Loading...
HomeMy WebLinkAboutNCC191806_ESC Approval Submitted_20190919catawba county utilities & engineering August 30, 2019 Shurtape Technologies, LLC 1712 8t" Street Drive SE Hickory, NC 28602 RE: LETTER OF APPROVAL WITH MODIFICATIONS Project Name: Shurtape Catawba Case Number: CBPR-07-2019-32493 Disturbed Area: 20 acres Submitted By: CAGE Civil Engineering Date Received: August 29, 2019 New Submittal Revision X Dear Mr. Raymer: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The Erosion Control Permit must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction_ activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of an_u land disturbing activity on the above named project. The NOI form may be accessed at de .nc. ov1NCG01. After submittal of a complete and correct NOI Form, a COC will be emailed to you within three business days. Title 15 NCAC 4B .0018(a) requires that a copy of the approved erosion control plan, NCG01 permit and COC, and records of inspections made be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statue 113A- 51 through 66), this office may require revision to the plan and implementation of the revisions to insure compliance with the Act. catawbacountync.gov Cotowbo County Government Center 25 Government Drive I Newton NC 28658 1 828.465.8261 MAKING. LIVING. BETTER. Acceptance and approval of this plan is conditioned upon your compliance with federal and state water quality laws, regulations and rules. In addition, local city ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form that you have piuvided. You are requested to file an amended form if there is any change in the information included on the form. Please ensure the approved plans and permit are picked up from the Government Center, see address above. In addition, please notify this office of the proposed start date for this project and to schedule a preconstruction conference. Your cooperation is appreciated. Sincerely, Toni Norton, P.E., LEED A.P., CPESC Water Resources Engineer Cc: File CAGE Civil Engineering NC DEMLR MODIFICATIONS Revise Rainfall Intensities for Temporary Sediment Basin #2, resubmit Soil Erosion and Sediment Control Plan — Overall Sheet C3.4 Soil Erosion and Sediment Control Plan — Central Sheet C3.5 Soil Erosion and Sediment Control Plan — South Sheet C3.6 • Show temporary diversions for flow into Temporary Sediment Basin #1 and Temporary Sediment Basin #2, slope drains where required Soil Erosion and Sediment Control Details Sheet C3.8 • Riser diameters do not match calculations, revise table