HomeMy WebLinkAboutNCS000096_Email RE Inspection Report_20190920Moore, James
From:
Moore, James
Sent:
Friday, September 20, 2019 9:14 AM
To:
Garcia, Lauren V
Cc:
Khan, Zahid; Graybeal, Christopher E
Subject:
NCS000096 Albemarle Inspection
Attachments: Albemarle NCS000096 Inspection 9-19-2019.pdf
Please see the attached inspection report, I recommend issuing the new permit with the same monitoring parameters. I
also recommend adding a footnote in the analytical section regarding the 15 minute holding time for pH analysis. Some
people are still taking pH samples to a lab for analysis. Please call if questions.
James Moore
Assistant Regional Engineer
Land Quality Division
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Phone: (704) 663-1699 x2138
Fax: (704) 663-6040
Email: iames.moore@ncdenr.gov
Mailing Address: 610 E. Center Ave. Suite 301
Mooresville, NC 28115
N, I Z_._
• Compares.--.,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Moore, James h
Sent: Monday, September 16, 2019 10:28 AM
To: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Subject: RE: Individual Industrial Permit Renewal Schedule Heads Up
Thanks, I remember the email but it is hard to believe it is not saved in my inbox or sent. I am going to inspect Albemarle
NCS000096 on Thurs pm. I have given my comments on Wire Bond based on my last inspection, do you still want me to
inspect again.
From: Garcia, Lauren V
Sent: Monday, September 16, 2019 10:18 AM
To: Moore, James <iames.moore@ncdenr.gov>
Subject: RE: Individual Industrial Permit Renewal Schedule Heads Up
All referenced documents have been distributed.
From: Moore, James
Sent: Monday, September 16, 2019 9:05 AM
To: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Subject: RE: Individual Industrial Permit Renewal Schedule Heads Up
I did not get your August 16t' email
From: Garcia, Lauren V
Sent: Monday, September 16, 2019 8:58 AM
To: Khan, Zahid <zahid.khan@ncdenr.gov>
Cc: Moore, James <lames.moore@ncdenr.gov>; Lucas, Annette <annette.lucas@ncdenr.gov>
Subject: RE: Individual Industrial Permit Renewal Schedule Heads Up
I sent you the drafts and associated information for NCS000163, NCS000311, NC5000321, and NCS000514 on August
16th. I forwarded that specific email to Chris at 6:59am this morning. I am preparing the remaining site (NCS000596,
NCS000339, NCS000259, NCS000183, NCS000096, NCS000037) documents to be sent this morning. You should not need
these things from me to do the inspections though, they are only necessary for the permit reviews. We do not put draft
permits in Laserfiche, only the finals. I just need a standard industrial stormwater inspection. I have attached the
inspection form Thad, Mike, and Isaiah use.
From: Moore, James
Sent: Monday, September 16, 2019 8:48 AM
To: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Subject: RE: Individual Industrial Permit Renewal Schedule Heads Up
Where is the link for the draft NCS permits we are inspecting this week, they are not on laserfishe
From: Garcia, Lauren V
Sent: Monday, April 01, 2019 4:11 PM
To: Reed, Isaiah <isaiah.reed@oah.nc.gov>; Lawyer, Mike <mike.lawyer@ncdenr.gov>; Moore, James
<iames.moore@ncdenr.gov>; Valentine, Thad <thad.valentine@ncdenr.gov>; Edgerton, Thom
<thom.edgerton@ncdenr.gov>; Lambe, Brian <brian.lambe@ncdenr.gov>; Wise, Brandon L
<brandon.wise@ncdenr.gov>
Subject: Individual Industrial Permit Renewal Schedule Heads Up
Greetings All,
Annette Lucas thought it would be a good idea for me to pass along this permit renewal schedule for those that do not
already have it. All of the permits highlighted in yellow are scheduled to be renewed this year. You guys will start getting
emails from me about them and I just wanted everyone to have a heads up.
Thanks,
Lauren
Lauren Garcia
Environmental Specialist II
Stormwater Program
Division of Energy, Mineral, and Land Resources
Permit: NCS000096
SOC:
County: Cleveland
Region: Mooresville
Contact Person: John Kuhn
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Compliance Inspection Report
Effective: 11/01/09 Expiration: 10/31/14 Owner: Albemarle U S Inc
Effective: Expiration: Facility: Albemarle U.S., Inc.
348 Holiday Inn Dr
Inspection Date: 09/19/2019
Primary Inspector: James D Moore
Secondary Inspector(s):
Kings Mountain NC 28086
Title: Phone: 704-734-2708
Certification: Phone:
Entry Time: 09:30AM Exit Time: 12:O0PM
Reason for Inspection: Routine
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Phone:
Inspection Type: Compliance Evaluation
Page 1 of 3
Permit: NCS000096 Owner -Facility: Albemarle U S Inc
Inspection Date: 09/19/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The inspection was for the permit renewal. The site was in compliance and I recommend issuing the new permit with the
same monitoring paramaters. However I do recommend adding a footnote regarding pH and the 15 minute holding time for
analysis. Some people are still taking pH samples to a lab for analysis.
Page 2 of 3
Permit: NCS000096 Owner -Facility: Albemarle U S Inc
Inspection Date: 09/19/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0 ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
N ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0 ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
N ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0 ❑ ❑ ❑
Comment
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑
Comment: Benchmarks for TSS and pH have been exceeded in the past but the next sample was always
within the benchmarks.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? N ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ M ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3