..... - ....-- - ----- -........... ... ...... -- - -.... -. -- ......---::-'-----"'-- - - --- --~--' ___ _-. __.:::_ ___ _:::._:::::::-_ --:::::._ --350 "-. -. -.. ---- ,,'-"- ...-- ---- - - ............... - -. --- - ----- - -.......... ~ ~~-. ~:=:=.--- ~ -- -...........-- ,-... ----- --... .....:.----------......;::::.,- ---=:::-::::::- --.:::--~ ~ -::: - ........ ---- --... -- - =----------::::: -::: .:::::-:--: ~- .... ___ '-- ---. _-. . ____ _ _ ::::- :---.:::::::-- - 35 .. .......... ....... --...... """'-. --- --..... ~:--- ........ -....-. -<-...- -...... ------......-.... -'-- ----:::::::::--..:: --- -- - ....--- --- -- -- ~ =.- -- -------- --...-- _. ....... ...... __ ____ ............... -.... __ ___ ~ ---.................. --~41' --... -- -- -. ----- --.,:---.:: - --- ::::---.:: '- --- ~ -----... ---- -... --- - "- '::::' -.::::::::-... ----. ::-----..::: ,,-- .- -.... -- .-- ~ ''-. ---- ---:::--- --...::::::-:::.:-... --- -- _. '----. __..------........... ...::::--- __ -_.:::::::::.. '-.. -- 335 - ::----....: - -- - ---- - -- -.... --- ----- ~ ...----~_......... .... . - ---- -- - -- ~~ -------- . - -- ---- ---.-- ~ ----- -- .........:::--::::-- - - - ~ ~........:.:::-- -- ~....... '.......... . -~. - - - - - --.......... ........ "-------....:::::: '- :"':"'-- - - - - - ::--::::::-::::-----=:::------- - -- -.... "'- -.::::::--:::::: -- . '. -.--..~-- ~-.....:: ----- ~~:-...::.. - =--::0-.-:- . HOLLY SPRINGS TOWNSHIP TOWN OF HOLLY SPRINGS JURlSOtCTlON SITE LOCATED IN WAKE COUNlY, Ne EXISTING 6' BEAVER DAM @ :t1' HT ABOVE EXISTING GRADE TO REMAIN UNDISTURBED. REMNANTS OF OLD WOOD STRUCTURE IS EVIDENT. SOIL & VEGETATION HAVE FILLED AND STABILIZED OLD STRUCTURE ,,/ / '" ",/ '" '" / ...., -//' '" - ./ /' /' /'/' + \...-- -,- -,- -.;.-,- -,- .. -'-- -,... ...,... ,... --------- -- . ------ N I u I- W W :r: (f) w w (f) . 318.4 .318,7 . 317,7 w z ~ :r: u I- <( ~ NEW CONCRETE WIER (2 TOTAL) AS SHOWN. 8' PATHWAY TO CONNECT TO WEST PATH END AT ELEVATION 328.75 WITH WOODEN BOARDWALK 0 192 LF RAMP TO GRADE AT EAST END OF BOARDWALK @ ELEVATION 326.07 RAMP SHALL BE 35' L @ ""5.21 % SLOPE CLEAR VEGETATION ONLY AS NEEDED TO INSTALL PATHWAY TO 1-' MAX. WIDTH. LIMB UP BRANCHES TO 8'-10' HT. AS NEEDED FOR CLEARANCE CUT WILLOWS AND TREE VEGETATION TO LEVEL OF EXISTING LAKE BOTTOM JUST PRIOR TO RE -FILLING OF BASS LAKE TO REMOVE VEGETATION AND PREVENT RE-SPROUTING FUTURE PEDESTRIAN TRAIL THIS SHEET ONLY. SEE SHEET C-2 FOR CONTINUATION (ALTERNATE HS-J) TYPE 4 1,680 LF _11_11_11- 100 I o I 50 I 100 I 200 I O\W\lER: TOWN OF HOLLY SPRINGS P.O. BOX 8 HOLLY SPRINGS. Ne 27540 SCALE 1" "" 1 00 ' """11",, ,\',}" CARo"" ......~\ ;e......... ~ ,,', .: ~~ : ~~., '.A.'; (~ (:~::)~..) ~;~ '-:. ~ ;"~"'L.. ..-.... ....~ "" . H \" "'IIU"'\\ . TREATMENT TYPE 4 f;t1.79 AC): UPPER ZONE: PERMANENT EROSION CONTROL FABRIC; PERMANENT SEEDING ONLY ALTERNATE HS-6: WIDELY SPACED WOODY VEGETATION TYPE 1-J TYPE 4 TOTAL: 56,635 CY 10.032 CY 66,667 CY 10.0J AC 1. 78 AC 11.81 AC SITE PLAN ENLARGEMENT - SHEET 2 BASS LAKE RESTORATION & SHORELINE STABILIZATION HOLLY SPRINGS TWP. IATES WAKE CO. NORTH CAROLINA RD 7 6 DATE 4/26/01 DRAWN VLH 09 143 SCALE 1. "" 1 00' SURVEYED TOWN OF H LL Y SPRINGS ZONED R-40 JOB NO. JL-HOL9 DRAWING DWQSITE (INCLUDES 20% SHRINKAGE VOLUME INCREASE) TYPE 1 6,798 CY 0.79 AC TYPE 2 2,514 CY 0,78 AC TYPE 3 1,037 CY 0.17 AC TYPE 4 7.0B1 CY 1.29 AC TOTAL: 17,430 CY 3.04 AC REVISIONS PIN 0658.02-77-5872 ~- /" VICINITY MAP NOT TO SCALE ~ HOllY SPRINGS TOWNSHIP TOWN OF HOllY SPRINGS JURISDICTION SITE LOCATED IN WAKE COUNiY. NC ~ 1. ALLUVIUM SEDIMENT SOIL SHALL BE EXCA VA TED AND DEPOSITED ON EXISTING HIGH GROUND IN ORDER TO REACH STABLE SOIL. STABLE SOIL EXCAVATION TO BE USED FOR RIPARIAN BUFFER EXPANSION ALONG WESTERN SHORELINE EDGE. 2, ISLAND FILL VOLUMES MAY VARY BASED ON FIELD CONDITIONS. ISLAND STORAGE VOLUMES ARE APPROXIMATE. ISLAND LOCATION IS APPROXIMATE AND SUBJECT TO FIELD ADUJSTMENTS AS NEEDED. FINAL LOCATION TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION. 3. THE SEDIMENT TRAPS AND DIVERSION BERMS ARE DESIGNED AND LOCATED TO CATCH DRAINAGE SEDIMENT ACCORDING TO EXISTING TOPOGRAPHY AND ANTICIPATED EXCAVATION AREAS. CONTRACTOR SHALL ADJUST LOCATION OF SEDIMENT TRAPS AND DNERSION BERMS TO FIT FIELD CONDITIONS, 4. GRADING AREA CALCULATIONS APPROXIMATE. ADDITIONAL DREDGING MAY BE REQUIRED THE GRADING AND DREDGING OPERATION, SOME TEMPORARY DIVERSION SWALES OR ADDITIONAL EROSION AND SEDIMENT CONTROL PRACTICES MAYBE REQUIRED. SEE DETAIL SHEET FOR SEDIMENT TRAP DIMENSIONS. 5. LIMITS OF CONSTRUCTION SHALL BE THE EDGE OF THE EXISTING TREE LINE AS CURRENTL Y LOCATED IN THE FIELD, AND AS INDICA TED ON THE GRADING AND EROSION CONTROL PLAN. 6, DEMOLITION SHALL INCLUDE REMOVAL AND DISPOSAL OF EXISTING BOATHOUSE AND DOCK, AS WELL AS ANY VEGETATION WITHIN PRIMARY GRADING AREAS. 7, PROPOSED RIPARIAN BUFFER FILL MATERIAL SHALL BE INSTALLED IN B-INCH THICK LIFTS AND COMPACTED TO NOT LESS THAN 95% STANDARD PROCTOR MAXIMUM DRY DENSITY. MATERIAL SHALL BE STABILIZED USING VARIOUS SHORELINE STABILlZA TlON TREATMENTS INDICA TED BELOW. B. FILL MATERIAL SHALL NOT BE DEPOSITED OR DISCHARGED INTO WETLANDS OR FLOODPLAIN AREAS 9. TREE PROTECTION FENCING AND OUTERMOST DIVERSION BERMS SHALL DENOTE LIMITS OF CONSTRUCTION. w w (f) ~~ HI-VIS ORANGE TREE PROTECTION FENCING ALONG EDGE OF EXISTING TREE LINE ENTIRE LENGTH OF WESTERN LAKE EDGE. TREE FENCING SHALL DENOTE LIMITS OF CONSTRUCTION N.C. GRID (NAD 83) ~-..., ""---' ~~. . I ---I I I I I I I I f i f ;' I L.() I u f- W W I --- .-______. (f) 316.8- ..r-T - r- ~..-Y> I / // / ---- ------- \ HI-VIS ORANGE TREE PROTECTION FENCING ALONG - EDGE OF EXISTING TREE LINE ENTIRE LENGTH OF WESTERN LAKE EDGE. TREE FENCING SHALL DENOTE LIMITS OF CONSTRUCTION PRIMARY RIPARIAN BUFFER BORROW AREA: _ REMOVE :t56,6J5 CY SEDIMENT/SOIL, 10.0J AC 0 :tJ.5' DEPTH INCLUDING 10,J49 CY FILL MATERIAL PRIMARY DAM CONSTRUCTION BORROW AREA: REMOVE :t28,000 CY/SOIL FILL MATERIAL TOTALS NOT INCLUDED IN RIPARIAN BUFFER DREDGING TOTALS) ... .../ DREDGING PLAN ENLARGEMENT - SHEET 1 BASS LAKE RESTORATION & SHORELINE STABILIZATION -- OLD SHORELINE EDGE w Z --1 ../ I U f- <{ ~ " ~ / ~~ 100 I __-330-- --- .----- --- -- -- -- - TEMPORARY DIVERSION BERM (TYP.)-.J LITTORAL SHELF STUDY AREA #J ENTIRE EXISTING EASTERN SHORELINE EDGE TO REMAIN UNDISTURBED ~ ~ RELOCATED SEWAGE PUMP STATION -~ 7(\ .__.~.- \ \ TYPE 1-3 TYPE 4 TOTAL: 56,6J5 CY 10.0J2 CY 66,667 CY 70.03 AC 7.78 AC 71.81 AC (INCLUDES 20% SHRINKAGE VOLUME INCREASE) TYPE 1 6,798 CY 0.79 AC TYPE 2 2,514 CY 0.78 AC TYPE J 1,037 CY O. 77 AC TYPE 4 7.081 CY 1.29 AC TOTAL: 77,430 CY 3.04 AC GRADING MATERIAL: APPLlNG-CECIL/ SOFT ALLUVlUM SOILS DREDGE DEPTH: 4'-B' UPSTREAM OF DAM EMBANKMENT "'3,5' SHORELINE EDGE/ LAKE BASIN 1 50 100 , I 200 I SCALE 1". 100' EMERGENCY SPILLWAY: 5: 1 SIDE SLOPES 0 2.12% CENTE:RUNE SLOPE TOTAL REVEGETATION AREA: 105,942 SF (2.4J AC) (GRASS SLOPE COVERING) AJAX INTERLOCKING CONCRETE BLOCKS EMBEDDED 0' TOE OF SLOPE: 4 ROWS @ BO LF LIVE STAKING: J,657 SF @ ::t600 LF x 6' W EQUAL MIXTURE @ 100% COVER PLANTED WITHIN RIP-RAP OR FABRIC CORNUS AMOMUM - 20J EA. SALlX NIGRA - 20J EA. NEW CHANNEL EDGE @ J: 1 SLOPE LIVE STAKING: 7,506 SF 0' ::t251 LF x 6' W EQUAL MIXTURE @ 100% COVER CORNUS AMOMUM - 57 EA, SALlX NIGRA - 57 EA. NEW CHANNEL EDGE @ J: 1 SLOPE EXISTING CHANNEL & CHANNEL EDGE TO REMAIN LIVE STAKING: 1,584 SF C :t64 LF x 6' W EQUAL MIXTURE @ 100% COVER CORNUS AMOMUM - 80 EA. SALlX NIGRA - 80 EA. EXISTING CHANNEL EDGE TO REMAIN mMJt. TO\\t4 OF HOLLY SPRINGS P.O. BOX 8 HOLLY SPRINGS. Ne 27MO ~ HOLLY SPRINGS TWP. OWNER TOWN OF HOLLY SPRINGS ZONED R-40 I I I I I WAKE CO. NORTH CAROLINA DATE 4/26/01 DRAWN VLH SCALE 1. - 100' SURVEYED APPROX. CLEARING & GRUBBING LIMITS. SEE SHEET -- FOR GRADING & EROSION CONTROL INFORMATION , ~ ...... 'A,..I "- , " " " REVISIONS PIN 0658.02-77-5872 JOB NO. JL-HOL9 DRAWING DWQSITE .........---...-- __ ~":K~Jlm:I"""'-~ lJ-": ~ ~ ~ \ ~~~~:~tfJf~l:tEM't~T~fT~:TIIffNEJ~gT~L~~G LIMITS OF CO~S~~5~'TlO~REE FENCING SHALL DENOTE PRIMARY RIPARIAN BUFFER BORROW AREA' REMOVE :1:10,032 CY SEDIMENT/SOIL . INCLUDING 7,081 CY FILL MATERIAL ' 1. 78 AC @ ::1:3.5' DEPTH TEMPORARY DIVERSION BERM (TYP.) OLD SHORELINE EDGE VICINITY MAP NOT TO SCALE ~ N.C. GRID (NAD 83) ALL DISTANCES ARE HORIZONTAL GROUND MEASURED IN FEET ....", ...--"':--- .....,---- " '-. ......... " "" /' HOLLY SPRINGS TOWNSHIP T~~ Of' HOLLY SPRINGS JURISDICTION ...,.. LOCATED IN WAKE COUNlV, Ne / ","'" ..,.-,'" / .... ' ....... / ~'f~ /' , /' /.... I __/ /' ./ ,/- , /' / / ./--- , , ,.- / ,.-/' , , /~ -- · 317.6 ~ I 0 l- . W 317.4 W I c.n W W c.n w z ~ I o I- <( ~ \ , ENTIRE EXISTING EASTERN SHORELINE EDGE TO REMAIN UNDISTURBED J 100 0 50 100 1 I I I 200 \ OYJNER: TOWN OF HOLLY SPRINGS SCALE 1 "= 100 ' P.O. BOX 8 HOLLY NO$. Ne 27 HOLLY SPRINGS TWP. tAlES WAKE CO. RD 6 DATE 4/26/01 SCALE 1 ~ = 100' REVISIONS OWNER TOWN Of HOLLY SPRINGS ZONED R-40 JOB NO. JL-HOL9 DRAWING DWQSITE PIN 0658.02-77-5872 DREDGING PLAN ENLARGEMENT - SHEET 2 BASS LAKE RESTORATION & SHORELINE STABILIZATION NORTH CAROLINA DRAWN VLH SURVEYED - -- ,- -----.-.--..-.--.----..---.---------------- HOLL~( SPRINGS, NORTH CAROLINA (REVISED) PHi~SE I EROSION CONTROL PLAN PIN #: 0658.02~77~5872 _01VNER -L DEVELOPER: TOWN OF HOLLY SPRINGS PARKS & RECREATION DEPARTMENT 128 SOUTH MAIN STREET HOLLY SPRINGS, NORTH CAROLINA 27540 T]~L: (919) 557-3934 (~ONTACT: Mr. Len Bradley VICINITY MAP NOT TO SCALE / / / ( HOLLY SPRINGS r:5ELEMENTARY SCHOOL .....7'0 ~ lio!..!.. r Sf' lio!.., Sir tr~VGS ',rc- 7- "'0 \oliO)?, I S< Ie .S ;'t\tCS J..t() ~O~D % ~~ ~ ~ ~ ~ ~\~~ ~~ ~~/ <:f.'0r:J. y' ~ HOLLY SPRINGS TOWNSHIP TOWN OF HOLLY SPRINGS JURISDICTION SITE LOCATED IN WAKE COUNTY, NC cor~SULTANT /1 AGENT: . , _ THOMPSON AND ASSOCIATES o CONSULTING ENGINEERS 153 HOLLY SPRINGS ROAD HOLLY SPRINGS, NORTH CAROLINA 27540 TEL: (919) 577-0808 F'AX: (919) 577-0609 CONTACT: Mr. Joseph J. Lyle APPENDIX: I)i\ TE: April 4, 2001 Revisions: FEBRUARY 6, 2004 C-l: GRADING AND DREDGING PLAN - SHEET 1 C-2: GRADING AND DREDGING PLAN - SHEET 2 C-3: DAM EROSION CONTROL PLAN OVERVIEW C-6: EROSION CONTROL DETAILS AND SECTIONS D-12: EROSION CONTROL DETAILS BASSECOVER.DWG GENERAL: BASS LAK E S ITE DATA: WA TERBODY: BASS LAKE; BASAL CREEK RIVER MILE: N/A TIDAL AREAS: N/A HIGH WATER LINE: SEE CHART, THIS SHEET LOW/ NORMAL WATER LINE: 324.00 AVERAGE WATER DEPTH: 4'-8' AT LAKE CENTER & EDGE 13' DEPTH AT DAM NEARBY FEDERAL PROJECTS: USDA SEWER LINE EXTENSION WATERWAY CLASSIFICATION: U.S. NON-NAGIVABLE WATERS OVERALL LAKE AREA - BEFORE BREACH - AFTER DAM RECONSTRUCTION - NET LOSS U.S. WATERS WILDLIFE HABITAT ISLAND GRAVEL FISH SPAWNING BEDS LITTORAL STUDY ZONES EXISTING LITTORAL ZONE (AT HEADWATERS) TOTAL TRAIL LENGTH 62.94 ACRES 52.61 ACRES ::t 1 0.33 ACRES ::t2.33 ACRES :t 1.24 ACRES :to.52 ACRES :to.51 ACRES LITTORAL LZ #1 LZ #2 LZ #3 SEE SHEETS L-1 & L-4 FOR PLANTING RECOMMENDATIONS 0.25 ACRES 0.24 ACRES 0.03 ACRES FISH GRAVEL SPAWNING BEDS: FB #1 220 LF (0.10 AC) FB #2 140 LF (0.06 AC) FB #3 150 LF (0.07 AC) FB #4 150 LF (0.07 AC) FB #5 280 LF (0.13 AC) FB #6 220 LF (0.10 AC) FB #7* 720 LF (0.33 AC) FB #8 275 LF (0.13 AC) FB #9 230 LF (0. 11 AC) FB #10 300 LF (0.14 AC) TOTAL AREA 2,685 LF (1.24 AC) * INCLUDES GRAVEL HAUL ROADS TO SEE NOTE 5, THIS SHEET SHORELINE STABILIZATION: TOTAL BORROW/DREDGE MATERIAl.; AREA: G3 RR W AR A 1 TA Y MAT RIA 66,470 CY INCLUDES 18,548 CY SUITABLE FILL MATERIAL. ADJUST SEDIMENT REMOVAL IN OTHER AREAS AS NEEDED TO EXCAVATE REQUIRED STABLE FILL MATERIAL) TYPE 1-3 56,267 CY 10.03 AC TYPE 4 1 0.203 CY 1.78 AC TOTAL: 66,470 CY 11.81 AC TOTAL BUFFER FILL MATERIAL: AREA; TOTAL: 18,548 CY 3.04 AC (iNCLUDES BORROW MATERIAL AND SUITABLE FILL MA TERIAL FOR SHORELINE STABILIZATION @ 10% VOLUME INCREASE FOR ANTICIPATED SHRINKAGE) AA' ~ (2.33 AC*) ~ WA TER ELEVATION A TOTAL: (47,922 CY) * DENOTES ACTUAL AREA BORROW AREA #2 TOTAL CY MATERIAL 28,000 CY (iNCLUDES BORROW MATERIAL AND SUITABLE FILL MATERIAL FOR DAM CONSTRUCTION @ 20% VOLUME INCREASE FOR ANTICIPATED SHRINKAGE) .QJ:SCRIPTION OF SHQRELlNE STABILIZATION TREATMENTS: TYPE 1 ::t817 LF (::to.75 AC) 00000000000 NATIVE TREE/SHRUB SHORELINE VEGETATION TREATMENT; LIVE STAKING; LUNKER LEAN-TO WITH HARDWOOD LOG EDGING; PERMANENT EROSION CONTROL FABRIC TYPE 2 ::t1.542 LF (::to.71 AC) *********** NA TlVE TREE/SHRUB SHORELINE VEGETATION TREATMENT; STACKED HARDWOOD LOG EDGING; PERMANENT EROSION CONTROL FABRIC TYPE 3 ::t350 LF (::to. 19 AC) ................ FOCAL POINT - PEDESTRIAN ZONES; SAND BEACH AREA WITH NATIVE WETLANDS VEGETATION IN ADJACENT LITTORAL ZONES; CARRY SAND TO WATERS EDGE AT POINT; NATIVE TREE & SHRUB VEGETATION BEHIND PATHWAY; COIR FIBER ROLLS: STACKED HARDWOOD LOG EDGING; EROSION CONTROL FABRIC TYPE 4 x2.380 LF (x 1.64 AC) _11_11_11_11- PERMANENT EROSION CONTROL FABRIC; PERMANENT SEEDING ONL Y ALTERNATE: WIDELY SPACED WOODY VEGETATION (SEE PLANT LIST, SHEET L-l) TOTAL INNOVATIVE SHORELINE STABILIZATION - ::t5.089 LF: 3.29 AC INCLUDES TREATMENT TYPES 1 - 4 DAM & SHORELINE CONSTRUCTION: WORK DESCRIPTION & NOTES: BASS LAKE RESTORATION WILL INCLUDE THE REBUiLDING OF ThE DAM ANO~cSTOR,t..:; THE LAKc. THE DAM WILL BE A CONCRETE AND EARTHEN DAM BUILT TO CURRENT DAM Sk"[Tf STAt-,DARDS THE DAM WILL INCLUDE A PRIMARY ANJ E}AERGENCY SPILLWAY THAT WILL DRA;'~ \;TO A I\j[l'. STREAM CHANNEL JUST NORTH AND PARALLEL TO THE EX/STiNG DAM. r"E Ex;STING DAM \~';L:" BE INCORPORA TED INTO THE STRUCTURAL FRAMEWORK OF THE NE'rV DAM. BASS LAKE RESTORATiON WILL INCLUO[ r,,[ R[SCULPTlNG OF THF IAK[ ROTTC',~ BY (;RAO;NG /;10..;:1 HAULING SUIIAE3U~ SOIL ANU ~EUIM[Nr lU ULU-'[N rlti:. dU! rUM uf rllt.. u,1\t., A'.J 'v ,,1,'L;..r:... ,\:....\ RIPARIAN BUFFERS ALONG THE WESTERN SHORELINE EDGE. THE OVERALL AR[A N:LL BE RESTORED USING TRADITIONAL AND INNOVATiVE BIO-REMEDIA TiON PRACTiCES. INCLUDif...G ~v;\K[R LEN, - TO STRUCTURES, HARDWOOD LOG TIMBER EDGES, COCONUT COIR FIBER ROLL S, ~OR[BA Y AND LITTORAL ZONES, WETLANDS PLANTlNGS. NATIVE TREE AND SHRUB SHORELINE STABiLiZA TiO,,,,". SHORELINE RIPARIAN BUFFERS WILL BE CONSTRUCTED USING EXCAVATED SEDIMct'.;T AND STABLE SO/~ FROM THE EXISTING LAKE BOTTOM. THIS MATERIAL WILL BE RELOCATED AND DEPOSITED ON HIGh GROUND IN OPEN FILL AREAS TO ELIMINATE THE NEED TO CLEAR VEGETA TlO". r--RO!~ THE EXISTi,\jG BuFFER EDGES. SHORELINE BUr--FERS WILL BE LENGTHENED A I--.. 0 ....iDcNED TO [\,,;.. 'vCE Bu;::FERS CURRENTL Y LOCATED ON-SITE. NEW RIPARIAN BUFFERS WILL BE PLANTED WITH NATIVE SHORELINE AND NETLAND VEGETATION. FiSH HABITAT AND A WILDLIFE HABITAT ISLAND WILL BE PROViDED WITHIN THE LAKE BED AREAS. PERVIOUS WALKING TRAILS AND LIMITED BOARDWALK AREAS WILL BE PROViDED FOR PASSiVE RECREA TlOAL uSE. FUTURE SITE AMENITIES INCLUDE FISHING PIERS. BOATHOUSE, AND BOARDi\AU<S. BuT ARE NOT INCLUDED WITHIN THE SCOPE OF THIS PROJECT. 1. GENERAL CONSTRUCTION: WORK INCLUDES THE DAM RECONSTRUCTION, CONCRcTE SPIL....WA YS, CONCRE:.T[ B....OCK BOAT RAMP, LAKE BOTTOM RESHAPING, MULCH PATHWAYS, SHORELINE BIO-ENGi\jEERING, CLEARING AND DCMOLlTlON, FISH HABITAT AND SPAWNING AREAS. A. EQUIPMENT SHALL ENTER SITE THROUGH CURRENT SEwER AND CONSTRUCTiON EASEMENT. SEWER EASEMENT AND OPTIONAL ABC GRAVEL HAUL ROAD TO BE GSED FOR SEDIMENT GRADING AND MOVEMENT. CONTRACTOR SHALL REPAIR ANY EXISTi,\'G SEWER STRUCTURES THA T HE DAMAGES AT NO COST TO THE OWNER. B. TEMPORARY HAUL ROADS MAYBE INSTALLED TO FACILiTA T[ SEDIMcNT REMOVAL. FiNAL LOCATION OF HAUL ROAD TO BE DETERMINED IN FIELD AND MUST BE .REVIEllrED AND APPROVED BY PROJECT ENGINEER, AND MUST COMPL Y WITH ALL APPROPRIATE REGULA TORY AGENCY REQUIREMENTS. THE CONTRACTOR SHALL NOT BE PAlO FOR HAUL .ROAD CONSTRUCTION AND/OR REMOVAL. THIS SHALL BE CONSIDERED PART Or-- THE OVERALL GRADING CONTRACT. C. Nfl',' CONCRETE AND EARTHEN DAM AND SPILLWAYS SliALL B[ CONSTRlJCTED AS PER ATTACHED ENGINEERING PLAN AND PROFILE DRAIVINGS, AND 'AUST CC'AP:... Y WTH ALL. APPROPRIA TE REGULA TORY AG[.\CY REQUI,REMENTS AND CONJ:TiONS 0;: APPROVAL. D. SEE SPECIFICATIONS FOR COMPACTIO/'-I PE~FORMANCE REQui~EMENTS r--O.R E,\/iRONME:.NTAL RESTORA TlON SITES. 2. BiD ALTERNATES SEVERAL BID AL TERNA TES ARE REQU,RED. SEE COVcR SnEE:T "JR ]ESCR ':;~O\S J. CONTRACTOR REQUIREMENTS, A. A PRE-BID CONFERENCE WILL BE HELD AT THE TOWN OF "OLLY SPR,!\GS PRIOR TO PROCcEJu\G TO THE SITE FOR A TOUR OF THE PROJECT SITE AND AN OVER/,[',., 0" T,.,E DES,G,\j A,\jD CONSTRUCTION SEQUENCE. B. BODING CON TRACTORS A~ER[Qu.RED TO "AiE RE...A :EO E\ I RC '-, ',1[', ~.:.... ~[S~C~/. ~ C '. EXPERIENCE. PREFERE,\jCE ..,,__ BE G./E\ TC CO\TQAC""O~S ,', ~- [,.. ;::'[."{ [',O[ .. \S~;'_,-- \~ L/'IE STAKING, HARDwOOD LOG EDG/~"G. r-"ATlvE Af\;D ,'.ETJ.',': IECr-;..T,:., ~E;-ERE\CES 1,.f.....S~ BE PROvIDED AtvD MUST VER,FY T.,.,E $;A TE] EXPERIU-.:CE. C NuRSERIES SHALL BE REQuIRE8 TO GvARA~ TEE ~MA T :..__ :;_:"', ~ ',::'. St:E:J....C Ar..::J 'Iv_Cn MATERIALS, AS A CONDiTIO~ OF PuRCHASE. ARE ;-~EE ~RJ'.I ;o;E ':", T !\rEST A TIOr--... 4. PROJECT LIMITATIONS AND EXCLUSIONS: A. MONITORING OF BuFFER AND rYULAtvD VEGETA T'ON SnA....... Bc COI,OvCT[!) By/..\ Cv ~S.:'E AGENCY, AND SHALL NOT BE CONSIDERED PART 0" T,., S PROJECT B CONSTRuCTION OF BOARDlVAL";S. BOATHOuSE, JOC";S /... \:J tISn;.\,':; p~,,<S :"R~ ~IOT f.,C, >JJe) AS PART OF THIS PROJECT. 5. GRADING & CLEARING WORt<.: WORK CONSISTS OF rtLLiNG A:...O,\'G ShORELINES TO OREA T[ '.E.V R;PA,Rk\ Bu;-;-~,R AR[AS ;:OR PLANTINGS, PATHWAYS AND FiSH I1ABITA T. THESE PLANS ;'_SO iNDICA T[ BORRO,\ AREAS FOR RIPARIAN BUFFERS WHERE THE SOIL MATERIAL SHALL BE OBTAINED. GRAD.\G ,',OR"; SHALL INCLUDE THE FOLLOWING: A. CREATING A WILDLIFE HAB/TA T ISLAND WITH THE SILT .1,.fA T[RIALREMO/E:;' FROM THE LAKE BOTTOM DURING THE GRADING OPERATION TO ACCESS Su TABLE F'lLL ;-OR T"E .RiPARIAN RIPARIAN BUFFERS. B. HAUL ROADS, TEMPORARY STREAM CROSS/I\GS AND S,'1I:.../.R ACCESS[S ~O ,',ORK AREAS. C. TEMPORARY EROS/ON CONTRO:.... MEASURES TO P.REVEvr SE]'MENT "RO'I E\ 7"[.RING TnE EXISTING LAKE BOTTOM STREAM CORRiDORS. D. CLEARING, CUTTING AND FILLING FOR DAM REPAIR AND CONSTRUCT,O,V E. CONTRACTOR SHALL NOT REMOVE, FROM THE SITE, OLO CO\iCRETE FRO'~ Tn[ EXISTING DAM OR BURN TREE STUMPS. THESE ITEMS ShALL BE DUMP[O INTO LOCA TONS ,'r'IT'"IN TH[ LAKE BOTTOM AS DETERMINED BY THE OWNER TO FACILITATE ns., HABITAT F. CONSTRUCTING SHORELINE RIPARIAN BUFFERS WITn SO~ ;-~OM THE [X!ST/\G J.,KE BOTTOM ONE FOOT OF SEDIMENT &- TOPSOIL OVER FILL MA TER;A~ S"ALL BE O[~OS, TED OVER ALL AREAS TO BE PLANTED OR RESEEDED. G. RIPARIAN BuFFER AND WALKING TRAIL MAY BE AD",uST[J ~O FIT CGRR[\ T ;-:[LO CONDiTiO(\.$. EXACT LAKE BOTTOM [LEVA TlON MAY VARY TO CPEA T[ S,"-,CLJSITY !;\ 7'.,[ ;-.J ~URE STREAM CHANNEL, FISH HABITAT, SPA,"NI,\G BEDS AND ;. ,'f :....:J:..:-E "'lAB/TATS"';' \.J. T..,E A~PROXll;" TE LOCATION OF ISLAND AND LAK[ BED [~['vATlONS AR[ AS \DiCATEJ 0\ S....E~S C-4 & C-5. FINAL LOCATION OF THE HABiTAT ISLAND TO BE AP;JRO/ED '\j ThE:-[_D BY T,....E ENGINEER OR LANDSCAPE ARCHITECT PRiOR TO CONSTRuCTiO,\'. H. ENVI RO N M ENTAL RESTORATION: SHORELINE AND HABITAT ISLAND VEGETATION MANAGEMENT PLAN: ,', O~K \C....0D[S RIPARIAN BU~FER AND _;ITO~AL ZONE CO:\STRUCTiON AND BUFFER VEGETATION. SE~ S.,EE~S ~-; - L-4 FOR P:..A'\iTI\G ~[Ou REM[NTS S[~ SHEET L-1 FOR TOTAL PLANT LISTS. SALlX r-.,IGRA AND ALNUS SERRuLA T A ~kt. Y BE OBT ':'1~jED FRO~1 INDiGENOUS POPULATIONS WITHIN ThE L.:.r<E BAS!N AREA AT BASS LAr<E,A~D ShAi.-L BE uSED FOR EST ABUSHING NEW RIPARIAN 8JF;:-ER A!\D STREAMBANr< \lEGET A Tim, ALONG THE I',ESTERN SHORELINE EDGE AND BELOW THE . .. F,'. () ,:~ .. ~ ~ " [XISV"C S:"C,FARiA A!\D SCIRPuS Sh':'L. RE TRM~SP~':'NTED INTO LOW, FLOOD PRONE AREAS OuTSiDE OF ~HE CO~,STRUCTiON L,~.ITS FeR TE',1PORART STORAGE UNTIL TRANSPLANTED INTO ;:lRO;:l:)SED FOREBAY AREAS ALOr--~G TriE.',ESTERI\ SHORE,-INE EDGE. SEE SHEETS L-1 - L-4. ? ...... EXIS flr-.,G SPARGANIUM ShALL BE TR/.NSPLANTED INTO ,r-.,-STREAM AREAS OUTSiDE OF THE ARE.A.S OuTSIDE OF ThE CONSTRJCTiO!\ LIMITS FOR TE~1PORARY STORAGE UNTIL TRANSPLANTED NTO THE PROPOSED FOREBAY AREAS :",-ONG ThE .vESTERN SHORELINE EDGE ~ AL_ \EGETATiON THROuGHOuT TME EXiSTI~~G LAr<E 80TTO~1 THAT IS !\OT RELOCATED SHALL BE CuT TO TrlE LEVEL OF THE EX,STING LAr<E BOTTOM, JuST PRIOR TO THE RE-FILLlNG OF THE LAKE. ~ THE EX:STi~G LAr<E BOTTOM AND STREM.1 CORRiDORS SHALL BE RE-EXAMINED BY LANDSCAPE ARCniTECT A,'"D POTENTIAL OuTSiDE AGENCY PRIOR TO THE START OF ANY GRADING ACTIVITY ;-OR THE PO~EN T, AL uSE OF DESIR ABlE ,"[ LAND PlA!\ ~iNGS Th A T MAY H AVE GERMIN A TED. 6 IN... T P....A\ T SPECIES NATI'/E TO T'"1t. NORTh CARO~Ir--..A ,-O,\ER PIEDMONT-uPPER COASTAL ~L/.iN, OR .',hE!\ NECESSARY. CUL TI;ARS OF ThESE SPECiES SrlOULD BE uSED. ORIGINAL 6 COL.....ECT;O\S OF ~1A TERIAL OF THESE SPEC,ES OR CUL Ti.ARS uSED SrlOULD BE FROM THE ;:lIED~,~O\ T-COASTAL PLAIN OF TrlE CAROLiNAS OR CENTRAL/SOUTHERN VIRGINIA. NURSERIES SMALL BE REQUIRED TO GuARANTEE TrlE pROVENANCE OF ThE PLANT MATERIAL AS A CONDiT,O\ OF PURCHASE. 7 ;:- r:::ECOMME"-;DED NATIVE SPECiES OR APPROPRIATE pRO',rENANCE ARE NOT AVAILABLE FROM A r>.uRSERY. T AXONOf..1iCALL Y RELA TE) NON-NATiVE SPECIES SHOULD NOT BE USED AS SUB- ST TUTES. iN ThiS SITUATION, THE SuBSTITUTES SHOULD BE OTHER NATIVE SPECIES WITH ECOLOGICA_ CHARACTERISTICS SIMiLAR TO TME RECOW.1ENDED SPECIES, EVEN IF THE RECOM- ~,lENDE8 A!\D SuBSTI TUTE S;:lECiES ARE NOT CLOSELY RELATED. CON TACT THE LANDSCAPE ARChiTECT ,\ THE EvENT THAT SuGGESTED NATIVE PLANT SPECIES ARE UNAVAiLABLE. CONTACT TME LANDSCAPE ARCHTIEC~ FOR LIST OFA VAilABLE NATIVE PLANT NURSERIES AT (919) 851-i 709 #203 OR ,,207. 8 J..,NDSCAPE ARO...,;TECT $t"iALL VISIT SuP?:... Y NURSE,R,ES ~C ""6PECT WULANJS VEGETATiON PRIOR :; ~0RC.,ASE or-- PJ. \... MATERIALS CO'. '''<ACTOR S.,.,A~~ \C.........DE AN A:..LOWANCE I!" d/S BID TO C'J./:R ...., S COST. SEt SPEC! t:', C:.. TO,\S ;-J.R ADDiTiONAL \r--ORMA TiO.\. NURSERY OR CONTRACTOR ~J ~vP~~ Y C0/.~Ar\TEE TnAT P~;"\:"S A~~ ",~[E 0" /EeCrAT;I[ COI\JTAM/NANTS AND U\VASIVE PLANT SPcC;ES sue,., AS hYDRILJ. OR O~,.,[,R j', ,ASI/~ OR ,~~tGAL AQ0AT:C vEGETATION AS OETERM/NED 3Y \CD[\~. 9. ':'.....i.- S'"10~EL\E A\) LITTORAL ZONE VEGETATION SHAL,- BE PLANTED AS SPECIFIED. VEGETATION ,',_L BE EVAL......A TED BY LANDSCAPE CONTRACTOR, ON :.. REGJLAR BASIS, TO DETERMINE IF .....NDESiR.:..B~E PLANT MATERIALS ARE A PROBLEM. FOR GRASSES AND WILDFLOWERS. HERBICIDES Sn,;.L.... BE APPL'ED I!\ TME FALL PRIOR TO PLANTiNG. :"PPL Y ROUNDUP TO THE WILDFLOWER AND GR.:.. SS :..REAS IF T rlERE IS REGRONTH. APPLY A FOlLOW- uP TREA TMEN T 7- DA YS BEFORE :~_'./.~ION.':' SPRI\G FOL_C,','-.....;:l TREAH.1U..T f.~AY BE NEEDED 7-0A'I'S BErORE PLANTING IF ,',E~_DS PERSS~ TIME S..,Ou....D BE :"__0,',EO ;OCR Tnt: BREAKDO\',!\ OF THE OLD PLANT MATERIAL. . ~ 'V ...r-E:-... ~ECCESS':'RY, <.is::: "RODEO" - ':", :.:;:;R:::' ,:::::. ,',::~_':'\: ME~BC,8E -,', ~..,i~ R,PAR,AN AND _I P:)R':"~ ZONES AS PER MA\vr A:~ .....RERS RECO~.I"IE\DA ~,ONS APPLY AERIAL.... Y AS NEEDED TO ,Nr~STEc) t.REAS. iF uNDESIRABLE. ".000'1 P~A~ TS ESTABLISH THEMSELVES, APPLY "RODEO," "RGu!\D -,,~" O~ ";J _A TEAv" ...;ERB C.DES ON ~O SEED :.REAS AS PER MANUF ACTJRERS RECOM- '.'E1\O A TI Or-.. s. :0\ TACT SEED S0?? _.ER ~O; NrOR~,1':" TION REGARDING WHICH FLOWERS OR GRASSES .:.RE ~OLERANT OF S;JECirIC ~ERB C SES :,;:l~_ Y "RODEO" OR "ROUNDJP" HERBICIDES DIRECTLY J,RF.CL Y ONTO BASAL CuTS AT A 25% SOLv TION OR AS PER MANUFACTURERS RECOMMENDATIONS. 1 .. IEetTA TION SnA....L. BE EVA~uA TED BY CO,\TRACTOR :0 .'[TERM/NE IF' OEER BECOME A PROBLEM. ." JEER ARE :)A'~AGI,"'IG THE RIPAR:A,\ ANO LiTTORA:... Pj..\/TINGS, APPLY "DEER AWAY" OR "DEER OFF" ~O T,,.,E AREA AS ~ER MANU"ACTU~tRS F<ECO,'~,I,1ENOATI:"~\S. APPLY EVERY THREE MONTHS IF NEEDED. /,PP!...iCl.. LON 0;- JEERREPE:..._E.NT S...,AL_ B~ ONL Y AFTE~ A PROBi.,EM DEVELOPS AND THE OVERALL PL.A\iT SJCC[SS ~A T[ 5 ~)[TERI.C..[]. T/""'[ APP:"!CA TO\ 0;: REPELLENT SHALL BE AUTHORIZED BY T ~ E ~ ,', ..., E R . . , .' ,'",,'[ ',A[5~ ;:-[\iC;,\G SnA:"~ BE ,\S~,:.~.~:' .t..ROu,'JO ~i rT~IRA~ ZON~S TO PROTECT ,\EhAND .'[G~:A ~ 0\ ~)EE S....[ET C- 6 "C~ ;-~..:=..~ SPEC FiCA ~ C\S AND DETA;LS .. ? -' ~'fA~ SnOu_.:/ BE ADDEO TO TnE S TE PR,OR TO CUL'/ vA TiON OR PLANTING OF VEGETATiON AND SEEDS .F ~nE SOIL p," IS BELO.1 6. Q. SOiL pd SHAL~ BE DETERMINED BY SOIL TEST. .. , .. \0 \'"ROGE\ S,..,A;",L BE AJOED J0RI\G THE ESTABL!S,.,'~Ef\; T OF GRASSES AND WILDFLOWERS. ..../F<OGEI\i ""i;"'~ E\'COuRAGE ."EEJ CRO,',T~ THAT ~'hL SGPRESS OR SMOTHER GROWTH OF GRASSES ~I"J..') ,', ~J~~Cr~,~RS. .. ;:, -' SnORE_.,\E RIPAR;AN BvF~ER AREAS S"1A....~ Bc ....OOSE\ED TO A DEPTh OF 3-INCHES WITH A CUL T:'./A TOR (;:09 W'LO~10'r\ER AND GRASS AREAS). S[EDS SHOULD BE PLANTED AT A CONSTANT JEPT"1 OF ;/4-INCHES AND BE \\EL:'" COI[REJ. .. - b ,'.i....,)t:'_C).'r'E,R SEEJS SnAL~ BE PL)..,\ ~[] 1\ TnE S~R\G ,VHEN THE SEEDS MAYBE EXPOSED TO OOO~, IAO:ST TEMPERA T J,R[S BELO.\ 40-DEeREES ;:-- "OR AT LEAST ONE MONTi-i.AS REQUIRED FOR G[R.'vl:\ATION. SEED;\jG ,S BEST /,H[,\j r....c SO:.... T[MP[RATURE IS GREATER THAN 55' F, AND WHEN AD:.J",A T[ 'AOtSTuRE is AVAILABL.E TO SuSTA!i\j 1;\ TAL SEEDLiNG GROWTH. SEED PLANTING MAY BE 00,',[ !\ T.,E"A....L O,\L Y AFTER T,.,E"'RS-:- K L~;,\G"RJST. .. '7 / . \0 "ERT,i../ZA TiO,\ FOR GRASSES MO,\'ILD;-Lo\\ERS ;SRECOMMENDED UNLESS SOIL CONDITIONS ARE VERY ;JOOR. WATER SEED AREAS DuRING T,"1E ESTABL. SHMENT YEAR ONLY. DO NOT FERTILIZE OR ....A TR SEED AREAS AFTER TdE ESTABLiSn'~ENT YEAR. SuPPLEMENTAL FERTiLIZERS AND WATER WILL ONL'r' E\COG~AGE WEED GROWTH 18. SE[O A.R[AS MAY B[ IAOl,ED OUR;\iG T,.,E ESTAB.... S,.,,V[,\T YEAR. MOrt' JUST ABOVE THE TOPS OF Th[ CESR[C PLANTS, AND NO LO',VER. A"TER T"E ES:ABUSHMENT YEAR. IT is ONLY NECESSARY TO MO.', SEED AREAS fVE.RY OTHER YEAR AC'iER A hARJ >(tLLlNG FROST TO REMOVE CROP RESIDUES. [ARLiER VOMNG WIL_ DESTROY FL.O.....ERli...G STALKS OR F~OWER BUDS. MOWING TOO LOW WILL DES~F?OY :n[ ABiliTY OF' TdE PLANT TO STORE ADEQuATE NUTRIENTS ;-OR SUBSEQUENT BLOOMS. 'AMJ ( -\A iWE S[ED/(\.GS l'';IL.L BENEFIT ;-RO&,1 BuRNiNG ~\HEN PLANTS ARE DORMANT. THIS MANAGEMENT TEC'1'\ Q..)[ R[QUiRES A KNOWL[DGEABL[PROFESS;Of\;AL TO ENSURE SAFETY. 49. ~EI.f:JCRARY ~fE GRASS SEEJi!\G S,.,00~:; 3E '.W,',ED ~C A"'lEIGnT' 0;: 8-INC,"'lES T,.,[ FOLLO'rVING S~;:'; \C ~O SET BACK T'S GRO,', Tr-o AND P~[ IE\T .RES[cJ,\G. 2C. ~.....[ CC\_JC.( C':;cN C[_~ CO\CRET[ B_CCK 30A~ RAIIP SHALL B[ BACK;:fLLEJ AND SEEDED WITh S[[J:\G AS PER SEEJd-.:G.\ SPECI;:ICA T C,\S ~ ST[J 0\ SHEET 0- 12 OF' ThE DAM CONSTRUCTiON PLANS. BARE ROOT VEGETATION 1. WHIPS/ SEEDLINGS MAY I1c OBTAINED FROM THE U.S. FOREST SERVICE OR OTHER SUPPLIER. NCFS MAY BE CONTACTEC AT (828) 438-6270. WHIPS/ SEEDLINGS ARE SPECIFIED ON SHEET L-1. 2. WHIPS/ SEEDLINGS SHALL BE PLANTED IN SPRING. IMMEDIA TEL Y FOLLOWING DELIVERY TO THE PROJECT SITE, ALL PLANTS WITH BARE ROOTS, IF NOT PROPERLY PLANTED, SHALL BE HEALED-IN CONSTANTL Y MOIST SOIL I)R SAWDUST IN AN ACCEPTABLE MANNER CORRESPONDING TO GENERALLY ACCEPTED HORTICULTURAL PRACTICES. 3. CONTRACTOR SHALL PR01 fCT THE PLANTS FROM DRYING OUT BY MEANS OF WET CANVAS, BURLAP OR STRAW OR BY AN ACCePTABLE MANNER CORRESPONDING TO GENERALLY ACCEPTED HORTICULTURAL PRACTICES WHILE PLANTS ARE IN TRANSPORT TO AND FROM HEALING-IN BEDS, OR ARE BEING DISTRIBUTED INTO PLANTlt'G BEDS, OR ARE AWAITING PLANTING AFTER DISTRIBUTION. CONSIDERATION SHOULD BE GIVEN IN RECARDS TO APPROPRIATE WEATHER CONDITIONS AND LENGTH OF TIME THE ROOTS WILL REMAIN OUT OF THE GROUND. 4 SOIL IN THE AREA OF TR:E AND SHRUB PLANTlNGS SHALL BE LOOSENED TO A DEPTH OF AT LEAST 5-INCHES. THIS 13 NECCESSARY FOR COMPACTED SOILS ONLY. BARE ROOT VEGETATION SHALL BE PLANTED IN HC'LES MADE BY MATTOCK, DIBBLE, PLANTING BAR OR IN AN ACCEPTABLE MANNER CORRESPONDING TO GENERALLY ACCEPTED HORTICULTURAL PRACTICES. 5. ROOT STOCK SHALL BE F LANTED IN A VERTICAL POSITION WITH THE ROOT COLLAR APPROXIMATELY 1/2-INCH BELOW THE SC'IL SURFACE. THE PLANTING TRENCH OR HOLE SHALL BE DEEP AND WIDE ENOUGH TO PERMIT THE ~OOTS TO SPREAD OUT AND DOWN WITHOUT J-ROOTlNG. THE PLANT STEM SdALL REMAIN UPRIGHT A\!D SOIL SHALL BE REPLACED AROUND THE TRANSPLANTED VEGETATION AND TAMPED AROUND THE WHIP/ SEEDLING FIRMLY TO ELIMINATE AIR POCKETS. PLANT TYPE AND SPAClNC SHALL BE AS SPECIFIED ON SHEET L - 1. ~ . THESE REVISIC NS RESULT IN A NET INCREASE OF ,24 ACRES OF U.S. WATEi?S. (A DECREASE IN FILL OVER ORIGINAL DESIGN) ISLAND AREA ,{EDUCED BY 50% .................= 1. 165 ACRES ADDEO TRAIL J.REA & NEW BLDG. PIERS......= + .9.3 ACRES EQUALS TO A/\ INCREASE IN U.S. WATERS...= .24 ACRES OVERALL PROJECT INFORMATION Bj~SS LAKE SHORELINE &: DAM RESTORATION SHEET C-1 IIIL ~ l 0 ~ 10'1' "'11111,,, ", CAR I" ,,~~...........()~ :', ::~/{.. ~.<~ .. ~l ). , ". .. \ ". : ( 667 :: :,:) : .: ':.~ \ IfS: -:.,~... ...~O '$ ". " · 'D.........~..;." .. " A \ "-\ " ," . \.f'" , I' HOLLY SPRINGS TWP. OWNER THOMPSON c!c ~ SOCIATES WAKE CO. NORTH CAROLINA 1 53 HOLLY SPRlt GS ROAD HOLLY SPRINGS, ~: 27540 DATE 9/30/01 DRAWN VLH/RAL (919) 577-,)808 FAX (919) 57~-0609 SCALE 1" - 100' SURVEYED REVISIONS: 2/09/04 TOWN OF HOLLY SPRINGS ZONED R-40 JOB NO. JL-HOL9 DWG. ASSDREDGRevSite2 04 7YPE 1 7YPE 2 7YPE 3 7YPE 4 ISLAND NO COCONUT ROLL NO COCONUT ROLL 350 LF: 10" ~ C 5 SQ. CM. DENS/7Y NO COCONUT ROLL 2,008 LF: 10' ~ @ 5 SQ. CM. DENS/7Y SECTiON 0-01 - APPROXIMATE LOCA TiON. SEE SECTiON, SHEET C-6 ---- ---" . .)4S " NATURE CONSERVANCY BOUNDARY (7YP.) APPROXIMA TE LOCATION OF TEMPORARY ACCESS PATH TO CROSS OVER EXISTING CUL VERT IN CREEK _'_'_1_1_1_1_1_1_1_.. PROPOSED SHORELINE EDGE STACKED LOG EDGING MULCH PATH -- , ~ ..------ -- . \,' ,,----- . / , /- / ,_/ .// / /1 . .. . . .. . ." .... _. . . .....,' '. . '.. . . . . ......... . . . . . . . .. .. . .. ...... , ' . . .. ....... L.l'~. i ..;.;.0. i .~.I.~'I.J LITTORAL ZONE. . .---- - - 34D - I.j tl l' '\ ):', ,; ~I.., / - (~.. 1/('- ~~_' ,'.-J /.' , ) 1"',1 ~ --> / " (' // <> / ; ~ '\/ \ / ~ / ~" I _ \..c/" // . />1;: ~/'\ j29.~ \ ", 0\'\ '"'\ /' .' <>. ~! 'nn ,~\ " . . , ~ I "." ., \\ ' . \ '-- / / '/" . ..... J. / ./ ~'-J~ 1\ . "'-.. ..............::........' 'Is, / ~ Jv-- """ ... ~ // _ , _ __ l~__ ./ 7'~~'" ' I .. " I " , ", ...' ,,'vi /, . ' " . ~ " r....~>,/ -"', ~-(' './ '~. / " x1 / J', " / . '.'1' ~ ~ I SECTION C-C1 SEE SHEET C-6 /' SINGLE STACK TIMBER EDGING @ 135 LF & 4" SAND @ :t 18 CY (0.034 AC). SEE NOTES 2 & 3, THIS SHEET ,- /' ,- ~~ - .--- (7// / / /~ FISH GRAVEL SPAWNING BED ....- ,/ HARDWOOD LOG EDGING #2 3 STACK ROWS @ 392 LF EA. SEE NOTE 4, THIS SHEET I r .' . . . (, ..'c',' "1 . :', ,.../ .~ -, ....'. '."'.".', : ,. . . .' \ . HABITAT ISLAND '. ",/' 335 - -- -. ...-/" I . . j')" ') / ; " ..J.. / ' . . // j77.; / SECTION A-A 1 SEE SHEET C-6 -- SAND BEACH W/ TIMBER EDGING n ! U --1--1- PROPER7Y BOUNDARY TEMPORARY ACCESS PATH ACROSS STREAM NA TURE CONSERVANCY BOUNDARY f-- W w I (j) . !i ~ .32~16 ff':J j] 2 .~ . . SAND BEACH (SB #2) 6 "x6" SINGLE STACK TIMBER EDGING @ 151 LF: 4" SAND @ :t 25 CY (0.05 AC). SEE NOTES 2 & 3, THIS SHEET EXISTING SANITARY SEWER LINE w w en ------... "- '.$< Q~ / -'," ("., ~~""-'-S~~ "'. .... ( \ " ~.:... ~L SAND BEACH (SB # 1 ) 6"x6" SINGLE STACK TIMBER EDGING @ 162 LF: 4" SAND @ i: 27 CY (0.05 AC). SEE NOTES 2 & 3, THIS SHEET ------- (' '. . , /" _'1 f g . / --- / I . 317.~ /' \ \ \ ..- . ..-- , j - .J / ---.-----~ C~/ \ . ) _. .--.-......-- , " HARDWOOD LOG EDGING # 1 3 STACK ROWS @ 259 LF EA. SEE NOTE 4, THIS SHEET .317~ " FUTURE BOARDWALK (NOT IN CONTRACT) " -. , Z --l 316.9 . .... EXISTING WETLAND VEGETATION WITHIN THE LAKEBED TO BE RELOCATED AND TRANSPLANTED PRIOR TO DREDGING THE LAKE BED AS PER THE VEGETATION MANAGEMENT PLAN ON SHEET C-1. ALL REMAINING VEGETATION NOT USED FOR PROPOSED PLANTlNGS SHALL BE CUT DOWN TO GROUND LEVEL PRIOR TO REFILLING THE LAKE " SECTION 8-81 SEE SHEET C-7 -.f" j 1 :.1 . ~ Fa #3 \ \ , " " " \, \ \ \ \ '--" -.... " I U f-- . 317 :, . .316.': . ., FUTURE WOODEN DECK (NOT IN CONTRACT) NEW 8' WIDE MULCH PATH SEE NOTE 1, THIS SHEET. SEE SECTION, SHEET C-6 SEE DETAIL, SHEET C-7 NEW 2.33 AC HABITAT ISLAND. SEE GRADING PLAN, SHEET C-4 AND SECTIONS, SHEET C-6 (SEE ALTERNATE HS-4 ON COVER SHEET) " .' \ ""':>0 \FB \ \ . -...... ' !'.1 . : rr-y- __ II"'" HARDWOOD LOG EDGING #3 3 STACK ROWS @ 75 LF SEE NOTE 4, THIS SHEET 316.3 . \ " , ~. -- ," "......., ; . ~------ '---'1 · .3 15.7 ..". V -: \ \ \ \ . .316.3 \\\.. '. \\, \\1".'1':1" - ,. \ . '.'~ I ) [ I' ' I )) : 1 \ ( : \,; of - /\ . 'J . :;' I . .. . ' l. __ ' 314\' · 315.2 OLD Fe #1 RELOCATED , ~ NEW LAKE EDGE ........ CUT ALL VEGETATION THROUGHOUT LAKE BED TO LEVEL OF EXISTING LAKE BOTTOM JUST PRIOR TO RE -FILLING OF BASS LAKE TO REMOVE VEGETATION AND PREVENT VEGETA TION FROM RESPROUTlNG . ........, . . .---- ----.... I I .j1~./j .uIIQBAL ZQtiES: LZ # 1 0.25 ACRES LZ #2 0.24 ACRES LZ #3 0.03 ACRES SEE SHEETS L-1 & L-4 FOR PLANTING RECOMMENDATIONS \ \ \ \ I, \ \. \ \ \ . .315.1 r---- ~ 1.314.6) , . \, -oj1~' ~4 FB #1 220 LF (0.10 AC) RELOCATED/ADD) 484 LF ~0.20 AC~ FB /1..2 140 LF (0.06 AC) FB #2 140 LF 0.06 AC FB #3 150 LF (0.07 AC) FB #3 150 LF 0.07 AC FB #4 150 LF (0.07 AC) FB #4 150 LF (0.07 AC) FB #5 280 LF (0.13 AC) FB #5 280 LF (0.13 AC) FB #6 220 LF (0.10 AC) (REDUCED) 152 LF (0.05 AC) FB #7* 720 LF (0.20 AC) (REDUCED) 584 LF (0.27 AC) TOTAL AREA (THIS SHEET) A 1,940 LF (0.85 AC) TOTAL AREA 2,685 LF (1.24 AC) 2,745 LF (1.23 AC) * INCLUDES 12' WIDE GRAVEL HAUL ROAD TO REMAIN SEE NOTE 5, THIS SHEET SEE ALTERNATE HS-5 ON COVER SHEET " \ \ I \ \ \ \ \ ! ( ( \ \ \ \ / c:.... . l,....... 1 ~ 1___ RELOCATED NEW FB #1 EXISTING 50' SEWER LINE & EASEMENTS BEGIN 8' WIDE MULCH PATH . AT EDGE OF BOAT RAMP j (~ f ? BOAT RAUP: DELflFD FROM PROJECT I ( CONLOCK /I 4" OPEN CELL ~t INTERLOCKING CONCRETE BLOCK RAMP SIZE :t 16'x89'. SEE SHEET 0-5 FOR LOCATION LAYOUT SEE DETAIL, SHEET C-7 TYPE 1 TYPE 2 7YPE 3 7YPE 4 4-STACK LOG ROW 817 LF TOTAL. 3-STACK LOG ROW 1,542 LF TOTAL 3-STACK LOG ROW 651 LF TOTAL NO STACK LOG EDGING I / NEW . ;' , ./ .( '\ I 1/ \. EXISTING BOATHOUSE TO BE REMOVED .HQI.ES : 1. 4" DOUBLE SHREDDED HARDWOOD MULCH SHALL BE USED PEDESTRIAN PA THWA YS. 2. ZONE 3 SAND BEACHES SHALL CONSIST OF 4" CLEAN, WASHED SAND OVER 140-NL NON- WOVEN EROSION CONTROL FABRIC. 3. TIMBERS AT SAND BEACH EDGE SHALL BE SINGLE STACK, 6"x6" CCA PRESSURE TREATED TIMBERS AND SHALL BE TOE-NAILED TOGETHER WITH 40-PENNY NAILS. 113 REBAR 0 24" - 36" LENGTH SHALL BE USED TO ANCHOR TIMBERS. SEE SHEETS C-6 FOR CROSS-SECTION AND C-7 FOR DETAIL. 4. STACKED HARDWOOD LOG EDGING SHALL BE 8" DIA. MIN. TO 3-STACK OR 4-STACK LAYERS TO 24" HT., REGARDLESS OF ACTUAL LOG SIZE. LOGS SHALL BE 8' MIN. WIDTH AND JOINTS SHALL BE STAGGARED FOR STABILl7Y. LOGS SHALL BE EMBEDDED INTO SOIL AND ANCHORED WITH #8 GAUGE WIRE AND 4' HT. 2"x4" HARDWOOD STAKES ~ 3 STAKES PER LOG SECTION. SEE CROSS-SECTIONS, SHEET C-6. 5. FISH SPAWNING BEDS SHALL BE 6-INCHES CLEAN WASHED GRAVEL 0 6" MIN. THICK 0 20' WIDTH ALONG SHORELINES. GRAVEL SHALL BE PLACED AT 24" DEPTH AT FINAL POOL. 6. EXISTING 50' SEWER EASEMENT SHALL BE UTILIZED FOR EQUIPMENT AND MA TERIAL ACCESS AND MOVEMENT THROUGHOUT THE SITE. CONTRACTOR SHALL REPAIR ANY EXISTING STRUCTURES THAT ARE DAMAGED, AT NO COST TO THE OWNER. 7. EXTREME CARE SHALL BE USED TO PROTECT EXISTING TREE BUFFER AREAS ALONG EXISTING SHORELINE EDGE. EXISTING BUFFERS TO REMAIN UNDISTURBED. 8. DEMOLITION SHALL INCLUDE REMOVAL AND DISPOSAL OF EXISTING BOATHOUSE AND DOCK, AS WELL AS ANY VEGETATION WITHIN PRIMARY LAKE BED GRADING AREAS. SEE DAM CONSTRUCTION PLANS FOR ADDITIONAL DEMOLITION REQUIREMENTS. 9. FILL MATERIAL SHALL NOT BE DEPOSITED OR DISCHARGED INTO WETLANDS OR FLOODPLAIN AREAS. 10. SEE RIPARIAN BUFFER CROSS-SECTIONS, SHEETS C-7 FOR SPECIFIC CONSTRUCTION DETAILS. SEE SHEET L -1 - L -4 FOR PLANTING DESCRIPTIONS, QUANTITES AND DETAILS 11. SEE SHEETS C-4 & C-5 FOR GRADING PLAN ENLARGEMENTS. 12. SEE SHEET C-3 FOR SITE PLAN ENLARGEMENT CONTINUATION. 13. SEE SHEET C-3 FOR CONTINUATION OF SHORELINE TREATMENT TYPES. 14. SEE SHEET C-1 FOR OVERALL BORROW AND DREDGING SUMMARY. \ '. l{ ~.. 1.~ ..; . , \\ " , ~' , ".~,.... ''''"'....., " ~ -''''. .... , " .........,' " ",. ", ........ ---....... ~'~ '''-, \~,', 250' ;> ( ~'A~~CU~Cy SPiLU\A Y . 314.9 ... , ~. , , \f:.-,', 50' ~RiVARY CONCRET[ S;J~_,',AY A,/ ,V;NCr',ALLS S~5: ~".J:JI\,E~R/NG PLANS \~,', TO? or:- DAM @ :r 540 u: 5[5: ~i\:J'\E[Rr...c PLANS '- , I 7YPE 1 :t817 LF (:to.75 AC) 00000000000 NATIVE TREE/SHRUB SHORELINE VEGETATION TREATMENT; LIVE STAKING; LUNKER LEAN-TO WITH HARDWOOD LOG EDGING; PERMANENT EROSION CONTROL FABRIC . j1.L~ \[,', q:?RAP SP,-,- WAY CHANN~L. S5:5: 5:N:J:NEERtNG PLANS r:-OR c....j.', \E', DESIGN. StE SHETTS " ~ &. ~-J F'OR STABIIIZATIO",J 1,1:. '.,JuS &: IEGETA TlON RC)..... REVU'-iTS " ~~ ", 7YPE 2 :t1.542 LF (:to.71 AC) *********** NATIVE TREE/SHRUB SHORELINE VEGETATION TREATMENT; STACKED HARDWOOD LOG EDGING; PERMANENT EROSION CONTROL FABRIC \ \ \ '.... ,\ , . j122 . ') ... , N.C. GRID (NAD 83) ALL DISTANCES ARE HORIZONTAL GROUND MEASURED IN FEET .",.-! , ./ .....- " , 7YPE 3 :t350 LF (:i:0.19 AC) ................ FOCAL POINT - PEDESTRIAN ZONES; SAND BEACH AREA WITH NATIVE WETLANDS VEGETATION IN ADJACENT LITTORAL ZONES; CARRY SAND TO WATERS EDGE AT POINT; NATIVE TREE & SHRUB VEGETATION BEHIND PATHWAY; COIR FIBER ROLLS; STACKED HARDWOOD LOG EDGING; EROSION CONTROL FABRIC ~ --- -'- '~..~.:. ., '. \ n-~---... 'I \ \ . \ t. I , . \) \ \ \ . \ ',: \ \ \ U" \, \~ "0 \: ,'"\ \ \ . \\, " '. / t.- , \ t \- ~ EXISTING SEWAGE PUMP STATION / , -- ~ 312.~ / , c:,. y' " u "-" ~U "-----. '. , .-........, , " i' / o"/ SITE PLAN - SHEET 1 OF 2 BASS LAKE SHORELINE (~ DAM RESTORATION 10C 2:: \-' --~ "'- ~ . . J1 J.7 'f .-,:......" x' :Y .310 ,r' , ), .. ---- - --- -- HOLLY SPRINGS TWP. OWNER TOWN OF HOLLY SPRINGS ZONED R-40 SHEET C-2 ... d-b. ~,t. \\\ CAR '" ,'~~..o...o...()~,;'" ~~/(....~0080~ .... )\ - ~/J{ 667 1'~ ':"Yl\ I~: , ~ '. o. 4lt -:., -;';%8008 ...~,p'$ 'I 'D80.0.0000~~" I, A LI>-\ \' R III1 '~'''''' TYPE 4I683 LF (IOA7 AC: THIS SHEET) -..-..-..-..- :i:2,380 LF TOTAL PERMANENT EROSION CONTROL FABRIC; PERMANENT SEEDING ONLY ALTERNATE: WIDELY SPACED WOODY VEGETATION (SEE PLANT LIST, SHEET L-1) -- , v I '. ....." '......... ~"---'-.,t......,. ~.._. - : ' ).. SCALE 1". .,:J . THOMPSON c!c } ESOCIATES WAKE CO. NORTH CAROLINA 1 53 HOLLY SPRt ~ 35 ROAD HOLLY SPRINGS, I\C 27540 DATE 9/30/01 DRAWN VLH/RAL (919) 577-C808 FAX (919) 577-0609 SCALE 1. - 100' SURVEYED JOB NO. JL-HOL9 DWG. BASSDREDGRevSlte2 0 ~OTAL INNOVATIVE SHORELINE STABILlfATlON - "~5:f)B9 tF;-3:29~Ac- INCLUDES TREATMENT TYPES 1 - 4 SEE SHEET 0-5 FOR SURVEY BENCH MARK LOCATIONS AND NAD 83 LOCALIZED GRID COORDINATES. , , ' REVISIONS: 2/09/04 PIN 0658.02-88-203.3 . "-, iJ- , --.......- - ~~ ..... ... , ... - 1 ~.... 1 _ -"-, - . -, '_'..s-I_- ~- - " 1 ' ~5 '-, " , ... ... I ... .. -- ./ - ",---, ' \....._ ,_ _, .__ __ ,_ -' - I _ _ , ...--;;; '. r---.3' '. - .---- '--, /--' _ .. . _ _ ~O-_________\ .-' ==-~..J.'" _ I _ _ --- - - . I . . - . .' - ~ -' ------. -- - - , --J.... . \ ' . .-- .)..r--------~ ~-----. - , ~ . -'." -0' ". ~ . "....... "--- - -.---- - ,.,......... ........-.-- . I , ........ ,.' ,- . 331 tJ .....J-...-'" /. ,', " . ..' ..___----. . .-~,..""'- - ,/ ' ..... '......... ,- ~ ,,"-- -- -- - . - --' - -- . ,- 't/ " .............-..----- .,,---'/ ", /' ,.// --./, ~,." - .. ,- ':'~': ", . '. . ----. . . .- -- ~ - 325.3 ,---- --- --- --~~ (----~/ \ / -~ ' (,1, . ~-:*: 327.2 . \: r' · ..x. 326.5 1-.' 32..l. 8 32 2 .........' .. .~).. ' . ............ ". . j' '- - -.......... ~" 325.2 / d "~ . ~ , 1_ ' .. 7 ",1..- '- --' // j . ,~. / - /.~ 'I · 32 5 .1' " .,. 328.8' , .- - 6:__~~___ _~-- - -- --"''''' _-. ~----7/'-" .' ' --- - \, .'. I '. ~~~'.. 1(O~. .'..'.. '1-- ,/./ '/ ,,' , \ ' ~'/ /- JjO ----.-, , , ,\ . '." I .. (..-. ..... - ..... / - " ".\ ..... 'I"'-"~- . - ~ ~,// "';;,,-,, .. -, ;~:=:.._~ ~'~":'.- ..... ...., - / ,/ -- , \ '-, - " ....., . ............-.."""'. \ -- '.: '4.:-'- "" ...............1. .---- .......,.j ". - , , . , I /\ ., . .j~ - . . --r' ::-- ~';" 1.:,,) ; ---......, .j.J~~ --., - - -...:.:.... -r-'~IiIi...-- 1 .'- ;:;'-... - ,/ r---,.~-~~~,,( .....,. -"". "....- "/' '. ... - 1 - - 1 -... 1 "'~-;!;;h ,- , "-. --.,. --... r- ( , ......... T" '...... .' / ,/ ..::" ----- ~40 ~')';~ ...... "' /" 'tr -- '0 ...... .............. -X," ............... /' '. ~, I:' ''', 3<o~:~:::~~~J~-< ,">....____j,/;{V't A7~~~~~' __ __ _ _ " : / ,"r ~",' , , - - - -- " /' r- /1 ... , I ",' '. I~'J'; \ ..... / r \ ,/ '-' , / ..j~ :. I EXISTING 6' BEAVER DAM @ :t 7' ..--IT ABOVE EXISTING GRADE TO REMAIN UNDISTURBED. REMNANTS OF OLD WOOD STRUCTURE IS EVIDENT. SOIL & VEGETATION HAVE FILLED AND STABILIZED OLD STRUCTURE -- " ........ '.... - _r .. -' ------...."....... ! 7'---...___ ~,_ . --- /" / --- -t . 32t\.6 .324.2 . , \ EXiST',':G ~\ET:__M\iO AREA TORE}.1/..:t-J Jt';JfSTURBEO \ ENO 8' MULCH PATH AT CREEr< FUTURE 8' WIDTH WOODEN BOARDIVALK @ 78,5 LF' (NOT IN CO,':TRACT) \ 1 ----- .---- .-- _1_ _1- _1_ _,_ _1- _1- I I )W - ---.-.' P i I I 1 I i ____ ,_, -- ....-r /' I ! I , -,- ' -,_- " ,--, I '. ' ~-'- . - .. i-, -,- -'- -,- -,- -,- -,- -,- -,- / .... "........ J'~j ... / ~.~ .. r . ~ J _"- ,/ ,/ '('}l.: .. ~ ...J_.....I.....J . #9 ....-- / "-"~ ( ..,'...... '; I ---- ,/ /' . ---- .' . " f+ 'v i I I.. .., . .,/ ,- I.... _--' j << ...., . J1 S.J -- -....-. .... '-" '''..320.4 , .', '- '--.-- \, ---~ , ,~ \ , ,oj?' ') \ ! ~\.t.~ I / . 1 .--'\ ," ..../: \~-- ".-- --- //'-31 -, -~) ~ '. .. / _ -d ,';1;..~ I , / ,-- (' / "-".J ,/ l.... 3'/~ ..v.... . ,31S . .3202 1 / ,~ - i 1 ,... - I - - , - " ' I '..._~ 0, t 36"1 PINE . .522 2 .. NEW HAUL ROAD AND PATHWAY '-.. ---...... , ........ " ..... '.... ..... - .-'- -...........---.-.....- '.... i .... I 'r-..... ! "---J' I \ -. ----------- , .. ....... ........... ........... ~, \ \ ---- -- -. " __ __- ~ 3.3~ - ----_____ ---- ' / ~ " '--.... '''-.... '""" ,.... / " ~ . -"-" ""'-- I[G~T;' T ~... ~.....KCivG,.,Ov T ~,(~ 8~D FUTURE 8' WIDTH WOODE,\ BOARD~VALK @ 198.25 LF (NOT IN CONTRACT) TO ...~/~... O~ ~X 5T \G ....A-<~ BOTTO'i ...JST PRiOR TO R~-~__ \G O~ BASS ....Ar<~ ~O ,R[MOVE VEGUA7",O\ A''i:J PR::VENT iEGUA TION FROI.1 R::SPROJTING TYPE 4x 1.697 LF ex 1.,32 AC: THIS SHEET) _11_11_11_11- :t2,,380 LF (1.79 AC) TOTAL PERMANENT EROSION CONTROL FABRIC; PERMANENT SEEDING ONL Y WITH WIDELY SPACED WOODY VEGETATION. SEE PLANT LIST, SHEET L - 7. (AL TERNA TE HS - 1 ) ~: 1. 4" DOUBLE SHREDDED HARDWOOD MULCH SHALL BE USED FOR ALL NEW PEDESTRIAN PA THWA YS. 2. FISH SPAWNING BEDS SHALL BE 6-INCHES CLEAN WASHED GRAVEL 0 6" MIN. THICK o 20' WIDTH ALONG SHORELINES. GRAVEL SHALL BE LOCATED AT 24" WATER DEPTH. J. EXTREME CARE SHALL BE USED TO PROTECT EXISTING TREE BUFFER AREAS ALONG EXISTING SHORELINE EDGE. EXISTING BUFFERS TO REMAIN UNDISTURBED, DEMOLITION SHALL INCLUDE THE REMOVAL AND DISPOSAL OF ANY EXISTING VEGETATION WITHIN PRIMARY LAKE BED GRADING AREAS. SEE DAM CONSTRUCTION SHEas FOR ADDITIONAL DEMOLITION REQUIREMENTS. FILL MATERIAL SHALL NOT BE DEPOSITED OR DISCHARGED INTO WaLANDS OR FLOODPLAIN AREAS. SEE RIPARIAN BUFFER CROSS-SECTIONS, SHEas C-7 FOR SPECIFIC CONSTRUCTION DaAILS. SEE SHEa L-1 - L-4 FOR PLANTING DESCRIPTIONS, QUANTlTES AND DaAILS SEE SHEas C-4 & C-5 FOR GRADING PLAN ENLARGEMENTS. SEE SHEa C-J FOR SITE PLAN ENLARGEMENT CONTINUATION. SEE SHEa C-2 FOR CONTINUATION OF SHORELINE TREATMENT TYPES. SEE SHEa C-1 FOR OVERALL BORROW AND DREDGING SUMMARY. 4. 5. 6. 7. 8. 9. 10. ~/!S~,'\G ,V~T"';"\J /~G~~A.... 0\ ,\'ITH'\ r,~E ~x S""'\G ....A-<~B~J :0 B~ RE~OCA T~C .~ \0 .,..R/."'S;:;....A..T~C ;X<OR ~c JR~JG\,-:; -,,:- ~x,STi.\G ....A,(~ 5~C ;.5 ;;~R T,'1~ /~C:'.:, ""0,\ It'fA:'\''AG[...~E\'''' ~.....r\~.'" s~~~"'" c--- ~ PROPOSED SHORELINE EDGE MULCH PATH FISH GRAVEL SPAWNING aED {/ / / / / /~ Fa #8 Fa #9 Fa '# 1 0 TOTAL AREA (THIS SHEa) TOTAL AREA ~ig ti ~g:; ~ ~gj ,300 LF ~O, 14 AC 805 LF (0.38 AC) 2,685 LF (1.24 AC) SEE NOTE 5, THIS SHEa SEE ALTERNATE HS-5, SHEET C-1 SITE PLAN - SHEET 2 OF 2 E~\SS LAKE SHORELINE Sc DAM RESTORATION EXISTiNG LAKE BED TO REMAIN UNDISTURBED EXCEPT FOR FISH SPAWNING AREAS AND CUTTING OF EXISTiNG VEGETATION '- ---- -- ......--. -'----350 " ---- ,- J3~ . - '..H(' ,_-, '-~, . -'''-'~_t__I__,_~,14I'!-' , ........... '. -.... '"" ,_________ .-_ ~ . .33. -- --. .13" u ~___ .-~----.--_. ,~ ,-" . .---. I I . '....-r . . JP4 /.J' / . 318.4 .318.1' . j1 B.6 j 19.. - . .31 0.3 · 317.6 . 317.7 / / ...' //,,:. /" ,'" / / ... " \ , " . . .'-J \ ".... "" , / / ~ ~'-...........'-....'-'-'-,= ---....,,"'..,................. / ,""'.C. GRID (NAD 83) /.~'- O,5TANCES ARE HORIZONTAL GROUND MEASuRED IN FEET ::-'\,J I :) --.J -~ ~) 1~ ~ /) _.J -7 ~- _.J :..J <.( 2 HOllY SPRINGS TWP. 1"" uu 50 200 I THO~PSON '" } 5SQCIATES WAKE co. DATE 9/.30/01 '5.3 HOll"" S~RI ~.:;s ROAD HOllY SPRINGS, I\C 27540 (919) 577- C808 FAX (91~) 57/-0609 lOa I I o I I SCA..E 1" - 1 00 ' SCALE 1. - 1 00' REVISIONS: 2/09/04 SHEET C-3 - ~1 oq[D~ \\\"11'", ,,\ CAR '" ,'~-(\......... 0<, :', ff~~t...~.O\;A : ( 667)1: :jO , .: ":"YJ \ Irs: ...~~o: o.o~ DRAWN VlH/RAl JOB NO. Jl-HOl9 .."':?vtO.....OO~~".. ... DWG. [) 'Ii; ~~,l~\\~' 3ASSDREDGRevSite2 04L ' II '.'~ ""-1 ~~ L l~^'" ~ / IPIN 0658.02-88-20.3.3 .. 1(..... tool IOWNER TOWN OF HOllY SPRINGS NORTH CAROLINA ZONED R-40 SURVEYED v PERMANENT EROSION CONTROL FABRIC B: NORTH AMERICAN GREEN C-125 MATTING @ f:817 LF x 10' W C-1: MIRAFI 140-NC NON-WOVEN FILTER FABRIC C f:817 LF x 10' W C-2: MIRAFI 140-NC NON-WOVEN FILTER FABRIC C f:817 LF x 10' W ACTUAL DISTANCE FROM SS MANHOLE TO EXISTING GRADE MAY VARY PER EACH MANHOLE LOCATION LIVE STAKING: SEE PLANT SUMMARY SHEET FOR SPACING AND PLANT DESCRIPTION C-350 EXCELSIOR MATTING BY NORTH AMERICAN GREEN. TIE DOWN TO TOP OF LOGS STACKED HARDWOOD LOGS ALONG SHORELINE. LOGS SHALL BE 8" MIN. DIAMETER. ANGLE LOGS ONTO REBAR. ANCHOR WITH 8-GUA. METAL WIRE \ 6.41' \ 3.0' ----~~1--~ t t 2 ~-q- 1 r::::::;; / /' ~ PERMANENT EROSION CONTROL FABRIC B: NORTH AMERICAN GREEN C-125 MATTING G f:1,542 LF x 12' W C: MIRAFI 140-NC NON-WOVEN FILTER FABRIC C :t1,542 LF x 10' W 8' DOUBLE SHREDDED HARDWOOD MULCH PA TH ~ TO 4" DEPTH - TO BE FIELD LOCATED \ \, LOCA TE TREE PROTECTION - FENCING ALONG OUTER EDGE EXISTING TREE LINE STACKED HARDWOOD LOGS ALONG SHORELINE. LOGS SHALL BE 8" MIN. DIA. EMBED LOG INTO SOIL. ANCHOR WITH #8 GUAGE WIRE & 4' HT. 2"x4"---, STAKES C 3 STAKES PER LOG \ \ LOCA TE TREE PROTECTION FENCING ALONG OUTER EDGE OF EXISTING TREE LINE ZONE FISH GRAVEL SPAWNING BED ZONE W ZONE M PA THWA Y 7.5' 6.0' l \ \ 8.0' PATHWAY i 2.18' 8.0' ZONE M/U 20.0' 8' DOUBLE SHREDDED HARDWOOD MULCH PATH ~ TO 4" DEPTH - TO BE FIELD LOCATED :f:6.0' 6.0' 8.0' + 328.25 - -. - - - - - - - - - - - - - - - - - - - ....- - -- ..- .- 4%_ \ 3% MAX. .25 + - 327 326 325 324 323 322 321 320 319 318 50- Y~ ,20RM _ _ LEAN- TO LUNKER STRUCTURE - #5 - REBAR @ 5' VERT., #5 REBAR: f: 7' @ 60. " ... ~.... 327 326 325 324 323 322 321 320 319 .---- ~- - 327 326 325 324 323 322 321 320 319 -----------.. FILL MATERIAL PER LF = 7.92 CY TOTAL TYPE 1 LENGTH = 817 LF 7.92 CY X 817 = 6457 CY J 327 326 325 324 323 322 321 320 319 318 50- YEAR STORM C-2 - - --- Ei -GRADE N.QIiM~1::1J~ IT!! l-~.v!b.. EX. Si~ J\ot NORMAL wAfER LEVEL ! 2 1 :-- . EX. GRADE ~EROSION CONTROL FABRIC SEE CHART, THIS DETAIL TOE IN TO EXISTING GRADE FILL MATERIAL PER LF = 1.07 CY TOTAL TYPE 2 LENGTH = 1.542 LF 1.07 CY X 1,542 = 1856 CY ------~------------- t SECTION A-Ai: TYPE 1 INNOVATIVE SHORELINE DREDGE STABILIZATION SCALE: 1/4" = 1'-0" SE_CItO\._B=-_Bl :_I_YPE 2 INNOVATIVE SHORELINE DREDGE STAB[LIZATION SCALE: 1/4" = 1'-0" NOTE: CROSS-SECTION IS SCHEMATIC IN NATURE AND IS TO PROVIDE AN OVERALL TREATMENT APPROACH TO TYPE 4 RIPARIAN BUFFER EXTENSION AND ST ABllIZA TION, SPECIFIC FOCAL POINT AREA - REMAIN OPEN DUE TO ANTICIPATED PEDESTRIAN ACCESS AND USAGE SAND BEACH: FILL WITH 4" CLEAN WHITE SAND FROM PATH TO SHORELINE EDGE. UNDERLAY WITH PERMANENT EROSION CONTROL FABRIC :t9.65' 4.29' LOCATE fREE PROTECTION FENCING ALONG OUTER EDGE OF EXISTING TREE LINE , ..... ... t ... 14.16' / I FISH GRAVEL SPAWNING BED C 24" MAX. WATER DEPTH SEE PLANS, SHEETS C-2 & C-3 FOR ACTUAL LOCATIONS PATHWA\;.. 8' DOUBl E SHREDDED HARDWOOD MULCH PA TH C 2.248 LF TO 4" DEPTH - TO BE ---, FIELD LO:A TED I I 10.9' 8.0' PATHWAY PERMANENT EROSION CONTROL FABRIC C-1: MIRAFI 140-NC NON-WOVEN FILTER FABRIC C :t281 LF x 16.0' C-2: MIRAFI 140-NC NON-WOVEN FILTER FABRIC C :t281 LF x 9.5' W COIR FIBER ROLL: 10" DIA. 0 5 SQ. CM DENSITY 0 f:281 LF. ANCHOR WITH 4' HT. 2"x4" STAKES @ 3 STAKES PER LOG LITTORAL ZONES C 30' MAX. WIDTH LOCA TED ADJACENT TO EACH SIDE OF SEE SHEET C-2 FOR EXACT LOCATION I STACKED HARDWOOD LOGS ALONG ! SHORELlNEG f:281 LF. LOGS SHALL II BE 8" MIN. DIAMETER. EMBED LOG 'I ~.J~LS~I~E ~N~,H~~. ~~4'#~T1~~'s ' C 3 STAKES PER LOG l 30.0' MAX. ZONE W ZONE E TYPE ,,3 SHORELlt\,E ARE.:. (0'0 ':'C TC~':"_; PERMANENT EROSION CONTROL F ABRie A: NORTH AMERICAN GREEN C- .350 MATTING C :t2,248 LF x '2' W B: NORTH AMERICAN GREEN C-125 MATTING C f:2,248 LF x 8' W C: MIRAFI 140-NC NON-WOVEN FILTER FABRIC C f:2.248 LF x 9' W 6"x6" CCA PRESSURE TREATED TIMBER BORDER SEE DETAIL, SHEET -- 8' DOUBLE SHREDDED HARDWOOD MULCH PATH G 281 LF TO 4" DEPTH - TO BE FIELD LOCATED 327 326 325 324 323 322 321 320 319 EX. GRADE 327 326 325 324 323 322 321 327 320 326 319 325 318 32.~ 317 323 316 322 321 ;>fO 319 I : 50- YEAR STORM I '---------------------1---------- , I H -,--'-, FISH GRAVEL SPAWNING BED -'- "J#.:x:)/ C 24" MAX. WATER DEPTH 2 ~~t1~,. /. SEE PLANS, SHEETS C-2 & A 1 I", "'..:~:/ /;/ C-3 FOR ACTUAL LOCATIONS ..:~'-.> ~ " '-, /, "/' / .....-:: .I , ' , " , ..., ., . _- - - - -' -EX. -GRADE.- ~ C 327 326 325 324 323 322 321 320 319 318 317 316 NORMAL WATER LEVE ---------- i6i, ':~, - 5.0" 8.0' I PATHWAY -l----~----- i I I, i3~ MAX. 324.50 I ~24.10 - 6.5' ZONE M LOCA TE TREE PROTECTION FENCING ALONG OUTER EDGE i~ OF EXISTING TREE LINE // " / ,-' , , ". / 15.0' SAND BEACH ,/ / EROSION CONTROL FABRIC SEE CHART, THIS DETAIL / /,' /' -' ' I I i r-------- l323.35 ~j .,--,j.:'.'.- '.C~"':1-~ .~ NORMAL WATER LEVEL I 4------------------------------------------1-----~ , I ~..: . ,,' ~' /' /"/~ 2 EROSION CONTROL FABRIC - SEE CHART, THIS DETAIL WRAP EROSION CONTROL FABRIC UNDER COCONUT COIR FIBER ROLL WITH STAKE DRIVEN THROUGH FABRIC FILL MATERIAL PER LF = 0.63 CY TOTAL TYPE 1 LENGTH = 350 LF 0.63 CY X 350 = 220 CY TOTAL BEACH SAND VOLUME = 70 ,. -' ' 50- YEAR STORM _ _ _ _ _ ,.- EROSION CONTROL FABRIC TO 3' BELOW NORMAL WATER LEVEL . '..~ ~. .'_._J- EX. GRADE FILL MATERIAL PER LF = 4 CY TOTAL TYPE 4 LENGTH = 2,380 LF 4 CY X 2,380 = 9,520 CY - - , SECTIO:; D- Dl: T'{PE ~4 INNOVATIVE SHORELINE DREDGE STA:~ILIZATION SCALE: 1/4" = 1'-0" NOTES: SECTION C-Ci: TYPE #3 INNOVATIVE SHORELINE DREDGE STABILIZATIO:; SCALE: 1/4" = l' -0" REVISIONS: SURVEYED 8 /23/0 1 2/09/04 DRAWING SHEET C-6 IDL ~(o't o~ \\"\""// \\\ CAR '" ~,,'~~..........~~~~~ {~(f~\Y' ~iO \\ Q}fS:: ":.~.... ..._~'$ , ~, · 'o........."c..;..., ~ " A ,~\' "/' . \\\ HI" '0. LEGEND F ... FLOATING MACROPHTE >1' INUNDATION E .. EMERGENT: l' INUNDATION TO BANK W = WET BANK, LOW SLOPE M = MOIST SLOPE U - UPPER SLOPE 50- YEAR STORM ELEVATION = 327.60' FILL D CUT 1. STACKED HARDWOOD LOG EDGING SHALL BE TO 24" HEIGHT. REGARDLESS OF ACTUAL LOG SIZE OR STACKING LAYERS. 2. SEE SPECIFICATIONS FOR COMPACTION PERFORMANCE REQUIREMENTS OF ENVIRONMENTAL RESTORATION SITES. 3. SUITABLE SOIL BORROW MATERIAL SHALL BE DEPOSITED ONTO EXISTING GRADE AND BUILT UP TO ONE-FOOT BELOW FINISHED GRADE. ONE-FOOT OF SEDIMENT BORROW MATERIAL SHALL BE DEPOSITED OVER SUITABLE SOIL TO FINISHED GRADE. THIS APPLIES TO ALL SHORELINE STABILIZATION AREAS EXCEPT THE HABITAT ISLAND. 4. THE HABITAT ISLAND SHALL BE CONSTRUCTED ENTIRELY FROM SEDIMENT BORROW MATERIAL. 6. PORTION OF STACKED LOG TIMBER EDGING MAY BE OBTAINED FROM ON-SITE CLEARING AND GRUBBING BELOW THE EXISITING DAM. BRuSH AND ROOT WADS TO BE USED FOR FISH HABITAT ALONG ISLAND AND SHORELINE BUFFER EDGES. 7. SEE SHEETS C-2 &: C-3 FOR LOCATIONS OF TYPES , -4 SHORELINE STABILIZATION TREATMENT 8, SEE L-l THRU L-4 FOR ACTUAL PLANTING REQUIREMENTS PER EACH SHORELINE TYPE. SEE SHEET L-1 FOR TOTAL PLANT LISTS. 9. SEE SHEET C-1 FOR ALTERNATE HS-4. 10. TOTAL FILL VOLUMES REFLECT A 1 O~ VOLUME INCREASE FOR ANTICIPATED SHRINKAGE. BIO-TECHNlCAL SHORELINE & VEGETATION PROFILES BAS 3 LAKE RESTORATION & SHORELINE STABILIZATION THOt.tPSON '" ASS )CIATES WAKE CO. 1 53 HOLLY SPRINGS ROAD HOLLY SPRINGS, NC 27540 DATE 1 /2/0 ~ (919) 577-08(6 FAX (919) 577-( f09 NORTH CAROLINA TOWN OF HOllY SPRINGS ZONED HOLLY SPRINGS TWP. OWNER DRAWN VLH/RAL JOB NO. JL-HOl8 SCALE: NTS D aSSdredgeRevSi te. dwg PIN J ") 4 ... CONSTRUCTION SCHEDULE 1. Obtain 0 land-disturbing permit. Schedule 0 preconstruction conference with the Regional Engineer. 2. Inl)tull grovcl Cl.)nl)tructlon pud, lCrTllJurury OIlier I)IUII:l. :lill fence, sediment basins or other measures os shown on the approved plan. Clear only os necessary to install these devices. Seed temporary diversions. berms and basins immediately after construction. 3. Call for on site inspection by Environmental Inspector to obtain Certificate of Compliance. 4. Begin clearing and grubbing. Maintain devices os needed. Rough grade site. 5. Install storm sewer, if shown. and protect inlets with block and grallel inlet control. sediment traps or other approved measures os shown on the plan. Begin construction, building. etc. 6. Stabilize site os areas ore brought up to finish grade with vegetation, paving, ditch linings. etc. Seed and mulch denuded areas within 15 working days or 30 colander days of completion of any phose of construction. 7. When construction is complete and 011 areas ore stabilized completely, call for inspection by the Regional Engineer 8. If site is approved, remove temporary diversions, silt fencing sediment basins, etc., and seed out or stabilize any resulting bare areas. All remaining permanent erosion control dellices, such as velocity dissipators, should now be installed. 9. When vegetation has become established. call for final site inspectian by the Regional Engineer. Obtain a Certificate of Comple1ion. Regional Engineer Office H 571-4700 John Holly SEEDBED PREPARATION " .) CHISEL COMPACTED A~EAS AND SP~EAD rOP$OIL j INCHE::. DEEP OVER ADVERSE SOIL CONDITIONS. If AVAILABLE. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. REMOVE ALL LOSE ROCK, ROOTS. AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. APPLY AGRICULTURAL LIME, FERTILIZER. AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW.). CONTINUE TILlAGE UNTIL A WELL-PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 61NCHES DEEP. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. MULCH IMMEDIATELY AFTER SEEDING ANDANCHOR MULCH. 2.) 3.) 4.) 5.) 6.) 7.) 8.) INSPECT ALL SEEDED AREAS AND t.W<E NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE.IF STAND SHOULD BE OVER 60~ DAMAGED, REESTABUSH FOLLOWING ORIGINAL UME. FERTIUZER AND SEEDING RATES. 9.) CONSULT CONVERSATION INSPECTOR ON WJNTENANCETREAThAENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. . APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (3 TONS/ ACRE IN CLAY SOILS) FERTILIZER - 1,000 Ibs. / ACRE -10-10-10 SUPERPHOSPHATE- 500 Ibs> / ACRE -20" ANALYSIS MULCH -2 TONS / ACRE - SMALL GRAIN STRAW ANOTHER - ASPHALT EMULSION 0 300 GALS./ ACRE SEEDING SCHEDULE DAM AND EMBANKMENT SLOPES DATE TYPE PlANTING RATE Mar 1 - Jun 1 TOll or Hard F..cu. 300 ID./ocre " (War 1 - ~ 15) (Mar 1 - Jun 30) Jun 1 - Sep 1 120 IDa/OCt. 2~ IDe/ocr. 120 IDa/acre J5 Ibl/oe,.. JO Ib./oer. 120 Iba/oere 25 Ibl/oere S.p 1 - War 1 (NOli 1 - Mar 1) Add Toll Faeeu. Or Add Hull.d Common Bermu<lo~ro.. --rOil f..cu. and -Browntop Will.t -or Sorghum-Sudan Hybrid. Toll f.ac:u. Add Abruzzi Ry. Con.ult ConHrvotlon EnQln..r Of Soli Con..rvotlon Slrvlc. for additional InformoUon concarnln~ oUlat ollemoUv.. lor vag. lotion 0' d.nuded oreo.. Th. obov. l!eQ.totlon rot.. or. tho.. whiCh do w.1I und.r local c:onditiona; oth.r ...dill9 rota comDinotion. or. poUibl.. In no COM Ihall Weeping l.cMgIaea or Crownvetch be planted or uMd on the dam. ...T.mporof)l - R.aHd aecordill9 to optimum .1<I.on tor d..ir.d parmon.nt VI9.tation. Do not allow t.mporoty COli'" to IIrow ovar , 2" in h'"lIht !>Itore mowing, oth.rwia. tNCU' may bI ahaded out. NOTES; ___~._.aoa&L__ _ ...-..~ .r_ -.... CUIIIU~"'_._ -_..~...-..._-_...- - .....cr_ItI~M......___..._.__ - 000 _1'IIlIICID_"'_ -. - -...--- ..-- - .nIDI< _ .....,. ~ ~ -- ... -- -------.-. _ -. _ _. __ 11__ .oa..____.........._ .. ~ ,. ........... - -- ... . ~ .. - -. ..... --- . .. - ., .., -- -- ...... A..... -- T,.. ~ no Do Illll En1M' It; i !IlGN nf'!'...n.. ..... TREE PROTECTION DETAIL MOl 10 ICII.E ~ .. NCDC1f , 0 0lI '07 lIASoO STQoo( ....... K UKb. ~ 10 K 110'1. I ao"w I " o JIt.J A ..-.... SlCTo. ~ KJIW .. "- IUI PERSPECTIvE VIEw '--1 --- - -'" - ..... -- ~- I t L.J BAf~LE INST ALlA TION - STEP SECTION AT OPENING ~ \. CiI8'IC .1IIm. ,... ...., A' ~ tI ..10 -..- .-----~ . .. 11~ .. ",.., .. ...n..a. '..-c ..--- ..-._..,._IVA EROSION CONTROL DETAILS BASS LAKE DAM ~ 1600 QJ FT/",! E .. ~ lWlaJS I<.fTlQO/T 10 ~Tt I..MO( IM.OlJ . 10 . ~ .. OOlWoC((Sl 5HOU..D K UXJIt.JtIl 10 ~ m.t. w.u..... I""f""t ..,. Ail l.oUQ '......1 lUll W\nl.IoLL ~ ... ., .-, ......u _ .. ---..-- -~. I. u:.t , 011 0Il~ .vetA) loOT DanllH<i ~ (flllt:) ACN:S. :t [AIlTH IOIW ~ Be STAillUn:D ../ SUIloh<i AoCCiCIUlIIo<i TO ~ SPlQf)CA nONs. .l. US[ CUM COWPACTOII flU. WA 1[RIA4, '011 [AATH Pili. QUill... SETlUD fa" \ CROSS SECTION FlL TER F A8RIC .. lOUS'I K .....,~ .. A CXloClmOoo -0. OIU. ~ nw:a.; 001 l)lllCT f\DIt 01 ....0 00010 ITIlI.CTa. 'OlIOOC ~ .m. fit>><< SiU. . ~; .uP tool( _. -- 8MfLE lNST,IlLL,l.TION - STEP 2 GRAVEL & RIP RAP FILTER BASIN ..:u. , ~ "'" 0ll0< 10 . '-"U) ~ T'Ol 01 I\... ~ o.aJllI J rm . ..orne.... ~ ~ ~ ~ TO WTDICD'T f\.o. ~;oa gp,on 10 A ~ QlJIU1. 1 1041 -.. K IIilloOoC) .... 104' 0ll0< . CIoo( --.1 N... ) Clr'I'C>o ~ K 1ILt(>>CT1lU:l1.:l __ ~ .. ~, 001 CAMJlUl rr ~ MAINTENANCE -.c:"'_~ _"'1Il1AOl_0'~_1U. _______TOll'I~ _ _ N _7.... AQQ lLU_ lIll OIC-fWI N _ _ 0' nc _. IUlZ N _ !HAT. _ IN A ~TIll -. I#IIU. _ -.1 N __ ,AItT 0' N -.c. ,_ 0C0l .. I-.c:TUlI fat __ __ ~ III _ -.,Y 0C0l nc _ 01 nc -.....Y TO ~ IT . A _ 01 U "_ .. ..0. ~ 01 N 1-'. _UY fU NI1 ~ 01 N _ 10 &JIH1LY _ _ _. ...",. _ __ __ lId -..aY -'. -..aID _1II.Y. ""'11I _ _, _ ....... _ ...... _ 1lC _ __ _ __ __ TIC _ _1II.Y_ ~<~-- GRAVEL & RIP RAP BASIN/OUTLET TW( A N'( OUTUl TO fUT IoM.A 11TH ..:. 0U'f0Cl O1AHfo1U T't1'f 8 PIPE OUTlET TO WItll- DEflNED O1ANNEL .. ... ~ ...00 """" -U II 00/l0 T)C IllWl lOUS'I K CUNG " .-xMIUY. r__ ,.. ...... f1 - r '- -., .--r-:~ -.. '-.:"- .. ,..J .- ...- -. ~E ~--- S(C'TlOI\ TkRIJ ~ . ~ TU CROSS Sr::nOlloAL -.1fl'l TEMPORAHY DIVERSION BERM ru,.PORARY Ol~SoON aiRwl CWTCii C(1)oI no. A TtW'QlUJl y III(X;( " Cf:IwI' ACTW 50IL L.OCA TW A' no( fa" OIl IAK 01 A ~ t)'~ Ao1llA ~ 1 TO t)'o(JIT STtlJCW fiAJfo()IT nee.. PIQ.ot ~ ~ A""Y nee.. ~Tl.C11ll SI..QfIU TO A Sf AaUZUl OolTUl; 011 1 TO t)'o(JIT 5alIMOoT~ IUrCn r1lQW A ~ AItLA TO A S[DIw[)IT ~ 'AQUTY. CGWlITlOa ~ ~ ~ ~\oO ITOMo.AT'[JI ~ WU1T I( ~..,.,Y t)~TW TO NOltCT ~ 1VlIICl a..(~U OIl IlCT _ il1*Oo T1 011 lilt t)AIoO C04 ntuCno-. TIwPQHART CW~SoON b(IjW/ OlTCii A. ..~ (;Il;WAC1lOIl " ~ f'U 1$ It(~ t)~' S/.If'IQOlT TO llIlI(CT ~ ~r- ~ STOIWIlAIUI ..TO A a.cw..ooT COol'llO.. DC'tIICl WST I( IMSTAoULIl .... TO ~ .. ~ " no( /IIItO (OIl .. ~nOH Ill" nu OI'OAnOH # SLtMlOlT COoTltO..S . t)~ AlII. ac$TAoULIl AS [AOt OlITlCAL I'CMT 1$ ~). .. t) ~S IloO.A.D I( L.OCA 1tD TO -n: 0AMAllD .., CQIc$~Tl()o OI'OA noo.s. c. Do ~ IloO.A.D I( SUllO .. lIU..01(I) # TH(Y AlII. IlOIAoto .. PUa: 0'00l >> DA~ D 0.( ex ~ Af'T(JI (..0. "'-. ... T C>>oC( A IIU)l II( "".110I [\$ 1l(JI"'" AS ""ctUNl y ....I\AA.. ~ ()jl f'U ()jl CUT ~ ~ , I ~- I ~r - ....-.- .. -- -- " t_1 ..-. ----, DiTCH ~ ~I _ _- 0' - . ~ ---- ~ .ue>>. ...A \ , IlOIC ~ r. _ ~....><AJUCII ~ ~ ~ ~) _, _ IlOIC _...-. ....... ... I " ] ~. --- "" , IlOIC ~ r. _ CIID1IX1U __ ClIl ~ .'~)_7___""__ '..-. 1IOTt1 ~ AJ ..... ~ 01 ~..WiIOS\AlIT\.n. SlAaJUD. ~ OC)Q 01 nc otooa: ..c TlIOQ. y ~ ...., . I'1IQUD. ~~ ....1\AA.. ~ Oll ,.... Oll M ~ ~~ ~ """'.....'1Ul f'o;. I I /"" \ ' \ , \ I ~\\'~' ~v &RW/ 0l1CH ..olt~ POSin.{ ~ ~ II( ~ TO ~ ~ # ~ DCU.DS 21 suo .. w...o...C>i ~ TWY ""'" TO UCLCl U ( ...... IIlU:lC1TlO ltUo.A. T) w..L>>.M OA - ~ ACJlO .mQ.'T ~ c........~ ~ AT no( '" " "-OI'Q .....sT ("" "'0 No ~ kOP( 0I\A0f0I I ...../~TQo II ~ co.-oo...y ~ TEMPORARY DE-WATERIt\G TRENCH NOltS; (1) . - 1.~ I1w(S THE III~UIII STONE Ol~ t!liT NOT LfSS niNo . INOtES. (2) G 1- l' ABOlo{ w.uu..uw TAllWATtR 011 TOP CI OiAHHEL BANI( (llIhI01- ['W(Jl IS U:SS) (3) L4 -lLh <i Tn CI IW'ftAP APRON. NOltS: Foom..c; SIZE _ 11I:I om.._ Ir - a.- h. - M' II" - ..' r ,r ... ,r u' M' TEMPORARY CONSTRUCTION ENTRANCE , ',:JLVERT OUTLET PROTECTION fa" [lLW nON OF STORJ.jWATER -..------- --------- [)OS TlH<i SLO '( 167WASHfJ) 5TON[ " ~ GRAVEL &: RIP RAP FILTER BASIN DETAIL DESIGN Of SPILLWAYS DlWHACE AIt(A lIlDIl lLh<iTH (AOl(S) (FT) , 4.0 2 '.0 3 &.0 . '00 , 12.0 SoONS s..o.. .... _w FlLTDt FABRIC SIDE VIEW ~ HEIGHT . ..clni llE1ERWlHED BY EXISllHG TOPOGfW'HY AND SEDIMENT STORAGE REQUIRED. K[Y RIP RAP INTO 1l1( QAW 'OR STAllUZAllOH. KEYED RIP RAP 167 WA9iED STClN[ fRONT VIEW ROCK CHECK DAM ",II"'", ", '" " CAO" ....' '\ r\ "0 ", fit" tl. ....... <:'/ " .. ~ ..~SS.. /1.' .... .:P ..~ '" /d.' -Y ':. : ~ "0 ~'. -y ~ : :'~ SEAL y.~ -: -'Cl. r'- : ~ 19793 : : -. ... ~ 'fJ"'f),_ -A-/Q:: ~'" ~ ..;:~/Nt,.~.". <..:;...... ", ,~(.i.",,~~"~\,:~,,""". / /la ~'~rt~ /~,/, 1.'/ NO. DA TE 1 9/28/01 DESCRIP nON Seeding Schedule Note \) ,at.... ~ I>I/U. ~ 'lHCI .... IIOT utUll 1 ACC. 1) "'" roocu aKMJ) IIOT K UV.D AI _ our.n-l 0lI .. ~ 01 COooC:OIf1lol.ItD f\.OII (CJlUQ. lll1't>UG. ~ CTt-) NM 01 ....ru IN PROGRESS DRAWINGS SUBMITTED FOR REVIEW NOT RELEASED FOR CONSTRUCTION OWN t:R: TOWN OF HOU_ Y SPRINGS 128 SOUTH MAIN STREET P.O. BOX 8 HOLLY SPRINGS. N.C. 27540 " (919) 557-3934 HOll Y SPRINGS TOv.NSHIP THOMP~~I' , CIA TE5 WAKE CO. 5821i~~~"RI RD R.<<EUI ~ '4.7 6 DA TE 11/28/2000 DRAWN RIB (9.18);" 5t:ll~~ FAX~_ ~143 SCALE NTS SURVEYED ~/; . (1Jt/')~ .,,' J ^ '.;f! ,. L:' L'l ,1.....1 I ~~ '~~ ~)L--~ I & 'o!./, (Ii' <'GlGlf --...... BY RIB SHEET D-12 OWNER: TOWN OF HOLLY SPRINGS NORTH CAROLINA JL-HOL7 SCALE.. NTS ..-- REVISIONS 7/11/01 1'01 ~ .'~ ....-.. If ..... ~ nc -'l 01 nc "'" roc&.. II .~. ~ to CloG A KllloolO(I .... .. ....., 01 YO.a UIl 'lHCI ~ --.L lJ ~ .'l.' 011 ru' ~ _ ~ CIllO PIIIUClllMUl ~ c.. wn... I'OST1.. 011 r ASTDO 10 CIIWI 001 110OO -'1 _, MO ~ f1AIU1 COIottI ~ It 1~ C>_TlJI 01 - ~ r.' lltD' .r [NIl>< I\... ~ .. 011 ," ~..u II / ....,.;& .........,. ~ ~'D JOb- -~...--.., ~~,. ~...... , . ,,/--..,~ t\.TD1 '_-, ~~~~..~~..,..., '?"'\'~"~~:~~~.'.,'\.' ~ . ~.-,.... ...,..../ .... ,_,.. -:-r....,-. "-_;)_ " ."'\ ~ ..,.. ..... ~ ~ .....""'-O.n 1lUtS'f.u(l (-...0<1 ~ r>M'ftC 001 [~ ~ 10 _ ./ wn... CU'l QII _ AJ " on CO<TVl )e' ~ - '-"'..,;,,, 01 OW'( eM...u I - - IV.. '..De .r- ..... ~ 1l0ll.tl0l( ..evil. - / ~ -... T>CI L.C-tU IS ~D QII .., ~ rr ~ oGI'I.C'lOl\. LL'w'''' TIer-. i I Y lot T1IOO\ co.u _I lOa. . ~ ~ IIGT _ (00I.f') I l: \ y;;~~" u:..aw ~It ~'1 ;"1" .' .:.;. -,; '.;!' . _ :.;. :.: ~ : 0 to' .... ~ '. .. .. ~ I . " .. 'r -' . . ' . I . . . f · ".........'.1...1'.<...- "('<1"'.1 '" . J' ..... . ". .~. '. 1 ~.J . .. ,- .. . '. . r '. c -' . . "~ '1 . · '. . ~ ". '. . .. 4. . .. . .. ... : l ~ J: ~~ ~~ =~: . -. _ . t: ..! ~~'_..~". ~ . ':'~ .:..:........:-t.... ~ ,'_..,) "'~J ~-#,1"'(..",,,, ...... . . -. .... '. ~.. . ~ I'~;~'U' '~~r~:~7l~'~~~' ~ I I I ...."-- ~ c-. -.:a.u' 01 ,..-: ""0 c-. .. 01 _ otTO tIIUoOo ....... _.. AI .'0", -. . , SILT FENCE ~ TEMPORARY STREAM CROSSING ZONED R-40 JOB NO. DRAWING BASS-DETAI PIN 0658.02-88-2033 / ! t;e.( i,,/J1f-l-- PRIMARY SPILLWAY ENERGY DISSIPATOR PAD ELEV. = 324.00 RIFFLE/ GRADE CONTROL STRUCTURE :i:30 IF C/l STEP-POOL SERIES :i: 160 IF e/l POOL J-HOOK :i: 100 IF C/l RIFFLE ElEV. = 317.50 WS :i:36 IF C/l J-HOOK RIFFLE :i:36 IF C/l POOL :i:90 IF C/L ElEV. = 310.50 WS RUN/ GRADE CONTROL STRUCTURE :i:55 IF C/l SEE lONGITUDIONAl PROFilE. THIS SHEET. FOR SPillWAY CHANNEL ELEVATIONS ---- ---- S.R. 1393 _ _ - - LAK( RO~J2.-.-_.._---- __ -------.--- ~ . ------ w} -------- ---'06--0-='--t'-V8LIC R\ i --- ~~-___. ~ I... - , ,.,- /// . - -/ / / /' -' - - ", -L.-- I ......... " / / -/ --- j I ;' /' ..// / / /, .---- ---""', '-. ..., "." ~ / / / .----/ I;f / I ,// // ~~'" """ ". / //' / //-- ----------J , (( ( ( ( "" ",', // / / I ~ i I \ \ \ ,-------. I I';) 1. \ \ \ :> \ --------.__ I I ,I \ \ I -__,~ ) I ~~-~-\ - X X ~ I I i ~fff - -X-X-xLt....J. I. -- I l' ! X-X-,-- L_ f"" .,:11r --~_."--.~.,- ------ ---- -- -- --_.- - - - - - - " -...... ./ ./ ". ......- ---- .- -_/ /- ./ ./' // /"f: /"f: :+: ",--...-" I I I I I ~ I ~ ZI-'-J -z I....... <(w ~a I 3: (/) I ~L5 '. , ", lw < -- -.J w u z " ", -..;:::::#1&- --= -- ~--:... -- -vJ + +- i- --- . - - ,/ i , --- ,,-....-- r' -- ----- - ----. -:::.......:::--: , ~ PIP~____~(30\, D .) \ / ..-- /- ".------ -....... . \ ""-.........1 PRIMARY' SPILL WA Y CHANNEL PLAN VIEW SCALE: / I ~.~ 1" = 40 ' C \.. \ ~ (),J-l \ nVJ. '1' \::. _ , If_ \ 4.;N~ \ I f ..\\.)(f' . \.. - ' '-J <\JY~ ...' \,,1' \J'^--' ;'\ ''')('v~ )t/ . \ ~J/ L-(\~/ ) (}0 / v~ v .-1 \ \< \) v 1!1'\'I' 'It ' --II , 336 O'l c.o 334 L.() tI') tI') II I\. '\. \ \ \ \ \ \ \ \ \ ~ o o ~ ~ g ~.5."{<>7 I'J "-. S:! ____ o o 332 ~ ....J W W Z o ....J o 6~ ~ a::: CL PROPOSED TOP OF DAM ELEV. ;: 331.00 330 EMERGENCY SPI lWAY ElVEV. 328.00 328 PRIMARY SPlllW,lY ..... -- RIFFLE/ GRADE '"' '"'. ,....r""! "" vv" y DISSIPATO PAD STRUCTU ~E ~lEV. '- 24.00 1=30 LF C /l I : I I I , _ , :~(Z~ BUONUl~IERS I .....~ I ~"--__ i ~ (/) 326 J HOOK RIFFLE I~ ~~ . ..., I ~ I v,~ lVfll"', SIZE BOULDERS :t36 IF C7L HOOK RIFFLE . ~~. '.1. " v, ~ 'VII'. SI~ E BOULDERS 36 LF C/l r""!,",,",, v,-,~ :t90 LF C/L El EV. - 310.50 WS 326 r""!~,", '" v~ :t100 F C/L ElEV. 317.50 WS ~TEP POOL SERI S :i: 160 LF e/l 324 1. U[J'70 322 L ~ o to 320 II --; l.L.! ....J cd rw ZL o w~ CT:c ~ fl:iu A ~~ .-- z~ :<'l ...... ~ ~Pn ~ ~ + II -> w ~ .-- N 0.-: "" ;', ~ CD CL r::.. .. ..~ ~ ~ L.() ~ --:....:- ~. L.() ~~ft..' tI') tI') . ~~, + ~ ..., _, n. ~ ~~~ -....;J~" J T'T J... l: 10.. ~~ ......~ I" -~ ~~~.... "': _+ ~ " JI~~ . '.'-'/0 ~ __ - I ............." ~ ..z:. ~ ~ ., --r ,... 'V"""(' T V · ~ ullC ~~ ~ ~'\.- II 318 ..~ to o ~ o -: ~ + ~ l.L.! ~ -: II 3: ....J W -' ....J CL LJ.J ,,", n ~ ~ ,....; L..l... f' CL + ~'l .- '7' 'c.::> ~ W VI W -7 ~ L.() N tI') :: 316 f' O'l .- tI') .-- 314 ~ en " ~ ~ e::J ....J UJ ~ Z rrI (/) '>- :;;; o CL a::: <l. .-- <( ~ :c N L..l... + J ~ >- ;..:. a::: ~ z . oc.::>....J ~ ZWCL \J I LJ.J LJ.J v, (f) 3: (f) 3: L.() f' o .-- tI') 312 ~ in 310 / / .... ~ ....t\J ~ ....~ \C\ ......, " ~ ~ ...... 0... W ~ ..... ....~ \r\ '" - ~ 0: o o ...... MIRAFI 500X M ~TTING v 'v....., .::> I VI'lt.L " ~~. KEY IN AT TOP OF CHANNEL. ~~.I"'\.. 0_ """_~ .;... I " ~ .- ~~Y'~ DATUM ELEV 307. 00 (/)CD 3:CL OL.() L.()tO ""L.() .-- .-- tI')tI') (/) 3: L.() tI') r' (f)CD :S:CL L.()L.() tOtI') L.()L.() .-- .-- tI')tI') (/)CD 3:CL OL.() NtO ~N .-- .-- tI')tI') (f) 3: o L.() tI') .-- tI') (/) 3: o o tI') .-- tI') O'l c.o L.() tI') tI') L.() c.o ,..... .-- tI') o L.() N tI') c.o tI') N tI') ,..... o N tI') ~ O'l .-- /'0 r<) N r<) N N t") r<) 10+00 11 +00 12+00 13+00 14+00 15+00 16+00 17+00 PRIMARY SPILL WA Y CHANNEL LONGITUD/~JAL SLOPE PROFILE SCALE: 1 " 1" - 40' HORIZONTAL 4' VERTICAL ,,:11r " , o " ... f .. ... ct+~",re;L. fltp....~ ~4-? 11+,s ~EeT I a ... ' (.) - , ~ ,- c;.) ..... )- T1+~q ~ Bc;uwst... RX>1Wl-~EfL , C ; (;) ...' o - ~H<<*- ~ ~ ~ ,-~~ 1l!-1S ~ J-HOOK VAN' DIAGRAM PLAN VIEW NOT TO SCALE IO'-err IS' - 0" ~~ 6h>Jl. ~~{ atANNet- 1~1J4." PIA. (l.Ifl- MP- ~ or:: ~ 7f) '2-' ~~l;I~ l'E1' - 0" -s~ Clh4-NNIIL- I 01.. 0" JWJ~ VICINITY MAP NOT TO SCALE MJ :T-H4 ~ Llfi}'- 24" qA ~--rof' W a...--.. .~ SI!!'E NMes ~, ~ 1l:J z,.' ~ ~ ~.,V"\ iHtS ~ J-HOOK VANe CROss-s~cnON NOT TO SCALE 1,I\It; ~ ,,-, \Jo~ ~ ~.P~ ~~ L-,~~~ ~q;;;. . ~~1.~ ~~ ~f$, ~~ ~ ~f2Ap tD le/'~ Rw1H. ~ ~~ 4, -ntts .~ 1 Of - 0 " S~1tM ~ IS- '- 0" s~ cffAN~CL IS-'- 0" 'S~ QJA~NEL IO'-C)" --.. (lPJIf_ 24': ~~~OF ~yz,~ ~~DM CHANNEL POQL NOT TO SCALE NIrZJ\:Fl _ ~ F*8.t:JL. ~ ~5";i116 ~/M=:1: CROSS-~gION m.~~ 'NU~THts ~I 336 334 T Min. Channel -Lo.Pth ... 3.00' 332 NOTES: 1. BOULDERS FOR J-HOOK VANES AND SPILLWAY SHALl BE VERY LARGE BOULDERS 0 1/2- TON MIN. SIZE de LARGER. J-HOOK SHALL TIE INTO TOP OF STREAM PANK. 2. J-HOOK SHALl BE ANGLED 20-30 DEG. HORIZ. FROM EDGE OF STREAM TO EDGE OF J-HooK BOULDERS, AND 3-7 DEG. FROM BANKFULL HT. TO STREAM POOL BOTTOM. 3. J-HOOK HEADER BOULDERS SHALl BE OFFSET UPSTREAM OF THE FOOTER BOULDER AND SHOULD BE FITTED INDIVIDUALLY TO AVOID GAPS. 4. CHANNEL RIP-RAP SHALL BE A MIXTURE OF THE FOLLOWING SIZES: CLASS l STONE CLASS B STONE (LIGHT) MED 13 DIA. MED 6" DIA. MAX. SIZE :20" DIA. MAX. SIZE :9" DIA. 70" MIXTURE 30" MIXTURE 5. CHANNEL SHALL BE LINED WITH MIRAFI 500X PERMANENT FABRIC UNDER RIP-RAP CHANNEL AND J-HOOK VANES. FABRIC SHALL BE KEYED IN AT THE TOP OF THE CHANNEL. PLACE MATERIAL AS PER MANUFACTURERS SPECIFICATIONS FOR CHANNELS. Ql0 '"' 522.10 efs SLOPE ... 2.12" d10 ... 1.79 ft. v10 ... 8.23 fps n ... 0.049 Shear Stress ... 62.4 Ilet · 1.79 ft · 0.0212 ... 2.37 II.t < 8.0 I/If B ... 30' 330 Q2 ... 114.50 ef. SLOPE ... 2.12" d2 .. 0.788 ft. v2 ... 4.49 fps n ... 0.039 (70" CLASS 1 STONE) (30" CLASS B STONE) Shear Stress'" 62.4!lct · .788 ft .. 0.0212 ... 1.~ I/at 1.04 I/sf < 2.0 II. (CLASS B STONE) 1.04 I/sf < 4.0 #/st (CLASS 1 STONE) 328 -'" -_._~ 'VI' eONTRO STRUCTURE :t55 LF C/L 324 TYP. CRO$S-SECTION THROUGH CHANNEL BEHIND lJAJ,I (NTS) , REVISION 8-1 ~TE: 10/2~/2001 322 VELOCITIES OF F'LOW THROUGH PRIMARY & EUERGENCY SPILLWAY: 2-YEM STORY: (Primary SpiJIwoy) WHERE 0 _ 3.2 x L x H MAX. WATER ELEVATION = 324.80 v = Q/ A ... 114.5cfs/40sf = 2.86 fps ~-YEAR STORY: (Primoty SpiJIwoy) MAX. WATER ELEVATION = 325.60 v = a/A ... 323.8cfs/80sf '"" 4.05 fps 10-YEM STOAW: (Ptimory Sphoy) MAX. WATER ELEVATION = 326.20 v = Q/A = 522.1 cfs/11 Osf = 4.75 fps 2~-YEAR $TORY: (Ptlmory ~) MAX. WATER ELEVATION = 327.00 v = a/A... 831.4cfs/150sf = 5.54 fps M>>-YEM STORU: (Ptimory 51111..0,-) MAX. WATER ELEVATION = 327.60 v = a/A... 1092.9cfs/180sf = 6.07 fps 100-Y[M STORY: (Bolh) MAX. WATER ELEVATION = 328.20 v = a/A.. 1448.75cfs/260sf ... 5.57 fps WATER SURFACE ....J W L ~ r3 320 LEGEND 318 316 )( ~ )( M SILT FENCE :J ~EDI"ENT BASIN ... TEMP. DIVERSION DITCH ~ I~ x w o ~~ ~ -=- C!J -: ;;:; ~ ~ n + ~ II ~ ~> .~~~~ - ~ ""':FP""..."j (11 -$ ~ 314 ~ DIRECTION OF FLOW 312 --330--- PROPOSED CONTOUR WS PB TES 310 1/3-PWP: (Bolli) MAX. WATER ELEVATION = 330.80 v = a/A ... 6585.4cfs/1 040sf ... 6.33 fps POOL BOlTOM TOP EMERGENCY SPILLWAY (/)CD :S:CL ~L.() L()N om .--0 tI')/'0 (f) :s: o o o .-- r0 N 0 to to o 0 r0 r<) SPILLWAY 'STABILIZATION PLAN/PROFILE BASS LAKE DAM 18+00 18+65.06 HOLLY SPRINGS TOWNSHIP OWNER: TOWN OF' HOLLY SPRINGS THO"~':~ A$$OCIATES WAKE CO. . NORTH CAROLINA ZONED- R-40 5821: HOLLY "SPRINGS RD RALEIGH. NC 27606 DATE 1/3/02 DRAWN VLti/RB JOB JL-HOL9 (91$)>651-1709 FAX~,t~) 8Q~'$2143 SCALE 1" = 40' SURVEYED DRAWING CREEK18 ..~~~ ,"c.> .: _,.'0: ,-; 40 I ~ 20 40 , , SCALE 1"= 40 . y REVISIONS PIN 0658.02-77-5872 ....J W ~ ~ , , 3 :j' '-' ~ " ~ ~ (J'l ~ ~ ~ 0;, tf\ ~8 ~ -..+ - '"' . ~"P""l~ ~,., ~ ~ (U wg ,. "'[.... __ 0 ;::: + " 1:5 II ~ ~, 0'- -- ...1"')' I", ~~~~__I ;~i\l ~~ ~~~ .;. d ~~;8d ~.",. ~~~J -'-- r .; .. ",. ~ '~ ""lIIIIIo.."-q,, ~ ~ (/) co (/) - ~a.. ~ ~If) 0 If)N 0 cien 0 ...0 ... ",,,, ", ~~'~:/'I' - /' ~' ~~ ~ C!f Or r (J G/~~ ~ . R\ / '1 s~ ..t.. ~ <;>~..".~ - -i-- ,~).. t ,,~ LV 11l'aoy q,~ . c ::'.t< ~ ce ~ ~. :L- ~ ~ ~~ .. ~J~I, r~ ~ f;:qctd;;/ d~ ~ c/trli/!?:)7/&/rg "'... ~~ ~.s,,"s -'>t'\ " ! ~ \ l?l/ .., - - rl J HOOK ~ ~OOK ~ POOL RUNI GRADE :t 1 0 c7f~- RIFFLE STEP-POOL SERIES ~--.;.... RIFFLE :t90 LF C/l CONTROL STRUCTURE ELEV. = 17.50 WS :t36 LF C/L :t160 IF C/l ~~~ %36 LF C/L ELEV. = 310.50 WS :t:55 LF C/L ~) S~ ($ Ji,j U /~ S.R. ~3 - - -- .- ~~ - h:" /;{j/ - ~, ~ __ 1'.....1." l..l J.d J ~'A _ '" -6;5s-:iJ./(E R~Q.------ _~- _--------- .~ --:---..~ 4'2'1' BRJ~E \ " - - - ~ 'JV ~ , '''F~~ ---R\ W ."..----. - - - - -,. .. - - - - ..........~ . ';,///$ ,!/' \7 -, ____ -, : / :f!tJT ~ '. M~ ~-;~"~.O' OBLIC , ~-:::-- -- --- -----, ............-'" ~~;~//," ~W I ' /1 I~ -l--- ~ \(;of "4 /---- t, _ _;- -/' "." _---- -. ..........._.,..- ,-/ i-r-L/ ~~/. ,~ ' L-- _ :f-"';;:j/ x.(n ,,/ ,I I __/ /.__----- '._, --- /- / ~r -i''7 ~ _ - --~' J J /~ lJ 1:-'\. .....--) / I f. /// "" ".- /' /~I /0i' I ~ ___------ / // / // ~~~ _.._--.-/ I I ,/ ".,--~ ", " // ~~~//,~.~/ ~//" I I ____ / /' /.., _--~...- Y I ( 11,('4" ,,, /" :+-,/g/~/'~''9 --.. '- (' (1-,;:,~-;~///// /<>~~\ ! (/ (I ( 1\ )~~ "\ ''-, ',,"--................... ~/ (f~/I@/ I, I -, ",' \ \ 1 ~ " /' ... 'L~ \~ - ----- / { I ,', / ~'I ;/\ ~ I __ ........ ~ >....... / .. -," \' k ~/ ./ ... / \ ~> '~\' t I \ \ \" ~.... / .,!-., 0 Ii / '/ \ I. , '" "\ \ \ ~ I~.......... \J. ~,\ (~ .J J. I \ \ \ "V rl"'~1 II 1/ \ I ~ I ~ - 1'-' " I I \~,/ -t · /' ,/ Q'( ^,Y I T I I \ \ - ":j.- In;j 01; N \ 300, <: ,,~ I I! (--r r-K I' / /' ~ j / 1'1 '1/ I" ~ I ))} ~i II " I /--"'""- "=1; -\I.-X -X-X-X_ -XL~: \, p~~ ~ ,~~Ol.. . / / Q:: l!/.. ~\~ ~\~~ II / ~~l.- _'(~ _ ,--2-~ L L--0-X-1c>~X"~X'--"7~/,~_, .1~~~ / I ~ ~~... ~. ~~~'~"\'~/' \ ,4 ~,.... . :r..,~ ' - --""-JtSe__"",_ ~ - ~ ,....;~ \~ wI>> ,I frOE DRAIN I ~ ~ I ) / ~~~\\~~'lI~' \ -~" r:"\ ,J '" Vf...I-\y", -..,.----.,.-~ ~-- I I.~( I ~ ~ (/) d / 11 ~'l~'" ' '. A4Y.'<' · ~ I.t ~~ r:\. \. ~ilI,"~=. .. v.)~ - ~ ---s:; - ~ ~ l'ft!/ C- -...-J., a... z ~ I B V1 ~) ) '~ ~ ~ J p:'e ~~~ ~ ")0 ~ ~a;- -"~It'"> ~,~~) ~ 0 ".' ~/III \ I I /7: '///,', ~/~~~;;~~A~~ ~L~~~~' ~T ~ t~- !;J:.,ti~"''-- ~\. ,~ ti/!/ I .........., \ Ii 35.00' I I 1 I I ,I I A~ ~:.;.>/ ,r/~ ~ -- ~ _ ~~ o~ ,,- ~ 0 · _. I '/11.. '\ \ ' I I 1"ll :/J, I Volnll[" ~~~~ "r--.....::::_ -" -....... ___ _.. ~- - ~ II JSBI' ',~X--rX-X-X-X-><+-+-I; -X~ I 11I111/'Ilt' I ,~,p.ra y' ..~__ y~. ~J--:~,;"..... ~-'-JI5 -__________-~_:====-- -.L~,... 5812/ I ~'xl - * ~) ...) .... I l \ 'jl)' 11 ,I, 'I, '(.4 ~IIII: ",""")'~,.'\'/V / -' // /;.W- ~ IJft ....--~ I -- I \ '/-1.' /',. r I~! I ~ o(~ ( I / ./ A~I/ .~~~~-. - ~....11 'r. '~l. ~l},Iri"'\" \ '"",' ,// !I/'-. . __ ___.....-______ :'~:ol...... ~_ 'r~.'3::'-- ---~ -7~'=~,'----:;:; -.JC , ~/ ~. ~ ~ J;'l' ff(\ \ / I /-._-f" -7 - .....JI=>" --- -.... ------ -- . . -- . , "./ ~ A ~, (~'\ '\ \ .4-,-- - - .' - -:-,... - - ...., ~"'I ./ I ~I'~:;). Z ,.( f'. ". '\ \. ~ _ - _ _~ ~ ....... "7' 1""\- - - ..0::. - ..... ~.../':'t'I~_ r/ '[.: ~ I ...... "r -~ \ ~ - r- IlJ: - - - - ~ ~v. J A 'I~ Z' ~, I bf-~ . - - -- - - .- . -- - ' , A ~ /iijj'~" ~~.. -' .4.~ ~.~ ~-;__= -~ ~ - - ~~~-_:.'-_ -~._~--= -I ~';"I ~I. o=__"..A"-,~~~ '-...----:2I'~~ fjfJfh~'J'l :.,....-"l ),-'~ .,,- - - - - I ~ \. '.W/),.,.,. ,",p--" ,- . :- ~, - ~ '<-"," >- H:. '-,17:', ~....._-~ ........... - m .... ~ ~ .". ~K ,~ :; . ,,': ";;::.- __ '~~~~ .j!, ,., .1 ,,~",:':::"'''I < bt' d."M" "fl" ,. ... "_ . ..,. Ii~, ~'j UI!Ili}.V ii!;{' r~ .'; it! ';"-; ~~ ,~~~; ~~'m1.lIlnI"'~\! , " - - \ 1r ( . ;-~~ ""~. iit~l!~~~~l~,~ ,~~ 2 ,09 IOF.'QC DAM · ., .-. .~. "ffio~' . .. .~~~ ~\! ,!I!, D ~ ~ . ~!mI'1':!~ thil,~,!.11i'M ,r, Y;>\....." ~ //'" ~ - . ....~ :-:': .:..~ ". \'~"'.J 'lit~r:~~~i,\~l\~!1'r~~~ ~-,.;... ,0''''''- _"_'1,: _ _ --,,_ ~._=-__ __~"/ _ + .,- =---~"-: ~ .... ..a,.....:"""'i \ ~ ../ .~ ~ .. ~ ..&~ . .. ~ ..>" ' t:~ . j\ . .. __ . .-;- ____ _ ..,.....-"- ~_ ..._ W!, , ~.. . ,~ ...... .. '. . ~'ml'''''''''' - - - -,... ~;;-- ------ - -'--"", K ^~1~:':'~':~. ~~~.:}"~:t ."'.~~:_-:-__ ;:.f-:~~ -- ~'="~ ->'--~ - 7'" -.'+ - ..,". ~ ->' "'~- :-:~. -;- ..,'''I\- ~~ ~ K ~ ..' ;':.~ '0;. :.: ~~~: --- ---,. ._ _ .-/~ _ _.~ - -- - .~ '..... ~ .~.......-.--: ~~~ 'fli1;~~ r "-..~~- -=:-~ _'~':.;,/.:- ------ ~ -,'~ - ..-::... ----.. - ,-'~ - ~\ ~\\ \,~ ,. "P ,,:../ ':::~~.::?- ~&--,/ .,.--'.' / ~ ..--.__ \ r ", '--::::~,,~ PIP~{30i.. dip) \~~\ \ \ \ ..~/~-.--" >"-~.' .. --..... ... Is --' ! RIFFlE/ GRADE CONTROL STRUCTURE %30 LF e/L PRIMARY SPILLWAY ENERGY SEE LONGITUDIONAL PROFILE. THIS SHEET. FOR SPILLWAY CHANNEL ELEVATIONS DISSIPATOR PAD ElEV, . 324.00 " ~ ...t\J ~ .....~ \C\ ....., " ~ ~ ", "- ~ w .....~ .....~ \r\ '" I I ! PRIMARY SPILL WA Y CHANNEL SCALE: 1" = 40 I - PLAN VIEW JJ6 ~ lA ~ ~ ~. ~I \ ~ ~ \ ~~ \ ~.\ \ i~ \ \ \\. \ , \ '- o o ~ ~ ..~ ~ o \ \ ;,1 at U) 334 .n ", ~ ... ",r'~ ..1/ ! I PROPOSED TOP OF DAM ELEV. ;I 331 .00 ,J II 332 . ~UJ UJ z 330 0 ....J o 0+ ~ 328 - a:: ~ ~ r-a:: 326 (/) , "I""'" :t:100 F C/L ELEV. ~17.50 WS ~ "\.~ -1 - 328.00 EMERGENCY SPI LWAY ELVEV. , ~ '-l'\ ~ I~ ~ ,,~' .~ ~ -HOOK RIFFLE -_. ~I.'" I v,.. mil'" SI E BOULDERS 36 LF C/~ ---, :t90 LF"""'C/L EIEV. - 310.50\ S J HOOK RIFFLE I. ,- -- ,'- .. V" mil'" SIZE BOULDERS :i:36 LF C/L l. PRIMAR.I RIFFLE/ ",-- S!!~~~ '( -GRADE f~.. ""V,. 'v ~ . TO PAD STRUCTU ~E " ~LEV. ~ 24.00 *30 LF C /L ~ I ~~ " g ~.5.~..... ~: !~ ~ _______ ,!~(7~ kU()~ ~lrRS' I ~.. g -~lc::, --'-. i , ~ ~ ~ ..~~~~ '\.... , II ~ ~'.~~.l.'"lr ~- ;Q I"': ~ "CI..,.;}f" ~ ,"; - ~ ~/ " ~ U ~ ~ '"""- .. ", .....J ;;;. ,.+ ~. 0= _ ~ ~~~ ~~.T J. T' 1: I.. ~; ;", .......~l~ ~ c~ t<\ ", ~ ~ ' '+ ~ is e:j ~ eI. ,";27,0- N .... UoI u" Z - ?' __ (/)....7 ~ ~~-~ C'ol u.._ + _I Q::: >-: 'I _ ~ ..... o::z~ . c '-' ::! ~ zwa.. VI UoII.I.I VI Vl ~ 324 .UU~ . t\j ..... ~ ~ 'U __1_. 5TEP-POOL SERI S :t: 1 60 LF elL 322 d.~ 0'?\V II --> I.o.! ....J rl ~w z~ o w~ 9J: :"! ~u ;; ~~ .... z:5 ~ .... ~ ~~ ~ IJ'l .+ n G:..: II co - , ", ~ . ~~ If) --- ~ ~ '^~~, : 1. '~':... ~ ...':. I"" ...,~,,4 ~ "'-"",~'~~ / ~ ...,,:~v- x -... 1/ e(..~{4-.0b / .. I iir. 320 ~ f, ~-; ~ -> UJ r-j \) ~' ~ 318 ..,; lJ..! ~ ::t If) C'ol ", ..... <:2 N t(\ ~ 316 + ... ,.... .... ~ 314 .... [.I \C G 312 ~ in ~ 8 VJ LlJ MIRAFI 500X M ~TTING KEY IN AT TOP OF CHANNEL. 310 (/) ~ (/) ~ a ~ - ", (/) ~ o It) "., - ", (/)CD ~a.. o If) NIX) "IItC'ol ... ... ",,,, DATUM ELEY 301. 00 (/)CO ~a.. If) If) IX)"" LOLO - ... ",~ V> ~ If) "" r--: ... ~ VlCO ~a.. o If) 1t)lX) ,....LO -- ".,,,, If) ,..... o en CD It) ~ ", - ", N ", ... N N I""') ,... o N ", 'It en ...... ", It) ~ ,.... ... ~ to I""') N ", ... ", C! If) N ~ 15+00 1 6 + 00 17+00 10+00 11 +00 12+00 13+00 14+00 ,/ PRIMARY SPILLWAY CHANNEL LONGITUDINAL SLOPE PROFILE SCALE: 1" - 40' HORIZONTAL 1" - 4 I VERTICAL / - ... C AN"'~L ~p.,,~ 1'W1~~ ~.4S, 1ft~ ~EeT ! - ... () ... . c;:) - > n+~e, He1'fpe:ll. ~st.. FlXTf1I:Il- ~Efl.. o c: Q ,I ~ .... )1 0' _I I I :J-:.~ ~ ~ ~ \-~~- TR1S ~ J-HOQK VAN' OIAGRAM NOT TO SCALE 10'-0" ~~ ~J'. - PLAN VIEW J~_.PIA. {llfl-M'P- 1l:Jf oP ~ 7f' '3-' ~~l;I~ I (?' - ti' I ~~ Clh4-N1'l1llL- 10'- 0" .s~ ~"- VICINITY MAP NOT TO SCALE I S' - 0 II ~~ af;4NNSl- Iff) j-H4 ~ LIq}'..24.' QA:)-"0V~.a" ~~~I ~ 70 -z,' eIIIiit~ ~'""" 1lfrS' ~ ' J-HOOK VAN' CROSS-S~CTION NOT TO SCALE 10'-0" S~JtM ~ IS"' 1- 0" IO'-~" .sT~ &+* STPSiA^\ cHIW ~Ct- IS-'- 0" 'S~ CH~~Na.. ~ ".~"..........- ~~~~~ CROSS - SECrlON ~~r ~~,}ItS ~~~'. ~~-rl!P~St1tT~ Tl1~ - '~ CHANNEL POOL NOT TO SCALE 336 334 ..~ "':;' ~Q,..'" ... '(I' . ~ "'Ij ~\ /kA..-~ Q2 - 114.~. I ~ t:;.rk~' SLOPE · 2.12. ';'I',~l/ d2 - 0.7. It. ''';, (jAr l/2 - 4.48 fpe '0, ;'/f'/^!" n _ 0.038 (70. CLASS 1 STONE) ,1/ /'-, "I. (:SOX CLASS 8 STONE) _tU~ "'lfl.,.. Sheaf Stfua - 12.4J/cf · .7~. .... O.QZ~. p-,,04 11"~or.. ~ 1.04 '/It < 2.0 ,/ (CLASS; <~ .... . /r(,jj / 1.04 flit < 4.0 "'" (Cl.ASlI ~/'/~'I.. " ?O, vI: "'0:'/, I?.J Q10 . 522.10 ef. '/>to,l)", SLOPE - 2.12. - 'r,'l,.", d10 - 1.7t ft.'I,t"!''!> l/10 - 1.23 fpl ""YI'I,I"I . n _ O.04t ,'}11; Shear S~ . 12.4 lief · 1.78 ~ e 0.0212 . U7 llfAlIe 1.0 "" , 332 NOTES: 1. BOULDERS f'OR J-HooK VANES AND SPiLlWAY SI-W.L BE vERY LAAGE BOULDERS 0 1/2- TON "'IN. SIZE "LAAGER. J-HOOK SHALL TIE INTO TOP Of' STREAM PANK. 2. J-HooK SHALl BE ANGLED 20-30 DEG. HORIZ. f'ROlot EDGE Of' STREAM TO EDGE Of' J-HOUK BOULDERS. AND 3-7 DEG. FROM BANKfULl HT. TO STR~ POO\. BOTTOlot. 3. J-HOOK HEADER BOULDERS SHALl BE Of'f'SET UPSTREAAl Of' THE f'ooTER BOULDER AND SHOUl.D BE fTTTEO INOMOUAU.Y TO AVOID GAPS. 4. CHANNEl. RIP-RAP SHALL BE A "'llCTURE OF THE FOL1.OWING SIZES: CLASS 1. STONE CLASS B STONE (UGHT) lotED 13 DIA. lotEO 6' OIA. loIAX. SIZE :t20. DIA. loIAX. SIZE :tt. DIA. 70" "'IXTURE 30" ""XTURE 5. CHANNEL SHAlL BE UNEO WITH lotllW'l 500X PERWoNENT FABRIC UNDER RIP-RAP CHANNEL AND J-HooK VANES. FABRIC SHALL BE KEYED IN AT niE TOP OF THE CHANNEL. PLACE llIATERIAL AS PER IilANUFACTURERS SPECIFICATIONS FOR CHANNELS. TYP, CROSS-SECTION THROUGH CHANNf'v- BEHIND ()AJ,I (NTS) . Rf:VISION 8-' DATEs '0/2&/2001 330 328 - . -- CONTRO ;':~jCTURE %55 IF C/L 326 324 322 VELOCITIES OF FLOW THROUGH PRIWAR't ct EWERGENCY SPILLWAY: I 2-Yl'M SJOftW: (MnarJ ,....,) WHERE C - 3.2 )( L )( H MAX. WATER ELEVATION - 324.80 v _ CIA - 114.5cf./40.f - 2.86 fp. ~-Yl'M SlOlM: (PrImorJ ~) MAX. WATER ELEVATION - 325.60 v _ C/A - 32J.8cf./80.f - 4.05 fps la-YEAR STOMI: (PrImoIy 5oIM01) MAX. WATER ELEVATION - 326.20 v _ O/A. 522.1cfs/110sf - 4.75 fps B-YEAR S1OIU: (Pr~ .....,) MAX. WATER ELEVATION · 327.00 v - O/A .. 831,4c:fs/150.f - 5.54 fps &a-YEAR SlOMt: ~PrImoIy ~) MAX. WATER ELtVATION .. 327.60 v .. O/A .. 1092.vc:f./180.f · 6.07 fp. IOO-YEAR STOfIlt: (loth) MAX. WATER ELEVATION - 328.20 v - O/A .. 1448.75c:f./260sf .. 5.57 'ps 1/3-PWP: (lot,,) MAX. WATER ElLVATION - 330.80 v .. O/A .. 6585.4<:f./1040.f · 6.33 'ps WS WATER SURFACE P B POOL BOTTOW TES TOP EWERGENCY SPILLWAY 320 LEGEND 318 M M M M SILT FENCE :::J ~EDlIlENT IIASlN .. TEMP. DIVERSION DITCH 316 314 ... DIRECTION OF FLOW 312 _ _ 330- - - PROPOSED CONTOUR 310 N co o ", ~ tJ ~ ~og ,t)? o ", 18+00 18+65.06 SPILLWAYi STABILIZATION PLAN/PROFILE BASS LAKE DAM HOLLY SPRINGS TOWNSHIP OWNER: TOWN OF HOLLY $PRIN~ 40 l 9 20 40 .~J J ~ SCALE ,.- 40 ' J THO"~" ct A$$OCIATES WAKE CO. 5621 HOLLY. SPRINGS RO RALEIGH. NC 27806 DATE 1/3/02 (919) 851-1709 FAX~1.~' 8~~7143 SCALE ,. .. 40' ~. i,: ;.,,... ZONED R-40 DRAWN VLH/RB JOB JL-i1l)L8 SURVEYE;O DRAWING CREEK 18 PIN 0858.02-;'7-5872. . REVISIONS - --..--..--- -_._~- -. .--." C5 0./ ~. K~ ~ a (y( I~tz.pd~ . A~ . .5~ 9..z;_ ..~ ~: t. (i~ (!-;; heavy qr~ c,t.:;~4;i 1: "l;. ~_ 3- _ ~ ~ ~~ ~1,Jl,.~ 0~ ~ b,ckt/l d~ s.-~ c!rr/~:>/q/rs :-~.y~ ~~<? s ~ ~ ~ ' ./ ~ , _ rL_ J HOOK ~ ~OOK ~ POOL RUN/ GRADE '912jl'nY - ~IFFLE STEP-POOL SERIES ~--;...., RIFFLE ::t90 LF e/L CONTROL STRUCTURE ~30 LF elL EL~'0 ~ _ ~1 ~~5LO WS :t:36 LF c/L :t: 160 LF C/l ~~s :t:36 LF C/L ELEV. == 310.50 WS :t:55 LF C/l ELEV. == 324.00 ~ ~ ~) 5~~ JiJ r!.Y~ S.R.1393_-0 --__ ->;;.~ - ->- _ ~/-'fj/ BRJ--E _____~ :' ~UJt1J OA /b~~~I~~LAKE ~~-W'C----:::::::;:':-':=:'-- :-:.---::-::--- / --;:-:--- - _ ~----~, #/' \ .~} ________ J ~ ~ BLIC R\ r _~-.-: -=::--- ---- -.:.." -:,f!f '-/ - , - -; I,' ~~~-L.IIV .1I",,1.J --'-6~O' pO :....__,~-::::--,.-- - -'...... ~~.--"_..... ,..~"j::!//jA'/ /~/. I" , _I-r-- ./;:~"'V' f.- I.(;.r'''' // _ -- -I / ,/' _ - - - - -... -- ,- .,' v- ------ '" -r-- . ~l/ /,;p' , _ ~__) /x' (iI / /' --- . I I ../ /'.... --...... ""--'" ---- :+-" /A ~ 1" q, I _ __~,-- J r //~..)r;-~1(\~---- ~ / I ~ /// ~ " "" /".......- ..1/ r~ ~~/~ ~ _ ____ / ,,/ / ./ ./ __~ .__"- __ I " / v--............ ",,, ./ ~.r // ,,,' / ~ /" I I ---- ~./, // ;~ -,.........----:..,/ ~\~'~ I I (' ;' (/ C~ ", "', '''. --- /" ",-+-' /'~./:'// ~ //;."9 I I / / '-'<: L..- ,/7' a.if'/ // - ,./ s~ I I I I )~ "" ". ",'-_____.......... ~" ~"I @/I ........, " ( 0\' /.,.,..- ~ K' / /'j - ./ -- ,/ ,0 \. ~ .- -.., { ( (\ "., /' 1"" //. (. /~ ,I; / /\ ~ I I =- - ..:::., D""';" / I'. )- k ~.... . - " / \ ~ P..- -~. l I r \ \ ' ,," I ~..1' .... / 'I -- 0 / / I '/ \ I . . _ -.. ......." \ \ ~ ... \ ~ '" ./ ..- \J .\\ (C " J).I J. \ \ \" 10"" ' r 'r2'{(J // / / \ I "4J I ~,,~~,,\,,' ( \ I \)/ J", // /v' ~-f!t[... f i \ \ \ - \ ',~......-f-' tn;y~'~:/ \ 'DO. I ~ tj ~"~~)I)/?/(. '0/ ,/ /*<'-r ( ~ -----~-0 i :t;~~~i~ /......r ~""'~~.u1{F) i"&~ I ~' n II) /~I!I / / I C-,-~ ':=1~ _x-xI-K -X-X-X-X-xL \: \ \ /~ ~;~~... ~ ~ ~~If'~; / Q:: ~ I l\\ J Idil/ V / ~~L-~",~~ ---2-- I ;j<-0-X'"\:::J ~)(-~)('-7:::;::::::;-: .~ ~ i-~!, .;.... 'f' / I ~ ~~" ~\ ~\~,,"\ }\' \ ~ ~._\"" ~-"'-315-__ _ ~ ~~~... "; 'Ai. ~1 I fTOEDRAlN I a ~~ I ) 1/1 \' ~r!i)"" ::-..... "I \, -""""- . ,--.. v """"'\YI ,.~ - "'I' - - - -.,.'"\.: ~ ~". ~ 1";;'/- "1 / ~ I ~;:z (/)L5UJ I / \"" ~' J'\ \ ./ I. ~\...\~,. 6~ '.. .-:.~..... r I' --J lo...l.... W Y/ .;", ~I \ 1 '\ ~ \ yo"" .1 . .... ~~~ CJJ.?'=.I4f~ .\~~ \. ~n,.t. ~\ .--<fJVt) 7,i'r1:L.1L'L l' Ai ~ ~'1/11 '\ \ I I ~ I II 1/ ".4 I i~ ""~'.-~J . \ .. . ~ 03 L. ~\. -~"'. "'./- ...... -...,;: == -cI"..l.!.. ,p ..... ~ ,1/1, ""-- \\ Ii 35.00', I I' r / ~- .' /' V .~-:.,..1 ~ "'^ A 03 ' ~ v ~ .-> . I , I'" -I I I I I f' I /4~~...,L: ~/ ,o:."/"; \ --.;:_ . o~ :---..",' ,f?-;',.O' ':'" _. ,.,.~ I 1'/ '" '\ \ 1\ I 1,1 ~.~ A,. (J",,,.' \<j,' -::;;..,.-'_ ."'. '"'"-L: ~ II w 'sal1'" ____X~X-X-)-X-Iv~" -X-J II '~1. / / / II ~~, "',._ ~ -~"'''' - 5812 'I ~ \ ,.,.. I ~/~ i '111~t I. /~~ ''ftiil~>j~' V .,........ .!-;",x;' -~315 --.------"--=====-- I ~ - /i' ~~I, - '" _~ ! - , - I J\ ~/'" " / j ik1j."t I · ,,; '~v, 7-~; ,,-I( / / //-lr;,oJ?/', ,- ~ . ..-' - .-- ~"''''''''''-~'''- -=' - '\1~ I ~'I ,.,'. . '1j'}9 '"i~~~\ 1\ / ! {--./ 'r-I'- 'F ~315- - 'j- ----== -~---------'.~,'~'''''''' +- _ .... _ -. .....,' V Y : :~ ['.} . '~~.,-"VJI'r/.;:t::r:' ~ .'\ \ \,-~d. ~f _i-- " ~ - _ - . - ::- - . -' ~- --=:~ ~ -- - I'I~-;; 'A,~"..'j:, ?)~I/r'~ ~"'""--t"QE-.---r-Ti'7,7"WJIll:., - - - - -' ---- ,~~ J ill, 'I JI 'fj , ~ ' I J.d-' J9~~ " - - - -.. -- ~ ..... - _.- - ' ~ ....... ~.~'J. 11. '>.~_,'i.:J':..t--:::~ -r '. -~ .-- - - -- - ,__ - .- -.--...:- - ~H' ~- -~;;;..,.::,-:;::---...-....t'I~'" "" . ..::-:-_-~ I, -= ~~~.~~..:.:; ~ ~, ~~~~~--\ 1--\ -.( -4--:_~ ~~...-:: ~ =-"":;.....~...... _' ..=-:--.n:;.: _ _ 'I ,- ' I' I I, /~.,.,. " If I .' ~~~~ .' --- . , -., _' "I ....... ~ 'A(j7/V'..-7 ."~. _ -~ _ - . -. -. .-' . - ..--:'_:'-:= ___---'"" -_~.....~ -:,,_"'-11:: ' "-I-..t..j .........;~-=: ..&!~ i ~I ~ !'flil .~ " \-~ ~~_ ~'-c .~._:.,""':~~ ~~. ~- - -- -, '.". ,""'^"; O({' ~\;'I' " ~ ....,. ,-.' '0(.,....,: ':i.li'''''W' ~4 r If '. ~ \ I,r :.~:' . . ,~ .:.~; -~c "-:-',:-,., '1' ',<\r"i\..;.;,:~~::..~.....li.;:;:\~llii;!;till&iil;:-jl~~~ ~~ ".)'j " .",~,t:U:'i mi~ l~1~~M~~K~ ~~d}t~il,\l~...;:;~' fl'~\l h~~'\'l11' "..~ .., ' "':" ~.,~~~~,~~~ . 'j ;~'~1!~ .~~\ ?{ --- \ . ,'. ,.. "" ,.,.. . ','..1'( ;;'~j.',i\"" ~jL,,!'~J' " ~ ti~~ ...,' '~.. ~ ,a,rn.....' l i ~ , "'" ."i: - :.:..~ :'t. .~..~ '~~.\ "~"""I;O~ .:;\v\.; ;/~;;.Pij.:,p~.t;;"':'-:::'l:__:';'j':;... ~".,-:-~--.. ,. '.L"_ _ "' A "''''.'.:.- ''':--=-_..... ...--____..J.-/-- ,+ - :--.~-:. ~:...-. ......... '. .../ . ~ ~ ' ~ . .,or 11'~ ~}7'."., - . ~... '- - -----.. ~7--'----__- .~- .'- ._ '... . . .. . .' , \'~I'M""" ,- ; r- ;;..--" ~- - .- ,_ -=- ------ - -- -- - .... - -d...~, ~ ~. . ;..".-.~.~~~. '~'i" ., _ - - .---:0;;>- - ." - .' '- · ."....-"r~ ." · . -n. ~,", " ..... . - - ~ .~\ J. ~Y:'fi~ :..:~' ::,,";.\r." ,.... .' ...--...... ........-~ / ./ ..- -:: - - __ .....' ."'~.;,..-;: .--I-{ \' ......7' .-\-1j::-.; ~..,,:; - ?--..; ",,<:,. "I ~~.......':."- .. :.-t" ;.rJ, '!)~ ". ~ 1:i1.. ~,.. . . ~ ,,-- ?:.~ ;.:_ -------' . ~ ~ -:.-rD- .T - .- ~.'-,,~ ~~~~---- :)0t:~?:=c~~:,~// 7~ ~~;:-... - ~~~ = - ~ .""::-':',;,, PIPE :(3~t.-t) ~ '~~'\'~ .~ 4~~""'~ ~)F" / /::-?-~ _--~~:~~/__"'7/.' I " -~= ,~,~ ~ \ , \~~ \ \ \ \,,~ ..... r-..Ai" ~,;::/ /~...::.z. / ~ ' .' ;...-r-- / " i ...-- -... , ),-.y/ '//I'-~' '- . - Is PRIMARY SPILLWAY ENERGY DISSIPATOR PAD RIFFLE/ GRADE CONTROL STRUCTURE SEE lONGITUDIONAL PROFILE. THIS SHEET. FOR SPILLWAY CHANNEL ELEVATIONS \ , -, " ~ - -- PRIMARY SPILLWAY CHANNEL SCALE: 1" = 40 I - PLAN VIEW ~ ( , ~ ~ 336 I'~,;I~ ..1/ , . Ol CD 334 Ll) I") I") \I 332 . ~ UJ~ 330 0 ...J o 6~ 328 ~ cr ~.~ 326 (/) PROPOSED TOP OF DAM ELEV. .. 331.00 t -,... '- ~ 1\:" 328.00 ---, _ , PRIMARht RIFFLE/ r\j ~.. SPILLW.l Y GRADE ... . "r-~'''''''''''''' - - ._- ~ \ .~ -::':::TO PAD STRUCTURE i'>-. ~ ~LEV. ~ 24.00 =t30 LF C L III ~ i '~: , , g~,5~<>? ~: ~ ~ ________ _.. :S(Z~ bU~~ ~1~Rs' I II g ....~I _.-~ i ..; ~ ~.- .~~},., ~ ~ ,,~ :;. '" - .~- Q --. ;.. - '" .' q .;i: ~ .~'"'.:;~ ..... i't'., ~ '- ---~; '^~~': $)~ S:'! rl. ...J ~ :"or'~" . + + I' ~ 0= _ ~ ~~ ~~T 7. y---r A.l.~' ' ~ ~ ~ I~' ..... u:; ", " I") ......ilIlt.....~ 1 --~ ......!!I~ "..... f8'~ "'" .- ~ ,,-.. r ~ ~ .~ . + ~ C> ~ II ~ ~ l' I~ ?Jr..?4 ~,~~':-..... [II :: ~ c;j - / ~ ~ ~ ~ 0.. lJJ ...J:J :-! e(. ,';27, D ~ -- ~ .. ~ 7' : ~ '- ~ 1/ e((;:;t4', 00 't( _~ / .. I . (:) 0 0..0:;--.. ~ w .- <C~;c VI L.LJ N u- ..... MIRAFI 500X M Il.TTING I + _, ~ >- I' 'J ~ ..~~~"nY~~. ~ 0:: Z ~ KEY IN AT TOt"' OF CHANNEL. . Cl(:).-J ~ zwo.. VI WLl..I VJ (/) ~ (/) ~ o o I") ~ I") (/) :: Ll) ,..... o .- I") EMERGENCY SPI LWAY ELVEV. J HOOK RIFFLE . J~ -- ... '.1. If. \011' IV'I' ". SIZE BOULDERS :t:36 LF C/L ~TEP-POOL SERI-S :t: 1 60 LF elL U HOOK RIFFt..E > j,.., -- .. '-',"" 1\011' lYlII", SI E BOULDERS 36 LF C/,L -"'''' :t:90' LF-"C/L ELEV. - 310.50 \~S - .. I .._ __ ,... -. - .- r.ONTROI STRUCTURE %55 LF C/L 324 ~ l& ~ ~ \f\ I~ \,\' - - I '"i""'- . J :t:100 F C/l ELEV. 1317.50 WS , ~ 324 , . urJ'70 322 ~ , ~ .c.. ~ o ~ ~ ~7 ~ Ll) N r-r) ~ ~.~ 0'9V II ....;. l.J.J -l ~ ~UJ z..c... o UJ ~ ~I ~ P::u A ~?;;: ~ z~ -; .~ wo.. rn mch ~20 318 316 ~ t-,,+_ ...... ~' :-~, '- l!' N" '"'J ~ ~~ ~~rY 314 o 312 ~ 1/'\ 310 DATUM ELEV 307. 00 (/) 3: (/)CD ::0.. Ll)Ll) CX)I") Ll)Ll) .- .- 1")1") (/)CD ::0.. OLl) NCX) -q-N .- .- 1")1") (/) :: (/)CD ::0.. OLl) U")CX) I'Ll) .- ~ 1")1") Ll) I") I' .- I") o Ll) I") .- I") en CD Ll) I") I") 1.0 I") N I") .- ..... N N r") ,..... o N I") -q- 0'> ..- I") Ll) to I' o Ll) N I") I") N I") .- I") 16+00 17+00 14+00 15+00 10+00 11 +00 12+00 13+00 PRINIARY SPILLWAY CHANNEL LONGITUDINAL SLOPE PROFILE SCALE: 111 - 40' HORIZONTAL 111 4' VERTICAL =-~ '" If;; -...' x _........ UJ tr\ ~8 , i=\ . ~ n_ (\~ ~ ... ": 'U UJ 52 o T"- '- o -I- ..;;; ,. .~ -d II _ -+-......... .. I W U _ / /~' .....~ '+ d-' '~'l~5I)d 1T~~ ~ ~~ .L- -.... r ~ -~~p-~ (/) CD (/) ::0.. ~ -q-Ll) It)N . 00'> .-0 1")1") ... ~ ,~ ~ ,~ \C\ ......., ...... ~ ~ "- 0.... W ~ .... ,~ \r\ '"" ... ~ N N\ ~ . ~ ...... C AN,\&G:L. ~p.~9'r Vtrs. ~..}~ I .~ ... - ... () ... . ~ - )1 -nt~q ~~ac. flX:1Tli:Il.. ~~sz. o , Q " (;) .... ~r 0' _/ I I ~>><<*- ~ 9ie ~ r~L 1ltt$ ~ J-HOOK VAN' DIAGRAM - PLAN NOT TO SCALE lOf_pl' ~~ 6h>1'- VIEW 1~~'4tp,A. ~MP- ~ tJF ~ 7f) -z,.' ~~l;I~ I?' - d' I ~~ ~NIIfL. I d... 0" VICINITY MAP NOT TO SCALE ISI - 0 II ~~ &l+ANNel- ~~~ :5I!'E 'I 1l1tS ~ ~flMi' tD 1&" ~ ~~ ~4:S 4, I.J~ ~ E~ ~~ ~. = ~, ~"..-r 10'-0" S~JtM ~ IO'-~" .5T~ s-t/Jt'. 1~1... 0" IS-'- 0" s.~ Ql~NNEL ~ \ SW.6lA~ c.ff~ ~tSL ..- MIIZMf _~ ~~. ~ ~1fi!iJ1lJ6 ~~ CROSS-SECTION ~ ~fZItP ~~ '1Wf~THts ~I (If) '... ~ ': Q,Pti):i-rt!P~rI_-~ ~~ TZ1~ BiJt.. '~Pl'1 a--~ CHANNEL POQL NOT TO SCALE --\ 336 334 332 NOTES: 1. BOULDERS FOR J-HooK VANES AND SPillWAY SHAU. BE VERY lARGE BOULDERS 0 1/2-TON WIN. SIZE. lARGER. J-HOOK SHAll. TIE INTO TOP OF STREAtoI flANK, 2. J-HooK SHALl BE ANGLED 20-30 OEG. HORIZ. FROW EDGE OF STRtAM TO EDGE OF J-HooK BOULDERS. AND 3-7 DEG. FROM BANKFUll HT, TO STREAM POOL BOTTO", 3. J-HooK HEADER BOULDERS SHAll. BE OFFSET UPSTREAtoI OF THE FOOTER BOUlJ)ER AND SHOULD BE FlTTED INDMOUAU.Y TO AVOID GAPS. ... CHANNEL. RIP-RAP SHAW. BE A WIXTURE OF THE FOLlOWING SIZES: ClASS 1. STONE ClASS B STONE (uGHT) MED 13 DIA. MED 6" OIA. MAX. SIZE :t20- OIA. t.IAX. SIZE :t9- OIA. 7011 wIlCTURE JO'J WllCTURE ~. CHANNEL. SHAll. BE UNEO WITH MIRAFI 50QX PERIootANENT FABRIC UNDER RIP-RAP CHANNEL. AND J-HooK VANES. FABRIC SHAll. BE KEYED IN AT THE TOP OF THE CHANNEL. PVoCE MATERIAL AS PER IootANUFACTURERS SPECIFICATIONS FOR CHANNEl.S. TYP. CRO~S-SECTION THROUGH CHANN{L_ BEHIND DAJJ (NT$) . . REVISION I-I DATE: 10/2&/2001 330 , Q2 - 114.50 . SL.OPE - 2.12 d2 - D.718 It. \/2 - ".48 fpe n . 0.039 (7011 CLASS 1 STONE) (JOX CLAS$ 8 STONE) Sh.af Streu . 12.4JI'f · .718 It - D.Q212 .. 1,04 1111 1.04 1111 < 2.0 1/ (CLASS I STONE) 1.04 1111 < 4.D 1111 (CiASI 1 STONE) 328 326 Q10 . 522.10 ct. SLOPE . 2.12. d1D - 1.78 It. \/10 . 8.23 fpe n - 0.048 Shear Sn.a . 12.4 lId · 1.78 ~ · 0.0212 . 2..17 1111 < 1.0 1111 322 VELOCITIES 01' FLOW THROUGH PRIUARY -" EWERGENCY SPILLWAY: I 2-YEAR S1Q8U: (PrImary ~) WHERE C - 3.2 x L x H I MAX. WATER ELEVATION - 324.80 v . C/ A . 114.5cf./40.f · 2.86 fp. ~YEAR StOMt: (Pr'.mot1 .....) MAX. WATER ELEVATION · 325.60 v . C/A . 323.8cf./80.f - 4.05 fps IO-YIM STOMt: (~ ~) MAX. WATER ELEVATION · 326.20 v . Q/A. 522.1cf./110If · 4.75 fpl M M M M SILT FENCE :J $m,lj(HT - ... TEMP. DIVERSaQN DITCH 320 I. ~. ",\ ~ ...J UJ IZ ~ I~ (:) 316 B-YIM STOIW: (Primofy ~) MAX. WATER ELEVATION · 327,00 v . Q/ A .. 831.4cfa/150.f · 5.54 fpl OO-YEAR STOIW: ("~ ~) MAX. WATER ELEVATION · 327.60 v . Q/A .. 1 092.9cf./l 80sf · 6.07 fps IOO-YIM StORM: (Iolb) MAX. WATER ELEVATION · 328.20 v . Q/A .. 1448.75ctl/260st . 5.57 fpl 1/3-PWP: (....) MAX. WATER ELEVATION - 330.80 v . Q/A .. 6585.4<:f./104O.f · 6.33 fps LEGEND 318 ~ (Il 3 314 ~ ... DIRECTION OF FLOW 312 - - 330- - - PROPOSED CONTOUR 310 WS WATER SURFACE PB ~L~rrOW TES TOP EWERGENCY SPILLWAY ~ HOllY SPRINGS TOWNSHIP OWNER: TOWN OF HOLLY SPRIN'" THOMPSON'It ASSOCIATES WAKE CO, NORTH CAROUNA ZONED' R-40 .' ... .. ~.' ... 5821 HOLlV, SPRINGS RD RAlEIGH. NC 27606 DATE 1/3/02 DRAWN VLH/RB JOB JL-H0L8 (919) 851-1709 FAX .~~.t) ~~143 SCALE ,.. · 40' SURVEY~D DRAWING CREEK1S ~ -0', ~og,~ o I") N CO o I") SPILL WA >1 STABILIZA TION PLAN/PROFILE \ BASS LAKE DAM o .- I") 18+00 18+65.06 40 I ~ 20 40 --: ---l. ...J SCALE 1 ". 40 ' J REVISIONS PIN 0858.02-/7-5872. ------ - .... ~ ~ U) U) V) P -0 V> ~ ~ ~ 6~~ U) U) U) 0 -; 3:? ~ ~ ~ ~N~ ,., ,., 1"11 ~O::o -; -; ~ r-<:); U)rr,<: Y> OJ c: U)~ rr,M rr,::o U) :r:o ~~ -;U) oV> I I (X) V> ~ ~:::I 00 I~ (()~ U) d:r: ::oS N(f) o <:0 rr,1 -0'1 ~d <:::0 :::I <:U) (;)'"0 o~ [ri:5 00 3:?o '"00 :::!<: OU) ~;ti ~ c: .00 c::::! ):;0 <:<: :::!):,. M<: (f)0 o 0 I I - (.., d d I-~ ::0 ::0 OJ U) 8 ~ I" ~ '"0 ,J (;) ~ " ):,. <: <: l' .,i o ~ '\0. o ~ k' o ::0 <- ~ (;) (. \ ;ti ~ '11 c: ~ ?: () ~ ' :::I r o 0 .:1 <: 0 .c <: <: ).. O :::I :;11 <: (,) :-f 1"'1 ~ ~ ~ VJ -.J 1"'1 ...;;! 2: o ;;2: 0 \) I '" 1\ C)~'"OC: I"Tl -l ~ '"0 <.n /'l"j ""V '"0 ~~~~ - "'-<: lJ ):; [1'J N ::j n:t <:: 0 ~.. -; <: -; <.n ~ fIl P.1 ~ -::0 00 \j U)~(J) :r:....._ 1"11'0 ~u)<: I) (J)>() ,()O .......f11<: '- O;ti ~O or- g~ <OJ -3:? 1'11.0 ,,) . 11'"0 ~~ o~ z:<: ,~ ~-; f11U) I)~ l);:o z- -1~ o <: r- -< d~~~~ ~rr,rr,~1"'1 '. ~ (.., t\> ~ ~!.:-",!\).?' ~ 001....... (.., (..,-(() o 'J~cn o ()()(l -< -<-<""'" ~~ ~ ~ ~ o -'I....... ~ 'J(X)((l ):,. ):,.):,.)> () oO(J cD en \.0 (:) 4"', ca ...... ~ <0 !:x> ~:!J ):,. CJ r-- r- <: ~ or- 00 g~ or- P - I):-f o:::! S;~ ~~ <:); ):,. r- ):,. U) ::0 U) U) ~ ~;:c ::E r- v>::b /'l"j r- . r- r--_ r- r- <: ...,.. ):,. 0 o U) t: -; ):,. 0 OJ <: rr, rr, -<::0 o s~ ra ~o o ~~ V> ):.: r- ~ :::I):,. o 0<: <:0 o ::0 ~o o :t (i) _ -'"0 (J) <: 0 () '"0 ~ ~ ::0 r- ~ ~o tj ::0'" -<f'l ~ ~~ d ~:::I rr,<: ~ OJ (;) r-' tj OJo ):>. ::b <: (;)-; ~ ~:r: 00 o -c: ::0 <: V> (;)rr, ):,. ::0 ~ Y> f'l~ X (j);ti :::!fIl <:s:: (;)rr, U)~ :r:::o Orr, ::0 ~(J) ~~ rr,r- r- tjOJ (;)rr, f'lc: V> f'ltj >< (i)~ :::10 <:'"0 (;)::0 COO c:o:! ~() rT'j-; ::0 v>~ -;(j) 0:::1 ::0<: fIl(;) ~;ti ~~ C:co <:c: ~~ eSl ::0):,. CO::o ~~ (J) ):,. r- o <: (;) 5~N~':!1 (;)G)o<:o 1"11<:0~ 1"T1::-1[ri r- o):.:~' CO (;):::1 1"11'"0 -0 ):.:0 ~<:~()~ ~. co::o:r: -; ~~~~I 0- 1"11 ~~~):.:'"O o <: tj <:~o~[rilf- o:;:l~:t:-f 0......0 ::0 <:~ ~); ;ti ~~ ~ :::! <: o M~N r-o::o 0 OU)-'::::<: ~;o n:i[ri CO I"T1 :-i ~ . :::o::!:!o~ oco(;)<: 1"T1rr,0 ::0):,. v> :::0-; 0'"O~ r-OG) r-_~ U)<: ~.~):.: U) ~. :::! ~~o ()):;<: ~:::I 1"T1~~ o ):,. ;:c;tio PfIli; :::o~ () ~(J)~ o:r:-; o~r- oco- a ~ r- d~~ ~rr,rr, r- " ~- I (.., 01 S1l 0) (.., 01 o -< -~- :-" ~ (X) 0 - (.., ):,. ):,. o 0 -;"lJr-o o::Of11c: :::oo~-; rr,:::or-~ S::-;or= oo.."r- '" 0 rr,:::Of'l~ "rr,~U) rr,1U)):,. (;)::!:!:::!...,. 1"11r-<:""- );!C:(;)o 6~s;:;ti <:o~~ ):,..."rr, <: co'" 0~0~ U):::jf11 ~U)o);! rr,s;:s:::::! ~~c....0 <::rr,C:<: -; U)-; -;0 ,.... . . ,.... ,.... . ,.... . ,.... ,.... ,...,-..r o o Vl () )> r fTI o "' 01 o o o o o ........ tv o o "'-",- "'- "'- 'i~' ... \\~- , , ... , , ::0 ~ en o Z Vl Vl ~ r fTI ~ ~ ~~ w~r.n ;;w~ ~ tJ:JO . ~ ~ r~~ ~I-r--....> N~Z ::r>~ ~O oZ Z~ WtJ:J ~~ OW ~ ~~o ~~t;j Z~~ ~ () o I o ~ ~ :u Vl C ::0 < ~ fTI CJ CJ ~ Z Z o ::0 -f I () )> ::0 o r Z )> o ::E Z ITl ::0 < r I ::!! Z o Ol 01 (Xl o tv I (Xl (Xl I tv o VI VI C- o rn Z ~ CJ ::0 )> ::E Z G) ~ Ul o < rTJ ;0 )> r r N I o 0 z r-f ITl r-< 0 CJ ::E VlZ "'0 ::0 ::00 I Z-" ~ G) o Vl C- r I I o r (() "'"'''''' ", -..l1^ A/', " t...\O.:Jf \ I V0 " ......~~\-:..OOOOOOOoo VL\.... ... 0 ~~oo 'T:l., , ~ ~ ~~, fff'l 0 l\Y~ ::r: ex> :0: :: ~ : >: :.;. U ; ;0: ... 0 00.. , 00 .1........._ --M 00"" .. , 00 . .......:uJIi.P : 00, ... " 000 ~oo ~\." ~... .. OOoo~ ~..1 \.~ ,~ "" R """ ".11.."" \ \ \ . ~~ii -<m sa~~ . azCD::J: Z 0 f,l ~ sa :::u Z a en ! 8 Z o ~ ..... UI ~ ? N ;'oJ !J> ~ ~: O~:~ 00 c::b ~ <: ~ (J):;j 0 I ,., -;......0 ~(.., o~c: o 5: :-< co ~~ Sl.Y>M <: <: c: U) o ~<::r: ~ co ~ r- :::0 o ~ ijj [ri tj ~o oU)O ~:r: ()otj (J) :::O:t 8~ C:[Il~ <: r- ~ ~ :::0 ~r- fIl_O o() ::o~~ r- 0:::0 0 :'l~ c:~o ):.: (i) ;;2: S2 s: ~-; ~c: - r- 00 M() .." !=J ::r: ~ U) l: ):,.~ () r- r- r- r;:tr- ~ ::0 co ~ ~f11 MC: U) a5tj 1 t\>d U):::O ~):,. r-r- r-r- co<: 1"11~ -'"0 ~tj d[ri <:;ti f11); <: G):I><: :;0 r- . or-0 ~S2G) oUl:;o ~C3 s::<: ~() Ultri,...", c: ~ :;0:1>> "":;00 0,." ():) z:r:~ o ri:l~ f'tiN -;0 <: ~ r- ~ ~ < z() ~z !3-J 1Il-< o )> r;:;~ )> \J rr, ):,. ~ t\> (J) (J) ;:;:!:!J ::r.: ~ ~g(j) ~~~~~ oM ~ rr, :::! ~ ~ "lJ ~ ::0 ~~~ ~~~~~ -<~ (;) X<:<::bCO ~;:;:! U) ):,. 01 ~ (;) (;) ::0 ::i v ' . , ~ ~ q c: co):,. -<):.: 3:?:r: ::0 s:: rr, :::O;:c -; <: U) ~s::~ O~::bu) ~l -;O::E ~U)U)~~ - c: 5: ", :-f U) r- U) :::0 ~ ::0 rT'j;:c):,.:::o r- ;;:f):,. I"T1 ~ ::0 "" r- 0 .>> U) U)~1"11 r:: 0 p co <: '"0 ~ ):.: 0 r- <: 0 rr, ~;:c :-I U) I"T1 (;) r ^ .>> ):; ~ :-f I"T1 \j OJ v J 0) :::0 r- -; :t 3:: :t rr, :t V> I ~ : :::o~ . 0)rr,;J:~ .v ):,. 0 ~ P () n...):; :::0 c: -t ~ :::e r-:r: ~-:::o rr, (;) V> ~~ Gl : ~ sa ~ 06~ ~ v<.. ::b c: r- M rr, () ~ (;) ~-;r- ~~C:f;;:;;r- (;) ""- ::-i):.: - 0 I"T1 :t co ~ (J) c: <: ~-; .!=J rr, rr, (J) 6 N :::I (J) (J) c: :r: rr, tj ~ o;f ~::i~ tj ~ (J) <: r:: <: [T'i ;;::j ~ -:r: Y> r- o tj (;) .." tj co ~ :t '"0 I'T1 00 ,.,..0(;) OOd ~"I(J);:o 0-; (J) <: :::0 r- ;:c ~ :b -;~ ):;co~ ~:brr, @~Mr-- 8 o().o t\> ~~ :::0 dS 0 -; -:!l @ :::0 :t:::O~ ~_ 0 t\> ~ rr, (J) [Il ~ ~ :::0 q -; o~~ O<::t <: ~~):,. ~!=Jrr,~ 8 ~:::o~ r- O:t ~ . I"T1 0 ):,. 0 ~~ ~~~~ ~ -.>> ::--I ;tio 0 :::OM ~oc:<: ):,. ~ :t () (;) d ~r- ~~a~ ~ r-(;)<:o [ri :::0 0 :::0 0 (J) :b ", PJ .." S - :-Ip:l:rJ<: ~ ~0 <: v>c/):::! ~~ffi r-r-I"h r-r-;o coco(J) rr,rr,):,. -; C:d U)f11~ tj,<: ~~o Or=CO ~tj~ <: 0 o~:r: :r:o O(;)tj :::o~(;) :-I:trr, ~~v> co ;:c ~::E):; ""V_r- ~:tr- ~co 0f11 10) '"0 ><::: ~~ <: ~ -<0 2~ ::b -'"0 r-:::o Y>J:l1 (f) ~(J) (..,~ :::orr, fti:-l ):;::0 :::o~ ::--I @~ t\> ~:::! I::~ (..,~ ~.Y> r-):,. ~<: (;)0 :t '\ a Ul:e ~z .-O:I: 0....0 S?:I:~ ....0 a~!G - ;u Z!(lz ~~~ "z.... ....~o 8"-~ cCUl ~~;! Ul"l] o ~~ 00 z ~ (J) :r: tj ~ <: o o ~ ::0 s: ~ ::!:! I ~ lftl I / J' ! I - ~ o I <: r- I , ~~ 0:::1 o~ r- o;ti (;)[11 [11~ Ov> ~:r: <::::0 (;)c: ~. co '"O(J)1f- ~:r: ~~ <:~ ~~ -;rr, ~~ OG) ~1"11 o);! <::::! ()o 0<: <::::;:! ;ti""V o~ r-~ ~~ CO.:-l :::0 - . OU) );! o ~ tj ~ :::0 o 1 \ or-...,.. OC:~ <:<:::1 ;ti~s 0::0'" r- ::-i r-::o ~~~ co <:" :::Ol~ od~ }as ):; :::O(J)1f- o:r: ~~ OPJ 0_ r-<: 01'T1 (;)s ~ tjl"11 ~);! <::::! .00 <: '"0 ~;ti ~~ <:~ ~fIl -;<:: :;i ~c: @~ o(J) <:);! ~ <: (;) ~. ~ rr, ~ ~ ~ rr, rr, (.., t\> ~ rr, - I I If-If- t\>(X) ~ (() OI(() 'I (()r- r-'" .."....... ~:t 0- :-!U) ):.: r-(J) :r: ~ '-.:. If- ?f- t\> - (X) In - ~ r- t\> ", r- .." If- (X) - 'J r- .." \ \ \ .." .......c: <:eE 0:::0 -;f11 ~"lJ of11 00 <:[ri ~;ti :b:h 0<: o ~ :b r= d dO~' ~co~~~(X) U)U)<: ~ f., s:: i? s:: :; ~ ~:r::r: f11 (X) - -< ~ "lJ:::O"lJ:t -; s:: ~ ~ ~ ~O --i, 0 C:-;"" ~)> '^-.::::: ~lJr- <:0 :r: U)"'- VJ~-:-IO:bO . 0 :-I:S: nl ~ ~ 0 0 -I:r: I <: ):,; <: G. r- ~ (;) 0 :t ~ 1 U) 0 ):,. ?< f11 ~ I r- ;:0 f11 lJ rr, :::0 U) rr,::t- @:b<:I"TJ:b-."rr,1"11 ~O- co 0 <::-fO :-I ~ 6 tj c; rr, I"TJ f11 OJ 0 :t :::0 I"TJ rr, rr, -I 2- c..., r-- ):,. i? ):,. ~ <: ~ o ;r: -; 01 ~ -; :::0 -; -< ~ ~ ii; I"TJ 0 (, ~ ):; 0 rr, <: :::0 o 2- r-:-f 1"11 ~ f11 -; :::0 rr, r- ::;: r 0- ):>: ):; ~ 0 f11 ~ -." - <... -. U) r- ' . , 0 :::0 t\> 0S::~::t- @<:-;A:~OO~ :::0 OJ):.: :-10<:(;)--; r-(1l2c...,rr,@-<:U) 0 oc:r-~ ~~6 ~<:~"lJ);! r-"lJ rr t\>. rr, ::0 r- r- ~ :::9 ...1 0 0 ~ r .0 c: P'-....- .>>OJ.>>..,......'J ..........-;0<: ;:0 ;:0 -I c: J ~ .." t\> I\) :-f U) ):,. :b :b :t rr I CXl -:-I - ~ U) <:<:~C:)(J) r-' 00 o 0 ):; r- .." ~ <: rr, :r: -< c- I 0 f11 ) "lJ U) rr, ):,.U)~C:):,.f'l <:OO<:cox 0r=000(j) U) O(j)~:::! );!R>U)e ~ OJ,,;ti:::o~ E~c:OJ(j)~ Nf11 0 tj:::! rr,);!eE" <:co o (;)~ :::!:::o Oorr,::o(;)~ b<:-~~:::O ;:cU)20 ~):';~~f11~ ::O~6:-1-:-1S:: c: f11(f)0 ~~<:O:::O@ C:r-:-I""I"TJI-I- ~tj o~-: r- - O<::r: -; OJco.."O.." i?i?~r;:j~ :::o::oc:::oc: o 0 :::0 r-o :::0 ~~f110rr, ~~"lJ~~ ~~- - rr,~U) ;:o):,.:::Oo1:! :b <: <: EOd-Z(;) ~)>coO"lJ .. J () f11 -; ii; OJg):,.~~ ~u)-; "lJ ~U));!orr, I"TJOOOO rr,c::r:<:[ri <:-;rr,~:-f O:b::O "lJ~ 0); o -; 0-:-1 -; <: U)o '-.:. i:ri I - - . - - . - - . - - I iig :~g :#g :*0 :~g :*0 \ .- + /, " t /, < " , " ,--~-~ ") -7 / Z / v \ \ ) _,I 11~11_ ~_'l , I ,: , - , , - , , - , I / I , , , f , , - , , - , , ~~ l"TJe ~:::o ~f11 ):;0 -<0 U)<: Vi~ MO s::::! o .......<: <: ~d ~d O~ o <: ~ :b o -0 ~co~ r-tjv) M U) :r: ~@~ ~O) ~ rr, ~);! :r: 0 -; U) rr, ):,. 11):::0 ~~~ =<@~ \j <0 '1-1- ):,.al r-" r-a(;) ):,. ~ :::0):,." ~~pj ~~ ~QJ~ r-tjv) M U) :r: ~@~ ?i0)~ rr, :);! :r: 0 -; U)f11):,. 1"lJ:::o ~~~ =<@~ \j -... 'I-I-a ):,.~I r-_ r-~ ):,. (;) :::o):,.~ ~~~ ~[rir- 1 ~o1 MO' co ::!:! S::Otju) ~"lJ<:U):r: -OU) U)~;ti@~ U):::OC:O)~ :r: -< 0 ~ ;;:f rr, ~ ~ ..&> f11;:Crr,0-; 0p0f11~ C:..,..,"lJ:::o r-::i:J:-I[11 :::oO:t::r:,.: OS::@~ ):>. 0(;) 01 . ..,.., If- ~Ol U)~~G) 1"T1r-_;:o rr, ):,.:b <:OO~ O"":::Or- M [ri ~co..." r-tjv) MU):r: ~@~ ~O)~ rr, :: );! :r:0-; U)1"11):,. 1"lJ:::o '1:;:1[11 '. ......):.: =<@~ \j 0) . 1-1- ):,.01 r-' r-~(;) ):,. ~ ):,. :::oO~ ~:::Or- ~[ri ~@~ ~I-I-:::O -; 'I 0 OI~ ?r- 0 _~O - r- U)o ~(;) "lJtj ::0(;) 0_ ::!:!<: r-(;) ~ ~ ~ c..., :::OU)/i;\r- rr,rr,~- orr,o:::j o . 0 S::~8~ S::f11 r- rr,rr,):,. <:-;OU) ~ :::o:r: Of11f11 :::!1U)r- O(X) .." <: -:-I U)-:!l0U) O);!e :::Or-O "lJ):,.-< S;::::O):,. <:~:::o :::!' ~ <: (;) ~ ~ ~ ):,. U) <: r- <: I"T1 rr, :-I 0 rr, ~ ~ "lJ (;) I\) 2 :::o~~ ):,. OOc..., M::!:!- r-<:):,. :r: rr, (;) 0 U) U)"lJ;:c I :r: s;: P ~c..., ~<:~ 0) -;~ );! '--' 0 U) -; I:r:- (()~U) -;s;: 06 1 . ~ ~l~J ~ r- ['1 V) :-f~J rr, (I) :r: :::0 24b~ ):,; co M (t\- ~);! :r:(,-; U) f'l ):,. I 1':::0 'I I I"h ". I ~ =<(Q)~ \j 'I . ~I ):,.(.1 r-: r- ..~ (;) )> ~ :::0 J- [11('~ ):>: r- U) - I '--' C ) - I J. :::0 -:-10 "lJ r- 0 rr, :::Of11c: ~:::oo~-; "lJI"TJ:::or--~ ~5d~~ c:" 0 :::!rr,:::o('J~ <:"f11~u) (;)rr,IU)):,. (;)::!:!:::!...,. f11r-<:""- ~c:(;)O 6~~;ti <:o~~ ):,..."rr, <:!lJOJ~ o:bo(;) U):;1rr, ;gU)0);! f11r-S:::::! ~Pc....o <:~c:<: -; U)--; -;0 ~OJ ~ ('J f'l r-tjv) o~ MU):r: ~~ ~@~ -;<: ?:; 0) ~ -"'0 (;) rr, : ~ :::0 s;: :r: 0 -; ~ U) f11):,. ::!:! rr, I "lJ:::o U) OJ ~ :t ~ :r: rr, U)O =<@~ cl-:-l :-0 If- ~ ?l ):,.~I~~ ~~ (;)~iS ;:O~;fe ):,.):,.:b :g is :::00 ~ ~ ~~ pj~c: ~U) ~~ fg?o~ o""i -:r: <:0 .....:;orr, ril-o ,."N -;~ ~ r- ~r-U) r-orr, :-t~o rr, :::! :::O:::!O <:0<: P<: -I" 0 rr,U)1 :r:rr,o U)f11- 1 U) 1 ~:r: ~):,. -;"lJ "lJ 0:::0 10 'J~ ~ M ,.....,.... . ,.... . ,.... ,.... ,...."'" ,.... ,.... . ~ "lJ_ C:U) S:::::! , "lJ~ U) . :-lU) , ):>: f11 :::!~ 0):; <:(;) f11 (;)OOf11):,. I"TJ~~S:::-f rr,<:<:~rr, U)<:<:(;):::o :r:~~~~ f11 o:-f ~OJd-< (f)~ U):r: ?~~~~ ~ U)r-.. ('J:::!~ n...~<:):;O <<-.- U) (;) -< 0 o:::! 0<: 1<:0;:0<: O)(;)~~~ '-....-0_<:-; ):>.~):,; S::(;)(;) f11rr, ~~ 0:::0 o~o "lJ<:<: ~(;)o r- @o -; 1\)1=1 CXl );:-... ~r-" ~ :A: Vi:-f~ :tr-- -c: OU) ~:r: @~ ~ <:t\>"lJ):,. o : :::0 o_oM OI"lJ:::o -;t\>02 U)):,.~::b :-!U)o:-f ):.:"lJ <::r:):,.:r: ~):,;U)U) :::0 r- "lJ I o-;;:c- U) R> f:: . . -; CXl :~ ):,,:::0 co~ o~ -1(;) o 0....... - .." ..,,<:oc: 00-1 "lJ -; ~c: :::o:::oU)::o o fT1 -:-I rr, '-l'"o.O f11 "-' ;:0- oC::bt\> -; ::0 (;) ~ Itj~~ <:'"r]-~ OOCXl:b -; :::0 0 <: - ~o <:~:-lf11 -):.: oU)"lJS;: o rr,-,. <:"lJ:::Orii ~~ :bU) Of11 -0 ~ 0<: -;0 ~OJ ~ 00 ~:r: ~o :b:b 0<: ,--;g s;: c: <: o :r: U):::O~ "lJf11_ :::OS::U) ~o:::! (;)~<: U)o(;) OJ OJ -<i? -I:t 00 ~&j 0f11 ..,,-; :r:o OOJ ~fT1 -< ~ CXl ):,. .." ""- : <: c: or-..o-; -;'J c: _oU):::o <:<:-;rr, 00 o:::o~o 0f11.>>0 ~M~~ ~@):,.:::O o :::o~ 0~~rr, olCO o 0 ):i. "lJ -; ~ ~ s:: "lJ <: rr, ~ s;: ~ rr, tj (;) f11 o r- o :to(;)<: U) ~~f11 I :-f"~ 'I :trr,~ . r-_ U) @U)~ ~~~:r: <: O~~ o <o~_ :-I ):,. <:);! rr, 0 (;)-; r;:;~~ ~ r-o ~ :-t MU) :t:::o@ (j)~ U);:;:!O) :r:'" : ~ o 8~ oe ~:::o .......f11 ~OJ -;i? ~-; o:r: 00 <:&j ~f11 ~R> o :to(;)=< U) ~~\j I :t~o 'I r-P . r- U) @U)~ ~ ~~v) o~:r: <: 0> <: :r: o ~P M ):,. (;)CO o _ :-l --=--- OJ):.: t\>~f11-; ~ r-o.. ~M~ :t ::0 (.., -<:@ u)):,; U) :-i 0) :r: rr, : ~ o 0(;)-; rr,;:o~ "lJ:b_ :;:15:0 ......pj:b r- @U)~ o~v) a~ :r: 'J~;:c ):,.<:P 0(;) co QJ~ rr,-; o~ U)t\> @I 0) R>~ ~(j) U):::! rr,<: s::(;) ~g ~ ~ U) rr, ~ ~~ ~ @ ~ rr,a ~ 1-1- ~ U)o -i~ ~ ~~ 0018 rr,QJ I r- 0 -;1 ::~ OQJ r- 1_ U)O 'I f11(;) rr,f11 lJO :::0(;) o~ ::!:!(;) r- [ri~ ~ t\> ~::!! ~ ~ <: VJ<: ,.,:rr, ~ f11 :-i fT1):,. ~ U) :::0 .--. U) o '--' 2 '-J"lJ CXl pf11 ~ ~O:-i);!~ ~~ r=r-~ r-..,..,-,..U)-;O ~ ""V......~ f11 U) ~ U) ~ :r: : I :r::-f ~ f11 0 '. f11:t:-l rr, ..,.., rr, :t -;""V_-; c: ~ I o U) ~ 0 I :r: U) I lJ -f11d- :b -2. :::0 <: 0 " :::of11 rr, C:o ~ <:c: :::::i U) :t -; ~~ rr,eE ~:::o ~rr, o ~::!:! ~U) I\):! <: .......(;) <: 0"lJ -;- ~ ~ 0"lJ ~tj ~[ri ~;ti -;); '-.:.<: u)~ ~C1 f11a <:~ S;:O ::01 ~o s::- ~. ~ ~II) I!I U)P :r: f11aJ ~ . o I 'I U)~ 0) :r: 0 (;) -; ~ :IX: U)~~ ~ VlO) 1 ::--1,,- U)):,; : ~:t rr, ~ ~~:::! -; @r- r- rr, s:: ~ U) ." -l@ OJ . 0::9 V) (f) f11 ..>>-,.. LI :::0 ):,. 0 ~ ...... orr r- 'I <: I I\) tj r-):,. ~ ~ .:'-J~ r-.. ):,. 0 (;) OJ ",:::0 - 00 ~ ~OJ);! 1-<(;) G;~tj-; (0@ '--'MU)~ ~ :::0- a - <:@ I ~ 01 ):,; 01 0 :-I 0) rr, : ):,.r- ~.." ~@~ ~(..,:::o -;010 ~~ 0r-8 ~;-r.o r- U)O f11(;) fT1fT1 "lJCJ :::0(;) O~ ::!!(;) r- 0~ :::OU)@r- f11~ =:::j o Od OU)~ S:::r:OI~ S::rr, r- f11f11):,. <:-;OU) ~ ::0 :r: '>>0f11f11 :::!1U)r- OCXl .." ~ dU) d :-l-; ..,.., ):.: c: ""Vr-o "lJ ):,. -< s;: :::0):" <: ~:::o :::!' ~ <: (;) ~ (.., ~~ ~e r-:::o 0fT1 o A:::!! ~U) c...,:! <: .......(;) <: 0"lJ -;ii; ~ 0"lJ ~tj ~[ri ~;ti -;); '-.:.<: :::OU)/i;\r- rr,f11~- 0rr,0:;1 o . 0 s::~~~ S::rr, r- ~f11)> D-;OU) ):i.o:::o:r: :::!1[riPJ OCXl .." <: -; U)'"r]0U) O);!e :::Or-o "lJ):"-< S;::::O):,. <:~:::o :::!' ~ <: (;) ~ I\) U)II) ~g ~~ f11 ~o 1 00 1- 'I U)~O> f11 :><::: rr,VlO> U) P : :r:<:-.J f110...;;! 1"11 s:: ~@~ 01-1-:::0 It\>tj .:'-JOI(;) OO~ 1-<(;) a~@ a- 010) o ):,. or- '--'.." O~ ~e r-:::o 0f11 o ~::!! ~U) ~~ <: .......(;) <: 0"lJ -;ii; ~ 0"lJ ~tj ~~ ~;ti -;); '-.:.<: : :::0 U) /i;\ r- rr,:r: ~ - 0f11 0 a O~ 0;:0 s:: 'J:b s:: 0 r- f111 ):,. <: oU) D CXl :r: ~d d PJ 0:::0 );! .." <: r-U) U) "lJ -; s;:):,.c: <:::00 :-t~-< ~. ):,. (;) ::0 U)~ f11 f11~ @d ~~ aOJ 'J:b ):,.~ 0U) f11 dS2 );!~ r-<: -; ~ U) ~ ~ ~~ C:e <::::0 ~f11 ::00 -<0 .......<: ~~ .::0 '--'~ ):; <: o -< s;: A: f11 tj (;) f11 r- ~ rr, ..