Loading...
HomeMy WebLinkAbout20081658 Ver 1_More Info Received_20090925WITHERS 03 RAVENEL ENGINEERS I PLANNERS ISURVEYORS September 25, 2009 Ms. Amy Chapman NC-DWQ 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 RE: Mike & Janet Rogers Residence 305 Champions Point Way Cary, North Carolina, 27513 Ms. Chapman: o$- MOSS ua. sFP ? ` 2 5 2009 WFT DERR - WATER QUALITY S AV STQRA( ATER BRANCH We are providing this letter in response to your Request For More Information provided on September 2, 2009 regarding DWQ Project #2008-1658v2. We have included the information requested in your letter and we offer the following information in response to the comment proved: 1. We have included a completed Infiltration Basin Supplement Form and all items on the checklist not provided with the previous submittal. 2. We have indicated the roof area to be treated by the infiltration basin. The area being treated (625 sgft) is fully accommodated in the proposed infiltration basin design and exceeds the area of the proposed impacts (447 sqft). 3. We have included more detail regarding the hydraulic device that will convey the stormwater runoff from the rooftop to the basin including the proposed bypass overflow from the side of the grit chamber into a bypass swale. 4. We have removed the vegetated area upslope of the infiltration basin. The proposed basin is over the area of suitable soil which runs at a consistent depth below the surface. We have also located the basin as far as possible from the proposed structure to minimize any adverse impacts. 5. We have indicated the surface of the basin will be planted with grass. 6. We have included a CD with the proposed stormwater plan in TIFF format. Please advise should you require additional information in support of this application. We appreciate your time and assistance regarding this matter. Sincerely, WJTHERS cS? RAVENEL, INC Bertoncino, PE Attachments Permit No (to be provided by DWQ) 4 .-?R STORMWATER MANAGEMENT PERMIT APPLICATION FORM Ma WDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be tilled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name Rogers Residence - 412 Prestonwood Contact Person Jason Bertoncino Phone Number 919-535-5174 Date 22-Sep-09 Drainage Area Number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 625.00 ft2 Impervious area 625.00 ftz Percent impervious 1.00 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.83 in 1-yr, 24-hr intensity 012 in/hr OEP n4fi.4 (5 sue, irvTtt7u5 i TY 4-73,-.,/ ++? Pre-development 1-yr, 24-hr discharge 0.00 ft3lsec lxS`? i7 iArv i IZvn? 6FF Post-development 1-yr, 24-hr discharge 0.00 ft3/sec ?JVLIi?LL AZt-Ay lUU.1n?tTLS Pre/Post 1-yr, 24-hr peak flow control 0.00 ft3lse Fr?L _ L Storage Volume: Non-SA Waters Minimum design volume required 52.00 ft 3 Design volume provided 52.00 ft3 OK for non-SA waters Storage Volume: SA Waters 1.5" runoff volume ft 3 Pre-development 1-yr, 24-hr runoff volume ft3 N i N Post-development 1-yr, 24-hr runoff volume ft3 Minimum required volume ft3 Volume provided ft3 Soils Report Summary Soil type Silty Loam Infiltration rate 0.63 in/hr SHWT elevation 306.00 fmsl Basin Design Parameters Drawdown time 0.59 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 308.50 fmsl OK Storage elevation 309.00 fmsl Storage Surface Area 70.00 ftz Top elevation 309.75 fmsl Basin Bottom Dimensions Basin length ft Mint .Ab T?p'6., wj Basin width ft Bottom Surface Area 70.00 ft2 Form SW401-Infiltration Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? 0.14 ac-in OK Length of vegetative filter for overflow 92.00 ft OK Distance to structure 30.00 ft OK Distance from surface waters 92.00 ft OK Distance from water supply well(s) ft ---ip "br- PQi i;SEr -7 Separation from impervious soil layer ft --> NUT y--vL,;v7 Naturally occuring soil above shwt 2.00 It OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? y '- (Y or N) OK Capures all runoff at ultimate build-out? y (Y or N) OK Bypass provided for larger storms? y (Y or N) OK Pretreatment device provided Grit Chamber N?tlY7!iRfl t7ftA A89Ap'PO® ® ?s *CM SEAS; 25944 ?. m Ile "e'611 Form SW401-Infiltration Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan In'tials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin}, - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. J? ?/ 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The ?? results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. "J 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 0 RIVE NEW LONDONDALE D ~ 0 Q ~ SOLID COVER ROOF AREA TO E TREATED = 625 SF Z ID COVER H U G4 STORMWATER STORAGE AREA 6" PVC ROOF DRAIN 1"VOLUME CALCULATION: ~ E a~ o J~ 18'°x18" HDPE ~ ~ VOLUME T B TREATED = 625 SF x (1")(%2) = 52 CF W ~ COLLECTION BOX ~ r 0 & GRIT CHAMBER ~9 REQUIRED STORMWATER STORAGE AREA: ~ 4~ DECORATIVE H ~ Q TOP OF BOX MAX. WATER REQUIRED AREA = 52 CF 10.75' DEPTH = 70 SF 3~~ 6,, Top ~ w~ EL=310.00 SURFACE ELEV=309.75 GRASS 3'' c, EDGE OF BOX ELEVATION=309,75 0.75' 12n of ~ ~ _ ~ TO BYPASS SWALE - EL-310.00 FV~31o k CHECK CAPACITY OF 6" PVC ROOF DRAIN LEADER: _ ~ EDGE OF BOX ELEVATION=309.25 1° _ '~S Q(10) =CIA =(1,0)(7.22 "IHR)(625 SF 143560 SFIAC) = 0.10 CFS d ~ EL-309.00 5 x , .gyp 'y. ,Tiv~ .i I N a TO STORAGE AREA. •:.x:~~;,,~.1,..,;'a~~ a°: ry::. .y/ AS n r ,,x:~ ~•4: EL-308.50 .Q SEE COLLECTION BOX 0 T CHAMPIONS POINT WAY n ~ 5 E CAPACITY OF 6°' PVC 1.0 SLOPE = 0.56 CFS OK W ~ DETAIL THIS SHEET ~L ,7 A~ R o9 ~ ' W o ~I , 3 ~ V~ V~ ~ ti CLEAN SAND ~ Q A 24 L L P F 6 PVC R F V~ ~ oo R S E S~ STO CHECK FLOW DEPTH OVER WEIR = ~ ~ z ~p ~ ~ ~ MINIMUM 1 MINIMUM m ~ DRAIN LEADER 2 PERMEABLE GEO Q ~ Ta ,2 2~ To ~ `G M~aT 9.5 W o~ ~ UNDISTURBED TEXTILE FABRIC , 3 0 3~~~ F ~RFq R Q=CLH s T V A E E R 0.11 CFS=(3)(1")H7.~ EL P R T SEASONAL HIGH I ~ E E H=0.11' =1.3" < 3"PROVIDED OK 1~ T WATER TABLE P E TR LTI ETIL T STORAGE AREA CALCULATIONS Q 1 Z W z W o ~ 1 STORMWATER ~ Q STORAGE AREA ~ ~ s. 70.0 S Ft Q q 625 SQ. FT. IMPERVIOUS TREATMENT ~ uJ STORMWATER I-' '•1 1 ~ EIP STORAGE AREA ~ CHAMPION'S POINT WAY VARIABLE WIDTH R/W ~ ~ ' ° , o ; OVERFLOW MH® EIP Ip-^ SWALE COLLECTIO BOX rah ~ 50' NEUSE RIVER Z 30' COMBINED \ ,i / RIPARIAN BUFFER J SANITARY SEWER AND yJ~ DRAINAGE EASMENT ` si~`~ EIP ~ rs / U 8"HDPE ~ / TOP BANK O JV eQ jog .CULVERT J ~ ~ TURKEY CREEK ROOF AREA ~ v 625 SQ.FT. . f ~ ~ N~ W 6 PVC ROOF , . ~ r' X ~ PCC SPORTS AND V DRAIN LEADER ~ ` RECREATION SERVICES, INC. ,~,~•.~....T~..,a ,f'~ 'f W i~, 447 SQFT IMPERVIOUS i i~°,,` ENCROACHMENT ~ z NIP W o ~ U ~ l' ® W r ?Y ~ i it / ' des i` e W ti ~ t , i V 0 0 GRAPHIC SCALE 50 p 25 50 100 \ ~ o \ ~ W 1 inch = 50 ft. i \ ~ N \ ~ J \ / / 4 U Z U \ ~ ' ~ \ \ o I \ ~ a \ \ Z ~ $ O ~ N \ \ i ~ O ~ r o \ \ o I o o \ o a~ a Z o \ I o o \ \ ~ COP cn4~O0 Q CONSTRUCTION NOTE: a r I - N m N \ \ N \ \ a ~ \ \ f o TC E i STORMWATER STORAGE AREA SHALL BE PROTECTED ~ ~ 3 ~ DD m \ \ o \ \ FC ~3o~u FROM RUNOFF UNTIL ENTIRE SITE IS STABILIZED. N ~ \ \ ° \ \ \ 4 \ \ ~ , m \ \ ~ \ o D \ \ \ c ~ y POOL DECKI~URFACE AREA m \ ~ / i \ \ / , N \ 318 SgFt \ \ \ ~ / a i \ \ ~ ' ~ ' x \ \ \ \ \ `J / \ \ \ \ ~ ~ 'J o_ \ \ RETAINING WALL ~ / 0ao®o08A0A0®BO°°0 w \ \ \ 129 SgFt m \ \ \ 0 1. eqo®,®,Q~~~ooCARp~~y°° a` ~ \ \ \ N \ \ \ \ \ o ~o aFESSJa a o~ e a - \ \ , a \ \ GRAPHIC SCALE oQ ° s ° 8 ~ ~~nA w e ° \ \ \ \ / / 10 0 5 10 20 \ 31 g \ o RE-VEGETATION \ \ \ 0 1 inch = 10 ft. pp ~ OOOOOtltl0° O~ \ \ \ LANDSCAPE ARE ®a®®~ 040000E6 a ° \ \ \ \ 955 SgFt \ \ 309 \ z w r r Y