HomeMy WebLinkAbout20161044 Ver 1_30% Initial Credit Release Request_20190911Strickland, Bev
From:
Sent:
To:
Cc:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
Erin, Kim, Mac and Todd:
Wiesner, Paul
Wednesday, September 11, 2019 3:53 PM
Davis, Erin B; Kim Browning; Haupt, Mac; Tugwell, Todd J CIV USARMY CESAW (US)
Allen, Melonie; Harmon, Beth; Stanfill, Jim; Baumgartner, Tim; Crocker, Lindsay;
Schaffer, Jeff, Emily Reinicker; Shawn Wilkerson; Ben McGuire
30% Initial Credit Release Request- Lone Hickory Mitigation Site_DMS# 97135 -
Yadkin 03040101
Lone Hickory -97135 -YD 01_STR_RW_Initial Credit Release.pdf; Lone Hickory -97135
_MY0-IRT Meeting Minutes_8-19-19.pdf
Follow up
Flagged
DMS requested IRT review of the As -Built Baseline Monitoring Report and Record Drawings for the Lone Hickory
Mitigation Site (DMS# 97135) on July 15, 2019. These documents were posted on the DMS portal on the July 15, 2019
and a hard copy was hand delivered to NC DWR on August 19, 2019.
The IRT initiated the MYO review on July 17, 2019 with a 15 -day review period as follows:
15 -Day Comment Start Date: July 17, 2019 - 15 -Day Comment Deadline: August 1, 2019 - 45 -Day Credit Release Approval
Deadline: August 31, 2019
On August 1, 2019, the IRT requested a MYO site visit for the Lone Hickory Mitigation Site. The IRT site visit was
completed on August 19, 2019. Meeting minutes were provided to the IRT. IRT comments received have been
incorporated into the FINAL MYO IRT meeting minutes and are attached.
Also attached is the initial credit ledger for the Lone Hickory Mitigation Site (DMS ID # 97135) in Yadkin 03040101.
DMS is requesting the initial 30% credit release and USACE credit ledger signature.
Project information is as follows:
Lone Hickory Mitigation Site
DMS Project # 97135
RFP# 16-006706 - Issued 10/21/15
Institution Date: 5/23/2016 - Full Delivery
Yadkin River Basin
Cataloging Unit 03040101
Yadkin County, North Carolina
Proposed Mitigation Plan Assets:
13,164 SMUs (Warm)
9.5 WMUs
As -Built MYO Prosect Credits:
13,164 SMUs (Warm)
9.5 WMUs
Designer: Wildlands Engineering, Inc. — WEI Contact: Emily Reinicker, PE, CFM, ereinicker@wildlandseng.com, 704-332-
7754 x106 (office); 704-965-7834 (mobile) NCDEQ- DMS PM: Paul Wiesner, paul.wiesner@ncdenr.gov, 828-273-1673
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the portal here:
Lone Hickory_97135_MYO_2019.pdf
https://ncconnect.sharepoint.com/sites/deg ext/dwm in/AsBuilt%20Report%20%20Drawing/Lone%20Hickory%20971
35/Lone%20Hickory 97135 MYO 2019.pdf
Please let me know if you have any questions or concerns.
Thanks
Paul Wiesner
Western Regional Supervisor
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-273-1673 Mobile
paul.wiesner(cancdenr.gov
Western DMS Field Office
5 Ravenscroft Drive
Suite 102
Asheville, N.C. 28801
D_ E Q F��`
Nle�
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
�D-
WILDLANDS
ENGINEERING
PROJECT: Lone Hickory Mitigation Site, Yadkin County, NC
DMS Project No. 97135
DATE: August 19, 2019; 10:30 AM
LOCATION: 1324 Lone Hickory Road, Yadkinville, NC
Attendees
Company
Name
Wildlands
Shawn Wilkerson
Wildlands
Ben McGuire
NCDMS
Paul Wiesner
NCDMS
Kelly Phillips
DWR
Mac Haupt
USACE
Todd Tugwell
1. Livestakes used onsite: Silky Dogwood 40%, Silky Willow 50%, Black Willow 10%
2. Wildlands Land Management team to identify and address:
a. Vegetation in UT1 stream channel 112+50 — 117+00.
b. Along UT1 from 113+00-160+00 a grass that looks similar to Johnson Grass is growing throughout.
c. A couple of kudzu sprouts were noted on a point bar of the West Side of UT3 around station 305+00.
3. UT26 Stream jurisdiction begins at the end of the overflow channel from BMP4. A short portion of this overflow
channel (upstream of stream resource) has been eroded by BMP outlflow. The area with damage is not
receiving credits.
a. The outlet area and overflow channel will be repaired by the end of September.
4. Ground water gauges:
a. GWG4 is loose. It is also installed over the filled ditch line. Wildlands to relocate outside of ditch or add
an additional ground water gauge adjacent to GWG4 but outside of the ditch.
b. The sediment sock on GWG6 is above the ground level. Wildlands to trim.
c. Make sure the monitoring team is calibrating the gauges, provide manual measure -down to compare to
data download.
5. Stream gauges
a. Stream gauges on UT2B and UT2A need to either be moved to upstream or add a camera using the
required locations:
i. For reach UT213- as seen on record drawings sheet 1.23, on the riffle between topo elevation
lines 764 and 763. The riffle is station 502+26 — 502+44.
Lone Hickory, Yadkin County, NC
8/19/19 1RT Walk page 1
ii. For reach UT2A- as seen on record drawing set sheet 1.20, on the riffle just above station
402+00. The riffle is in station 401+80 — 401+94.
General IRT notes for the future:
-Remove Green Ash from future planting plans.
-Stream gauges are to be installed no farther than midway down reaches.
Lone Hickory, Yadkin County, NC
8/19/19 1RT Walk page 2
From: Haupt, Mac
To: Wiesner, Paul; Tuawell, Todd I CIV USARMY CESAW (US); Kim Browning
Cc: Phillips, Kelly D; Ben McGuire; Shawn Wilkerson; Emily Reinicker; Kristi Suggs
Subject: RE: Lone Hickory_DMS# 97135: As -Built/ MYO IRT Site Visit (8-19-19) Meeting Minutes
Date: Friday, August 30, 2019 2:23:03 PM
Paul,
I would add two items:
I was concerned with the placement of both stream gauges on reaches UT213 and UT2A (as you
recall, one of my comments on the draft mit plan was that stream gauges were to be placed no
farther than midway down the reach). I would either like the gauges moved or add a camera at the
recommended locations:
1. For reach UT26- as seen on record drawings sheet 1.23, on the riffle between topo
elevation lines 764 and 763, and
2. For reach UT2A, as seen on record drawings sheet 1.20, on the riffle just above station
402+00.
Thanks,
Mac
From: Wiesner, Paul
Sent: Thursday, August 29, 2019 11:20 AM
To: Haupt, Mac <mac.haupt@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US)
<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly. D. Browning@ usace.army.mil>
Cc: Phillips, Kelly D <Kelly.Phillips@ncdenr.gov>; Ben McGuire <bmcguire@wildlandseng.com>;
Shawn Wilkerson <swilkerson@wildlandseng.com>; Emily Reinicker
<ereinicker@wildlandseng.com>; Kristi Suggs <ksuggs@wildlandseng.com>
Subject: Lone Hickory_DMS# 97135: As -Built/ MYO IRT Site Visit (8-19-19) Meeting Minutes
Kim, Mac and Todd;
The meeting minutes from the August 19, 2019 IRT site visit are attached for your review.
Please let us know if you have any additional comments, questions or concerns.
WEI;
Please include the final meeting minutes in the MY1 report as an Appendix. Please also provide any
updates/ resolutions discussed at the meeting in the MY1 report.
Thanks
Paul Wiesner
Western Regional Supervisor
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-273-1673 Mobile
paul.wiesner(oncdenr.gov
Western DMS Field Office
5 Ravenscroft Drive
Suite 102
Asheville, N.C. 28801
D- E\Z��
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Tugwell, Todd J CIV USARMY CESAW (US)
To: Haupt, Mac; Wiesner, Paul; Kim Browning
Cc: Phillips, Kelly D; Ben McGuire; Shawn Wilkerson; Emily Reinicker; Kristi Suggs
Subject: [External] RE: Lone Hickory_DMS# 97135: As -Built/ MYO IRT Site Visit (8-19-19) Meeting Minutes
Date: Wednesday, September 4, 2019 9:45:55 AM
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to report.spam@nc.gov<mailto:report.snam(c�r�nc.gov>
Paul, I agree with Mac. I did note that both UT2A&B were both dry. UT2A did have water in the pools on the
steeper section, but it had vegetation growing within the bed in the wetland area.
Todd
-----Original Message -----
From: Haupt, Mac [mailto:mac.haupt&ncdenr.gov]
Sent: Friday, August 30, 2019 2:23 PM
To: Wiesner, Paul <paul.wiesner@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US)
<Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (US)
<Kimberly.D.Browning@usace. army.mil>
Cc: Phillips, Kelly D <Kelly.Phillips@ncdenr.gov>; Ben McGuire <bmcguire@wildlandseng.com>; Shawn
Wilkerson <swilkerson@wildlandseng.com>; Emily Reinicker <ereinicker@wildlandseng.com>; Kristi Suggs
<ksuggs@wildlandseng. com>
Subject: [Non-DoD Source] RE: Lone Hickory_DMS# 97135: As -Built/ MYO IRT Site Visit (8-19-19) Meeting
Minutes
Paul,
I would add two items:
I was concerned with the placement of both stream gauges on reaches UT213 and UT2A (as you recall, one of my
comments on the draft mit plan was that stream gauges were to be placed no farther than midway down the reach). I
would either like the gauges moved or add a camera at the recommended locations:
1. For reach UT213- as seen on record drawings sheet 1.23, on the riffle between topo elevation lines 764 and
763, and
For reach UT2A, as seen on record drawings sheet 1.20, on the riffle just above station 402+00.
Thanks,
Mac
From: Wiesner, Paul
Sent: Thursday, August 29, 2019 11:20 AM
To: Haupt, Mac <mac.haupt@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US)
<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>
Cc: Phillips, Kelly D <Kelly.Phillips@ncdenr.gov>; Ben McGuire <bmcguire@wildlandseng.com>; Shawn
Wilkerson <swilkerson@wildlandseng.com>; Emily Reinicker <ereinicker@wildlandseng.com>; Kristi Suggs
<ksuggs@wildlandseng. com>
Subject: Lone Hickory_DMS# 97135: As -Built/ MYO IRT Site Visit (8-19-19) Meeting Minutes
Kim, Mac and Todd;
The meeting minutes from the August 19, 2019 IRT site visit are attached for your review.
Please let us know if you have any additional comments, questions or concerns.
m
Please include the final meeting minutes in the MY report as an Appendix. Please also provide any updates/
resolutions discussed at the meeting in the MY1 report.
Thanks
Paul Wiesner
Western Regional Supervisor
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-273-1673 Mobile
paul.wiesner@ncdenr.gov<mailto:paul.wiesnerL&,,ncdenr.gov>
Western DMS Field Office
5 Ravenscroft Drive
Suite 102
Asheville, N.C. 28801
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Mitigation Project Name Lone Hickory County Yadkin USACE Action ID 2017-00100
DMS ID 97135 Date Project Instituted 5/23/2016 NCDWR Permit No 2016-1044
River Basin YADKIN Date Prepared 7/17/2019
Cataloging Unit 03040101
Credit Release Milestone
Potential Credits (Mitigation Plan)
Potential Credits (As -Built Survey)
Scheduled
Releases
(Stream)
Warm
13,164.574
13,164.574
Stream Credits
Cool Cold Anticipated Actual
Release Year Release Date
(Stream) (Stream)
Scheduled
Releases
(Forested)
Riparian
Riverine
9.500
9.500
Wetland Credits
Riparian Non
Non -riparian Scheduled
riverine
Releases
(Coastal)
Coastal anticipated Actual
Release Year Release Date
(Wetland) (Wetland)
1 (Site Establishment)
NIA
N/A
N/A
NIA
NIA
N/A
N/A
2 (Year 0 / As -Built)
30%
3,949.372
2019
7/17/2019
30%
2.850
30%
N/A
7/17/2019
3 (Year 1 Monitoring)
10%
1
2020
10%
10%
N/A
4 (Year 2 Monitoring)
10%
2021
10%
15%
N/A
5 (Year 3 Monitoring)
10%
2022
15%
20%
N/A
6 (Year 4 Monitoring)
5%
2023
5%
10%
N/A
7 (Year 5 Monitoring)
10%
2024
15%
15%
N/A
8 (Year 6 Monitoring)
5%
2025
5%
NIA
N/A
9 (Year 7 Monitoring)
10%
2026
10%
NIA
N/A
Stream Bankfull Standard
10%
NIA
NIA
Total Credits Released to Date
Total Credits Remaining to be Released
30.00%
70.00%
3,949.372
9,215.202
30.00%
70.00%
2.850
6.650
NOTES:
CONTINGENCIES:
Signature of Wilmington District Official Approving Credit Release
Date
1 - For NCDMS, no credits are released during the first milestone
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted it to the NCDMS Portal, provided the following criteria have been met:
1) Approval of the final Mitigation Plan
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan
4) Reciept of necessary DA permit authorization or written DA approval for porjects where DA permit issuance is not required
3 - A 10% reserve of credits is to be held back until the bankfull event performance standard has been met
Mitigation Project Name County Yadkin USACE Action ID 2017-00100
Date Project Instituted 5/23/2016 NCDWR Permit No 2016-1044
Date Prepared 7/17/2019
Lone Hickory
DMS ID
97135
River Basin
YADKIN
Cataloging Unit
03040101
DEBITS (released credits only)
o
` .
mn
'-
C
O U
z
Ratios 0.885659 1.5 2.5 10
m`
~• ry�
md CEu
N R
E
A� dd
u
N S
w
O
md '�
u
N y
C
mo
•C� `m •�
_n ° _n
N
C
mE
� du
_n c
A
C
•A mi'
a_ d
N
a
. •
`m
n�
'- °
C N
O d
Z K
o
` .
mn
'-
C
O U
z
m
'- c
C A
O Z
Z W
OC2
•- v
C VI
O d
z n
.O
Li m
m o
yj
A d
U
i .o
m
N
A U
U
E
'° c
UI N
A t
U W
OO
AE
i iE
m y
N N
A
U a
As -Built Amounts (feet and acres)
11,565.000
1,065.000
9.500
As -Built Amounts (mitigation credits)
13,058.074
106.500
9.500
Percentage Released
30%
30%
30%
Released Amounts (feet /acres)
3,469.500
319.500
2.850
Released Amounts (credits)
3,917.422
31.950
2.850
NCDWR Permit USACE Action ID Project Name
NCDOT TIP U -2579B -
2014-0090 2008-03183 Winston Salem Northern Belt
3,469.500
319.500
Remaining RELEASED Amounts (feet / acres)
0.000
0.000
2.850
Remaining RELEASED Amounts (credits)
0.000
0.0001
2.850