HomeMy WebLinkAbout20190883 Ver 1_USACE Permit_20190918U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2019-01086 County: Rockingham U.S.G.S. Quad: NC -Southwest Eden GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: City of Eden Attn: Terry Shelton Address: 308 East Stadium Drive Eden, NC 27288 Size (acres) —24 Nearest Town Eden Nearest Waterway UTs to Dan River / Matrimony Creek River Basin Roanoke USGS HUC 03010103 Coordinates 36.481769 N -79.768956 W Location description: The overall City of Eden Phase 11— Bridge Street Basin Sewer Replacement and Rehabilitation pro 4ect includes the Bridge Street and Dan River Outfalls, encompassing Matrimony Creek near Robin Road to the Dan River, several smaller gravity flow lines to the Matrimonv Creek and Dan River Outfalls. and the outfall along the Dan River to the Highway 87, in Eden, Rockingham County, North Carolina. Description of projects area and activity: This verification authorizes the fifteen (15) distinct sites (crossings/proiects): 1) Site 1 (Stream Crossing 11-S1) requires the temporary discharge of dredged material into 36 linear feet of stream channel, for aerial sewer line construction access and installation. 2) Site 2 (Stream Crossing 11-S11) requires the temporary discharge of dredged material into 85 linear feet of stream channel, for aerial sewer line construction access and installation. 3) Site 3 (Stream Crossings 11-S12, 11-S13, and 11-S14) requires the permanent (no loss of waters of the US) discharge of fill material into 100 linear feet of stream channel, for sewer line construction access installation, and rip rap stabilization. 4) Site 4 (Stream Crossings 11-S2, 11-S10, and 11-S15) requires the permanent (no loss of waters of the US) discharge of fill material into 130 linear feet of stream channel, for sewer line construction access, installation, and rip rap stabilization. 5) Site 5 (Stream Crossings 11-S3, 11-S4, and 11-S9; Wetland Crossing 11-W4) requires the temporary discharge of dredged material into 159 linear feet of stream channel and 0.02 acre of riparian-non-riverine wetlands, and the permanent (no loss of waters of the US) discharge of fill material into 35 linear feet of stream channel, for sewer line construction access, installation, and rip rap stabilization. 6) Site 6 (Stream Crossing 11-S5) requires the temporary discharge of dredged material into 37 linear feet of stream channel, for aerial sewer line construction access and installation. 7) Site 7 (Stream Crossing 11-S6) requires the temporary discharge of dredged material into 35 linear feet of stream channel, for sewer line construction access and installation. 8) Site 8 (Stream Crossing 11-S7) requires the permanent (no loss of waters of the US) discharge of fill material into 73 linear feet of stream channel, for sewer line construction access, installation, and rip rap stabilization. 9) Site 9 (Stream Crossing 11-S8) requires the permanent (no loss of waters of the US) discharge of fill material into 49 linear feet of stream channel, for sewer line construction access, installation, and rip rap stabilization. 10) Site 10 (Wetland Crossing 11-W7) requires the temporary discharge of dredged material 0.01 acre of riparian-non- riverine wetlands, for sewer line construction access and installation. 11) Site 11 (Wetland Crossings 11-W6 and 11-W9) requires the temporary discharge of dredged material 0.012 acre of riparian-non-riverine wetlands, for sewer line construction access and installation. 12) Site 12 (Wetland Crossing 11-W1) requires the temporary discharge of dredged material 0.01 acre of riparian-non- riverine wetlands, for sewer line construction access and installation. 13) Site 13 (Wetland Crossings 11-W2 and 11-W5) requires the temporary discharge of dredged material 0.22 acre of riparian-non-riverine wetlands, including the permanent conversion of <0.1 acre from forested to herbaceous wetlands, for sewer line construction access and installation. 14) Site 14 (Wetland Crossing 11-W8) requires the temporary discharge of dredged material 0.004 acre of riparian-non- riverine wetlands, for sewer line construction access and installation. 15) Site 15 (Wetland Crossing 11-W3) requires the temporary discharge of dredged material 0.02 acre of riparian-non- riverine wetlands, for sewer line construction access and installation. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 12. Utility Line Activities SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 5/23/2019, and updated information submitted via email on 7/31/2019 and 8/29/2019, and the enclosed plans Drawing Numbers 11-C2, 11-C3, 11-C7, 11-C9, 11-C11, 11-03, 11-C16, 11-C19, 11-C21, 11- C22, 11-C25, 11-C27, 11-C29, 11-C30, 11-C31, 11-C33, 11-C34, 11-C39, 11-C40, D9, and D10. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at (919) 554-4884, Ext. 30or David.E.Bailey2(a,usace.army.mil. Date: 2019.09.18 11:24:41 Corps Regulatory Official: -04'00' Date: 9/18/2019 Expiration Date of Verification: 03/18/2022 SPECIAL CONDITIONS 1. Temporary discharge of excavated or fill material into streams will be for the absolute minimum period of time necessary to accomplish the work, and such authorized crossings will be constructed and restored per details on Drawing Numbers D9 and D10, and seeded per Sections 2.3, 2.4, 2.5, and 2.6 on the attached "Section 32 92 19 Seeding" detail. 2. Aside from the stream crossings specifically authorized as described above, and shown on Drawing Numbers 11-C2, 11-C3, 11-C7, 11-C9, 11-C11, 11-C13, 11-C16, 11-C19, 11-C21, 11-C22, 11-C25, 11-C27, 11-C29, 11-C30, 11-C31, 11-C33, 11-C34, 11-C39, 11-C40, no additional impacts to wetlands, streams, and other potential waters of the US are authorized for the City of Eden Phase 11— Bridge Street Basin Sewer Replacement and Rehabilitation project. Date: 2019.09.18 Corps Regulatory Oficial: 11:24:23 -04'00' Date: 9/18/2019 - Expiration Date of Verification: 03/18/2022 Copy furnished: Diandra Hyman, P.E., W.K. Dickson & Co., Inc., 730 Corporate Center Drive, Raleigh, NC 27607 George Lankford, George K Lankford, LLC, 238 Shady Grove Rd., Pittsboro, NC 27312 Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105 r r ■ F. "moi- _.-•# ; V{�� v�10, ^ plow A, 40 ar BSW-3 11-W7 UT7 to Matrimony Creek `.rf BSW-8 BSW-4 UT4 to Matrimony Creek BSW-2 11-S3 s 11-S4 "■ . 11-W6 = 11-W4 11-S9� MOR UT5 to Matrimony CreekAr n„�r� r f UT2 to Matrimony Creek �i., • J 11-S11 �v r �' �,-�-l�r • . UT3 to Matrimony Creek BSW-1 �' r' ' • 11-S14 r -� •� �_.`►��. 4w; ' • ��. � �11-S1 - .•. ^. : �� � 11-W 1 '�' ��` f r �- 11-S 12 11-S7 Bv� ��.; 11-S13 SW -9 r ;=�. r F UT1 to Matrimony Creek ! ;, 4t ex o '� � .. 11-S2 _ UT6 to Matrimony Creek c� 11-W3 Legend 11-S10 5z Limits of Disturbance UT3 to Dan River 11-S15 L Pipe Replacement °�'#� Pipe Realignment Pipe Liner °'F Streams _ r Dan e BSW-7 Stream Impacts ® Wetlands 11-W5 11 -W211 -S6 0 Wetland Impacts 4 UT1 to Dan River UT2 to Dan River BSW-6 00 . t- i a,. ' UT5 to Dan River -S8 ~yr "61 Impact No. 11-S1 Figure No. 3.1 Plan Sheet No. 11-C13 11-52 3.2 11-C16 11-53 3.3 11-C21 11-54 3.3 11-C22 11-55 3.4 11-C25 11-56 3.5 11-C29 11-57 3.6 11-C2, 11-C7 11-58 3.4 11-03 11-59 3.3 11-C21 11-510 3.2 11-C16 11-S11 3.1 11-C11 11-512 3.7 11-C39 11-513 3.7 11-04 11-S14 3.7 11-C40 11-515 3.2 11-C27 11-W1 3.1 11-C9 11-W2 3.5 11-00, 11-01 11-W3 3.6 11-0 11-W4 11-W5 3.3 3.5 11-C21 11-C31 11-W6 3.8 11-C19 11-W7 3.8 11-C19 11-W8 3.2 11-C27 11-W9 3.8 11-C19 UT4 to Dan River 11-S5 11-W8 4 W� N Figure 2: Project Overview o 400 soo 1,600 DICKSON �TL161 Eden Remediation Plan - Feet community infrastructure consultants s Bridge Street Basin Replacement and Rehabilitation 1 inch - 800 feet NC 770 y \ • vo�0 e 11-S1 - 36 LF Temporary Impact N Legend — Limits of Disturbance JL — Pipe Replacement Pipe Realignment — Pipe Liner -P2 — Streams Stream Impacts _ Wetlands D Wetland Impacts o� � w + DICKSON community Infrostruciure consultants S' WASHINGTON ST 11-S11 - 85 LF Temporary Impact r Figure 3.1: Hampton Street and Harris Street Aerial Map (2015) Eden Remediation Plan Bridge Street Basin Replacement and Rehabilitation V 3 11-W1 - 0.01 ac Temporary Impact O`er ' 0 75 150 1 inch = 150 feet 300 w Feet T 411, 'A �P 00 0 Git ip ELL AVE Y, Ih r- Temporary Impact 11-S2 - 60 LF Temporary Impact —� WD IICKSON community Inf[O$t?UCIUF@ consu[lonts 1 � r ,X, G 4 0T2 to Dan P:Ner w Figure 3.2: McConnell Avenue and Tulloch Street Aerial Map (2015) 5 Eden Remediation Plan Bridge Street Basin Replacement and Rehabilitation A, A -rc A. 44 BSW-6 BSW-7 11-W8 - 0.004 ac Temporary Impact 11-S15 - 34 LF Permanent Impact 0 75 150 1 inch = 150 feet 300 m Feet �1 r J, k FORFSTRO ��� 2 o° �O ROejH Ro ��Om m 11-S3 - 102 LF Temporary Impact O/V ST Legend — Limits of Disturbance — Pipe Replacement Pipe Realignment — Pipe Liner — Streams Stream Impacts D Wetlands D Wetland Impacts � ► �Y � rf ��� .thy. � � r � �. VIII All - ee 11-W4 - 0.02 ac Temporary Impact ■►WI< N WDICI<SON w community InliP5llUC1UF8 consvilpnts S,' E EESLAL- 11 11-S9 - 35 LF Temporary Impact F• AW UT4 to Nlatrirno nYOCI L -S4 - 57 LF 1 Temporary Impact A r LAWSON ST 1 � . CO 1111. rI �• :� � t t � Q40 Figure 3.3: Price Street and Lawson Street Aerial Map (2015) Eden Remediation Plan Bridge Street Basin Replacement and Rehabilitation 0 75 150 1 inch = 150 feet 300 w Feet ■hwI<w Figure 3.4: Harris Street and Martin Street ^�i 0 75 150 300 � ♦ Aerial Map (2015) Feet communi}y nff psflu CturO CpnSUllpn}g DI�I��VI V Cn Eden Remediation Plan 1 inch = 150 feet I Bridge Street Basin Replacement and Rehabilitation 4f 11-W2 - 0.24 ac Temporary Impact �r - 11-W5 - 0.02 ac Temporary Impact N w �DICKSON ►' F community Infrostruciure consultants S F r Figure 3.5: Dan River Aerial Map (2015) Eden Remediation Plan Bridge Street Basin Replacement and Rehabilitation 11-S6 - 35 LF Temporary Impact 1 0 75 150 300 Feet 1 inch = 150 feet Legend — Limits of Disturbance i — Pipe Replacement ,; Pipe Realignment Pipe Liner * - - Streams Stream Impacts 0 Wetlands D Wetland Impacts edk N w �DICKSON ►' F community Infrostruciure consultants S F r Figure 3.5: Dan River Aerial Map (2015) Eden Remediation Plan Bridge Street Basin Replacement and Rehabilitation 11-S6 - 35 LF Temporary Impact 1 0 75 150 300 Feet 1 inch = 150 feet *. V-1 .• G�� 61Alo Legend — Pipe Replacement Pipe Realignment — Pipe Liner — Streams Stream Impacts 0 Wetlands = Wetland Impacts NhwK ::� W DICKSON -+z community Inff Psf(UClUFO consvilpnts t17 11-S7 - 73 LF Temporary Impact a:�C.... Figure 3.6: Carter Street Aerial Map (2015) Eden Remediation Plan Bridge Street Basin Replacement and Rehabilitation CARTER ST 11-W3 - 0.02 ac Temporary Impact 0 50 100 200 Feet 1 inch = 100 feet - F� `r0 LLI o I U 11-S12 - 42 LF Temporary Impact Legend _ — Limits of Disturbance — Pipe Replacement Pipe Realignment — Pipe Liner — Streams J' Stream Impacts 0 Wetlands D Wetland Impacts .r WK DICKSON wV, community Infrostruciure consultants S 11-S14 - 34 LF. Temporary Impact A. • 5� - !� 1 - N • E � � •t ° Dan River 11-S13 - 24 LF Temporary Impact Figure 3.7: Washington Street and Anderson Street Aerial Map (2015) Eden Remediation Plan Bridge Street Basin Replacement and Rehabilitation 0 50 100 1 inch = 100 feet 200 w Feet Legend — Limits of Disturbance — Pipe Replacement Pipe Realignment — Pipe Liner — Streams Stream Impacts 0 Wetlands = Wetland Impacts ■► Ww I < N DICI<SON w community InliPsllUClUFO consvilpnts S,' E fir• -_ ■ " AL 11-W9-000 ac -. " f► t� Temporary Im act p Y p yr . A• } 1 •, CO ,�=.,rte► -. = BSW-2 11-W6 - 0.01 ac - Temporary Impact 11-W7 - 0.01 ac H/44,914 �`Temporary Impact `S14bR 7� �T CO • Figure 3.8: Smith Street and Robin Road Aerial Map (2015) Eden Remediation Plan Bridge Street Basin Replacement and Rehabilitation 0 75 150 300 Feet 1 inch = 150 feet Additional Information Request for PCN Form PCN Narrative - City of Eden Remediation Program Phases 11/12: Bridge Street Basin Sewer Replacement and Rehabilitation C. Proposed Impacts Inventory (CONTINUED) 3. Stream Impacts. If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a 3f 3g Stream Impact Number 3d 3e Average Impact Permanent (P) or 3b 3c Perennial (PER) or Type of Stream Width Length Temporary (T) Type of Impact Stream Name Intermittent (INT) Jurisdiction (ft) (LF) 11-S1 T Aerial Matrimony Creek PER 404 36 (11- C13/Figure 3.1) 11-S2 T Excavation UT2 to Dan River PER 404 60 (11- C16/Figure 3.2) 11-S3 T Excavation UT4 to Matrimony PER 404 102 (11- C21/Figure 3.3) Creek 11-S4 T Excavation UT4 to Matrimony PER 404 57 (11- C22/Figure 3.3) Creek 11-S5 T Excavation UT1 to Dan River PER 404 37 (11- C25/Figure 3.4) 11-S6 T (11- C29/Figure 3.5) Excavation UT3 to Dan River PER 404 35 11-S7 T Excavation UT6 to Matrimony PER 404 73 (11- C2/Figure 3.6) Creek 11-S8 T Excavation UT5 to Dan River PER 404 49 (11- C33/Figure 3.4) 11-S9 T Excavation UT7 to Matrimony PER 404 35 (11- C21/Figure 3.3) Creek 11-S10 T Excavation UT2 to Dan River PER 404 36 (11- C16/Figure 3.2) 11-S11 T Excavation UT3 to Matrimony PER 404 85 (11- C11/Figure 3.1) Creek 11-S12 T Excavation UT1 to Dan River PER 404 42 (11- C34/Figure 3.7) 11-S13 T Excavation UT1 to Dan River PER 404 24 (11- C34/Figure 3.7) 11-S14 T (sheet no. 11-C40/Figure Excavation UT1 to Dan River PER 404 34 3.7) 11-S15 P (sheet no. 11-C27/Figure Excavation UT2 to Dan River PER 404 34 3.2) Page 9of10 July 2019 oU ww oo �JU a'OD¢ 0 woo gra U= QOW ro 0. ui0 w 0Zw -0 o� z 0 z16 00. zw Z 00 =UQ ro= OY� w3� � N 00' zwa ° 0, moa ozz owU a W � Q =3:z a.� w.E� W0 mir3 =d0 0 -ow °2 Z°w z� oZ� U -U ZZD w °�_ 0 � H U(0)LL p00 YQ 4INz- 0 0 =Zw 0o m= .'o 0 oU 0E w 0 536 532 528 524 520 516 512 1 504 EXIST SMH BSE 0508 ,irl \ -- PROPOSED MH BSE 0178 4' DIA STD MH / O 1 tilmm j BSE 0392 co 947 CARTER ST \ 1369, P&J489 79791304x'.78&,,� / S2S3o \i �5cl 1 i �� 9 � \ c 0o EGG STON ARRISQN C/O H RRISON GGCESTON \ \ 8QA 1496, PG 420 \ PI - 13042370 PROPOSED MH BSE 0712 \ 4' DIA STD MH \ —W/ OUTSIDE DROP STA 1+02.34 (CARTER ST) S =STA 14+68.66 (CARTER OUTFALL) RIM EL=530.88 DWG NO. 11-C7 FOR \ \ TER STREET REPLACEMENT q AND PROFILE �a5 � K- 14_ 624 I.2588 ___o l � 0 ,p O �T O 0 STANTON BRYrT T �/ / , 287.2 SY TURF/ % !`� CLARK ANNA MAE 1259 IVERCREST DR 953 CARTER —�o�� ,� FESCUE SOD 1041 KLYCE ST D 505 , P 1719 1505 , G("82/ �/ (WITHIN LOD) , / � DB 1068 , PSr110 P N 79691 93 913 P N 7 0 101 Y� �s T°� PIN 7979'3034 6 s�RON_.. / LEA"=40' LL O N U) ti w Lu � F- o Lu w O U Q 536 532 528 524 520 516 512 1 504 10+00 11+00 12+00 13+00 14+00 15+00 16+00 NOTES: 1. m CONTRACTOR SHALL BE SEWER SIZE, MATERIAL AND DEPTH RESPONSIBLE FOR BYPASSING ALL 2. CONTRACTOR SHALL COORDINATE SEWAGE FLOWS DURING CIPPL & WITH OWNER'S PROJECT SEWER INSTALLATION. CONTRACTOR COORDINATOR AND PROPERTY SHALL NOTIFY RESIDENTS/BUSINESS OWNER TO LOCATE EXISTING SAN OWNERS OF CIPPL INSTALLATION SEWER LATERALS AND TO FINALIZE AND MANHOLE REPAIRS AND TO LOCATION TO INTERCEPT EXISTING REFRAIN FROM USING WATER. SEWER LATERAL. LOCATIONS CONTRACTOR SHALL SUBMIT DEPICTED ARE APPROXIMATE AND MAY DETAILED WORK PLAN SHOWING REQUIRE FIELD ADJUSTMENT. HOW ALL SEWAGE FLOWS WILL BE 1 BYPASSED. ` 2. LIMITS OF WORK (LOW) ARE LATERAL TO MINIMIZE COST OF INSTALL, LATERAL LENGTH, AND INTENDED ONLY FOR ROUTING DISRUPTION TO PROPERTY AND BYPASS PIPING. CONTRACTOR IS RESIDENTS. ALL LATERAL BENDS NOT PERMITTED TO USE THIS SHALL BE 45 DEGREE OR LESS, NO 90 CORRIDOR FOR ACCESSING SEWER DEGREE BENDS ON LATERALS SHALL REPLACEMENT. NO DISTURBANCE IS BE ALLOWED WITHOUT PRIOR PERMITTED. 3. CONTRACTOR SHALL USE IN AND 4. CONTRACTOR SHALL COORDINATE OUT APPROACH TO MAKE STREAM WITH OWNER'S PROJECT CROSSING OR INSTALL SEWER AND COORDINATOR AND IMPACTED RESTORE CHANNEL AND BANKS BY PROPERTY OWNERS MINIMUM OF 96 WORKING FROM EITHER SIDE. 4. SEWER MAIN CORRIDOR ON THIS LATERAL RE-ROUTES TO ARRANGE SHEET LIES INSIDE A FEMA SPECIAL TEMPORARY ACCESS TO PROPERTY FLOOD HAZARD AREA (REFERENCE AND RESIDENCES AND TO DISCUSS NC FLOODPLAIN MAPPING PROGRAM, SEWAGE OUTAGE. NATION FLOOD INSURANCE 5. CONTRACTOR IS RESPONSIBLE TO PROGRAM, FLOOD INSURANCE RATE FIELD VERIFY ALL UTILITY LOCATIONS MAP PANEL 7969-07/03/07. 5. CONTRACTOR SHALL COORDINATE 6. CONTRACTOR SHALL VERIFY EXISTING THE SUPPORT OF EXISTING POWER SAN SEWER LATERALS SHOWN (OR POLE AND TEMPORARY GUY WIRE NOT SHOWN). ALL EXISTING SAN REMOVAL & REPLACEMENT (IF SEWER LATERALS ARE 4" VC OR IRON NECESSARY) WITH DUKE/PROGRESS (UNLESS OTHERWISE NOTED). ENERGY BEFORE EXCAVATING NEAR CONTRACTOR SHALL REPLACE ALL THESE UTILITIES. CONTRACTOR ACTIVE SEWER LATERALS FROM SHALL USE ALLOWANCE TO PAY FOR PROPOSED CLEANOUT TO PROPOSED COST OF DUKE/PROGRESS SUPPORT SEWER MAIN WITH 4" PVC AND NEW AND/OR BRACING. CONTRACTOR CLEANOUT AT RIGHT-OF-WAY. INSTALL SHALL COORDINATE WITH DUKE - ENERGY PRIOR TO BEGINNING WORK IN ROAD, DRIVEWAY, SIDEWALK, OR (MIN 72 HOURS) TO ARRANGE FOR PARKING LOT. POLE BRACING AND THE POSSIBILITY 7. CONTRACTOR SHALL PROVIDE BRIDGE OF DE -ENERGIZING OVERHEAD MAT FOR EQUIPMENT STREAM POWER OR A PORTION THEREOF. 6. CONTRACTOR SHALL PROVIDE & PUMP AROUND TO MAINTAIN BRIDGE MAT FOR EQUIPMENT CONTINUOUS FLOW OF STREAM AND STREAM CROSSING AND PROVIDE PROVIDE A DRY CONDITION DURING COFFER DAM & PUMP AROUND TO INSTALLATION OF SEWER PIPE MAINTAIN CONTINUOUS FLOW OF STREAM AND PROVIDE A DRY 8. LOCATION OF SERVICE LATERAL FOR CONDITION DURING INSTALLATION 1300 RIVERCREST DR HAS NOT BEEN OF SEWER PIPE 7. RIP RAP STABILIZATION SHALL BE DETERMINE SAN SEWER SERVICE COMPLETED WITHIN 7 DAYS OF BANK LATERAL LOCATION AND ELEVATION DISTURBANCE, UPON REMOVAL OF BEFORE BEGINNING CONSTRUCTION BRIDGE MAT AND WHEN ALL WORK AND ORDERING MATERIALS. DOWNSTREAM IS COMPLETED, CONTRACTOR SHALL RECONNECT PROVIDE SILT FENCE ON TOE OF SERVICE ACCORDING TO PROJECT SLOPE. (EA SIDE OF BANK AND/OR GENERAL NOTES & SPECIFICATIONS. PERM FORD). GENERAL SEWER LATERAL NOTES: 1. CONTRACTOR SHALL VERIFY EXISTING SEWER SIZE, MATERIAL AND DEPTH 2. CONTRACTOR SHALL COORDINATE WITH OWNER'S PROJECT COORDINATOR AND PROPERTY OWNER TO LOCATE EXISTING SAN SEWER LATERALS AND TO FINALIZE LOCATION TO INTERCEPT EXISTING SEWER LATERAL. LOCATIONS DEPICTED ARE APPROXIMATE AND MAY REQUIRE FIELD ADJUSTMENT. 3. CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR ROUTING SEWER LATERAL TO MINIMIZE COST OF INSTALL, LATERAL LENGTH, AND DISRUPTION TO PROPERTY AND RESIDENTS. ALL LATERAL BENDS SHALL BE 45 DEGREE OR LESS, NO 90 DEGREE BENDS ON LATERALS SHALL BE ALLOWED WITHOUT PRIOR APPROVAL. 4. CONTRACTOR SHALL COORDINATE WITH OWNER'S PROJECT COORDINATOR AND IMPACTED PROPERTY OWNERS MINIMUM OF 96 HOURS PRIOR TO PERFORMING LATERAL RE-ROUTES TO ARRANGE TEMPORARY ACCESS TO PROPERTY AND RESIDENCES AND TO DISCUSS SEWAGE OUTAGE. 5. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL UTILITY LOCATIONS AND DEPTHS PRIOR TO INSTALLATION. 6. CONTRACTOR SHALL VERIFY EXISTING SAN SEWER LATERALS SHOWN (OR NOT SHOWN). ALL EXISTING SAN SEWER LATERALS ARE 4" VC OR IRON (UNLESS OTHERWISE NOTED). CONTRACTOR SHALL REPLACE ALL ACTIVE SEWER LATERALS FROM PROPOSED CLEANOUT TO PROPOSED SEWER MAIN WITH 4" PVC AND NEW CLEANOUT AT RIGHT-OF-WAY. INSTALL CLEANOUT IN VALVE BOX IF LOCATED IN ROAD, DRIVEWAY, SIDEWALK, OR PARKING LOT. 7. CONTRACTOR SHALL PROVIDE BRIDGE MAT FOR EQUIPMENT STREAM CROSSING AND PROVIDE COFFER DAM z & PUMP AROUND TO MAINTAIN O CONTINUOUS FLOW OF STREAM AND PROVIDE A DRY CONDITION DURING INSTALLATION OF SEWER PIPE U D 8. LOCATION OF SERVICE LATERAL FOR 1300 RIVERCREST DR HAS NOT BEEN VERIFIED. CONTRACTOR SHALL (n DETERMINE SAN SEWER SERVICE z LATERAL LOCATION AND ELEVATION O BEFORE BEGINNING CONSTRUCTION U AND ORDERING MATERIALS. CONTRACTOR SHALL RECONNECT SERVICE ACCORDING TO PROJECT O 0 GENERAL NOTES & SPECIFICATIONS. LL0 Lu U) Q Lu J Lu o� O z J z O U) U) O D Lu Lu cr Ir O LL i z a 0 J a z LL VVK DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 CA R0� SEAL9��' 025490 IN PROFESSIONAL SEAL m p z O O Q cc cc W LuO Lu Lu a �z Q W J z Q Q Q z LL J Z z 0 0 Lu cr O Z w U 0 U w Lu 0 W 0 W OC Z z z cr_ Fn Lu Lu Q o W W LL. Q 0 W 0 U W W_ m F— W Q W J z 0 U Z_ w 0 00 a cc: m o PROJ. MGR.: CMK DESIGN BY: MOS DRAWN BY: MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C2 WKD PROJ. NO.: 20120031.11. RA 21 OU w oo �JU 'Zw a0¢ woo gra 0mw U= oOm 0. Ywo w ozw -o oz 0 ZZU °om =UQ ro= OY� w3� moo' zwa °¢Zamo ozz owo wH!a m3:= w.� w. E� w0 mir3 =do BZW -ow w2 Z°w oz� U -U ZZD w Y � H UOR o YQ N 4zZ o0E 0 =Zw mo= 0.'o UU 0E 00 54 ?° pR qti'�� � ?33 G�o�� 149 53 d' 0/% _ 535 PROPOSED MH BSE 0178 4' DIA STD MH STA 0+00.00 (TROGDON) =STA 0+00.00 (CARTER ST) RIM EL=529.70 IivV �500YR_ 300YR- - - --SopyR_ S2j28 556 552 544 540 1 5 536 I° 532 IX 528 I¢ 524 w 520 0 EXIST SMH BSE 0178 (BRICK) TO BE REMOVED /-,/ GRIFFIN MARY O STALEY / co � �rn 928 CARTER ST DB 718, PG 842 I'z co CoQ� PIN 797913042668 Q 0) m SEXIST SMH BSE 0392 322.4 LF 8" VCP TO BE REMOVED I L 282.4 LF 8" VCP TO BE ABANDONED, PLUG EA END & GROUT FILL PROPOSED MH 545 BSE 0391 4' DIA FLAT TOP MH STA 3+68.87 RIM EL=534.86 SIMPSON GLENN H JR DB 845, PG 221 I71A1 7M- M40llA 0707 EXIST SMH / JOYCE BOBBY DEAN BSE 0393 co tic 1147 TROGDON DR PROPOSED MH mZ i+ BSE 0394 ; 0z �- DB 966, PG 1254-7 4' DIA STD MH ?i G PIN 797913047950 ui EGGLESTON oyA - PIN 797913047572 EXIST SMH Q �-Z m DB 1496, PG 120 SCALE:1 "=40' 1'�Vr>YBSE 0454 +� SPIN 797913042370 \ co PROGRESS/ DUKE ENERGY NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL POWER SAFETY REQUIREMENT HORIZONTAL AND VERTICAL U) z m IY ==wwO CLEARANCES AS MANDATED BY DUKE ENERGY AND OSHA. THE MORE CONSERVATIVE SEPARATION REQUIREMENTS SHALL Q Q O O O M w❑0�U� GOVERN. MINIMUM CLEARANCES SHALL ALSO INCLUDE MAXIMUM SAG. CONTRACTOR SHALL COORDINATE WITH DUKE ENERGY AS U) I- u- ❑_ MAXIMUM SAG MUST BE CALCULATED FOR EACH SPECIFIC LOCATION 2. ANY TREES REMOVED AROUND TRANSMISSION MAIN MUST BE CLEARED BY A CERTIFIED ELECTRICAL TREE REMOVAL Lu ❑SU)<2»> Q ���0Cn�zzz CONTRACTOR. 3. CONTRACTOR SHALL COORDINATE WITH DUKE ENERGY ENCROACHMENT REPRESENTATIVE PRIOR TO CONSTRUCTION IN DUKE 0 w ENERGY EASEMENT TO VERIFY LOCATION OF POISE/ GROUNDING GRID. CONTRACTOR SHALL BE RESPONSIBLE FOR REIMBURSING Lo 20CD0 °0=� DUKE ENERGY FOR THE COST OF ANY REPAIRS IN EVENT POISE/ GROUNDING GRID IS DAMAGED DURING CONSTRUCTION. 0moiz0C) It M N Lo DISCOVERY OF POISE/ GROUNDING GRID SHALL BE COMPENSATED BY ALLOWANCE. 4. ACCESS TO ELECTRICAL FACILITIES MUST BE MAINTAINED AT ALL TIMES. AN UNOBSTRUCTED, LEVEL AND 30 FOOT WIDE ACCESS oLL +0 CL Q Q w Lo w Z O WAY MUST BE MAINTAINED ADJACENT TO AND UNDERNEATH THE OVERHEAD CONDUCTORS AND TO EACH TRANSMISSION � 0 ❑ >� m > > STRUCTURE FOR DUKE ENERGY TO PERFORM ROUTINE MAINTENANCE AND EMERGENCY REPAIR. 5. REFUELING OF EQUIPMENT INSIDE DUKE ENERGY EASEMENT IS PROHIBITED. 6. CONTRACTOR SHALL NOT USE DUKE ENERGY EASEMENT FOR STOCKPILING OR STAGING. 7. CONTRACTOR SHALL ADHERE TO ALL OSHA MINIMUM APPROACH REGULATION AS DEFINED IN OSHA 1910.333 AND OSHA 29 CFR EXIST 6" 1226.1407-1411 (OSHA 29 CR 1226.1407-1411 APPLIES TO USE OF CRANE OR DERRICK). 8. CONTRACTOR SHALL COORDINATE WITH DUKE ENERGY ASSET PROTECTION RIGHT-OF-WAY SPECIALIST A MINIMUM OF 72 HOURS m W PRIOR TO BEGINNING WORK OF THE SEWER CROSSING OF THE TRANSMISSION RIGHT OF WAY. co 9. THE TRENCH SHALL BE COMPLETELY BACKFILLED AT THE END OF EACH WORK DAY. O EXIST LOCATION EXIST �1 APPROX li J O Lu Q z w 0 LuO z LLL = w� _mow 50 ti ON ti rn CMO w=IY Cn2u- _ w > ❑u o C) � `r' U) p O m _ _> O co w 3 ❑ aJ Ou7N II O II Lo I- Z ❑ m � MOM 2 N LO 7 2 0O ❑ ~ U II Q Q' O 00 N O O Lo Q ODu)0< O w O �N II N w ❑ w M oo�N II ~ ���.6c�Zz >> I-MwZ0 EXISTING GRADE v)Q2�O> Ow<���� �Q�oMwzp F- Lu ALONG PROPOSED X H- Lu U) z z O p m Q g>> Lu SAN SEWER 0- 3:.6~nEz z U) EXIST SMH Z wBSE Z 0391 W W 0 68' DUKE/PROGRESS (BRICK) TO BE Z U GP ENERGY EASEMENT REMOVED I Lu F- II O LU O I q M F II co '~ J I L]Ijv Q W 0 w z U _ z z CONNECT EXIST ' 8" VCP TO ��'� 185% $" PUC PROPOSED MH =-g LF (SEE DET, DWG D1) ��pl PROPOSED ANTI -SEEP COLLAR (SEE DET, DWG D12) o� ao0o (q i °i o � M M M M M M M 0+00 1+00 322.4 LF 8" VCP TO BE REMOVED SCALE: HOR 1"=40'; VERT 1"=4' OVERLAY /LDTB LEY M PER DETAIL TROGDON DR SHEET D4 1456 , PG 156 / 7913048584 SY mr-ivIV V C iT ASPH,9.1 SYJ & REPLACE EMENT CLEANUP 21.4 SY 1 & SEED W/ EXIST AS'HALT STRAW PAVEMENT 7797913004958:77 REMOVE & REPLACE ±10 LF 1 4R CONC C&G L PI _ O M O cn U) z m IY ==wwO - - bo 00 N w M Q Q O O O M w❑0�U� M'tt O U) I- u- ❑_ U.) M co II U Q II Lo � 0-<�JcowZZ Q 0 N °� z O co w z w Lu ❑SU)<2»> Q ���0Cn�zzz o 2O2 w CD w <0z -. 0 w _ _0QUJ � co Lo 20CD0 °0=� _ CD �OOO4OOM w __ O� 0moiz0C) It M N Lo m w W LU W p �`Imo L II 11 ~ `M 00 =W w O�� � 0-Q><>co O w Z Z ❑ oLL +0 CL Q Q w Lo w Z O ❑ Q O M N ti M co O❑> Q >> O � 0 ❑ >� m > > � �M It Lo � _ >� H U) Lu 0 U `M `M 11 IL > U) 11 z z z ~ d > Cn Z Z 0 cn ❑ �+ J II II tL< 0cowZZ0 ❑�w<>>> w .6 U) z z z EXIST 6" APPROX WATER LINE LOCATION EXIST-[ m W WATER SERVICE J J APPROX Z EXIST LOCATION EXIST �1 APPROX li J O lV�g 18„ RCP WATER SERVICE LOCATION EXIST SEWER SERVICE - NOTE: PROJ. MGR.: MWF DESIGN BY: vw 1. CONTRACTOR SHALL VERIFY DDICKSON EXISTING SAN SEWER LATERALS Q SHOWN (OR NOT SHOWN). ALL communitV infrastructure consultants EXISTING SAN SEWER LATERALS ARE 4" VC TO IRON (UNLESS 720 CORPORATE CENTER DRIVE OTHERWISE NOTED). RALEIGH, NC 27607 CONTRACTOR SHALL REPLACE (t)919-782-0495 ALL ACTIVE SEWER LATERALS (f)919-782-9672 FROM PROPOSED CLEANOUT TO PROPOSED SEWER MAIN WITH 4" WWW.WKDICKSON.COM PVC AND NEW CLEANOUT AT NC LICENSE NO.F-0374 RIGHT-OF-WAY. INSTALL CLEANOUT IN VALVE BOX IF O Lu LOCATED IN ROAD, DRIVEWAY, SIDEWALK, OR PARKING LOT. 2. CONTRACTOR SHALL RESTORE ���•C..... i NATURAL AREA LAWN AND ��.��.��FESS /p�9 9 o DRAINAGE SWALE TO ORIGINAL SEAL CONDITION. CONTRACTOR SHALL 025490 FINE GRADE TO ENSURE POSITIVE DRAINAGE TO EXISTING DRAINAGE • `cNG INFEATURES. FESCUEE��•' • .` SHALL BE USED N LIMITS OFOSWALE TO iRKW. F.\S ppm,, ENSURE STABILIZATION IS ACHIEVED DURING SIGNIFICANT PROFESSIONAL SEAL RAIN EVENT. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR BYPASSING ALL SEWAGE FLOWS DURING SEWER INSTALLATION. 4. SEWER MAIN CORRIDOR ON THIS SHEET LIES OUTSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. EXIST SMH �I _ BSE 0394 (BRICK) TO BE I1.4 EXIST I 24" RCP REMOVED it, 8,. pUC 1.71% I N pROppgED 175'$ LF BORING T-2 PRO7ED BORING T-1 132.3 LF OF (PWR) (PWR) @ 1.87% ELEV=538.00 ELEV=536.00 PROPOSED I 30.3 LF OF 8" PVC @ 1.69% PROPOSED 30.1 LF OF 8" PVC @ 1.93% N 'L'o- M O � � O 'L'o- M O � � � N � � 'u"), 'L 'u"), O M � 'L'o" � O � O M � � O 7 00 c0 N � M U? O � r 7 M c0 r O M M 7 N O O 7 O N � M r- N 00 O O N N M Nt L0 It L0 co co co rl- 00 O O N N N N N N co co � u7 V) co co co co co co co co M co M M M M M M M ' � ' � � cf) Lf) Lf) Lf) cf) Lf) Lf) � cf) � �f) � cf) � cf) � cf) Lf) Lf) Lf) Lf) � Lf) � cf) � Lf) � cf) � Lf) 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 556 552 544 540 536 532 528 524 520 z 0 U W z O U 0= O LL 0 W U) LuQ J W O z J z O W O 0- D 0- W W 0= O LL 6 z Q J Q z LL WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: MOS DRAWN BY: MOS PROJ. DATE: Q DRAWING NUMBER: 11-C3 m p z O O Lu z Q m W J J Z J O LuO z LLL W c U) 2 Q U > O O U = LU F- Lu Ir O > Lu LLI Er z o Z Z W W 0 O Z m Lu F- LL O LU O M F '~ J a L]Ijv Q W 0 w z U z WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: MOS DRAWN BY: MOS PROJ. DATE: Q DRAWING NUMBER: 11-C3 W z Q Q Z J J Z J O z LLL W c 2 Q U O O U = LU F- Ir O > Lu LLI Er z o Z Z W W 0 O Z m W 0w F- LL O LU O M F '~ J U L]Ijv Q W 0 w z U z_ O m m WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: MOS DRAWN BY: MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C3 WKD PROJ. NO.: 20120031.11. RA OU w �JU 'Zw a0¢ Z04 gra 0mw U= oOm 0. w ozw -o oz 0 ZZU °om wo =UQ ro= OY� w3� moo' zwa ° Z¢ moa OZZ 0wo a w H! Q =3:z W0 mir3 =dp 0 -o' w2 z°w oZ� U -U ZZD w Y � H Ugw 000 YNQ §=Z oo� 0 =Zw Fox ��o UU�I�i y I I I I \1 322.4 LF 8„VCP \ \ I TO BE REMOVED \ i \ \ I I SEI TF LO C0 LO WY/ ANK Q� \ �� ova /0 LESTON \I \\ \ NOTES: �-7�2 o ' T 4� Q ARRISON ��o o wDB 1��SP Oc 37/4 �� �/p HARRISON ❑ o Q PIN 7 � 45948 �� E GLESTON CLARK ANNA MAE\ > Q/ � 944\CARTER ST 1041 KLYCE ST ROADSIDE DITCH d' �s/DB 1 96 , PG 120 \QB 1068, PG 110 \ STABILIZATION, 1 Lr 797913034686 PIN 79G13042370 PI ❑ (TYP BOTH SIDES) V1 tt t ` �L (68 ❑ 467 SY (TOTAL) ilii ki lit `VA �\ \ SQ0 � �s CLEANUP, SEED I t add A � �s & STRAW W/NET PLAN AND PROFILE \ 1t11i�iitlt `� 9�s�pdA 1. CONTRACTOR SHALL VERIFY EXISTING SEWER SIZE, MATERIAL AND DEPTH 2. CONTRACTOR SHALL COORDINATE WITH OWNER'S PROJECT COORDINATOR AND PROPERTY OWNER TO LOCATE EXISTING SAN SEWER LATERALS AND TO FINALIZE LOCATION TO INTERCEPT EXISTING \ lull 1(1 5 Q o' ❑ DEPICTED ARE APPROXIMATE AND 1 \ I 1 �1 111 \3 r \- RE VE & REPLACE ❑ \ \ ❑ TEMPORARY ROCK MAY REQUIRE FIELD ADJUSTMENT. liIltl EXI CONC DRIVE TO LIMIT OF DISTURBANCE, SILT CHECK (TYPE B), PROPOSED MH I I I \ I \ \ \1 \ \ `X kill 1 t ). t t t F ST EXPANSION OR I TYP. 16 PLACES I \ CRAIG FAYE 1 1 t 1 DISTURBED AREA= 0.49 AC BSE 0179 I I I \ V AV 934 CARTER T \ \ 1111 iliiitlltiil CONTRACTION JT PROPOSED MH I � 11tt BSE 0712 4' DIA STD MH 3. CONTRACTOR SHALL HAVE FULL I I \ WHIC�`(EVER .� MORE REMOVE EXIST BSE 0179 RESPONSIBILITY FOR ROUTING 1111 1204.0 SY STA 4+97.11 SEWER LATERAL TO MINIMIZE COST I \ Ili!ttitttl tt11t ±16 SY 4' DIP. STD MH &REPLACE TO BE REMOVED \ \ \ DB 631, PG 6 1 Iii 111111 1111 Q ( ) ASPHALT RIM EL=541.73 \ 1PIN 7979 4 88 11 ttil W/ OUTSIDE DROP 614.7 SY \\ OF INSTALL, LATERAL LENGTH, AND 11111 REMOVE & MILLING AND SMH BSE 0179 STA 1+02.34 (CARTER ST) EXIST ASPHALT RIM=543.07 DISRUPTION TO PROPERTY AND 111111 o REP! ACE 54 LF z =STA 14+68.66 CARTER OUTFALL OVERLAY RESIDENTS. ALL LATERAL BENDS \ 1 \ � t t 1 I t to o o ( ) PAVEMENT INV IN=535.71 \ I I I \ '0 1 / tt 11-W3 i1 24 CMP WITH M vo RIM EL=530.88 PER DETAIL INVOUT=535.70 \ PROPOSED 43 LF \ SHALL BE 45 DEGREE OR LESS, NO I \ co 1 1 111111 11111 54 LF 24 L � SHEET D4 90 DEGREE BENDS ON LATERALS \ 11 ss `” til t LASS IV RCP �, I0 1 +0 2+00 3+00 4+00 5+ 0 4 PVC SAN SEWER \� / \ 111 III( �� > 12' TCE SERVICE \ \ SHALL BE ALLOWED WITHOUT EXIST SMH t t 11 )111 122°¢'S �p E R E E E 1 PRIOR APPROVAL. BSE 0392 \ 0 111 11111 1 f c� al X - I I I \ tv _ 11111!! 11 11111 — f i .f f f i f— — i, i r i r i r r — ❑ / I m APPROX 6 HOUSES I I Qow liitll �iiill �� b6 SERVED o I I LOW �,Ow of Q LOW - f— - CAR E R T. N LOW �' J - -ss- ----SS-----SS-- _ ----SS-- T. - 8 CP N O 40 PUBLIC R/WpW Low - - - ±161 LF TO LOW 89� - - Ty SMH BSE 0448 o ,TGE so_ 00 A,— � � J \ o to 0I L \ I T CONNECT EXIST N 1"00 \\ b 1 \ \ \ 8" VCP TO PROPOSED MH ? HI / I I (SEE DET, DWG D1) C-) FRIILLD/ \ `o / I GANTT FONDA J\6NES \ 941 CAR / \ 1303 RIVERCREST �R PROPOSED MH BSE 0178 IN 797913040375 \ \ DB 1128, PG 1582 ' PIN 797913040431 \ STA 0+00.00 (CARTER ST) H RRIS GARLAN I\ \ -STA 0+00.00 (TROGDON) WAYNE �` �o \ RIM EL=529.70 0 \ s 94X CARTER S 1 \ \ B13.69,PG14 9 I PSN 79\9130402 8 I - c REMOVE & R�PE6gCE 12 SY EXIST RIS RAP (OR AS NECESSARY) allo 552 ' 67EEl! c Ix I— CD > p w m of O z 06 Q � ao � 540 =w0oNI­ Qo oo�C°N oN�� oLnN 1i aao❑wz0 ofl�oiQ2>> 536 w����EEzz + N' / m'" 4. CONTRACTOR SHALL COORDINATE --- --- - --- - --- ---- - WITH OWNER'S PROJECT FLOPt 1"Irm Em \ \ I COORDINATOR AND IMPACTED 6" w/L PB 9, PG 89 - - - v� _ s� Q �� \ \ \ PROPERTY OWNERS MINIMUM OF ESP 96 HOURS PRIOR TO PERFORMING �r r� - -� e - A LATERAL RE-ROUTES TO ARRANGE �- Y i� \ t TEMPORARY ACCESS TO _- �' a o I - ss� i �� ` V A PROPERTY AND RESIDENCES AND _I �N � z I 0 - \ fr \ � N � o o 1 _ I \, �( TO DISCUSS SEWAGE OUTAGE. CC,,))o> > Cl) - �v' v' PROPOSED SAN I � > > - _ �� `� I �� // 5. CONTRACTOR IS RESPONSIBLE TO SEWER LATERAL_ \ � \ \ FIELD VERIFY ALL UTILITY =- = 0 - SEE NOTE 6, & SEE PROPOSED (\ o�idARRIS, i CLEANOUT LOCATIONS AND DEPTHS PRIOR TO GAR WAYNE- 1 QUANTITY NOTE, % � CLEANUP &SEED (TYP ALL LATERALS) & 45' BEND I / / -� INSTALLATION. \ 947 CARS R SEE QUAN ITY NOTE, — -o B 1138 , PG 2 - �� (TYP ALL L TERALS) WATER SE VICE TO I� - 26.6 SY \�� �\ 6. CONTRACTOR SHALL VERIFY o BE REPLACE -D FROM \ = IN 797913040260 �5p0YR- - - - CLEANUP & ETT JEFF R \ \ EXISTING SAN SEWER LATERALS �b , \ \ EXIST METER TO MAIN - - 1 FESCUE SOD AND OTHERS \ n \ SHOWN (OR NOT SHOWN). ALL - \goo STREAM CROSSING 11-S7, TYP, (QTY 6) - �sooy \ N \ EXISTING SAN SEWER LATERALS SEE NOTES 7 AND 9, - I - 963 CARTER ST \\ �= _�T N BRYAN T�� - - - - , 1 V ARE 4" VC OR IRON (UNLESS 11-S7 SEE DWG NO. , \ DB 808, PG 2001 ❑ \\ \ D9 FOR CROSSING 953 CA - / f OTHERWISE NOTED). CONTRACTOR F�- - - - - - - L - PIN 797913031834 \\ ' SHALL REPLACE ALL ACTIVE =_ REQUIREMENTS 1505, PG 2682 \ _So\ \ EKS RENTAL / a SEWER LATERALS FROM o �'10�i� �� PI 797913041016 _ O\ PROPERTIES LLC - _ `O \ PROPOSED CLEANOUT TO 525 _ y \ \ 0u0"' _ -9_5 CARTER ST � �' PROPOSED SEWER MAIN WITH 4" t - , -HALEY ADB 132�So 576 /� VA i PVC AND NEW CLEANOUT AT FSEEWG N . 11-C2 FOR -�ooiPIN797��139`1y ooY� \ \\\ RIGHT-OF-WAY. INSTALL CLEANOUT WILLIAM BRIANER ST OUTFALL DYED FAA�IILY TRUSTS 955 CARTER ST IN VALVE BOX IF LOCATED IN ROAD, AND PROFILE — so DRIVEWAY, SIDEWALK, OR PARKING 949 CARTER S� A,(OYB 1410, PG 1477 syn, LOT. -- o DB -1138 , PG 2192 �F�fN 797913030998 \ / �/ \ PIN 797913040029 �� _ _ _ 1 7. CONTRACTOR SHALL PROVIDE \ - \ "_ ' to - - - % BRIDGE MAT FOR EQUIPMENT NAM STREAM CROSSING AND PROVIDE (:(IFFFR AAAA R PI IMP AR(ll min TO MAINTAIN CONTINUOUS FLOW OF ~ Lu 552 STREAM AND PROVIDE A DRY o > CONDITION DURING INSTALLATION U) OU OF SEWER PIPE. 0 0 = °� m w ~o 2 � ti (q 8. SURVEY INDICATES APPARENT U) o m � � co CONFLICT BETWEEN EXISTING m L6 U O w rn J? 548 SANITARY SEWER AND EXISTING ++w z � 0- Q w O 24" RCP. CONTRACTOR SHALL 11_U)Q > > 0 o U) > REPLACE 24" RCP AT A CONSTANT w U) z z 0- U) z SLOPE MATCHING EXISTING INVERTS. U- EXISTING GRADE 544 9. AN ORDINARY HIGH WATER MARK ALONG PROPOSED WAS NOT OBTAINED AT THIS C14 w O SAN SEWER EXIST SMH LOCATION AND THE DITCH CD BSE 0179 N CURRENTLY EXISTS AS A FULLY w O /1-1 U) U Q TO BE LINED RIP -RAP DITCH. THE m a 06 o? Z I I REMOVED CONTRACTOR WILL BE REQUIRED g=0w (0 00- � �� ------- 540 TO RESTORE THE DITCH TO 0 2 0 Q C6 o7 co > EXIST 6" i� ��--_-- _- ---_ ORIGINAL GRADE. U) p +� � „ WATER MAIN O (n - + _j 11 it D (APPROX 0< � 2 > > >> LOCATION) �zz z _j i 415.3 LF8"VCP TO BE REMOVED i 0+00 1+00 2+00 3+00 4+00 u( Lq LO � 5+00 536 532 528 524 520 516 z O U D U) z O U O LL 0 W U) LuQ J W O z J z O W U) O D_ D 0 - Lu W Ir Ir O LL i z a o� 0 J a z LL WK DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 SEAL9��' 025490 � a is► PROFESSIONAL SEAL m p z o F- 0 Q cc Lu U) LuO U) Lu Lu a ui 0 Q Z Q Q z z J W qz z O 2 J W Ir w 2 Q U z W 0 O U Q w 0 Lu O W Z z Lu W z W W BC Q0 m W W m LL U) 0 W O rr W W W Uj U m g W J Q I— CU z 0 Lu 0 < 0 PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C7 WKD PROJ. NO.: 20120031.10. RA PROPOSED 54 LF PROPOSED i 24" CLASS IV RCP, WATER SERVICE SEE NOTE 8 TYP, (APPROX EL) 532 i G P 528 EXIST SMH ' BSE 0178 �'� (BRICK) TO BE �' PROPOSED REMOVED 524 I SAN SEWER ' LATERAL, TYP ' I (APPROX ELEV) 520 I PROPOSED 102.3 LF OF 8" PVC SCALE- HOR 1"=40'; VERT 1"=4' @ 1.88% 516 Il- 0� O � Ln Lq -t 1p O 0� O OO Ln f- (0 Nr_: 'D Lo N N 0� N O O O 00 r- 1� 00 0� 00 a7 O 0�m N 0) N m N 0) N m N O co co co co co ro co L� 00 co O 'IT NN It NN It It N It LO Ln LO Lf) LO Ln LO Ln LO Ln LO Ln LO Ln LO LO LO LO LO Ln 0+00 1+00 2+00 3+00 4+00 u( Lq LO � 5+00 536 532 528 524 520 516 z O U D U) z O U O LL 0 W U) LuQ J W O z J z O W U) O D_ D 0 - Lu W Ir Ir O LL i z a o� 0 J a z LL WK DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 SEAL9��' 025490 � a is► PROFESSIONAL SEAL m p z o F- 0 Q cc Lu U) LuO U) Lu Lu a ui 0 Q Z Q Q z z J W qz z O 2 J W Ir w 2 Q U z W 0 O U Q w 0 Lu O W Z z Lu W z W W BC Q0 m W W m LL U) 0 W O rr W W W Uj U m g W J Q I— CU z 0 Lu 0 < 0 PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C7 WKD PROJ. NO.: 20120031.10. RA ow ooO FUO OJU OZw CoQ wwo 2F7 Dm; U= mem o =�oF Czw F _o az Zoo o 10 w c) wY LL OYN waw =ww o w, CoQ ozz aw0 w¢Q ¢3:Z w°o I w3a 0 �zw 'o< Qo< UOZ z=w 371 U U- zzw � yUF oo . Y .'< §=z F OOQ F ;o o im= a Ei F OwQU❑ 0/ N LIN SEE DWG NO. 11C11 '�iO\ \ \ FOR LOWER / y \ MATRIMONY PLAN NN AND PROFILE LO G- i\/ f y Jj SMH BSE 0426 \ \ \ �i % RIM=513. 5 STRUCTURES TABLE NAME STA. TOP SLAB ELEV INV IN INV�1T 1 7+31.79 525.81 521.53 521.27 2 7+85.95 526.47 524.64 522.81 \ OJ W_ INV IN=5 6. 8 \ \ (P \p INV IN=5 6. \ �l \ INV OUT=5 5.9 \ Y 'L\ PROPOSED MH \\ \ \ i BSE 0425 \ \ 5' DIA FLAT TOP MH �j \ \ STA 1+44.93 (ELM ST ESMT) �\ Yr, \ SHER OOD STEVE R / 0 97 LF TREE / CTIONA 80 HAMPTON ST Q1 I c"' PROT FENCE SEE DWG NO. 11-C11 / 706 , PG 880 ^oma CONTRACTOR SHALL FOR REMOVAL OF EXIST N 796912955679 `^ REMOVE & REPLACE 24 LF AERIAL CROSSING (OR AS NECESSARY) 12" RCP / W/CONC COLLARS PROPOSED MH N I PROPOSED BSE 0427 \ a 283.4 LF 8" VCP MH BSE 0751 TO BE ABANDONED 5' DIA FLAT TOP MH PROPOSED 4' DIA STD MH i PLUG EA END STA 2+54.17 LATERAL STA 7+27.89 & GROUT FILL 5; IN =524 RIM EL=514.87 SEE NOTE 1, RIM EL=525.00 A=55°17'22" RT - -- - REMOVE TYP (QTY 2) 4=23°26'16" RT- 1 QV � VE 53� ,lx 102.3 LF 8" VCP / & REPLACE 211.2 LF 8" VCP � � l TO BE ABANDONED TO BE ABANDONED 15.7 SY EXIST ill i1 PLUG EA END PLUG EA END CONIC FLATWORK & GROUT FILL 25 & GROUT FILL.,). PROPOSED MH BSE 0427A EXIST RSE 0428 i - l >l IN(1�")=523.27' ( w W/CONC COLLARS TEMPORARY 4 JA -FLAT `TOP MH oo� 24j 1l1 i �t � OUT 5 1� 732 z CONSTRUCTION STA 3+88.79 (BRICK) TO BE l l l Xi O U) INV=519.08' A �1 11 8L TREE ENTRANCE RIM EL=514.82 52 ABANDONED tll t l i l po SEE II PROTECTION 4=16°34'12" LT 5 REFER TQ_ ooA ill l l l l l NOTE 4 �I �� FENCE WRIGHT KENAN 60F��pE PIPE SPEC 2,1 X7'00 N� 11 l l l PLUG TYP ��� ' t l l 11 I o PO BOX 661 - - - - - - - - / = ti TRIBUTARY 3 TO l 11�Y 111 f RIM EL -517.02 \ , INV IN=514.07 805 MPTON ST o PIN 79691295765 SMH BSE 0425 dr _ MATRIMONY INV OUT=514.07 l / / SHALL REMOVE & 2 v _ 8a CREEKINV l lit / o REPLACE 56 LF (OR I DB 711 PG 187 / RI M_ �� 421 LF 5+00 w �� INV IN=505.00 t A, `� 4+00 SILT FENCE t t l llt �/ / / AS NECESSARY) 24" w I PIN 7 6912954642 / V OUT=504.96 11-S11 �- 8 VCP i tl l - -o'er T RCP W/CONC / ' F5 �° 1111 Mill -SS - - - SS- l COLLARS LF Top IPROPOSED MH SILT FENCE sA n o RESTORE LAWN �0 BSE 0429 l heap llllt ll Illi ill / s 4'DIASTDMH X APPROX. 88LF 1C n, 6� Tll l �2Q t 1 u l l I t l t l l 398.9 SY TURF/ 18" DIP TO BE , / STA 0+00.00 (HAMPTON ST) / l l l l 11 hb��l l l l l l l 1 i l 1 1 111 l ll l l l l �l111 l l l l �� 11 I l l i I FESCUE SOD ABANDONED lt1 l - � / I �- =C -17A 8+27.89 ELM ST ESMT llltllltl llltlllt 11-W1 111 It ltll � _ ( ) / ll l ll llilllill lhlllll llllllll lull illi llllllllllillll l'[lll 2� - (WITHIN LOD) PLUG EA END 0.36 AC ,�� 6 0 I R RIM EL=532.72 \ 44 t l 111 111 5? _--- l 11111 iTl T t -1 t l l l t l l l t l I A=89°53'55"' RT / �� \ &GROUT FILL 1111 111 111CLEAR ll l 111 l 111 l 111 l lllllll l 111 l 111 l 111 llllllll ll l 111 l ll �" -n °� T u, 0 &GRUB - - VR J REMOVE & REPLACE I Qn°' I �A.C' / / LIMITS OF DISTURBANCE 1 1l1 goo EXIST TREES ALONG TOP OF O o �j �� 11 l l 1 Kl 111 t / / oo�' -� 10R� CONIC DRIVE UI C� I1 II \� / NOT TO EXCEED TOP OF O h1 111, �XIST S \ 01 w BANK AND NEAR BLDG SHALL 141.8 SY EXIST o .-2. BANK (TOB NOT SHOWN) !11 >` It tll tt / - ��� - � o�� HAVE THE STUMPS LEFT IN - II " 1� BSE 0427 ��o0 1ooYR� ��o _ ��.qo9- �I A A BRICK TO BE s o EXISTING PLACE TO AID IN BANK & CONTRACTOR SHALL a ml a, a, MO R SE N LEIG ,\0 2941.5 �'(G /`� t ltll It / (BRICK) FOOTING STABILIZATION TYP. REMOVE & REPLACE 64 LF m � L, � 21 MILL RD \\`\ N 1 PROPOSED MH 0 2941.5 SY ABANDONED WETLAND ( ) N G , o' 11 t t 1 1111 / -A�° CLEANUP, SEED REFER TO v BOUNDARY (OR AS NECESSARY) 24" RCP in� 1 141 PG 44 QHS \0 P- Q I�5 / BSE 0424A PROPOSED 20' �h ' 2, 5 Q- i i i 1 I i i � & STRAW W/NET SPEC 01 27100 pp9 t W/GONG COLLARS Q PI 796912957421 (BSW-1), PERMANENT CITY OF g1`Z$ 5' DIA FLAT TOP MH �G / l t l t 11 E�T?M ���s TEMPORARY vv ��6 STA 0+00.00 t 11 LYI 1 i t S 0425 LIMIT OF DISTURBANCE, ( EDEN UTILITY ESMT RIM EL=514.85 �Y 11}xltl / �O- DISTURBED AREA= 0.61 AC IMPACT \ �r \� 11l Xlill / A=24°44'03"RT �,�Q' ll 111 REMOVED E = 0.01 AC) PROPOSED MH HUFF EORGE M JR FOR SEE DWG NO. 11-C10 BSE 0428 p FOR HAMPTON ST 4' DIA FLAT TOP MH 811) IAMPTON ST ° REPLACEMENT I I STA 5+12.32 DB 845 , PG 990 � PLAN AND PROFILE SEE DWG NO. 11-C14 �� 1t1 11 1 /^ PIPE RIM EL=520.24 PIN 796912955446 / FOR CONTINUATION l 11,1 t / Typ F RG S RITA H A=38°53'41" LT IP /TYP MABE D VID RAY 317 HA RIS ST HUTCHERSON 111 1 11111 / 808 B YANT ST HU CHER WATKINS MAXINE L HILL BARBARA 4 8, PG 50 HAR D GEORGE I I I Z � HA OL GEORGE I 821 HAMPTON ST I I 536 532 528 1%111 / 901 BRENTWOOD RD DB 14 , PG 1727 PIIN 79691295231 N Q) L' 111 0 �`' c�"�� I IN 79 912951338 1 1 15 HARRIS S I 1 ARRIS DB 813, PG 2141 Ln w EXIST SMH DB 48 7 PIN 796912953 89 SCALE:1 "=40' � Q BSE 0424 PIN 796 128 82 I PI 7969129523 8 I PIN 796912955344 w < LL w z EXISTING INLETS 1 & 2 = _ > e0 coLU = O N w z w TO BE REMOVED -o 2 OU rn"o m C5:; 2i w g Q o o AND REPLACED UJ o w 0 00 N Ln nj N II w=� U) wz w=�Q w SEE TABLE FOR RIM O�Q J��Li)z co 2Q zIt � o Q w2ELL z &PIPE INV, TYP aQ 00wz0 a- I - w_ Co- w= m Hw o= Oo-mQ�>> �O�>Ow o oco po mg�� w ���� �06� o00 (SEE DET,DWGD7) d��xsu�iE z c i M O p w N - V)aw0� o L o0 � 2i CCDM w<0 p0,�iL0 CN NIILn Ln OwF-�+C) II m�F-U��oM C/Uj ) _j JwLlnz CONTRACTOR SHALL aQQ�� Q LU 0 ED 00 LO00 ll - � wQQJu)w�z O REMOVE & REPLACE 56 LF � o m < 2i > > > O a Q J + _j II � O p - m Q z > > CONTRACTOR SHALL (OR AS NECESSARY) 24" aLn�Cucn II �zzz aQ�Oc�w- n �_xr>zz REMOVE & REPLACE 64 LF 100 YR FLOOD ELEV=526.20' <w CN > 524 0 < o �Q LU w = z Uj 2 a 2 > 00N �0Lo Lo.N m �Uo�LO w Q Ln II 520 0 _j LU LU ) � � 0 w ~ + J LI I II a<<_j3: 0 z 0 co z > a-In�.6U)>z 516 \\ / 512 m EXIST SMH BSE 0424 (BRICK) TO BE REMOVED 0.96% 504 PROPOSED 144_93 LF 18DIP@ _ _ 500 LID CO U) C\j Cc 11o w U) LU XV)F - wmcn� ti w N 0 w=� 00w W ma=> o � _j Ln o l11 0 1 _ + J V) I - a -<<_j z 0 0 0<>> a06W z EXIST SMH BSE 0425 (BRICK) TO BE REMOVED II BORING (PWR) ELEV=512.00 ' SED 109.24 LF 8" DIP@ 0.76C/C ROf�� _ APPROX. 88LF 18" DIP TO BE ABANDONED _ PLUG EA END U & GROUT FILL 0o m�2>> a_ ;t 3:.6cnEz z APPROX EXISTING GRADE ALONG EXISTING SAN SEWER / I / r BORING (PWR) ELEV=512.50 � - - RCP W/GONG COLLARS, (OR AS NECESSARY) 24" RCP SEE DET DWG D8 W/CONC COLLARS, SEE DET DWG D8 EXIST 12" CMP TO BE REMOVED AND REPLACED O ' PROPOSED 1O SAN SEWER / - - LATERAL,TYP , (APPROX ELEV) BORING _ (PWR) ELEV=515.00 / 0 ih 0 / PROPOSED 0 PROPOSED ANTI -SEEP COLLAR SEE DETAIL SHEET D12 SCALE: HOR 1"=40'; VERT 1"=4' PROPOSED I DESIGN BY: 64 LF CLASS III 24" DRAWN BY: PROPOSED PROJ. DATE: BORING CONNECT EXIST (RNE) MH BSE 0752 ELEV=515.50 U 8" PVC TO 4' DIA STD MH � PROPOSED MH STA 8+02.89 I �' SEE DET, DWG D1 SMH BSE 0429 ( ) RIM=532.68 1. CONTRACTOR SHALL RIM EL=528.61 I I I A p INV IN=522.48 z A=15°20'13"RT O SEWER LATERALS SHOWN c�� INV IN=522.48 EXISTING CONCRETE RIM=525.64' $k� (OR NOT SHOWN). ALL U / INV IN=522.46 DRIVEWAY SHALL NOT I-5�.�4-V I W / INV OUT 22.23 BE USED BY THE LATERALS ARE 4" VC OR Q EXIST IRON (UNLESS OTHERWISE SpofU�t1T=523.06' 6" CI WATER MAIN, z NOTED). CONTRACTOR CONTRACTOR FOR SITE Y I SHALL REPLACE ALL -'- CONNECT EXIST ACCESS OR EQUIPMENT ACTIVE SEWER LATERALS 0 8" PVC MOBILIZATION. FROM PROPOSED Lij EXIST SMH C:) PROPOSED MH CLEANOUT TO PROPOSED U) BSE 0429 M O (SEE DET, DWG D1) PROPOSED ±40 LF (BRICK) TO BE AND NEW CLEANOUT AT 6" DI WATER MAIN, �tll i 11111 4' J 2 62.2 SY JUTE MAT SEE NOTE 3 CLEANOUT IN VALVE BOX IF Ljj 0 PERM LINER, SEE LOCATED IN ROAD, 1 > N Ul DET DWG NO. D12 z z PARKING LOT. `CONTRACTOR SHALL LU 01: LU 0 IP REMOVE & REPLACE 48 LF I =524.62' SHALL REMOVE (OR AS NECESSARY) 24" RCP SHALL BE COMPLETED BSE 0427A EXIST RSE 0428 i - l >l IN(1�")=523.27' ( w W/CONC COLLARS TEMPORARY 4 JA -FLAT `TOP MH oo� 24j 1l1 i �t � OUT 5 1� 732 z CONSTRUCTION STA 3+88.79 (BRICK) TO BE l l l Xi O U) INV=519.08' A �1 11 8L TREE ENTRANCE RIM EL=514.82 52 ABANDONED tll t l i l po SEE II PROTECTION 4=16°34'12" LT 5 REFER TQ_ ooA ill l l l l l NOTE 4 �I �� FENCE WRIGHT KENAN 60F��pE PIPE SPEC 2,1 X7'00 N� 11 l l l PLUG TYP ��� ' t l l 11 I o PO BOX 661 - - - - - - - - / = ti TRIBUTARY 3 TO l 11�Y 111 f RIM EL -517.02 \ , INV IN=514.07 805 MPTON ST o PIN 79691295765 SMH BSE 0425 dr _ MATRIMONY INV OUT=514.07 l / / SHALL REMOVE & 2 v _ 8a CREEKINV l lit / o REPLACE 56 LF (OR I DB 711 PG 187 / RI M_ �� 421 LF 5+00 w �� INV IN=505.00 t A, `� 4+00 SILT FENCE t t l llt �/ / / AS NECESSARY) 24" w I PIN 7 6912954642 / V OUT=504.96 11-S11 �- 8 VCP i tl l - -o'er T RCP W/CONC / ' F5 �° 1111 Mill -SS - - - SS- l COLLARS LF Top IPROPOSED MH SILT FENCE sA n o RESTORE LAWN �0 BSE 0429 l heap llllt ll Illi ill / s 4'DIASTDMH X APPROX. 88LF 1C n, 6� Tll l �2Q t 1 u l l I t l t l l 398.9 SY TURF/ 18" DIP TO BE , / STA 0+00.00 (HAMPTON ST) / l l l l 11 hb��l l l l l l l 1 i l 1 1 111 l ll l l l l �l111 l l l l �� 11 I l l i I FESCUE SOD ABANDONED lt1 l - � / I �- =C -17A 8+27.89 ELM ST ESMT llltllltl llltlllt 11-W1 111 It ltll � _ ( ) / ll l ll llilllill lhlllll llllllll lull illi llllllllllillll l'[lll 2� - (WITHIN LOD) PLUG EA END 0.36 AC ,�� 6 0 I R RIM EL=532.72 \ 44 t l 111 111 5? _--- l 11111 iTl T t -1 t l l l t l l l t l I A=89°53'55"' RT / �� \ &GROUT FILL 1111 111 111CLEAR ll l 111 l 111 l 111 l lllllll l 111 l 111 l 111 llllllll ll l 111 l ll �" -n °� T u, 0 &GRUB - - VR J REMOVE & REPLACE I Qn°' I �A.C' / / LIMITS OF DISTURBANCE 1 1l1 goo EXIST TREES ALONG TOP OF O o �j �� 11 l l 1 Kl 111 t / / oo�' -� 10R� CONIC DRIVE UI C� I1 II \� / NOT TO EXCEED TOP OF O h1 111, �XIST S \ 01 w BANK AND NEAR BLDG SHALL 141.8 SY EXIST o .-2. BANK (TOB NOT SHOWN) !11 >` It tll tt / - ��� - � o�� HAVE THE STUMPS LEFT IN - II " 1� BSE 0427 ��o0 1ooYR� ��o _ ��.qo9- �I A A BRICK TO BE s o EXISTING PLACE TO AID IN BANK & CONTRACTOR SHALL a ml a, a, MO R SE N LEIG ,\0 2941.5 �'(G /`� t ltll It / (BRICK) FOOTING STABILIZATION TYP. REMOVE & REPLACE 64 LF m � L, � 21 MILL RD \\`\ N 1 PROPOSED MH 0 2941.5 SY ABANDONED WETLAND ( ) N G , o' 11 t t 1 1111 / -A�° CLEANUP, SEED REFER TO v BOUNDARY (OR AS NECESSARY) 24" RCP in� 1 141 PG 44 QHS \0 P- Q I�5 / BSE 0424A PROPOSED 20' �h ' 2, 5 Q- i i i 1 I i i � & STRAW W/NET SPEC 01 27100 pp9 t W/GONG COLLARS Q PI 796912957421 (BSW-1), PERMANENT CITY OF g1`Z$ 5' DIA FLAT TOP MH �G / l t l t 11 E�T?M ���s TEMPORARY vv ��6 STA 0+00.00 t 11 LYI 1 i t S 0425 LIMIT OF DISTURBANCE, ( EDEN UTILITY ESMT RIM EL=514.85 �Y 11}xltl / �O- DISTURBED AREA= 0.61 AC IMPACT \ �r \� 11l Xlill / A=24°44'03"RT �,�Q' ll 111 REMOVED E = 0.01 AC) PROPOSED MH HUFF EORGE M JR FOR SEE DWG NO. 11-C10 BSE 0428 p FOR HAMPTON ST 4' DIA FLAT TOP MH 811) IAMPTON ST ° REPLACEMENT I I STA 5+12.32 DB 845 , PG 990 � PLAN AND PROFILE SEE DWG NO. 11-C14 �� 1t1 11 1 /^ PIPE RIM EL=520.24 PIN 796912955446 / FOR CONTINUATION l 11,1 t / Typ F RG S RITA H A=38°53'41" LT IP /TYP MABE D VID RAY 317 HA RIS ST HUTCHERSON 111 1 11111 / 808 B YANT ST HU CHER WATKINS MAXINE L HILL BARBARA 4 8, PG 50 HAR D GEORGE I I I Z � HA OL GEORGE I 821 HAMPTON ST I I 536 532 528 1%111 / 901 BRENTWOOD RD DB 14 , PG 1727 PIIN 79691295231 N Q) L' 111 0 �`' c�"�� I IN 79 912951338 1 1 15 HARRIS S I 1 ARRIS DB 813, PG 2141 Ln w EXIST SMH DB 48 7 PIN 796912953 89 SCALE:1 "=40' � Q BSE 0424 PIN 796 128 82 I PI 7969129523 8 I PIN 796912955344 w < LL w z EXISTING INLETS 1 & 2 = _ > e0 coLU = O N w z w TO BE REMOVED -o 2 OU rn"o m C5:; 2i w g Q o o AND REPLACED UJ o w 0 00 N Ln nj N II w=� U) wz w=�Q w SEE TABLE FOR RIM O�Q J��Li)z co 2Q zIt � o Q w2ELL z &PIPE INV, TYP aQ 00wz0 a- I - w_ Co- w= m Hw o= Oo-mQ�>> �O�>Ow o oco po mg�� w ���� �06� o00 (SEE DET,DWGD7) d��xsu�iE z c i M O p w N - V)aw0� o L o0 � 2i CCDM w<0 p0,�iL0 CN NIILn Ln OwF-�+C) II m�F-U��oM C/Uj ) _j JwLlnz CONTRACTOR SHALL aQQ�� Q LU 0 ED 00 LO00 ll - � wQQJu)w�z O REMOVE & REPLACE 56 LF � o m < 2i > > > O a Q J + _j II � O p - m Q z > > CONTRACTOR SHALL (OR AS NECESSARY) 24" aLn�Cucn II �zzz aQ�Oc�w- n �_xr>zz REMOVE & REPLACE 64 LF 100 YR FLOOD ELEV=526.20' <w CN > 524 0 < o �Q LU w = z Uj 2 a 2 > 00N �0Lo Lo.N m �Uo�LO w Q Ln II 520 0 _j LU LU ) � � 0 w ~ + J LI I II a<<_j3: 0 z 0 co z > a-In�.6U)>z 516 \\ / 512 m EXIST SMH BSE 0424 (BRICK) TO BE REMOVED 0.96% 504 PROPOSED 144_93 LF 18DIP@ _ _ 500 LID CO U) C\j Cc 11o w U) LU XV)F - wmcn� ti w N 0 w=� 00w W ma=> o � _j Ln o l11 0 1 _ + J V) I - a -<<_j z 0 0 0<>> a06W z EXIST SMH BSE 0425 (BRICK) TO BE REMOVED II BORING (PWR) ELEV=512.00 ' SED 109.24 LF 8" DIP@ 0.76C/C ROf�� _ APPROX. 88LF 18" DIP TO BE ABANDONED _ PLUG EA END U & GROUT FILL 0o m�2>> a_ ;t 3:.6cnEz z APPROX EXISTING GRADE ALONG EXISTING SAN SEWER / I / r BORING (PWR) ELEV=512.50 � - - RCP W/GONG COLLARS, (OR AS NECESSARY) 24" RCP SEE DET DWG D8 W/CONC COLLARS, SEE DET DWG D8 EXIST 12" CMP TO BE REMOVED AND REPLACED O ' PROPOSED 1O SAN SEWER / - - LATERAL,TYP , (APPROX ELEV) BORING _ (PWR) ELEV=515.00 / 0 ih 0 / PROPOSED 0 PROPOSED ANTI -SEEP COLLAR SEE DETAIL SHEET D12 SCALE: HOR 1"=40'; VERT 1"=4' PROPOSED I DESIGN BY: 64 LF CLASS III 24" DRAWN BY: RCP @ 1.68% PROJ. DATE: BORING DRAWING NUMBER: 11-C9 (RNE) m ELEV=515.50 U 56 LF CLASS III 24" RCP @ 2.28% PROPOSED 75.0 LF OF 8" PVC @ 3.84% PROPOSED 25.0 LF OF 8" PVC @ 3.98% L; w r1_ 2 CDLU Q W L� 00 w > CO = O o 06 OUrn��� NOLO wowo��- II co � I--I---N II 0 0 + J II � aQQ_j,--wz0 °o�0Q�>> a_ ;t 06 ) z z M M (D Ln O Ln M 6� N (D Ln N Ln LO CO O O ti d7 N Co ti Co c? Ln 7 (q Co c� O co a) Ln O O r1_ d7 LO LO O CO O O O N 00 LO LO m N N L1) Lf) Ln N N N N N N N N N N N LO LID LO LO Lf) LO LO LO LO LO LID Lf)LO LO LO LO LID LO LO LO Lf) LO LO LO 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 INS DESIGN BY: I DRAWN BY: o PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C9 a m U NOTE: 536 0 p� 1. CONTRACTOR SHALL U) I VERIFY EXISTING SAN z z O O SEWER LATERALS SHOWN O (OR NOT SHOWN). ALL U Z EXISTING SAN SEWER LU m W 532 LATERALS ARE 4" VC OR Q EXIST IRON (UNLESS OTHERWISE 6" CI WATER MAIN, z NOTED). CONTRACTOR O SEE NOTE 3 SHALL REPLACE ALL W 2U oC ACTIVE SEWER LATERALS 0 Z W FROM PROPOSED Lij EXIST SMH 528 CLEANOUT TO PROPOSED U) BSE 0429 SEWER MAIN WITH 4" PVC Q (BRICK) TO BE AND NEW CLEANOUT AT REMOVED RIGHT-OF-WAY. INSTALL J J CLEANOUT IN VALVE BOX IF Ljj 0 Ir LOCATED IN ROAD, 524 DRIVEWAY, SIDEWALK, OR z z PARKING LOT. LU 01: LU 0 0 CONTRACTOR 2. RIP RAP STABILIZATION SHALL REMOVE SHALL BE COMPLETED I & REPLACE 48 LF F_ WITHIN 7 DAYS OF BANK (OR AS 520 DISTURBANCE, UPON J NECESSARY) 24" REMOVAL OF BRIDGE MAT z RCP W/CONC Ir AND WHEN ALL WORK O COLLARS, DOWNSTREAM IS U) SEE DET DWG D8 COMPLETED, PROVIDE SILT w 2 z W FENCE ON TOE OF SLOPE. w J W 516 (EA SIDE OF BANK AND/OR W PROPOSED 1-- PERM FORD). O 48 LF CLASS 111 24" 0 0 - RCP @ 3.08% LLOZ0 3. CONTRACTOR SHALL � INSTALL 6" DI CUT -IN VALVE � 512 ON EXIST 6" CI WATER MAIN < a AND REMOVE AND o REPLACE/RELOCATE NEW 6" WATER MAIN WITH RJDI w PIPE AND FITTINGS. MAKE Z w CONNECTION AFTER SS MH ' OI-- 1 w 508 WITH 6" SOLID SLEEVE. LJJ a_ 2i izz (if Q w ae oe ae c0 4. CONTRACTOR SHALL = g > _ CO CO CO N INSTALL ±12 LF NEW 4" PVC 10 < 0 CCD)0o M N N N LNn LATERAL AND CLEANOUT O IL p o + LI`I) LO � LO F ) W O II II II TO INTERCEPT EXISTING LL 1 - + Cp J Q JO O Q w z_ z_ z_ 0 504 SAN SEWER LATERAL U)Q�2»>> 06 U j� z z z z 5. SEWER MAIN CORRIDOR z ON THIS SHEET LIES INSIDE j A FEMA SPECIAL FLOOD HAZARD AREA Q 500 (REFERENCE NC FLOODPLAIN MAPPING Q PROGRAM, NATION FLOOD J INSURANCE PROGRAM, Q FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. z _ 9+00 LL DICKSON communitv infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM INC LICENSE NO.F-0374 ,����IIIIIII .A �.:oFESS ► �� 9l. SEAL 025490 e •��A,��., p,�RkW F I SN�P� 481111145- PROFESSIONAL SEAL PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C9 a m 0 p� I z O O Z Q LU m W Q z � °C U) z 0 W U W 2U oC p O Z W 0- 0 U = W 0 Ir z LU 2 z z C/) LU LU 01: LU 0 cc W W WCo 0 F_ LL O W LU W w Ir F- U) � U w 2 z W w _ J W Q C31 1-- 0 z_ LLOZ0 PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C9 a W I Z Q W Q z � Z z 0 W U W 2U oC Z W 0- 0 U = W 0 Ir z 2 z z C/) LU LU 01: LU 0 W W WCo 0 F_ LL O W LU W Ir F- U) � U w 2 z W w _ J W C31 1-- 0 z_ IU � � M� W < a o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C9 WKD PROD. NO.: 20120031.11. RA 21 UU w oo �JU 'Zw ap¢ wwo gra U= oUm ,na0 w 0Zw -o oz 0 z16z Z °om =UQ 15, Y O, w3� �0, zwa ° 0, P: a ozz owo wFa 13:Z w�� 0 w m�3 =dp �Zw �0w wm Z°w 32 oZD U -U ZZD w Y � H U0.w poo YQ T. oo� 0 =Zw �o= UU�I�i \\ti SEE DWG NO. 11-C9 �- - - - \ 0337 FOR PROPOSED ELM ST \ _ - - - X EXIST AB ND NED NOTES. ti til \ _ TO BE ABANDONED � � \ REPLACEMENT PLAN & L\X - - - X - - -FLWY - - IN PLACE YY 1w >- PROFILE _ FLWY - - - LWY\ 1. CONTRACTOR SHALL BE DICKSON \ FLWY PROPOSED 142.4 LF OF ±90 LF 6" VCP Lj FL PROPOSED MH} RESPONSIBLE FOR / MHBSE0425 �;= CONTRACTOR TO PROVIDE COFFER DAM & „ TO BE ABANDONED - - - BYPASSING ALL SEWAGE communit infrastructure consultants 27 FLS 36 x 0.375 STEEL \ rn BSW 0400 FLWY - - - -FL - WY - - - - - ,?fl PUMP AROUND TO MAINTAIN CONTINUOUS PLUG EA END -FLWY- - - - - WY- - - FLOWS DURING CIPPL & RIM=514.45 O ENCASEMENT W/18" RJDI \ 5' DIA FLAT TOP MH INV IN=505.00 x FLOW OF STREAM AND PROVIDE A DRY Cn & GROUT FILL SEWER INSTALLATION. 720 CORPORATE CENTER DRIVE INV OUT=504.96 00' INSTALLED BY BORE & 4 STA 6+39.58 CONTRACTOR SHALL NOTIFY RALEIGH, NC 27607 CONDITION DURING REMOVAL OF AERIAL JACK METHOD 0.12% = N RIM EL=519.73 PROPOSED MH �° CROSSING (±75 LF TOTAL DRY CONDITION) @ I t 46.5 SY JUTE MAT - ° ' RESIDENTS/BUSINESS (t)919-782-0495 BSE 0425 Ls' STREAM CROSSING 1 - , I Z 4- PERM LINER, SEE 0-13 1406 RT (f)919 782-9672 OWNERS OF CIPPL 5' DIA FLAT TOP MH �= SEE DWG NO. D9 FORS/\51 r - - DET DWG NO. D12 CONTRACTOR SHALL PERFORM INSTALLATION AND MANHOLE 346.6 LF 18 VCP \ WWW.WKDICKSON.COM STA 1+44.93 (ELM ST ESMT) CROSSING REQUIREMENTS C MINIMAL CLEARING & GRUBBING REPAIRS AND TO REFRAIN TO BE ABANDONED \ ALIGNMENT A >- =STA 0+00.00 (MATRIMONY) SMH BSW 0337 CONNECT EXIST FROM USING WATER. NC LICENSE NO.F-0374 � PROPOSED MH PLUG EA END RIM=527.65 r O \ � _ �.,� TO LIMITS OF PROPOSED 20 PERM Z RIM EL=517.02 �° '' 18" DIP TO 6' CONTRACTOR SHALL SUBMIT �a BSE 0426 & GROUT FILL INV IN=506.95 C7 Z I 129.75LF 18 VCP ESMT (±0.01 AC), TYP O - �5' DIA FLAT TOP MH INV IN=507.65 717 TO BE ABANDONED PROPOSED MH DETAILED WORK PLAN 79.9 LF 18" VCP ` PROPOSED INV OUT=506. 9 - (J) a- PLUG EA END (SEE DET, DWG D1) EK - SHOWING HOW ALL SEWAGE "",AL ON FLOWS WILL BE BYPASSED. TO BE REMOVED ~� � -� GG � � STA 1+03.63 20' PERMANENT � � I� I - - -� � ---- IM L - E RIM EL=513.41 I o & GROUT FILL - nip CROSSING R M TR H ����nnnq�� o \ \ O _ - CITY OF EDEN LIMIT OF DISTURBANCE, - ---- - 932.6 SY LQWE Q ��O CARO ,7*0 UTILITY ESMT DISTURBED AREA= 0.32 AC - - - - - I �� Y R E PROPOSED 12'x10' --- 65 LF :� ��•''•••••• •'`� ii 0- 180 0 0 CLEANUP, SEED - 2. CONTRACTOR SHALL p i �\ I BORE & JACK 4 _ - �� .: •FESS 1u4 9 - & STRAW W/NET - - - MAINTAIN TWO WAY TRAFFIC - - - -FLWY-- �- I\ L� Y - ss NG -- _-_ _ SILT FENCE 10, W :QUO �9�.• FL -FLWY � , � RECEIVING PIT � 9+00 AT ALL TIMES. CONTRACTOR SEAL ±120 SY CLASS II 11 IS11 \� - - _� = _ _ + - _ - - 8+00 RIP RAP BANK \���� __ - - _ - -___= % _ 1 - - _ 7 00 T 514.6 - -- > C _ _ - __ - -� �1 _ EXISTING CHURCH STONE O SHALL PROTECT EXCAVATION 025490 : STABILIZATION oa - O - - -- - �- _ �� �� \ IIL /,r\ _ - � u; _ PICNIC SHELTER _ USING TRAFFIC RATED STEEL , + - - _ / / I - - OUTLET, -j :•FN ��•; / \ rr S€0-2� 0 _- - _ / - -� �' _ y:. - PIRG . - FLWY 405 LF FLWY, TYP PLATES (REQUIREMENTS, . GINE �• 'r RIM=51 S �_ _ - _ - - - 15'RCP T - = o �i �l •••-.......••'•• _�` r S - - - - �N _ -r0 .= 7.6 'c PLUG, o SIZING & SECURING OF : R o / _� rrr r=rr rr IN IN=506.18 - '✓-520.17 SILT FENCE TO REMAIN =r INV IN -506.52 -0- - _ I �� I O' t= $� I TYP N > PLATES SHALL BE ,,i„i�► ST8J y N / r=r frr rrf INV OUT=505.99 - ` \ -' ' '' ' '' ' '' '' ' RESPONSIBILITY OF LICENSED - - SS- P r r =r % % % % % , % , % % / =r =r =r =r r =r % % /% % % r - SS / �5f T ice/ OUTLE \ / r i -RLQ r r r / / / / / / / r r ?1 ' / / / / / / r r / i =; r it i i i r it � / r , , =r = o c- s� - r = r =r r = � � _ _ �r �S1r 1r � � I� -�r �� � ��s�;, �r � � �'�7 r'�i �'� r � rr r 'r 'i =r � =r , %,�% , % r '�, r �, % ENGINEER), BASIC CRITERIA PROFESSIONAL SEAL T P � r= rr r w � ,pct; r Sir r r r rr ,; rr rr rr rr rr rr rr rr r 'r 'rr'r rr rr rrr r T r rrr r r r r �, r, „ , 0 x r-- r r r r r r r r, r r P r, r r OO SHALL BE THAT PLATE SHALL uu-ab O BE RECESSED, FLUSHED WITH s l r r 7' r r✓ r l rr r rr O r�S ` , err r ,r rr r r �O / r' r r rr RIP = ±75 LF TO SMH + PAVEMENT SURFACE AND �I I +0 i I r= y 78 LF PROPOSED O m INV=520.66' °o / a a =r =i _r.� C�=r r =� r r \ o BSW 0336 ASPHALTED ON EDGES. / ° iz,� r = r r % / r =r r r 4 I I 0 - SILT FENCE Y 382.25 LF OF / �� � � � � ', ,r r r r r r rr r r +00 �1 � 16 LF 8" VCP r '= rr rfr rrr =ir =rr err 7 /Lr rr r TOC=527.76' ' / - GREENW I \ F{AL= -p 18" IN SITU DINING 18" IN PROVIDE CONTRACDEETAIL OF PUMP ASP PROPOSED m TO BE ABANDONED ' r = r IN=522.61 ;u --I - SMH BSW 0 116 LF r r r rr I \ PROPOSED 20' PERMANENT c� AND PIPE ARRANGEMENT T li- PLUG EA END r r rr rr = rr 6' m O z RIM=517. SILT FENCE w rr rr =rr =r =r r rf++ Av o ' MH BSW 0337 CITY OF EDEN y D - T, INV IN=508 W MAINTAIN TWO WAY TRAFFIC i 111 &GROUT FILL v 0 5 DIA STD MH UTILITY ESMT m m O cn m C� INV OUT=508. z AND TO MAINTAIN F- r fr rr rr r r +r r r C7 0 _ co ��� l ±23 LF 8" DI o r r rrr r= rr ' r STA 5+49.92 ALIGNMENT B Z m z co - r r r I. ,I ACCESSIBILITY FOR � / � m,r r = _ =r rr =i ! = r r r � B 9 i m O m � i / \ TO BE REMOVED r rr r r r r =r �r RIM EL=525.74 SEE DWG NO. 11-C12 Z c cn r- � = PEDESTRIAN TRAFFIC. 29 fi / SMH BSE 0427 PROPOSED MH _ 'r = ,r�,r rr =rr rrr r, rr �� 0-1 r r; r _ ° -� m O U � 64 LF 8 VCP , = r r r+ � - 8 32 08 LT m CONTRACTOR SHALL o` RIM=513.50 BSE 0712 - r r, rr r r ✓ r FOR PROPOSED o �- �° / TO BE ABANDONED _-100YR�� =r=r���� r rr= , =r - -r ALIGNMENT B ( Q PROVIDE TRAFFIC RATED INV IN=507.25 L5' DIA FLAT TOP MH r �'� =r, rr r =i =r rr i ! r r �� BUILDING RAMP FOR BYPASS PIPE AND r' r �� 3� OVERHANG wv0ur=507.25 PLUG EA END =r _ r = °y PLAN &PROFILE / STA 1 +62.55 & GROUT FILL PROPOSED MH BARRICADE PUMPS T O 4QA ��N RIM EL=514.87 BSE 0711 ENSURE SAFE TRAFFIC FLOW MFo A=37°27'56" LT '' ' ��r i'rr ;r`r�,�� r= `� �r+ REMOVE AROUND WORK AREA. p zo MgTR14f� lsjj Y °°� 5' DIA FLAT TOP MH 53p�r = i `r r� 5 �r� � U) E p & REPLACE �� y � _ _ CONTRACTOR SHALL °C - ° / NyC Rye o STA 3+08.23 ao 2 1491.4 SY EXIST - - - y RFF RIM EL=515.85 I �� - X19 - EXIST 25' CITY OF EDEN K 0-15'01'32"LT a _ _ GRAVEL DRIVE \� \ _ _ _ \ O 0 � I- \ ` \\ � 525_ mow, PROVIDE WARNING SIGNS IN W -1572.2 SY -- I ���� �� p� - -- 1p RIGHT OF WAY 211.2 LF 8 VCP \ ` __ = oy ACCORDANCE WITH MUTCD �y�yc 40'x20' BORE &JACK CLEANUP 187.1 SY _ - �1po INDICATING MOTORISTS OF Z o = TO BE ABANDONED \ ��� - - -begs_ R_ n� _ \ CLEANUP, SEED ��� - - _ - - y WORK AREA AND PUMP/RAMP O l / O C PLUG EA END \ \ ENTRY PIT AND & SEED W/ I - - / �Oy�� &GROUT FILL I PROPOSED \ ��_ os_ _ --o > GRADING LIMITS STRAW I &STRAW W/NET \ SO ADEQUATE DISTANCE IS > } � PROPOSED I a I SHORING NG ACTIVE -619.7 SF PROPOSED �`y�ops\°off - - PROVIDED FOR MOTORISTS Lu 0 o PROPOSED MH BSE 0753 TEMPORARY U i MH BSE 0755 �� _ _ i 100YR- - -10 TO REDUCE SPEED. cr- SEE DWG NO. 11-C9 0 5' DIA FLAT TOP MH I �+ c6'o 100YR� - --2i.100s- / FOR PROPOSED ELM ST CONSTRUCTION �, REMOVE 4 DIA STD MHS STA 3+76.24 I I 10 STA 5+49.92 fi 3. CONTRACTOR SHALL VERIFY REPLACEMENT PLAN & ENTRANCE, TYP r) p & REPLACE NA0os-- / PROFILE / RIM EL=519.40 r 1 C W RIM EL -526.61 ALL EXISTING SEWER / / ° -� cn O 162.7 SY ° - LATERALS SHOWN OR NOT o= 46'33'58" LT 92.0 SY 2 ASPHALT MI LING o I m X EXIST ASPHALT A= 80'35'47" RT ( z / AND OVERLAY, (TYP N DOT O U) PAVEMENT SHOWN). CONTRACTOR O 3 LANE SECT N), �" I SHALL REINSTATE AND g o o� PER NCDOT STiD'S I PROPOSED MH REHABILITATE ALL EXISTING U �� (THERMOPLASTIC PAINT) I I I BSE 0754 ACTIVE SEWER LATERALS / _ / ❑ I 4' DIA STD MH WHERE CIPP LINER IS o . (DOGHOUSE) INSTALLED, TYP., UNLESS W EXIST SMH STA 4+86.62 - ■ OTHERWISE SHOWN ON THE Q \ BSW 0112 RIM EL=529.58 PLANS. REHABILITATION OF U) \� s SCALE:1 "=40� 1 �= 77°44'17" LT LATERALS SHALL BE IN z ca c ? cn \ r o 1 �,� W ACCORDANCE WITH SPEC I I I I I I I I z Q I SECTION 33 12 14. 0 a 532 C0 u- _ Z UTILITY NOTES: 00 uj co 00 o g 2 T- 0 O ti v v'o 1. SEWER CROSSING O m J -UN orn W = Z - _ ❑ ❑ rn N ao STREAMS AND AERIAL LL Q w w - - U) � W W rn Ln � Lo I" CROSSINGS SHALL BE 0 = �_ _ _> / J \\ Q Q J Lo w z z p HYDROSTATICALLY W 3 528 Q��OUcoMoo z �� w / ���m��zzz o W TESTED TO 150 PSI. 528 V w otS %� w<w0coLno � N W> Lc) W> dln�0C'n o W> OSS 100 YR FLOOD 1- 2 ❑ / � _ 100 YR FLOOD F N W I- z w O w I- o+ J L,o g❑ n o Q z O Q ❑z n 2. SEWER CROSSING Q Q Qwg� p-��Qwz w=�Q z ELEV=526.2' _ ���� z / v_ ELEV=526.2' _ J Q z _ Q _ O APPROX TOE = 2 Q Z STREAMS SHALL NOT w ai�� �g zz a-lo�.6�Ezz m��w 000 co OF N�O0 / OF SLOPE m��w 000� HAVE JOINTS BELOW W Z J W 0 524 -°o 2 LL 06 w oN bo °�° = tZ T > `„ = � w � O O O 0 06 M / T- T � � C\! `. � STREAM CHANNEL 524 CC 20 2OC7p��NN co o 2 ❑F-0 o)Lo o / ~�000~NN (NORMAL WATER q z O G 2�O>M o0 oN�o ❑QF- Lo O w Q WQ�❑ ii m Lo ❑�� �aiu7� o J UJ ❑ Orn o w Q ❑ ii co `�' U) = z cn J W W O J LO - / W Q W ❑ 6 Lo �� o ii EXISTING GRADE SURFACE ELEVATION) OR W w Q W U O n � � Lf' U) -i W w N Ln J o �� 00 00 O w ~ � + � W ii �/ EXIST 12" � i mow"' �� w Li' ~ WITHIN TWO FEET OF Q 4 O Lo O o ii o ii W Q J O + ❑ ALONG EXISTING IL O z ,,,� v U W J Ln O w~ + w �� EXISTING GRADE = a~> 00 Q °' W~ z Q J o W~ z OTHERWISE NOTED. O OwI-❑�+ �1 11 1� ¢:0 O =O ��� ❑�mQ� » Oa�OQ z_O SAN SEWER BANKS UNLESS W+ o ❑ w Q w z O O- O z- WATER LINE s �Q< <W1zz0 OF:j z>> ALONG PROPOSED I-O0c� -co �_ > �_w ❑gym » z U = r O❑��Q gz»> 0 - �-wZ Z ❑I-� CVL6O Lon dLn>o6ul) >z z din ~-wz z r �_ �Ol-cq-w w���scn�>__ SAN SEWER wQ�❑ o „ 1 520 ~ 520 -0- � m W ii > z z z U) -j w W 00 `� PROPOSED 12'X10' CLASS II RIP RAP Q Q J w z O BORE &JACK 3. RIP RAP STABILIZATION J Q O W BANK STABILIZATION, O p� m Q g- 1 SHALL BE COMPLETED 0 W SEE PLAN co ,� c j z z RECEIVING PIT WITHIN 7 DAYS OF BANK O w z PROPOSED PIPE TOE OF DISTURBANCE, UPON z z CENTERED ON SLOPE REMOVAL OF BRIDGE MAT U) W _ W z 516 STREAM, SEE AND WHEN ALL WORK 516 W c 0 0 No UTILITY NOTES 1 DOWNSTREAM IS (n Q C z COMPLETED. PROVIDE O z m G w SILT FENCE ON TOE OF W w I 1 SLOPE, EA SIDE OF BANK 0 W O EXIST 6" VCP_ CONNECT EXIST ( ) W W Q 512 I I \\ SAN SEWER 18" VCP TO 512 CC \ / PROPOSED PROPOSED 142.4 LF OF 36" x PROPOSED MH 0- U G w EXIST SMH 40'X20' BORE & 0.375" STEEL ENCASEMENT (SEE DET, DWG D1) Lu Cn w EXIST SMH \ W/18" RJDI INSTALLED BY BORE W U B E 0425"'---(BRICK) JACK ENTRY PIT (BRICK) TO BE ( RICK)TOB &JACK METHOD @0.12% ______________ W z ( W o. E OVED REMOVED F11110 50 _ ----------- - 382.25 LF EXIST 18" VCP @ 0.21% % w Z = 508 W PROPOSED 145.68 LF 18" PVC@ 0.16% c II II --------------- - - - - - - - - - - - - a � m o II PROPOSED 0 PROPOSED 15.4 LF OF 18" RJDI PROPOSED 58.9 LF OF 18" PVC PROPOSED 382.25 LF OF O PROPOSED @ 0.12% 89.7 LF OF 18" DIP 18" IN SITU LINING V- 504 U @ 0.12% BORING B-9 68.0 LF OF 18" PVC ° Ln PWR p� °.-.. @ 0.12 /0 504 r PROJ. MGR.: MWF m o 79.9 LF 18" DI ( ) °'10'° ALIGNMENT A DESIGN BY: AB, ATM, MOS ELEV=501.50 TO BE REMOVED PROPOSED z DRAWN BY: AB, ATM, MOS cn + -1 PROPOSED 4.0 LF OF 18" RJDI SCALE: HOR 1 "=40'; VERT 1 "=4' BORING B-8 PROJ. DATE: MARCH 2018 U) j w Q w 103.6 LF OF 18" DIP @ 0 12% (PWR) DRAWING NUMBER: 500 w m v~i @ 1.24% ELEV=503.50 500 O 00 co co � 00 co N Lfl T M � � � 0 11-C 11 w N M f� CV CD oo ti co O O Lq I� M OO N 00 M I� O M ti CV a7 ti ti Ln 11' 0cy) w co O I I Lo Ln I- Ln co ti O � O 00 N O Lo co O 00 ti 1- CO O O O N N N N N N N - - WKD PROJ. NO.: Lo Lo Lo Lo Lo Lo Lo Lo Lo Lo Lo L(") L() Ln L(") L(j L(j L(") Ln Lo Li') Ln L(") Lo L(") Lo a` a z 20120031.11. RA w -0+25 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 LL LL ow 000a Foo FoJ° oZw aoQ wwo 2F7 °=w gom .ao =�o ozw 5_o oz "o oowZ c) wY ~c)_ oYN waw D1.=wa o_ w , ?oQ ozz owo w¢¢ ¢�Z o�� w°o I w3a 0 ozw -o' °it °oZ z=w oZl. U -o ZZS omaw = U yH U°LL ❑oo Yz m � ooQ �'o 0oF oo0 °oLL 014 oxo _ I w TEMPORARY _- \ irf CONSTRUCTION I I \ i f ENTRANCE (HEAVY DUTY EXIST SMH it rfrr COMPOSITE RIG MAT) I I 0 \ o BSE 0550 V �� , 145.2 SY I \61 \ \ CLEANUP, SEED I I \ & STRAW W/NET �P�'ROX \ \ \ SEE DWG NO. 11-C15STREAM CROSSING 11-S1, \ �\ SERVE pOVSEs \ FOR PROPOSED ii� 1> SEE DRAWING NO. D9 FOR - _ VE CIPPL, EASEMENTS & ii rr oo SMH BSE 0548 CROSSING REQUIREMENTS 0 �_ -ss_ q _ CLEAR --NIV IN1505.47 STREAM CROSSING J ss_ M _ EROSION CONTROL 0.03 AC _ j i - _ _ _ �, INV IN -503.97 (84 SY CLASS II RIP RAP -SSS & GRUB INV OUT=503.9 BANK STABILIZATION) R/V�css� _ _ - �� 3a 9� 381.1 SY TOTAL BOTH SIDES I S% Dp -_ _ Mrff x 33 CLEANUP S & SEED W/ PROPOSED MH �BSE 0558 1 7S - _ _ O STRAW 4' DIA FLAT TOP MH STA 3+81.87 4 RIM EL=513.52 REMOVE 423°29'04" 1 \ \ \ \ & REPLACE \ SMH,BS 0559 \ 32.0 SY 134 LF RIM=X13.52 , EXIST ASPHALT � INV IN=5'Q6.92 - / SILT FENCE INV OUT=5p6.42 PAVEMENT \ Oj �0 M BSE 0549 ' TEMPORARY ROCK \ \ 7O>� ��\ \0.04 AC�1.I� ' SILT CHECK, TYPE B ' SMH BSE 0549 \ RIM=513.14 \X1INV IN=504.59 \. INV IN=504.14 \ \ \ \ \ \ PROPOSED INV OUT=504.09 I \ 20 PERMANENT r'0 CITY OF EDEN \ \ UTILITY ESMT TEMPORARY CONSTRUCTION - Y ENTRANCE `-<700y \ SMH BSE 0506 9 o o. y00� o00 \ \ \ \ _ \ RIM=522.79 "Y` W SMH BSE 0507�� \ _ INV IN=517.99 INV OUT=516.04 � \ 'o LRIM=513.97 _ \ INV IN=504.40 _ Cp INV IN=505.4210 A -INV O6T=504.37 > \ _SS-_ _ \ s SCALE:1 "=40'co \�xx\\ �\ �o .\\ \ - / / / / / / / /// / I I 74.6 LF8"DI\\\\ AERIAL CROSSING TO BE REMOVED I V o 48 LF \ \\ \\��\\`� \ \\\ \\ SILT FENCE \ \\ \ �s \\�\\\\ � (TOTAL BOTH SIDES) I \ \ �// \\ \\ \\�--_- I 63.4 SY I\\\\ \moo \IN \\\ \�\\\ % i �/��// I I I I I I CLEANUP, SEED I \\\\\ \\����\�\� I & STRAWW/NET I � � \�►�-_-- _ _• � �� � � � � I III 1 1 � � III I \ \ \\ \ I PROPOSED \�z \ \\\\ I I MH BSE 0557\ \\ \ ��� �- -- _ - / _ I I I I I I I I I I I I 4'DIASTMH DI III I I I III II \ Il I STA 4+71.49 �\ \ Sis\ \� ;� ;� _ _ _ I I III I I 1 I Ico \ I RIM EL=511.70 �\ \ \ \ - , ---DD.GEVFEWt 10EMETERY INC I I A= 3°43'47" LT \ 00- , �- -\\I 135 NC 135 +00 I III IIII I I p 1 r-\ _ _ PIN7969 6835889 I I I IIIA I I ISI I I / I I 5 SMH BSE 0557 RIM -511.70 _ I I I I I I I I I I I \ INV IN=507.49 \ ±275 LF TO -- I I I I I I I I I I I I Icoco INV OUT=507.45- I SMH BSE 0 ani+ MOl I -�- 1 � o Moi rt l I I -- -�V\U -ss-----ss-----ss ss-11, tt liltlilt -I - -Ss- - --I-tsS- - - - -�s �- Boa I I I 1 II� I - MO� - 30?J MO t - 3 III I I Ill I 1 11-S1 +itl~ I MOl 2i� APPROX 13 HOUSES, EXIST SMH r�tt BSE 0556 I/ r 1 I i Y i I y i I y 1 COMMERCIAL BLDG &SMALL 1 RETAIL CENTER SERVED REMOVE II 1 1 1 1 l i I III II' I I CLEAR & REPLACE &GRUB., 34.9 SY o EXIST ASPHALT I EXIST SMH PAVEMENT DAVES CONSTRUCTIUIN l 60 LF BSE 0559 SMH BSE 0558 SI RVICE, INC, / III III I SILT (BRICK) RIM=511.55 1528 NC 135 ( I TO BE REMOVED INV IN=507.34 I FENCE I _ INV OUT=507.34 \ I PII� 79691285 136 14.2 LF 8" VCP I 41.6 LF 8" VCP TO BE REMOVED TO BE REMOVEDEXIST SMH I I I I I I I C) I PROPOSED MH BSE 0559 BSE 0558 I I I I I III I I I I 4' DIA FLAT TOP MH (BRICK) I I I I I I I I -STA 3+38.89 TO BE REMOVED (I I I ( I I I I RIM EL=513.46 I I I III I I I I I i =18°3'45" LT I I i IIII III I I II I I CONNECT EXIST SEE DWG NO. 11-C14 FOR I I I I 8" VCP TO PROPOSED TEMPORARY I I I I I I I Il II I II I PROPOSED MH CONSTRUCTION ACCESS I I o I I (SEE DET, DWG D1) 0 X I 1 I ?I I I I I I I o CONSTRUCTION NOTES: 1. WIDTH SPAN OF CREEK IS GREATER THAN 40 FEET, WHICH IS TYPICALLY THE LONGEST SPAN OF A TEMPORARY BRIDGE MAT. THEREFORE, ACCESS HAS BEEN PROVIDED FOR CONTRACTOR TO WORK FROM BOTH SIDES OF CREEK AND SHALL NOT CROSS CREEK WITH EQUIPMENT. ACCESS TO THE WEST BANK SHALL BE PROVIDED THROUGH A RIGHT OF ENTRY UTILIZING AN EXISTING PAVED CORRIDOR FROM AN EXISTING DRIVEWAY ADJACENT TO WASHINGTON STREET. PRIOR TO BEGINNING WORK, CONTRACTOR SHALL COORDINATE WITH OWNER'S PROJECT COORDINATOR AND ARRANGE A MEETING WITH THE PROPERY OWNER TO DISCUSS THE ACCESS ROUTE THROUGH THIS PROPERTY AND DEVELOP AND IMPLEMENT MEASURES TO AVOID ANY DISRUPTION TO OWNER'S USE OF THE PROPERTY AND BUSINESS OPERATIONS. RIGHT OF ENTRY SHALL NOT BE UTILIZED FOR ANY STORAGE OR STAGING WITHOUT LANDOWNER'S CONSENT AND AN AGREEMENT INDEMNIFYING THE CITY OF EDEN AND DESIGN ENGINEER. CONTRACTOR SHALL PROVIDE THE FOLLOWING PROVISIONS FOR THIS RIGHT OF ENTRY: A. PERFORM THOROUGH PRE -CONSTRUCTION VIDEO OF CONSTRUCTION ACCESS CORRIDOR DOCUMENTING PAVEMENT CONDITION. B. MAINTAIN CONTINUOUS ACCESS TO THE BUSINESS. UNDER NO SUCH CIRCUMSTANCE SHALL CONTRACTOR'S USE OF ACCESS RESULT IN LOSS OF BUSINESS ACTIVTIES, STORAGE OR PARKING. C. PRVIODE SAFE ACCESS THROUGH ROUTE, OBEYING A SAFE SPEED AND PORIVIDNG TRAFFIC CONTROL, FLAGGING OR OTHER MEANS NECESSARY TO ENSURE A SAFE SHARED USED OF THIS RIGHT OF ENTRY. 2. ALL WORK TO CONSTRUCT THE PROPOSED AERIAL CROSSING AND REMOVAL OF THE EXISTING AERIAL CROSSING SHALL BE PERFORMED IN THE DRY CONDITIONS UTILIZING A COFFER DAM AND STREAM PUMP AROUND WORK PLAN. 3. SEWER FROM SSMH BSE 0558 TO SSMH BSE 0557 INCLUSIVE OF PORTION THROUGH ENCASEMENT SHALL BE HYDROSTRATICALLY TESTED TO 150 PSI HELD FOR 2 HRS PER WATER MAIN TESTING REQUIREMENTS 4. STREAM CROSSING SHALL NOT HAVE JOINTS WITHIN TWO FEET OF BANKS UNLESS OTHERWISE NOTED. 5. CONTRACTOR SHALL SUBMIT A DETAILED SEWAGE BYPASS PUMPING AND CONSTRUCTION SEQUENCE PRIOR TO BEGINNING WORK. WORK PLAN SHALL ADDRESS THE FOLLOWING REQUIREMENTS: A. CONTRACTOR SHALL KEEP THE EXISTING SEWER IN SERVICE UP TO SSMHO559 AND UTILIZE IT AS A BYPASS PUMP LOCATION TO REFRAIN FROM HAVING TO ERECT A TEMPORARY AERIAL BYPASS PIPE CROSSING. B. CONSTRUCT THE PROPOSED SEWER INCLUSIVE OF THE AERIAL CROSSING FROM SSMH BSE 0559 TO A SAFE WORKING DISTANCE FROM EXIST SSMH 0557. C. INSTALL SECOND BYPASS PUMP LOCATED AT EXIST SSMH 0556 TO BYPASS FLOW AROUND EXIST SSMH 0557 TO EXIST SSMH SO IT CAN BE REPLACED AND THE EXISTING UPSTREAM SEWER RECONNECTED TO IT. D. PROPOSED SEWER AND MANHOLES BETWEEN PROPOSED MANHOLES BSE 0559 AND BSE 0557 SHALL BE TESTED AND OPERABLE PRIOR TO DIVERTING FLOW AND DISCONTINUING BYPASS PUMPING E. COMPLETE MANHOLE AND PIPE REMOVAL AND ABANDONMENT. UTILITY NOTES: 1. PIPE THROUGH ENCASEMENT AND FOR SUBMERGED STREAM CROSSINGS SHALL BE FACTORY RESTRAINED. 2. SEWER CROSSING STREAMS AND AERIAL CROSSINGS SHALL BE HYDROSTATICALLY TESTED TO 150 PSI. 3. SEWER CROSSING STREAMS SHALL NOT HAVE JOINTS BELOW STREAM CHANNEL (NORMAL WATER SURFACE ELEVATION) OR WITHIN TWO FEET OF BANKS UNLESS OTHERWISE NOTED. z 0 U U) z 0 U Ir 0 LL 0 Lu C LLIQ J W 0 z J z 0 W 0 0 - Lu W m 0 LL z Q J Q z LL �D KSON 1 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM INC LICENSE NO.F-0374 0*. �..AR0��� 0� 'v .y • SEAL 025490 '�i���'• GINE••• PROFESSIONAL SEAL PROJ. MGR.: m DESIGN BY: AB, ATM, MOS 00 o AB, ATM, MOS PROJ. DATE: MARCH 2018 528 528 p p� 0 Lu z O O Z w=� 2iLL0 Lo 0 Q Q z C) Z z cu) w _ 0_> N co m w Q U) LL r 0 U) W 2 01: U U U �coco UI��� 0 m w com _ _> c? 524 524 C) L--- 0 . co Ln Lo O 11 (n J Lu LLI 00 II Lfl � 2 = 00 0 0 � � r,,,- � � � U O � � O Q0-cr 524 01: U) W - oEr 100 YR FLOOD O LL+ _j II D J w p o ti Lo O II Q ELEV= 523.50 = W Q Q M W Z o � m < > W Lo cc < _j j Lo 11 z z W m Q 0 p > Z W Co W LL cc _ LU 0W O w w���tsc��z z Op�0Q Q Lo 20 > a -; co -60 z U w 2 z Y W YY J o Q z �_ 520 MN C) O NI��0'' 0 m cl CD ���� J 520 a m �j 0_ `� O Q Ir � O m Lei O Lo M Lo 00 N m - W - Lo PROPOSED 2 O PROPOSED = w0 = > STEEL VENT, o Y U 0 -t O Lo Ln o II Ln+_J II 00 Lo Lo 0 0 cn�+ JLnLlnj EXISTING GRADE 2 rn o o o 0 LNn U) ���~ ���OUO � o II VENTELEV=513.46 mw m Ln m�� CD o w z 0 w z z ALONG EXISTING ~ 00 Lo Lf' w � o N w z z 0 oo =" L`� Lo S2Lu Q 2> (n E z w Q �» x c/) ZZZ zz SAN SEWER S2 w Q �» CQ _J UJ w ;;' � Lu PROPOSED x U) [-- O Q J+ J 11 =) Lo(o 11 516 W m w00U) - Z Z wmcnEwQ Mwz0� 2"0 GALV m H O W 516 0 � � E » w STEEL VENT, X c/)LO [-- � � a_ w��.scn�zz> 46 ELEV=513. wmcn� I I EXIST SMH - - - PROPOSED 84 BSE 0558 _ SY CLASS II /� (BRICK) TO BE RIP RAP I REMOVED 512 ill II II I I I I 512 EXISTING MANHOLE I I EXIST SMH I I EXISTING MANHOLE TO BE REHABILITATED ~ TO BE REHABILITATED REFER TO SPEC BSE 0559 I APPROX (BRICK) TO BE 1 OHWM = 510.51 EXIST 8" VCP @ 0.50% REFER TO SPEC SECTION 33 01 37 REMOVED 508 SECTION 33 01 37I I _ - - LJ 508 CONNECT EXIST --- _-- I I 8"VCPTO - _______ - - - 0 --���--------------I 115.0 LF EXIST 18" VCP @ 0.10% ---__ - o� - _ - PROPOSED I I I PROPOSED MH (SEE DET, DWG D1) 504 155.4 LF EXIST 18' VCP @ 0.40% ----I I--------------� I 43.0 LF OF 8" DIP I 504 I---------- ___ - a o I LJ @1.93/o I PROPOSED LJ CONNECT EXIST PROPOSED 27.6 LF OF 8" RJ DIP PROPOSED 8" VCP TO 9.0 LF OF 8" RJ DIP @ 0.78% 155.4 LF OF PROPOSED MH @ 0.78% STA 4+44.04 18" IN SITU LINING (SEE DET, DWG D1) STA 3+90.86 ELEV. 506.79 500 500 ELEV. 506.42 PROPOSED 52.0 LF SEE DWG D5 FOR 16"x0.375" STEEL AERIAL PIPE ENCASEMENT W/ 8" CROSSING DETAILS RJDI PIPE @ 0.50% 496 74.6 LF 8" SPIRAL STEEL 496 AERIAL CROSSING TO BE REMOVED SCALE: HOR 1 "=40'; VERT 1 "=4' 492 492 co c? � Co r N Co N 00 m N N o N Lo u') Lo Lo -0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 CONSTRUCTION NOTES: 1. WIDTH SPAN OF CREEK IS GREATER THAN 40 FEET, WHICH IS TYPICALLY THE LONGEST SPAN OF A TEMPORARY BRIDGE MAT. THEREFORE, ACCESS HAS BEEN PROVIDED FOR CONTRACTOR TO WORK FROM BOTH SIDES OF CREEK AND SHALL NOT CROSS CREEK WITH EQUIPMENT. ACCESS TO THE WEST BANK SHALL BE PROVIDED THROUGH A RIGHT OF ENTRY UTILIZING AN EXISTING PAVED CORRIDOR FROM AN EXISTING DRIVEWAY ADJACENT TO WASHINGTON STREET. PRIOR TO BEGINNING WORK, CONTRACTOR SHALL COORDINATE WITH OWNER'S PROJECT COORDINATOR AND ARRANGE A MEETING WITH THE PROPERY OWNER TO DISCUSS THE ACCESS ROUTE THROUGH THIS PROPERTY AND DEVELOP AND IMPLEMENT MEASURES TO AVOID ANY DISRUPTION TO OWNER'S USE OF THE PROPERTY AND BUSINESS OPERATIONS. RIGHT OF ENTRY SHALL NOT BE UTILIZED FOR ANY STORAGE OR STAGING WITHOUT LANDOWNER'S CONSENT AND AN AGREEMENT INDEMNIFYING THE CITY OF EDEN AND DESIGN ENGINEER. CONTRACTOR SHALL PROVIDE THE FOLLOWING PROVISIONS FOR THIS RIGHT OF ENTRY: A. PERFORM THOROUGH PRE -CONSTRUCTION VIDEO OF CONSTRUCTION ACCESS CORRIDOR DOCUMENTING PAVEMENT CONDITION. B. MAINTAIN CONTINUOUS ACCESS TO THE BUSINESS. UNDER NO SUCH CIRCUMSTANCE SHALL CONTRACTOR'S USE OF ACCESS RESULT IN LOSS OF BUSINESS ACTIVTIES, STORAGE OR PARKING. C. PRVIODE SAFE ACCESS THROUGH ROUTE, OBEYING A SAFE SPEED AND PORIVIDNG TRAFFIC CONTROL, FLAGGING OR OTHER MEANS NECESSARY TO ENSURE A SAFE SHARED USED OF THIS RIGHT OF ENTRY. 2. ALL WORK TO CONSTRUCT THE PROPOSED AERIAL CROSSING AND REMOVAL OF THE EXISTING AERIAL CROSSING SHALL BE PERFORMED IN THE DRY CONDITIONS UTILIZING A COFFER DAM AND STREAM PUMP AROUND WORK PLAN. 3. SEWER FROM SSMH BSE 0558 TO SSMH BSE 0557 INCLUSIVE OF PORTION THROUGH ENCASEMENT SHALL BE HYDROSTRATICALLY TESTED TO 150 PSI HELD FOR 2 HRS PER WATER MAIN TESTING REQUIREMENTS 4. STREAM CROSSING SHALL NOT HAVE JOINTS WITHIN TWO FEET OF BANKS UNLESS OTHERWISE NOTED. 5. CONTRACTOR SHALL SUBMIT A DETAILED SEWAGE BYPASS PUMPING AND CONSTRUCTION SEQUENCE PRIOR TO BEGINNING WORK. WORK PLAN SHALL ADDRESS THE FOLLOWING REQUIREMENTS: A. CONTRACTOR SHALL KEEP THE EXISTING SEWER IN SERVICE UP TO SSMHO559 AND UTILIZE IT AS A BYPASS PUMP LOCATION TO REFRAIN FROM HAVING TO ERECT A TEMPORARY AERIAL BYPASS PIPE CROSSING. B. CONSTRUCT THE PROPOSED SEWER INCLUSIVE OF THE AERIAL CROSSING FROM SSMH BSE 0559 TO A SAFE WORKING DISTANCE FROM EXIST SSMH 0557. C. INSTALL SECOND BYPASS PUMP LOCATED AT EXIST SSMH 0556 TO BYPASS FLOW AROUND EXIST SSMH 0557 TO EXIST SSMH SO IT CAN BE REPLACED AND THE EXISTING UPSTREAM SEWER RECONNECTED TO IT. D. PROPOSED SEWER AND MANHOLES BETWEEN PROPOSED MANHOLES BSE 0559 AND BSE 0557 SHALL BE TESTED AND OPERABLE PRIOR TO DIVERTING FLOW AND DISCONTINUING BYPASS PUMPING E. COMPLETE MANHOLE AND PIPE REMOVAL AND ABANDONMENT. UTILITY NOTES: 1. PIPE THROUGH ENCASEMENT AND FOR SUBMERGED STREAM CROSSINGS SHALL BE FACTORY RESTRAINED. 2. SEWER CROSSING STREAMS AND AERIAL CROSSINGS SHALL BE HYDROSTATICALLY TESTED TO 150 PSI. 3. SEWER CROSSING STREAMS SHALL NOT HAVE JOINTS BELOW STREAM CHANNEL (NORMAL WATER SURFACE ELEVATION) OR WITHIN TWO FEET OF BANKS UNLESS OTHERWISE NOTED. z 0 U U) z 0 U Ir 0 LL 0 Lu C LLIQ J W 0 z J z 0 W 0 0 - Lu W m 0 LL z Q J Q z LL �D KSON 1 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM INC LICENSE NO.F-0374 0*. �..AR0��� 0� 'v .y • SEAL 025490 '�i���'• GINE••• PROFESSIONAL SEAL 11-C13 WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: m DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 m p p� 0 z O O Z U) Q z C) Z z J 0 0 U) W 2 01: U U Z W0 LuO C) Q0-cr 01: U) W - oEr 0-Q z Q 2 z z z W m Q 0 Z W Co W LL cc _ LU 0W O Q C/) U w 2 z W J W �_ 0 C) O m J w a Q Ir � 0 11-C13 WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: m DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: Lu 0 z Z U) Q z Z z J 0 W 2 01: U U Z W0 J Q C) Q0-cr 01: W - oEr 0-Q z Q 2 z z z m Q 0 Z W Co W LL _ LU 0W O Q C/) U 2 z W J W �_ 0 C) O m J w Q Ir � 11-C13 WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C13 WKD PROJ. NO.: 20120031.11. RA i °w Z°oa FUO OJU ozw aoQ wwo 2F7 U= ,om ..o =�o F ozw F _o az Zoo oz wY ~0_ LL OYN waw D0c ,z< pm 2. pm ozz awl w¢¢ ¢�Z d�c7 _ w°o I w3a 0 �zw -o' Q°� UOZ z=w oZl. U -U z'w w yoF U°LL ❑oo §mz�=z oo� Fro �oF ow QU❑ CD u -W I cn _i(I J CD co 0 U - +I U CONNECT EXIST 24" VCP TO PROPOSED MH cn (SEE DET, DWG D1) cn SMH BSE 0444 f21M=505.83 INV IN=498.35 INV IN=499.05 INV OUT=498.33 CONNECT EXIST 24" VCP TO PROPOSED MH (SEE DET, DWG D1) ' I - BSE 0438 EXIST 68' 4' DIA FLAT TOP MH I PANEL 7969-07/03/07. ROBERTS BUD R JR BAKER MICHAEL WAYNE STA 1+25.24 I I I EASEMENTR m PROPOSED MH 901 CENTRAL AVE 905 CENTRAL AVE 1 _ I SMITH DENISE L 1 1 s I 4' DIA FLAT TOP MH DB ADM, PG COMB DB 1401 , PG 1405 '' I -- 1 r _ o I a m I o STA 2+75.43 PIN 797910355294 N 797910354,4-- 97910354.4 I I } I o- - I I RIM EL=516.58 I PROPOSED 8' CARRIER STREAM CROSS! G - 13 33" LT 1 � w I I A=26°53'48" RT PROPOSED PIPE W/50 LF16"x.025 THICK 11-S10, SEE DWG O. I II � o 20' PERMANENT STEEL ENCASEMENT BY D9 FOR CROSSING 2 U a p O 0 CITY OF EDEN 523 LF OPEN CUT METHOD REQUIREMENTS 1 ZD _ I J - �� UTILITY ESM _ �'�� _ SILT FENCE SMH BSE 0133 RIM=516.67 ±21 SY (TOTAL) PROPOSED MH m _ _ 1510 . - _� \�� _ _�_ _ ___ UNN INV IN=513.04 CLASS I gMEDTR� W � BSE 0444 O ~ J = _ --_----__�_____ INVOUT=513.02 RIP RAP BANK �qRy 5 DIA FLAT TOP MH Lu - _ I- �% /� =-- 8� - _--- �� _�� - - - -- = - _ �N 2 STABILIZATION _ ���� WEST ST OUTFALL STA 0+00.00 of DAN RIVER OUTFALL STA 31+1 6 --)SP % 15 Ni TB _ f r r r '7l7 - ����R AERIAL - ����\� r VCP CROSSING 514.36' r'rr% r rrrr rrrr rr', rrrr rr RIM E L=507.65 rrrr rrrrr rrr r rrrr frrf rri rrr rrr rrr rr r rr rr rrrr r r :r rr rr r r Y \ = TB = - v r.�. rrrr- rrr rr r r rrrrrrr r rrr ,� rrr rrr rrr rr rr r r rr rr rr rr rr rr rr rr rr r r r 7� r rr rr rr rr rr r r r r rrr rrr r� r r r r r r i r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r rr rrr rr rrr rrr rrr \ � � I r r rrrr rrr rrr r r rl r rrr r r r rr rrr rrr rrr rrr rrr rrr rrr \ rr r � r r rr rrr rrrr rri r rrio�r r , � .rrr r, rrr r rrr r r � $ r r r \rrr rrr rrr rrr rr rr r ', rr rr rr r r r rrr r r rr r yr r rr rr rr rr rr rr r r r r r r rr rr rr rr rr rr rr r r r r rr r, r, rr rr r,', r rrr rr rr rr r r r r / / � rr rrr r rr �r r r r rr rr rr rr rr r r r r r r rr rr rr rr rr rr rr rr r r K r - - 11-S 0 r rr rr rrr r lr rrrrr rrr rrr GRAVEL r rr ✓ r rrrr rr \ r r ✓rrrrr \ ��' r rr rr rrrr rr rr \rrr r r r r r r rr rrr r\rrr\ rrr rrrrr \ r rrr rrr rr, rr rr r rr � ,, rrr r rr r r, r ,rrr r r r r r rr rr r r r r r r rr rr rrr r r r rr rrr r ' Lu 6� r r r, r r r r r r J r r r r r r rrr r r f✓ � rr 5 , r r r rr \rrr rr rrr rrrr rrr rr r ��= -- --- �� r rrr rr rrr - - rrr rr rr rr r O \rrrr rrrr rrrrr�frr r r rr II \ U 513.25 67' 158 L Jrrar r SMH BSE 0370 2815.6 SY CP 513. p rrrrr,r (" AERIAL VF - Q I SILT FENCE i IPROPOSED MH MITCHELL BSE 0369 JAMES W INC 4' DIA FLAT TOP MH 141 S HAMILTON ST 1 FSTA 6+82.30 DB 1259, PG 1439 RIM EL=518.42 ±32 SY (TOTAL) PIN 797910352586 / A=08022'52" RT CLASS II SMH BSE 0369 RIP RAP BANK RIM=518.18 STABILIZATION / -INV IN=514.10 / INV IN=514.24 171 LF INV OUT=514.08 SILT FENCE �- 525 r / _,77, . rT r ' r r ✓ ;, , ` r � r / /w�ru rr rri r! � � rr/ r'rrr/ rri r `Z r�r�r `/ "f 0 r r SMH BSE 0162 5 i r, rrrr rrrrr rrr rr ii r _ r? rrr rr r rr rrr rr rr r,r'r RI M=522.94 r r r r rrr err ' , ri rri ` rr rri rr, r r ri rr rr ri rr rri ri r 1 1-S 2 r r --INV I N=516.29 r r r r r ! r, r rr r✓rr `r>rr,r r�O, INVOUT=516.18 r r 0.007 AC _ -_-- �✓ 1 CLEAR e - & GRU52� CONNECT EXIST \ 525 8" VCP TO STREAM CROSSING I PROPOSED MH r r r r r RIM -517 23 CLEANUP SEED BOSSING 2' 11-S2, SEE DWG NO. J (SEE DET DWG D1) CONSTRUCTION NOTES: 1. EXISTING BSE0132 IS ON OPPOSING SIDE OF CREEK AND / CAN BE ACCESSED FROM MCCONNELL AVENUE. CONTRACTOR SHALL SECURE BYPASS PIPING ACROSS STREAM IN CASE OF FLOODING CONDITIONS OR ELEVATED STREAM FLOWS. INSTALLATION OF BYPASS PIPE SHALL NOT DISTURB ANY PORTION OF THE EXISTING BANKS AN STREAM. HAND CLEARING OF BANK SHALL ONLY BE PERFORMED FOR INSTALLATION OF BYPASS PIPE. 2. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, >- 3 � rr,r r r "r� r- r zO C 513.6 � 51625' ' FLOOD INSURANCE RATE MAP -Z I LLrr: rrrrr rrr v DWG NO. 11-C27 O N I SMH BSE 0438 I FOR DAN RIVER I RIM=51 .36 I INV IN=510.36 PLAN & PROFILE i I INV OUT=505.31 UK I I Ibw E I I PROPOSED MH E# EXIST SMH BSE 0444 (BRICK) TO BE REMOVED 500 + I I I BSE 0438 I I I I o I 4' DIA FLAT TOP MH I PANEL 7969-07/03/07. W/ OUTSIDE DROP I STA 1+25.24 I RIM EL=514.50 I A=54°14'56" LT m I I \ PROPOSED MH _ I SMITH DENISE L 1 932 MCCONNELL AVE I DB 861 , PG 2308 .43' PIN 797910450774 r _ o I 1 m I o z O I I BYPASS PIPE I I } I I I CONNECT EXIST I I I I o I FOR CROSSING I I PANEL 7969-07/03/07. DRAWN BY: 6" VCP TO r AERIAL REQUIREMENTS 0 PROPOSED MH m I I I \ PROPOSED MH I I I PRP PROPOSED MH O I .43' 0162 1 � I TEMPORARY I m I z O m I I BYPASS PIPE Zp rri.. I I 1. CONTRACTOR SHALL NOT I I I r r �r� I I - 13 33" LT CROSS G I A=44'02'22" LT I O 0 U) II INV IN=511.69 INV OUT=511.59 1 I I & STRAW W/NET SEE DWG NO. 11-C27 FOR CONSTRUCTION ACCESS )KRIS BRENDA LAWSON 931 MCCONNELL AVE DB 839, PG 1531 PIN 797910358435 r CONTRACTOR SHALL PROVIDE BRIDGE MAT SEE \ (MIN 30 FT) FOR EQUIPMENT STREAM CONSTRUCTION rrr �f 1 NOTE 1 I EXIST SMH� \ CROSSING AND PROVIDE COFFER DAM & I BSE 0132 *r*r*rr�rh I PUMP AROUND TO MAINTAIN CONTINUOUS r� r+r FLOW OF STREAM AND PROVIDE A DRY 1 rr�r� CONDITION DURING INSTALLATION OF 1 MLCH LLC JONES rri SEWER PIPE, TYP (QTY 2)142 E MEADOW RD CHRISTINE FRANS \ DB 1495, PG 1134 912 MCCONNELL AV'; j PIN 797910356638 1 DB 760, PG 1251rrr¢r¢ \ TOLBERT DAVID MICHAEL ITI O ANGE 1 PIN 797910355774'�r¢¢r 923 MCCONNELL AVE 1130 OBERTS R�r �✓ DB 916,PQ 1 B 60, PG 522 0o'rr PIN 797 035 24 P N 7 79103566611 L � r ;d \ cn _ r Q 1 +I U) w I 1 REMOVE &REPLACEr 20 LF CONIC SIDEWALK rr 1 (OR AS NECESSARY) r*r *r / P -- - - r -- �- SCALE:1 "=40'SS-----SS----- SS- - - - -ss- - - - -ss .SS 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 SAFETY ZONE AS SHOWN ON I I THE PLANS. CONTRACTOR SHALL INSTALL A SAFETY FENCE AS SHOWN. SAFETY FENCE CAN BE SILT FENCE OR CONSTRUCTION BARRIER FENCE WITH SIGNS DISPLAYING SOU LORILEE SOUTH ORILEE LACEYI "DO NOT ENTER THIS AREA" AND 907 MCC LL AVE 907 CCONNELL AVE SECURED TO THE FENCE. I SIGNS SHOULD BE POSTED MIN. DB 1381 , P 1 1 B 1353, PG 90 OF EVERY 50 FEET. PIN 797910355 00 1 N 797910354804 2. THE CONTRACTOR SHALL BE cn RESPONSIBLE FOR MAINTAINING Lu 0 ALL POWER SAFETY REQUIREMENT HORIZONTAL 2 L I AND VERTICAL CLEARANCES AS 511.6 SY I 1 MANDATED BY DUKE ENERGY AND OSHA. THE MORE CLEANUP, SEED ` 1 CONSERVATIVE SEPARATION & STRAW W/NET' REQUIREMENTS SHALL GOVERN. MINIMUM CLEARANCES SHALL ALSO INCLUDE MAXIMUM SAG. --A CONTRACTOR SHALL ------ -- COORDINATE WITH DUKE ENERGY AS MAXIMUM SAG z MCCONNELL AVE MUST BE CALCULATED FOR o EACH SPECIFIC LOCATION _ z 3. ANY TREES REMOVED AROUND Lu TRANSMISSION MAIN MUST BE U o CLEARED BY A CERTIFIED w = � Q ELECTRICAL TREE REMOVAL m 532 CONTRACTOR. = O = > cv 6' _ 4. CONTRACTOR SHALL 2 H LD O q N COORDINATE WITH PROGRESS/ z 0 Q p cN.i `il' DUKE ENERGY ENCROACHMENT Lu `i' w � REPRESENTATIVE PRIOR TO O a Q Q J LL 00 w I- p CONSTRUCTION IN PROGRESS/ U m o - m < � w z 528 DUKE ENERGY EASEMENT TO a_ � � °6 c E - VERIFY LOCATION OF POISE/ GROUNDING GRID. o CONTRACTOR SHALL BE LL RESPONSIBLE FOR Q REIMBURSING PROGRESS/ DUKE Lij n 524 ENERGY FOR THE COST OF ANY EXIST SMH REPAIRS IN EVENT POISE/ )E BSE 0162 GROUNDING GRID IS DAMAGED La SED (BRICK) TO BE DURING CONSTRUCTION. REMOVED DISCOVERY OF POISE/ J ±32 SY CLASS II GROUNDING GRID SHALL BE W RIP RAP 520 COMPENSATED BY ALLOWANCE. 5. ACCESS TO ELECTRICAL FACILITIES MUST BE o APPROX _ _ MAINTAINED AT ALL TIMES. AN z OHWM = 517.56 - - _ UNOBSTRUCTED, LEVEL AND 30 FOOT WIDE ACCESS WAY MUST 516 BE MAINTAINED ADJACENT TO J AND UNDERNEATH THE z 1.00% OVERHEAD CONDUCTORS AND o LF 8" RJDIP TO EACH TRANSMISSION STRUCTURE FOR PROGRESS/ (n 512 DUKE ENERGY TO PERFORM W ROUTINE MAINTENANCE AND (n CONNECT EXIST 8" VCP EMERGENCY REPAIR. O TO PROPOSED MH 6. REFUELING OF EQUIPMENT O_ (SEE DWG, DET D1) INSIDE PROGRESS/ DUKE rr ENERGY EASEMENT IS 508 PROHIBITED. UTILITY NOTES: 7. CONTRACTOR SHALL NOT USE PROGRESS/ DUKE ENERGY EASEMENT FOR STOCKPILING 1. PIPE FOR SUBMERGED STREAM OR STAGING. W CROSSINGS SHALL BE FACTORY 8. CONTRACTOR SHALL ADHERE > RESTRAINED. TO ALL OSHA MINIMUM W 504 APPROACH REGULATION AS 2. SEWER CROSSING STREAMS DEFINED IN OSHA 1910.333 AND SHALL BE HYDROSTATICALLY OSHA 29 CFR 1226.1407-1411 TESTED TO 150 PSI. (OSHA 29 CR 1226.1407-1411 0 APPLIES TO USE OF CRANE OR LL 3. SEWER CROSSING STREAMS 500 DERRICK). r SHALL NOT HAVE JOINTS BELOW 9. CONTRACTOR SHALL R STREAM CHANNEL (NORMAL COORDINATE WITH DUKE z WATER SURFACE ELEVATION) ENERGY ASSET PROTECTION OR WITHIN TWO FEET OF BANKS RIGHT-OF-WAY SPECIALIST A UNLESS OTHERWISE NOTED. MINIMUM OF 72 HOURS PRIOR Q 496 TO BEGINNING WORK OF THE SEWER CROSSING OF THE Q u CO I- Nt N TRANSMISSION RIGHT OF WAY. °r° 00 00 cN 10. THE TRENCH SHALL BE J "' � "' "' COMPLETELY BACKFILLED AT Q THE END OF EACH WORK DAY. z 8+00 9+00 Fl- �D KSON 1 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 too /off .y ` � 9 a SEAL 025490 '�i���'• G I NE,,. W.. F I S.';�P PROFESSIONAL SEAL CONNECT EXIST r 'D9 r FOR CROSSING I I PANEL 7969-07/03/07. DRAWN BY: 6" VCP TO r AERIAL REQUIREMENTS m PROPOSED MH >r rrr Vc'P rrn.cci I 1 \ PROPOSED MH (SDWG D1) EE DETBSE rrlrr 0.1 AC ~Krr 518BSE PRP PROPOSED MH O 0133, \ .43' 0162 1 PROGRESS/ DUKE ENERGY NOTES: 4' DIA FLAT TOP MH I TEMPORARY I fCLEAR ry r &GRUB 4' DIA FLAT TOP MH z O STA 5+33.25 I BYPASS PIPE Zp rri.. STA 8+58.17 I 1. CONTRACTOR SHALL NOT RIM S \ I I r r �r� RIM EL=522.02 ENTER DUKE ENERGY'S 25 -FEET - 13 33" LT CROSS G r + A=44'02'22" LT r CONTRACTOR SHALL PROVIDE BRIDGE MAT SEE \ (MIN 30 FT) FOR EQUIPMENT STREAM CONSTRUCTION rrr �f 1 NOTE 1 I EXIST SMH� \ CROSSING AND PROVIDE COFFER DAM & I BSE 0132 *r*r*rr�rh I PUMP AROUND TO MAINTAIN CONTINUOUS r� r+r FLOW OF STREAM AND PROVIDE A DRY 1 rr�r� CONDITION DURING INSTALLATION OF 1 MLCH LLC JONES rri SEWER PIPE, TYP (QTY 2)142 E MEADOW RD CHRISTINE FRANS \ DB 1495, PG 1134 912 MCCONNELL AV'; j PIN 797910356638 1 DB 760, PG 1251rrr¢r¢ \ TOLBERT DAVID MICHAEL ITI O ANGE 1 PIN 797910355774'�r¢¢r 923 MCCONNELL AVE 1130 OBERTS R�r �✓ DB 916,PQ 1 B 60, PG 522 0o'rr PIN 797 035 24 P N 7 79103566611 L � r ;d \ cn _ r Q 1 +I U) w I 1 REMOVE &REPLACEr 20 LF CONIC SIDEWALK rr 1 (OR AS NECESSARY) r*r *r / P -- - - r -- �- SCALE:1 "=40'SS-----SS----- SS- - - - -ss- - - - -ss .SS 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 SAFETY ZONE AS SHOWN ON I I THE PLANS. CONTRACTOR SHALL INSTALL A SAFETY FENCE AS SHOWN. SAFETY FENCE CAN BE SILT FENCE OR CONSTRUCTION BARRIER FENCE WITH SIGNS DISPLAYING SOU LORILEE SOUTH ORILEE LACEYI "DO NOT ENTER THIS AREA" AND 907 MCC LL AVE 907 CCONNELL AVE SECURED TO THE FENCE. I SIGNS SHOULD BE POSTED MIN. DB 1381 , P 1 1 B 1353, PG 90 OF EVERY 50 FEET. PIN 797910355 00 1 N 797910354804 2. THE CONTRACTOR SHALL BE cn RESPONSIBLE FOR MAINTAINING Lu 0 ALL POWER SAFETY REQUIREMENT HORIZONTAL 2 L I AND VERTICAL CLEARANCES AS 511.6 SY I 1 MANDATED BY DUKE ENERGY AND OSHA. THE MORE CLEANUP, SEED ` 1 CONSERVATIVE SEPARATION & STRAW W/NET' REQUIREMENTS SHALL GOVERN. MINIMUM CLEARANCES SHALL ALSO INCLUDE MAXIMUM SAG. --A CONTRACTOR SHALL ------ -- COORDINATE WITH DUKE ENERGY AS MAXIMUM SAG z MCCONNELL AVE MUST BE CALCULATED FOR o EACH SPECIFIC LOCATION _ z 3. ANY TREES REMOVED AROUND Lu TRANSMISSION MAIN MUST BE U o CLEARED BY A CERTIFIED w = � Q ELECTRICAL TREE REMOVAL m 532 CONTRACTOR. = O = > cv 6' _ 4. CONTRACTOR SHALL 2 H LD O q N COORDINATE WITH PROGRESS/ z 0 Q p cN.i `il' DUKE ENERGY ENCROACHMENT Lu `i' w � REPRESENTATIVE PRIOR TO O a Q Q J LL 00 w I- p CONSTRUCTION IN PROGRESS/ U m o - m < � w z 528 DUKE ENERGY EASEMENT TO a_ � � °6 c E - VERIFY LOCATION OF POISE/ GROUNDING GRID. o CONTRACTOR SHALL BE LL RESPONSIBLE FOR Q REIMBURSING PROGRESS/ DUKE Lij n 524 ENERGY FOR THE COST OF ANY EXIST SMH REPAIRS IN EVENT POISE/ )E BSE 0162 GROUNDING GRID IS DAMAGED La SED (BRICK) TO BE DURING CONSTRUCTION. REMOVED DISCOVERY OF POISE/ J ±32 SY CLASS II GROUNDING GRID SHALL BE W RIP RAP 520 COMPENSATED BY ALLOWANCE. 5. ACCESS TO ELECTRICAL FACILITIES MUST BE o APPROX _ _ MAINTAINED AT ALL TIMES. AN z OHWM = 517.56 - - _ UNOBSTRUCTED, LEVEL AND 30 FOOT WIDE ACCESS WAY MUST 516 BE MAINTAINED ADJACENT TO J AND UNDERNEATH THE z 1.00% OVERHEAD CONDUCTORS AND o LF 8" RJDIP TO EACH TRANSMISSION STRUCTURE FOR PROGRESS/ (n 512 DUKE ENERGY TO PERFORM W ROUTINE MAINTENANCE AND (n CONNECT EXIST 8" VCP EMERGENCY REPAIR. O TO PROPOSED MH 6. REFUELING OF EQUIPMENT O_ (SEE DWG, DET D1) INSIDE PROGRESS/ DUKE rr ENERGY EASEMENT IS 508 PROHIBITED. UTILITY NOTES: 7. CONTRACTOR SHALL NOT USE PROGRESS/ DUKE ENERGY EASEMENT FOR STOCKPILING 1. PIPE FOR SUBMERGED STREAM OR STAGING. W CROSSINGS SHALL BE FACTORY 8. CONTRACTOR SHALL ADHERE > RESTRAINED. TO ALL OSHA MINIMUM W 504 APPROACH REGULATION AS 2. SEWER CROSSING STREAMS DEFINED IN OSHA 1910.333 AND SHALL BE HYDROSTATICALLY OSHA 29 CFR 1226.1407-1411 TESTED TO 150 PSI. (OSHA 29 CR 1226.1407-1411 0 APPLIES TO USE OF CRANE OR LL 3. SEWER CROSSING STREAMS 500 DERRICK). r SHALL NOT HAVE JOINTS BELOW 9. CONTRACTOR SHALL R STREAM CHANNEL (NORMAL COORDINATE WITH DUKE z WATER SURFACE ELEVATION) ENERGY ASSET PROTECTION OR WITHIN TWO FEET OF BANKS RIGHT-OF-WAY SPECIALIST A UNLESS OTHERWISE NOTED. MINIMUM OF 72 HOURS PRIOR Q 496 TO BEGINNING WORK OF THE SEWER CROSSING OF THE Q u CO I- Nt N TRANSMISSION RIGHT OF WAY. °r° 00 00 cN 10. THE TRENCH SHALL BE J "' � "' "' COMPLETELY BACKFILLED AT Q THE END OF EACH WORK DAY. z 8+00 9+00 Fl- �D KSON 1 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 too /off .y ` � 9 a SEAL 025490 '�i���'• G I NE,,. W.. F I S.';�P PROFESSIONAL SEAL WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: AMH DRAWN BY: AMH PROJ. DATE: Q m = W o p o z O O � Q � a z W O Z O 0 U) z � o 2 U p O 0 U = o J m � � C) W W � Z J 2 Z Z J Q Lu W W LL Z 00 LU cc D 0 0 O W W CC ~ F- w 6i U li.i 2 z W 0 _j � w W C) z a 0 m < 0 WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: AMH DRAWN BY: AMH PROJ. DATE: Q DRAWING NUMBER: 11-C16 = W o cr o + � Q � a z O Z O z W � o 2 U + 0 U = o J m � � C) W W � Z J 2 Z Z J Q W W LL Z 00 LU D 0 0 O W W CC ~ F- Q 6i U li.i 2 z W 0 _j � w W C) z 0 m < WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: AMH DRAWN BY: AMH PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C16 WKD PROJ. NO.: 20120031.11. RA 21 0. w 000 �JU a0¢ 'OD woo gra 0mw U= p0m 0. F.o w ozw -o az 0 ZZU Dom =UQ ro� OY� w3� moo, zwa ° 0, P: a ozz 0 w 0 wa =3:z o -E wog 0 w,X mZ3 wg o � �0< awe zo w �D oZD U -U ZZD W2 °R_ Y R H UQw poo YQ N 410 0� 0 =Zw �o? 0.,o UU 0E \ 1co \ I I I I I I II I I I I I I I I III I I I \ \ \ \ \ \ \\ \ \ \ \\ \� \ \\ \ \ \\ \ \\�� \\� / \\ \� Id�ST \ III I I III I I I 11 I I���� /- \ I °C I w III III III IIIIII I I I I Lc) ��- x I I I �, \ \ \ \ \ \ \ _ \ \ \ \ I- - I o�W III I � I I I III I I I I I I I I I \ \ \ \ \ \ � \\ \ - �� \\ \ / � \ p 5�9 � - - cy)m co a=°� III I I I III II")I II I I I I I I I \ \ \ \\ \ \\ \ \-__ _ \\\ I \, \ 9 90 A-% M = I a w I I I I I I I I I I I I III I I I s� \ \ \ \ \ \ \ \ \ \ _ _ - - 5s' - ; \ \ / EXIST SMH -\ +'� I 1¢N I III I I I I� I I I I I I I I \ \ \ \ \ \ \ \ \ \ \ \5_ \ Seo \\ \ / I \ \ BSW 0089 I I I I I I I I I III I I I I I I I I \ \ \ \ \ \ \\ �\ \\ \ _----____ �/R - �E I I I I I III I I tol I I I I I I I I I I I I I \Z�C\HR TFCD \ \ \ \\ \_ _\ - \\\\\ \\ \� \ `___ '-- � �R T 1 I I I I I I I I I I III I 1 I \ 444\OAKL'EY 560 _ _ = \\ I I I I III I I I I III I I I I I I l \ \ DB 1475, P 928 \ �\ \\ ss \\ �___---___----------__ \\� \\ \ \ \`/� \ s� \ \� _580_ �-�-- ' I I I III I IIIIII I II \� \ PIN 7q696877PROPOSED ------------ p �g g� 20'PERMANENT �� \ - - - -\ \ \ \ \ \ / \ \ _ I I I I I I CITY OF EDEN I I I \ \ \ \ \ _ ------ \ \ \ \ \ AM RY Y I I I I I I i UTILITY ESMT\\\\ \ \ I O Lu a Ij >' 0 > \ \ \ IZABETFh lRDD�'\ w aD6S 13ST� ----- I a0UJ\ \ --- z 2 I I II I a I/I I I 112 SY OF HEAVY DUTY \ \ - - - - _ - \ \ \ \ \ \ \ I d \ 799�9fl 972$00 \ \ \ - o I I I I I I I I I CONSTRUCTION RIG MATTING \ \ \ / \- I I I I I I I I I I I co (RATED FOR600PSI) -_-----PLJL�IAII/LMAR_ir---- \\\ \ X ---- / I I I I II I I I I I - = ELIZABETH RIZR - _ \\ \ \� \ / \ \ \ \ \ \ /- / / I I I I I I 38 SY OF HEAVY DUTY - - - _ NEAREST FIRE HYDRANT 1 / / I \ \ \ _ - - - - / `o I I I I I I I I I CONSTRUCTION RIG MATTING -- _ - - - - - - --132�SMiTkI \ \ \ \ - - _ - - - - - - - LOCATED APPROX. 460LF � \ \ I I I1 - �B 09E -PG -48 \ - - - (RATED FOR 600PS1) REINFORCED - - I - _ , _ AT THE SE CORNER OF I I III I I \ \ WITH WOOD MATTING SUBGRADE - -PtN T969�0887�77�4 \ \ ROBIN RD. & SMITH ST. I I �/ \\\ \ \ \ \ _ �� --ST-lOA C LIGHT - / I I I I \ \ \ \ \ THROUGH WETLANDS 436 SY OF HEAVY DUTY - \ I I (� \ \ �HI��TH�TJ�UST � _ - \ _ T3"ORD9 00) EXIST SMH I? I I 1 \ \ \ \ \ \ CONSTRUCTION RIG MATTING - \ \ I I/ \ \ \ \ 1330 T� - - - - -M806-,-PG-�00 / BSW 0102 I� I \ \ RATED FOR 600PS1) \ \ \ EXISTING ±12' I I \ \\ \ D 5 ,PCC 6 - - - to \ \ \ \ \ ( \ \ \ COE ESMT I \ _ - - - - PJ1�179690$999co1-1 I I N L 6908 7-2 17 -_ - - - ,N m I O 1 "' V \ \, \ �\ . \ 1 ACCESS GATE _- c') PROPOSED \ \ \ \ \ \ _ \ \ \ I \ , \ \ �\ \ \ \ _ - - 848.80 SY S H BSW 0340 W 1 \ 1 - I � \ \ \ \ - I \ \ LIMIT OF DISTURBANCE I 38 SY OF HEAVY DUTY \ 7� _ CLEANUP P RIM=516.s5 20' PERMANENT \ RESTORE DAMAGED - I \ / �\ \ \ , - - & SEED O�� O Z + - DISTURBED AREA= 0.44 AC I I - I li INV IN=511.68 0 CITY OF EDEN �o \ \ \ \ \ EA roFEN WI kl - PROPOSED / CONSTRUCTION RIG MATTING INV IN=511.08 I UTILITY ESMT o �� \ \� W/STRAW Q J m INV OUT=511.08 W ` �\ E�LANDISE MI ' I I I ISI (RATED FOR 600PS1) REINFORCED _ _/I \ 0 QZO/ O O /53.44 SY El-- \ ) �I I WITH WOOD MATTING SUBGRADE - 86 N SITUOLINING 8+� 555 � I THROUGH WETLANDS I TEMPORARY / u 1+ CONSTRUCTION _ EXISTING y \ I ` 0 �� \ \ \ \ \ \ \ \ PROPOSED I I ` - - - - - WETLANDS \I \ \ \ \ 403.3 LF OF RESTORE DAMAGED _ � ENTRANCE, TYP --7-- 403 +- _ _ - - _ o (BSW-4), 11-W \ \� �\ „ 1 \ _ I - _\ 550 TEMPORARY \ �0�+�0 \ 8 IN SITU LINING \ EASEMENT WITH _ _ - > ( \ \ WETLAND SEED MIX _ _ - - _ ; IMPACT= � �'� �� � � �` \ \ � \� \ 0.002 AC) I II ` \ \s \\ 1087.74 SY \ (63.50 SY) _ ° _ I -545 - - // // / _ e 0O ,5. CLEANUP + "'O 3+00 &SEED PRO\ 200.1 LSED F _+60--- - W/STRAW \ co 8" IN SITU LINING 540- / 1 \ \cn \\ '' �'i'i'ii \ ---- ------ � ii B _�Gj� / i I 4. I� I \\ - - -- --- _-- B BB _ _ w \\ \ \ 4+00 _ iii iii 53--- T� / 41 i i'i'i ii i i i / jam- - BB.-�C SMH BSW 0311 /� Z_ \ \ O \ / \ \ i 'i i \ \ - - - - iii 0y 8'/ , \ i RIM=549.97 ��\ i i \ 7 \� i �/ i INV IN=543.46 REST RE DAMAGED I / �� �/ _ � / � - \ � � / ,�� INV IN=543.77 - �6EXISTING WETLAND ",', , , , , 1 y es 395 SY OF HEAVY _ _INV OUT=543.39 / U i SMH BSW 0085 E EMENT WITH v� Ai ",' , y - / / f- 2 � y � � � - BOUNDARY (BSW-3), , , , , J\� / RIM=539.78 � � DUTY CONSTRUCTION / / / Q WETL ND SEED MIX �' i i (r) "''� %/ - - I I \ � �� � � i i - (TEMPORARY IMPACT= N , �,'�4 � � � � 68 i % � / / �� D� // INV IN=535.97 � RIG MATTING (7.60 SY) i� t� O / �c3� \ 6) / _ _� 0.01 AC) \ \ ' '' �' ' 9 ` �� ! /� INV IN=536.26 \ (RATED FOR 600PS1) vV� / / ��� - - _ - \\ 910 LF \ INV OUT=535.90 EXISTING WETLAND - f /� \ SILT FENCE o 9y 6 i BOUNDARY BSW-2 �SiV�Wf PAMELA E 55 / PROPOSED I I �j / i / - \ \ P WI AI �' Q /� / / WIJVN RAA�GIE� _ \ SMH BSW 0310 530 -vP� \- ( ), % \ PAy�KLANb 1 20' PERMANENT �� (51 -/ /y/ / 13�9'HIL-tSID DR= - RIM=531.64 �R\6vGREE�� �� �i �� TEMPORARY IMPACT= �- i i' / _ - \ \ PARTM`E /I T CITY OF EDEN �, I / // / - - - - -� �� - - al -= as=_���oet- INV IN=526.35 NNPMMoN� 9y % B8/ �� // //��� (/ S1VI1�#S'� / i - Y / u, I ,p / / 'DB�O--PG-131-9 - - - \ v PSR 0.01 AC) k / \ 9td AJ UTILITY ESMT / I i j%� / //% / / -� �-4 A _z �� _ _BB = g� \a INV OUT=526.09 �pM j� ��� / i 61'112 ; FSG 70� - / _ - \ \C/ N�ATKI!'tl� s� // / / ,IN1j7�96 1'z 7S3 6 - - = -__ - ` ,� el _ 9y e� ,% y �� Pla796J1AW2b'I'r - \ \ GOMP� / //-_ 2 KL' c� // �� j-�`� _� -__ _- =-8g�� G !%�%����%��j� ��� �� ���RARDIN�Z\ \PIN 9�129,75 9�/ \ / / �ht@'dFl Fm 51A o 51A SIMITH ST \ / // -56 DB 1�2�PG152 \ ---� �a� Til -ST- \\ / / /� c�'/ / / /'/ o� ^ F-540- _ - - _ _ _ - _ - / ���DB-TO -, 8z �PtN�7 19%3228 ��� \ / \ I `n CA�1 �4 / / �/ i i / i i PFN7969 72458- ' 540 536 532 528 524 520 516 512 mim az ap O p0 - pp0 O 00 00 co Co O r r L!7 II Lo w 536 + 556 I- o w F- z z 0 EXISTING GRADE c� Q w- O U) Q 2z- > > > (BASED ON LIDAR) X 1 -- Lu z_ z_ w U) E> z z z ALONG EXISTING w to IY SANITARY SEWER SEE NOTE 1 532 I 1 II 552 EXISTING GRADE (BASED ON LIDAR) a2 0) co co co u') Lo Lo F II II D zzO zzz EXISTING I I ALONG EXISTING I I MANHOLE (BRICK) Ln w SANITARY SEWER 100 YR FLOOD TO BE REHABILITATED o z z SEE NOTE 1 ELEV.=528.2 _ , REFER TO SPEC , , 528 548 CD bo bo C) SECTION 33 01 37 � N r` - rn N Lo EXISTING 00 Oi / r o coLo Lo Lo MANHOLE (BRICK) / i U -i Lu z z TO BE REHABILITATED W Q z > > REFER TO SPEC 524 544 w v~i > z z z SECTION 33 01 37 Q ' PROPOSED / EXIST U 200.1 LF OF �� GAS LINE 8" IN SITU LINING o ' _ so � 520 540 265���/ PROPOSED PROPOSED 265.4 LF OF 403.3 LF OF 8" IN SITU LINING 8 IN SITU LINING I I 516 536 I-' EXISTING TLJ MANHOLE (BRICK) TO BE REHABILITATED 111�F Oi R�jI REFER TO SPEC I I 20�i Q Cj� SECTION 33 01 37 EXISTING MANHOLE I� (BRICK) TO BE 512 53� I REHABILITATED H REFER TO SPEC SECTION 33 01 37 SCALE: HOR 1 "=40'; VERT 1 "=4' SCALE: HOR 1 "=40'; VERT 1 "=4' 0) 00 I,- co (fl u') rl- O 00 O 0) 0) r- (fl N C0 O u') r-- Lo 0) OD 0) 07 ti ti 0) � ti 0) CV c7 C0 r� 0) ~ OO Ln 00 00 � N ~ 00 O Lf) ~ N 00 07 6 co � 00 00 oi O N It Lf) co 00 0) O M N co co M Lo co rl- M O co Lo LC) Co Cfl 00 0) O Oo N N N N N N V) N N M M co co � M M co V) I- It Lr) Lo Lf) Lo Lo Lo Lo Ln Lo Lf) Ln Ln Lo L() L() Lf) Lo Ln u') Ln Lo u') Ln u') Lo Lo Ln -0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 560 556 552 im 9+00 544 540 536 532 528 NOTES: 1. LIDAR CONTOURS ARE APPROXIMATE AND ARE SHOWN TO PROVIDE APPROXIMATE DEPTH OF EXISTING SEWER. WHERE EXISTIN MANHOLES ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH PAVEMENT OR EXISTING GRADE. 2. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD ARE (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. Z O U D U) Z O U m O LL 0 W U) LuQ J W H O Z J Z O W W O 0- cr D 0- W W m Er O LL 6 Z Q 0 Z LL WK DICKSON communit infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 G O♦O��` C A ROS ♦♦♦���FESS ���: A •Q SEAL 025490 PROFESSIONAL SEAL m p z O O Q °C ccW Lu0 U) > W 0= Lu a 0 IIIIIIIIoz Q W O Z Q + Q Z J O Z z O W IIY p 2 Q O Z W U + O U O Q 0-< Q 10 W Oz C/)W T Z Z J fr Q10 LL Z 00 W W LL 0 0 W O O W W � 0 F-L]Ij Z W z � � � H _ CD Lu z O m Q CE 0 PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C19 WKD PROJ. NO.: 20120031.11. RA w Ow 000a FUo IJV pzw ao¢ zoo �m= V=� 00. ya0 =�o w oZw F -o oN w00 °� U Z °Om wY, _Q U oY� DLLw 0 =wz o.w .0 ozz o w 0 w¢< ¢3:Z wD� >0o 0 w.Z w3a =a� oZw Y ¢o¢ ao� VOz ?=w oZ= U -O z zz w yUH ,o Y .'< §=z oo� 0 =Zw Ro' ¢F awlo oow m 596 592 • •, :E 576 572 564 -- 7,� N�EEKS JESSE G-- - \560 BE'E\CHWO06�LN \ \ ?B 1243\, PG 240 --T \ PIN 79790084283 / / \ \\ \�\ ADO / ��^^ _ vJ \ \ M ERS JESSE o � o \ \\co 552 EEC P� "gym co a��p��� \ 12 , PG +��2 r� PIN 79790508'437$ / \ SEE NOTE 2 LEA D D \ \ /\/ \ EXIST SMH 1203 ROBINWRD / % \I�QEE \ JESSE BSW 0023 / / - D 1424'; PG 2� 9 / \ / / 556 BEE FOOD N P 79�790w0$2 80\ DB 1 3, PG 24 LIMIT OF DISTURBANCE \PIN 7 7905084 0 DISTURBED AREA= 0.06 AC TEMPORARY / / / �/ � \ EXIST SMH CONSTRUCTION / / / \ \ CONNECT EXIST Bsw 0227 ENTRANCE, TYP � / 8" DIP TO - - EXIST SMH / \ \ PROPOSED MH R SS\ \ BSW 0006 / o (SEE DET, DWG D1) � 82.2 SY SEE NOTE 2 ASPHALT >r �/ MILLING AND z PROPOSED SSS / / PROPOSED OVERLAY PER m 232.2 LF OF 20' PERMANENT DETAIL SHEET D4 O 8" IN SITU LINING / CITY OF EDEN IH SW 0009 / UTILITY ESMT R M=583.53 00 145 LF / INV N=575.44 - SILT FENCE / 2p+40\ INV N=575.31 =575.04 W. -M Imo _ _ © / // / r STREAM CROSSING REMOVE 11-S3, SEE DWG NO. & REPLACE D9 FOR CROSSING 22.6 SY REQUIREMENTS EXIST ASPHALT, / PAVEMENT PROPOSED TEMP ROCK PIPE INLET SEDIMENT TRAP, TYP (QTY 2) PROPOSED MH BSW 0715 / / 4' DIA FLAT TOP MH o/ / / STA 21+98.24 �/ RIM EL=583.10 / A=24°59'09" LT 23+� a co / 135 LF SILT FENCE N / W° -Y ��`ia✓ 295.4 LF 8" VCP TO BE ABANDONED, PLUG EA END & GROUT FILL ±79 SY CLASS I RIP RAP BANK STABILIZATION 666 PROPOSED MH BSW 0349 4' DIA FLAT TOP MH STA 24+47.61 RIM EL=585.96 A=17°35'57" RT HAYDEN ROBERT W C/O ROBERT W HAYDEN DB 1382, PG 1781 PIN 797905088464 ±13 SY CLASS I RIP RAP BANK STABILIZATION STREAM CROSSING CONTRACTOR SHALL REMOVE 30 LF (OR AS NECESSARY) 8" VCP TO PERFORM NEW SAN SEWER INSTALL EMOVE & REPLACE 696 11-S9, SEE DWG NO. ±6 LF (ORAS NECESSARY) D9 FOR CROSSING 15" RCP W/PIPE COLLAR REQUIREMENTS , p ^ 1855.24 SY 5g �Q���� CLEANUP SMH BSW 0349 J V� & SEED RIM=585.96 �� �� W/STRAW INV IN=578.47 Q �O INV OUT=578.45 ��/�Q� SMH BSW 0349A 20 LF 8" VCP ��5� 690 RIM=590.19 TO BE REMOVED 2 .COQ J �O INV IN=583.48 26+oo INV OUT=583.43 2+00 ,WWW�� uj 27+ S � 1, / r r f/r r/ / rr rr r/ r rr r /� r r r/ r r r ,✓ t _ `b - �S / r rr r / r r / �gp / _ _ rrr r rr r rrrrr//rr i / 5 ❑ ❑ ❑ 5 - J� gR �G, 313.81 SY - - �i / / EI zos Y $S. - r r/ // rrr rrr / frr /rr rr rrr rr / rr rrr rrr ° STONE g� PIPE PLUG, Rp O l O � � 590 No CLEANUP / TYP OUTLET, TYP & SEED - - 1 l PROPOSED ` / r / /// /rr/rr/rrrrrr 157 L F CONNECT EXIST r, r, r / / r r 153 LF TEMP ROCK 77 W/STRAW / / / 190.6 LF OF _ - 8" VCP TO to r, /r/r r r r/rr/r,/r//rr/rrrrr/r/ r o n o SILT FENCE SILT FENCE PROPOSED - - 8" IN SITU LINING - - - rrrrr m SILT CHECK, 595 20' PERMANENT - - PROPOSED MH ° PROPOSED MH CIO SMH BSW 0025 SEE DET, DWG D1 ° 5gp CONTRACTOR TO UTILIZE BRIDGE MAT TYPE B, TYP (� CITY OF EDEN / RIM=579.99 585 ( ) ` a/ FOR EQUIPMENT STREAM CROSSING BSW 0349A - --� - - _ i TEMPORARY EXISTING WETLAND 4' DIA FLAT TOP MH UTILITY ESMT / / INV IN=572.43 - - -_ EDEN / LIMIT OF DISTURBANCE AND COFFER DAM &PUMP AROUND TO O L-1� / o o �� - INV IN=573.41 - -__/CONSTRUCTION BOUNDARY (BSW-8), STA 26+72.93 O INv ouT-572.35 _ PRESERVATION ENTRANCE, TYP DISTURBED AREA= 0.38 AC MAINTAIN CONTINUOUS FLOW OF04 SY OF �� �/ / _ _ - - (TEMPORARY IMPACT=� RIM EL=590.19 + /` STREAM DURING INSTALLATION OF ►\l HEAVY DUTY / _ _S TIS PROPOSED MH i SEWER PIPE, TYP QTY 2 0.02 AC) I A= 02°22'14" RT �y - � CONSTRUCTION / C -Y' / _ - �O���NNETH R I �O � STICKE�L� J � BSW 0009 i i/ � ( ) 1 I u 600 _1211 LAWS�}Pd Sr- 4' DIA STD MH \ RIG MATTING / / / f- -6B 1432�P6 122 V (� (RATED FOR 600PS1)/ / DB 1413, P� 1.025 P� X9050841 / STA 21+48.24 j �� i , PROPOSED W m/ 797905082086 _ - - RIM EL=585.01 i / 20' PERMANENT - z SEE NOTE 2 / / r / - / / i CITY OF EDEN j / O / o/ ILLARD-AL-V _ - - / PERKINS E ETHA JONETTA UTILITY ESMT 1q��F EXIST SMH co Ali 20 - 1135 WSON ST WA REN MATT EW LEE JOH HAROLD I � / TO BSW 0007 / . / ,5 LAWSON ST _ _ _ I - DB ACC PG CHANGE 1127 LAWS NST Q ��1 // // � PIN 79 2 � P 8 04 /� ELISSA _ _ � � � � � � � � � PIN 7 905087113 � B 1492 , P 1063 � 1123 L WSON ST � � j 1203 LAWSON _ i PIN 79 905180214 EI 206 EE NOTES -- - - D61351 PG 0 - PIN 7979050 9231 S 5 8 3 �� HOU SFR J11 l SCALE:1 40 - - EIR oa 596 592 • ., :c 576 572 564 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 1. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF BANK DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN ALL WORK DOWNSTREAM IS COMPLETED, PROVIDE SILT FENCE ON TOE OF SLOPE. (EA SIDE OF BANK AND/OR PERM FORD). 2. ROAD RAMPS SHALL BE USED ALONG BEECHWOOD LN. FOR PURPOSES OF BY BYPASS PUMPING. BEECHWOOD LN. MUST REMAIN OPEN TO TRAFFIC. 3. CONTRACTOR SHALL ADHERE TO TRAFFIC CONTROL REQUIREMENTS IF CONTRACTOR ELECTS TO CLOSE ROAD AT OR NEAR SSMH BSW 0023 FOR CIPPL AND REPLACEMENT OPERATIONS. ACCESS TO {INSERT ADDRESS POINT} SHALL NOT BE IMPEDED B ROAD CLOSURES. SEE DWG NO. 11-G3 FOR TRAFFIC CONTROL GENERAL NOTES 4. CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES. CONTRACTOR SHALL PROVIDE DETAILS OF PUMP AND PIPE ARRANGEMENT TO MAINTAIN TWO WAY TRAFFIC AND TO MAINTAIN ACCESSIBILITY FOR PEDESTRIAN TRAFFIC. CONTRACTOR SHALL PROVIDE TRAFFIC RATED RAMP FOR BYPASS PIPE AND BARRICADE PUMPS T O ENSURE SAFE TRAFFIC FLOW AROUND WORK AREA. CONTRACTOR SHALL PROVIDE WARNING SIGNS IN ACCORDANCE WITH MUTCD INDICATING MOTORISTS OF WORK AREA AND PUMP/RAMP SO ADEQUATE DISTANCE IS PROVIDED FOR MOTORISTS TO REDUCE SPEED. 5. LIDAR CONTOURS ARE APPROXIMATE AND ARE SHOWN TO PROVIDE APPROXIMATE DEPTH OF EXISTING SEWER. WHERE EXISTING MANHOLES ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH PAVEMENT OR EXISTING GRADE. z O U Z) U) z O U m O LL 0 W Q w J w O z J z O U) U) O O_ o� Lu W O LL i 6 z a o� 0 J Q z LL CD'DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NOT -0374 :.•oFESS/p .•9 9 SEAL �•: 025490 �IVGINE � PROFESSIONAL SEAL m p z pC O O Lu Q It U) z p O Lu w Q 0 �z coQ 2 Lu O Z Q + Q Z rll_ J N z O Z O w aC 0 2U o Z w O O U T_+ Q 0- OC Wo0 O r � Ir z J Z Z J LL w w cl:F LL Z m o o w O O W w C/) CU Z_ L]Ij w m z O 0 z Lu O m Q C � o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C21 WKD PROJ. NO.: 20120031.11. RA ow Zooa FUo IJV OZw ao¢ zoo Wim= V=� 00. ya0 =�o w ozw F -o oN w00 °� U Z °om wY, _Q U oY� Dow ZWz 00E oZZ o w 0 w w¢¢ ¢3:Z wD� > 0 0 w.Z w3a =a� ozw Y ¢o' ao� VOz ?=w oZ= U -O Zzo w oma= YUH ,o 000 Y U1Q §=Z oo' o =Zw aw-o oow a \ \ \ \ \ \ ' \ROCMNGHANF — CONTRACTOR TO UTILIZE BRIDGE MAT FOR COUNTY BOARDPUMP EQUIPMENT STREAM CROSSING AND COFFER DAM & AROUND TO MAINTAIN CONTINUOUS FLOW OF 51-yHA�RINGTbNIjwySTREAM AND PROVIDE A DRY CONDITION DURING \ D�1385`, PG 1175 D$NINSTALLATION [tRADDOCK OF SEWER PIPE & TREE REMOVAL \PIN 7 7901.92188-�15CEDARST PROPOSED MH b� \ \ DB,.1-62, 1x-07 13,BSW 0358PROPOSED MH \ \ -� �IN 7979051 4650 4'DIA FLAT TOP MH � BSW 0717 STA 28+47.11 - 4 ' DIA FLAT TOP MH _-- G'A \ - - ' � W OD I RIM EL=592.67 - - _ _ STA 29+64.67 PROPOSED MH J SEPH IMAN \ � 1 \A=02°03'59" LT _ \ RIM EL=594.77 � BSW 0718 _ \ \ _ - - - CE AR ST � Off Ol _ A- 24°11'20" RT \ \ 4' DIA FLAT TOP MH- - LIMIT OF DISTURBANCE - - _ _ �l � STA 30+23.23 PIN 7 518455'1 I DISTURBED AREA= 0.36 AC- -±44 LF 8" VCP\TO RIM EL=596.86 I / _ ' - B� RE OVECb _ A= 24°11'31" LT - REMOVE 1720.4 SY CLEANUP, SEEDS _ _ _ ±114 LF 8" VCP _ PROPOSED 20'_ &REPLACE I / & STRAW W/NET \ \ TO BE ABANDONED, � PERMANENT 2.7 EXIST I PLUG EA END _ ID CITY OF EDEN s ONC SIDEWALK, I cel - 0.36 AC & GROUT FILL \ \ \ _ _ _ - _ UTILITY ESMT Z �RMsTR� cRFT cr 0 CLEAR 28+00\ & GRUB � 29+� \ � - _ E� - _ \ N /s / � \ ACCE \ XIST SMH BSW 0358 o w \ \ \CESS) a I �� U \92 \ \ \ _\ 30 I r r r CF rr r r r �'r .r � r f rr rr ✓r .r r . r� ,�r rr � r r r f r� . rr .r r . , 69 � kr rr ✓r . r f ry rr ,�r N�, v 5g4. 1 ' J3� rr � rrrrr �' r4�r ✓ ' r r r �r �r � rr~ � r rr �r ✓r �' i rr rr r+r �r �r r � _ $ � rr r rr rr rr rr rr rr rr rr rr rr r . r r r. r I _ 1�J SS -L — F r r rr rr rr rr rr rr rr rr r r r r r r rr rr rr rr r rrr r ri r — — S— � I / r r r �rr�' r r r r rr r r r r rrr rr rr rr rr rr r rr r r r r rrr r ✓ — _ -_S� o I 8' UCP o n PRUII,T BRIAN KEITH 51 � CEDAR ST / I DB 1469, PG 14 PIN 797905186645 DWG NO. 11-C23 \ FOR PROPOSED CEDAR ST / PLAN & PROFILE \ WALKE� JAMES I \ C/4 JAMES R WALKER \ \ B 07E\, PG 705 \ l PIN 797905186546/ I EXIST MH BSW 0350 / / TO BE REMOVED Q SE G1 CD co / Z ANDERSON STEPHEN D co 1017 LAWSON ST / CO DB 798, PG 610 PIN 797905188538 Lr_r rr r r rr rr rr rrr rrrrr rrrrrrrr rr rrr rr rr rr rr rr rrr r r r r r rrr rrr — — rrr I / I / / � / / 516 P r r 11-S4 r yrr rdn / I / � _ EI r rr rrr ri rr ri rrr r'r rr rrrrrrrr rri r�� rr �rri rrrr r� rrir r �rr�ri rr / / / / � � �n rr rrrr rr- rrrr rr g� rrrr I / � / � pBeS c X5911 X61 LF rr �r rrrr vrrr rrrrrr rrr' rrrrrrrrrr rrrrrrr rr r� / R W 04.52 � / / �� r r r r r r� r r r r r r r r r r r r r r, r, , � l \ �� rr rrrrrrr r r r r r r r r r r r y r r r r r e7 r 'r r 1.^ IfdV IN ;598 7 i A— / 100 LF SILT FENCE �� 5 r'r r r r rrr rrr ` T�ir M, / l INV 01JT=595.97 - J -SILT FENCE - _ _ PROPOSEDco �' U) - 160.8 LF 8" VCP - 20' PERMANENT - - - - - 'C REMOVE 36 LF w - PROPOSED MH - - - - - CITY OF EDEN - ---STONE / REMOVE 30 LF 4' CHAIN LINK - - _ TO BE ABANDONED, _ - - _ _ - - - - Qom- I i - BSW 0719 - UTILITY ESMT - -I- � _ � � 4 CHAIN LINK � --FENCE � � � � I p _ PLUG EA END _ - - - - - _ _ - - . FENCE 4 DIA STD MH PATTERSON JOAN STEGALL O & GROUT FILL _ - - _ - - - - - ---FENCE CONTRACTOR SHALL STA 31+96.70 + - - - _ _ _ _ EXIST MH BSW 0358 _ - - PROVIDE 80 LF NEW - - 0 RIM EL=606.61 ULDING LILLY G I 1021 LAWSON ST I N - - -� - - PROPOSED SAN - TO BE ABANDONED _ - PROPOSED SEED -STREAM1 S4 EE DWG CROSSING NO. 4' CHAIN LINK FENCE ° I 025 L,B�WSON ST DB 699 PG 995 - SEWER LATERAL - - -IN PLACE- (TOTAL) A=90 0 0 LT 656 PG 1868 PIN 797905187530 Q - AND EC BLANKET i -D9 FOR CROSSING ALONG PERMANENT CITY (� I- — - TYP, SEE NOTE 1 - - - - - - —WILSON SANDRA- � � OF EDEN UTILITY ESMT I � t N 797 051-86445 / LANp RA�PIrI / R� 516 PROSPF DB I F REQUIREMENTS I - - EXIST SMH PIN 79796E (n --- I-------- — 111a �AWSON ST / r J r �� -- -- --- --- - -- --- PROPOSED � � / - G- G- - BSE 0478 _ _ - DB 755 ,�C 6�2 - TEMPORARY c� I/ / - - G - - - -SS- - - - ss- Luco \ \ 1 \ - — — — co LION-R6G—E-R DALE _ — — — — Pl N-7979051 P334 , �I CONSTRUCTION V i _ — a — — — — — —SS— — — — ss \ \ \ - [ I I ENTRANCE -/ - - - - G EXIST SMH mss\ — — 1121 LAWSQ ST — MCN BB LY�LN PtfLLT/�M I — - _ — J BSW 0229 Lq _ I DB 1262 PG 93 I ---- 11 / ---w--- / 0/'V — FPI796'C8 6 —'I-1 5 LAWSON_SS— — EIP 00 I EIP o, I _ — — G — s__+_ \ / — W _ _ — — W— — / ,M , Sr ss, 148G578 I---- -- s---- / \ - LAWSON ST —w--- / \ M, — — — — — — — — — PIN 797905182219 — — — — G — I ��s—w=� — — — — — EXIST SMH / _ — G — — _ EXISTSMH- / I _ _ I — — \ BSW 0130 BSE 0404 _ — — — — G G —ss —ss— — LE GRAV S BRENT J Co yY0 \ \ \ l l G — — — _ _ — _— _—ss = W_ — — A�� I STEVENIROSS — — G — w 105 LA 1472 , PG 2280 - - — w— 1109 LAWSON ST 1 \ / R — — — —ss— — - — —\`N— — EXIST SMH 7 7 , P� 426 N 797 85411 / / \ / D _ D / I P` / _ss— — w— — \ BSW 0133 PIN 7979051 3376 PIN 79 9051 3 IJ // / „_ / , L / �S •JAM E LILI-\i \ SG�LE.1 40 PAvLINE dNi -)AO P 616 612 m ml m 596 592 580 c L 616 612 m ml m 596 592 ME 27+00 28+00 29+00 30+00 31+00 32+00 33+00 NOTES: 1. CONTRACTOR SHALL VERIFY EXISTING SAN SEWER LATERALS SHOWN (OR NOT SHOWN). ALL EXISTING SAN SEWER LATERALS ARE 4" VC OR IRON (UNLESS OTHERWISE NOTED). CONTRACTOR SHALL REPLACE ALL ACTIVE SEWER LATERALS FROM PROPOSED CLEANOUT TO PROPOSED SEWER MAIN WITH 4" PVC (UNLESS OTHERWISE NOTED) AND NEW CLEANOUT AT RIGHT-OF-WAY. INSTALL CLEANOUT IN VALVE BOX IF LOCATED IN ROAD, DRIVEWAY, SIDEWALK, OR PARKING LOT. 2. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF BANK DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN ALL WORK DOWNSTREAM IS COMPLETED, PROVIDE SILT FENCE ON TOE OF SLOPE. (EA SIDE OF BANK AND/OR PERM FORD). QUANTITY NOTE FOR LATERALS: TOTAL RESTORATION QUANTITIES BELOW FOR SANITARY SEWER LATERAL REPLACEMENT AND WATER SERVICE LINE REPLACEMENT (WHERE INDICATED ON PLAN) ONLY; • 20 LF OF SANITARY SEWER LATERAL (4" PVC) z O U Z) Cn z O U m O LL 0 W Q W J W O z J z O W 07 O O_ W W O LL i 6 z a o� 0 J Q z LL CD'DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ,. S,39, .•C ARp� ��,��4 9 o� SEAL -•o : 025490 . 1 i vv. FES; ,�,��. 111111116 PROFESSIONAL SEAL m ❑ z o o Lu U Q It cn LLJO W Lu Lu a 0 1z Q W O Z Q + Q Z ;I- J (y) z z OO W cr 0 2U o Z W O O U � + Q 0- OC r%_0—O N �W J Ir J W Z W Q OC Q p ILL Z CO o w O O W W C/) CU Z_ W m z O 0 z Lu O m Q C PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C22 WKD PROJ. NO.: 20120031.11. RA o. w ooO FUo OJV OZw Qo¢ wowo �mQ V=� o. yao =�o w ozw F -o oN w °O Iz o o z, mY< _ Q U OY� Dow ZWz o.E O°< ozz o w 0 w G'� w¢¢ ¢3:Z wD� >oo 0 w.Z w§Q =a� ozw Y ¢o' ao� 1i _oz ?=w 3� oz'D L)-o ZZ� w yUH VULL ❑oO Y iz< Z H OO' O 2Zw �o, oow O YL co SQ� 1 \ ! UIS I UKti 1 1 X S 1 I \ _EXIST SMH TEMPORARY ' / I l / / EXIT COE E. / / c VAh'IABLE ` !DTH R/W LCONSTRUCTION BSE 0052 / / / / / / / ACCESS IIII IIII I I I I ` / 9O NIF, K' CA1VI'B L -L ENTRANCE // / G // E i— / 'I'8 MAIN I D1 S`T / // //DB4E ,15 l l l l l IIII I I I I I I I I I y, // i�/DB' 1,31 ,,FSG 215 _ N I I /�/ � �/ //� 47'9 9115635191 /�//PIN 91j 61 8 �o Z-- / / l l IIII I I I I I I I 00 o I 'r, REMOVE C\J CI� x'wmo I Oc &REPLACE I I c\1 U 1r C� j �� co a 84.5 SY EXIST 11 /l 11 11 l 11 I I I I I I I I I O ro a O � I ' cn GRAVEL DRIVE = w c a' �N-�' j +_ISI �� I j \ 'yr/ / // / / / �r EXIST SMH // / / / / / I I I I j I ( I �� ►- xs I ;n \ jl'\ \\ -><-\ \� _ �F` / / / / / / / _.o° / BSE 0168 I 1 \� �\ \ \ \<\ \ \ 00 o , ►- �I \ \ \ \�\ \ \ \ \ \ \�\ \ \� }oda-�' I 1 \\\ \\\ \\�L��1 / / / / / / -7- 1 1 I I I I I I I I 1 1\ I w a 0 1 3 I 1 1 1\ \\JE�I�'JI�E`R�Y N / ///� Q r o I \ \ 1\1 I�/Iy�I E\�\E\L \ / / / / \ ss� 8z c _rx \ 14\E �30/ //RCSB TSON MARC RET��;�III�^L_ cWz�_ \\\ I \\ \ 1�/ / sal I d 1 w f- 1 \d — �/ / / / 814 ST /2 - / /l I I I i I I \ \ \ \\ ° - 1 I \ \ \'�\ 7\911\5�2Y4� / / / / / / /��/ DB 4 , PG 43 ��� Q i I I I I I\ I u�o I 1 �I \I \\\ �— / 0 4 //// PIN 79 9115615Q7 00 528 524 520 516 512 504 500 0 Lo 0 0 � U) m mL00 L J � w Qg Lu U) BOTTOM OF BRIDGE I STA: 11+15.43 ELEV.=XX.XX NC 87 R.O.W. — I � .J Lo 0 1-0 0 co C6 w Q g W U) Fy I BOTTOM OF BRIDGE STA: 11+57.71 ELEV.=XX.XX NC 87 R.O.W. 00 i° . rn mm zz0 zzz EXIST 16" DIP WATER LINE EXIST 48" CMP 11 II � I I EXISTING MANHOLE EXISTING MANHOLE \ — I I (BRICK) TO BE (BRICK) TO BE REHABILITATED REHABILITATED REFER TO SPEC REFER TO SPEC PROPOSED SECTION 33 01 37 SECTION 33 01 37 500.4 LF OF 24" IN SITU LINING — — — — — — — — — — — — — - -------------�----------------11 123.5 LF OF EXIST 24" VCP @ 0.18% Q — — — — — — — — — — — — — u 492 z 0 a 10+00 11+00 EXISTING GRADE (BASED ON LIDAR) ALONG EXISTING SANITARY SEWER SEE NOTE 4 ------- / / / PROPOSED 438.5 LF OF 24" IN SITU LINING 438.5 LF OF EXIST 24" VCP @ 0.17% — — — — — — — — — — — — — — — N O 00 't It 00 o 0 0 06 00 o 0 0 Lo Lo Lo Lo Lo Lo 12+00 13+00 SCALE:1 "=40 C) w 0 w=� U)z c g w O� - - W o N _ m0=> �C `- cy) U000r-Lric2)� co Urn N M � rn 0�W w�°w j aQQ- w�zz0 0 o coP w»> aLn�00 >zzz CONNECT EXIST 24" VCP TO PROPOSED MH (SEE DET, DWG D1) ---------------- ----------------- SCALE: ----------- SCALE: HOR 1"=40'; VERT 1"=4' c7 Ln N00 co co N (D 00 Ln r` o ai o 0 0 0 0 0 0 Lo Lo Lo Lo Lo Lo 14+00 15+00 SMH BSE 0582 AERIAL CROSSING. :E !M=509.04 CLASS II RIP RAP 1 N=505.09 O IN IN=505.15 7. PIPE THROUGH ENCASEMENT AND FOR IN OUT=505.0 SUBMERGED STREAM CROSSINGS () PROPOSED 48.6 LF SHALL BE FACTORY RESTRAINED. m � z % oO \ \ Z O ENCASEMENT W/24" / / 8. SEWER CROSSING STREAMS AND O RJDI PIPE @ 0.08% / AERIAL CROSSINGS SHALL BE / HYDROSTATICALLY TESTED TO 150 PSI. 0- / 9. SEWER CROSSING STREAMS SHALL NOT 100 YR. FLOOD Q ELEV.=523.0 EXISTING GRADE ALONG PROPOSED SAN SEWER EXIST SMH \ BSE 0049 \ (BRICK) TO BE \ REMOVED \ PROPOSED 172.85 LF OF 24" RJDI @ 0.08% 00 00Lo ~ o 00 Lo Lo m 16+00 17+00 APPROX OHWM= 498.47 SEE DWG D5 FOR AERIAL PIPE CROSSING DETAILS � O 00 co 0 0 m m J 7 O n %0 i fr,'r, rr r 7 Ivo = N V , Z f3fEg�1 R- J -G 863= ) 4M7391- NOTES: 45739 NOTES: cps t \\ \ \ \ \ \ \ \ I I 1. LIMITS OF WORK (LOW) ARE ONLY FOR ROUTING BYPASS PIPING. CONTRACTOR IS NOT PERMITTED TO USE THIS CORRIDOR FOR ACCESSING SEWER \ \ \ \ 1 I\ \ \ \ \ 1 1 I REPLACEMENT. NO DISTURBANCE IS PERMITTED. �p I 2 RIP RAP STABILIZATION SHALL BE \ \\ I I > I I I \\ COMPLETED WITHIN 7 DAYS OF BANK DISTURBANCE, UPON REMOVAL OF z III II I I I I I I/III VIII BRIDGE MAT AND WHEN ALL WORK O iiidill iii�Ilii �Iliil IIriII�� II I�11 I, I II IIS I I I/I I I I I DOWNSTREAM IS COMPLETED, PROVIDE I 1 i III I I / I I, I 1 ✓ I III 1 SILT FENCE ON TOE OF SLOPE. (EA SIDE U OF BANK AND/OR PERM FORD). 3. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC U) FLOODPLAIN MAPPING PROGRAM, z NATION FLOOD INSURANCE PROGRAM, O FLOOD INSURANCE RATE MAP PANEL U 7969-07/03/07. 4. LIDAR CONTOURS ARE APPROXIMATE O AND ARE SHOWN TO PROVIDE LL APPROXIMATE DEPTH OF EXISTING 0 SEWER. WHERE EXISTING MANHOLES w ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH Cn PAVEMENT OR EXISTING GRADE. Q uj 5. PIER/FOUNDATION IS SHOWN J SYMBOLICALLY ONLY. ACTUAL DEPTH W AND FOUNDATION TYPE SHALL BE DETERMINED IN THE FIELD AT TIME OF INSTALLATION. SEE GENERAL O CONSTRUCTION NOTES. z 6. LAY BACK MINIMUM OF 2 JOINTS OF RESTRAINED JOINT UPSTREAM OF THE J PROPOSED 68 SY AERIAL CROSSING. z CLASS II RIP RAP O 7. PIPE THROUGH ENCASEMENT AND FOR SUBMERGED STREAM CROSSINGS () PROPOSED 48.6 LF SHALL BE FACTORY RESTRAINED. w 36"x0.375" STEEL / — — — - / ENCASEMENT W/24" / / 8. SEWER CROSSING STREAMS AND O RJDI PIPE @ 0.08% / AERIAL CROSSINGS SHALL BE / HYDROSTATICALLY TESTED TO 150 PSI. 0- / 9. SEWER CROSSING STREAMS SHALL NOT / HAVE JOINTS BELOW STREAM CHANNEL / (NORMAL WATER SURFACE ELEVATION) OR WITHIN TWO FEET OF BANKS UNLESS OTHERWISE NOTED. W SEE NOTE 6,7,8 & 9 > 425.8 LF 24" VCP 500 w M TO BE REMOVED O PROPOSED 279.85 LF 24" DIP @ 0.08% LL 496 I � z SEE NOTE 5 D� Q 492 J Q z 18+00 19+00 20+00 LL rDWK DICKSON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NOT -0374 CARO 9 f� SEAL �•: 025490 1 � JIG / ` GINE 44101,11140* PROFESSIONAL SEAL m p z O o Lu Q It w z 0 O Lu w a 0 1z Q Lu O + z Q N Q z O Qz z J O O J LLJ It t O Z w U + O U _O Q oc Q O o Lu z U) 2 z z J J OC Q 0 < z m W LL LL D o w O W LU O U W > <� H z 0 C7 z Lu z Q O m Q � p PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: I MARCH 2018 DRAWING NUMBER: 11-C25 WKD PROJ. NO.: 20120031.10. RA 0. ww 0-°°0 DJU OZw a0¢ Z04 gra 0mw U= . o0 0. W 0Zw -0 o00 ZZU °Om wYJ _ ro= OYQ�Q w3W moo, zwa ° 0, P: a oZZ ow0 a wEa =�z w w�� 0 w m�3 =d0 (JZw -o' Q0� z°w 32 oZ� U -U Zz.0 w °2_ 0 � H USW 500 YN 4 Q 10 o0� 0 =Zw =0= 0.,o OU 0E PROPOSED MH PROPOSED MH BSE 0163 E= - - CONNECT EXIST BSE 0444 STREAM CROSSING STONE�LLE LUMBER SMH BSE 0163 6' DIA FLAT TOP MH pp�N RIV- - io 24" VCP TO 5' DIA FLAT TOP MH RIM=510.44 STA 29+83.48 - - - y PROPOSED MH STA 33+43.67 (DAN RIVER) 11-S15, SEE DWG NO.� COMPANY INC PROPOSED MH BSE 0173 Q INV IN=497.96 RIM EL=505.49 - - - y -STA 0+00.00 WEST ST D9 FOR CROSSING 3442 NC HIGHWAY 135 5' DIA FLAT TOP MH _I - (SEE DET, DWG D1) - ( ) STA 36+50.00 LL. J INV OUT=497.94 _ _ _ _ - p < RIM EL=507.65 REQUIREMENTS DB 1515, PG 2855 O Q - - 4= 0001 05 RTS �9S - _ _ z SMH BSE 0444 PIN 797914341217 RIM EL=505.71 O - J - - _ - - - - _ - - RIM=511.36 LIMIT OF DISTURBANCE, 4=180°00'00" + - - - CONNECT EXIST < m 1\ / INV IN=498.35 DISTURBED AREA= 0.32 AC 38 O 30+00 421 LF m W � 500 p � INV IN=499.05 37+00 N O - - - 24" VCP TO 31+00 SILT FENCE 5p5 \( INV OUT=498.33 36+00 APPROX Q - - 500 PROPOSED MH 32+00 O D I �` 35+00 432 LF 400+ HOUSES W - _ (SEE DET, DWG D1) PROPOSED 00 n 33+00 I I\` �� 34+00 39.52 SY CLASS II SILT FENCE o b SERVED o 360.2 LF OF m I III\\\\� RIP RAP BANK i N �- z o N 24" IN SITU LINING O (�(\ \\\�\ STABILIZATION Q J _Q Mw Mo SS- 4 -= _ A - , 0-1 FL W1� 2E (n 289.96 SY w W "` '' _ ±540 LF TO 510 CLEANUP _ - - - SMH BSE 0171 p &SEED _ ----- - _ ~~~ -- - W/STRAW 51 p _ - , - - F y - -�F �� .``~ ��` STONE 1571.5 SY 0 o+0 RESTORE DAMAGED W - w � - `l ` ` ` __ CLEANUP, M LIMIT OF DISTURBANCE, - - l` ` _ OUTLET, SEED & m Q EASEMENT WITH _ EXISTING WETLAND _ DISTURBED AREA= 0.06 AC SEE NOTE 2 l - - - - WETLAND SEED MIX _ BOUNDARY (BSW-7) ` `\'� \ _ _ STRAW W/NET - - - - (21.WY) 615 PROPOSED `l 125°20'27-FLW,- ------- - - W EXISTING WETLAND �_- - \ CONTRACTOR TO UTILIZE BRIDGE \ Z a - - ; 20 PERMANENT - BOUNDARY (BSW-6), - - - _ - _ .`\ MAT FOR EQUIPMENT STREAM YF�`-- - �� CITY OF EDEN - - - `` i Q (TEMPORARY IMPACT - _ _ -� - �y�� UTILITY ESMT _ - - - - - - - `.` .l` 58.56 SY CROSSING AND COFFER DAM & 7 �'`� �FLWy� Q w = -Ogg_ = 0.004 AC) _ _egg - \ \\�\ \ _ \ \ - - _ _ _ \ \ \ l` `` CLASS II \ PUMP AROUND TO MAINTAIN \ \ \ \ �FLWy� Q Z Q U -� \ - �HAL�E�Af�FPIQYE - - \ \ RIP RAP BANK CONTINUOUS FLOW OF STREAM I \ - - - _ _ - _ Z���� 444 LF �\ �\ \\\�� - \ \ ``z�, \ - Q Q SILT FENCE \ �� - 98et�Lo�E_ - STABILIZATION DURING INSTALLATION OF SEWER - - - - - LW y - - - •FL _ O \\ \\ \ D$�1-P6�6g �\ `c� Z PIPE. AERIAL CROSSING SHALL BE I - ----_--------_wy� �� p ;Z �� \ -\���- - \\ \ `~ ``�� a� INSTALLED UNDERADRYSTREAM \ ---- ----- oJ�� �U -FL %�� �\ SMH BSE 0438 l.` `. < pm --------- ;;c U W. ----- -\ - - v oo CONDITION. \ ---- U W o - - RIM=514.71 ti \ \ ---- \ INVIN=510.36.``. ``.� �Z� I \ �\--------------- +/ o �� - - INV OUT=505.31 ` ` ` ` ' `l `` mo\ I I � i ROBEf�TS-B1��D-R� � � - - - - - - - \`l \ � I - _____ EXIST _\, \�\ �' ��,� II I I /9'O GEN WAL AV �I \ ` - - - - - - - DIRT/GRAVEL DRIVE \ , \ \" X _\ N I I / D�ALZI�, PGGDLVIB� _ _ - - _GEitFTRAL�iI�E= - ---dHo---`:\ `\\ -:Y, (5% �� I I -p IIII I_I�79791/-0/3/5/5-29-4--�------_---_--_------------- --------_-_----fi--n--CONSTRUCTION dHO ACCESS ROUTE HO KE POWER --5W(R J- \Sp Q m� POLE #111 dHo -- -- ---T- = -- --- -1- U DUKE \ \\\ \\ \\ \ \ \ \ \ s\ �- Q� `. -dH m / ��' /i-�-- _--_ _----_-_- TEMPORARY POWER _ \ \\\ \ \ \ \ \ \� \ \ \ N `\ m o -� dH0 POLE \\ \ REMOVE' \ \ \ \ \ `.. z��_------------ - - CONSTRUCTION _ �\ \ \\ h // ��i --------------- -- ��� ENTRANCE _ - \ - - \� &REPLACE \ \ \\ \ \ \ \ \ \ \ \ _ \ \ //i / / - - _ - - - _ - \ \ 579.7 SY EXIST \ \ \ _\ SEE DWG N0.11 -C16 _ _ - - - - - _ - \ \ \ \ \ KE PO EFS \ \ \ \ \ `.. GRAVEL DRIVE / \\ \ \\ \\ \*'�0\ \ \ \ \\ \ _ FOR WEST ST OUTFALL ---------_ y�009,p --- \\ \ \ \ \ \ \\ \ \ \ \ \ \ \\ \ \ \ l.`.`. I PLAf4F&-PRQFILE-- / BR N��H L W DrI \ \ \ �\ \ \ \ SMH BSE 037-o\ \ \ \� \ IIIIIIIco\93\i�l G�E\ \ \ \\ \\ \�\ \ RIM=517.23 -� II IIII// 1�,�// 2 2 2 a \ \ \ \ \ \ B p3v9 PG 53 INV- - I IIII I �/ \ '\ INV OUT=51 .59 - - - - - - - - �3 \ \ \ \ ,d _ \ \ \ -0� �� N�797�\Q3�5 \ \\\\ \ \ \\ \, \\ \ \ �'\ \. \ \,�, \ \ \ ,,`.� ,� I I I I �I l I.II ��I ///�/��/,'/ b�✓-� i// // \// /�/ _ _ _ _- _ _ - \ \ \ \ SCALE:1 "=40' NOTES: 1. LIMITS OF WORK (LOW) ARE ONLY FOR ROUTING BYPASS PIPING. CONTRACTOR IS NOT PERMITTED TO USE THIS CORRIDOR FOR ACCESSING SEWER REPLACEMENT. NO DISTURBANCE IS PERMITTED. 2. NO DISTURBANCE PERMITTED BETWEEN SSMH BSE 0163 & SSMH BSE 0444. ACCESS SHALL BE PERMITTED FOR/LIMITED TO LAYING ABOVE GROUND, TEMPORARY WATER LINE FOR CIPPL CURING PROCESS (IF REQ'D) AND SEWAGE BYPASS PIPE 3. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. 4. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF BANK DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN ALL WORK DOWNSTREAM IS COMPLETED, PROVIDE SILT FENCE ON TOE OF SLOPE. (EA SIDE OF BANK AND/OR PERM FORD). 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 Z O U D o� Cn Z O U m O LL 0 W U) Q W W H O Z J z O U) W W O 0- cr D 0- W_ W m Er O LL i 6 Z Q 0 J Q Z LL VVK DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 OO�� �CARo� #�P*, _��` SEAL ' 025490 ,t,/fW F\►o-.N las PROFESSIONAL SEAL m Z O O Lu °C W cc LuO U) Lu w a 0 L Lz Q = o W o + z Q M Q Z O J Z z O O W c Z w U + O U -r a) � � N g w F- O C) or- z cn Z Z J Lu Lu J OC Q0 < W LLLL W ILL 0 0 W O O W W F- W U W > < 0 OC o Z Lu oc z Q o m < 0 o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C27 WKD PROJ. NO.: 20120031.11. RA ow ooO FUo OJV OZw ao¢ zoo Wim= V=� Dom ya0 =�o ~ w ozw F -o aN V0 A °� U o z' wY, Q U o N OY� Dow ZWz o.E °°< oZZ o w 0 G� w¢¢ ¢3:Z o-0 >oo 0 w. Z w3a ma' oz Y ¢o' ao� V_oz ?=w oZ� U -O ZZo w °2_ yUH VUw 0In0 YU1Q =Z o� OOg O =Zw �o, ago oow 528 524 520 516 512 504 500 492 z w 0 LY a w 47+00 LIMIT OF DISTURBANCE, DISTURBED AREA= 0.55 AC STONEVILLE LUMBER COMPANY INC 3442 NC HIGHWAY 135 DB 1515, PG 2855 PIN 797914341217 SMH BSE 0174 RIM=510.46_ INV IN=499.97 INV OUT=499.95 51+00 CONNECT EXIST 18" VCP TO PROPOSED MH (SEE DET, DWG D1) PROPOSED MH BSE 0174 5' DIA FLAT TOP MH STA 51+33.07 RIM EL=512.46 A= 0°02'44" LT \\ \ \\ \\ I '-MCI-RATH GA \ \ \ 15Q ONGWOO R \ \ DB 1036, PG5 — — - PI 797903221 REMOVE & REPLACE 10 LF — I J (OR AS NECESSARY) EXIST PROPOSED MH 48" CMP W/METAL BANDS I I J BSE 0452 5' DIA FLAT TOS' MH 15.11 SY CLASS B Q 17.01 SY CLASS B STA 55+83.68 LL RIP RAP BANK rRIP RAP BANK RIM EL=513.28 STABILIZATION I STABILIZATION A= 07°28'06" RT O � I I W STREAM CROSSINGI MAT FOR EQUIPMENT STREAM v� \ 11-S6, SEE DWG NO. CROSSING AND COFFER DAM & PUMP I D9 FOR CROSSING � AROUND TO MAINTAIN CONTINUOUS � j REQUIREMENTS FLOW OF STREAM DURING INSTALLATION OF SEWER PIPE \ Q CONNECT EXIST \ w 18" VCP TO F- z II PROPOSED MH Q CITY OF EDEN (SEE DET, DWG D1) I W ' �'0 BOX 70 I Z '� I I Z I DB ACCT, PG__CHANGE I PIN 79791324'1653 I SCALE:1 "=40' m i• 11 50+00 51+00 52+00 53+00 54+00 55+00 56+00 528 524 520 516 512 508 504 500 496 492 NOTES: 1. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF BANK DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN ALL WORK DOWNSTREAM IS COMPLETED, PROVIDE SILT FENCE ON TOE OF SLOPE. (EA SIDE OF BANK AND/OR PERM FORD). 2. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. 3. LIDAR CONTOURS ARE APPROXIMATE AND ARE SHOWN TO PROVIDE APPROXIMATE DEPTH OF EXISTING SEWER. WHERE EXISTING MANHOLES ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH PAVEMENT OR EXISTING GRADE. i i 516 PROPOSED PROPOSED REPLACE 10 LF 20' PERMANENT 449.5 LF OF NECESSARY) 512 CITY OF EDEN 18" IN SITU LINING J UTILITY ESMT J 508 508 EXIST 48" CMP o LL 00 48+00 STONE 49+00 50+00 O+ / 504 OUTLET, err O (n — — —/ QZ -7/ �/ — o W 18" VCP _ Z Z —�--- D--- Q 765.9 SY 2 NEAREST FIRE HYDRANT SY 2C HEAVY DUTY (n LOCATED IN THE CENTRAL AVE. C LEA CONSTRUCTION i CUL-DE-SAC IN FRONT OF & SEED RIG MATTING (RATED 900 CENTRAL AVE. W/STRAW FOR 600PS1) 528 524 520 516 512 504 500 492 z w 0 LY a w 47+00 LIMIT OF DISTURBANCE, DISTURBED AREA= 0.55 AC STONEVILLE LUMBER COMPANY INC 3442 NC HIGHWAY 135 DB 1515, PG 2855 PIN 797914341217 SMH BSE 0174 RIM=510.46_ INV IN=499.97 INV OUT=499.95 51+00 CONNECT EXIST 18" VCP TO PROPOSED MH (SEE DET, DWG D1) PROPOSED MH BSE 0174 5' DIA FLAT TOP MH STA 51+33.07 RIM EL=512.46 A= 0°02'44" LT \\ \ \\ \\ I '-MCI-RATH GA \ \ \ 15Q ONGWOO R \ \ DB 1036, PG5 — — - PI 797903221 REMOVE & REPLACE 10 LF — I J (OR AS NECESSARY) EXIST PROPOSED MH 48" CMP W/METAL BANDS I I J BSE 0452 5' DIA FLAT TOS' MH 15.11 SY CLASS B Q 17.01 SY CLASS B STA 55+83.68 LL RIP RAP BANK rRIP RAP BANK RIM EL=513.28 STABILIZATION I STABILIZATION A= 07°28'06" RT O � I I W STREAM CROSSINGI MAT FOR EQUIPMENT STREAM v� \ 11-S6, SEE DWG NO. CROSSING AND COFFER DAM & PUMP I D9 FOR CROSSING � AROUND TO MAINTAIN CONTINUOUS � j REQUIREMENTS FLOW OF STREAM DURING INSTALLATION OF SEWER PIPE \ Q CONNECT EXIST \ w 18" VCP TO F- z II PROPOSED MH Q CITY OF EDEN (SEE DET, DWG D1) I W ' �'0 BOX 70 I Z '� I I Z I DB ACCT, PG__CHANGE I PIN 79791324'1653 I SCALE:1 "=40' m i• 11 50+00 51+00 52+00 53+00 54+00 55+00 56+00 528 524 520 516 512 508 504 500 496 492 NOTES: 1. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF BANK DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN ALL WORK DOWNSTREAM IS COMPLETED, PROVIDE SILT FENCE ON TOE OF SLOPE. (EA SIDE OF BANK AND/OR PERM FORD). 2. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. 3. LIDAR CONTOURS ARE APPROXIMATE AND ARE SHOWN TO PROVIDE APPROXIMATE DEPTH OF EXISTING SEWER. WHERE EXISTING MANHOLES ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH PAVEMENT OR EXISTING GRADE. PROPOSED 18" DIP 500 SAN SEWER 500 m•. CALE: HOR 1"=40'; VERT 1"=4 0+00 0 o m•. 1+00 Z O U U) Z O U Ir O LL 0 Lu U) Q J Lu O Z J Z O Lu O 0 - Ir Lu Lu Ir Er O LL i 6 Z Q J Q Z LL CD'DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ,o4�`��••C4 ����:.•oFESS/p •.;9 s' 9 SEAL �•: 025490 xx PROFESSIONAL SEAL m p z O O U Lu It U) z p O Lu w a 0 IIIIIIIIz Q 2 O Lu O + Z Q Lo Q Z O Z zJ O O LLI ItO Z w C) + O_ C) T_ ~ JF - 'I � Ir Z U) Z Z J J OC Q L 0 LL Z 00 Lu � LL o w O 0 W Lu O U Lu > < �z H 0 Z Lu oc z Q 3 m a 0 Cc cr � o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C29 WKD PROJ. NO.: 20120031.11. RA i i 516 1 REMOVE & 516 REPLACE 10 LF (OR AS NECESSARY) 512 EXIST 48" CMP 512 W/METAL BANDS I � 508 508 EXIST 48" CMP �-- II /L_—J 504 / 504 PROPOSED 18" DIP 500 SAN SEWER 500 m•. CALE: HOR 1"=40'; VERT 1"=4 0+00 0 o m•. 1+00 Z O U U) Z O U Ir O LL 0 Lu U) Q J Lu O Z J Z O Lu O 0 - Ir Lu Lu Ir Er O LL i 6 Z Q J Q Z LL CD'DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ,o4�`��••C4 ����:.•oFESS/p •.;9 s' 9 SEAL �•: 025490 xx PROFESSIONAL SEAL m p z O O U Lu It U) z p O Lu w a 0 IIIIIIIIz Q 2 O Lu O + Z Q Lo Q Z O Z zJ O O LLI ItO Z w C) + O_ C) T_ ~ JF - 'I � Ir Z U) Z Z J J OC Q L 0 LL Z 00 Lu � LL o w O 0 W Lu O U Lu > < �z H 0 Z Lu oc z Q 3 m a 0 Cc cr � o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C29 WKD PROJ. NO.: 20120031.11. RA 00 Zaw °o OJU OZw ao� zogi~ m" w U= g¢m ya0 �No w oZw F -o Uz d F "3UO 8 o m = U J OY8 Dow zwa Dow ozz owc7 W F, � m 3:z< Woo 0 w§< Xom Xao C7Zw Mo< am r z O= w oz� U UO z- zw UDLL p�0 lew< 3=z OO O� �0 cow owo UOFE —i \ / �nn_ MCG RAT –6–k Y–L — 150 LONGWOOD DR DB 1036, PG 2545 PIN 797903227104 / / I STONE / OUTLET, I 58+00 TY I 59+00 60+00 i899 LF rSILT FENCE r rr rirrri i'r�rr rrir r rrr rrirrrir rri rir ii r jir��i/''�� r r r r r rrr r r r i r r r r r j r r r r Y Y Y CQ NEAREST FIRE HYDRANT ` LOCATED IN THE CENTRAL AVE. — — — — — — — — CUL-DE-SAC IN FRONT OFr 448.4 SY _ _ _ _� 1:O2SY 900 CENTRAL AVE. CLEANUP -' CONNECT EXIST 532 528 524 520 516 512 1: 504 500 M. PROPOSED J 448.9 LF OF 18" IN SITU LINING X 13 h HEAVY DUTY - — — 18" VCP TO CONSTRUCTION & SEED _ j PROPOSED MH RIG MATTING (RATED W/STRAW — ��y/ (SEE DET, DWG D1) FOR 600PS1) I � I I I I //� I �✓ �� / PROPOSED MH BSE 0450 5' DIA FLAT TOP MH STA 60+32.54 RIM EL=510.91 A= 04°35'40" LT 61- _ Y Y — — - - 500 — -- — 10 505 — --- — — — _--- _—_— PROPOSED MH BSE 0449 / r-F`LWY _ FLWY 62+00 — / cd OI i ririrr rri �r<r-��.d�w�w �r �r� rrrr rrr rr r ,r�rd.rar.rw ,w SMH BSE 0450- — — 520 RIM =510.91 �INVJN=5�2 --- -- INV OUT --601.00 RESTORE DAMAGED EASEMENT WITH WETLAND SEED MI (979.36 S�) - 560.5 SY OF HEAVY DUTY CONSTRUCTION RIG MATTING (RATED FOR 600PS1)_ REINFORCED WITH WOOD / —IOU I MATTING SUBGRADE / THROUGH WETLANDS 0 I IV SCALE:1 "=40' 5' DIA FLAT TOP MH i J 18" IN SITU LINING • (OUTSIDE DROP) ui QSTA EXISTING WETLAND 63+81.34 U - BOUNDARY (BSW-5), RIM EL=510.27 CONNECT EXIST (TEMPORARY IMPACT A= 00°02'15" LT 18" VCP TO CONNECT EXIST I ---�------o = 0.20 AC) PROPOSED MH 6" VCP TO --- X70 \ SMH BSE 0449 SEE DET, DWG D1 ( ) � _ LIMIT OF DISTURBANCE, RIM=510.14 INV IN=501.52 - — — — PROPOSED 20' PERMANENT Lu _ DISTURBED AREA= 0.50 AC INV IN=506.76 INV OUT=501.44 PROPOSED cr_ / r-F`LWY _ FLWY 62+00 — / cd OI i ririrr rri �r<r-��.d�w�w �r �r� rrrr rrr rr r ,r�rd.rar.rw ,w SMH BSE 0450- — — 520 RIM =510.91 �INVJN=5�2 --- -- INV OUT --601.00 RESTORE DAMAGED EASEMENT WITH WETLAND SEED MI (979.36 S�) - 560.5 SY OF HEAVY DUTY CONSTRUCTION RIG MATTING (RATED FOR 600PS1)_ REINFORCED WITH WOOD / —IOU I MATTING SUBGRADE / THROUGH WETLANDS 0 I IV SCALE:1 "=40' 532 528 524 520 516 512 1P 504 500 M. 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 NOTES: 1. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. 2. LIDAR CONTOURS ARE APPROXIMATE AND ARE SHOWN TO PROVIDE APPROXIMATE DEPTH OF EXISTING SEWER. WHERE EXISTING MANHOLES ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH PAVEMENT OR EXISTING GRADE. z O U DC (/) z O U cC O LL 0 Lu Q W Lu O z J z O W O 0– Ir D 0– W_ Lu 0C cr O LL i 6 z_ Q 0 J Q Z LL DICKSON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 .A... Ilk�'. SS /p� :9,�. SEAL` 025490 PROFESSIONAL SEAL CO p z O 0 Lu°C U) z p 0 Lu w Q 0 IIIIIIII° a = O Lu o + Lo z Q (D Q z O J I—Qz z O o J LU M ZLU (.0O U � LoQ 0 Q 0 It z (n z z J Lu Lu J � Q0 < Z Co LU LLLU LL LL 0 W O LU LU O C/) CU W Q � z 0 Z w oC z Q 0 m Q O Ir � o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C30 WKD PROJ. NO.: 20120031.11. RA r W W z _.FL- i 18" IN SITU LINING • ui • 1 1 :: ui i' bbd 0 CONNECT EXIST I ---�------o F Cal m 6" VCP TO --- X70 Q -- .. 525 PROPOSED MH \ — - -ter -----___---- �� .. � _♦ .♦-:o'?oi �� -� ` � Jam♦• �!' r - — — — PROPOSED 20' PERMANENT � 532 528 524 520 516 512 1P 504 500 M. 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 NOTES: 1. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. 2. LIDAR CONTOURS ARE APPROXIMATE AND ARE SHOWN TO PROVIDE APPROXIMATE DEPTH OF EXISTING SEWER. WHERE EXISTING MANHOLES ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH PAVEMENT OR EXISTING GRADE. z O U DC (/) z O U cC O LL 0 Lu Q W Lu O z J z O W O 0– Ir D 0– W_ Lu 0C cr O LL i 6 z_ Q 0 J Q Z LL DICKSON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 .A... Ilk�'. SS /p� :9,�. SEAL` 025490 PROFESSIONAL SEAL CO p z O 0 Lu°C U) z p 0 Lu w Q 0 IIIIIIII° a = O Lu o + Lo z Q (D Q z O J I—Qz z O o J LU M ZLU (.0O U � LoQ 0 Q 0 It z (n z z J Lu Lu J � Q0 < Z Co LU LLLU LL LL 0 W O LU LU O C/) CU W Q � z 0 Z w oC z Q 0 m Q O Ir � o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C30 WKD PROJ. NO.: 20120031.11. RA r W W z _.FL- 7— 17— rI 1 U) --- -- -- ------ ui ui 0 CONNECT EXIST I ---�------o F -- ---- --77>1TOYR 6" VCP TO --- X70 Q —100YR, 525 PROPOSED MH \ — - - — — — PROPOSED 20' PERMANENT (SEE DET, DWG D1) \ — � 12L CITY OF EDEN cn \ \ - UTILITY ESMT I \ I / I EXISTING SAN SEWER TERMINATION UNKNOWN, - UNITS SERVED UNKNOWN — - cn , I �JA00s' 009— — / 532 528 524 520 516 512 1P 504 500 M. 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 NOTES: 1. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. 2. LIDAR CONTOURS ARE APPROXIMATE AND ARE SHOWN TO PROVIDE APPROXIMATE DEPTH OF EXISTING SEWER. WHERE EXISTING MANHOLES ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH PAVEMENT OR EXISTING GRADE. z O U DC (/) z O U cC O LL 0 Lu Q W Lu O z J z O W O 0– Ir D 0– W_ Lu 0C cr O LL i 6 z_ Q 0 J Q Z LL DICKSON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 .A... Ilk�'. SS /p� :9,�. SEAL` 025490 PROFESSIONAL SEAL CO p z O 0 Lu°C U) z p 0 Lu w Q 0 IIIIIIII° a = O Lu o + Lo z Q (D Q z O J I—Qz z O o J LU M ZLU (.0O U � LoQ 0 Q 0 It z (n z z J Lu Lu J � Q0 < Z Co LU LLLU LL LL 0 W O LU LU O C/) CU W Q � z 0 Z w oC z Q 0 m Q O Ir � o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C30 WKD PROJ. NO.: 20120031.11. RA o. `nww ooO �JU a0¢ 'OD woo www 0mw U= pOm 0. w 0Zw -o z o zzw Z °om =UQ OY� w3� �0' zwa ° 0, �0 ozz owo w w � Q m3:z w.� w.E� W0 W, wg o � -o' w2 z°w oZ� U -U ZZD w Y � H UQw poo YN 410Q o0� 0 =Zw mo? 0'o UU 0'm 532 528 524 520 516 512 504 500 F4 496 w m 510 ADO y�5 DAN RIVER / 505 _ — —' /MCGRATH GARYL - - - \\ \\\ DB/1036 , PG 255- - PROPOSED \ \ \ / 20 PERMANENT v v v v 43.4 SY OF HEAVY DUTY SED FIN 797903227/104 CITY OF EDEN SED CONSTRUCTION RIG MATTING UTILITY ESMT \ \ 29709 LF OF (RATED FOR 600PS1) / \ \ \ \ SMH BSE 0180 S 18" IN SITU LINING 510 -----_/ \ \LOWER MATRIMONY CREEK _ \ — LIMIT OF DISTURBANCE, \ \ \ \ REINFORCED WITH WOOD RIM=513.69 /0 70+00 STONE DISTURBED AREA= 0.41 AC \— - MATTING SUBGRADE THROUGH 904 LF INV IN=501.74 68+00 +00 0 \ WETLANDS SILT FENCE INV OUT=501.69 �_ ��-�'�' 6 OUTLET, WETLANDS 71-4- v 44 1+ RESTORE DAMAGED EASEMENT WITH WETLAND SEED MIX (25.96 SY) 66X0,3 r -0 �, y y y y i iFLwY PROPOSED 351.9 LF OF 18" IN SITU LINING EXISTING WETLAND y _STORE DAMAGED BOUNDARY (BSW-5), EASEMENT WITH W(TEMPORARY IMPACT WETLAND SEED MIX 110 40 SY 0.02 AC) 778.4 SY _ HEAVY DUTY J1 CONSTRUCTION RIG MATTING (RATED _ FOR 600PS1) — — — --Ile_� i�Tp1-R 100y�J°C' , --nMIT OF DISTURBANCE, DISTURBED AREA= 0.26 AC 525 / / / / / ,� (ACCESS ROAD) SCALE:1 "=40' 505 4D 0 r�72+► , DO PROPOSED 351.7 LF OF W " 18IN SITU LINING 73+0 s - p �o . 74 �'� , ��' i, ► SMH BSE 0177 RE-GRADE/REPAIR SOIL- RIM=507.11 INV IN=501.98 ','ii,li,'� ,;i PATH AS REQUIRED —-�' — \ — INV OUT=501.93 S 2000.09 SY �0. CLEANUP &SEED — \ \ -520 — , _ — — — — — N— \ \ \ \ W/STRAW SMH BSE 0176 RIM=509.96 0) \ INV IN=502.11 ((f INV OUT=502.09 Z CLARK ANNA MAE L/E _ J j)'' SEE DAN RIVER OUTFALL — — — — — -1041-KLYCE-ST— — — — _ — U 4, CONSTRUCTION ACCESS \\ \� \\\\\�\\ \ \ — — — — — —DB 1-068—, P -G-110 _ — - �o�ys, INSET, THIS SHEET��� - - - - - --P+N-7979-13034686 Q 515 _ 011 EXISTING BARN \\\\�\\\ \\��\\\`� �t00 �� �� 520, LL 65+00 66+00 67+00 69+00 70+00 71+00 72+00 73+00 532 528 524 520 516 512 NOTES: 1. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL 7969-07/03/07. 2. LIDAR CONTOURS ARE APPROXIMATE AND ARE SHOWN TO PROVIDE APPROXIMATE DEPTH OF EXISTING SEWER. WHERE EXISTING MANHOLES ARE ARE LOCATED WITHIN STREETS, RIMS ARE TYPICALLY FLUSH WITH PAVEMENT OR EXISTING GRADE. v N \vnlN \ TEMPORARY CONSTRUCTION \ ENTRANCE N v \ C \� O ,moo, U) W 45 C/) O 508 / \, / W_ 500YR-- / \ ` � V,W M 00t, \ —500YR /� 504 � I� 0vv - 520 m O LL 500 - •. 74+00 i DAN RIVER OUTFALL z CONSTRUCTION ACCESS SCALE:1 "=40' Q 0 J Q Z LL vw DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 CAR0� 1O*o ESS /p�9�9 SEAL 025490 PROFESSIONAL SEAL m p z O O Q cc Lu U) LuO U) W 0= Lu a 0 IIIIIIIIz Q W O Z Q + Q Z � Z J z 0 O W 2 Q O z Lu U O 0 U = + a 0-F—Lo 0 Lu 0 J W J W zW LL OC Q0 j Lu LU O 0 w 0 Ir LU W < Lu 0 Z z Q C) z � m o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C31 WKD PROJ. NO.: 20120031.11. RA c\n O U 0 \ \ U) CONSTRUCTION \ \ ACCESS ROUTE ` U \ -Nyddy�,o � O LL 0 W REMOVE (n & REPLACE 5�p Q cgs 748.8 SY EXIST W ' GRAVEL DRIVE J Lu TEMPORARY CONSTRUCTION EASEMENT J �o Z EXISTING O BARN ,moo, U) W 45 C/) O 508 / \, / W_ 500YR-- / \ ` � V,W M 00t, \ —500YR /� 504 � I� 0vv - 520 m O LL 500 - •. 74+00 i DAN RIVER OUTFALL z CONSTRUCTION ACCESS SCALE:1 "=40' Q 0 J Q Z LL vw DICKSON communitV infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 CAR0� 1O*o ESS /p�9�9 SEAL 025490 PROFESSIONAL SEAL m p z O O Q cc Lu U) LuO U) W 0= Lu a 0 IIIIIIIIz Q W O Z Q + Q Z � Z J z 0 O W 2 Q O z Lu U O 0 U = + a 0-F—Lo 0 Lu 0 J W J W zW LL OC Q0 j Lu LU O 0 w 0 Ir LU W < Lu 0 Z z Q C) z � m o PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C31 WKD PROJ. NO.: 20120031.11. RA w °o UJU <0W off Z.2 2- oow "m �,o =-o w OZ. F -o zoz UU ZU °ZOm Y J xU¢ pox 0Y waw 1o� zz< 0.� zl CoQ ¢wz_U w�a m3z 610 WDM 0 w3¢ �¢3 xao c�zw om a Q UOZ z=w Oz, U -U w 0 Z ops L) U p00 oo0� o z xw fox a�0 °oLL ) AA1A " 0 --_ \ \ \ --j GO 8 \ \ 0 m / CO O� v JOHNSTON 01 vvv �Q JEFFREY O P IN 7-9Z9/116-&7 -29_0 vvv vlvv _ p SH B IM= 0. INV - NOTE: S 154.4 LF 12" VCP _ ME-RSO­"AMaT L/E/ TO BE REMOVED - - - - - C40-RAL-PI-G-EME SON - - - CONTRACTOR SHALL COORDINATE WITH OWNER'S - - - - \ -D�946 , PG 41� i i j / / i' %'� _CH_ ST - PROPOSED MH PROJECT COORDINATOR TO FINALIZE RELOCATION OF - - - - /� / / // /_ - _ ss- - /�N'i SHED. CONTRACTOR SHALL PROVIDE CONCRETE SLAB - -PIN 7 79"46�23'/ A BSE 0697 Np�V \ \ 3�,\�� 4� _ - _ ���\\ \ \�\ AND EMPLOY LICENSED ELECTRICIAN TO RE-ROUTE \_ i // / j REMOVE/RELOCATE 5' DIA STD MH EXISTING MH J Tp pqN �UT ���� - - - \ \ \�\ \\ UNDEGROUND ELECTRIC CIRCUIT TO RELOCATED SHED. - - '/ % / // / / j i EXIST SMH STA 9+47.88 BSE 0143 RI O RIVE -_ - - - j �� / / ' - BSEo1az- EXIST WOOD SHED (BRICK) TO BE \ \ \\ \ PROVIDE OWNER 30 DAY NOTIFICATION TO SECURE _ / / / / / / RIM EL=520.40 Z /i / PROPOSED MH OUTSIDE PERM ESMT, REMOVED PROPERTY OWNER'S SELECTED RELOCATION SIGHT. _ - �'/ i / / %/ i i j/ BSE 0571 _ SEE NOTE 7 _ N SEE DWG NO. 11-C25 \\ CENT -RCI �- - \ 2 \\ EASEMENT OBSTRUCTION ALLOWANCE SHALL COVER // 1 / %iii %%/ i 5' DIA FLAT TOP MH -w / lSP�pp NEO -- \ S ---' / / / / / / / / �/ YR- 450.4SY -- FOR PROPOSED DAN \ERT ARE �\ \\\\ \\\ RELOCATION, SLAB AND ELECTRICAL COSTS. _ / /� / / /� �� ��� i„f - TEMPORARY 500 RIVER OUTFALL Y�I FK- _ \ �\ \\\ - - � / / / / / / /- - STA 7+94.49 - - CLEANUP - PIPE \ NE \\ \ // RIM EL=511.16 &SEED W/ -� pool - 525 \ \ \ \\\\\ '�. CONSTRUCTION _ -A A \ \ V / _ PLAN & PROFILE vv� vA�VA� A\\�\\A VA v w �� /� / // / = _ lT PLUG, CONTRACTOR TO INSTALL BRIDGE MAT RINE ENTRANCE 049 \ \ 4=29 32'45" RT -JUTE MAT of - \ \ \ \ \ \ \ \\ TYP 2 71 PROPOSED 20' \\\\ \ \\ \\\� \ \ \ MIN 45 LF FOR EQUIPMENT STREAM515/N 639 \ PERMANENT CITY OF \ \\\\\� \ \ \ \ \\\ \ \ \ \ �\ - - CROSSING AND COFFER DAM & PUMP - ��- EXIST SMH S BSE 0371 SEE DWG NO. 11-C37 FOR PROPOSED HARRIS ST (WEST) PLAN & PROFILECON OP M S R CCRETE O/�-,STUR (PER CITY 6.93' Z4"RCp GIS) .Sg-500Y►�- - � � �/ 5TPi, PROPOSED SAN - - - �� ) \ \\ IN T=496.31 - -- / - - - = Cp \" EXIST METAL SHED EDEN UTILITY ESMT \\\ \\\ \\ \\ \�\\ \\\ \ \\ \ - AROUND TO MAINTAIN CONTINUOUS /i/ �� �ii/ - - - - 0 + \ \ \\ \\ \\\\ \ \ \ \ \ �� /ii i SEWER LATERAL - - - - BB - - - - - V,S13.0 / ST pI / ` w/ OUTSIDE PERM ESMT\\ \\ \\\\\ \ \\ \\ �� _ FLOW OF STREAM DURING / / /�� / SEE NOTE 1, &SEE =SMH Bs 57> - el -- - - - - BB - - =510' =682- �.v \ ��f \ ` \ \\ \\\\ \ \�\\ \ \\\ �� - INSTALLATION OF SEWER PIPE /�� RIM=513.51 l �1 - - T S OF �V \ \ \ \\ .� / QUANTITY NOTE, - P CT / / INV IN=508.39 Cl - - / � /� -i a0 - 15 - - .s �� - � � / � cp (PER ��/ ��00 LIMIT OF DISTURBANCE SSS �� _ // Q ,i / (TYP ALL LATERALS) INV OUT -508.3 r r r ST. NCRETE S DISTURBED AREA= 0.68 AC \� �� ��- -UR �`' /� JSP /// r r rr 8` oo Io O� vvv vvv / /p��\ -�0 - �� / �Q / / rrrr r r O RUCT __ v� S 3 21.I 393 LF \\\\ \\ �`F� FSILTENCE PROPOSED MH 2*00 oz, TrREr �r J rr r \> rr rr r -505 BSE 0572 /v /S 1z UP 5DIA FLAT TOP MH � \ - - - -/// / / r r, r rrr rr d�rf ``��\\\ ` � �3 rr rrrrrrrrrrr r r rrr rr � ✓� � -� ERTyU � - - -- STA 4+80.34 / /// i rrr rr rr rr r r rrr rrrrr rrrrrrrrrrrrrr rr rrrrrrr rrrr rrrr rrrrrrrrrrrrr rrr rrrrrrr rrrrrrr rrrr rrr rr f r : DB 753- , 832 1.89 0ELIM3+3" LTR4°3751 PROPOSED MH r rrrr rrrr r - r r BSE 0049 6' DIA FLAT TOP MH rr�r� rr r °4 rOrrr rrr rrrrrrrrrrr>r"rrr rrrrrrrr rrrrrrr rrrorrrrrrrr o STONE OUTLET, STA 0+00.03 SMH BSE 05 2 rro pr4+o0 RIM EL_511.71 RIM_509.04 g SpSTYP ,///��////%/ �/ / /r/rr /rrrOrrprrrrrrrrrrrrrrrrrrrrr rrrrrrr r rrrrrrrrrrrrrrrrrrrr rrrrrrrrrrr rrr rr?rrrrrerrrrr�-r rOrrr 1NO 58 \ \LF 12," VCP TO W - 4vM,v INV IN=505.0 rrrrrrrrrrr rr\rrrr r\rrr r rrrrrOr rprerrrrrrrrrrrrr rrrrrrrrrrrrrrrrrr rrrrrr rr r rr� rrrrr rr rrrr , / \ ° !� Or rr rrrr___r-rr/rrrrrrrrprrrrrrrr'rrrr� � _\-_rr_r.r� /r rr/rrrrr rrrrrrr r rrr rrrr r rrrr o/i // 24TRF� $?Sy s BE ABANDONED, INV IN55 T=550055..0pO / / _/ INVOUP5 PLUG EA END & PROPOSED MH BSE 0582 GROUT FILL ANF OORUN5'DIA FLAT TOP MH N OII- R9\� _ r r rrr rr rr3r 0 N 72 LF 8" VCP TO819 M SW/ OUTSIDE DROP r / _ v rr \\�$ U.3 X 09 = / STA 1+37.52 / - - 7 r rrrrrrrrrrr rr rr Op rrrrr rrr rrrr rr rrrrrrr rpt 525 ABANDONED, PLUG �LU�\ r�=rte --- r r r r r r r r r r r r r r r / EA END & GROUT FILL - \ �7 104693 r RIM E L=509.04 / - - U 'rrr rrr rrrr r rr rrr rrrr rrrr rrr rr r r rrrr �, / / / / J'i 945-HARRl� T /774 1\Nn HAI RSTON D EMAf3l U� \ 'r 'rrrr'rr rrr ' rr rrrr rrr rrrr rrrrrrrrrrrrrrrrr r 5/ \'p 1241.2 SY / // / �N l , / REMOVE & \- - / / \ rr 11-S8 rrr rrr rrrrr rr rrr rrrr 51 0 / /�j \ D B�40'PG 166 / - - °\ Old - _ \� \ rr rr rr rr rr rrr \2 CLEANUP / �pIj L'OV 0 REPLACE 24 LF - _ r 8 �MARTNNST -J \ rrr r r r r / 53 ---RN/ - �iZ� r -\ r r r r r r r r r r r r r // / / - � &SEED W/ DB' �-1-� zaa � \ GRANITE CURB \i_ �d d� -DB 388 -PG 120`' \\ r r rr r r r r r r STRAW/ / P 7 4'65- � \ 3��1°� f.� r r d� d=�"N , i / �`-�� � $ � \L \\\ \ 3TRE r r / _ i \ � - j/� O / / P 1046`94/14 / 0 v� A y rrr / ���i / / / / / - 1340.9 SY \ \ r / •I I �� ` - / / / / � �f'R � vA v vv � \ �A � %� / / / // ��� / / �� / / / � B / � � � / _ PROPOSED MH - o r W \ \� SEE DWG NO. 11-C34 FOR / \ \� \ \ BSE 0698 CLEANUP, � �� � � % � �' / / �i / / / / / / - -� / / - �x SEED & S SMH BSEP 0572 \� / / / Q 0 - - _ / �� o e 4' DIA STD MH / PROPOSED MILL BRANCH TREAI�V 6QSS1 \ \ �� RIM=514.34 / / / / / _ / - �� STA 9+81.56 HAMPTON -DAVID L F (SEG 2) PLAN &PROFILE STRAW W/NET v v y / / / - �i SEE DWG NO. 11-C36 - RIM EL=521.64 / 53_ 11-S8, SEE DWG NO. \ \ \\ ,lPftt OUT0506.76 / / / /� / - �� \ V / / / / - r / - - r D9 FOR CROSSING \ \ / / / 1� FOR PROPOSED -941 HARRIS -ST - S - _ REQUIREMENTS v v v LL ^ / // / / O� a - - SEE DWG NO. 11-C42 - 0 2,c / / / / // / // / - t� �� \ \-tAREiQ K' / / rye \ �` / o HARRIS ST EAST _ / / � a�. \ / / / - \ \ / / / / r r- - / , (EAST) \ �B 971 P 1�5// / J ERYIES - FOR PROPOSED Y \ \ �O / / / - - - - a \\ PA ICjA-C R1 IS // / + PLAN & PROFILE \ - �A AUDI --JUNIOR PIN 79 10442625 QUI � - MARTIN ST REROUTE ° / \ \ \ / / \ \ \ \\� \�� \, ! ^^a \y - - - PLAN &PROFILE / \ \ / / / HJ°tNff�Y YAI�I9RACOICHRAN \ �3f3� HELM T,S�T/ / �oo` / r / I 24 0� SMH BSE 0144 Rtf�E \� \ -\ / / / /H - \ - 797-CHUM�NEYZQOP��4RR1�ST o / �/ STI LR �� 1327�PG 41 4 / � / � / / / 4RIM=527.63 �R DB 43� PG 2240 - � 14 7 , PG 980 /80 MARTW-ST - \ 7 -\ / / NNIE F2� MPBE L a� �PENJ97�104��66 / / / I / / / INV IN=521.20 ROP S L1�C_ / / ' 114 797-9tO46056 - - B I_ \ / 8Z\ SMH BS 1 "/ / / /� // // / 9 1 9-3 PG�92- - ,�� _ ^ / / / / / INV�UT=52 - PIN 797 1 62698 - - - o - - - - - - / \.9� / / / % 1210�19G, 5 \ �� - - - ' / / / / /' / / / 1 -GLE CLUB RD \ / / / w � 18 TNS RIM=520.02 \ / / PIN'797910-468524 \ / / - \ - W D 6E %P 0 / ,�8 Lve"1W\ INV IN_515.45 \%� /// / / // / / / - - - PI )79,10467 �� -_ _ // / / / / / / / / i / / 6 1191 , PG 20 1- \ - m � w w - 6v5, - / /�// / / - - / / / \ \ \ \ - - / _ = > 00 00 ,Og INV IN -515.66 Q / o - - - - \ PI 7�7>�115 1�4QQ8 INV OUT=515.34 V O� /`/ // / / // / / - - - \ \ \ \ \ \10 / Y - �/ / / / // / / / / / 797910463BCZ9 ` \ / N 0 C/)H H 00 Lp 14? LOO M 524 l-- 520 520LU wo �Z _ Q `l w O=> 516 X00 J W LU 0 D LL Q J Q o m 512 w 504 500 E•• ¢ m o 492 z a a' a LL §w z N It CD tiCOO cflN (0 CO d7 Lo O Ln O m ISI I I O II J owLU zz p� � �>> > w WZ Z Z > i l i i 100 YR. FLOOD 0 ELEV.=523.0 N 00 w CD w= < z U)w N ��w =00=> 0 0~ U� 110 M wQw W'��0II M J p W W co II Oa~COQ O EXISTING GRADE ALONG PROPOSED SAN SEWER UTILITY NOTES: 1. PIPE FOR SUBMERGED STREAM CROSSINGS SHALL BE FACTORY RESTRAINED. 2. SEWER CROSSING STREAMS SHALL BE HYDROSTATICALLY TESTED TO 150 PSI. 3. SEWER CROSSING STREAMS SHALL NOT HAVE JOINTS BELOW STREAM CHANNEL (NORMAL WATER SURFACE ELEVATION) OR WITHIN TWO FEET OF BANKS UNLESS OTHERWISE NOTED. a_in03.60Ez z � AERIAL EXIST SMH BSE 0582 (BRICK) TO BE REMOVED / / EXIST SMH _BSE 0049 / (BRICK) TO BE REMOVEDA / 137.5 LF 12" VCP TO BE REMOVED / PROPOSED 137.5 LF OF 12" DIP @ 0.50% CROSSING & / PIERS TO BE / REMOVED / 342.8 LF 12" VCP / TO BE REMOVED - - - - PROPOSED 30 SY CLASS II RIP RAP PROPOSED 342.81 LF 12" DIP@ 0.50% N � W o 2E w=< U) LL _ W 0=> 200 0 JCID W LU a- w Q � 0o�m I N 00 m 00 00 o no 11 + J II �wz0 > > Z Z 100 YR. FLOOD 0 ELEV.=523.0 QUANTITY NOTE FOR LATERALS: o Q<OrnwZ20 o 3. LIMITS OF WORK (LOW) ARE INTENDED ONLY FOR ROUTING BYPASS PIPING. 1. CONTRACTOR SHALL VERIFY EXISTING SAN SEWER LATERALS SHOWN (OR CONTRACTOR IS NOT PERMITTED TO USE THIS CORRIDOR FOR ACCESSING NOT SHOWN). ALL EXISTING SAN SEWER LATERALS ARE 4" VC OR IRON � - m � 2i > > MARCH 2018 SEWER LATERALS FROM PROPOSED CLEANOUT TO PROPOSED SEWER MAIN 4. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF BANK Ji a- ;t 3:.6C/)R__ DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN ALL WORK 528 TOTAL RESTORATION QUANTITIES BELOW FOR o < _ Q 2. NO LAND DISTURBANCE SHALL BE PERMITTED IN RIGHT OF ENTRY (ROE), SANITARY SEWER LATERAL REPLACEMENT AND 5. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD W � z LL HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION CONTRACTOR. WATER SERVICE LINE REPLACEMENT (WHERE II °0 I- w A. PERFORM THOROUGH PRE -CONSTRUCTION VIDEO OF RIGHT OF ENTRY T INDICATED ON PLAN) ONLY; 6. PROPERTY OWNER RELOCATE SHED SO IT IS OUTSIDE THE PERMANENT AND 00 _ o 00 o TEMPORARY CONSTRUCTION EASEMENT PRIOR TO CONSTRUCTION. IF SHED _ B. REPAIR ANY COLLATERAL DAMAGE TO RIGHT OF ENTRY (ROE) TO THE • 50 LF OF SANITARY SEWER LATERAL SATISFACTION OF THE OWNER AT CONTRACTOR'S COST. 2 � U q Z PREVAILING UNIT PRICE. O r �QOfQ °N -`O nj 524 r z 100 YR. FLOOD 11 0 ~ � W II 1 N w> ELEV.=523.0 - - w Q Q Jo M w Z 0 � G O O N =Qz w 12�Q °o-11.2 wE03:.6wE z LU °U)u-w d 20(D0 w< O E' 1--� Q J 0o 0 PROPOSED SAN SEWER LATERAL, TYP (APPROX ELEV) EXIST SMH EXIST S MFH - BSE 0572 314.0 LF 12' VCP BSE E (BRICK) TO BE TO BE REMOVED (BRICK) TO BE BE ------------------- --- REMOVED REMOVED - - - - - - - - - - PROPOSED 12" CARRIER PIPE W/50 LF 20"x.025 THICK STEEL ENCASEMENT BY OPEN CUT METHOD SCALE: HOR 1"=40'; VERT 1"=4' 00 f- 19 O 00 O 10 O M I � O O 00 � N O "t N � M N M N 00 - O - N N N O It C") - O - N LO 07 N O O O O O .4 6 6 L2 N 66 O 00 4 � � � � O O O O O O O O O O O m Lf') LC) m Lf') Lf) LC) Lf') LC) LC) Lf') m m m Lf') LO LC) LID Lf) 0+00 1+00 2+00 3+00 4+00 5+00 DIP@ 1.44% PROPOSED 314.15 LF 12 N O � o � Lo m N O O ��Lo 11 ~o mJ LO + J W 11 tiwl­-z0 � W > > C/) >Z Z EXIST 16" CI WATER LINE 154.4 LF 12" VCP TO BE REMOVED -zoo - - n96S10 520 EXIST 10" CI WATER LINE 516 SEXIST 6" CI GAS LINE I 512 PROPOSED 33.7 LF OF 12' DIP @ 0.40% 508 NOTES: Ii 3. LIMITS OF WORK (LOW) ARE INTENDED ONLY FOR ROUTING BYPASS PIPING. 1. CONTRACTOR SHALL VERIFY EXISTING SAN SEWER LATERALS SHOWN (OR CONTRACTOR IS NOT PERMITTED TO USE THIS CORRIDOR FOR ACCESSING NOT SHOWN). ALL EXISTING SAN SEWER LATERALS ARE 4" VC OR IRON SEWER REPLACEMENT. NO DISTURBANCE IS PERMITTED. (UNLESS OTHERWISE NOTED). CONTRACTOR SHALL REPLACE ALL ACTIVE MARCH 2018 SEWER LATERALS FROM PROPOSED CLEANOUT TO PROPOSED SEWER MAIN 4. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF BANK WITH 4" PVC AND NEW CLEANOUT AT RIGHT-OF-WAY. INSTALL CLEANOUT IN DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN ALL WORK VALVE BOX IF LOCATED IN ROAD, DRIVEWAY, SIDEWALK, OR PARKING LOT. DOWNSTREAM IS COMPLETED, PROVIDE SILT FENCE ON TOE OF SLOPE. (EA SIDE OF BANK AND/OR PERM FORD). 2. NO LAND DISTURBANCE SHALL BE PERMITTED IN RIGHT OF ENTRY (ROE), RIGHT OF ENTRY IS USED FOR SEWAGE BYPASS PIPING. THE FOLLOWING 5. SEWER MAIN CORRIDOR ON THIS SHEET LIES INSIDE A FEMA SPECIAL FLOOD PROVISIONS SHALL BE STRICTLY ENFORCED AND SHALL BE PROVIDED BY HAZARD AREA (REFERENCE NC FLOODPLAIN MAPPING PROGRAM, NATION CONTRACTOR. FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP PANEL II 7979-07/03/07. A. PERFORM THOROUGH PRE -CONSTRUCTION VIDEO OF RIGHT OF ENTRY T DOCUMENTING EXISTING CONDITION. 6. PROPERTY OWNER RELOCATE SHED SO IT IS OUTSIDE THE PERMANENT AND TEMPORARY CONSTRUCTION EASEMENT PRIOR TO CONSTRUCTION. IF SHED _ B. REPAIR ANY COLLATERAL DAMAGE TO RIGHT OF ENTRY (ROE) TO THE _ HAS NOT BEEN RELOCATED AT CONTRACT AVAILABILITY, CONTRACTOR SHALL SATISFACTION OF THE OWNER AT CONTRACTOR'S COST. RELOCATE SHED OUTSIDE TEMPORARY CONSTRUCTION EASEMENT AT Z PREVAILING UNIT PRICE. O r W nj N r r N CO G O O N N O LU J LU Ir U W Z W m LO m LO m LO LO 6+00 7+00 8+00 9+00 10+00 U) z 0 U Ir 0 LL 0 W W LLJQ J W 0 z J z 0 W W 0 0 - Ir W W It Er 0 LL I z Q 0 z LL DICKSON communitv infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f) 919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ���•���.AR.. ♦ice. �p�oFESS �O� �q ice'' SEAL 025490 ♦♦1 4 , J1111101"", PROFESSIONAL SEAL m Ii MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS a MARCH 2018 DRAWING NUMBER: z O O Ir W IL � ^ II T LuO Z a z W Q Z W G QZ z O LU J LU Ir U W Z W m C) U � J Q Q 0- 0 LL w � Z � 0 W M Q W 0 = Z 00 LU U W 0 � W LL z 0 W > WKD PROJ. NO.: 20120031.10. RA PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS a MARCH 2018 DRAWING NUMBER: 11-C33 W ^ II T Z a z Q Z W G QZ z O LU J W 2 Ir U W Z W C) U � J Q Q 0- 0 LL 0 W � Z � 0 W M Q W 0 = Z 00 LU U W 0 � W LL z W W > MF- F- m C/) � U J w Q LU w J J - z � ! V z LU I m m WKD PROJ. NO.: 20120031.10. RA PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C33 WKD PROJ. NO.: 20120031.10. RA 21 0. w poo 0JU 0Zw a0¢ wo o gra U= p0. ,na0 w oZw F -o oz 0 ZZU 00. =Y� ro= OY� w3� �0, Zwa °0 0ZZ 0w0 a wFa =3:z w�� 0 N 3a m�3 =dw (JZw �0< awe Az 0 U -U Z z.0 w_ °� Y � H U�w Soo z- 410 410 0� 0 =Zw =0= 0.,o OU 0E / J� // MWF SM SE 0143 AB, ATM, MOS RIM=521.07 _ I I --8" DIP@ 0.83% / INV IN=516.62 MARCH 2018 INV IN=513.51 2. INV IN=511.51 pNG� E INV OUT=511.4MsCwG52 I him- PROP - S� OV GONG / 516 9 x Q COP i / 524 2� RG5 / CNS c5"I o.�`f�GP p PROPOSED MH o�p 6'i r� BSE 0143 ,5153/ HIM/ 4' DIA STD MH. I STA 0+00.06 3 �� TO BE ABANDONED 0 RIM EL=521.04 J,51 ga, / 3. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF �� -7 0y SEE DWG NO. 11-C40 FOR LIMIT OF DISTURBANCE". ' �- _ - - 81 a� y _ PROPOSED MH MORAVIAN CHURC 11-S12 �RE�jLQ PROPOSED BURTON ST STREAM DISTURBED AREA= 0.79 AC - _I / +154 LF EXIST 4' Si- r AME -RIC ONGR�C�RVG� g5E CHAIN LINK FENCE 949 HARRIS CROSSING PLAN &PROFILE STREAM CROSSING BSE 0700p ,� 88 - _ \ ll ll lull -88 --- vw 4' DIA FLAT TOP MH 9� bl n1 lull eg INV, G MS 521. �J006� _ 35 LF 8" VCP l`` .l 11-S13, SEE DWG NO. - TB - S / \ R TO BE REMOVED sK I I1 l Illi lull - BB -- s�o pNG' �B 9�,��� 2143 D9 FOR CROSSING STA 6+74.31 (SEGMENT 2) Qg�j� ���788llll ull / C 4�'R DICKSON e - TO BE REMOVED COP 15 EQ �` ` ti` / =STA 0+00.00 (WASHINGTON ST) ' ' / communit infrastructure consultants x,510. c\sl ���N ��NE PIN 79791036995 o����. �.��� REQUIREMENTS 797910364718 nl lull / / �N �G r c�NCE � - a STONE 102.7 LF 8 VCP �,��, RIM EL=537.96 �y IPE QRQP el - - ��`�`��` 48.2 LF 8" VCP nl nil ul SEE DWG NO. �S - g8 �NKNOWN r - e OUTLET, TO BE ABANDONED, 351.6 LF 8 VCP i� nt not �/ /�� m �` / � 720 CORPORATE CENTER DRIVE cRE �c� _ - - To Riau 3 PLUG EA END �` TO BE ABANDONED, s 9� Op nl nnllq,lnl�p / 11-C39 FOR h - X GpN SCR 1 15 - 88 - DqN Y 1 TYP _O �, TO BE ABANDONED / rn / RALEIGH, NC 27607 �� e 41/ / 52 �� 88 - RwER PLUG EA END s u llul ull , PROPOSED / o (t)919-782-0495 -� cy � � - 7s+75�- ai - - � d oo� &GROUT FILL � � PLUG EA END �y // S - 88 - - ` ` o & GROUT FILL nn lull n1n� 138 LF WASHINGTON ST // _/ °vi (f)919-782-9672 - _ - - _ & GROUT FILL uu unn nn �o REMOVE SEE COTE 6 + �� +00 - _ 409 LF till ull SIL CE / �'- -6 00 PLAN &PROFILE S s \ aFRG�� 9� z til 1 TREE, TYP�__ 8� - el ; - - _ _ e _ SILT FENCE // \ WWW.WKDICKSON.COM 57 �. ll llllllll 1gTrttt - - 88 _ 88 88 - - - - -�_- JXlllll 540 11-513Op ll o ll l l 40 oy8y 88 - 8 - - - ---81 ---� �l� S MH BSE 03a NC LICENSE NO.F-0374 l lllllllllll 111111111 Q-, Iy� lllllllllll ll � S I OOYR' 525 -- y3�J llllll �l llillllilllllillllillll lllll'[illllllll _ _ _ l lkl-� �}-ll - -SS- - illi illi � / Q O / / Z RIM=542.77 ,i�yy�1,l� 11111 00 i i i � llllllll l l l l l l l l l l l l l l l l l l 471111 l l l lll.i l 1 1 1 1 11 II i 11 l lllllllllll l l l l)l 1 $ llllllllll l u l l � l l 1 do - �CA9h 1 S- --- do 40� -S dQ S 1 1 1 l l l l llllll l l llllllllll l 1 1 1 �� � / INV IN=537.29 l�lllll llllillll llllilllllilllllill llllllllllllllllll uKa l ll ll llllllllllllll l � llllllll llllllllllll 11111-1-r'�� „�,lll 111111 1 �lllllllllllllllll 11 l' ISSI llllllll > >> ! l - l 111111 \ *sag / INV IN=538.67 li'l't Illi l.�llUllllUl lllllll l� '� llllll„l uliiiill iiillilillll �illlilllllilllllllllllillllilllllill llillllilllllillll 11111illlllillllll lllilllll 1 llllllllll i l illi l -l� � 10' 11111MllllUll llliiillliilllliiIIlilTtlil�i _,• k� �l SS \ / INVOUT=533.32 lllllllll llllll illlllllllllllllll ��11111 1 11111111111111111 1llllll l lllliill \ nlilnll� nillni lnnilnnilnlil Willi nniln ni Uri ��u,� I / SMH BSE 0388 rri111 l 11111 i 5301111111111111111111-1 111111111111111111111111111111111111111 111111111 l l l l l l l l l l l l l l l l l l l H N //- ll lllllllllllllll '' lllllll lllllll lllllllll l b OVE JO SToR coCIM=543.32 Illi lllllillllilll lllllllllll mlli l l SMH BSE 0386 TTTl1-Rl li•TT1 �T iTRi TRiTT l llll�lilllliil ll illll r llllllllll 1 i I MS 111 l llllll l u l l 11 L i l l l l l l �} RIM=525.30 535 1 1 1 l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l �`� I N T T/� �T� / N1 l IN=535.98 0 " - N "' 1 Mil llllllllllll illi llllllllllll i i 01 Op Cp UCT(/ z INV IN=517.47 PROPOSED MH �� of 1 hill lin Ol 12TREE NC.s4 RF v / YNV IN=535.64 / p C , �1 A INV OUT=517.26 LU SMH BSE 01 0� 11 till p .�, PO OX 1 2.75, NV OUT � 111 5\'- G 43 n i l sa4Re O BSE 0386 U SMH BSE 0385 n l l� ovo //Vv- cks A Z $$ � �h z � � RIM=527.19 oy° llllllllll illy °� DB 7 3 P 7 qCC q p 11 fs �v i I PROPOSED SAN 4 DIA FLAT TOP MH o RIM=526.57 INV IN=521.15 PROPOSED �r- n1l FSS) pP 4� O INV IN=520.27 � '� REMOVE � � � SEWER LATERAL, STA 2+84.19 �- � wv ouT=521.15 20 PERMANENT s10, l lull BARRIER FENCE 791 7 12 i u i 9 ,- INV IN=520.95 O 111 , 0� R�& REPLACE �o TYP, SEE NOTE 1 RIM EL=525.65 O INV IN=521.02 EXIST MH BSE 0149 CITY OF EDEN a 1l (SAFETY FENCE) ° �Op; i til 12.1 SY EXIST A=15°33'46" RT c INv ouT=520 1s (BRICK) UTILITY ESMT AGE 1111 nl 20 340 LF TOTAL a 170 LF 8" VCP TO ssit I Op CONC SIDEWALK/ IP 180.6 LF 8" VCP TEMPORARY n BOTH SIDES, o / `� 9's�' n CONNECT EXIST PROPOSED MH TO BE REMOVED a BE ABANDONED Sg IJ ,-6 0 0 TO BE REMOVED � ' \ 0 C,qp� CONC APRON - - 8 VCP TO BSE 0385 CONSTRUCTION n 11111 � SEE NOTE 4 o PLUG EA END & 9 / 1 n pFD� - 3825.6 SY o 6' o 114 LF 8 VCP PROPOSED MH - - PROPOSED MH 4 DIA FLAT TOP MH ENTRANCE, TYP. ull lnI E'P Xp J / TEAMER SOPHIA CLEANUP, un un ® O 545 o a o GROUT FILL TO BE ABANDONED, BSE 0699 (SEE DET, DWG D9 STA 4+21.26 LOVE JOHN D / MEADOWS ) 0� SEED & / PLUG EA END 4' DIA FLAT TOP MH �- ci RIM EL=528.99 OIL CO INC 217.6 SY 2" ASPHALT s / ii1 111111111111 o & GROUT FILL STA 1+29.46 1900 PRICE RD co W A=07044'14" LT STRAW W/NET DB 753 PG 877 p / \ RIM EL=520.70 DB 748 PG 565 TORRENCE �' MILLING AND / SMH BSE 0388 \ j� n 1111 i i 11111111 ii / RELOCATE EXIST _ REMOVE, OVERLAY (NCDOT / / WATER METER, A=29°34'57" LT PIN 797910369763 LEIGH ANTHONY 1 PIN 797910376125 & REPLACE TYP 3 LANE SECTION, / Q RIM=543.32 \ u1 _ RECONNECT TO I 936 BURTON ST MAPLE VIEW I 30 LF CONC C&G S' INV IN- _ s THERMOPLASTIC O INV IN5.64 1-S1 EXIST SERVICE DB 03E PG 270 I 10' 924 WASHINGTON ST (OR AS NECESSARY) ' \ PAINT / / INV OUT=535.5 I ) •, i SEE DWG No. 11-C33 LJ G PROPERTIES PIN 797910460841 I �' DB 1462 , PG 508 °�� yX Q OF EDEN LLC I �m PIN 797910378064 PROPOSED MH v� Op pz h° ii1111 ii1 1 11 p FOR PROPOSED MILL BSE 0701 / BRANCH (SEG 1) 947 HARRIS ST NOTES: />>,e E - PLAN &PROFILE B 1457, PG 980 4 DIA STD MH SS o EI QN� 1. CONTRACTOR SHALL BE RESPONSIBLE FOR BYPASSING ALL SEWAGE FLOWS DURING CIPPL & SEWER INSTALLATION. STA 7+75.80 IN 797910460569 CONTRACTOR SHALL NOTIFY RESIDENTS/BUSINESS OWNERS OF CIPPL INSTALLATION AND MANHOLE REPAIRS AND RIM EL=548.73 � SEE DWG NO. 11-C36 FOR A=34058'22" LT PROPOSED HARRIS ST TO REFRAIN FROM USING WATER. CONTRACTOR SHALL SUBMIT DETAILED WORK PLAN SHOWING HOW ALL SEWAGE / -7 PLAN &PROFILE / HERRIOT LUCION W FLOWS WILL BE BYPASSED. 823 3 SY REMOVE u & REPLACE 945 HARRIS ST 2" ASPHALT 2. CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES. CONTRACTOR SHALL PROTECT EXCAVATION USING \ MILLNG AND 217.4 SY DB 1240 , PG 168 TRAFFIC RATED STEEL PLATES (REQUIREMENTS, SIZING & SECURING OF PLATES SHALL BE RESPONSIBILITY OF OVERLAY IREPAIR EXIST ASPHALT PIN 797910461652 LICENSED ENGINEER), BASIC CRITERIA SHALL BE THAT PLATE SHALL BE RECESSED, FLUSHED WITH PAVEMENT VERLMARKINGS PAVEMENT / SURFACE AND ASPHALTED ON EDGES. CONTRACTOR SHALL PROVIDE DETAILS OF PUMP AND PIPE ARRANGEMENT T PVMT PROPOSED MH MAINTAIN TWO WAY TRAFFIC AND TO MAINTAIN ACCESSIBILITY FOR PEDESTRIAN TRAFFIC. CONTRACTOR SHALL & ARROWS) / PROPOSED MH / �,S BSE 0703 PROVIDE TRAFFIC RATED RAMP FOR BYPASS PIPE AND BARRICADE PUMPS T O ENSURE SAFE TRAFFIC FLOW BSE 0702 a S 4' DIA STD MH °I AROUND WORK AREA. CONTRACTOR SHALL PROVIDE WARNING SIGNS IN ACCORDANCE WITH MUTCD INDICATING 4' DIA STD MH o / (DOGHOUSE) SEE DWG NO. 11-C35 :z' " /<' " SHROPSHIRE WRIGHT OTELIA H MOTORISTS OF WORK AREA AND PUMP/RAMP SO ADEQUATE DISTANCE IS PROVIDED FOR MOTORISTS TO REDUCE STA 9+01.93 / / FOR PROPOSED MILL STA 9+65.39 (SEGMENT 2) \Om SPEED. / p =STA 0+00.00 (SEGENT 3) ( ) Q� PROPERTIES LLC 821 W LAKE MEAD BLVD RIM EL=547.49 / � `SS' PLAN &PROFILE 510 BEAGLE CLUB RD APT A A=14°51'18" LT I p RIM EL=546.93 DB 1191 , PG 2021 I 3. CONTRACTOR SHALL VERIFY ALL EXISTING SEWER LATERALS SHOWN (OR NOT SHOWN). CONTRACTOR SHALL REMOVE A= 42°36'53" LT PIN 797910462812 REINSTATE AND REHABILITATE ALL EXISTING ACTIVE SEWER LATERALS WHERE CIPP LINER IS INSTALLED, TYP., & REPLACE Q� �O �RI�I 797910463669 I UNLESS OTHERWISE SHOWN ON THE PLANS. REHABILITATION OF LATERALS SHALL BE IN ACCORDANCE WITH SPEC 55.6 SY EXIST Q / o CONNECT EXIST z 8" DIP TO Q SECTION 33 12 14. SCALE:1 "=40' CONC // I� 2 PROPOSED MH S�Mp \ 4. CONTRACTOR SHALL CLOSE PORTION OF PARKING LOT WITH TEMPORARY BARRICADE FENCING AND ENTRANCE & SIDEWALK / / co (SEE DET, DWG D1) 93$ WAC11 RO t/ r, U 544 540 536 cy) CD Lu wm 532 0 w U) m 528 = Oa a-< O� 524 520 516 512 SHALL BE CLOSED UNTIL ALL WORK IS COMPLETED AND SEWER IS INSTALLED ACROSS WASHINGTON STREET 5. LIMITS OF WORK (LOW) ARE INTENDED ONLY FOR ROUTING BYPASS PIPING. CONTRACTOR IS NOT PERMITTED TO Lfl o 556 USE THIS CORRIDOR FOR ACCESSING SEWER REPLACEMENT. NO DISTURBANCE IS PERMITTED. Lo cyi M 6-4= W� LLj Z M O � Z 6. CONTRACTOR TO UTILIZE BRIDGE MAT FOR EQUIPMENT STREAM CROSSING AND COFFER DAM & PUMP AROUND TO 2"1-+ � g Q O N M T- 1-- = w w w oq z w w g MAINTAIN CONTINUOUS FLOW OF STREAM DURING INSTALLATION OF SEWER PIPE U) w Q W w ❑ U 0 N� 2 Q> c'') ti M m 2 W w z Lo Xc)I-� �O� ❑r-- II uo W ❑�U��cO �w 5000 00 00 W W m (n � O � ❑ J + J II U) u- 0 � M II 2 W w (n co co �� a O Q U) r,- W Z O ❑ O II 2 o 540 552 cn OW-cnOQ -O EXISTING GRADE Or��❑J+SII ❑ Lu Lu W �w� z IY�����2zz ALONG PROPOSED�oQv~i0°'WZO ui❑cnQOc'7o��riLn co ca W - _ _ 0 (U) H- (n~O W ❑O + II Lo Lo I- 00 w �w� 005000 oo SAN SEWER dm��.6u')YZz oU) +O�n II ❑ M 2 > W U' �Q 0O WZZ 2 2iti W2� § 2Op�OUm�o« o� W Q 2 ❑O�w<>>> r` o ALL _ W QW �❑ N _ cn cD 4 _ d���0u') rno o z ❑� N -04=L11 =a -U- Q w�^ ❑ co zzz548 ceN co W m�i-w co co WJ❑W WN�LoLoLo IIS m��Ww / _ N CD u') O 2 =O=> Ln�-rn 0u- +SII n II ❑ 536 548 =a -0I- � zz�N + II w=� ��00 coco M a_<< 'twzzz 0 ��0�0 0 co N / tri ow cn W IY z ❑�� Va'� OD❑� Q --- U o �000 c'» m »» ❑ W� r` N / 2°oIt a- 9-3:.6 n�--- WQ❑w❑ Q� =dF- W a0 �� (n<W ❑W 1- 11 �- O\ ~-ZZZ Z ~ o co 00 + II U)0Y 2i (D0 r`N cYi� 0QLL QNwZ ❑ rn ou- + o -j j / BORING �o �- O=> o"oN co II �� ❑��U t n> 0 0 - O �Q❑aOJ Q wzzz O (PWR) xU I wQ�❑0.Lo -NCO II W �'_ �m<2i> > O- > � O-iLu W+il �' w d OSSc�EZ Z o IY❑O m »» ELEV=542.00 wm ����� II �zzz z EXIST6"CI 00 - Ln 5�2� 544 544 IY W O 0 06 Lu Q LL U) IL Q Q O- W? O I- co N r-- 7 N / WATER LINE BORING D - m � > > w EXISTING GRADE z 0000 LNn N `II (PWR) 0- C-6 cn > Lo BORING g + II ALONG PROPOSED J II O (PWR) I I I I ELEV=540.50 SAN SEWER � Q w z ) z X � > > ELEV=524.00 BORING 00 00 BORING W z z PWR 1 1 I I 't " " C) p o (PWR) 528 540 ELEV)534.00 j l j 1 1 540 c0 • w r - EXIST SMH I I O � c5 LT, ELEV=523.50 � C) I I BSE 0388 C) J il Ll Lig ~ + rGAS LINE I I j j EXIST SMH (BRICK) TO BE Ow Z Z 0 I I 1 I I j I I BSE 0443 ABANDONED �Q 2 > > > III EXIST SMH I (BRICK) TO BE BORING REFER TO I I W z z z EXIST SMH I I I I BSE 0149 AUGER REFUSAL 100 YR. FLOOD � � 524 536 I I ABANDONED SPEC 012700 - - - - - -T j 536 - BSE 0385 I I I (BW -K) TO-B� REFER TO (PWR) - - BORING ELEV.=523.4 / i PROPOSED (BRICK) TO BE fEjO�ED ELEV=533.00 --SC 000 -_ - - i i AUGER REFUSAL / SAN SEWER EXIST SMH REMOVED I _ 351.6 LF 8" VCP I I - - - - - - - I (PWR) LATERAL, TYP BSE 0386 j - - - J I' TO BE ABANDONED I I - - - (APPROX ELEV) (BRICK) TO BEt8.2 pP�" IP@ 0.50% ELEV=531.50 EXIST 2" DI REMOVED - - - - - - - - LF 8" VCP 2 gg°I° 532 j 0 j - - 532 WATER LINE _ _ - _ - - - - TO BE ABANDONED g OSP BORING p5 LF AUGER REFUSAL 114.8 LF 8" VCP PROPOSED 180.6 LF 8" VCP - -�% 102.7 LF 8" VCP �p 253 (PWR) PROPOSED TO BE ABANDONED 63.5 LF OF 8" DIP EXIST 10" CI TO BE REMOVED - - - TO BE ABANDONED P � ° -WATER LINE EXIST SMH _ - - - - - - PR ELEV=527.50 � � 101.5 LF OF DIP (x70.50% @ 2.59% BSE 0143 - - - - - - 35 LF 8" VCP UTILITY NOTES: - - - - EXIST 6 (BRICK) TO BE TO BE REMOVED 516 528 _ - - - - - ' � --28' REMOVED - - 1. SEWER CROSSING STREAMS AND AERIAL CROSSINGS SHALL BE GAS LINE - - - PROPOSED 13 - - 8" DIP@ 0.50°° 01 PROPOSED 154.73 LF 8" DIP@ 0.50% MWF DESIGN BY: AB, ATM, MOS HYDROSTATICALLY TESTED TO 150 PSI. _ I I --8" DIP@ 0.83% PROJ. DATE: MARCH 2018 m 2. SEWER CROSSING STREAMS SHALL NOT HAVE JOINTS BELOW I him- PROP - Q 512 524 STREAM STREAM CHANNEL (NORMAL WATER SURFACE ELEVATION) OR 24 p WITHIN TWO FEET OF BANKS UNLESS OTHERWISE NOTED. Li 114 LF 8" VCP W I z O TO BE ABANDONED 3. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF Z cc W BANK DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN SCALE: HOR 1 "=40'; VERT 1 "=4' Q SCALE: HOR 1"= ALL WORK DOWNSTREAM IS COMPLETED. PROVIDE SILT FENCE ON W LuO z O TOE OF SLOPE, (EA SIDE OF BANK) 20 (D J W cr U w U) Z w O C) H J C0 N O m M N O M u') C0 ly' C0 O7 � O O d7 00 M M N O It O O O O 07 r- d7 O Ln O N I O 00 O N O M co co d7 0) 07 M Ln r1- It 00 Lo M 00 M 7 00 0� � N N N N N O N N N N N `T N co N N N O N O N ti N N ti N 11- N ti N N 00 N m N O M M Lf� O M N O 00 M co M It � 00 00 r1It O co � I- It Lo Lo Lo Lo Lfl Lo Lo Lo L7 Lo Lo Lo L7 u') Lo Lo 0 z � Lo Lo Lo m u') Lo Ln Lo Lo Ln Lo Lo Lo Ln Lo Lo Lo Lo Lo 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 U) z O U O LL 0 W U) LuQ J W O z J z O U) W U) O D- D 0 - Lu W O LL O z a 0 J a z LL O�O't,41 CARO�jp #, �0 �F p -o o /�-**'9 SEAL 025490 PROFESSIONAL SEAL r PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 m Q p W z O O Q cc Z cc W z Q Z W LuO z O (D J W cr U w U) Z w O C) H J QQ - Lu LL o fr z j z O W OC Q0 W = Z m W U Lu W O LL Q W W cr � m a J g W J J z 0 r PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C34 Q W N Z Q z Q Z W Z z O (D J W cr U w Z w O C) H J QQ - �O LL o fr z j z O W OC Q0 W = Z m W U 0 W O LL Q W W cr � m U J g W J J z 0 C G I- Lu � 0 z � m 0 WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: 11-C34 WKD PROJ. NO.: 20120031.11. RA ow ooO FUo OJV OZw ao¢ zoo Wim= V=� 00. ya0 =�o ~ w ozw -o oN w') °� U o z' wY, _Q U OY� Do. =wz o.E °°< ozz o w 0 w w¢¢ ¢3:z wD� >oo 0 w.z w3a =a� oz° Y ¢o_ aom w V'oz ?=w OzU'D U - O ZZo w 2= oUH VULL 0o0 =Z OO Og O r=Zw ow >wo po 0 x, CONTRACTOR TO UTILIZE BRIDGE MAT FOR EQUIPMENT STREAM CROSSING AND COFFER DAM & PUMP AROUND TO MAINTAIN CONTINUOUS FLOW OF STREAM DURING co / INSTALLATION OF SEWER PIPE B TNER JIMMY LAND CHARLES 969 BURTON ST 946 WASHINGTON ST / DB low, PG 1647 / \ DB 1512, PG 1775 co PIN 7979791030366737 PIN 797910374130 STREAM CROSSING / 11-S12, SEE DWG NO. / / MORAVIAN N AMERICA REQUIREMENTS D9 FOR CROSSING U E R JI URT N T 459 S CHURCH ST REQUIREMENTS DB 1512, PG 75 DB ADM, PG COMB PROPOSED MH 0709 PIN 797910367759 BSE PIN 797910362849 4' MH DIA FLAT TOP MH c� STA 0+96.30 544 540 - 536 - 532 - 528 - 524 - 520 - 516 - LOVE JOHN D OIL CO INC _ DB 753, PG 877 DIKE 7a7a1n4791')ti tj PROPOSED MH REMOVE & REPLACE REMOVE d// / / / 2�0 (D O� ��� %� BSE 0376 917.6 SY 3.3 SY EXIST / 4' DIA FLAT TOP MH 6 RF CONCECURB, T Q� M R! i CLEANUP, CONC SIDEWALK STA 2+51.45 SEED & CONNECT TYP, QTY / O 5 1. co �� i%vV ,55p.31, RIM EL=545.60 STRAW W/NET '548. ^� (F��LF�qRO M" " i PROPOSED 8" DIP h A= 43°43'17" RT TO EXISTING MH 0� I/V 4QQ= 90.4 SY (SEE DET, DWG D1) (F/L 587' M ss' CLEANUP REMOVE & 4 00 ®S` �/ DE's WiT s— ~' & SEED W/ S REPLACE 24 LF / SETTLE Sso JALESSA RAE DB 1435, PG 140 ( PIN 710371452 -N _ v) `J� SMH BSE 0 3M / i i SMH BSE 03 RIM=556.00 iSs It� UT=".0oo AppRGX Sep HOUSES SMH BSE 0383 RIM=556.00 INV OUT=548.00 1 � Qo Z 03 r w O coo car y 1 0 03 p -� co n X:- EXIST PEXIST SMH 0 I Lu m�_LL Q> w>->- 55 z DO ;0 ~ z AB, ATM, MOS 1114 'VOOAREA O Q > 50X Cl)3 EA –1 IV 2 A O = 0 -C/) I CA) G) ozm ;v Cnco co ►� Z rn _ m M SMH BSE 0157 kC 0 _ IAPPROX 8 HPC 9VF % HOUSES SERVED ROckl % I \ �. rARk, PROP BSEE0 NOTES: 1. CONTRACTOR SHALL VERIFY EXISTING SAN SEWER LATERALS SHOWN (OR NOT SHOWN). CONTRACTOR SHALL REPLACE ALL ACTIVE SEWER LATERALS FROM PROP. CLEANOUT TO PROP. SEWER MAIN WITH 4" PVC AND NEW CLEANOUT IN VALVE BOX AT RIGHT-OF-WAY UNLESS OTHERWISE NOTED. VALVE BOX AT CLEANOUT ONLY IF LOCATED IN ROAD. DRIVEWAY, SIDEWALK, OR PARKING LOT. 2. RIP RAP STABILIZATION SHALL BE COMPLETED WITHIN 7 DAYS OF BANK DISTURBANCE, UPON REMOVAL OF BRIDGE MAT AND WHEN ALL WORK DOWNSTREAM IS COMPLETED, PROVIDE SILT FENCE ON TOE OF SLOPE. (EA SIDE OF BANK AND/OR PERM FORD) 3. CONTRACTOR SHALL PERFORM CCTV INSPECTION TO DETERMINE STATUS OF EXISTING SEWER SERVICE. AFTER REVIEW OF CCTV VIDEO BY OWNER'S PROJECT COORDINATOR TO CONFIRM EXISTING SEWER IS ACTIVE OR INACTIVE, CONTRACTOR SHALL ROUTE SERVICE TO PROPOSED MH OR ABANDON SERVICE. PLUG EA END AND GROUT FILL EXISTING SERVICE AS NECESSARY. 4. CONTRACTOR SHALL COORDINATE THE SUPPORT OF EXISTING POWER POLE AND TEMPORARY GUY WIRE REMOVAL & REPLACEMENT (IF NECESSARY) WITH DUKE/PROGRESS ENERGY BEFORE EXCAVATING NEAR THESE UTILITIES. CONTRACTOR SHALL USE ALLOWANCE TO PAY FOR COST OF DUKE/PROGRESS SUPPORT AND/OR BRACING. CONTRACTOR SHALL COORDINATE WITH DUKE ENERGY PRIOR TO BEGINNING WORK (MIN 72 HOURS) TO ARRANGE FOR POLE BRACING AND THE POSSIBILITY OF DE -ENERGIZING OVERHEAD POWER OR A PORTION THEREOF. -3+00 -2+00 Z O U U) Z 0 0 LL 0 W W LuQ J W Ir 0 Z i J Z 0 W W 0 _W Lu 0 LL I CD Z Q J Z_ -1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 LL DWDIKCKSON 1 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL PROJ. MGR.: Lu m�_LL Q> w>->- AB, ATM, MOS ~ z AB, ATM, MOS m� ILL z O W CO DRAWING NUMBER: W W =m m w ��'U` O > zz_> N 2 m =0- > bo Go O 2 > 0000 C14 Lgcc) Lu 2c\j 0 0 U O OOCON N O O 00 N z 2��'U` O (p 00 Lo 0 U Ln l!) 00 N w=� > LL Z U) r T m (fl LLo LLo Q O W Q W Q' 0 U) J W W O M O I� N Ln O L(7 N N N II + II Lf) Lf) Lo 4 540 552 "t � Lo m - W Q W 2 0 Lam{) M II d W 00 O Cn J W W Ln II _ _ > Lf) o - N t = 00 Lf) II II N II F- H II II 552 564 M 00 co o u- dQ�QO O�D�m + O J II II II = Q Wzzz O Q U 06 C) u- + J II g 0 m co W QQON WZ O HU0 M o Ln OoD�00Q�» + J D Z) W"tWzzoo Qg»» CD w O� Ln 00 W EXISTING GRADE �- O °� g»» 07—zzzz II W LU 0 �- O ~—zz EXISTING GRADE cnJwLuC.0 W °� w��zzzz � � cn 9 c mocoL� o g _ _ LU = Q § w § ALONG PROPOSED �- — — — — 0 L -- — — O LL + J II ALONG PROPOSED O Q< J Q w z o O — U) g coN L i) F- F- � m� —'L� zz� SAN SEWER i W OC Q0 LLJO SAN SEWER �o,m��>> EL �o607E— Z 00 WU) + J D �~WO Qg> aa�W 000000I� = O o = > co ���oo ����� �� LU 536 548 Z — i ' 548 560 wc~i10=? O�O�UNao � W Q W of 0 i 0 w W i / Z 2 Z W V co J 0 W W Ln Ln - 1 Ou-- + J II II II o- Q J � z_ z_ z / / T— 2 H0 0 Lu C7 Z Q _ EXIST INV OUT PIPE TO — Q w O In BE PLUGGED INDSIDE MH � .6 `) zzzz 532 544 w -- ,--2% s" PSC 2� 544 556 EX,ST / 0 IIIIIIII0 / A / EXIST - 528 540 j 24" HDPEI 540 552 I / v CONNECT (CORE DRILL) / 00 PROPOSED 8" DIP TO EXISTING BRICK MH / (SEE DET, DWG D1) II 536 / PROPOSED 536 548 , - II 40.0 LF OF8"DIP LL / @3.05% PROPOSED 137.0 LF OF8"DIP°°@ 1.95% 520 532 PROPOSED 30.8 SY 532 544 CLASS II RIP RAP vz— 516 528 528 540 co g IP@ 1.21% SCALE: HOR 1"=40'; VERT 1"=4' ED 251.45 LF PROPOSF- SCALE: HOR 1"=40'; VERT 1"=4' SCALE: HOR 1 "=40'; VERT 1 "=4' 04 Co O O f� O O Lq N 7 Ln O o0 I- O N O N O N Ln N I� N r- M O 00 N co 00 00 Lq (D I� O O � N 00 N 00 LLQ 00 O 00 00 f- � O O O Lo O N f_ ti � 00 O O N Nt m co co Co co Lf> � co co N O co Lf) V) Lf) O Co (` 00 00 00 O O N Ln CN N Ln N N Ln LN N Ln N Lo N Ln Lo co Ln co Ln co Lo Lo co Ln co Lo � co Lo co Lo co Lo � It Lo ' Ln Ln LLo It Ln 't Lo It IUD LLo It Ln It Lo LLo It Ln � Lo Ln LLo Lo Ln -3+00 -2+00 Z O U U) Z 0 0 LL 0 W W LuQ J W Ir 0 Z i J Z 0 W W 0 _W Lu 0 LL I CD Z Q J Z_ -1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 LL DWDIKCKSON 1 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL 11-C39 WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: m DESIGN BY: AB, ATM, MOS ~ z AB, ATM, MOS PROJ. DATE: Q DRAWING NUMBER: W W 2 m ❑ Lu z z Q Z Q O z J 0 ILQz W O Q U 06 WQ ZW O W qU � � It O 0 L Z U) Z W W OC Q0 LLJO Z 00 WU) 0 LU 0 Z W W O W ~U 0 w W w Z 2 Z W V J H T— 2 H0 0 Lu C7 Z Q 0 m In w 0 IIIIIIII0 11-C39 WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: m DESIGN BY: AB, ATM, MOS ~ z AB, ATM, MOS PROJ. DATE: Q DRAWING NUMBER: W W 2 Lu U z Q Z Q z J 0 ILQz W Q U 06 ZW O W qU � � O 0 L Z ol: Z W W OC Q0 W Z 00 WU) 0 LU 0 Z W W O ~U 0 w W w Z 2 Z W V J H T— 2 H0 0 — C7 Z Q 0 m 11-C39 WKD PROJ. NO.: 20120031.11. RA PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: I MARCH 2018 DRAWING NUMBER: 11-C39 WKD PROJ. NO.: 20120031.11. RA i ow 000a FUo CJU pzw Qo¢ woo UDro=w gom ya0 =�o w ozw F -o woo °� U Z 000m wY, U _ Q LL � _ oY� oON ZWz o.E °°< oZz ow(D w¢a ¢�Z o 0 >oo 0 w.z w�Q =a� ozw ¢Y o' <-- UOz Z=w oZ= U -O Zzo w oma= y8 UULL 0�0 YU1Q =z oorr 0 =Zw �0, �- ow w �YQ"i�� i A=bu -4t'04" KI oy �Qj�•A SNP i 128.2 SY i\ CLEANUP, 0�Q / SEED &1"- 564 / / STRAW W/NET 160° 17 49� O _ 110 LF i PROPOSED MH BSE 0703 SILT FENCE 4' DIA STD \ - PROPOSED MH - (DOGHOUSE) MH BSE 0167 RIM EL=546.93 4' DIA FLAT TOP MH- >\ \ STA 1+05.64 RIM EL=546.83 V PROPOSED SAN ,. SEWER LATERAL,fffl _ TYP, SEE NOTE 1 H BSE 01 _ - RIM=548.06 INV IN=538.63 \ INV OST ^5$,63 / \ CONTRACTOR TO INSTALL BRIDGE MAT (MIN 30 LF) FOR EQUIPMENT STREAM _ CROSSING AND COFFER DAM & PUMP AROUND TO MAINTAIN CONTINUOUS FLOW OF STREAM DURING -� INSTALLATION OF SEWER PIPE SIMPRO LL PROPOSED 20' 35 SHINGTON T PERMANENT CITY OF PG 1082 EDEN UTILITY ESMT PI 797 0376399 \ 55 560 = LLJ W Z 00 _ W M M w Q> o o 00 M co "t � Co Lo 556 cowMo�12 LC) n�M II U) co - o 11 LO 0- o Q H J m w Z Z �CnQQ[Q~2ZZ O 552 I2 544 I� 540 536 SMH BSE 0167A RIM=552.61 INV IN=542.43 INV OUT=542.36 0 o-< <- o Q W = W' o W W' 0 W Q J+ maw z�� m �w _ 2000 � T- T- O N z � Lo M wQ��(4 WLo4 Lo _ O2�U�CA� o0� M W Lr) Lr) (y) II w 0 W 0 MLr) II) Cn J W LIj Q W Q J O+ J II II D O W W M N 11 wQ�O�wzz0 °o,mQ2»> 0-QQJ�WZ0 o - COQ O 3:0 w�3:o6w > f'-zz PROPOSED 37 SY CLASS II RIP RAP 00 Q C° w M O Q W LL _ w 2=UO SLI) M F- 0 00 Lr) co wowo��� Lo 11 0U)��+_LII D p Q< O� W Z 0 ���m~�zz o�S(n�- - 5- "t otScnlY-- 33E 0155 DONED ROCKINGHA 1 m / NOTES: �ss� ° 2 RENTALS LLC / s� 136 PARKW OD DR o 1. CONTRACTOR SHALL I" DIP v A. oo> r, ��=���� ° / / / VERIFY EXISTING SAN BANDONED, SSS �U DB 1345 , P 2161 / SEWER LATERALS k END \ OjC �, PIN 7979103 2308 o SHOWN (OR NOT T FILL ���� v�4' CONNECT EXIST �� vT-U, m o PROPOSED MH SHOWN). CONTRACTOR v �= 8 DIP TO °��, �� I I/ c BSE 0706 SHALL REPLACE ALL - 66.8 LF 8" PVC WM \ �` °� oma% o °s PROPOSED MH 4' DIA FLAT TOP MH ACTIVE SEWER TO BE ABANDONED, << 2 so (SEE DET, DWG D1) o� / STA 1+30.11 LATERALS FROM PROP. PLUG EA END op 44 &GROUT FILL 0+00 _ d "� / / RIM EL=526.80 CLEANOUT TO PROP. 2+00SEWER MAIN WITH 4" PVC s 45.1 SY sMH BSE SMH BSE 0158 ��� �,� / AND NEW CLEANOUT IN CLEANUP RIM=546.47 / �Lj o INV IN=538. , s SS \ RIM=526.55 �)�o o SMH BSE 0147 VALVE BOX AT &SEED W/�INv ouT= 6'72 0 wv ouT=522.88 �- m >�, RIGHT-OF-WAY UNLESS RI M=525.36 JUTE MAT AxC/O / �� Mph �_ m�' �s ( �0 INVOuT=521.68 OTHERWISE NOTED. a nrT' r r rr VALVE BOX AT -ss ----- / S BURTONSTJ 4, o o -ss CLEANOUT ONLY IF r r rrr rrr'r rr 'r ' rr o CONTRACTOR TO INSTALL COFFER =��=� -r rr r rr rr rr rr rr ri rr LOCATED IN ROAD. O O rr rr rr r r� , r r r DAM & PUMP AROUND TO MAINTAIN ��n0-1 J 0 ss�� DRIVEWAY, SIDEWALK, rr r,rr ' CONTINUOUS FLOW OF DITCH AND 134.0 SY OR PARKING LOT. \ \ o DRY CONDITION DURING of / CLEANUP, " rrr 70, INSTALLATION OF SEWER PIPE m SEED & 2. RIP RAP STABILIZATION rirrr IN WIL M N �wr" I I / SHALL BE COMPLETED T SETTLE / PROPOSED MH - I STRAW W/NET �0O BOX 2136 6 BSE 0385 CONNECT EXIST / WITHIN 7 DAYS OF BANK 891 , PG 452 T ss� s� LESSA RAE / 4' DIA FLAT TOP MH �� II / 8" VCP TO DISTURBANCE, UPON PI 79791037 4 [1 , v �o o D 1435 , P 40 STA 4+21.26 ���� / PROPOSED MH LD REMOVAL OF BRIDGE CONNECT �p�0o�o SIN 797910 71 2 RIM EL=528.99 ��� I o (SEE DET, DWG D1) MAT AND WHEN ALL WORK DOWNSTREAM IS PROPOSED 8 DIP / _ BUTNER JIMMY ti� TO EXISTING MH sy ss�� SMALL JACQUELIN P ` - I I I / COMPLETED, PROVIDE ^ SEE DET DWG D1 �o �� 39 9 BRIARGATEiDR I 969 BURTON ST Ell SILT FENCE ON TOE OF ( ) SEE DWG NO. 11 C34 FOR DB 1512 , PG 1775 DB 858, PG 5,55 PROPOSED MILL BRANCH �� I I I SLOPE. (EA SIDE OF BANK IN SA HEIRS �� ��� o ( PIN 797910367759 AND/OR PERM FORD IN 79791037 415 (SEG 2) PLAN & PROFILE=� °I I� ) Cl THO GOINS� - I EXIST SMH 0 =� m 3. CONTRACTOR SHALL p �fN 7 0637254 '6-0 BSE 0384 J \ m CONTRACTOR TO INSTALL BRIDGE PERFORM CCTV P /�. \ \ �T I`\ I m MAT (MIN 30 LF) FOR EQUIPMENT INSPECTION TO STREAM CROSSING AND COFFER DETERMINE STATUS OF fzb°'So `foo A PATTERSON ANNIit� ��� �s\� DAM & PUMP AROUND TO EXISTING SEWER ' ��� MAINTAIN CONTINUOUS FLOW OF SERVICE. AFTER REVIEW \` aw \ \ �p °o DB 151 , PG 192 \ \ ��' PIN 797906371596 ��� _ I STREAM DURING INSTALLATION OF CCTV VIDEO BY \\ `s / s I \ OF SEWER PIPE OWNERS PROJECT COORDINATOR TO tet• �nzz \\ CONFIRM EXISTING 1660 / SEWER IS ACTIVE OR BURTON ST STREAM CROSSING INACTIVE, CONTRACTOR a \ SHALL ROUTE SERVICE REMOVE r ss\ \ PROPOSEDTO O SCALE:1 "=40' & REPLACE ABANDON SERVICEPLUG \ \ \ 32.4 SY \ X EXIST ASPHALT Js�l° \ s'�y;p /PAVEMENT556 2 \ s��0 o PROPOSED MH °s9A°\ s� oo w LBSE 0155 ass o \ \ / o 5' DIA STD MH F�G� yam\ \\ \ w W/ OUTSIDE DROP / / o ss / 0° � w STA 5+10.58 / _ RIM EL=549.48 / \\ `\ 552 g 0 \ \ w¢w0�o ° . `. 0 W J L0 w o-< <- I C) 0 W Q J+ �.6 0- �� U) _ LL � m d �_ w Z cn r - PROPOSED = 0 O 00 00 00 - I� � I � r� co � M O w � N ~ O (� W 006"tM 00 co U') Lo r mO00 Lo ~ dQ�Q�L0WZZ O+ J LO M 2 C'j Lo + I In M II ~ O 3:0 O0 » �LoWZ0 2» / a�O�o6cjEEzz z- z- X< Ill U) / EXISTING GRADE / \ ALONG PROPOSED // \ SAN SEWER / I / I U o-< <- I Cl � co 0 W Q J+ �.6 0- �� 548 Q F- O \ PROPOSED PROPOSED a 532 co � z 79.9 LF OF 8" DIP 88.1 LF OF 8" DIP ---0 ` =p> PROPOSED @ 0.50% @ 0.50% m O II 105.6 LF OF 8" DIP PROPOSED 8" CARRIER m / @ 0.50% PIPE W/ 40 LF 16"x.025 a / 552 THICK STEEL ENCASEMENT U) of / BY OPEN CUT METHOD oCLo'j N Ll / 512 M L~ co II z 528 O w O= / O N Lo Q :E > > Oce) ��z z z w O N O O M a7 O 00 N r� N O N 00 INACTIVE, CONTRACTOR LY O O O Cfl O co O O ABANDON SERVICE. PLUG a EACH END AND GROUT 544 FILL EXISTING SERVICE co // a -1+50 -1+00 0+00 1+00 SCALE: HOR 1"=40'; VERT 1"=4' O 0) 00 N M OCM Ln It 00 Lo Lo L0 Lo Lr) Lo L0 Lo 2+00 CONNECT PROPOSED 8" DIP TO EXISTING MH (SEE DET, DWG D1) PROPOSED 70.3 LF OF 8" DIP @ 0.50% M CD CO o Lf) Lo L0 Lo Lf) 3+00 4+00 564 560 556 552 544 540 536 532 528 5+00 540 536 532 528 524 520 516 512 = 00 2 Lo O W Wcn m o-< <- . ti °NLo-Lo Lo Ln - N II Cl � co 0 W Q J+ �.6 0- �� 548 Q F- O \ w Z Z Z Q O Lo U) Oo f co � z CD 0 w= � U) u- 544 ---0 ` =p> 2 O O OOMO p - U N 540 536 532 528 524 520 516 512 = 00 2 Lo O W Wcn m EXIST SMH BSE 0385 (BRICK) TO BE wQw�� . ti °NLo-Lo Lo Ln - N II 0 W Q J+ LO Ln F- O ' Q F- O \ w Z Z Z Q O 556 Oo f � � » » d�O��t3 U) �ZZZ Z Lo / Oo O N PERFORM CCTV O II INSPECTION TO O+ W / 516 m 00 00 O - 00 / 552 EXISTING SEWER U) of / SERVICE. AFTER REVIEW oCLo'j N Ll / 512 M L~ co II z / O w O= / O N Lo Q :E > > Oce) ��z z / W / U) SEWER IS ACTIVE OR / wmcnlY INACTIVE, CONTRACTOR EXIST SMH BSE 0385 (BRICK) TO BE I I REMOVED I II CONNECT EXIST -� 8" VCP TO CONNECT EXIST PROPOSED MH U 8" VCP TO (SEE DET, DWG D1) PROPOSED MH ±16 LF 8" VCP o z (SEE DET, DWG D1) TO BE REMOVED co 37.5 LF 8" VCP PROPOSED TO BE REMOVED 52.9 LF OF 8" DIP @ 1.53% PROPOSED 26 SY SCALE: HOR 1"=40'; VERT 1"=4' CLASS II RIP RAP N Cfl 00 O N N LoN Lr) 0+00 1+00 2+00 540 536 532 G vw DICKSON communityinfrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NOY 0374 PROFESSIONAL SEAL >- z ❑ z 0 O w°C Ir U) z p O > Lu Lu a 0 lz Q coLu Z Q z 06 Z Z � J W w ooc O Z w U U O U = W a w Q W O � W � W z O W � 0 U) 528 Q U) Li EXISTING SERVICE AS ' I 556 NECESSARY. 4. CONTRACTOR SHALL / 520 PERFORM CCTV / INSPECTION TO / 516 DETERMINE STATUS OF 00 00 O - 00 / 552 EXISTING SEWER 00 M 6 / SERVICE. AFTER REVIEW oCLo'j N Ll / 512 OF CCTV VIDEO BY co II z / OWNER'S PROJECT w O= / COORDINATOR TO Q :E > > ��z z / CONFIRM EXISTING / 548 SEWER IS ACTIVE OR / INACTIVE, CONTRACTOR / SHALL ROUTE SERVICE / TO PROPOSED MH OR / ABANDON SERVICE. PLUG EACH END AND GROUT 544 FILL EXISTING SERVICE co // o Lri AS NECESSARY. I I REMOVED I II CONNECT EXIST -� 8" VCP TO CONNECT EXIST PROPOSED MH U 8" VCP TO (SEE DET, DWG D1) PROPOSED MH ±16 LF 8" VCP o z (SEE DET, DWG D1) TO BE REMOVED co 37.5 LF 8" VCP PROPOSED TO BE REMOVED 52.9 LF OF 8" DIP @ 1.53% PROPOSED 26 SY SCALE: HOR 1"=40'; VERT 1"=4' CLASS II RIP RAP N Cfl 00 O N N LoN Lr) 0+00 1+00 2+00 540 536 532 G vw DICKSON communityinfrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (17919-782-9672 WWW.WKDICKSON.COM NC LICENSE NOY 0374 PROFESSIONAL SEAL >- z ❑ z 0 O w°C Ir U) z p O > Lu Lu a 0 lz Q coLu Z Q z 06 Z Z � J W w ooc O Z w U U O U = W a w Q W O � W � W z O W � 0 U) 528 Q U) Li 524 520 516 i cr 512 Z Co W M LL UJ Z j O W O 0 O W W w z °C cr Q oC O W U � Iii m LL Q w J J z CD ~ w OC z fr m cr C � � m PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 Q DRAWING NUMBER: 5z 11-C40 G J WKD PROJ. NO.: W 20120031.10. RA m om 00 FUO �JU p Z w aoD ww0 z~ o U=w 0�. 'ao =gip w Ozw m -p ~Om wU0 "� ozw 00 0 =u,m ~O= 0Y! w�a QO0X0 'wa 0.. '0a Zz Ow0 w�a z 0 10 .D¢ 0 wtiz w�a 2a3 0 0 -, Q� w z°w 3� oZ� U-� ZZp°' w _ YUP U p00 Yz M =Z r� oo� " 0 F5M ¢F aw0 0 00 LL Iq CD'D SwIlMaKDON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 OO���H • C A Rod SEAL i2. 025490 . . �•'•�.NG I NES.'•• PROFESSIONAL SEAL m z O O w Ir Cn z o Fn 0 LU z O U Z w O U IIIIIIIId O LL O W a LU Q J W Q w 7 � J o Q z Cn Q W z J v Q w p J � F C� w or z o 0 0 z o w z O W w � 0 LU w Ir R � � Q o o z w U W 0- w U- 0 OC o O Q LU w z w U �� a w �./ / J F LU F— CR � w W v CD z cc LUO Ir o aLL 0 PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS z DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 w DRAWING NUMBER: a °C D9 z 0 0 J WKD PROJ. NO.: a` Q z 20120031.01. RA a w LL SUMMARY TABLE FOR STREAM /SWAGE CROSSINGS REQUIREMENTS APPROX MIN QUANTITY ORDINARY HIGH WATER STREAM/SWALE STREAM JUSTIFICATION FLOW RATE STRUCTURE/PROCEDURE PERMANENT PERMANENT MARK (DEPTH (FT) FROM CROSSING IDENTIFIER (GPM) (1) REQUIREMENTS STABILIZATION STABILIZATION TOP OF BANK) LOWER SEWER BRIDGE MAT COFFER DAM CR 11-51 MATRIMONY CROSSING 221309 g� PUMP AROUND CLASS II 65.3 CU YDS N/A CREEK CR 11—S2 UT 2 TO SEWER 110044 BRIDGE MAT, COFFER DAM CLASS II 24.9 CU YDS 0.83 DAN RIVER CROSSING 8c PUMP AROUND UT 4 TO SEWER BRIDGE MAT COFFER DAM CR 11-53 MATRIMONY 1753 CLASS I 43.9 CU YDS 0.42 CREEK CROSSING g� PUMP AROUND UT 4 TO SEWER BRIDGE MAT COFFER DAM SYNTHETIC MAT CR 11-54 MATRIMONY 40 24 SQ YDS 0.92 CREEK CROSSING 8c PUMP AROUND 8c GRASS CR 11—S5 UT 1 TO DAN SEWER 8923 BRIDGE MAT, COFFER DAM CLASS II 52.9 CU YDS N/A RIVER CROSSING 8c PUMP AROUND CR 11-56 UT 3 TO DAN SEWER 693 BRIDGE MAT, COFFER DAM CLASS B 16 CU YDS 2 RIVER CROSSING 8c PUMP AROUND UT 6 TO SEWER BRIDGE MAT COFFER DAM CR 11-57 MATRIMONY CROSSING 1144 � PUMP AROUND CLASS B 19.6 CU YDS N/A CREEK CR 11-58 UT 1 TO DAN SEWER 19120 BRIDGE MAT, COFFER DAM CLASS II 23.4 CU YDS N/A RIVER CROSSING 8c PUMP AROUND UT 7 TO SEWER BRIDGE MAT COFFER DAM CR 11-59 MATRIMONY CROSSING 1330 � PUMP AROUND CLASS I 7.2 CU YDS 0.92 CREEK UT 2 TO SEWER BRIDGE MAT, COFFER DAM CR 11-510 DAN RIVER CROSSING 9982 8c PUMP AROUND CLASS I 11.7 CU YDS N/A LOWER SEWER BRIDGE MAT COFFER DAM CR 11—S11 MATRIMONY CROSSING 650355 � PUMP AROUND CLASS II 94.1 CU YDS N/A CREEK CR 11—S12 UT 1 TO SEWER 5022 BRIDGE MAT, COFFER DAM CLASS B 12 CU YDS 1.5 DAN RIVER CROSSING 8c PUMP AROUND CR 11-513 UT 1 TO SEWER 290281 BRIDGE MAT, COFFER DAM CLASS II 20.2 CU YDS N/A DAN RIVER CROSSING 8c PUMP AROUND CR 14-51 UT 1 TO SEWER N/A BRIDGE MAT, COFFER DAM CLASS II 32.7 CU YDS 4.25 SMITH RIVER CROSSING 8c PUMP AROUND CR 15-51 SMITH RIVER SEWER N/A BRIDGE MAT, COFFER DAM CLASS I 130 CU YDS 1 CROSSING 8c PUMP AROUND CR 15-52 UT 1 TO SEWER N/A BRIDGE MAT, COFFER DAM CLASS II 118.2 CU YDS N/A SMITH RIVER CROSSING 8c PUMP AROUND CR 16-51 TACKETT SEWER 1707 BRIDGE MAT, COFFER DAM CLASS I 18 CU YDS 3.5 BRANCH CROSSING 8c PUMP AROUND UT3 TO SEWER BRIDGE MAT COFFER DAM CR 16-52 TACKETT CROSSING 2471 8c PUMP AROUND CLASS II 9 CU YDS 1.8 BRANCH CR 16-53 TACKETT SEWER 7340 BRIDGE MAT, COFFER DAM CLASS B 28.3 CU YDS 1.25 BRANCH CROSSING 8c PUMP AROUND CR 16-54 TACKETT SEWER 23520 BRIDGE MAT, COFFER DAM CLASS II 92 CU YDS 2.75 BRANCH CROSSING 8c PUMP AROUND UT4 TO SEWER BRIDGE MAT COFFER DAM SYNTHETIC MAT CR 16—S5 TACKETT N/A 13 SQ YDS N/A CROSSING 8c PUMP AROUND 8c GRASS BRANCH CR 17-51 UT2 TO SEWER N/A (2) BRIDGE MAT, COFFER DAM STRAW W/NET 39 SQ YDS 0.67 DRY CREEK CROSSING 8c PUMP AROUND 8c GRASS (1) FLOW RATE DATA FOR BRIDGE STREET BASIN (CR11—XX) FROM HYDRAFLOW MODEL RESULTS. FLOW MEASUREMENTS WERE MADE ON NOVEMBER 2, 2017 AND ARE SUBJECT TO CHANGE GIVEN ANTECEDENT RAINFALL AND SEASONAL VARIATIONS IN GROUNDWATER. FLOW MEASUREMENTS ARE BASED ON ORDINARY HIGH WATER ELEVATION. (2) A STANDING POOL OF WATER WAS OBSERVED AT THIS CROSSING. m om 00 FUO �JU p Z w aoD ww0 z~ � U=w Dim Sao =gip w Ozw F -o oz "o 0z z w UOm mu,UQ ~pN 0Y! p00 'wa 0.. '0a 0Zz w0 wizz 010 .D� 0 wtiz w�a 2a3 0Zo ¢.0, Q� w z°w 3� oz� U-� ZZp°' w _ YUP U p00 YMz=Z r� oo� " 0 F5M ¢F rw� Iq DWDK'SKSON communityinfrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t)919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 OO���H • C A R0� ��i�,i SEAL i2. 025490 PROFESSIONAL SEALco z O 0 U-1 °C °C w z o O U) U-1 z O U 0 w Z O U IIIIIIIIz O LL 0 W U) LUQ J Q Z CLU 0 z O3 o z � QLU w I z J U p J F- F- CR C� w f z z o 0 O _ O w z U) U) O LU W w Cl) w Ir E U Q 0 O z w U w 0— w w 0 z 0 w W w U �� a w IJ..� �./ / W H z W W � c� U z ~I = w O a LL PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS z DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: w Q °C D9 z 0 J WKD PROJ. NO.: a` Q z 20120031.01. RA w LL SUMMARY TABLE FOR STREAM /SWAGE CROSSINGS REQUIREMENTS APPROX MIN QUANTITY ORDINARY HIGH WATER STREAM/SWALE STREAM JUSTIFICATION FLOW RATE STRUCTURE/PROCEDURE PERMANENT PERMANENT MARK (DEPTH (FT) FROM CROSSING IDENTIFIER (GPM) (1) REQUIREMENTS STABILIZATION STABILIZATION TOP OF BANK) LOWER SEWER BRIDGE MAT COFFER DAM CR 11-51 MATRIMONY CROSSING 221309 g� PUMP AROUND CLASS II 65.3 CU YDS N/A CREEK CR 11—S2 UT 2 TO SEWER 110044 BRIDGE MAT, COFFER DAM CLASS II 24.9 CU YDS 0.83 DAN RIVER CROSSING 8c PUMP AROUND UT 4 TO SEWER BRIDGE MAT COFFER DAM CR 11-53 MATRIMONY 1753 CLASS I 43.9 CU YDS 0.42 CREEK CROSSING g� PUMP AROUND UT 4 TO SEWER BRIDGE MAT COFFER DAM SYNTHETIC MAT CR 11-54 MATRIMONY 40 24 SQ YDS 0.92 CREEK CROSSING 8c PUMP AROUND 8c GRASS CR 11—S5 UT 1 TO DAN SEWER 8923 BRIDGE MAT, COFFER DAM CLASS II 52.9 CU YDS N/A RIVER CROSSING 8c PUMP AROUND CR 11-56 UT 3 TO DAN SEWER 693 BRIDGE MAT, COFFER DAM CLASS B 16 CU YDS 2 RIVER CROSSING 8c PUMP AROUND UT 6 TO SEWER BRIDGE MAT COFFER DAM CR 11-57 MATRIMONY CROSSING 1144 � PUMP AROUND CLASS B 19.6 CU YDS N/A CREEK CR 11-58 UT 1 TO DAN SEWER 19120 BRIDGE MAT, COFFER DAM CLASS II 23.4 CU YDS N/A RIVER CROSSING 8c PUMP AROUND UT 7 TO SEWER BRIDGE MAT COFFER DAM CR 11-59 MATRIMONY CROSSING 1330 � PUMP AROUND CLASS I 7.2 CU YDS 0.92 CREEK UT 2 TO SEWER BRIDGE MAT, COFFER DAM CR 11-510 DAN RIVER CROSSING 9982 8c PUMP AROUND CLASS I 11.7 CU YDS N/A LOWER SEWER BRIDGE MAT COFFER DAM CR 11—S11 MATRIMONY CROSSING 650355 � PUMP AROUND CLASS II 94.1 CU YDS N/A CREEK CR 11—S12 UT 1 TO SEWER 5022 BRIDGE MAT, COFFER DAM CLASS B 12 CU YDS 1.5 DAN RIVER CROSSING 8c PUMP AROUND CR 11-513 UT 1 TO SEWER 290281 BRIDGE MAT, COFFER DAM CLASS II 20.2 CU YDS N/A DAN RIVER CROSSING 8c PUMP AROUND CR 11-514 UT 1 TO SEWER 737378 BRIDGE MAT, COFFER DAM CLASS II 12 CU YDS N/A DAN RIVER CROSSING 8c PUMP AROUND CR 11-515 UT 2 TO SEWER 2921688 BRIDGE MAT, COFFER DAM CLASS II 76.2 CU YDS N/A DAN RIVER CROSSING 8c PUMP AROUND CR 14-51 UT 1 TO SEWER N/A BRIDGE MAT, COFFER DAM CLASS II 32.7 CU YDS 4.25 SMITH RIVER CROSSING 8c PUMP AROUND CR 15-51 SMITH RIVER SEWER N/A BRIDGE MAT, COFFER DAM CLASS I 130 CU YDS 1 CROSSING 8c PUMP AROUND 15-52 UT 1 TO SEWER N/A BRIDGE MAT, COFFER DAM CLASS II 118.2 CU YDS N/A SMITH RIVER CROSSING 8c PUMP AROUND CR 16-51 TACKETT SEWER 1707 BRIDGE MAT, COFFER DAM CLASS I 18 CU YDS 3.5 BRANCH CROSSING 8c PUMP AROUND UT3 TO SEWER BRIDGE MAT COFFER DAM CR 16-52 TACKETT CROSSING 2471 8c PUMP AROUND CLASS II 9 CU YDS 1.8 BRANCH CR 16-53 TACKETT SEWER 7340 BRIDGE MAT, COFFER DAM CLASS B 28.3 CU YDS 1.25 BRANCH CROSSING 8c PUMP AROUND CR 16-54 TACKETT SEWER 23520 BRIDGE MAT, COFFER DAM CLASS II 92 CU YDS 2.75 BRANCH CROSSING 8c PUMP AROUND UT4 TO SEWER BRIDGE MAT COFFER DAM SYNTHETIC MAT CR 16—S5 TACKETT N/A 13 SQ YDS N/A CROSSING 8c PUMP AROUND 8c GRASS BRANCH CR 17-51 UT2 TO SEWER N/A (2) BRIDGE MAT, COFFER DAM STRAW W/NET 39 SQ YDS 0.67 DRY CREEK CROSSING 8c PUMP AROUND 8c GRASS (1) FLOW RATE DATA FOR BRIDGE STREET BASIN (CR11—XX) FROM HYDRAFLOW MODEL RESULTS. FLOW MEASUREMENTS WERE MADE ON NOVEMBER 2, 2017 AND ARE SUBJECT TO CHANGE GIVEN ANTECEDENT RAINFALL AND SEASONAL VARIATIONS IN GROUNDWATER. FLOW MEASUREMENTS ARE BASED ON ORDINARY HIGH WATER ELEVATION. (2) A STANDING POOL OF WATER WAS OBSERVED AT THIS CROSSING. i 00 Zaw 00p000. �JU pzw Qo11 z� z0. 0 Dm� Dm� pxw p�61 w Ozw z.o oz w00 z 0 dU Szom wo x_UQ �px OY< w3Q .0o $wz oom z Do< ozz ow(D ¢kms w¢Q ¢3z d�cr) wpF, 0 wtiz w�Q x I< a❑ 7zw ¢�� awe z,z -32 0 z S U- zzw n oma= Y U H U p.00 Y�Q 3xz 000 z o moo= F H mwoiow Up v� PROPOSED 12' WOOD BRIDGEMAT (3) 4' WIDTHS FOR CROSSING KICK BOARD (PROTECT EITHER SIDE WITH SILT FENCE AS SHOWN BELOW, OF SUFFICIENT HEIGHT TO PREVENT DEBRIS FROM FALLING OVER) EXISTING STREAM OR SWALE 1/4 CLASS I RIP RAP FOR APPROACH (WIDTH VARIES) SUPPORTED STABILIZATION W/FILTER FABRIC, TYP (SEE PLAN & PROFILE)r F WATER DIVERSION, INSTALL BOTH SIDES 12' 50 BOLTS TO OPTIONAL SECURE PLYWOOD MAT SHEETING ELEVATION 8"x8" KICK BOARD, TYP U) PLAN SECTION A -A GENERAL NOTES: SEQUENCE NOTES: 1. INSTALL TO CREATE A MINIMUM 12 FT CROSSING WIDTH OR LARGER WIDTH 1. MAT SHALL BE INSTALLED PRIOR TO CONSTRUCTION. LOCATION OF MAT AT FOR CONSTRUCTION EQUIPMENT. EACH CROSSING SHALL BE COORDINATED BY CONTRACTOR SO IT DOES NOT CONFLICT WITH SEWER EXCAVATION AND IT RESIDES WITHIN LIMITS OF 2. PERIODICALLY CHECK MAT HARDWARE, RETIGHTEN AS REQUIRED TO MAINTAIN DISTURBANCE (LOD). STRENGTH AND INTEGRITY. 2. MAT SHALL REMAIN IN PLACE UNTIL ALL DOWNSTREAM (IN TERMS OF SEWER 3. REMOVE ANY DEBRIS THAT ENTERS STREAM OR DRAINAGE WAY. FLOW) WORK HAS BEEN COMPLETED, RESTORED AND DEEMED ACCEPTABLE. 4. CONTRACTOR RESPONSIBLE FOR SIZING STRUCTURAL COMPONENTS OF MAT 3. WHERE MAT LOCATION OVERLAPS LOCATION OF A PROPOSED PERMANENT TO CARRY ALL CONSTRUCTION LOADS INCLUDING EQUIPMENT AND MATERIAL. FORD OR REPLACEMENT OF AN EXISTING FORD, THE FORD SHALL THEN BE CONSTRUCTED AND SHALL BE USED BY THE OWNER FOR PERPETUAL OPERATION AND MAINTENANCE OF SEWER. TEMPORARY STREAM CROSSING (BRIDGE MAT) NOT TO SCALE R STRAP TOP OF BANK ,111, oh, ) 1\ \/ -i i ii i ii I I KEYWAY AT OHWM FILTER CLOTH - _ z ORDINARY HIGH WATER MARK(OH (VARIES) ~ T (MIN) IS BASED UPON MIN DIAMETER OR THICKNESS OF SIZE OR CLASSIFICATION AS -� - DEFINED IN STABILIZATION MEASURES, SEE - STREAM CROSSING REQUIREMENTS TABLE - STONE SIZE/THICKNESS (T): • CLASS II RIP RAP=28" • CLASS I RIP RAP=20" • CLASS B RIP RAP=18" SECTION RIP RAP TO CONFORM TO EXISTING SLOPE REPLACE EXISTING STREAM BED COBBLE STONE IN DITCH BOTTOM AFTER PIPE INSTALL DE -W) SILT BAG LOCATION FILTE FAB R I GRAVITY SEWER FILTER CLOTH (NO JOINTS SHALL BE INSTALLED - BENEATH STREAM -STAGGER _ PIPE LAYING SO JOINTS ARE SILT BAG OUTSIDE STREAM INFLUENCE) II - PER PLANS 15-20' DISCHARGE - - - - - - - - FILTER FABRIC HOSE STABILIZED CROSS SECTION OUTFALL CLASS A STONE SILT FENCE TO PARALLEL STREAM = w U Lu � O > LL w LUw Z) 0§-- I03: C/) 0 --- - CREEK/DITCH BED AS REQ'D IN, PLAN STREAM BANK STABILIZATION NOT TO SCALE STRAP 1/4"x7" PROVIDE 1/8"x7" RUBBER - CLASS 53 D GASKET UND ,/-Ft STRAP 1/4"x8" PROVIDE CIRCUMFERENCE OF L CRUBBER GASKET IRCUMFERENCE O p AROUNDIFULL G TO 5'-0" MAX. POE FLANC 2'-6" PIPE 2„ 2-3/4"0 A325 BOLTS AND WASHERS EACH 1/2" TAKE-UP SIDE TYPICAL (UPSET (TYP.) THREADS) 3/16 (3/16" WELD ALONG BOTH EDGES OF THE R3/8x8 120° 3/16 3/8" PLATE) HP8x36 (WELD VERTICAL HP CONTINUOUSLY TO HORIZONTAL HP) w U) R STRAP 1/4"x7" ,V-12" SHALL BE CLASS 53 MANUFACTURED RESTRAINED JOINT DUCTILE IRON CLASS 53 DI OR FLANGED PIPE. FIELD RESTRAINT SYSTEMS (IE: MEGA -LUGS, GRIP -RINGS, ETC.) SHALL NOT BE UTILIZED. ALL OTHER PIPE SHALL BE CLASS 53 DUCTILE IRON FLANGED PIPE. • � Cl) J O� M LL w w INTENT/DISCLAIMER: IT IS THE INTENT OF THIS DETAIL TO PROVIDE P8x36 = O GENERAL GUIDANCE ON THE INSTALLATION OF H -PILES TO SUPPORT AN ULU ~ AERIAL CROSSING. THE DESIGN ENGINEER SHALL CAREFULLY REVIEW w w a THE SPECIFIC SITE SOIL CONDITIONS PIPE LOADS AND PIPE DESIGN PRIOR TO CONSTRUCTION. THE FAYETTEVILLE PUBLIC WORKS z > COMMISSION ASSUMES NO LIABILITY FOR THE USE OF THIS DETAIL. w o W l 1 TYPICAL "H" PILE SUPPORT N.T.S. H -PILE DETAIL 4" THRU 16" PIPE FOR AERIAL CROSSINGS NOT TO SCALE 1/2" TAKE-UP (TYP.) R 1 /4"x8" T-6" (3/16" WELD 6A ALONG BOTH 6V --EDGES OF THE 3/8" PLATE) (WELD VERTICAL BEAM CONTINUOUSLY TO HORIZONTAL BEAM) 2-7/8"DIA A325 BOLTS AND R STRAP 1/4"x8" WASHERS EACH SIDE TYPICAL (UPSET THREADS) W14x43 3/8" END R SEAL WELDS CLASS 53 DUCTILE (WELD VERTICAL IRON FLANGED BEAM t PIPE CONTINUOUSLY TO HORIZONTAL BEAM) R EXISTING 8" CLASS GROUND A STONE EXISTING CHANNEL SILT BAG PROFILE INTENT/DISCLAIMER: IT IS THE INTENT OF THIS DETAIL TO PROVIDE POLYETHYLENE LEVEL WITH TOP OF w Q GENERAL GUIDANCE ON THE INSTALLATION OF H -PILES TO SUPPORT AN 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. F AERIAL CROSSING. THE DESIGN ENGINEER SHALL CAREFULLY REVIEW 0 HP8x36 MIN. (6 THE SPECIFIC SITE, SOIL CONDITIONS, PIPE LOADS, AND PIPE DESIGN 4. THE BY-PASS PUMP SHOULD ADEQUATELY CONVEY MINIMUM 450 GALLONS / MINUTE OR AS SHOWN � PRIOR TO CONSTRUCTION. THE FAYETTEVILLE PUBLIC WORKS OR OTHER APPROVED z COMMISSION ASSUMES NO LIABILITY FOR THE USE OF THIS DETAIL. DAM DETAIL. w w Lj co 1 TYPICAL "H" PILE SUPPORT H -PILE DETAIL >16" THRU 24" PIPE FOR AERIAL CROSSINGS NOT TO SCALE NOTES: NOTES: POLYETHYLENE LEVEL WITH TOP OF 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OF CHANNEL. MEMBRANE ON FACE, T-0" BANK OR AS NECESSARY 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 20 ML THICK 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING 0 DAY. A MAXIMUM OF 1000 FEET MAY BE DISTURBED AT ANY ONE TIME. 2 4. THE BY-PASS PUMP SHOULD ADEQUATELY CONVEY MINIMUM 450 GALLONS / MINUTE OR AS SHOWN 1 CLASS I RIP RAP, NJ BARRIER )SE OR OTHER APPROVED 5. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS SANDBAGS, SEE COFFER MATERIAL (IF USING RIP RAP DAM DETAIL. U) DOWNSTREAM, SLOPE NO SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND Q GREATER THAN 2:1) 00 1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. >> 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL O BY-PASS PUMP 5' EXISTING BOTTOM 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. OF STREAM ER DAM TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SANDBAGS, CLASS I SYNTHETIC j SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS STREAM FLOW WILL ALSO BE PUMPED TO AN RIP RAP OR OTHER FILTER FABRIC OUTFALL STABILIZED WITH CLASS A RIP RAP. NON -ERODIBLE kRGE HOSE MATERIAL ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. NOTES: 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF 1. CONTRACTOR SHALL INSTALL COFFER DAM WITH BYPASS THE IMPERVIOUS DIKE. WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A ARRANGEMENTS ALONG ALL JURISDICTIONAL STREAMS PRIOR TO =D PIPE SEWER INSTALLATION TO ENSURE DRY CONDITIONS. SEE STREAM WITH THE DOWNSTREAM DIKE FIRST. PUMP AROUND DETAIL. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS DIKES AND 2. CONTRACTOR SHALL FOLLOW CONSTRUCTION SEQUENCE AS NOTED STABILIZE DISTURBED AREAS IN ACCORDANCE WITH STREAM STABILIZATION REQUIREMENTS. ON CONTRACT DRAWINGS. 8 ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE/COFFER DAM. COFFER DAM NOTES: NOTES: 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. w 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 1000 FEET MAY BE DISTURBED AT ANY ONE TIME. 4. THE BY-PASS PUMP SHOULD ADEQUATELY CONVEY MINIMUM 450 GALLONS / MINUTE OR AS SHOWN w ON SUMMARY TABLE THIS SHEET UNLESS OTHERWISE NECESSITATED BY FIELD CONDITIONS. 5. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS SANDBAGS, SEE COFFER DAM DETAIL. SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. O 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED OUTFALL. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF r SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS STREAM FLOW WILL ALSO BE PUMPED TO AN v OUTFALL STABILIZED WITH CLASS A RIP RAP. z 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION AND/ OR UTILITY CROSSING WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS DIKES AND Q STABILIZE DISTURBED AREAS IN ACCORDANCE WITH STREAM STABILIZATION REQUIREMENTS. 7 8 ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE/COFFER DAM. L O 18. ALL STEEL MEMBERS AND STRAPS WILL BE POWER TOOL CLEANED TO A MINIMUM OF SSPC-SP3 AND HOT -DIP GALVANIZED PER ASTM A123. BOLTS AND WASHERS WILL BE HOT -DIP GALVANIZED PER ASTM A153. ALL WELDS WILL BE GRINDED AND COATED WITH 2 COATS STREAM PUMP AROUND U NOT TO SCALE D U) z O U O LL 0 rLU V ) J LU O z J z O LU U) O 0- - 0- LL NOTES: 1. ALL STEEL SHALL CONFORM TO THE REQUIREMENTS OF ASTM A992 GRADE 50. 2. A SUBSURFACE GEO-TECHNICAL REPORT IS REQUIRED TO DETERMINE PILE EMBEDMENT LENGTH. w 3. THIS DETAIL IS FOR GUIDANCE/INFORMATION ONLY. THE DESIGN ENGINEER SHALL BE RESPONSIBLE FOR PROVIDING A PROJECT SPECIFIC DESIGN. 4. FOR ALL AERIAL CROSSINGS, A PROJECT SPECIFIC DESIGN SHALL BE SUBMITTED TO FAYPWC FOR REVIEW AND APPROVAL. w 5. A SUBSURFACE GEO-TECHNICAL EVALUATION IS REQUIRED IN ORDER TO DESIGN THE PILE LENGTH, EMBEDMENT, AND SPACING FOR THE SPECIFIC PROJECT LOCATION. THE DESIGN ENGINEER SHALL PROVIDE A COPY OF THE REPORT AND THE DESIGN TO FAYPWC. 6. THE DESIGN ENGINEER SHALL FURNISH A STRUCTURAL DESIGN BASED UPON ACTUAL FIELD CONDITIONS AND THE INTENDED USE OF THE STRUCTURE. LATERAL LOADS MAY REQUIRE THE ADDITION OF A BATTERED PILE. THE DESIGN ENGINEER SHALL CONSIDER SUCH LOADS AS ICE/SNOW, FLOODING, ETC. 7. FOR AERIAL SUPPORT OF PRESSURE MAINS, THE ENGINEER SHALL ENSURE THAT THE PIPE JOINTS CAN PROVIDE THE NECESSARY O THRUST RESTRAINT. CALCULATIONS SHALL BE SUBMITTED TO FAYPWC FOR REVIEW, PRIOR TO CONSTRUCTION. 8. LOCATION AND SPACING OF PILES SHALL BE BASED UPON ACTUAL FIELD CONDITIONS AND AS SPECIFIED BY THE DESIGN ENGINEER. EACH PIPE JOINT SHALL BE SUPPORTED BY A PILE, UNLESS OTHERWISE APPROVED BY FAYPWC. 9. ANY CHANGES TO THIS DETAIL SHALL BE REVIEWED AND APPROVED BY FAYPWC PRIOR TO CONSTRUCTION. 10. ANY REVISIONS TO THIS DETAIL SHALL BE SIGNED AND SEALED BY A REGISTERED PROFESSIONAL ENGINEER AND SUBMITTED TO r FAYPWC FOR REVIEW. v 11. PILES SHOULD NOT BE PLACED IN THE CENTERLINE OF THE STREAM. z 12. PILES SHALL BE DRIVEN UTILIZING A VIBRATORY HAMMER OR PILE HAMMER. 13. ALL PILES SHALL BE DRIVEN TO REFUSAL. THE DESIGN ENGINEER SHALL PROVIDE FAYPWC WITH CALCULATIONS AND/OR A REPORT THAT CLEARLY DEFINES WHAT CONSTITUTES REFUSAL. SHOULD THE CONTRACTOR UTILIZE A DIFFERENT DRIVING METHOD THAN SPECIFIED, THEN REVISED CALCULATIONS SHALL BE PROVIDED TO FAYPWC. 14. PILES SHALL BE CUT OFF SQUARE AT THE REQUIRED ELEVATIONS WITH METHOD OF CUT APPROVED BY THE DESIGN ENGINEER. 15. EXPANSION JOINTS SHALL BE PROVIDED AS REQUIRED. THE EXPANSION JOINTS SHALL BE SUPPORTED BY PLACEMENT OF PIERS WITHIN 3 FEET ON BOTH SIDES OF THE JOINT OR AS SPECIFIED IN THE DESIGN. Q 16. ALL PILE LOCATIONS SHALL BE STAKED BY A NC LICENSED PROFESSIONAL SURVEYOR, IN ACCORDANCE WITH THE APPROVED PLANS. 17. ALL WELDS SHALL BE BY A CERTIFIED WELDER. J 18. ALL STEEL MEMBERS AND STRAPS WILL BE POWER TOOL CLEANED TO A MINIMUM OF SSPC-SP3 AND HOT -DIP GALVANIZED PER ASTM A123. BOLTS AND WASHERS WILL BE HOT -DIP GALVANIZED PER ASTM A153. ALL WELDS WILL BE GRINDED AND COATED WITH 2 COATS OF A COLD APPLIED GALVANIZING PAINT. 7 19. ALL DI PIPE IN SANITARY SEWER SERVICE SHALL HAVE AN INTERIOR LINING OF PROTECTO 401 OR APPROVED EQUAL. L_LL DI KAON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, INC 27607 (t) 919-782-0495 (fl919-782-9672 WWW.WKDICKSON.COM INC LICENSE NO.F-0374 ,����IIIII►I C A Rod '�,,�0•��Q` ESS /0A'•'v9 ' A SEAL9�i 025490 pf PROFESSIONAL SEAL m Z O O Wm CC U) Z p O W rr LU Q 0 Illllll10 O z �(1) V ) O Q � z U z J J cc c N z J U Q -j O < � (D Q Q w rC O V J �Z L~U w Z ') w Cn w or- Q 0 U Z w 0 0 Q w LU/ U U) LU LLI J H Z H U Z W O Q 0_ 0 PROJ. MGR.: MWF DESIGN BY: AB, ATM, MOS DRAWN BY: AB, ATM, MOS PROJ. DATE: MARCH 2018 DRAWING NUMBER: D10 WKD PROJ. NO.: 20120031.10. RA SECTION 32 92 19 SEEDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Fertilizing. 2. Seeding. 3. Hydroseeding. 4. Mulching. 5. Maintenance. 6. Stream restoration/stabilization permanent seeding. 7. Stream restoration/stabilization temporary seeding. B. Related Sections: 1. Section 3123 17 — Trenching — Restoration of disturbed area. 2. Section 3125 13 — Erosion Controls — Restoration of disturbed area. 1.2 REFERENCES A. ASTM International: 1. ASTM C602 - Standard Specification for Agricultural Liming Materials. B. NCDOT Standard Specifications: 1. Standard Specifications for Roads and Structures, latest edition, published by the North Carolina Department of Transportation. 1.3 DEFINITIONS A. Weeds: Vegetative species other than specified species to be established in given area. 1.4 SUBMITTALS A. Section 0133 01 - Submittal Procedures: Requirements for submittals. B. Product Data: Submit data for seed mix, fertilizer, mulch, and other accessories. C. Test Reports: Indicate topsoil nutrient and pH levels with recommended soil supplements and application rates. D. Manufacturer's Certificate: Certify products meet or exceed specified requirements. E. Invoices or proof of purchase to verify quantities specified. City of Eden Seeding Eden Remediation Program 3292 19-1 WKD Project Number: 20120031.0LRA F. Operation and Maintenance Data: Include maintenance instructions, cutting method and maximum grass height; and, types, application frequency, and recommended coverage of fertilizer. 1.5 QUALITY ASSURANCE A. Perform Work in accordance with Section 1660 of NCDOT Standard Specifications. B. Maintain copy of document on site. 1.6 QUALIFICATIONS A. Seed Supplier: Company specializing in manufacturing products specified in this Section with minimum 3 years documented experience. B. Installer: Company specializing in performing work of this Section with minimum 5 years documented experience. 1.7 DELIVERY, STORAGE, AND HANDLING A. Section 0160 00 - Product Requirements: Product storage and handling requirements. B. Deliver grass seed mixture in sealed containers showing percentage of seed mix, germination, inert matter and weeds; year of production; net weight; date of packaging; and location of packaging. Seed in damaged packaging is not acceptable. C. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer. 1.8 MAINTENANCE SERVICE A. Section 0170 00 - Execution and Closeout Requirements: Requirements for maintenance service. B. Maintain seeded areas immediately after placement until grass is well established and exhibits vigorous growing condition for minimum of three cuttings. PART 2 PRODUCTS 2.1 TOPSOIL MATERIALS A. Conform to Section 32 91 19. Topsoil: Original surface soil typical of the area, which is capable of supporting native plant growth; free of large stones, roots, waste, debris, contamination, or other unsuitable material, which may be detrimental to plant growth; pH value of 5.4 to 7.0. City of Eden Seeding Eden Remediation Program 3292 19-2 WKD Project Number: 20120031.0LRA 2.2 SEED MIXTURE A. Furnish materials in accordance with North Carolina Board of Agriculture rules and regulations as specified in Section 1660 of NCDOT Standard Specifications. B. Seed Mixture and Rate: 1. ] 'iedmont Region: Tall fescue 80 lbs/acre Sericea les edeza 20 lbs/acre Kobe les edeza 10 lbs/acre 2.3 STREAM RESTORATION/STABILIZATION PREMANENT SEEDING A. Seed Mixture and Rate: 1. The seed mixture shall be applied at the rate of 20 lbs per acre. 2. The following table lists herbaceous, permanent seed mixtures. The Contractor shall provide detailed information including but not limited to germination rates, noxious weed seeds and date and location of harvest on seed mixture. The Engineer must approve the seed mixture and any mixture changes prior to application. Permanent Seed Mixtures: Scientific Name Common Name Seed `%0 Andropogon virginicus Broomsedge 15 Carex vulpinoides Fox Sedge 10 Chasmanthium laxa Wood Oats 10 Coreopsis major Tickseed 5 Elymus virginicus Virginia Wildrye 15 Juncus effuses Soft Rush 15 Leersia oryzoides Rice Cut Grass 10 Panicum clandestinum Switchgrass 10 Scirpus cyperinus Woolgrass 10 2.4 STREAM RESTORATION/STABILIZATION TEMPORARY SEEDING A. Seed Mixture and Rate: 1. Winter seed mixture shall be used between October 1 and April 1; all other dates the summer seed mixture shall be used. Winter seed mixture shall be applied at 50 lbs/acre; summer seed mixture shall be applied at 40 lbs/acre. City of Eden Seeding Eden Remediation Program 3292 19-3 WKD Project Number: 20120031.0LRA B. Temporary Seed Mixtures Reference NCDOT Standard Specification 1060 for fertilization, lime and mulching rates. 2.5 WETLAND TEMPORARY SEEDING Temporary Scientific Name Common Seed % Andro 0 on vir inicus 2 lbs/acre Name Panicum ramosum Seed Mixture B Winter Horedum. spp. Barley 50 Virginia Wild Rye Secale cereale Winter Rye 50 Seed Mixture C 3 lbs/acre Browntop Horedum spp. Summer Panicum ramosum Millet 50 Wool ass Pennisetum glacum Pearl Millet 50 Reference NCDOT Standard Specification 1060 for fertilization, lime and mulching rates. 2.5 WETLAND TEMPORARY SEEDING Temporary April 1 to October 1 Andro 0 on vir inicus 2 lbs/acre Browntop Millet Panicum ramosum 20 lbs/acre Pearl Millet Pennisetum glac um 20lbs/acre Virginia Wild Rye El mus vir inicus 2 lbs/acre October I to April 1 Juncus effusus 3 lbs/acre Barley Horedum spp. 25 lbs/acre Winter Rye Secale cereale 25 lbs/acre 2.6 WETLAND PREMANENT SEEDING Permanent Broom Sedge Andro 0 on vir inicus 2 lbs/acre Fox Sedge Carex vul inoides 2 lbs/acre Wood Oats Chasmanthium laxa 2 lbs/acre Virginia Wild Rye El mus vir inicus 2 lbs/acre Soft Rush Juncus effusus 3 lbs/acre Rice Cut Grass Leersia oryzoides 3 lbs/acre Switch ass Panicum clandestinum 3 lbs/acre Wool ass Scir us cyperinus 3 lbs/acre 2.7 ACCESSORIES A. Mulching Material: Oat or wheat straw, free from weeds, foreign matter detrimental to plant life, and dry. Hay or chopped cornstalks are not acceptable. City of Eden Seeding Eden Remediation Program 3292 19-4 WKD Project Number: 20120031.0LRA B. Fertilizer: Commercial grade; recommended for grass; of proportion necessary to eliminate deficiencies of topsoil, as indicated in analysis. When test is not available, use 10-10-10 mixture of Nitrogen, phosphoric acid, and soluble potash. C. Lime: ASTM C602, Class T or Class O agricultural limestone containing a minimum 80 percent calcium carbonate equivalent. D. Water: Clean, fresh and free of substances or matter capable of inhibiting vigorous growth of grass. E. Erosion Fabric: Jute matting, open weave. F. Herbicide: As required to combat type of weeds encountered. G. Stakes: Softwood lumber, chisel pointed. H. String: Inorganic fiber. PART 3 EXECUTION 3.1 EXAMINATION A. Section 0130 00 - Administrative Requirements: Verification of existing conditions before starting Work. B. Verify prepared soil base and topsoil are ready to receive the Work of this Section. UPS 0:171M14IFA 12[e1 A. Apply lime at application rate recommended by soil analysis. Work lime into top 6 inches of soil. B. Apply fertilizer at application rate recommended by soil analysis. C. Apply after smooth raking of topsoil and prior to roller compaction. D. Do not apply fertilizer at same time or with same machine used to apply seed. E. Mix fertilizer thoroughly into upper 2 inches of topsoil. F. Lightly water soil to aid dissipation of fertilizer. Irrigate top level of soil uniformly. 3.3 SEEDING A. Apply seed evenly in two intersecting directions at the rates shown above. Rake in lightly. City of Eden Seeding Eden Remediation Program 3292 19-5 WKD Project Number: 20120031.0LRA B. Do not seed areas in excess of that which can be mulched on same day. C. Planting Season: 1. Piedmont Region: a. Fall: August 15 — September 15. b. Late Winter: February 15 — March 21. D. Do not sow immediately following rain, when ground is too dry, or when winds are over 12 mph. E. Roll seeded area with roller not exceeding 112 lbs/linear foot. F. Immediately following seeding and rolling, apply mulch to thickness of 1/8 inch. Maintain clear of shrubs and trees. 3.4 STREAM RESTORATION/STABILIZATION PERMANENT SEEDING A. Apply water with fine spray immediately after each area has been mulched. Saturate to 4 inches of soil. B. Stream restoration/stabilization permanent seeding will be required on newly constructed streambanks above and below the bankfull elevation. Staging and heavy traffic areas shall require tillage or sub -soiling to reduce compaction from equipment to ensure adequate conditions exist for seedling survival. At least three passes shall be made in varying directions; the final pass shall be on contour. Minimum tillage depth is 8 inches. C. Permanent seeding shall occur in conjunction with stream restoration/stabilization temporary seeding where applicable. When stream restoration/stabilization permanent seeding occurs independently, the area shall be mulched as directed in Stream restoration temporary seeding provision. D. Areas fertilized for stream restoration/stabilization temporary seeding shall be sufficiently fertilized for stream restoration/stabilization permanent seeding; additional fertilizer is not required for stream restoration/stabilization permanent seeding. E. Seed mixtures at the rates shown in the table above shall be used for seeding. Ideally, stream restoration/stabilization permanent seeding shall occur in November, February or March. 3.5 STREAM RESTORATION/STABILIZATION TEMPORARY SEEDING A. Temporary seeding will be required on all stream restoration/stabilization areas disturbed following all land disturbing activities in accordance with Section 1620 of the latest edition NCDOT Standard Specifications. This temporary seeding is specifically to be used within streambanks. B. All soil in planting areas shall be tested and the rate of fertilization and liming shall be in accordance with the test results. City of Eden Seeding Eden Remediation Program 3292 19-6 WKD Project Number: 20120031.0LRA C. The planting of any species of fescue grass within stream and channel banks is prohibited unless otherwise approved by the Engineer. D. All areas shall be mulched for erosion control upon completion of construction activities or as directed by the Engineer. 3.6 HYDROSEEDING A. Apply fertilizer, mulch and seeded slurry with hydraulic seeder at rate of 6 lbs per 1,000 square feet evenly in one pass. B. Apply water with fine spray immediately after each area has been hydroseeded. Saturate to 4 inches of soil and maintain moisture levels two to four inches. 3.7 SEED PROTECTION A. Identify seeded areas with stakes and string around area periphery. Set string height to 12 inches. Space stakes at 5 feet on center. B. Cover seeded slopes where grade is greater than 3 H:1 V with erosion fabric. Roll fabric onto slopes without stretching or pulling. C. Lay fabric smoothly on surface, bury top end of each section in 6 -inch -deep excavated topsoil trench. Overlap edges and ends of adjacent rolls minimum 12 inches. Backfill trench and rake smooth, level with adjacent soil. D. Secure outside edges and overlaps at 36 -inch intervals with stakes. E. Lightly dress slopes with topsoil to ensure close contact between fabric and soil. F. At sides of ditches, lay fabric laps in direction of water flow. Lap ends and edges minimum 6 inches. fcx:� L /:111210 91►/:11►[y 21 A. Mow grass at regular intervals to maintain at maximum height of 2-1/2 inches. Do not cut more than 1/3 of grass blade at each mowing. Perform first mowing when seedlings are 40 percent higher than desired height. B. Neatly trim edges and hand clip where necessary. C. Immediately remove clippings after mowing and trimming. Do not let clippings lay in clumps. D. Water to prevent grass and soil from drying out. E. Roll surface to remove minor depressions or irregularities. F. Control growth of weeds. Apply herbicides. Remedy damage resulting from improper use of herbicides. City of Eden Seeding Eden Remediation Program 3292 19-7 WKD Project Number: 20120031.0LRA G. Immediately reseed areas showing bare spots. H. Repair washouts or gullies. I. Protect seeded areas with warning signs during maintenance period. 3.9 SCHEDULE A. See Drawings for detailed seeding schedule. END OF SECTION City of Eden Seeding Eden Remediation Program 3292 19-8 WKD Project Number: 20120031.0LRA Determination of Jurisdiction: A. ® There are waters on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued DATE. Action ID: FILE NUMBER. Basis For Determination: See the Preliminary Jurisdictional Determination form dated 9/18/2019. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Phillip Shannin, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by N/A. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** i:�'v � f' Date: 2019.09.18 11:24:09 Corps Regulatory Official: -04'00 David E. Bailey Date of JD: 9/18/2019 Expiration Date of JD: N/A NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: City of Eden (Attu: Terr SheltonFile Number: SAW -2019-01086 Date: 9/18/2019 Attached is: See Section below LAPPROVED PROFFERED PERMIT Standard Permit or Letter of ermission A RED PERMIT Standard Permit or Letter of ermission B DENIAL C JURISDICTIONAL DETERMINATION D INARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.gM.mil/Missions/CivilWorks/Reu� latoryProgramandPermits.asox or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Phillip Shannin, Administrative Appeal Review Officer Attn: David E. Bailey CESAD-PDO Raleigh Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1OM15 3331 Heritage Trade Drive, Suite 105 Atlanta, Georgia 30303-8801 Wake Forest, North Carolina 27587 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunit to participate in all site investigations. Date: Telephone number: Signature of appellant oragent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: David E. Bailey, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 Action ID Number: SAW -2019-01086 Permittee: City of Eden (Attn: Terry Shelton) County: Rockingham Project Name: City of Eden / Bridge Street Basin sewer remediation / Rockingham county / municipal Date Verification Issued: 9/18/2019 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date