Loading...
HomeMy WebLinkAbout20060446 Ver 1_Approval Letter_20060419? W AT FRQG r o `ii;?NW411W -c Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality April 19, 2006 DWQ Project # 06-0446 Wayne County NC Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1619 Subject Property: Norwood Gainey Site Neuse River [030412, 27-56, C, SW, NSW] 303d Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions Dear Sir or Madam: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 7.7 acres of riparian wetland in conjunction with proposed wetland enhancement at the site as described within your application dated March 16, 2006, which was received by the N.C. Division of Water Quality (DWQ) on March 17, 2006, with more information received from you on April 18, 2006. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3495 (GC3495). The Certification(s) allows you to use Nationwide Permit(s) NW27 when issued by the US Army Corps of Engineers (USACE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 213 .0233. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h): This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Riparian Wetland 7.7 acres PCN page 8 of 12 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands No ` Carolina Natura!!y An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper NC EEP Page 2 of 4 April 19, 2006 Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream as identified within 15A NCAC 2B .0233 (5). If this is not possible, it may be necessary to provide stormwater facilities. that are considered to remove nitrogen. This may require additional approval from this Office. 5. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B 33 and GC 3402. 6. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 7. The size of the Riparian Buffer restoration areas presented in Table 1 (page iii) do not match the values given in the text on page 14. These values should be accurate calculations for the restoration areas and should be consistent throughout the document. NC EEP Page 3 of 4 April 19, 2006 8. You have proposed a Riparian Buffer Herbaceous Zone which would be located beyond zone 2. DWQ cannot give credit for any restoration outside of the 50-foot buffer. 9. No soil amendments should be conducted on the site without prior approval from DWQ since the stream is NSW. 10. Acer rubrum (red maple) should be removed from the planting plan and be replaced by a more appropriate species. 11. The anticipated locations for the vegetation plots should be shown on the site plans. 12. The as-built and subsequent monitoring reports should include a list of the number of trees present for each species. 13. Vegetation monitoring should be conducted during the growing season. 14. General, descriptive observations must be made each year while walking through the site in order to determine any problems areas that might be developing so early corrective actions can be taken. This provision must be added to the monitoring plan. 15. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly or Ian McMillan in the Central Office in Raleigh at 919-733-1786 or Kyle Barnes in the DWQ Washington Regional Office at 252-946-6481. AWK/Um Alan W. Klimek, P.E. Si cerely, (j^e(-7 V04J NC EEP Page 4 of 4 April 19, 2006 Enclosures: GC 3495 Certificate of Completion cc: USACE Washington Regulatory Field Office Kyle Barnes, DWQ Washington Regional Office DLR Washington Regional Office File Copy Central Files Amanda Mueller, DWQ Filename: 060446NorwoodGaineySite(Wayne)401_NBR