Loading...
HomeMy WebLinkAboutSW5140701_COMPLETE FILE - HISTORICAL_20140910STORMWATER DIVISION CODING SHEET RESCISSIONS PERMIT NO. DOC TYPE ❑COMPLETE FILE -HISTORICAL DATE OF RESCISSION ❑ O(-� �._-1- �._L. I D YYYYMMDD Wade, Larry From: Matt Lowder [mlowder@trianglesitedesign.com] Sent: Wednesday, September 10, 2014 11:59 AM To: Wade, Larry Subject: RE: SW5140701 Advance Auto Parts - Spring Hope Go alicad and return the submittal package to 1ne. 'Hanks for the follow-up Matt l..owdcr, PE., 'F1'iartgle Site Design, 4006 13arrett Drivc, Suite 203 Raleigh, NC 27609 919-333-5729 mlowder a,trianglesitedcsign.com From: Wade, Larry [mailto:larry.wade@ncdenr.gov] Sent: Wednesday, September 10, 2014 11:56 AM To: mlowder(Ptrianglesitedesign.com Cc: Bennett, Bradley; Randall, Mike Subject: SW5140701 Advance Auto Parts - Spring Hope Hello Mr. Lowder, An Additional Information Request for the subject project was due in our office on September 5, 2014. As of today, I have not received any correspondence from you. We are required to return the project if the submittal dates are not met, and you will need to submit the project again as a new project and pay all fees over if it is returned; however, If you need some additional time, we can grant a reasonable extension if needed. Please let me know what your intentions are to proceed. Thanks, Larry W. Wade PE Telephone: (919) 807-6375 Fax: (919) 807-6494 Stormwater Permitting Program North Carolina Department of Environment & Natural Resources Division of Energy Mineral and Land Resources 1612 Mail Service Physical Address - 512 N. Salisbury St. Room 942S Raleigh, NC 27699-1612 Raleigh, NC 27604 Rar'--AaR.Al -16 J-4-A47 -VA-4 Sir Application Completeness Review CX GP21206:i� LY'First Submittal ❑ Re-submitt i Date Received: I Date Reviewed:') zi By Bill Diuguid Development/Project Name: p Receiving stream name S Clas ificaton: C tisu.. River Basin: lvc_/Ic a For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-ll, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): Al Zd _. Latitude and Longitude: 35- . 7 D z. SOW 9 bb JurisdictioT ns ..j ! c,[_" s A C v&w4 Project Address: .!r S E Engineer name and firm: IbA7`T o Phone: 9l 9-SS 3 — �SPO Email: o 1&q;• �f. Is the project confirmed to be in the State MSI Stormwater Permit juris tion? Yes 6t ❑ No o Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets U High Density ❑ Other ' 401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) o'�UA 52, y' t e Check for $505.00 included �riginal signature (not photocopy) on application Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-memb Imana , Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which in Eludes the name, title, mailing address and phone number of the person signing the letter. Coov of property deed showin❑ ownership or control -a-.For subdivided projects, a signed and notarized deed restriction statement Sealed, signed & dated calculations fl/ Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) V Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road d Two sets of sealed, signed & dated layout & finish grading plans with appropriate details arrative Description of stormwater management provided Soils report, geotech information provided �d ❑ Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or adjacent property r�/Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; G✓ Dimensions & slopes provided ❑ Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density BMP operation and maintenance agreements provided Application complete Rep-gh"t❑ Application Incomplete Returned: (Date) Comments A,-x_o o i` d e o C- 8 April 26, 2013 Revision, Bill Diuguid ************************ThIS is a government E-mail address**************************** *********E-mails sent and received from this address can be disclosed to third parties************ Wade, Larry From: Wade, Larry Sent: Wednesday, September 10, 2014 11:56 AM To:'mlowder@trianglesitedesign.com' Cc: Bennett, Bradley; Randall, Mike Subject: SW5140701 Advance Auto Parts - Spring Hope Hello Mr. Lowder, An Additional information Request for the subject project was due in our office on September 5, 2014. As of today, I have not received any correspondence from you. We are required to return the project if the submittal dates are not met, and you will need to submit the project again as a new project and pay all fees over if it is returned; however, If you need some additional time, we can grant a reasonable extension if needed. Please let me know what your intentions are to proceed. Thanks, Larry W. Wade PE Telephone: (919) 807-6375 Fax: (919) 807-6494 Stormwater Permitting Program North Carolina Department of Environment & Natural Resources Division of Energy Mineral and Land Resources 1612 Mail Service Raleigh, NC 27699-1612 Physical Address - 512 N. Salisbury St. Room 942S Raleigh, NC 27604 is a government E-mail address**************************** *********E-mails sent and received from this address can be disclosed to third parties************ Wade, Larry From: Wade, Larry Sent: Tuesday, August 05, 2014 2:49 PM To:'mlowder@trianglesitedesign.com' Cc: Devane, Boyd; Randall, Mike Subject: SW5140701 Advance Auto Parts - Spring Hope Mr. Lowder, This is to follow up on our telephone conversation from yesterday After a review of the subject plan submittal, i am requesting additional information on the following items. 1. The project will require peak flow matching the pre -development discharge rate for the one year, 24 hour storm event as noted in the Phase II requirements because it is a Phase 11 tipped county. Please revise your design and calculations accordingly. 2. There is a possibility you may be able to revise your design to eliminate the sand media and underdrain system if you can meet the requirements of 15A NCAC 02H .1008 . 3. The SHWT elevation was not clear in the soils report provided. Please have the report corrected to provide the information in the area where the proposed bio-retention cell is located. 4. In reference to the possibility of purchasing additional property off site to reduce the total impervious, after some discussion in the office, this does not seem reasonable if the property is already in a conservation easement it does not seem appropriate, additionally this option is only made available in water supply watersheds. 5. In reference to reducing the disturbed area, a permit is not required for a project that does not require an erosion control permit. Please consider this a formal additional information request. A response is required within 30 days from today's date. If you have any questions, please let me know. Larry W. Wade PE Telephone: (919) 807-6375 Fax: (919) 807-6494 Stormwater Permitting Program North Carolina Department of Environment & Natural Resources Division of Energy Mineral and Land Resources 1612 Mail Service 942S Raleigh, NC 27699-1612 Physical Address - 512 N. Salisbury St. Room Raleigh, NC 27604 ************************This is a government E-mail address**************************** *********E-mails sent and received from this address can be disclosed to third parties************ r�{ FhST Yl� �i,jG`.L.y c*, ', r, f�p3. ]` tti•''k. •li 'Ov..'`�. :t,rv�,. �. {' a sty"1 fl� Jnci�ir'�slR•u? S v�%, e ' 1-•bir�e,,E,� 1 't''r�a� S3 '�' r! ;`,� fr T � ��•� � fix, � � � � . '.:�� � t ' E� S�d„�se, t� �y % n �i 'now. r +� t •n �'��`� uv""First Submittal ❑ Re-subm DevelopmentlProject Name: A Receiving stream name River Basin: 7 -,fA _ fl✓A.M /L Application Completeness Review dapcs I Date Received: '711 SASA Date Reviewed: 9/2-1/li, By Bill Diuguid .. /1-11- .,4. -/l-A, — C e O._. 14gti n: _C �s w For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-11, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Manaaement Strateay. High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): A IA Latitude and Longitude: 3S .6 �7 [9 z. Sel tq -7 0 06 /,9. d3' kV Jurisdiction r F4.2� X C.-,,,,4 Project Address: .6' Engineer name and firm: /Y/A"TT a Pt T Phone: 91 j-.S.s 3 — 64590 Email: o e ; -fA Is the project confirmed to be in the State MSI Stormwater Permit juris tion? Yes & ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets EloHigh Density ❑ Other 401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) uj- BUA S2, 5' a% Gil" Check for $505,00 included ref Original signature (not photocopy) on application C- Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-memb Imana , Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which in Eludes the name, title, mailing address and phone number of the person signing the letter. - Coov of orooerty deed showina ownership or control —&_For subdivided projects, a signed and notarized deed restriction statement ae'seaied, signed & dated calculations w' Correct supplement and O&M provided for each 8MP on site (check all that were provided & number of each) r,' Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road �i Two sets of sealed, signed & dated layout & finish grading plans with appropriate details arrative Description of stormwater management provided d Soils report, geotech information provided f d ❑ Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or adjacent property ,,,,adjacent Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; d Dimensions & slopes provided ❑ Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density BMP operation and maintenance agreements provided Application complete Rea*a mtl D Application Incomplete Returned: (Date) sh "d — Comments f+c cAsr 9 rz.r in 0't �, & /0,�1� X.:f Afefdefl" o,y �Ae pd&-,�.�_ C'— 8 April 26, 2013 Revision, Bill Diuguid 2; rr M.I s i1 Y {l t .J' y� I fr i3 '� � x'h _ • i J� [� 1w �s ~�. �,-?', _ e r � ...r .t�ti t a- •iYF�fa '` ' :_ �N Z 1. � _ fit { kl.ie�_.. i 'r x.k _.. .�.«i�S./I h. '>��,, �. .. ..,�11 o-? _ a_, ,•J�. .�'y �', '['�0