Loading...
HomeMy WebLinkAbout20090616 Ver 2_CAMA Application_20090924.r DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Sleepy Creek Farms (Sunset Villas) C/O Jim Maxwell 2. LOCATION OF PROJECT SITE: 103,105,107,109 and 111 Old Causeway Road in Atlantic Beach (previously the Sundowncr Motel) Photo Index - 2000: grids 40-511 (K-7&8) 2006: grids 40-8086(K-8), (L-7&8) State Plane Coordinates - X: 2679386.678 Y: 355000.214 Rover: J042109A Longitude: 76°44'21.65540 Latitude: 34°42' 14.97620 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 4/21/2009 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 5/11/2009 lr= @ Office - Morehead City U 6. SITE DESCRIPTION: SEP 2 4 2009 (A) Local Land Use Plan - Atlantic Beach dated 1993 Land Classification from LUP - Residential/Conservation DEW-WATERWAUTY (B) AEC(s) Involved: CW, EW, PTA, ES WMANDSMNoSTORMM IER9RAW1 (C) Water Dependent: docks /slips (yes), high ground work(no) (D) Intended Use: Private (E) Wastewater Treatment: Existing - septic systems Planned - none (F) Type of Structures: Existing - docks boat ramp, bulkhead, two incomplete duplexes three lots and driveways Planned - bulkhead, docks, boat ramp removal, boatlifts and pilings. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: DREDGED nTUPP (A) Open Water N/A N/A 9,900 ft2 Inc. 6,318 ft2 Shaded (B) Coastal Wetlands N/A N/A 40ft2 Inc. 40ft2 Shaded (C) High Ground N/A 28,084 ft2 N/A w) 1 Utai Area L1siumea: 325,UL4 It` (E) Primary Nursery Area: No (F) Water Classification: SA/HQW Open: No 8. PROJECT SUMMARY: The project proposed is to reconfigure the existing docks, fingers and pilings, 20 slips, remove the existing boat ramp, add two sections of bulkhead, place 10 boatlifts within slips 1,3,5,7,9,11,13,15,17 and 20 and all existing and new high ground development. The purpose of this project per the applicant is for better use by the condo owners. Field Investigation Report: Sleepy Creek Farms Inc. (Sunset Villas) Page 02 9. Narrative Description The Sunset Villas project is located at 103,105,107,109 and 111 Old Causeway Road on Atlantic Beach and is adjacent to Causeway Canal. This property was previously known as the Sundowner Motel. The property has been subdivided into five separate parcels. The property is .92 acres in its entirety or .184 per parcel and is an average of 5' above NHW. The site currently has two existing duplex/ condos with septic system, three vacant lots with septic, boat ramp, canal, docks with finger piers and pilings, driveways and existing impervious surface which totals 47 % within the AEC. There are 25 slips currently onsite however after the reconfiguration there would only be 20 slips. There is a fringe of coastal marsh along the south side of the property along the east canal. It is located r wali--ftvard of the existing bulkhead and landward of the existing docks. It consists of Spartina alterniflora. The undeveloped portion of the high ground is comprised mostly of grass, a few cedars, yucca and scrub bushes. The developed portion of the high ground contains two duplex/condos with septic and driveways which still are in the process of completion. The duplexes previously were permitted under minor permit #,'10-05 which expired on December 31, 2008. All high ground work has now been submitted for major permit review. The proposed development is a private project. There is a commercial property to the south and a Carolina Power and Light sub station to the north of the project area. Atlantic Beach's Land Use Plan classifies this property as Residential with all AEC's classified Conservation. This section of Causeway Canal is not designated as Primary Nursery Area and is closed to the taking of shellfish. Causeway canal within this area carries a water classification of SA/HQW. Riparian corridors have historically been drawn as property line extension within this area. Substrate is mostly sand and silt. No SAV's or shellfish beds were observed within the proposal project area. 10. Project Description: The current proposal is for the removal and reconfiguration of the existing docks, removal of the existing boat ramp, the addition of sections of bulkhead, reduction of the number of slips from 25 to 20 and the development of all existing and new high ground work. The applicants are proposing the reconfiguration of the docks and all associated pilings and fingers. There are 25 existing slips currently which would be reduced to 20 once the reconfiguration has been completed. Dock "A" would be 6' x 300' and run parallel with the canal. There would be eight 3' x 25' finger piers which would extend waterward from dock "A". They would house slips 1-16. Dock "B" would extend west from dock "A" for a total of 26' and then would turn south for a total of 60'. There would be two 3' x 28' finger piers which would house slips 17 - 20. There would be eight 12' x 13' boatlifts installed within slips 1, 3, 5,7,9,11,13 and 15. The remaining two boatlifts would be installed within slips 17 and 20 and would be 16'x 13'. A total of nine pilings would be installed within various locations of the slip areas. The typical boat would be less than 30' average and open runabout. All development would remain inside the slip areas and would not extend farther than 25' waterward of the nhw for slips 1-16 and no more than 65' from the existing bulkhead for slips 17-20. The width of the canal is an average of 150'. The applicants are proposing to remove the existing boat ramp so this area can be converted into a boat slip. A total of 50ecubic yards of sand and concrete would be removed below nhw. The concrete would Field Investigation Report Sleepy Creek Farms Inc. (Sunset Villas) Page 03 be trucked to an approved site and the sand would be disposed of on lot 6. The dimensions of the disposal area would be 10' x 60' and located a minimum of 30' above the nhw. This material would be used for the new duplex/condo unit permitted under minor permit # 10-05. The new bulkhead sections would be vinyl with a total length of 37 linear feet with a F width. The bulkhead sections would be located at or above the nhw contour. The first 16' section of bulkhead would be located at the old boat ramp area. This would be used to stabilize this area once the boat ramp has been removed. A total of 35 cubic yards of fill material would be used for the backfill of this area to bring to existing grade. These dimensions would be 16'x 20'x 3' in height. The next 21' section of bulkhead would be located at the south end of the docks and property. It would be installed to tie into the neighboring existing bulkhead. There would not be any fill placed below nhw within either section of bulkhead. The applicants are not proposing any excavation within the slip areas due to sufficient water depths. The average existing depth within the slip areas are -4.0' nlw. The upland development was previously permitted under minor permit # 10-05. This permit expired on December 31, 2008. There are two existing duplexes which at this time have not been completed and three duplexes proposed. There would be 10 residential units with 10 units per acre. The duplexes would be of two story design with dimensions of 50' wide and 55' long. The percent of impervious within the AEC is 47 % which was reduced from the existing impervious (Old Sundowner Motel) of 67 %. The entire tract to be covered by impervious would be 39.6%. A total of 28,084 square feet would be graded, filled or disturbed during the upland development. 11. Anticipated Impacts: The proposed docks and fingers would shade 6,318 ft2 and incorporate 9,900 ftz of open water within the canal area. Dock B would shade and incorporate 40 ft2 of coastal wetlands. A total of 28,084 ft2 of high ground would be graded, filled and disturbed. The setting of pilings would cause an increase in temporary turbidity. There would be no hindrance to navigation due to all work being inside of the existing slip areas. Name: Heather Styron Date: 5/14/09 Morehead City i?iueAnexnr m Maier Development Perm (last revised 12/27/06) O - O Co 1 to V 4% it North Carolina DiVISiON OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Sleepy Creek Farms Inc Project Name (if applicable) Sunset Villas Applicant 1: First Name Jim MI Last Name Maxwell Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 938 Millers Chapel Rd PO Box City Goldsboro State NC ZIP 27834 Country USA Phone No. 919 - 778 - 3130 ext. FAX No. - - Street Address (if different from above) City State ZIP Email 2. Agent(Contractor Information Business Name Stroud Engineering, Pa Agent/ Contractor 1: First Name MI Last Name Ronald D Cullipher Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 151A Highway 24 Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 247 - 747 9 ext. - - ext. FAX No. Contractor # 252 247 4098 Street Address (if different from above) City State ZIP Email RCULLIPHER@STROUDENGINEER.COM <Form continues on back> 252-808-2808 .. 1-888-4RCOAST .- www.nccoastaimanagement.net Form CCkii iMP ;Page ? of A) As PLP CAT CN `cr Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret Old Causeway Rd Block 19 - SR 1205 Subdivision Name City State Zip Atlantic Beach NC 28516- Phone No. Lot No. (s) (if many, attach additional page with list) - ext. 2, 3, 4, 5, 6 a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Whiteoak Manmade Canal c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. (]Natural ®Manmade (]Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ?No work falls within. Atlantic Beach 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 300 FT .92 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or .184, NWL (normal water level) (if many lot sizes, please attach additional page with a list) 5 ?NHW or ®NWL e. Vegetation on tract Grass & Landscaping f. Man-made features and uses now on tract Residential Duplex Condo units g. Identify and describe the existing land uses admiacent to the proposed project site. Boat storage yard to the south. Progress Energy Substation to the North h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Residential (Attach zoning compliance certificate, if applicable) ®Yes ?No ?NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes ®No ?NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes ®No ?NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 .. 1-888-4RC0AST .. www.nacoastaImanagement.net n_rm D?CiUi ;AP--! ,"Page 3 of :4) 3r ?yBG.T:e'f'f -cr Major Development Permit m. (i) Are there wetlands on the site? Yes ?No (ii) Are there coastal wetlands on the site? IZYes ?No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater treated by Onsite Septic o. Describe existing drinking water supply source. Town of Atlantic Baech public water p. Describe existing storm water management or treatment systems. Infiltration Chambers provided for excess runoff 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Government ® Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of the project is to reconfigure existing docks on site for use of the condo owners. Boats lifts will also be added. I c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Jet pump, Barge, Excavator stored onsite d. List all development activities you propose. The development will include the removal of existing docks for replacement, removal of an existing boatramp, construction of a new bulkhead along the shoreline, and the construction of 20 slips. 4 slips will be provided per lot. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 28,084 ®Sq.Ft or ?Acres g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes ®No ?NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None i. Will wastewater or stormwater be discharged into a wetland? ?Yes ®No ?NA If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ®NA j. Is there any mitigation proposed? ?Yes ®No ?NA If yes, attach a mitigation proposal. <Form continues on back> 252-808-2808 .. 1-888-4RCOAST .. www.nccoastaImanagement.net orm DCNI NIP-1 ;Page -i of =4) ,APPLCA-r1!CN `or Nlaior Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps; plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Rhonda G. Cooper Phone No. 252-726-3471 Address 108 S. 10" St. Morehead City, NC 28512 Name Progress Energy Phone No. 1-800-452-2777 Address PO Box 1551, Raleigh, NC 27602-1551 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Minor Permit # 10-05 issued 9/12/05 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date -7 /3 9 f Print Name David Gambardella (Authorized Agent) Signature/ Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information pDCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information 252-808-2803 .. 1-383-4RC€ AST .. www.necoastalmanagement.net ron 4-440 d® IMP-2 EXCAVATION L (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include ail suppiementai information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel NLW Canal Boat Basin Boat Ramp Rock Groin Rock (excluding ( or Breakwater shoreline NWL) stabilization) Length 25 FT Width 15 FT Avg. Existing Depth NA NA 1.4 FT NLW Final Project Depth NA NA 5 FT NLW 9. EXCAVATION NThis section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Concrete and Sand 50 CY to convert old boat ramp into boat slips and bulkhead after concrete removal (CF/27 = CY 25X1 5X3.6 = 1350 /27 = 50 CY) c. (i) Does the area to be excavated include coastal wetlands/marsh d. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL NNone (ii) Describe the purpose of the excavation in these areas: Remove boat ramp and convert to boat slips High-ground excavation in cubic yards. NA 2. DISPOSAL OF EXCAVATED MATERIAL ?This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Sand on High Ground Onsite Lot 6. Concrete to approved 10'x 60' on Lot 6 dump c. (i) Do you claim title to disposal area? NYes ?No ?NA (ii) If no, attach a letter granting permission from the owner. d. (i) Will a disposal area be available for future maintenance? ?Yes NNo ?NA (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL NNone (it) Describe the purpose of disposal in these areas: DISPOSAL OF DREDGE MATERIAL f. (i) Does the disposal include any area in the water? ?Yes NNo ?NA (ii) If yes, how much water area is affected? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12126/06 3. SHORELINE STABILIZATION []This section not applicable (If development is a wood groin, use MP-4 - Structures) a. Type of shoreline stabilization: MBulkhead []Riprap []Breakwater/Sill []Other: c. Average distance waterward of NHW or NWL : 1' waterward of NHW (old bulkhead) e. Type of stabilization material: Vinyl Bulkhead g. Number of square feet of fill to be placed below water level. Bulkhead backfill 300 sf (300'x 1') Riprap Breakwater/Sill Other i. Source of fill material. Approved sand mine b. Length, 300' Width: 1' d. Maximum distance watennvard of NHW or NWL: 1' waterward of NHW (Old Bullhead) f. (i) Has there been shoreline erosion during preceding 12 months? []Yes MNo ?NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material Sand 4. OTHER FILL ACTIVITIES ?This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? MYes ?No ?NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW). If yes, (ii) Amount of material to be placed in the water 35 CY to fill old boatramo landward of new bulkhead 16'X20'x 3' ava = 960 CF/27= 35 CY) (iii) Dimensions of fill area 16'X20'x 3' avg (iv) Purpose of fill Remove and fill old boat ramp after bulkheading and construct new bulkhead along entire property submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL MNone (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Silt Fence Backhoe c. (i) Will navigational aids be required as a result of the project? []Yes MNo ?NA (ii) If yes, explain what type and how they will be implemented. d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes MNo ?NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 7--2-0_0`?, Date Sunset Villas Project Name David Gambardella (Authorized Agent) Applicant Name 252-808-2808 :: 1-888-4RCOAST :: www.necoasta_€rreana;c ement.net revised: 12126106 Applicant Signature 252-808-2808 :: 1-888-4€ COAST :: www.nccoastalmanaciement.net revised: 12/26,06 Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. 3 Residential Duplex's Proposed, 2 existing duplexs to be completed. 5 total c. Density (give the number of residential units and the units per acre). 10 residential units. 10 units per acre e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land-disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ?Yes ?No UNA (ii) If yes, list the date submitted: b. Number of lots or parcels. 5 d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 28084 sf f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Concrete g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 47% i. Give the percentage of the entire tract to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 39.6% j. Describe proposed method of sewage disposal. On site septic 1. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Surface runoff h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ®Yes ?No ?NA (ii) If yes, list the date submitted: 5/11/09 k. Have the facilities described in Item (i) received state or local approval? ®Yes ?No ?NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ?Yes ®No ?NA If yes, attach appropriate documentation. PfeVIn VS Ul 'C CLS Set ?fifCC/ie? St'? rve. m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Town of Atlantic Beach n. (i) wVili water be impounded? ?Yes ®No UNA (ii) If yes, how many acres? o. When was the tot(s) platted and recorded? p. If proposed development is a subdivision, will additional utilities be 2/2005 installed for this upland development? ?Yes ?No ®NA S--- /'/- 0? Date Sunset Villas Project Name David Gambardella (Authorized Agent) App Ij?an?Name Applicant Signature Farm DCM MP-4 1 3 d Z-4 "04 (Construction within Public Trust Areas) Attach this form to joint Application ror CAMA Major Permit, Form DCivi MR-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: []Commercial ?Public/Government ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 2 (iii) Length Dock A: 300' Dock B: 86' (iv) Width 6 (v) Floating ?Yes NNo e. (i) Are Platforms included? ?Yes NNo If yes: (ii) Number (iii) Length (iv) Width (v) Floating ?Yes ?No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 20 (ii) Number of slips existing 25 to be removed and replaced with 20 slips i. Check the proposed type of siting: ? Land cut and access channel []Open water; dredging for basin and/or channel NOpen water; no dredging required []Other; please describe: k. Typical boat length: 20'-30' m. (i) Will the facility have tie pilings? ®Yes ?No (ii) If yes number of tie pilings? 9 []This section not applicable b. (i) Will the facility be open to the general public? []Yes ®No d. (i) Are Finger If yes: (ii) Number (iii) Length (iv) Width (v) Floating Piers included? ®Yes ?No 10 25'-28' 3 ?Yes ®No f. (i) Are Boatlifts included? ®Yes ?No If yes: (ii) Number 10 (iii) Length 12'-16' (iv) Width 13' h. Check all the types of services.to be provided. ? Full service, including travel lift and/or rail, repair or maintenance service ? Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 20 ? Dry storage; number of boats: ? Boat ramp(s); number of boat ramps: ? Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout 1. (i) Will the facility be open to the general public? ?Yes NNo 252-808-2808 :: 1-888-4RCOAST :: vvvvw.nccoastafnianagernent.net revised: 12/27/06 2. OOCKJNG FACILITY/MARINA OPERATIONS ?This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ? Office Toilets ? Toilets for patrons; Number: NA; Location: NA ? Showers ? Boatholding tank pumpout; Give type and location: NA b. Describe treatment type and disposal location for all sanitary wastewater. NA c. Describe the disposal of solid waste, fish offal and trash. Trash receptacles will be provided dockside d. How will overboard discharge of sewage from boats be controlled? "No Sewage Discharge" sign e. (i) Give the location and number of "No Sewage Discharge" signs proposed. 1 on main dock (ii) Give the location and number of "Pumpout Available" signs proposed. NA f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. NA g. Where will residue from vessel maintenance be disposed of? NA h. Give the number of channel markers and "No Wake" signs proposed. 0 i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. No Fuel Provided j. What will be the marina policy on overnight and live-aboard dockage? NA k. Describe design measures that promote boat basin flushing? NA 1. If this project is an expansion of an existing marina, what types of services are currently provided? NA m. Is the marina/docking facility proposed within a primary or secondary nursery area? ?Yes ®No 252-808-2803:: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12127106 n. is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ?Yes ONo o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands MQ? If any boxes are checked, provide the number of square feet affected. NCW 0 sf ?SAV ?SB ?WL ?None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ?Commercial ?Public/Government ?Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ED This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a• Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ?Commercial ?Public/Government ?Private/Community C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252.868-2808 :: 1-888-4RCOAST :: v vv v.nccoastafmanagement.net revised: 12/27iQ6 a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. On Riparian Line. 15' setback waiver requested 10 FT Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body d. Water depth at waterward end of structure at NLW or NWL 150' avg 4 FT Average aC) NL e. (i) Will navigational aids be required as a result of the project? ?Yes ®No ?NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ®This section not applicable a. Give complete description: 4-21-09 Date Sunset Villas Project Name David Gambardella (Authorized Agent) Applicant Name Applicant Signature 252-808-2808 :: 1-588-4RCQAST :: www.nccoasta[management.net revised: 12127106