Loading...
HomeMy WebLinkAbout20191081 Ver 1_Public Notice Comments to USACE_20190919ROY COOPER Governor MICHAEL S.REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA fnvironmenta/Quality September 19, 2019 Corps Action ID# SAW -2017-00103 D W R# 20191081 Guilford County David Bailey U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Subject Project: GSO Rental Car Facilities Relocation Dear Mr. Bailey: On behalf of the NC Division of Water Resources, we respectfully request that you consider the following comments within your review of the 404 Individual Permit request for the above referenced property: 1. The Applicant states that the "Proposed Action" is to resolve visibility obstruction issues as determined by the FAA. The applicant indicates that there are four key components of the project. The Division offers the following comments regarding the key components of the Proposed Action: a. The application states that one component of this project is "site preparation of approximately 44 acres of approved [emphasis added] future aerospace development'. The 404 and 401 approvals for the future aerospace development have expired and were specific to the project proposed (FedEx) at that time. Any development of this location should be reviewed as a "new" project and follow standard 404/401 permitting procedures for purpose and need, alternatives analysis, and avoidance and minimization as part of this application. b. The Applicant indicates that grading will occur for construction and continuation of utilities along the Proposed Worldwide Drive right-of-way. The 404 and 401 approvals for Worldwide Drive have expired and were specific to the project proposed (FedEx) at that time. Worldwide Drive should be reviewed as a "new" project and follow standard North Carolina Department of Environmental Quality I Division of Water Resources D_E �� 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 2 769 9-1617 919.707.9000 Corps Action ID# SAW -2017-00103 DWR# 20191081 Page 2 of 3 404/401 permitting procedures for purpose and need, alternatives analysis, and avoidance and minimization as part of this application. c. The application indicates that excess earth from the car rental facilities relocation project must be moved to the nearest appropriate respective locations for project efficiencies and cost savings. The Division proposes that excess earth disposal into jurisdictional waters is not justified in order to meet the FAA visibility obstruction issues. d. The applicant states that "The Proposed Action, including all components, must not interfere with aviation or economic development specific to GSO". The Division questions whether interference with economic development justifies a project purpose under Section 404 of the Clean Water Act. 2. The Division has concerns regarding the statement "The use of fill material for site preparation on airport sites that may be recovered in the future for airport -related development is an efficient use of resources and minimizes earthwork, hauling, and associate environmental impacts from repeated use of heavy equipment and vehicles". Specifically, the Division is concerned regarding the use of the word "may" and whether the proposed aerospace development is speculative in nature and that the applicant is relying on the cost reductions and improved logistics for the car rental facility relocation to justify the future aerospace development project rather than justifying the aerospace development project on its own merit. If cost reduction and logistics are to be used as justification for these impacts the Division recommends that specific data be provided to support the justification. The applicant states that "avoiding development of this site now with simply be postponing a significant element of PTAA's mission..". The Division requests that the USACE consider the temporal environmental consequences that would be realized should impacts be approved for a "future" development that "may" occur. 3. Further analysis of the Proposed Project and final determination of the project Purpose and Need may warrant a further review of, or updates to, the Alternatives Analysis that has been provided within the application. 4. The Division has concerns that there will be indirect hydrological impacts to Stream SB as a result of the loss of drainage area/hydrology source and the proposed locations of the stormwater control measure outlets. 5. The Division has concerns that there will be indirect hydrological impacts to the stream within the Brush Creek Conservation Area that is downslope of the future aerospace development and Worldwide Dr impacts as a result of loss of drainage area/hydrology source and the proposed treatment of stormwater through previously constructed pond F-1. 6. The Division has requested additional technical information from the applicant (attached) and requests that the USACE review and consider the applicant's response prior to issuing any authorizations for this project. Corps Action ID# SAW -2017-00103 DWR# 20191081 Page 3 of 3 Thank you for your considering the Division's comments during your review of this Individual Permit. If you have any questions, please contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov. Sincerely, Mac Haupt, Acting Supervisor 401 & Buffer Permitting Unit cc: Richard Darling, Michael Baker International (via email) Olivia Munzer, NCWRC (via email) DWR WSRO DWR —Wetlands and Buffer Permitting Branch ROY COOPER Governor MICHAEL S.REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality September 19, 2019 DWR # 20191081 Guilford County Piedmont Triad Airport Authority Attn:J. Alex Rosser 1000A Ted Johnson Parkway Greensboro NC 27409 Subject: REQUEST FOR ADDITIONAL INFORMATION GSO Rental Car Facilities Relocation Dear Mr. Rosser: On August 14, 2019, the Division of Water Resources — Water Quality Programs (Division) received your application dated July 12, 2019, requesting an Individual Water Quality Certification and Jordan Lake Buffer Authorization from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. If the U.S. Army Corps of Engineers requests a response to any comments received as a result of the Public Notice, please provide the Division with a copy of your response to the USACE. 115A NCAC 02H .0502(c)]. 2. Please provide detailed site plans at a scale of no smaller than 1"=50' with topographic contours shown for the future aerospace development and Worldwide Dr. Please locate all wetlands, streams, and riparian buffers as overlays on the site plan. These drawings must include clear impact drawings and/or insets that include all permanent fill (fill slopes, road shoulders, dissipator pads, etc.) and any temporary fill as hatching or color coded. [15A NCAC 02H .0502(b)] 3. Please provide a detailed engineering plan, profile view, and cross-section of all proposed culverts. These drawings must include details regarding stream alignment in relation to pipe alignment, pipe slope, pipe burial, and dissipater pad. [15A NCAC 02H .0502(b)] 4. Please clarify whether the Division of Energy, Mineral and Land Resources will require riprap within any stream channels or wetlands as part of the Erosion & Sedimentation Control Plan North Carolina Department of Environmental Quality I Division of Water Resources D_E 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 2 769 9 1617 o.��-' 919.707.9000 Piedmont Triad Airport Authority D W R# 20191081 Request for Additional Information Page 2 of 3 approval. If riprap is required, please enumerate and clearly label the temporary and permanent impacts on the site plan and submit a channel restoration detail. Riprap must be located below the stream bed elevation. [15A NCAC 02H .0506(f) and (g)] 5. All work must be done "in the dry", therefore, dewatering methods will be necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized for any proposed culvert installation and the sequence of construction events to be followed to ensure compliance with this requirement. In addition, please ensure that the location of the temporary impacts are shown on the construction drawings and clearly indicated in the revised impact table. [15A NCAC 02H .0502(b)(3)] 6. Pursuant to 15A NCAC 02H.0506(a) a 401 Water Quality Certification may only be issued upon determining that existing uses are not removed or degraded by a discharge to classified surface waters. The application notes that impervious surfaces from the future aerospace development and Worldwide drive will be treated in Stormwater Pond F-1. Please note that the rerouting of any drainage area and surface flow has the potential to remove existing hydrology from features adjacent to this project and therefore remove existing uses of the stream channels or wetlands. Please provide a detailed hydrologic analysis of indirect impacts to the stream immediately below these impact areas. Pursuant to 15A NCAC 02H.0506(a) a 401 Water Quality Certification may only be issued upon determining that existing uses are not removed or degraded by a discharge to classified surface waters. Based on the information provided in the application and associated documents, the current drainage area of Stream SB within the New Rental Car Facilities is proposed to be rerouted through multiple stormwater wet detention basins. Please note that the rerouting of any drainage area and surface flow has the potential to remove existing hydrology from features adjacent to this project and therefore remove existing uses of the stream channels or wetlands. Please provide a detailed hydrologic analysis of indirect impacts to the stream immediately below theis impact areas. 8. You have indicated that the future aerospace development and worldwide drive meet the definition of "Airport Facilities" per 15A NCAC 02B .0267 and that the impacts are identified within the Table of Uses as "Allowable with Mitigation". Please submit a buffer mitigation plan detailing the amount of buffer impact for Zone 1 and/or Zone 2 and how the impact will be mitigated. [15A NCAC 02B.0267] 9. The Division is currently reviewing the Stormwater Management Plan submitted for the New Rental Car Facilities and will send comments regarding the review by separate document. Pursuant to Title 15A NCAC 02H .0502(e) and 15A NCAC 02B [Neuse] .0267, the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above Piedmont Triad Airport Authority DWR# 20191081 Request for Additional Information Page 3 of 3 requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this link: https://edocs.deg.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on the link is referenced above). If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Sue Homewood at 336-776-9693 or Sue.Homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Mac Haupt, Acting S pervisor 401 & Buffer Permitting Branch cc: Richard Darling, Michael Baker International (via email) David Bailey, USACE Raleigh Regulatory Field Office (via email) Olivia Munzer, NCWRC (via email) Chonticha McDaniel, Stormwater Engineer, 401 & Buffer Permitting Branch (via email) DWR WSRO 401 files DWR 401 & Buffer Permitting Unit