Loading...
HomeMy WebLinkAbout20021418 Ver 1_Complete File_20040111F \V A TF Michael F. Easley, Governor `O?O 9QG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources t7 Alan W. Klimek, P. E. Director 7 Division of Water Quality () Coleen H. Sullins, Deputy Director Division of Water Quality January 11, 2004 Mr. Todd Fisher GNA Design Associates, Inc. 428 East Fourth Street Suite 408 Charlotte, NC 28202 Dear Mr. Fisher: RE: Stormwater Management Plan - Pinnacle Point Development DWQ # 02-1418 Mecklenburg County DWQ staff have reviewed your plans to relocate the stormwater pond for the Pinnacle Point Development as described in your letters of December 18, 2003 (received December 22, 2003) and January 6, 2004 (received January 7, 2004). DWQ has reviewed these plans and has no objection to this plan with the following exception. The proposed outfall from the pond is currently designed to end about 40 to 80 feet from the edge of the streambank. Given the relative relief of this site and the flow from this outfall, it is very likely that this outfall will be erosive and result in streambank erosion unless the outfall is taken to the elevation of the channel. Therefore please redesign the outfall to directly connect the outflow from the pond to the receiving stream. We understand that there is a 35 foot wide, protected "wetland buffer" on this site. You must seek a modification for encroachment into this protected buffer from the US Army Corps of Engineers. In this case, DWQ believes that such an encroachment is warranted to prevent downstream water quality violations. I can be reached at 919-733-9646 if you have any questions. Until we receive the final revised plan, this project shall remain on hold as incomplete. yours, CC Alan Johnson, DWQ Mooresville Steve Chapin, Asheville Field Ofi File copy Central files Dorn al Office Army Corps of. ngineers N. C. Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 733-7015 Customer Service 1-877-623-6748 GNA DESIGN ASSOCIATES, INC. '4-0?L GNA Job No. 54215 December 18, 2003 Mr. Todd St. John NCDENR - Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 DE IL 2 2 2003 WATER UoAu V y 4E?TION GNA DESIGN ASSOCIATES, INC. 428 East Fourth Street Suite 408 (704) 373-1907 Charlotte, INC 28202 Fax(704)358-0766 Re: DWQ Project No. 02-1418 Stormwater Management Plan Pinnacle Point Development, Charlotte, NC Dear Todd: The stormwater management plan for the Pinnacle Point development in Charlotte, NC, previously approved by the Division of Water Quality under Project No. 02- 1418, has been revised. The project developer proposes to relocate the planned wet pond stormwater management basin which services the project onto an adjacent parcel in order that the parcel on which the basin is currently located may be used for additional commercial development. In addition to relocating the basin, the basin has been re-sized to accommodate the additional proposed development. Construction plans and design calculations for the revised stormwater management basin are enclosed for your review. Please contact me at 704-373-1907 with any additional information needs. Sincerely, R. Todd Fisher, P.E. Associate encl. WETLANDS 1401 GROUP -.'W ? (I"' VP Principals Teresa L. Hawkins, ASLA Landscape Architecture Jeff D. Oden, PE Civil Engineering F. Lee Howell, PLS Surveying 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 GN/A, DESIGN ASSOCIATES Inc. 428 East Fourth Stmt Suite 408 (704) 373-1907 Charlotte, NC 20202 Su rip . Landsmps Amhitlsmm . CiVil Enpinaerinp ENGINEERING DESIGN DATA STORM DRAINAGEt STORM WATER DETENTION* AND EROSION CONTROL Stormwater Pond Relocation Pinnacle Point Development Charlotte, North Carolina GNA Job No. 542 1 5 m I' o?1s? ®?'? ,. s DI oa 1 1 1 1 1 0 GNA Job No. 54215 Issued: 12/16/03 SUBMITTAL NARRATIVE Stormwater Pond Relocation Pinnacle Point Development Charlotte, North Carolina Project Description GNA DESIGN ASSOCIATES, INC. ' The overall drainage plan for the Pinnacle Point development prepared by Lucas-Forman, Inc., dated March 6, 2003, and previously approved by the City of Charlotte and the NCDENR Division of Water Quality (DWQ File No. 021418), has been revised. The developer proposes to relocate the ' planned stormwater management basin which services the project onto an adjacent parcel in order to utilize the parcel on which the basin is currently located for additional commercial development. 1 H it u D In addition to relocating the basin, the basin has been re-sized to accommodate the additional development proposed within the two parcels located on the south side of Berkeley Place Drive (Parcel A and the Pond Parcel; refer to drainage area map). r] 11 r ' GNA Job No. 54215 Issued: 12/16/03 Page 1 of 1 J i n n n TABLE 1 Modeled Peak Discharges for Design Storms Pinnacle Point Charlotte, North Carolina V NA DESIGN ASSOCIATES, INC. Post-Dev. Peak Discharge cfs Detention Routed Pre-Developed Contribution Allowable Actual Peak I Max. Peak Total from Peak Discharge I WSE Design Storm Discharge cfs to Basin Public ROW Discharge cfs cfs I ft 2-YR 6-HR 11 60 9 20 11 635.58 10-YR, 6-HR 45 121 14 59 -- 56 636.68 50-YR 6-HR - - - - - 172 - --- --- - ( ... 112 637.43 - - -- 100-YR, 6-HR - 195 - - 140 637.70 NOTES 1. Pre-developed peak flows estimated using HEC-1 computer model. 2. Post-developed peak flows and detention routed peak flows and water surface elevations (WSE) estimated using HEC-1 computer model with stage-storage-discharge relationship per Table 5. 3. Allowabe peak discharge = pre-developed peak discharge + post-developed peak from public ROW area. E ,7 7 GNA Job No. 54215 Issued: 12/16/03 GNA DESIGN ASSOCIATES, Inc. Stormwater Pond Relocation Pinnacle Point Development Storm Drainage Calculations F r-, 1 i? 2 as NN 6 t2 1 H W W S N Z C a c m ' N = a0 U w ? m o V ? Z r L 3 a N U R K O y n 0 N O N N O Z O O Z rn (.9 m a W m G J ?!i N O I?tt Cy M ?iI tp ?I t0 <O1 i? i (? iNI 4 0 (C prof 'CyNyD O 'I M!M { N?N C N N Oi N a0) Ih'. Ni N ( 17.1 Ih N N i N ^x(00, C M b ? ( O O? I ( O O !t t O 6 ti ? O O N'i s olo`I d?dl dl ' NI (9? 'oi ? ni i?l !off O .N- 'sla ': ojo C rE ?Ij ?:, Nli o! dio I ICI Ial 010 u LL C o M Ito th tp I I 0)l ?I I N4 NI 'WIC N',.? IL C m ? N.. O W M'.' N N m Q I N M0 ?j INl N M 1 ?' I I?IN 0 ; O LL IN 1 10 O X010 ? ° ' rni a r ? f ??? i itnl <?n.- m Y 6 U m U vi of o N+N?CN, ,d. iNl iii N 'O ao SIN V1 C C C A MGM M? i 0? 61 O I ICI COI i M? O' i0) ? : O 1 i0 M? ? .1 O : IG G a r la a a 7K???. al !o a p: ''. ala L0UUq m •a y O O O `°1 m?ml : 00 r N. i? W'. aD I? ?- Q 6 C O V 1 m ? rl OI 4 N a j? ( O ? N( 1Ci ?;0 N?O m o w 6 LL U t dl of Nl ? N) ia? ?M? l of L 6j l I.io A m 2 <iNil p rm E o7 °o °o, M°IM o ? o! N, i !ono ??N?N ? di oho lob ?o :dd m °c ° Z slm m '. rnl rnl 'rnjrn O E i l i l l i j m IL o, of of o ?d ioo ?R. I- MI OI OII ?l l MI a ?i 1 0 j, OBI ?I MGM ?I l m CI I°I I,dl °I (oj ,I?IIo d d c E I 1 , ' I _ j _ I O a aO MI ? d dj i Of I ', o l l M' ?dI i 'N'CO io:,d l I t J I tp I I VV ?I F MCI NI ?, m fO W ?M { 01 NI ¢]` i I ?N 2 W O r O O I O I O? tN0 m t0 1,q N % (NO 1 ?p I (O 0 O ? M (p t0 ? r U 2 _- O LL _-G y(Miq+? l z N r? N: IWl IN rl N IWI stn ~ Im,ry iWI? N ml m o` o 2 w FL O? C 0 C 0 0 O F ? Z k I 0 0 0 ' GNA Job No. 54215 Issued: 12/16/03 GNA DESIGN ASSOCIATES, Inc. Stormwater Pond Relocation ' Pinnacle Point Development I? Supporting Data for Hydraulic Analysis u 0 Ll L C Project No. DWQ (to be provided by DWQ) ' DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review ' A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed ' operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : ??ts NAL?? Pot N ' Contact Person: TOM F?St1E?2. Phone Number: ('701-A ) `SZ ? i5o'1 For projects with multiple basins, specify which basin this worksheet applies to: VbN (? A ' Basin Bottom Elevation (oZCo -a ft. (average elevation of the floor of the basin) Permanent Pool Elevation 0 . o ft. (elevation of the orifice invert out) Temporary Pool Elevation Co3?-ZS ft. (elevation of the outlet structure invert in) ' Permanent Pool Surface Area ??,?jZCo sq. ft. (water surface area at permanent pool elevation) Drainage Area yrj.5< ac. (on-site and off-site drainage to the basin) ' Impervious Area Zc6.1 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume cu. ft. (combined volume of main basin and forebay) ' Temporary Pool Volume \ VL 4s Co Cj cu. ft. (volume detained on top of the permanent pool) Forebay Volume Vyioc? cu. ft. (3`i,ZZ7 R-aE"t; -5-n5 ' SA/DA used Z-1`1 (surface area to drainage area ratio) Diameter of Orifice in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST ' The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials ' X The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Y Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. ' X The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). )<The tem orar ool draws down in 2 to 5 da s p y p y . X The forebay volume is approximately equal to 20% of the total basin volume. >C Sediment storage is provided in the permanent pool. X Access is provided for maintenance. X A minimum 30-foot vegetative filter is provided at the outlet. (C w-\F-AL TO WW-AOIC, w-S Avt) 4WA. X -----.A site specific operation and maintenance (O&M) plan is provided. (P?Ev?c?t?t Svt'a?t ?T?En, A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. ' A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page 1 of 1 7 1J n l I 7 ___- __.._ Gf€?cE, ?v??. ?..???_?.__?.c- ?._?.?:??_..tM? _?..._?1•?d. Ate. ? -__?- -' VWQY `-! Al- -7 ?`? A -- --- --- -- _ _ _--- _- _ ___ _ ------ ??Nn '?AKC?L = Z.UC? Ac- (U AL y ?MQ. AiU A _ .? G??-? O 005 ?.. ..._.._. ..? - - _.._...,_.???. ' = \??L\r.r6. loo- 0 i n I I 7 7 0 0 0 . --- - ----- _ . _. _. _ --- - - ----- - - ---- - ------?-Z - - - - - -------- -- --- ----- --------- z \ z \ -1 VIC ------ i p H r 0 0 ' GNA Job No. 54215 Issued: 12/16/03 Page 1 of 1 H H H C 1 DESIGN ASSOCIATES, INC. ? f TABLE 3 COMPOSITE RUNOFF CURVE NUMBERS Pinnacle Point Charlotte, North Carolina Drain. Area Hydrologic Runoff Area ID acres Soil Grou Cover T e CN CN x A EXISTING CONDITION AREA A 7.90 B Woods 55 435 To Basin 4.40 B Grass 61 268 0.00 B Impervious 98 0 26.20 C Woods 70 1834 5.40 C Grass 74 400 1.90 C Impervious 98 186 Total: 45.80 Composite CN: 68 PROPOSED DEVELOPED CONDITION AREA A 0.90 B Woods 55 50 To Basin 4.95 B Grass 61 302 6.45 B Impervious 98 632 0.00 C Woods 70 0 11.80 C Grass 74 873 21.70 C Impervious 98 2127 Total: 45.80 Composite CN: 87 NOTES 1. Soil types include: Cecil and Pacolet groups (Group B) + Enon, Monacan, and Wilkes groups (Group C). Refer to Soils Map. 2. Runoff Curve Numbers per Soil Conservation Service Technical Release 55 (SCS TR-55), June 1986. II J I 1 F 1? Q Z O w o? Z C7 1 [ i F t v - ' w? J H ( f t t F M N M L O z 9 p O z y O ? N CL s i ? U ?' o U Z m c Qj c s a o L i U m e (! i 1 l' I Iii ? ~ L M1 0 O?? I M O? O o ?? ( I O I O I O O? O I O O O O O I ~ 1 j I I I i N II I I s i ? ? v : I ? I I i .. ? M' ' O> I I I( N I I I I r N a I ! a C7 > i j> ( i ! i d > u i I I N ? F ? I i I F U i O I ( I « ? I I I ! ! i I ? ?? p L d c jml Oi I I i M I ! II i'? M M v v i i F c ' , I I I l I I N ? w v ! N! Mi j N M,I O ?l tL d '? i i ?' ? i ! ! r j I r u? I M c V O I I j I I OI j I I O O v i i I I ?? i I l N i ??? I I i : 1 I I I C 1 N Ii a ?' l I I M 1 ! i i ri u i i I i 1 i i C ?j?I ! ! M! i O I ! M o i I to j !, mi iAl NI l O to o ? I j II la`VI I j I! Ijai ? gl, ! a? a I ! ; I ?, r I ? N I i l l: ? I i I ! 1 1 i I;! I I l i LL I i Nii I I I I N I I C a ! 4 ? ' O d j > ji 1 ?, L to V i , Cj I c? i > i ; ? ? I N ' I ! I ! i t f C d ! N O O NI O I MI OI c O o I O I O O I O I O ? I j i? ? I i i l 1 i d o n' o ?n r o ?n f o 0 0 o I0 0 0 o 0 y o 0 0 0 ( o o c - L o s C .'?' I I I ? I I !O'M l0 cco VI MI7 N I MI Oi O (O 1 I d "' , ( N• i l I I V I I ? I a I I? i I i v I 3 oI _I _ 3? of -I I - I c! ?E c c j l c ?! c c! 3 O 31 c c, 31 c of ) ?ior 1 ? ? U r L ? U? U 1 L, ? I I ci r U LL p I - p j N? L [ ? L ?. c I ? I I j ! ' t ! ! E ! i 11 1 1! I I I l i? ? l' l I l O a j! i ! I I I ! . 9j ?I ?' ?' a?I c c c c ! H ! , f0 (6 r C { N (0 I i L ( O ( O N 0 > N N .V. V.. O of of I i of o . a l i l I j?I j I j I N I I i ci i ? ? ? ?' C I 1 a a I U) jto iniv`i ai c`"n! la`1<n?a'iiai w E fn Q Q z N rM v O i d I U ULL O ' Iw 0 ' Z l 7 I !P N M LO O O ' O r Z `N .- _ O O Z ai m O. t O C N R M m ? C O N ? C w m v O d O m G ? O a U) L O) r-. l0 co C O c ? U CL O O U Z CO C C ? FL O m L U w ? I O i 0 O 0 0 O O O N tO M II( m V m I d' w N LO M CD N N O M N N T7 O O O O O O O O r N M M V LO LO CO M m LO M m 00 . v v 00 r 10 v LO LO O O O O O O C k, O O O O O O O O O h r CM V d' U ) h 0) r ?.., 0 O' I O h <t r i CO LO N 00 LO r O O m N OR '7 O CO N O x a tp N I I I I I I I I O V I O <t N It N 1 M ' t 'd' LO 'T CO ? O V 1` It w V w It m d' m 't 0 CO LO to N Lo N LO 41 L N 3 CC 'p I I ! I I I I I ; I I I I I I I I I I I I I I 1 O 0 co M to M m M CO O r M V: N L 1 : j 1 i S O co N V (DI m r O I I 1---t ---S - I - r-{ ? .d I I : i O co co (O M t(7 0) co f` W 1 (D O M I I I I I I I I I I I I I l I I I ( I I p l 4 cn? r` N 1 9 ? ti iD + O S CO I r M I LOI r- 0) rl r: r, N? N ? ! I I I ? I i l I I ? O i O 01 O? p 0 0 0 O i 0 O -O I O O, I O O N r LO N M M ? m M "t m d' 7 lC7 W lO N CO lO (O m CO N h 1 LO I t` W 0D v. CO i CO' CO 0) CO I m 0) O co 6 0 0 1 0 0 0 1 0 0 0 0 0 6 C. 0 O C) 0 0 6 6 0 0 0 O I O 61 6 O I i i I N ? co I N N m N I O I O 00 O N LO O co CO co N O d' O LO co O N M 1- t` 0) p t` O O au O O LO n M N. CO N V p N M m m M M N LO OD O 'IT N Iq M O O m It m w h CO CD co 1` co O N ct lO m y m y V O r LO O CO M O l m N to f` O M CO m N LO co N LO CO r ? CO r t0 CO N t0 I O O O r r I N M M 4 d' 4 6 6 16 6 m CO m r` 1; h 00 00 w Oi of 6 O 01 w j i d' t` ? W I I O n N 'ci' N M N L m r W - N t` co CO co O m m O O 00 co CO d' V M N I LO C. m O w ! M p co M C14 I r, I O v M M O LO M O v 00 V m N M O m CO h r- r- 1 m M m v h ? m N 00 co CD 00 r h 2k' O I N ( ?. ' O M M LO co 00 _ M CD M N O m M h CD O lO O lO CO . I N I Cp N d. Lo ( 0 M 00 m O N M lO t` Op m N V' LO f` ap O M yf i r rl r r r N N N NI N N N N M M M? M M M m i ; I I + ! l i I I f0 I O O co fl- O N ? LO N m LC) LO ti m O d' O (0 N m m co co m N LO m I- > m O M p N h N _ m CO N O m m co 00 1` r-_ 1` ti 1` co 00 00 ` O N N I 0) t` CD LO M to O O tO 00 O N M N to N 00 N O M N M M M LO M h M 0) M d' M d' LO ch l? V, m st LO M 0 LO LO V '' O C ) r r r N ?t r r r r r r r r C ! i rl I l l l M I LO ti CO ? co ( m I M I CO I M CO CO ? M _ I p CD m ! N lO 1 0D CO v I N I O M CO ( col _ d y, 1- O+ V I _O I N co L M I CO 1 I N LO m I LO I N LO LC) CO O N 001 Il O 0) MI r O co co O lO cD v N W C; p m M lO r` 't M CO LO M CD r 1` m h _ ; ti O CO m N M 0 M r d' + m ' (O r` N Q ?. N r tt r O r 1 - r { r N 7 - V U-) LO LO LO LO LO LO LO LO LO LO 0 LO CD CO CD co j i + S I ( I I I I I I I I I ? I I I I cy) LO 00 OD 04 (0 I 1 j j I I ! I f I i I N C; o 00 N (O N? ? v- co c 0! m I I I I( I I l I I I I I I ! I I I I I . I I 1 l l I f I I C ) l ( I + ! i m i 1 I O LL 16 d' N rf r O o o co co 00 o M C, l l l l l l l l l l l l l l l l l l l l l Q LO CD N m p > I I i 't i I O I i + I 1? i ' i I I I 1 I I CD O I m rril 00 , N ?I I I I I I I 1 I I I I I I 11 I I I I 1 I I I I r r N NI ? C ? y ? i I I S l 1 I I I I ` I ; LL (p O p 1 0 00 O m N I I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Q ; I r r N N M I I I I I 0 O I 0 O 0 O I 0 O 1 0 O ? 4 I 0 O 0 O LO N O LO LO t` O O LO N O LO LO Ih O O LO N O tO LO h O N LOO LO O N O to 0 N O r N M 4 W r- N N r- CO CO w a0 m m m 0 0 0 0 r O LO O LO O LO O LO O LO O tO O LO O to O LO C. LO O • 0 0 0 0 0 0 C. 0 C, 0 0 N LO r- C) C14 UI) r.- CD N U') N C) C\I LO r- ? ?' . . (D O W m O N M M M M d' d' <1' V' vi vi LO 6 CD CO CO CD O N. F- h co . = d N N N M M M M M M M M M M M M M M M M M M co 1 CY) C( M CM W co (k 1 C D ! co 1 O ( co 1 C D C O 1( ( O 1 CD C O I ( D I ( D ( D I C O co ( 0 co C O ( O w f O C 1 ( D 1 ( D C D I .0 l 0 C D O d I I 1 J . i QD?I aE - Pa CeDj Wk EnD y ?rEnB'? Y WkE i W ?. 1 SOILS hw Abbington Place at Pinnacle Point Chadottef North Carolina Approximate Scale: 1" = 600' Source Mecklenburg County GIS i I 0 H n 0 IF _t?t,, I 4u / 19 ,r ?? I 9 rlr ,' 1, , t/ bit 1 ' ZI, r I\ i ' /y? ? , ql / / ,? /l/ ? ?'l r/r7 ? melt ??Y? ' ? ? Y\Y ? \ ? ! ?? 3??,.? " ?, J 1 ! ? v \?, dIL / > Y t f I I ;?i 1 t flit - `'t \ .YY ? ?••? SI A J\ i dy'` c A''?t I 1 ? a 1 ? A ^,vA ?// vvw F _?Ye / v ? ;V?,? r? , ?r /.f: l ! ?J 1 ??? t l` ??V???- +" ???'l Vw!t ??V? _ YY ?' r r? ???. ??V ..? '. ? `? n, ? !.r?. ., \\. ?F?l ?r1,4/ F ,.. \??,a` \ ?`?c - Ir /' ^, ? - '? _ J ,'-'. ? -- __ ?+!''•S?2 I,,lr t" .mn ?i,4 1 r\\ -\5` ?? rAi VFW & \\++, Y11,:: -. Y ??- - r? 'IF '' I1 to 1?` vAv1G/ ??, ?v ?V vv ! ! Ya \r i ' //i I?,? X ?. Y / / ? ? 1 t1?\'?i 1, :N.l? ?\T, It yyll `r1r rl ` ? ` _? / ./? /_?r /i, •.? \ \ y i \w \'a\ , 1? 91 i I+" ? It`d rl, r Y v //? ' ,/ r r \ \\\\\?? v ? ?II I F , Fir' ? , 1 ), fq ?1 I ? ! r '\ x `? \t tl kk 1, 1.\Y\\\'+ t r Y r (l V'1 V ? Vt' V , ?.. v x, F v . '. ti ', i?r1, - v •- ,; ''? y ', A ?v ,??? ? - ?. , tll _ t r I , 4d, t 17/, ?\ I ° / \ y, ?l. i } \?` . \ ?` \'. „x\Y _ ?? :?(' ? J/ ?!I . ? ., a?,,', •, X t i 4 ? 't'') I?r!ii '' ? *•?' ^? e, ? ? _ 'r / ? >`w' ? h,`ti?„ ` \ v ,. - • ?, ^,?''7 1 I'' ?' `t _•?';•°< , ??,v V' - --I? ? V ' I P ?\ I t 9,?!;' ) /i'ft ?4,li., __ •Ai! ))' r?.'\??y\?\t'\?+..\ \\\,a?? 4-,a`_ 4_-!` ?r°Y???!,?, STREET t PU??t?,+ il4 jal rlyrfl`r ??r" / ! _{r/y' s t? \\?\\ `- 1I ? (1 y l,P ,(, i 9 ! i)'I y }`. 9h9// _tJ 1 1 ?1` f ?,1,, , ` L`\ - tkt 1.90 AC IMP. .}? 11A\ ??ry{ qHY. I. !i, r l 7rd ,?,!I ' ! r * ??. ?,9 r??' _r?tl N'BVI,,`I ?FI?I?I1?\`?? _____? ['` SY, ?'/ e .. - I ?'?y???\? { il,lb ?', r ter ? c ;w?, irk! I \a,\. _ /? ti?h!tal ? • I\ f .})l,i 1, ' )Y rr)111'` ?fa'h ?/;., ? r a lil'\ , rl ?-'> ..• I,gil'II..` IX M. ? ,I ,i I?.?'^l.l\ \\, f rc .?i°i?l.7,.'t f ??.,?,I I\ " i. ?Y : iYy? 'I !i?', . \.. _( nll?,?, i TOTAL AREA -I- f t 1 ,, r, , (t ,, 9 I I II?II,/ ? ?, 11 ;II i 11 II ?Irl?' / I ?\'1a1 1 `` a' // // I 1i ??1,11 1 t!1,?'t , I lid 1?1\ Il`,. r I y' U, 1 AX! ?h < 1 O I,1 a ?, N/ , I !21 'a 1 1 I / I I ? / L"n N r` / p r 1 ?" y r bt l to 14 Nf \ • i?? t,l ,' r? 7?' ? ? 1, ?I? ? V `\ v 'TV.V AC Yom' ?- ,??? ? ?. , I I v? \?' ? t J ?y I ?r /iif RY z' t' ?'1 ',% ';.? ?a?`I 7y/?' ,.'t`P? vv "+ h'- ?/? ,IIt y?. ,v `'? ?.? _? ? { f 7 ! 5r '" ?< '?yrr h I I I rl _ _-_ ?Y _ _ YY . .,} ! , l V \N hA. ow!. 'I I I ryas "/ 7??. r A a?.l ?.? ?`?°"`__ ?----?_? /• _Y ??1'? v ? __ ? '! b n \ a 1 -?v 71 / / , III; y f//f _T " nr X1711, _-- ?y \ 1 ' \ \ tip A yt r ,CC I I '? .%o / '.r. I I 9111 I! _ a `?\ ?,\ Y / r r ? ti trl , yC_ ="% 1!, ^v /``yC, .:? ^ ?f.. - '`t-- 3•?,`r ==`-?r -- ___-__ x J ) 17 _ _...???._.. ? \ _ _.. /. Ili ? / •?/ /, r/ J ',\ ?a I PATH_ ; I rl , ?? / 1 411 -1 1 200' T 00' 0' 200' I C I ' i SCALE: 1 = 200 46 P w ? r u o ? _P 0 0 1 w N N1'1N > iyN U 03 Q Z LLOU • Z L 00 3 W W • O L N ??c 4 0 dlnU Q a' a z ° ce4wot m. w a tw. aanq. .XAaW aeM ?mlWe, bon nw agilal/w,bn- b pralAflk. Ndetm .i a eeM b reu° awn O~ au) P:w Qz Va Z :>: 0 00:3 H 'lJW0 Q- ir W ? °z? Qo ° az°z WU W0-LLJ_ Z W 0 Q ? Q V a Z f- ?Q3 QL 0z wx Nd p W U F O W I 3i Proiect No. 54215 Checked b JDO Drown b RTF Dole Drownl2 16/03 Revisions Sheet 1 OF 1 0 n 7 H G d C1 C 06 W P ? n u o ? m 0 W MN c.-.N U mOU m Z LL Z N O.m, u MM OY.? Y/ W m O u Q <I%IU Q V Q a °u o z0 c J • Cb1YIW iN uM ar U?r d^M^9e ?11pw1 wHtm pYnJNM Yan Ib mYPM/mgh- ar Y P?IeM1 b "d N Whet to Np! W MMn CIO 0z Q-Z HW Qp UjL z :>:F- -j-,o0 <C) W m? WZ ooh fro a. z ° n 0: 0u ?p ~W ? 3a0 Va z ?Qv QW oz ?> Na pW C) F Proiect N. 54215 Checked b JDo Drown b RTF Date Drownl2 16 03 Revisions sheet 1 OF 1 F 1 J I? GNA Job No. 54215 Issued: 12/16/03 GNA DESIGN ASSOCIATES, Inc. Stormwater Pond Relocation Pinnacle Point Development Existing Conditions HEC-1 Analysis for 2 & 10-Year Design Storms FLOOD HYDROGRAPH PACKAGE (HEC-1) * MAY 1991 + VERSION 4.0.1E Dods *•+* Dodson & Associates, Inc. *... Lahey RUN DATE 12/04/03 TIME 13:47:15 7 X X XXXXXXX XXXXX X X X X X X XX X X X X X XXXXXXX XXXX X XXXXX X X X X X X X x x x x x X X XXXKXXX xxxxx XXX * U.S. ARMY CORPS OF ENGINEERS * HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 551-1748 w * rx.xww..ww.w w*w..w.w.*xw..w...r...r.r** THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1 (JAN 73), HECIGS, HECIDB, AND HECIKW. THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE. THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY, ' DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM 1 HEC-1 INPUT PAGE 1 LINE ID....... 1....... 2.......3.......4.......5.......6.......7.... ...8.......9......10 *•* FREE *** 1 ID 54215: PINNACLE POINT, CHARLOTTE, NC 2 ID PROPOSED BASIN RELOCATION 3 ID EXISTING CONDITIONS 4 IT 2 01JAN00 1200 1000 S 10 0 0 ' 6 KK A-2 7 KM 2-YR, 6-HR STORM 8 KO 3 1 9 BA 0.07156 10 PH 0 0.42 0.83 1.45 1.76 1.95 11 LS 0 68 2.28 ' 12 UD 0.354 13 KK A-10 14 KM 10-YR, 6-HR STORM 15 KO 3 1 16 BA 0.07156 ' 17 PH 0 0.59 1.26 2.36 2.90 3.21 3.72 18 LS 0 68 19 UD 0.354 20 21 EZ FLOOD HYDROGRAPH PACKAGE (HEC-1) U.S. ARMY CORPS OF ENGINEERS MAY 1991 HYDROLOGIC ENGINEERING CENTER VERSION 4.0.1E * * 609 SECOND STREET • Lahey F77L-EM/32 version 5.01 * * DAVIS, CALIFORNIA 95616 ' wxx x Dodson Associates, Inc. RUN DATE ATE 12/&04/ 03 TIME 13:47:15 x.x .r.. w rw w.» rr w ** ** (916) 551-1748 * 54215: PINNACLE POINT, CHARLOTTE, NC PROPOSED BASIN RELOCATION EXISTING CONDITIONS 5 IO OUTPUT CONTROL VARIABLES IPRNT 0 PRINT CONTROL IPLOT 0 PLOT CONTROL ' QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 2 MINUTES IN COMPUTATION INTERVAL IDATE 1JAN 0 STARTING DATE ITIME 1200 STARTING TIME ' NQ 1000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2JAN 0 ENDING DATE NDTIME 2118 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL 0.03 HOURS ' TOTAL TIME BASE 33.30 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND ' STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT ... ... ... ... ... ... ... ... ... ... ... ..x ... ..x ... ... ... ... ... ... ... ... ..x ... ... ... ... ... w.. ... ... ..x ... . 6 KK * A-2 . •«+*«rrr+•*** 2 YR, 6-HR STORM 8 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 9 BA SUBBASIN CHARACTERISTICS TAREA 0.07 SUBBASIN AREA PRECIPITATION DATA 10 PH DEPTHS FOR 0-PERCENT HYPOTHETICAL STORM ..... HYDRO-35 ...... ............... TP-40 ............... ........ ... TP-49 .... ....... 5-MIN 15-MIN 60-MIN 2-HR 3-HR 6-HR 12-HR 24-14R 2-DAY 4-DAY 7-DAY 10-DAY 0.42 0.83 1.45 1.76 1.95 2.28 0.00 0.00 0.00 0.00 0.00 0.00 STORM AREA 0.07 11 LS SCS LOSS RATE STRTL 0.94 INITIAL ABSTRACTION CRVNBR 68.00 CURVE NUMBER RTIMP 0.00 PERCENT IMPERVIOUS AREA 12 UD SCS DIMENSIONLESS UNITGRAPH TLAG 0.35 LAG UNIT HYDROGRAPH 55 END-OF-PERIOD ORDINATES 3. 8. 15. 24. 36. 51. 66. 78. 87. 92. 93. 93. 88. 83. 77. 69. 60. 50. 42. 36. 31. 27. 24. 21. 18. 15. 13. 12. 10. 9. 7. 6. 5. 5. 4. 4. 3. 3. 2. 2. 2. 1. 1. 1. 1. 1. 1. 1. 1. 0. ••• 0. 0. 0. 0. 0. rtx« •!! r«i «!• HYDROGRAPH AT STATION A-2 TOTAL RAINFALL = 2.28, TOTAL LOSS = 1.98, TOTAL EXCESS = 0.30 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CPS) (HR) (CPS) + 11. 3.53 2. 1. 0. 0. (INCHES) 0.296 0.296 0.296 0.296 (AC-FT) 1. 1. 1. 1. w!r *+w wrtr « CUMULATIVE AREA = 0.07 SQ MI rr wr« r•i !rrt rr! !!i ••+ rt+. .*: rww **• w«« xrr rr! !•• •!. r +r rt e r ! 13 KK * + r rt •••••+«rt«rrxx A-10 xr rt rt r+ !!! ••! wrt+ rtxr !!i !!+ +!rt ir! i!x • •!!i •ltwrtxwr 10-YR, 6-HR STORM 15 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE rrr HEC-1 ERROR 1 *** INVALID CARD IDENTIFICATION CODE OR CARD OUT OF SEQUENCE CARD NO. 20 SUBBASIN RUNOFF DATA 16 BA SUBBASIN CHARACTERISTICS TAREA 0.07 SUBBASIN AREA PRECIPITATION DATA 17 PH DEPTHS FOR O-PERCENT HYPOTHETICAL STORM ..... HYDRO-35 ...... ............... TP-40 ............... ........ ... TP-49 .... ....... 5-MIN 15-MIN 60-MIN 2-HR 3-HR 6-HR 12-HR 24-HR 2-DAY 4-DAY 7-DAY 10-DAY 0.59 1.26 2.36 2.90 3.21 3.72 0.00 0.00 0.00 0.00 0.00 0.00 STORM AREA = 0.07 18 LS SCS LOSS RATE STRTL 0.94 INITIAL ABSTRACTION CRVNBR 68.00 CURVE NUMBER RTIMP 0.00 PERCENT IMPERVIOUS AREA 19 UD SCS DIMENSIONLESS UNITGRAPH TLAG 0.35 LAG +rrt UNIT HYDROGRAPH 55 END-OF-PERIOD ORDINATES 3. 8. 15. 24. 36. 51. 66. 78. 87. 92. 93. 93. 88. 83. 77. 69. 60. 50. 42. 36. 31. 27. 24. 21. 18. 15. 13. 12. 10. 9. 7. 6. 5. 5. 4. 4. 3. 3. 2. 2. 2. 1. 1. 1. 1. 1. 1. 1. 1. 0. 0. 0. 0. 0. 0. r *** * ** * ;* #** HYDROGRAPH AT STAT ION A-10 TOTAL RAINFALL = 3.72, TOTAL LOSS 2.69, TOTAL EXCESS 1.03 r PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CPS) (HR) (CFS) + 45. 3.47 8. 2. 1. 1. (INCHES) 1.031 1.031 1.031 1.031 (AC-FT) 4. 4. 4. 4. CUMULATIVE AREA - 0.07 SQ MI 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND r TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD OPERATION STATION FLOW PEAK + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT r + A-2 11. 3.53 2. 1. 0. HYDROGRAPH AT + A-10 45. 3.47 8. 2. 1. r *•• 1 ERROR(S) DETECTED BY HEC-1 *•* r r r r r r r r r r r r r BASIN MAXIMUM TIME OF AREA STAGE MAX STAGE 0.07 0.07 H F1 j ^1' ' GNA Job No. 54215 Issued: 12/16/03 ?GNA DESIGN ASSOCIATES, Inc. Stormwater Pond Relocation ' Pinnacle Point Development r 0 C? u 11 0 I I Proposed Conditions HEC-1 Analysis for 2, 10, 50, & 100-Year Design Storms l;x,,,,,,,,, ,,,,«x«rrr««r«rr,r,»r«xxrr«rr«? FLOOD HYDROGRAPH PACKAGE (HEC-1) * MAY 1991 + VERSION 4.0.1E **• •aod L+EM/3cversion 5.01 D *+** Dodson son & Associates, Inc. RUN DATE 12/18/03 TIME 07:53:56 t K K KXXXX XX KKKXX X X X K X X XX K K K X X XKXXXKX XXXX X XXKXK K X X X X K X X K X K K X K KKXXX XX KXXXK XXX * U.S. ARMY CORPS OF ENGINEERS * HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 551-1748 THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1 (JAN 73), HECIGS, HECIDB, AND HECIKW THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE. THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY, DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM 1 LINE ••• FREE **• 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 1 LINE 50 51 52 53 54 55 56 57 58 59 60 61 62 HEC-1 INPUT PAGE 1 ID....... 1....... 2.......3.......4.......5.......6.......7.......8.......9......10 ID 54215: PINNACLE POINT, CHARLOTTE, NC ID PROPOSED BASIN RELOCATION ID DEVELOPED CONDITIONS IT 2 01JAN00 1200 1000 IO 0 0 KK A-2 KM 2-YR, 6-HR STORM KO 3 1 BA 0.07156 PH 0 0.42 0.83 1.45 1.76 1.95 2.28 LS 0 87 UD 0.300 KKA-2BASIN KM ROUTE THROUGH DETENTION FACILITY KO 3 1 RS 1 ELEV 633.0 SV 3.9832 4.2477 4.5189 4.7967 5.0810 5.3708 5.6650 5.9637 6.2667 6.5742 SV 6.8862 7.2027 7.5236 7.8492 8.1792 8.5139 8.8532 9.1970 9.5456 9.8988 SE 633 633.25 633.5 633.75 634 634.25 634.5 634.75 635 635.25 BE 635.5 635.75 636 636.25 636.5 636.75 637 637.25 637.5 637.75 SQ 0 0.12 0.25 0.33 0.39 0.44 0.49 0.54 0.58 0.62 SQ 7.31 19.5 35.3 48.6 49.2 58.2 74.0 94.3 118.2 145.2 SE 633 633.25 633.5 633.75 634 634.25 634.5 634.75 635 635.25 SE 635.5 635.75 636 636.25 636.5 636.75 637 637.25 637.5 637.75 KK A-2ROW KM CONTRIBUTION FROM PUBLIC STREETS KO 3 1 BA 0.00594 LS 0 98 UD 0.300 KK A-10 KM 10-YR, 6-HR STORM KO 3 1 BA 0.07156 PH 0 0.59 1.26 2.36 2.90 3.21 3.72 LS 0 87 UD 0.300 KKA-IOBASIN KM ROUTE THROUGH DETENTION FACILITY KO 3 1 RS 1 ELEV 633.0 SV 3.9832 4.2477 4.5189 SV 6.8862 7.2027 7.5236 BE 633 633.25 633.5 SE 635.5 635.75 636 SQ 0 0.12 0.25 SQ 7.31 19.5 35.3 SE 633 633.25 633.5 SE 635.5 635.75 636 4.7967 5.0810 7.8492 8.1792 633.75 634 636.25 636.5 0.33 0.39 48.6 49.2 633.75 634 636.25 636.5 HEC-1 INPUT 5.3708 8.5139 634.25 636.75 0.44 58.2 634.25 636.75 5.6650 5.9637 6.2667 6.5742 8.8532 9.1970 9.5456 9.8988 634.5 634.75 635 635.25 637 637.25 637.5 637.75 0.49 0.54 0158 0.62 74.0 94.3 118.2 145.2 634.5 634.75 635 635.25 637 637.25 637.5 637.75 ID....... 1....... 2.......3.......4.......5.......6.......7.......8.......9......10 KK A-10ROW KM CONTRIBUTION FROM PUBLIC STREETS KO 3 1 BA 0.00594 LS 0 98 UD 0.300 KK A-50 KM 50-YR, 6-HR STORM KO 3 1 BA 0.07156 PH 0 0.75 1.615 3.05 3.78 4.20 4.92 LS 0 87 UD 0.300 PAGE 2 63 KKA-50BASIN 64 KM ROUTE THROUGH DETENTION FACILITY 65 KO 3 1 66 RS 1 ELEV 633.0 67 SV 3.9832 4.2477 4.5189 4.7967 5.0810 5.3708 5.6650 5.9637 6.2667 6.5742 68 SV 6.8862 7.2027 7.5236 7.8492 8.1792 8.5139 8.8532 9.1970 9.5456 9.8988 69 SE 633 633.25 633.5 633.75 634 634.25 634.5 634.75 635 635.25 70 SE 635.5 635.75 636 636.25 636.5 636.75 637 637.25 637.5 637.75 71 SO 0 0.12 0.25 0.33 0.39 0.44 0.49 0.54 0.58 0.62 72 SQ 7.31 19.5 35.3 48.6 49.2 58.2 74.0 94.3 118.2 145.2 73 SE 633 633.25 633.5 633.75 634 634.25 634.5 634.75 635 635.25 74 SE 635.5 635.75 636 636.25 636.5 636.75 637 637.25 637.5 637.75 75 KK A-100 76 KM 100-YR, 6-HR STORM 77 KO 3 1 78 BA 0.07156 79 PH 0 0.82 1.74 3.40 4.10 4.40 5.50 80 LS 0 87 81 UD 0.300 82 KKA-100BASIN 83 KM ROUTE THROUGH DETENTION FACILITY 84 KO 3 1 85 RS 1 ELEV 633.0 86 SV 3.9832 4.2477 4.5189 4.7967 5.0810 5.3708 5.6650 5.9637 6.2667 6.5742 87 SV 6.8862 7.2027 7.5236 7.8492 8.1792 8.5139 8.8532 9.1970 9.5456 9.8988 88 SE 633 633.25 633.5 633.75 634 634.25 634.5 634.75 635 635.25 89 SE 635.5 635.75 636 636.25 636.5 636.75 637 637.25 637.5 637.75 90 SQ 0 0.12 0.25 0.33 0.39 0.44 0.49 0.54 0.58 0.62 91 SQ 7.31 19.5 35.3 48.6 49.2 58.2 74.0 94.3 118.2 145.2 92 SE 633 633.25 633.5 633.75 634 634.25 634.5 634.75 635 635.25 93 SE 635.5 635.75 636 636.25 636.5 636.75 637 637.25 637.5 637.75 94 95 ZZ 1rt rtrw+re++r+wwwwwr»rrrwx wxx».r+w+wxw..xxr + xxxxwrxxxrtwrrt++*xrxxxw+wxxxrtrtwrrtrtxrtrtx * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS + MAY 1991 * * HYDROLOGIC ENGINEERING CENTER + VERSION 4.0.1E * w 609 SECOND STREET * Lahey F77L-EM/32 version 5.01 * * DAVIS, CALIFORNIA 95616 * Dodson & Associates, Inc. + + * RUN DATE 12/18/03 TIME 07:53:56 + * (916) 551-1748 rt x rtrx.rr»wrw+w+xxrxrrx*wwrwwwxrrr+wr»xxxxrr xrrrtx»xxe+xw+rtwrrxxxxxe*xrrtr.*xwwwrtxrtr» 54215: PINNACLE POINT, CHARLOTTE, NC PROPOSED BASIN RELOCATION DEVELOPED CONDITIONS 5 IO OUTPUT CONTROL VARIABLES IPRNT 0 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 2 MINUTES IN COMPUTATION INTERVAL IDATE 1JAN 0 STARTING DATE ITIME 1200 STARTING TIME NQ 1000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2JAN 0 ENDING DATE NDTIME 2118 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL 0.03 HOURS TOTAL TIME BASE 33.30 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT 6 KK * A-2 ++w+wrww*rxrr+ 2-YR, 6-HR STORM 8 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 9 BA SUBBASIN CHARACTERISTICS TAREA 0.07 SUBBASIN AREA PRECIPITATION DATA 10 PH DEPTHS FOR 0-PERCENT HYPOTHETICAL STORM ..... HYDRO-35 ...... ............... TP-40 . .............. ........... TP-49 ........... 5-MIN 15-MIN 60-MIN 2-HR 3-HR 6-HR 12-HR 24-HR 2-DAY 4-DAY 7-DAY 10-DAY 0.42 0.83 1.45 1.76 1.95 2.28 0.00 0.00 0.00 0.00 0.00 0.00 STORM AREA 0.07 11 LS SCS LOSS RATE STRTL 0.30 INITIAL ABSTRACTION CRVNBR 87.00 CURVE NUMBER 1 11 ' RTIMP 0.00 PERCENT IMPERVIOUS AREA 12 UD SCS DIMENSIONLESS UNITGRAPH TLAG 0.30 LAG UNIT HYDROGR APH 47 END-OF-PERIOD ORDINATES 4. 12. 23. 38. 57. 78. 94. 104. 109. 109. 104. 97. 88. 77. 64. 52. 43. 36. 31. 26. 22. 19. 16. 4. 3. 3. 13. 11. 9. 2. 2. 2. 8. 1. . 1. 6. 1. 5. 1. x«x 1. 1. 1. .xx rrx 0. 0. 0. «xx 0. .rr HYDROGRAPH AT STATION A-2 ' TOTAL RAINFALL 2.28, TOTAL LOSS 1.15, TOTAL EXCESS = 1.13 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CPS) + 60. 3.37 9. 2. 2. 2. (INCHES) 1.129 1.129 1.129 1.129 (AC-FT) 4. 4. 4. 4. CUMULATIVE AREA = 0.07 SQ MI .«« xrx rr« .rx xrx ... r«« ««« ««« «x. «r « r«« «r« «.« «xx «xx xxx xx x xxx x.x . rr rr« x.. rx« x«x « «« ..« ««« xxr .rr « x« .r. r«« 13 KK wwA-2BASINxw + ? rr..x.xxxxrrxr ROUTE THROUGH DETENTION FACILITY 15 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE HYDROGRAPH ROUTING DATA 16 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 633.00 INITIAL CONDITION X 0.00 WORKING R AND D COEFFICIENT 17 SV STORAGE 4.0 4.2 4.5 4.8 5.1 5.4 5.7 6.0 6.3 6.6 6.9 7.2 7.5 7.8 8.2 8.5 8.9 9.2 9.5 9.9 19 SE ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 1 21 SQ DISCHARGE 0. 0. 0. 0. 0. 0. 0. 1. 1. 1. 7. 20. 35. 49. 49. 58. 74. 94. 118. 145. 23 SE ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 EV T ON D ATA COMPUTED STORAGE-OUTFLOW- EL A I STORAGE 3.98 4.25 4.52 4.80 5.08 5.37 5.66 5.96 6.27 6.57 OUTFLOW 0.00 0.12 0.25 0.33 0.39 0.44 0.49 0.54 0.58 0.62 EL EVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 STORAGE 6.89 7.20 7.52 7.85 8.18 8.51 8.85 9.20 9.55 9.90 OUTFLOW 7.31 19.50 35.30 48.60 49.20 58.20 74.00 94.30 118.20 145.20 ELEVATION 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 xw. ...HYDROGRAPH ATwSTATION A 2BASINww xrr - PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR a (CFS) (HR) (CFS) + 11. 4.23 4. 1. 1. 1. (INCHES) 0.474 0.688 0.750 0.750 (AC-FT) 2. 3. 3. 3. PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE 6-HR 24-HR 72-HR 33.30-HR + (AC-FT) (HR) 7. 4.20 7. 6. 6. 6. PEAK STAGE TIME MAXIMUM AVERAGE STAGE 6-HR 24-HR 72-HR 33.30-HR 1 + (FEET) (HR) 635.58 4.23 635.34 634.95 634.66 634.66 CUMULATIVE AREA = 0.07 SQ MI xrx r.. ... ..x .x. ... x«« ««. ... .r. .. . ... ..x ««x «.. ... rrr .r . ... ..« . .. ... .r. .x. ..« . .« ... .r. ... «.« . r« ..r x.. :««+xxxxxar... 25 KK * A-2ROW + rrrrrx***«***« CONTRIBUTION FROM PUBLIC STREETS 27 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 28 BA SUBBASIN CHARACTERISTICS TAREA 0.01 SUBBASIN AREA PRECIPITATION DATA 10 PH DEPTHS FOR 0-PERCENT HYPOTHETICAL STORM ..... HYDRO-35 ...... ............... TP-40 ............... ........... TP-49 .... ....... 5-MIN 15-MIN 60-MIN 2-HR 3-HR 6-HR 12-HR 24-HR 2-DAY 4-DAY 7-DAY 10-DAY 0.42 0.83 1.45 1.76 1.95 2.28 0.00 0.00 0.00 0.00 0.00 0.00 STORM AREA 0.01 29 LS SCS LOSS RATE STRTL 0.04 INITIAL ABSTRACTION CRVNBR 98.00 CURVE NUMBER RTIMP 0.00 PERCENT IMPERVIOUS AREA 30 UD SCS DIMENSIONLESS UNITGRAPH TLAG 0.30 LAG UNIT HYDROGRAPH 47 END-OF-PERIOD ORDINATES 0. 1. 2. 3. 5. 6. 8. 9. 9. 9. 9. 8. 7. 6. S. 4. 4. 3. 3. 2. 2. 2. 1. 1. 1. 1. 1. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. rrr 0. 0. 0. 0. 0. 0. 0. rww *** rxr rrx HYDROGRAPH AT STATION A-2ROW TOTAL RAINFALL 2.28, TOTAL LOSS 0.23, TOTAL EXCESS = 2.05 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR a (CFS) (HR) (CFSJ s 9. 3.33 1. 0. 0. 0. (INCHES) 2.051 2.052 2.052 2.052 (AC-FT) 1. 1. 1. 1. ass rrx r+r x CUMULATIVE AREA = 0.01 SQ MI ar rra r** *** *** :rr x+r x*+ :xr aar r** +xr aaa rrx xrr rxx rxr r rr r** rrr ++* wxr rrr rx* rrr r r 31 KK * rxxrx*xx*xx** A-10 rr r*r rr• rrr a rrrrr*rrr rwrr - 10-YR, 6-HR STORM 33 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 34 BA SUBBASIN CHARACTERISTICS TAREA 0.07 SUBBASIN AREA PRECIPITATION DATA 35 PH DEPTHS FOR 0-PERCENT HYPOTHETICAL STORM ..... HYDRO-35 ...... ............... TP-40 ............... ........... TP-49 .... ....... 5-MIN 15-MIN 60-MIN 2-HR 3-HR 6-HR 12-HR 24-HR 2-DAY 4-DAY 7-DAY 10-DAY 0.59 1.26 2.36 2.90 3.21 3.72 0.00 0.00 0.00 0.00 0.00 0.00 STORM AREA 0.07 36 LS SCS LOSS RATE STRTL 0.30 INITIAL ABSTRACTION CRVNBR 87.00 CURVE NUMBER RTIMP 0.00 PERCENT IMPERVIOUS AREA 37 UD SCS DIMENSIONLESS UNITGRAPH TLAG 0.30 LAG UNIT HYDROGRAPH 47 END-OF-PERIOD ORDINATES 4. 12. 23. 38. 57. 78. 94. 104. 109. 109. 104. 97. 88. 77. 64. 52. 43. 36. 31. 26. 22. 19. 16. 13. 11. 9. 8. 7. 6. 5. 4. 3. 3. 2. 2. 2. 1. 1. 1. 1. •rr 1. 1. 1. 0. 0. 0. 0. *** err rrr rrr HYDROGRAPH AT STATION A-10 TOTAL RAINFALL = 3.72, TOTAL LOSS = 1.34, TOTAL EXCESS = 2.38 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR r (CPS) (HR) (CFS) + 121. 3.37 18. 5. 3. 3. (INCHES) 2.381 2.381 2.381 2.381 (AC-FT) 9. 9. 9. 9. CUMULATIVE AREA - 0.07 SQ MI •xx +++ xx« +.+ r.w +++ +++ +x+ ++x w«+ xx . +++ +«+ +++ +++ +++ +.x xx x x.x x.a xx x ++w +++ +xw w++ « «« w+« +«« +.r x«x . xx xxx x«+ 38 KK +xA-10BASI-- N * + ROUTE THROUGH DETENTION FACILITY 40 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 41 RS HYDROGRAPH ROUTING DATA STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION _ RSVRIC 633.00 INITIAL CONDITION X 0.00 WORKING R ANDD COEFFICIENT 42 SV STORAGE 4.0 4.2 4.5 4.8 5.1 5.4 5.7 6.0 6.3 6.6 6.9 7.2 7.5 7.8 8.2 8.5 8.9 9.2 9.5 9.9 44 SE ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 46 SQ DISCHARGE 0. 0. 0. 0. 0. 0. 0. 1. 1. 1. 7. 20. 35. 49. 49. 58. 74. 94. 118. 145. 48 SE ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 ' O OW V ON L TA COMPUTED STORAGE- UTFL - E E ATI DA STORAGE 3.98 4.25 4.52 4.80 5.08 5.37 5.66 5.96 6.27 6.57 OUTFLOW 0.00 0.12 0.25 0.33 0.39 0.44 0.49 0.54 0.58 0.62 ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 STORAGE 6.89 7.20 7.52 7.85 8.18 8.51 8.85 9.20 9.55 9.90 OUTFLOW 7.31 19.50 35.30 48.60 49.20 58.20 74.00 94.30 118.20 145.20 ELEVATION 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 +.+ x-- - IOBASIxx N xx« HYDROGRAPH AT STA TIO A- PEAK FLOW TIME MAXIMUM AVERAGE FLOW + (CFS) 6-HR (HR) 24-HR 72-HR 33.30-HR (CPS) a 56. 3.77 13. 4. 3. 3. (INCHES) 1.718 1.933 1.999 1.999 (AC-FT) 7. 7. 8. 8. PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE 6-HR 24-HR 72-HR 33.30-HR + (AC-FT) (HR) 8. 3.77 7. 6. 6. 6. PEAK STAGE TIME MAXIMUM AVERAGE STAGE 6-HR 24-HR 72-HR 33.30-HR + (FEET) (HR) 636.68 3.77 635.57 635.02 634.72 634.72 CUMULATIVE AREA = 0.07 SQ MI w.. ... x.. .x. ... ... x.. ..x ... .x. .x + ... x+. ..+ - ... w.. x. . x.. w+x x +a ««x +++ «+« «.. x .. ... x.. ..x ««« + ++ +«+ .x+ 50 KK *OROW - A . --x . xx CONTRIBUTION FROM PUBLIC STREETS 52 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 53 BA SUBBASIN CHARACTERISTICS TAREA 0.01 SUBBASIN AREA PRECIPITATION DATA 35 PH DEPTHS FOR 0-PERCENT HYPOTHETICAL STORM ..... HYDRO-35 ...... ............... TP-40 .. ............. ........... TP -49 .... ....... 5-MIN 15-MIN 60-MIN 2-HR 3-HR 6-HR 12-HR 24-HR 2-DAY 4-DAY 7-DAY 10-DAY 0.59 1.26 2.36 2.90 3.21 3.72 0.00 0.00 0.00 0.00 0.00 0.00 STORM AREA = 0.01 54 LS SCS LOSS RATE STRTL 0.04 INITIAL ABSTRACTION CRVNBR 98.00 CURVE NUMBER RTIMP 0.00 PERCENT IMPERVIOUS AREA 55 UD SCS DIMENSIONLESS UNITGRAPH TLAG 0.30 LAG w+ # UNIT HYDROGRAPH 47 END-OF-PERIOD ORDINATES 0. 1. 2. 3. 5. 6. 8. 9. 9. 9. 9. 8. 7. 6. 5. 4. 4. 3. 3. 2. 2. 2. 1. 1. 1. 1. 1. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. HYDROGRAPH AT STATION A-10ROW TOTAL RAINFALL 3.72, TOTAL LOSS = 0.23, TOTAL EXCESS a 3.49 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CPS) (HR) (CFS) + 14. 3.33 2. 1. 0. 0. (INCHES) 3.482 3.486 3.486 3.486 (AC-FT) 1. 1. 1. 1. rRw e4+ frf # CUMULATIVE AREA = #f +ff ### #«t ttt t** R+f ++ 0.01 SQ MI t +++ fft Ott fi#4 t#* «+ « ++f Rrr 4RR 4 ## #44 #4fi tfi 4 56 KK * 4*4*ifi #f ##4 tfi A-50 #R# fR« ««f fRR R#* t## ffr Rr# 4!k * «•r«rif rr+rif 50-YR, 6-HR STORM 58 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 59 BA SUBBASIN CHARACTERISTICS TAREA 0.07 SUBBASIN AREA PRECIPITATION DATA 60 PH DEPTHS FOR 0-PERCENT HYPOTHETICAL STORM ..... HYDRO-35 ...... . .............. TP-40 ... ............ ........... TP-49 .... ....... 5-MIN 15-MIN 60-MIN 2-HR 3-HR 6-HR 12-HR 24-HR 2-DAY 4-DAY 7-DAY 10-DAY 0.75 1.62 3.05 3.78 4.20 4.92 0.00 0.00 0.00 0.00 0.00 0.00 STORM AREA = 0.07 61 LS SCS LOSS RATE STRTL 0.30 INITIAL ABSTRACTION CRVNBR 87.00 CURVE NUMBER RTIMP 0.00 PERCENT IMPERVIOUS AREA 62 UD SCS DIMENSIONLESS UNITGRAPH TLAG 0.30 LAG UNIT HYDROGRAPH 47 END-OF-PERIOD ORDINATES 4. 12. 23. 38. 57. 78. 94. 104. 109. 109. 104. 97. 88. 77. 64. 52. 43. 36. 31. 26. 22. 19. 16. 13. 11. 9. 8. 7. 6. 5. 4. 3. 3. 2. 2. 2. 1. 1. 1. 1. irf 1. 1. 1. 4ri #t« 0. 0. +f« 0. 0. fi*i HYDROGRAPH AT STATION A-50 TOTAL RAI NFALL 4.92, TOTAL LOSS = 1.43, TOTAL EXCESS = 3.49 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 172. 3.33 27. 7. 5. 5. (INCHES) 3.491 3.491 3.491 3.491 (AC-FT) 13. 13. 13. 13. CUMULATIVE AREA = 0.07 SQ MI 63 KK + A-50BASI N ROUTE THROUGH DETENTION FACILITY 65 KO OUTPUT CONTROL VARIABLES IPINT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 66 RS HYDROGRAPH ROUTING DATA STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 633.00 INITIAL CONDITION X 0.00 WORKING R AND D COEFFICIENT 67 SV STORAGE 4.0 4.2 4.5 4.8 5.1 5.4 5.7 6.0 6.3 6.6 6.9 7.2 7.5 7.8 8.2 8.5 8.9 9.2 9.5 9.9 69 SE ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 71 SQ DISCHARGE 0. 0. 0. 0. 0. 0. 0. 1. 1. 1. 7. 20. 35. 49. 49. 58. 74. 94. 118. 145. 73 SE ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 TFLOW EL GE O EVATION DA TA - COMPUTED STORA - U STORAGE 3.98 4.25 4.52 4.80 5.08 5.37 5.66 5.96 6.27 6.57 OUTFLOW 0.00 0.12 0.25 0.33 0.39 0.44 0.49 0.54 0.58 0.62 EL EVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 ' STORAGE 6.89 7.20 7.52 7.85 8.18 8.51 8.85 9.20 9.55 9.90 OUTFLOW 7.31 19.50 35.30 48.60 49.20 58.20 74.00 94.30 118.20 145.20 ELEVATION 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 xxx xx. - xx xx x HYDROGRAPH AT STATION A-50BASI -PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33 .30-HR + (CPS) (HR) (CFS) + 112. 3.60 22. 6. 4. 4. (INCHES) 2.824 3.040 3.108 3.108 (AC-FT) 11. 12. 12. 12. PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE 6-HR 24-HR 72-HR 33.30-HR + (AC-FT) (HR) 9. 3.60 7. 6. 6. 6. PEAK STAGE TIME MAXIMUM AVERAGE STAGE 6-HR 24-HR 72-HR 33.30-HR + (FEET) (HR) 637.43 3.60 635.75 635.07 634.77 634.77 CUMULATIVE AREA = 0.07 SQ MI i .xx xxx.xx xxx xxx xxx xxx xxx xxx xxx x xx xxx xxx xxx xxx xxx xxx xxx xxx xxx x xx xxx xxx.xx xxx xxx xxx xxx .xx xxxx xx xxx xxx ' 75 KK xxxxxxxxxxxxxx A-100 ? xxxx xaxxx+xxx 100-YR, 6-HR STORM 77 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL ' IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 78 BA SUBBASIN CHARACTERISTICS TAREA 0.07 SUBBASIN AREA PRECIPITATION DATA 79 PH DEPTHS FOR 0-PERCENT HYPOTHETICAL STORM HYDRO-35 ...... ............... TP-40 ........ ....... ........... TP-49 . .......... 5-MIN 15-MIN 60-MIN 2-HR 3-HR 6-HR 12-HR 24-HR 2-DAY 4-DAY 7-DAY 10-DAY 0.82 1.74 3.40 4.10 4.40 5.50 0.00 0.00 0.00 0.00 0. 00 0.00 STORM AREA = 0.07 80 LS SCS LOSS RATE ' STRTL 0.30 INITIAL ABSTRACTION CRVNBR 87.00 CURVE NUMBER RTIMP 0.00 PERCENT IMPERVIOUS AREA 81 UD SCS DIMENSIONLESS UNITGRAPH ' TLAG 0.30 LAG xxx UNIT HYDROGRAPH 47 END-OF-PERIOD ORDINATES 4. 12. 23. 38. 57. 78. 94. 104. 109. 109. 1 104. 97. 88. 77. 64. 52. 43. 36. 31. 26. 22. 19. 16. 13. 11. 9. 8. 7. 6. 5. 4. 3. 3. 2. 2. 2. 1.. 1. 1. 1. 1. 1. 1. 0. 0. 0. 0. -- HYDROGRAPH AT STATION A-100 TOTAL RAINFALL = 5.50, TOTAL LOSS = 1.46, TOTAL EXCESS = 4.04 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CPS) (HR) (CFS) + 195. 3.33 31. 8. 6. 6. (INCHES) 4.039 4.039 4.039 4.039 (AC-FT) 15. 15. 15. 15. «w« rrr r.r rrr CUMULATIVE AREA = 0.07 SO MI rwr «x« r«« rrr rrr rww r«x *«r rrr rrr r«r xr« wxr r rr rr rr r www 82 KK « . r«w«w«r«««x A-100BAS * IN r r r « «r« «. « xrr ««x x r. rrr .r w ««x xxr rrr •«• wxr x«r xr rr rrrrrrx ROUTE THROUGH DETENTION FACILITY 84 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE *** HEC-1 ERROR 1 *** INVALID CARD IDENTIFICATION CODE OR CARD OUT OF SEQUENCE CARD NO. 94 HYDROGRAPH ROUTING DATA 85 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 633.00 INITIAL CONDITION X 0.00 WORKING R AND D COEFFICIENT 86 SV STORAGE 4.0 4.2 4.5 4.8 5.1 5.4 5.7 6.0 6.3 6.6 6.9 7.2 7.5 7.8 8.2 8.5 8.9 9.2 9.5 9.9 88 SE ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 90 SO DISCHARGE 0. 0. 0. 0. 0. 0. 0. 1. 1. 1. 7. 20. 35. 49. 49. 58. 74. 94. 118. 145. 92 SE ELEVATION 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 PEAK FLOW TIME r (CPS) (HR) + 140. 3.57 PEAK STORAGE TIME + (AC-FT) (HR) 10. 3.57 PEAK STAGE TIME + (FEET) (HR) 637-70 3.57 1 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 COMPUTED STORAGE-OUTFLOW-ELEVATION DATA 3.98 4.25 4.52 4.80 5.08 5.37 5.66 5.96 6.27 6.57 0.00 0.12 0.25 0.33 0.39 0.44 0.49 0.54 0.58 0.62 633.00 633.25 633.50 633.75 634.00 634.25 634.50 634.75 635.00 635.25 6.89 7.20 7.52 7.85 8.18 8.51 8.85 9.20 9.55 9.90 7.31 19.50 35.30 48.60 49.20 58.20 74.00 94.30 118.20 145.20 635.50 635.75 636.00 636.25 636.50 636.75 637.00 637.25 637.50 637.75 HYDROGRAPH AT STATION A-100BAS MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR (CPS) 26. 7. 5. 5. (INCHES) 3.368 3.584 3.654 3.654 (AC-FT) 13. 14. 14. 14. MAXIMUM AVERAGE STORAGE 6-HR 24-HR 72-HR 33.30-HR 7. 6. 6. 6. MAXIMUM AVERAGE STAGE 6-HR 24-HR 72-HR 33.30-HR 635.82 635.10 634.80 634.80 CUMULATIVE AREA = 0.07 SQ MI STORAGE OUTFLOW ELEVATION STORAGE OUTFLOW ELEVATION RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT A-2 60. 3.37 9. 2. 2. ROUTED TO A-2BASIN 11. 4.23 4. 1. 1. BASIN MAXIMUM TIME OF AREA STAGE MAX STAGE 0.07 0.07 HYDROGRAPH AT + A-2ROW 9. 3.33 HYDROGRAPH AT + A-10 121. 3.37 ROUTED TO + A-10BASI 56. 3.77 HYDROGRAPH AT A-lOROW 14. 3.33 HYDROGRAPH AT r A-50 172. 3.33 ROUTED TO ' i ? A-SOBASI 112. 3.60 HYDROGRAPH AT A-100 195. 3.33 ROUTED TO A-100BAS 140. 3.57 •+• 1 ERROR(S) DETECTED BY HEC-1 + +• 1 635.58 4.23 1. 0. 0. 0.01 18. 5. 3. 0.07 13. 4. 3. 0.07 636.68 2. 1. 0. 0.01 27. 7. 5. 0.07 22. 6. 4. 0.07 637.43 31. 8. 6. 0.07 26. 7. 5. 0.07 637.70 3.77 3.60 3.57 I I I I I I I I I I I I I I I I GNA Job No. 54215 Issued: 12/16/03 1 GNA DESIGN ASSOCIATES, Inc. Stormwater Pond Relocation Pinnacle Point Development Erosion Control Calculations 1 \2•t??oz. ? z Qt P1?.1,AC t_?. 'QG? r?J ? QGNn ??.C)CAZ !c? ?•.? Tky \` C)o ?1 ?? •?)(? ?? ?` acv ---- ----------- f? 7? Z`3? 1 1 \?c, 1 ?1 c? G 77 1? 11 11 [7 1 1 , 2,, G? ? 1- J J .r 11 F", 7 0 d ?1G? _ U M I .. ANC/ p L ?`\1C\? r a - -_ -- - --------- ------ n J n 0 11 1 -l- Appendices 30 Outlet IW = Do + La diameter (Do) pipe 1 JIwater < 0.5Do L=Zz ` 20 10 50 100 Discharge (ft3/sec) 1Z? Js E Q) 2 N CA CL ca L Q. 0 1 'd U 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (T. < 0.5 diameter), r- \ Rev. 1?r93 -X`o'l?l. e?`gir o? PP 60j ?. ? ?rfl?fllitft? 8.06.3 l 0 C 0 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 l `l` J )S" Appendices 3 De, .+U ,vu cuu 5uu IUUU Discharge (ft /sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (T,v < 0.5 diameter). Rev. 12193 8.06.3 z N Cn a CO a 0 A;?'; > 1 1 J 7 1 1 1 Appendices 1 1 3 ° • .!: +i Outlet i' .. ,I, W - Do+La 9:f r! ?r pipe ly i 'r P diameter (Do) 80 tC itt I! 1: La it ester < 0.500 r' i }} .I t.???? if y 1 r i 1 11 of p'p?o60? :4? } ? ? i ly i \,el\gt 1 r E fiti ?ri?R` I 1 , _ r. : ry .? 4 it {II II i-r0 a'' r i ;F4 + ,, F 1 y 4 41 4 t 0- 4 3 r t t !: '? r? t? s 4 -J ?r ; r a -41 20 3 41- 4 Till Ml tit I MR '?, a Q i A N ; v : 20 r i ; ? c?c? 1z I i v is - E' 4--0 f i Vo10 d t ! .? III I !l. `` t_ i.. i II I I I ' y i? I I I I ?I '! ??` .' .I I•L' UCH I :ji .: .. •: 0 lStr,. n?;.a? 3 5 1 20 5? 1 100 200 500 1000 \o Discharge (ft3/sec) N? I Curves may not be extrapolated. Figure 8.16a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (T.< 0.5 diameter). 1 G? n.t C PG N 1 Rev. IZ93 8.06.3 1 11 7 1