HomeMy WebLinkAboutCABARRUS_COMPLETE FILE - HISTORICAL_20021106-STORMWATER DIVISION CODING SHEET
Municipalities NOT MS4
PERMIT NO.
NCS0000S
DOC TYPE
❑ COMPLETE FILE - HISTORICAL
MOST RECENT
DATE
a 1 6 (p
YYYYM M D D
w A r��Qt;
r_
Michael F. Easley, Governor
William G. Ross Jr„ Secretary
North Carolina Department of Environment and Natural Resources
11 /6/2002
CABARRUS COUNTY
MR. FRANK W. C!_1FfON, JR., CAB ARRUS COUNTY MANAGER
P.O. 130X 707
CONCORD , NC 28026-0707
Mr. Frank W. Clifton, Jr.:
Alan W. Klimek, P.E., Director
Division of Water Quality
Subject: NPDES Phase 11 Stormwater Program
In 1990 the U.S. Environmental Protection Agency's (EPA) Phase I stormwater program was promulgated under the
Clean Water Act. Phase I relies on National Pollutant discharge Elimination System (NPDI-S) permit coverage to
address stormwater runoff from: (1) "medium" and "large" municipal separate storm sewer systems (MS4s) generally
serving populations of 100,000 or greater, (2) construction activity disturbing 5 acres of land or greater, .md (3) ten
categories of industrial activity. The NPDES Stormwater Phase 11 Final Rule was promulgated in December 1999 and is
the next step in ETA's effort to preserve, protect, and improve the Nation's water resources from polluted storm water
runoff. The Phase 1l program expands the Phase I program by requiring additional operators of MS4s in urbanized areas
and operators of small construction sites, through the use of NPDES permits, to implement programs and practices to
control stormwater runoff. Phase 11 is intended to further reduce adverse impacts to water quality and aquatic habitat by
instituting the use of controls on the unregulated sources of stormwater discharges that have the greatest likelihood of
causing continued environmental degradation.
The NPDES Stormwater Phase 11 Final Rule requires nationwide coverage of all operators of'small MS4s that are
located within the boundaries of a Bureau of the Census defined "urbanized area" based on the latest decennial Census.
We are writing to you to remind you that Cabarrus County has been identified as being located within a census
designated urbanized area in both the 1990 and 2000 decennial census. As a regulated community, you are required to
develop a storrnwater managernent program and apply for stormwater permit coverage, if you own and operate a small
MS4 or file a certification that Cabarrus County does not own or operate a small MS4. The deadline for submitting your
application package or non -ownership certification is March 10, 2003. Application and certification documents, as well
as additional information on the NPDES stormwater program, are available for download at our web site . Our web
address is http://l12o.enr.state.nc.uS/su/stornlwatei-.htrnl. You may also contact us for hard copies of the documents. It'
you have any questions about this letter, please feel free to contact me (919-733-5083, ext.525) or Darren England
(919-733-5083, ext. 545)
Sincerely,
Bradley Bennett, Supervisor
Stormwater and General Permits Unit
cc: Central Files
Stormwater and General Permits Unit Idles
Mooresville Regional Office
= vkA
N5D 7NR
N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service
1-800-623-7748