HomeMy WebLinkAbout20191251 Ver 2_PCN Form Submission (2)_20190920DWR
IDIOM n of Water Resources
Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
21nitial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned
20191251
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
Select Project Reviewer*
Garcy Ward:eads\gpward
Information for Initial Review
1a. Name of project:
Ocracoke NC 12 Beach Restoration - Hurricane Dorian
1a. Who is the Primary Contact?*
Paul Williams
1b. Primary Contact Email:*
pcWlliams2@ncdot.gov
Date Submitted
9/20/2019
Nearest Body of Water
Atlantic Ocean
Basin
Tar -Pamlico
Water Classification
SB
Version# *
2
Reviewing Office*
Washington Regional Office - (252) 946-6481
1c. Primary Contact Phone:*
(252)482-1861
Site Coordinates
Latitude: Longitude:
35.168724-75.816177
FA. Processing Information U
County (or Counties) where the project is located:
Hyde
Is this project a public transportation project?*
r Yes r' No
Is this a NCDOT Project?*
r Yes r' No
(NCDOT only) T.I.P. or state project number:
WBS#M
15801.1048011
1a. Type(s) of approval sought from the Corps:
r Section 404 Permit (wetlands, streams and waters, Clean Water Act)
W Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What types) of permit(s) do you wish to seek authorization?
r Nationwide Permit (NWP)
r' Regional General Permit (RGP)
R Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
f Yes r No
1d. Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r Individual Permit
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Express
r Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r- Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r- Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
ryes r- No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r- No
1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r- No
1j. Is the project located in a designated trout watershed?
4 Yes r No
FB. Applicant Information
1d. Who is applying for the permit?
r Owner W Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
ryes r- No
2. Owner Information
2a. Name(s) on recorded deed:
US Department of the Interior - Cape Hatteras National Seashore
2b. Deed book and page no.:
2c. Responsible party:
2d.Address
Street Address
1401 National Park Drive
Address Line 2
City
Manteo
Postal / Zip Code
27954
2e. Telephone Number:
(252)475-9019
2g. Email Address:*
sabrina—henry@nps.gov
r- Unknown
State / Rwince / Region
NC
Q�untry
USA
2f. Fax Number:
r- Yes r No
r- Yes r No
v
3. Applicant Information (if different from owner)
3a. Name:
Paul Williams
3b. Business Name:
NC Department of Transportation
3c.Address
Street Address
113 Airport Dr.
Address Line 2
City
Edenton
Postal / Zip Code
27932
3d. Telephone Number:
(252)482-1861
3f. Email Address:*
pcvAlliams2@ncdot.gov
State / Rovince / Region
NC
Country
USA
3e. Fax Number:
(252)482-8722
C. Project Information and Prior Project History U
1. Project Information
1b. Subdivision name:
(d appropriate)
1c. Nearest municipality / town:
Ocracoke
2. Project Identification
2a. Property Identification Number:
2c. Project Address
Street Address
1.6 miles from South Dock Ferry Terminal
Address Line 2
City
Ocracoke
Postal / Zip Cade
27960
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Atlantic Ocean
3b. Water Resources Classification of nearest receiving water:*
SB
3c. What river basin(s) is your project located in?*
Tar -Pamlico
3d. Please provide the 12-digit HUC in which the project is located.
030201050208
4. Project Description and History
2b. Property size:
1
State / Province / Region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Cape Hatteras National Seashore - conservation
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
F Yes r- No r Unknown
4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
NCDWR Project No. 20181301
SAW-2018-01877
Project History Upload
Ocracoke NC 12 Dune Repairs - Hurricane Florence.pdf 541.24KB
SAW-2018-01877 Ocracoke NC12 Dune Repairs_ Hurricane Florence.pdf 145.52KB
Topo - Dune Washout.pdf 802.11 KB
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
Topo.pdf 775.42KB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
Soil_Map.pdf 478.96KB
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
0
4h. Explain the purpose of the proposed project:*
Primary dune along NC 12 was severely eroded during Hurricane Dorian on Ocracoke Island, exposing the roadway of NC 12 to the ocean. Project would restore the beach to the
prestorm profile in two areas of severe erosion to protect the roadway repair activities and the installation of temporary sand bags.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The beach in the two areas of severe erosion would be restored to the pre -storm profile. The storm washed away the beach in these areas, and NCDOT proposes to restore a total of
approximately 41,443 sq. ft. of beach with approximately 2,080 yards of sand from the South Dock dredge spoil site. The beach elevation would match the elevation of the existing
adjacent beach. If the beach naturally accretes before beach restoration is complete, NCDOT would reduce or eliminate beach restoration activities.
4j. Please upload project drawings for the proposed project.
Permit Dravdngs.pdf
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r WA
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
13.9MB
O Unknown
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
r Wetlands r Streams -tributaries
W Open Waters r Pond Construction
4. Open Water Impacts
r Buffers
4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbody type 4f. Impact area
Sheet 6
Beach restoration
P
Atlantic Ocean
Fill
Ocean
0.65
Sheet 7
Beach restoration
P
Atlantic Ocean
Fill
Ocean
0.30
4g. Total temporary open water Impacts:
0.00
4g. Total permanent open water impacts:
0.95
4g. Total open water impacts:
0.95
4h. Comments:
As a result of Hurricane Dorian, MHW is currently within the area to be repaired. Approximately 0.95 acres below MHW will be filled with approximately
2,080 yards of beach quality sand from the dredge spoil site to restore the storm eroded beach.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Beach will be restored to the pre -storm profile and limited to the storm eroded area of the roadwiay washout.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
All work will occur during daylight hours to minimize impacts to hatching sea turtles in the vicinity. Work will not be permitted within 300 feet of observed
sea turtle nests. Fill material WWI be hauled in from the South Dock dredge spoil site.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
f Yes
r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
No wetlands will be impacted by project. Proposed activities do not require mitigation.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r^ Yes r No
If no, explain why:
Project is on the oceanfront.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
Comments
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes
r No
U
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)? *
f Yes
r No
Comments:*
Activity and impacts covered by Minimum Criteria Checklist.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?*
r Yes
r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
f Yes
r No
3b. If you answered "no," provide a short narrative description.
Project restores an existing beach.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r' Yes r' No s WA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?"
G Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?"
r: Yes r No
What Federal Agency is involved?
National Park Service
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
r Unknown
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat? *
r Yes r No
Are there submerged aquatic vegetation (SAV) around the project vicinity?*
r Yes r No r Unknown
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
National Marine Fisheries Database
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
R Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
National Park Service - Southeast Archeological Center
7c. Historic or Prehistoric Information Upload
NPS - Data.pdf 343.88KB
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
r: Yes r No
8b. If yes, explain how project meets FEMA requirements:
WA
8c. What source(s) did you use to make the floodplain determination?*
NCFloodmaps.com, Zone VIE
Miscellaneous
Comments
Coordination with the US Corps of Engineer's supports emergency permitting for this project. NIPS Special Use Permit has been requested and will be submitted when received. CAMA
Major Permit Modification will be requested for this project. Correspondence with other agencies will be submitted by email or uploaded to Laserfiche.
Miscellaneous attachments not previously requested.
NCWRC Email.pdf
Sig
*
W By checking the box and signing below, I certify that:
218.971
u
u
. I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a vritten signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Paul Collins Williams, Jr.
Signature
Date
9/20/2019