Loading...
HomeMy WebLinkAbout20121074 Ver 2_USACE Permit_20190907STATES OF Regulatory Division Action ID: SAW -2012-01900 Mr. Michael Moran Ashley Furniture Industries, Inc. One Ashley Way Arcadia, Wisconsin -54612 Dear Mr. Moran, DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 07 September, 2019 NC Department of Environmental Quality Received SEP 12 2019 Winston-Salem Regional Office Reference the Department of the Army (DA) permit issued on March 28, 2013, to you for Ashley Furniture Industries, Inc., for impacts associated with the expansion of your furniture warehouse and manufacturing facilities. Specifically, the project is located at 916 Baltimore Road, west of Advance, in Davie County, North Carolina. This site contains Buffalo Creek and its adjacent wetlands subject to our regulatory authority pursuant to Section 404 of the Clean Water Act. Impacts authorized by the permit included mechanized land clearing, excavation, culvert installation, and the placement of fill material, resulting in the permanent loss of 316 linear feet of jurisdictional stream channel and 4.106 acres of jurisdictional forested wetlands adjacent to Buffalo Creek. Reference the site inspection conducted on November 14, 2017, with your consultant, Mr. Kevin Martin with Soil and Environmental Consultants, PA, with Mrs. Jean B. Gibby and Mr. Andrew E. Williams of my staff to evaluate portions of the original wetland delineation. During that site visit, it was determined that Wetland Impact H (0.437 acre), along with a substantial portion of Wetland F and the upper portion (northern) of Intermittent Stream 5 were no longer subject to our regulatory authority pursuant to Section 404 of the Clean Water Act due to a loss of hydrology, which resulted from cessation of the irrigation -system on the property. _- -- - - - Reference is also made to your permit modification request dated June 17, 2019, based upon the revisions that were made to the wetland delineation during the site visit of November 2017, a change in the site plan, and a change in the stormwater management plan. Since Wetland Impact H (0.437 acre) was determined to be non jurisdictional, the total permanent loss, of wetlands is revised from 4.106 acres to 3.669 acres. This area was located in an area on the original permit as an area labeled future expansion. It is noted that the applicant originally compensated for unavoidable wetland losses through the mitigation of 7.121 acres and with the reduction in impacts, the amount required to offset the unavoidable jurisdictional losses associated with the project thus far would be 6.247 acres. In addition, the revised site plans show a sediment basin r� v IN and possible future stormwater device in the area previously identified as Wetland F and a fill slope from the Spoil area/Future Trailer Parking area is proposed where Intermittent Stream 5 was previously, identified. Considering that Wetland F and a portion of Stream 5 was eliminated from jurisdiction under our regulatory authority, work in these areas will not require DA authorization. See attached sheets dated March 7, 2018, for the revised delineation. Following evaluation of the information submitted in your modification request, the U.S. Army Corps, of Engineers, Wilmington District has determined that your request is appropriate and reasonable. This work must be constructed per the Revised Overall Site Plan dated May 20, 2019. All other conditions of the permit, including the permit expiration date of December 31, 2033, remain -in effect as written. Should you have any questions, please do hesitate to contact - Mrs. Jean B. Gibby, Raleigh Regulatory Field Office at telephone (919) 554-4884, Ext. 24. FOR THE COMMANDER 94N Robert J. Clark Colonel, U.S. Army District Commander Enclosures Copy Furnished: Ms. Sue Homewood Division of Water Resources North Carolina Department of Environment and Natural Resources 450 West Hanes Mill Road, Suite 300 Winston Salem, North Carolina 27105 Mr. Kevin Martin Soil and Environmental Consultants, PA 8412 Falls of Neuse Road, Suite 104 Raleigh, North Carolina 27615 -3 - Copies Furnished without Attachment: U.S. Fish and Wildlife Services Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 28516 Mr. Todd Bowers Wetlands Regulatory Project Manager — North Carolina Region 4 Water Protection. Division -- - U.S.-Environimnfal Protection Agency 61 Forsyth Street Southwest Atlanta, Georgia 30303 r ----------- I --1 I I I I i I PROPERTY LINE (calculated) — — — — I I Y-----�._--— ------ I / I / I / PROPERTY LME (calculated) / / / LIMITS OF STUDY / I / I / / I / I / I / I / � I / � I h s Ci \\ s►EEr 2 < I I SHEET 1 I I I I I I I I � I I I SHEET 3 P I I IIII i I I I LIMITS OF S II II I I II -O - I L I N I O c L r — — — — — _. —PROPERTY LINE (calculated) 0 ----- PROPERTY LINE (calculated)— _ I --'--------------- U O oro .` t1111CARn,/ .� N Industries, Inc. SS' W��:y _ Z ti _— SE L r: 3320— c� _ 'Uv m o moi, In •..��_. , .�� 'The NO Grid coordinates shown m this plat were derived by RTK differential CPS observations using me Lefm GS08plus receiver. COVER SHEET Ashley Furniture Industries, Inc. SCALE COUNTY TOWNSHIP DATE PREC. RATIO 1' = 600 DAVIE I SHADY GROVE 07 MAR 2018 1 1 : 10,000 + PROPERTY DESC: PIN: 5860572009 PS 11 PG 70-73 -- COE FORESTRY k SURVEYING P.O. BOX 36 DRAFTED BY: WALUBURG, N.C. 27373 CLJ I PHONE/FAX (336) 769-4673 F-01411 JOB # 18027 E–mail SURVEYED BY coeforOgmail.com r,,/ni SEA o 'The NC Grid coordinates ^' shown an this plat were W derived by RTK differential GPS observations using one Lelca G508plus receiver. AD 1983 State Plane Orth Carolina FIPS 3200 feet =808038.18 -1562999.09 Concrete Monument /E8 from PB 11 Pg 72 page 3 of 4 titled: Davie County Economic Development Commission { l 1 1 l 1 1 1 1 1 1 IL 1 I 1 1 1 1 1 16�as , W SBA71 Line Bearing Distance L1 N S7•-10'-40' W 20.97' L2 S 69'-52'-20' W 31.35' L3 N 52'-04'-43' E 19.49' L4 S W -09'-2V E 14.11' SBB74 N SBC2 upland �2 SBCI .SE SBA74 7SBA13s 7r-37'-27' w6.65' N M' -21'-3C W 17.51' Top of Bank Top of Bank t Area of Stream E4 7e4,\ 2653 Sq.FL 0.061 Ac.+/- -- N 87•-21-23' W I 26.12' SBA16 324 +/- Linear feet of Stream 'This certifies that this copy of this plat accurately depicts the boundary of the Jurisdiction of the Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is change in the low or our published regulations, this determination of Section 404 Jurisdiction may be relied upon for a period not to exceed five years from this date. The undersigned completed the determination utilizing the appropriate Reglonal Supplement to the 1987 U.S. Army Corps of Engineers Wetlands Delineation Manual, 33 C.F.R. part 328 and other U.S. Army Corps of Engineers guidance.' Regulatory Official, Title - Date, USACE Action ID No., i^- S8820 1 SBA17 58821 SBA18 SBA19 SBB22 4 20 10 0 �0 SHEET 1 of 3 WETLAND MAP FOR Ashley Furniture Industries, Inc. SCALE COUNTY TOWNSHIP DATE PREC. RAT10 1' --_V_DAVIE I SHADY GROVE 1 07 MAR 2018 1 1 : 10,000 + PROPERTY DESA PIN: 5860572009 PR 11 PG 70-73 COE FORESTRY k SURVEYING F-01411 JOB B P.O. BOX 36 18027 WALLBURG, N.C. 27373 E-mail: SURVEYED BY BY: 0PHONE/FAX (336) 769-4673 coefor9gmail.com CJ/DL C b y A WIp Q S n pDp A PHT4T°� _ANp N 3mT m c D n o h ' � o � o O O O +DI Di3.,- d 3 3NPSpA 0 D Q 6 m p h O1 a N S T j 5 N N II OMmQQ°0S O mm, mnhc'p D00ap.o m FF3D S NN�DD£h m 'T P 'O T p S 33 OTO=N £� L 'o mNLP T DP h GT L hp IDI p'30 Szpn nNlpp_N A _ T Q T 4�O � A �k FEB 2016 °0030 oQn z - m o yTm no° ' ° O_00~j f��p=OD I+O O ';Q m 0 fJ�ryNiO WIp Q S n pDp A PHT4T°� _ANp N 3mT U MID, P Q TAD rt �y^O h3001 W N h D D h mhN 'n5T hQWNL opOQ�npT T4,0 oma -i n 5 rt O O D DPS O +DI m 9 11 fn SD Z o A O Al X> MEW,z �AXA m C K�WN m (D vN O Q s o my m CO fJA Li A � T _N 0 m T U � 0 J D O A 0 O = In N m 00 p L4 4�O � A �k FEB 2016 °0030 oQn z - m o yTm no° ' ° O_00~j f��p=OD I+O O ';Q m 0 lz�NC ERID (feet) FEB 2018 �� � me 00 _ \ r§ \ \\ al eb � }§\ ; .- Gab � CD� {§ >§/ ® (&;\ R. k K emt to |K� \( %} lz�NC ERID (feet) FEB 2018 �� � me 00 _ ®+; VN \ \\ al eb � !7 % ; .- Gab � lz�NC ERID (feet) FEB 2018 �� � SITE DATA OWNER: PIN: 5860-56-1470 PIN: 5860-57-2009 /,% / 1 .11.11. I — _ _ i_. PIN: 5860-67-3478 �z 58 3 478 ASHLEY FURNITURE R E I ND., INC. AC// ONEASHLEYWAY PERMITTED IMPERVIOUS COVER=117.08 AC Im ARCADIA, WI 54672PERMITTED DRAINAGE AREA=1PHONE: (608) 323-6258 Iw , ..: (7 I ENGINEER: ALLIED DESIGN, INC. ��/ I /J/ Il 1111 \J • l \ \\ /j IMPERVIOUS AREA SHOWN < 80 AC. i 4720 KESTER MILL ROAD INCL. PHASE 2 DEVELOPMENT ? ' � t' - WINSTON-SALEM, N.C. 27703 PHONE: (336) 765-2377 FAX: (336) 760-8686 STEVE M. CAUSEY, P.E. scauseY@allied-engsurv.com VICINITY MAP / II I \ .� ///.._ 1 _ I -- i ' ( _ SURVEYOR: BRADY SURVEYING COMPANY, P.A. NOT TO SCALE ��) ( ,/✓/ a3 as �, / �_ / / _ m_ - - \ 2990 BETHESDA PLACE, SUITE 601-B 3 \ I / / j/ =� 'aim '- . v Y— -Y1 I> '-> WINSTON-SALEM, N.C. 27103 PHONE: (336) 760-2716 FUTURE DEVELOPMENT MAYBE ROUTED TO FAX: (336) 760-4529 THE EXISTING BASIN OR TO A NEW DEVICE _ i jjT j� / i PHASE 2 PER THE NEW DESIGN CRITERIA. ANY / SUCH /�/ — I BUILDING I ISTORY / //- IM, NACNRWGNIYTA®VIION NEW SCM WILL BE SUBMITTED TO DWR FOR `— // % � / � \' EXPANSION ! Ana \ � 3• "`( / \ \ �- ) J % / / _ REVIEW PRIOR TO CONSTRUCTION. /j \\ / / \ II 529,984 SF I II z1 / I J (TO E>(. E/X. jB,A19IFS1I.IN)II CONNECT BUILDING EXPANSION &M. AIN mo STO\�G Lu EXPANSION TO EXISTING PIPES TO DRAIN TO EXISTING BA \ \ ) II \ \ ` . ...... _ DESIGNATED FEATURES //l /l /I'�((( (CORPS SITE MEETING 11/14/17) 1111111 \\I\\�\\�TO REMAIN B BEOAPP IED J Ia� r k / — — \ /BUFFERS 1111\II / /IIt111M111(,r ✓ (\�!/78—r i—/1,. III/ / 1 = � �- _ � _ —_ -� -'� �-� � �'.� J Its � z . y 1NDAFV(' PHASE 2- SOILS 'WASTE 11 j/! ��=1� 1 j ) \ 1111111 I \I 11111111\ h� TO BALANCE GRADING \ \ I I /\ - 1 �/ (I 11111 1�II111111<" 26± ACRES -.� / !II 1 i� �-/ /� \ I(/( / ( Illll\11r \� I J/ / \ \\\ \�\�\ /✓i 1 I / / III J/(/� Z\_ \ \ I ( \ 1 EX. BASIN \1\e \ \ ��\ \\�� 4 / \ /J// 1111i•\ t\ �\1,> 1 inch = 400 ft. �/� _— ) / // / '•• \ \ �' � ' � - / / / / / J ! •„\ •,Ir / / // / 1 (((( (\ PHASE 2 LEGEND IPOTENTIAL FOR FUTURE TRAILER PARKING. �1 I I \ \ �� ASPHALT PAVING WILL BE SUBMITTED TO DWR FOR REVIEW PRIOR TO ANY CONVERSION TO IMPERVIOUS SURFACE. \ GRAVEL PAVING DESIGNATED FEATURES ���\\ ` \//Jl\\\ '\ 1 I / J /r/(/ ( \ (///)// r 11((`—S \ / / \ / / ii/y CONCRETE PAVING II / / moi/ (CORPS SITE MEETING 11/14/17) \ J I I \ \\ — — / /� ' / //� /% CURB AND GUTTER TO REMAIN AND BE PROTECTED' `�/ / 411 II \ l\ \\ \ / / RESERVED FOR EROSION CONTROL BASIN. ����! \) l j/ �J�/' BUFFERS TO BE APPLIED _//1)1111 I �-- \ \ J 1 J 1 J PROBABLE LOCATION FOR FUTURE SCM. -i/� (J / j J�(r/l j j CONCRETE SIDEWALK ._ ✓% — = 1/J — I \ I / // / / PREVIOUSLY PERMITTED - \�\\\\\\\/%i //(/ \ \\11 1\l��\\ll l\ \1� / / I1.\,1\\ I l` II II\t\\\\ \✓ /. WETLAND IMPACTS Z Lu 0 W LL Zowa w Q X�oo IwUF- < CV z LU wg�o U) _�06< a.�06m Ke__v;_se , OVERALL SITE PLAN SHEET C-1 l z U N < C o E z �� 8 C O o' .�U' �zmn 13)w gwwnow Qw o¢m m _z wvszmn'w wzan U Y�Y.6 Y.L z diU w K QU aa,n Z Lu 0 W LL Zowa w Q X�oo IwUF- < CV z LU wg�o U) _�06< a.�06m Ke__v;_se , OVERALL SITE PLAN SHEET C-1