Loading...
HomeMy WebLinkAbout20091008 Ver 1_CAMA Permit Application_20090921NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director (J 9' 1 0 0 8 Secretary September 18, 2009 12 ??0 V L5 MEMORANDUM: 0 L5 TO: Cyndi Karoly, Supervisor SEP 2 1 2009 401 Oversight & Express Permits Unit Division of Water Quality-Surface Water ProtectiogETLA6DEW - Ar?s" n?Ti + FROM: Doug Huggett, NC DENR-DCM Major Permits Coordinator 400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA Major Permit Application Review Applicant: NNP IV - Cape Fear River, LLC (River Lights) - Major Mod#92-07 Project Location: Along River Road, adjacent to the Cape Fear River, in New Hanover Co. Proposed Project: To construct a residential docking facility, commercial dry stack marina, loading platform, transient dock, 72 boatlifts, 2 observation piers w/platforms, kayak/skull launch, boardwalks, utilities and infrastructure Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 12, 2009. If you have any questions regarding the proposed project contact Jason Dail (910) 796-7302, when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Ave„ Morehead City, NC 28557--3421 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nccoastalmanagement net An Equal Opportunity \ Affirmative Action Employer NorthGarolina Naturally DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: NNP IV-Cape Fear River, LLC 2. LOCATION OF PROJECT SITE: Located along River Road, adjacent to the Cape Fear River, in New Hanover County. Photo Index -2006: 14-6641/6642 A-Z, 1-24 2000:14-140/141,A-Z,1-14 1995:14-144, A-Z, 1-24 State Plane Coordinates - X:23199994 Y:148754 Rover File - V-061508A Long: 77°56'32.631" Lat:34°09114.489" 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 6/15/07 & 9/01/09 Was Applicant Present - Yes - Agent 5. PROCESSING PROCEDURE: Application Received - 9/03/09 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Wilmington/New Hanover County Land Classification From LUP - Conservation, Limited Transition (B) AEC(s) Involved: PT, EW, ES (C) Water Dependent: Yes (D) Intended Use: Private/Commercial (E) Wastewater Treatment: Existing - None Planned - Municipal (F) Type of Structures: Existing - None - high ground Planned - Proposed residential docking facility, commercial dry stack marina, loading platform, transient dock, boatlifts (72), observation piers w/ platforms (2), kayak/skull launch, boardwalks, utilities and infrastructure. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FTLT,FD nTHRR (A) Vegetated Wetlands - "404" and Coastal 1,650 sq. ft. (shaded) (B) Non-Vegetated Wetlands - Open Water 38,471 sq. ft. (incorporated) (C) Other - High Ground 101 acres (disturbed) (D) Total Area Disturbed: 4,439,681 sq. ft. (101.9 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SC Open: Closed 8. PROJECT SUMMARY: The applicant proposes to construct a residential docking facility, commercial dry stack marina, loading platform, transient dock, boatlifts (72), observation piers w/ platforms (2), kayak/skull launch, boardwalks, utilities and infrastructure. NN? IV Cape Fear River, LLC Page Two 9. SITE DESCRIPTION: For detailed information on current site conditions and site specific characteristics, please refer to the most recent Field Investigation Report (FIR) for NNP IV Cape Fear River, LLC, prepared by Jason Dail and circulated on 6/19/2007. The waters of the Cape Fear River (in the vicinity of the project) are classified SC, by the N.C. Division of Water Quality. The area IS designated as a Primary Nursery Area, by the N.C. Division of Marine Fisheries and these waters are CLOSED to the harvesting of shellfish. The Wilmington-New Hanover County Land Use Plan classifies the area as Conservation. CAMA Major Permit #92-07 authorized a 4-slip docking facility, crabbing pier with gazebo and a section of boardwalk along the waterfront in the marina village. Subsequently, a minor modification was issued on March 3, 2009, and authorized the re-alignment of both piers, directional bore for utilities, and for the relocation of a section of boardwalk. Until now, the permittee has not requested any additional modification or refinements. PROPOSED PROJECT: The applicant is proposing to construct a residential docking facility, commercial dry stack marina, loading platform, transient dock, boatlifts (72), observation piers w/ platforms (2), kayak/skull launch, boardwalks, utilities and infrastructure, on and adjacent to the subject property. The proposal to develop the property as requested constitutes Phase I of the overall site development. A rudimentary master plan has been provided, and shows the layout of the subdivision; however, only the items being applied for are included in the application package. No additional high ground work, outside of what is being proposed in conjunction with the dry stack facility, is being included in this request. According to the application package, the applicant proposes to construct a one-hundred twelve (112) slip community boating facility with 467 linear feet of temporary side-to dockage (potentially creating 18 additional slips), a 20' x 40' kayak/skull launch, an 84-slip commercial dry stack storage facility with a 282 linear foot section of side-to dockage, two crabbing piers with observation platforms, seventy-two boatlifts and a riverfront boardwalk. The applicant states that the 112 permanent wet slips would provide water access for the residents of "Riverlights", as would the 467 linear foot section of side-to dockage. If all of the wet slips are accounted for, using 25 linear feet of dockage as a potential slip, then the total number of residential docking spaces would total 130. In addition to the residential docking structure, the applicant states that the skull/kayak launch and observation pier would be for the exclusive use of the Riverlights residents as well as for the use of the UNCW crew team. As proposed, the marina facility and associated amenities would not be open to the general public. To prevent confusion, and to eliminate the need to cover every proposed span of dockage, please refer to sheets 3-6 of 14 for a detailed depiction of the proposed docking system, including the skull launch, boatlifts and observation piers/platforms. The applicant states the residential portion of the docking facility would be separated from the commercial aspect by a secure gate, which would be located along the main "dock spine". The gate would prohibit commercial access beyond the commercial side-to dockage. Approximately 273 linear feet (potentially 10 wet slips) of side-to dockage would be associated with the commercial marina facility as would a 15' x 329' fork lift pier and 28' x 44' fork lift drop pad. The fork lift pier would span a 70' section of Coastal Wetlands prior to terminating at the fork lift drop pad. Approximately 1,080 sq. ft. of vibrant Smooth Marsh Cordgrass and Black Needle Rush would be impacted as a result of the fork lift pier construction. As stated, handrails would be placed on the landward side of the dock spines to prevent possible dockage. NNP IV Cape Fear River, LLC Page Three It should be noted that a 121,000 sq. ft. area of open water would be eliminated by the construction of the previously permitted 4-slip pier and/or the requested fork lift pier. Approximately 2.7 acres of open water area would be enclosed and deemed unusable by the general public, or those wishing to access the area using a powerboat. There is sufficient water (approximately 1'-3' at Normal Low Water) in the enclosed area and access should not be eliminated. Please note the writer is requesting that the fork lift pier, or 4-slip pier, be elevated a minimum of 6-8' above the elevation of Normal High Water to allow safe passage to and from this area. The request is stated in the Recommendation Section of the Field Investigation Report. Access to the residential marina facility, skull launch and observation piers would be provided via a mulched driveway and wooden boardwalk. Please refer to the attached plans (sheets 3-6 of 14) for a detailed view of the proposed boardwalk. Please note that the boardwalk is not being proposed over and areas of Coastal Wetlands, nor does the boardwalk extend waterward of the Normal High Water (NHW) line. The proposed high ground dry storage building (130' x 160' x 40') would house up to eighty-four (84) vessels and would be located approximately 300' landward of the NHW line. Parking for the facility has been proposed on the western and eastern sides of the dry stack building, outside of both the Conservation Overlay District (COD) and the 75' Estuarine Shoreline AEC. A concrete fork lift lane would extend from the west side of the building and would terminate landward of the 30' buffer. From that point, a wooden fork lift pier would extend towards the Cape Fear River. Water depths in the vicinity of the proposed docking structures and fork lift platform range from -2.5' to -6.0', relative to Normal Low Water (NLW). Please note that the water depths in the vicinity of the folk lift drop zone range from -2.0` to -3.0' at NLW, resulting in shallow bottom impacts (due to constant disturbance from fork lift). Very little information has been provided in this application package that details the activities occurring outside of the 75' AEC. However, an agreement document between NNP and the City of Wilmington has been prepared and submitted to the City for review and a FONSI has been approved by State Clearing House. Furthermore, there appears to be impacts to "404" wetlands as a result of the dry storage facility construction and adjacent development. No Nationwide permits, or other approval indicators, were attached with the information included in the CAMA permit application. Lastly, it is not known whether or not the applicant has received approval from the Land Quality Section, Public Water Section, Division of Water Quality non-discharge unit, New Hanover County Zoning, etc. Again, the applicant has provided adequate information regarding development proposed within the 75' AEC; however, any and all additional development located landward of the AEC remains uncertain. I recommend that each agency carefully reviews the documentation provided to ensure that the proposed development is consistent with all local, State and Federal Laws, Regulations and Codes. Please find below, a list of permits/approval received to date from other Federal, State and local agencies. The authorized work is listed below. Division of Water Quality- Stormwater Permit #SW8070672 (Marina Village) and SW8080312 (Phase I) US Army Corp of Engineers - Action ID SAW-2007-00517-065 Letter from Archives and History referencing archaeological survey and management plan - NCDCR - letter dated 6/16/09. 10. ANTICIPATED IlVIPACTS: Construction of the subdivision, as proposed, would result in the disturbance of approximately 101 acres of high ground. The proposed docking systems would incorporate approximately 38,471 sq. ft. of open water and public trust area. Approximately 0.001 % of impervious coverage (that associated with the dry stack storage phase of this project) would be located within the 75' AEC. Approximately 121,000 sq. ft. of public trust water would be eliminated as a result of the construction of the proposed fork lift pier. Additional high ground impacts are uncertain due to the limited amount of knowledge known to the writer. Submitted by: Jason Dail Date: 9/14/09 Office: Wilmington Project Narrative - REVISED 8-06-09 Major Modification to CAMA Permit # 92-07 RiverLights New Hanover County, North Carolina River Road Holdings, LLC, Applicant This Major Modification proposes a 112 slip community boating facility with 467 linear feet of temporary tie-up, a kayak/skull launching dock, a dry storage facility with 84 slip storage capacity and approximately 282 linear feet of temporary tie-up dockage, two crabbing docks and a riverfront boardwalk. Although there are only 112 permanent wet slips available for ownership for residents of RiverLights, there are a total of 467 linear feet of side-to temporary dockage available along the outermost t-docks (attenuators), etc that could numerically represent an additional 8 slips. The community boating facility, therefore, has the potential to accommodate 120 slips. Again, only 112 pennant wet slips will be available for ownership. RiverLights will be a mixed-use community. All features of the marina will be private use for residents and guests of RiverLights with the exception of the dry storage facility, which will be commercial use. Individuals who are not residents of River Lights will have the opportunity to purchase/lease a dry storage slip and access the temporary dockage along the waterfront. A gate will be located on the dock structure to separate the commercial use dry storage facility from the private use community boating facility. This gate will be locked during daily use but will be accessible to emergency responders. There will be approximately 282 linear feet of temporary tie-up dockage which will offer a temporary staging area for the dry storage facility. The kayak/skull launching dock will be available to residents of the RiverLights and will also be open to the crew team at the University of North Carolina Wilmington. The two additional crabbing docks will remain private use by the residents of RiverLights and will be accessed by a mulch/gravel drive. The marina facility and associated amenities will not be open for general public use. The site is located adjacent to the Cape Fear River, New Hanover County, North Carolina. Phase IA is included as upland development associated with the project. CAMA Permit # 92-07 authorized a 4-slip docking facility, a crabbing pier with a covered gazebo, and boardwalks along the waterfront in the Marina Village site. A Minor Modification was submitted in January 2008 requesting changes to the alignment of both piers and boardwalks to reflect the current plans as shown in the Environmental Assessment. Also requested with the Minor Modification was authorization for directional bores for utilities under Barnards Creek and Mott Creek. Approval for this Minor Modification was received from DCM on 3 March 2009. The RiverLights development has been annexed by the City of Wilmington and a development agreement was entered into on 10 June 2009. Approximately 184.7-ac within the development, including the Marina Village, are zoned MX-CD. The remaining 1,155.6-ac, including Phase IA, are zoned R7-CD. Waters of the Cape Fear River in the vicinity of the subject property are classified as SC by DWQ and DMF has classified the marshes and bottom areas as Primary Nursery Area (PNA). All floating structures will be located in a minimum depth of -2' Mean Low Water (MLW). The federally maintained Cape Fear River channel is over AU-1G 1 X12099 1 0 ;:: eV` W1LAfl1 \JGiON, NC of the proposed project. Several small undeveloped islands exist between the federally maintained navigation channel and the subject property. Jason Dail verified the coastal wetland line in the field with Greg Finch from LMG in July 2007 as part of the CAMA Express Permitting; however, the primary focus was in the marina village. The coastal wetlands to the south (in the vicinity of the 2 crabbing docks) were delineated by LMG in July 2007 but this line has not been verified by DCM staff. The marina facility will provide water access and low impact recreational opportunities to residents of the RiverLights community and also to individuals outside of the community who choose to lease/purchase dry storage slips. The community marina facility received a "Finding of No Significant Impact" on 2 June 2008. Stormwater permits for the Marina Village and Phase IA have been obtained. The Sedimentation and Erosion control plan has not been finalized. RiverLights will be serviced by the Cape Fear Public Utility Authority. The pumpout facility located at the marina will tie into the community sanitary services. AUG 10 2009 Wiu%,IINGTOINI, NC or I 2 09- 1 0 8 DCM MP-1 APPLICATION for Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Nnp Iv Cape Fear River, Llc Project Name (if applicable) RiverLights Applicant 1: First Name Richard MI L Last Name Croteau Applicant 2: First Name NA MI NA Last Name NA If additional applicants, please attach an additional page(s) with names listed. Mailing Address 228 North Front Street, Suite 101 PO Box NA City Wilmington State NC ZIP 28401 Country New Hanover Phone No. 910 - 442 - 2840 ext. NA FAX No. 910 - 442 - 2850 Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Land Management Group, Inc. Agent/ Contractor 1: First Name MI Last Name Jenny Johnson Agent/ Contractor 2: First Name MI Last Name William S Morrison Mailing Address PO Box City State 2522 Wilmington NC ZIP Phone No. 1 Phone No. 2 28402 910 - 452 - 000 1 ext. NA NA - - ext. FAX No. Contractor # 910 452 0060 NA Street Address (if different from above) City State ZIP 3805 Wrightsville Avenue Wilmington NC 28403- Email jjohnson@lmgroup.net <Form continues on back> 4K fC V.1.0I AUG 10 2009 Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # New Hanover River Road 1100 Subdivision Name City State Zip RiverLights Wilmington NC 28412- Phone No. Lot No. (s) (if many, attach additional page with list) NA - - ext. NA, , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project 4y'v_ fe-Ax' Cape Fear River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade []Unknown Cape Fear River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ?No work falls within. City of Wilmington 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) +/- 15,132' +/- 56,932,920 s.f. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or Phase 1A, no individual lots platted to date , NWL (normal water level) 0' to 60' ®NHW or ?NWL (if many lot sizes, please attach additional page with a list) e. Vegetation on tract Native grasses and shubs and trees. f. Man-made features and uses now on tract Existing mulch access drive on Marina Village site. Construction of new River Road alignment and lake underway. g. Identify and describe the existing land uses adjacent to the proposed project site. Residential, business, and commercial uses. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Marina Village is MX-CD, Phase 1A is R7-CD (Attach zoning compliance certificate, if applicable) ®Yes ?No ?NA J. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ®Yes ?No []NA If yes, by whom? S&ME, attached 1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes ®No ?NA National Register listed or eligible property? <Form continues on next page> ': A G 1 0 2009 252-838-2808 ., 1-888 4RCOAS v .rs sa ? tsa a ag n 7? ?: '^3,'`t % GTON, NC Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ?No (ii) Are there coastal wetlands on the site? ®Yes ?No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ?No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. None o. Describe existing drinking water supply source. None p. Describe existing storm water management or treatment systems. None. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ?Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of the proposed project is to create water front access on the site including an open water boating facility, dry storage facility, kayak/skull launching dock, crabbing docks, and a riverfront boardwalk. Also included is upland development, roads and utilities, associated with Phase 1A located outside and AECs. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Standard marine construction methods and equipment will be used for the construction of the dock system and a riverfront boardwalk. Land-based equipment will be stored on the upland portions of the propery. d. List all development activities you propose. Construction of an open water boating facility, dry storage facility, kayak/skull launching dock, crabbing docks, and a riverfront boardwalk. Roads and infrastructure for Phase 1 A located outside any AECs. e. Are the proposed activities maintenance of an existing project, new work, or both? New work f. What is the approximate total disturbed land area resulting from the proposed project? 101 ?Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes ?No ®NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. No new discharges are proposed with this application. i. Will wastewater or stormwater be discharged into a wetland? ?Yes ®No ?NA If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ®NA j. Is there any mitigation proposed? ?Yes ?No [DNA If yes, attach a mitigation proposal. __ f f <Form continues on back> AUG 10 2009 IM 4.r 252-808-2808 ,» 1.888-4RCOA T www.necoastaimanagement.net Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Watermark Marina/Wilm LLC Phone No. NA Address 3526 River Rd., Wilmington, NC 28412 Name Nathan S and Judia B Sanders Phone No. NA Address PO Box 3167, Wilmington, NC 28406 Name Carolina Power & Light Company Address PO Box 1551, Raleigh, NC 27602 Name NCDOT Phone No. 910-251-2655 Address 300 Division Drive, Wilmington, NC 28401 Name Bill Clark Homes of Wilm, LLC Address 430 Eastwood Road, Wilmington, NC 28403 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Major Permit # 92-07 Corp: SAW-2007-2319-065 Stormwater Permit # SW8 070672 (includes Marina Village) Stormwater Permit # SW8 080312 (Phase 1A) h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name 1? / A, J IA6 C'ab yrv Signature AUG 1 0 2009 Please indicate application attachments pertaining to your proposed project. ?DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts 252-808-2868 .. 1483 4RCOAST .. www.nCCo2stalM3n39e e,-1t,rat Form DCM MP-1 (Page 5 of 5) ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information APPLICATION for Major Development Permit 14 »',E AUG 1 0 2009 CM W 1 00fiNGTO Nom= 252-803-2818 , 1-888-•4RCOASi' .. rr ?.v.rs?c? to s sa a - r t Form DCM MP.3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. A propose . One at marina village site. 211 lots proposed in Phase 1A. A dry storage facility for 84 vessels. c. Density (give the number of residential units and the units per acre). 1.65 units per acre in Phase 1A. e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land-disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes ?No ?NA (ii) If yes, list the date submitted: 5/2008 d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. Marina Village = 11 acres Phase 1A = 90 acres f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Asphalt, concrete and other impervious surfaces as necessary under existing stormwater permit g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0.001 % for concrete dry storage launching pier. i. Give the percentage of the entire tract to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 30% Total Development 46.3% Marina Village 24.4% Phase 1A j. Describe proposed method of sewage disposal. Community sewer 1. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Surface runoff 0-CM, WlUkMNIGTON, W.7 h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ®Yes ?No ?NA (ii) If yes, list the date submitted: SW8 070672, permitted 02-14-08 SW8 080312, permitted 04-02-08 k. Have the facilities described in Item (i) received state or local approval? ®Yes ?No ?NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ?Yes ONo ?NA If yes, attach appropriate documentation. AUG 1 0 2009 2- f;8-28082;: 1-888-4R,COASg °. vvww.nccc to-nia m t; :Ie revised. 1 i2 i'0 m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Community n. (i) Will water be impounded? ?Yes ?No ®NA (ii) If yes, how many acres? o. When was the lot(s) platted and recorded? Overall tract platted and recorded on July 31, 1957 p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ®Yes ?No ?NA ?'lo -P2 Date RiverLights Project Name NNP IV Cape Fear River, LLC Applicant Name Applicant nature AG 10 2009 252-808-2808 :: I-888-4;i COAST c: WVVW.nl- .......... Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITYAWARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ®Commercial ?Public/Government ED Private/Community d. (i) Are Finger If yes: (ii) Number (iii) Length (iv) Width (v) Floating b. (i) Will the facility be open to the general public? ?Yes ONo c. (i) Dock(s) and/or pier(s) (ii) Number 16 (iii) Length See MP-4 attachment (iv) Width See MP-4 attachment (v) Floating ®Yes ®No e. (i) Are Platforms included? ®Yes ?No If yes: (ii) Number 3 (iii) Length See MP-4 Attachment (iv) Width See MP-4 Attachment (v) Floating ?Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 40 Wet Slips; 72 Lift Slips; 84 Dry Storage Slips (ii) Number of slips existing 4 permitted i. Check the proposed type of siting: ? Land cut and access channel []Open water; dredging for basin and/or channel ®Open water; no dredging required []Other; please describe: k. Typical boat length: 30' to 50' m. (i) Will the facility have tie pilings? ®Yes ?No (ii) If yes number of tie pilings? 30 AUG 10 2009 []This section not applicable Piers included? ®Yes ?No a)32, b)8, c)8 a)30' b)39' c)44' a)3.5' b) 4.5' c)4.5' ®Yes ?No f. (i) Are Boatlifts included? ®Yes ?No If yes: (ii) Number 72 (iii) Length 12' (iv) Width 12' h. Check all the types of services to be provided. ? Full service, including travel lift and/or rail, repair or maintenance service ? Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 40 ® Dry storage; number of boats: 84 ? Boat ramp(s); number of boat ramps: ® Other, please describe: 72 Lift Slips j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Mixed types 1. (i) Will the facility be open to the general p ite E ?Yes ONo 2 - i96- act3 ;; -#i 8 4 +G 3A T . *r av t,?.r<. "' °" #. ` 12/2 Tr 06 Z DOCKING FAC/UMMARINA OPERATIONS []This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ® Office Toilets ® Toilets for patrons; Number: 2; Location: Clubhouse - was not proposed in CAMA Major Permit 92-07 ® Showers ® Boatholding tank pumpout; Give type and location: Tie into community system located on Dock 1, see Sheet 4 - was not proposed in CAMA Major Permit 92-07 b. Describe treatment type and disposal location for all sanitary wastewater. Community sewer c. Describe the disposal of solid waste, fish offal and trash. Trash bins and dumpsters at various locations d. How will overboard discharge of sewage from boats be controlled? No overboard discharge policy e. (i) Give the location and number of "No Sewage Discharge" signs proposed. Signs proposed to be at the end of pier 1 and pier 2 (see Sheet 4) (ii) Give the location and number of "Pumpout Available" signs proposed. Signs proposed to be at the end of pier 1 and pier 2 (see Sheet 4) f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. No maintenance activities g. Where will residue from vessel maintenance be disposed of? No maintenance activites h. Give the number of channel markers and "No Wake" signs proposed. Signs proposed to be at the end of pier 1 and pier 2 (see Sheet 4) i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. No fuel service provided j. What will be the marina policy on overnight and live-aboard dockage? No live-aboard policy k. Describe design measures that promote boat basin flushing? NA RECEIVE 1. If this project is an expansion of an existing marina, what types of services are currently provided? NA AUG 10 2009 252-308-260 :: 1-888-4RC AS revised, 12127106 For DC _4 (structures, Page f ) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ®Yes ?No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ?Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW 1,617 so ft of potential partial shading from elevated Piers ?SAV ?SB ?WL ?None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ONo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ® This section not applicable a. (i) Is the boathouse structure(s): ?Commercial ?Public/Government ?Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ® This section not applicable a• (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) El This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ?Commercial ?Public/Government ?Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) Av 10 29019 7. GENERAL C;0v1WILMIsN TON, C 252-808-2808 : 1-838-4RCOAS3 4: r a c? stat a as >is?erst.n # revised; 12!27;'06 x ) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. Greater than 15' -r1800' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 1500' d. Water depth at waterward end of structure at NLW or NWL -5' to -6' MLW e. (i) Will navigational aids be required as a result of the project? ?Yes ®No ?NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ?This section not applicable a. Give complete description: A dry storage facility is proposed to be located east of the landward terminus of Pier 1 (northeast of the structures permitted in CAMA Major Permit 92-07, see Sheet 2). The building dimensions are 160'x 130' with an elevation of 40'. The facility will accommodate 84 vessels. Haul out services will be supplied and will access the water via Pier 1 (see Sheet 2). Temporary tie-up will be located at Dock 1 and Dock 2 (see Sheet 2). A locked gate will be located on Dock 2 to separate the commercial dry storage temporary tie-up from the residential use wet slips and tie-ups. YkT Date RiverLights Project Name NNP IV Cape Fear River, LLC Applicant Name Applican gnature x RE E 1) AUG 10 2009 0CM WiLIMIi;GTON, N 252-808-2808 :. 1-888-4R SEAS revised. 12127/06 aY a esk n ??r.r i f p b rw J t la•a ) r i?? _ *on pe i- co+ `gyp t i f;-? r ?.IUn? I t 3 - ? Ll ??._ _ I .° GIs do, lv?ll ?/a oM e. 74 17 74 76 t33 Ft's s ,?x`L ?h °_ - v 1=- 87/ 76 •. u. i ?? 4, U" td w JZ1 n !? _ Nr?ei 8 ,ter ?1 17 aw 0. 0" _z . t ?^¢ tP sw.,, H n r + S o n .? r. SITE 'r ` ?S 8u1 ?Z 13z ?? I I / 1. ? t, r _ 4 - ?.: ? -Fs 1 ' Ybs i'; _ ? CI(irenaw ir; \• t j ? '•t ,? l` "?-?,11? .?, r 17 A 1, 4 1: 87 \ - 'C o}' g ke _ J G may' r`. '?., f $ ' / w 711 }j r. tJ] Feu ra+tr - 1 133 r 1_, 1-... n o sa{" _1 4? /'u awlKL.eek J I', l t -?'\ 1 {. g ) ? ?-cT°r 7a.cni K N 7? \b I b?? ?-. 1 - `yP .,. _? \ < `i_. '?, \.. - ac Myrtle 4?t A/ac naao 1 t..? s / n as .a,p rt ?, ? 1Jp. .i. ? ? _.j- 1 it _ . °• 3 air ?...Grova ', uune . .& :; - ?,e,ron ?' i i` j't aP, e,ev I 1 •„ok,x,!! r 421 ro - - B7 17 r '' o/ ' ? • r? f 4 , - _ 133 rP.za Vi, 'c --?. d . 3 47, y n Min CnieF z , _" Zi F •,a, W Y. i -- Y \ , i 7;t, i K. a n! j l t s cw , ?J f +, { 1 f / -,tom 4 -_). r IE 14 _ ? 1 _, ?? (L ? 41c. _ . + vyf tt s I - i , x •? W a? Carolina Beath Fishing Pier \ y tjs- ' 1 kool P O P SCH - 1 _ r i I Carotin aR <elPark Heiloacao k ae ?, Boi. ?i%/ ti7/. ?` ^ r B nsw n ¢ ti 7, j" IZ , t' n n«n L ?? I _ / ?j, yJ ( 133 cents Pier Wi rnington n . Beach RECEIVED NOV 14 2008 `Boundaries are approximate and are S••E DCM WILMINGTON, NC not meant to be absolute. SCALE 1" = 1 Mile Map Source: North Carolina Atlas & Gazetteer. Pg 82, 83 & 84.2003 CAMA Major Express Permit River Road Property LMG Figure 1 New Hanover County, NC LAND MANAGEMENT GROUPmc. Vicinity Map 02-06-698 Environmental Consultants 71 j } i r4 t. 7 C 23t Js 5 Cr 7 rpgir , 1 •• r (? 3 ire' 0 \0 I r4.. , ' Mx l ? "f ?? ` ? ? "`"""444+•1 Jr .v" ^S 1 r' 4 Camv6ell 1 LIGHTS f I1 f { f ` r. Tf2AILEF2 i `wC.. t r^ 1 r r } m ! 46 *Boundaries are approximate and are SITE WIttAING1 5 not meant to be absolute. Y9 Map Source: Carolina Beach & Wilmington Quadrangles 7.5 minute (topographic) 1990. SCALE 1 rr = 2000' CAMA Major Express Permit River Road Property LMG Figure 2 New Hanover County, NC 1.ANAMANAGEMENT GROUP INC USGS Topgraphic Map 02-06-698 Environmental Consultants RECEIVED NOV 14 2008 *Boundaries are approximate and are not meant to be absolute. Map Source: NRCS Soil Survey. CAMA Major Express Permit River Road Property New Hanover County, NC 02-06-698 DCM WILIVi NGTON SCALE 1" - 1800' LMG LAND MANAGEMENT GROUP wc. Environmental Consultants Figure 3 Soils Map I . o , 1 - e+ I k - j'" l' ^ / . t` _ . 4aLd6fOS ?. F . 1 \ ?'pP UE _r?a ??\^ N yater r Iitngs °V . i -' .I d "E 1 ?a 1. I w t?+t; ?.:1 t7 C. -?•!-1Dx -\ - Il.?nn.uir r d ,?). ?+ X7,'131 Bj`1F9r/g? $ f ?l - _ , ?\ _ .. _ C ' Iar+dJ 'DIA'M L PD NE ?'7 9 _ / l J? \i JI 1.1K C . I, m _ IY f ' _ s "_ % - E t yi"< ?> { .\y 1 gTI` In .-_.' Indc : t f ev i ? 5 1 Zi r 1! ;? I! Naiamra .y ?? ?, 1 J 8 _ - ' LW +a,: -? ` ? naal'??? rr'-., ? -uOaUesl?plj•C _ _ I tt??74{t to (/!gq `74 - - t) 74 76 i33 _ Y - Ui T.'t 132 7 lam 8 7 $ ?- ?? - 76 ' he \ r. li ttt ?1 4y`i: r r w J t i r L ( P-1 C a{ r• rI p W /4 17 to ? .? ct. 1 ? ?7e ?? r•',/ r??+l '???i ? / - y r _ C ?aeo ¢ Q y Jt ?r j yl / ?? - Y' -_ ? ? ? iu? E 1., _C_,k .- .?' ,,.1 m? I i ?? t ? g l?f,... ?C ? _F•,.'" { S 4: ,T ri SITE % `p.? 1 1 r I . ca 9DXE z - , ,.1 f jt .? si.e.?'__S•, yt •y,t-. i wnboau"? _. l?/'7'_ L ?- z +??' `\ _ ... •?$`" c1lall (• / x' ?s x 'k -4 TNa iN T L is L wR ta: tF7 11 17 1 .x'1 '• - [11r.adn F ., ,1i ` .-t I ! -l >? t.'# s / I r I ': 87 yE 1J3 _c .. ft 4it 41- S '- r.""?t DraiEamn 17 87 \ +% 1? a, yt -t. _ 1 - _ ?" Ya .. - 1. E ?- ( 1 1 f_. w i ae t L,I ?. I "v' '* m ¢last o ?,, ? - 4.. o \ ?? r'< r .P(oARV 1 I f I F .. Myrtle ve 3. ? - I , ` ?fi 17 ' l 87 N ?.N I _? _ t L? P- '4' _ _ r 133 GoLl" ?? , / Pux¢rox s .?i qy (. "$ $1 I 5 - - w all / l 1nnc.? F °o g0p0i wa S S J, y I ?\ I 1 ' III _ _ I (y'J 1 r 1 l .I { 1 f "' .' 1 ' n ao t 9 crt tC s tt l? ,. c __ i k I 1 Par r ill rowers ?¢ vl I fr<?' On a L? ?„ I I,r cs i t r, _. f Z c? J l .r * w W Z w Carding Beath 'v ? /? +!' „ ? _ s ?? ? ? L _ R I`t / ? ?, ? ._ ? , • Fishing Pier """...777 ; -AOss 11 N O Lo,eF. C J S _ KfI p7ErL1JY1 t I. J \ Tjrt SI I .N• 't 181e'P rk l h H.1 1 ORCXID LN alSY 1 1. 11. [. 1nNr11I t `' .. 8 Illgp S"a,l? ?, 4''_,? J'C. I') Z' BSW., ?_•.}w[+ ?? "fir a 1 oaL V I` t ° i II jr ?? o s s f P0+4+ "° sE nado<n azt l i i 1 - ?T. l ) ya -. 133 ? 4 ` \ __: - ` •) J c? ??J _? ! Ce ter Pier i Fay ,m cE k•? Wtlm[n on _ _ m? unNti . 1 ?{ ri >? /? a ; . Beach *Boundaries are approximate and are SITE not meant to be absolute. Map Source: North Carolina Atlas & Gazetteer. Pg 82, 83 & 84.2003 e CAMAMajor Express Permit OCT p 1U0$ River Road Property LMG Figure 1 New Hanover County, NC LAND MANAGEMENT GROUP INL. 02-06-698 Environmental Consultants DCM WI" 1,ty, [M aP I I ?t f *Boundaries are approximate and are not meant to be absolute. Map Source: Carolina Beach & Wilmington Quadrangles 7.5 minute (topographic) 1990. (--AMA M-or Express Permit SCALE 1" = 2000' 1 River Road Property LMG & q u???i New Hanover County, NC LAND MANAGEMENT GROUPiNC U$ $ o s Map 02-06-698 Environmental Consultants W?j Y *Boundaries are approximate and are not meant to be absolute. Map Source: NRCS Soil Survey. CAMA Major Express Permit River Road Property New Hanover County, NC 02-06-698 SITE LMG LAND MANAGEMENT GROUP wc. Environmental Consultants CALF I " 0, Rau ?r. Figure 3 DC M 4ilI MN Map ^ '.s ue MP-4 Attachment 1. Docking Facility/Marina Characteristics c. Dock(s and/or Her(s) Len th ft) Width (ft) Pier 1 329 15 Pier 2 207.8 9.2 Pier 3 275.7 6 Pier 4 275.7 6 Dock 1 97.4 11.9 Dock 2 408.2 9.8 Dock 3 69.8 6.2 Dock 4 224.5 9.8 Dock 5 194.2 8 Dock 6 207.8 8 Dock 7 207.8 8 Dock 8 160.5 9.8 Dock 9 194.2 8 Dock 10 224.5 9.8 Dock 11 69.8 6.2 Dock 12 40 20 Platform 1 28 44 Platform 2 28.33 28.33 Platform 3 28.33 28.33 Boardwalk 578.9 6 *NOTE: See Sheets 1 and 4 of 14 for Labeling. $yyc4 ?. AUG 10 2 99 Vl 1o L I ASO I ueld a9S Ileian0 :ja"nN 1904S :AS uN,e/0 969-90-ZO .000't-.t 0'11'JaA18 lead edeO AI dNN HN 1 60/90/90 1 St461.paA!>:! w0.PawOw!A0w._ MU-19VOW:aed '940t-£4£(OW:au04d LOW euy0Je0 yVON'u010u1w!M 108AS IMA 4110N £bZ P..0 q w!NOW :WOBd NOUVMOAN! A3A8ns 80/ONV SON IMV80 IVNIO180 NO 03SVH S1 dVW SIHl aNnos :6q .-0 pue pau6!Sa0 w,np,4S euueW pue po0 Mln of 9Al)e19?j gay sy)dad jejeM '88 dn`dN sl wnled leoi)uan •LOOZ Ain ul E)nl Aq pa;eaullap 9.19M 96e11lA e1.11.113W ayl puoAaq spuellam 1e1Se0310-M # )luaaad `dnVo aqj fo lied se LON AInr ul 86ell!A eulJen ay) ul gull puellem le)seoo ay) paljuaA ilea uoser 0 60482 ON wry nncVV ?P4" P. I000-Z0,01,6:9U008191 ZOnZ BUHM0 yuON 'U0IBuimllM :911!1 ZZSZ x013 80190 lsOd SJUVI)nSUOD Iol UaWUOJ!AU3 ':?N, dRON`11NHYVHOtlNVWA QNN'I ,?2 iueoqddv 09!b/d Iu:J VLYenraVuc!meN -' 8b`S8U'6U1:id Ild VVVVJ `JUU6 000'Z 000 L 009 0 NOIIVNIW 83130 AON311SISNOO V 03A31038 SVH 03'd.SL 3H1 JO S11W1l 3H101,10A361N3MO13A30 ONVIdn BOY111A VNIBtlW '011 '83A18'd V3d 3dVO-AI dNN 0103nSSl L026'ON 1IW83d 31VIS Ol NOUVOIJ10OW 80NIW V 83ONn 031tl11um N338 SVH SN3380 S1LOW ONV SONVNdV9 d0 ONISSO8O Alll!ln gull Puol?aM T T T PUIDI aM V017 b0t,/ID?SDOO ?ulof ----------- gull MHW ---------- 31,111 03Y .5L _.._.._ jalln8 ,0£ - gull QOM Pupal AINO ONI.Liffl iOd WiN3WNO2JInN3 X103 0,0 (C UUOAvld) (V Jeld) a'a Je!d Bu!ggsJO O ., . O 34B!l '8 J6M0d IEullaJea ®J ?..:::.`.. --- .....:::..:. / ? ,lL army , -T -I 1 1 1' atl?- . 111 T?????``??. ?•.e Ca /?' ?IC - uol;amwma Jepun AI;ueJJna -ails-1 III _..,_.-uol;anJ;suoO Jepun Al;ueuna °_- >//// ';ue9Uu6lleea psoa Jenla I? „ur 11 ?Ilr V!, e9e4d J I q _ / r TT?? I _ •• .... i' .Irf- -T 1' I ors ?r_ 1 / I / I Ilr, 1111 1 covgz ON 1uo)6!kl peOa poOM4983 O'i'l `Lul!M;O sewOH 'Ilia S1N den uogeool a)lS duo .... OdOb9 ?W a d ?6 W Od U • 311S q* n 1N3W3`JtlNVW lV1SV00 JO NOISIAI4 soot e o a3s SAIS321 , I 400a Bul4oune-1 Ilml ual3s0MPOW JoulW SOOZ AJenusir 4;IM pe"pucing 1 P '01119 06e11!A euPRW d?oa (Z uv0981d) (£ Jeld) Jeld BulggsJO _ ,r0 II ? VIA 0319 eulJeW i,ovez ON `uo116 '= llM SaadNa'dH eApa uolswa 00£ Z6b8Z ON `uo;BuIWIIM lOaON POOH JeARJ 9ZSE .771 `-umautimm Iva-04mm Property Extends 700' (To Barnards Creek) __ _ W,WWWW iW; W WWW ; i Wj. W W T. W' y 8 W Outer Limits of i +-y _ t W? W Coastal Marsh ry?y? W 4 Channel Width M LW (0 ontour) i f i , I r ,1 ^ 1 HW ?.? , Level Spreader, (Typ. ? 1 (I Joint Coastal/ 404 Wetland Line Jason Dail verified the coastal wetland line in the Marina Village in July 2007 as part of the CAMA Permit # 92-07.Coastal wetlands beyond the marina village were delineated by LMG in July 2007. Legend ry Storage Facility r% / I ., r ill I I I I /,1 i I I , I I'I III If I L-J II , I Property Extends 12,000' (To Motts Creek) COD Line -coo-r.".- 30' Buffer 75' AEC Line MHW Line ----------- Joint Coastal/404 404 Wetland W W Wetland Line UTILITY CROSSING OF BARNARDS AND MOTTS CREEKS HAS BEEN Project: INTITIATED UNDER A MINOR MODIFICATION TO STATE PERMIT NO. 92-07 ISSUED TO NNP IV-CAPE FEAR RIVER, LLC. MARINA VILLAGE UPLAND DEVELOPMENT BEYOND THE LIMITS OF THE 75' AEC HAS RECIEVED A LM G CONSISITENCY DETERMINATION. Applicant: FOR ENVIRONMENTAL PERMITTING ONLY LANDM ENTGROUPrnc Environmeenntal tal C Consultants 0 100 200 400 Post Office Box 2522 Title: Wilmington, North Carolina 28402 MA19nnR'':AMA Fn FCVn9-nR_RRR Telephone : 910-452-0001 d 404 Wetlands 07-1335 issued 94-07) B Tul E V E SEP d 32009 DIVISION OF COASTAL MANAGEMENT NOTE: Marina Village Upland Development Submitted With January 2008 Minor Modification Request. Dock and Marina Structures Designed and Drawn by: MARINE River Lights NNP IV Cape Fear River, LLC Community Boating Facility Site Plan Veritical Datum Is NAVD 88. Water Depths Are Relative To MLW. THIS MAP IS BASED ON ORIGINAL DRAWINGS AND/OR SURVEY INFORMATION FROM: McKim 6 Creed 243 North Front Street Wilmington, North Carolina 26401 Phone: (910)343-1048, Fax: (910)251-8282 www.mckimcreed.com 08/06/09 V-200' Drawn By: Sheet GSF NA lumber. 02.06.698 Number: 2of14 s? 4 umH.x,!un aMu! IJW4dk8uuud JU!GyV HGud JOA!aXJe!IIuJ VL1JdnWuu1muN -- Vbi rVWCU1Jd 11-1 VVVVJ VUUCMVVVJ\- I L000-Z9t-UL6:auay alai lm? ht w £ dso I!elso JIOop ilmis pus fq!ae j bu4eog ZoVBZ eugoJeo 41JON 'uo)6w LU11M ON O OS 0 a!1!1 ZZ9Z X09 93WO 1sOd :JegwnN laayg :AS uMeJp suo-7)wua s Ull/ bad lViN3WN02iUW3 2JOd INO SM T flolio - ? 969-90-20 ,00 L=„ L Oll 'Jan!a Je9d edep Al dNN 3"? dR0il9 1N3w3 JVNV V w UNVJ 4N "I :JegwnN qof :oleos :lueo!Iddy f"1 TATrT 'NOUVNIW 83130 AON311SISN00 1 V O 31038 SbH 03V.SL 9H1 d0 S11WIl 3H1(INOA3g 1N3WdOl3A3p J 1 /\ 1 Y 1 L 1 ONVldn 30V111A VNIBVW 011 "a3A18 8V3d 3dVO-AI dNN O103f1SS1 VN 60/90/90 e146r!Jen!8 11N1 Ol NO aONIW tl S a00!Wd O-Z6 ON e e ISSO6 VMml N339 HO N33B SVHVH S>GN3380 Sl S110W ONV NV S(3 SOatMatl9 JO JNISSOaO Alni Alflllfl also uo?smea ti p PBeJoW1)IaW aull PUDI?aM ID4SD0,? W0'J''MMM `` Z9Z9"L9Z(%6) :xed '940L-£V£(OL6) :au04d /1 n u l a eaui a - - - - - - - - - - - au l .1 MHW LOOZ I f SWl q p I p . L04BZ eu!ImeO 4UON'uol6u!wlyti ---------- cull 03d ,5L WAS Wad gPON£YZ aaaM 96ell!A 8UIJ W 8113 puoAeq spue13aM P 9 I ? S?LO-Z6 # ?. d `dWdS 433 _,._„,?a}}n8 ,0£ --, -, -° -° _ aull 40? a?tOS a seo iw.?a a o lied V =1 Noutlwa W'd odw V408=1 tI A3AanS 80/ONV SONIM"O Cue LOOZ A nf ul a6eIli .n euueW 9u3 ul aulI ,,q u-0 Pus Pau6!sep Pua I ' lb NIJI80 N003SVg Sl dVW SIHl sam16w1S euueyV pus Hoop pUeRaM 1a3seW 943 pald.uan I! e(] nosef -MlW 01 and3e19?l aJd s43daa Ja3e M '88 GAVN Sl wn3ea leol3lJ9n lovx.OZ y -71 dA l) 1 r y , f' 1 \ V.+ ? 0) d!is,M!'1 f' (ono;uo: . M7 W . 1N3VI3!DdN` V4 -`d1Sd6 ,. : ' .. ? ? ., JO NOISIAIG \ I, \ \ \ of of ' 60OZ E.0 d3S \ 8 o \ .\ , _ b \ \ ..\ Z. s H A mooa au;eow 11 1 P a u1!IeN'3 .8x.802 j u! P U L aald Pax!A Ax.802 s (OdAl) 6683po lei;uepisei ' I ° ?//* / ,Pue eBeltaop of oE- _ d!IS 4aM -- °° i 1?aeJoC4UG4 lJae;s Aip ? - -- ?; gul;e,edes o;eq ' - enn aeo a ena . . 9 N ,.. PeRols ep!M 4 A r = l ?; 1 6 (OdR ) 1? l : fit= ', '` 1 ysJeW -e;seo dlig 141-1 o s IWI as n N / 8Z A o 1 W s 1 , (HAA 0 d -a!1 Ajajoduual . Ped do la mol mio_ i Ja!d M.7 4JOA Pue I ? s8930d Pax! aPIM .91 1 - , i I ; T I ? l 4, T - ?. T T i Jason Dail verified the coastal wetland line in the Marina Village in July 2007 as I Y part of the CAMA Permit # 92-07.Coastal I y wetlands beyond the marina village were I . delineated by LMG in July 2007. r Pier PUMPOUT LOCATION Platform 1 (NO WAKE AND NO SEWAGE DISCHARGE SIGN) Dock 1 (T EMPORARY Tiff-UP) )l l ri Dock 2 m : I (TEMPORARY TIE-UP) 3.5 Dock 3 \ / ,': f 1 23 4 Dock 4 5 21 6 22 28. 7 23 d J / 1 J l i If ? !I ? 9 25 . . . . 4 \1 1'' + » 26 11 27 ' • • P. 12 ? 29 13 N 29 . - Proposed . 14 30 ,...- t ' / 15 31 Boardwal / 16 , Dock 5 17 34 a / Gate separating 19 35 dry stack temporary/ T 2 320 33 6 Tempt dockage and / / 37 38 39 40 41 42 43 44 45 46 residential dockaaa 0 emp / 2 J?45 Permitted I , ,.; = Gazebo 3 D k 6 ?. Permitted Pj oTm,F "'- oc L -1W 51 52 53 54 k?llk Pier 2 47 I 55 56 d (NO WAKE AND NO SEWAGE DISCHARGE ETON) -.- -- } Ralhn6 57 58 59 60 61 62 63 64 65 66 o Dock 7 5 Q . 5 a i \ \ \ \ Permitted .v? 2 - Pier Dock 8 , 2 4. ?.. -, Tempt = o 69 70 71 72 73 74 75 76 ?j 67 6B F V k Temp 7 (CF 77 93 30 0 3 emp J ???//// ?S?JJS??..1lllJJJ ! . . 94 78 79 95 \ \ \ V \ SEP 0 3 2009 so % . , \.? Permitted 'B ' •?• Boardwalks DIVISION OF 83 v v OASTAL MANAGEMENT 64 100 v ? Dock 10 B5 N 101 , 87 103 Z7 "i7 89. 105 106 90 \I 1 ' Dock 1 91 92 We Permitted Pier t? 3.5 \ 1 ` \ , A S 1 Dock 12 - I - - - ? ! =\ nPegsary \ Veritical Datum Is NAVD 88. Water Depths Are Relative To MLW. Dock and Marina Structures end Le Designed and Drawn by: THIS MAP IS BASED ON ORIGINAL g COD Line --------- 30 Buffer _.,_ DRAWINGS INFORMATION FROM: , 75' AEC Lin e McKim & Creed 243 North Front Street - - _ _ - - MHW Line ----- Coastal Wetland Line _.. _.._.._.._.._ Wilmington, North Carolina 28401 .._ Phone: (9,0)343-0048. Fax: c9,g,25, 8282 MAI2IN E d d mcrae .com www md UTILITY CROSSING OF BARNARDS AND MOTTS CREEKS HAS BEEN INTITIATED UNDER A MINOR MODIFICATION TO STATE PERMIT NO. 92-07 ISSUED TO NNP IV-CAPE FEAR RIVER, U.C. MARINA VILLAGE UPLAND DEVELOPMENT BEYOND THE LIMITS OF THE 75' AEC HAS RECIEVED A MG Project: Date: Revision Date: River Lights 08106/09 NA Job Number: Style: Applicant' CONSISITENCY DETERMINATION. . LLC 1"=100' 02-08-888 ar River NNP IV C F FOR ENVIRONMENTAL PERMITTING ONLY LAND MANAGE Environmenta MENT GROUPiac. /Consultants , ape e Q 25 rJ Post Office Wilmington, North Box 2522 Carolina 28402 Title: Boating Facility and Skull Dods Detail Drawn By: Sheet Number: MP4 Supplemental Sheet GSF 4 of 14 Tele hone:910-452-000, a .._.._.._.._.._.._.._.., J .Z _O A! Z_ a? 'w .W a o • 000* . ••? w . ,? z ? .o z w tr -Mv ,. O - _ A ,-' - LLI a ? ? 3 i? m = M LN3W3E)b'NHW -lylSVOc) JO NOISIAIQ O 6002E 0 d3S F 7. 4) "M mc 0 V?¢ -0'9 0 0 ` a M R z H O w ? ,, .- Q C o ?- C a IL a in ? a m a = a0 WF a 3 0 a Z Q Wj Q ? ?w a? 0 o J o ZN W¢ ? 2 ? Z N oZWO JO?ZB W Z wOLL00¢> mN?aa E ZWOm00 dJ¢Z?C9 wE.wa 02 aZ it w O¢ o<a(x O I O J Z F H k Z WJm Z 0¢ t?? O O Z O 0 Z ? Z ¢>mo p ? ? N Q Z Z¢aa¢ g?wir ma Q C C N R i Y 3 0. ? M 00 0 C d co IIx l/ ? ?? ccu 3 a d } O)o N 0 3 O .? T 4- V 7 w a N Co Q (0 C O '-* C O o (U a) ,- ?p .C M I? V ca E E U' N W (D N a y J 1 I Q J I I ?? C N'L< O -a I I N U I C) -C C I I c Y Y? ? C O t0 O cu a) -t c Q o = 0.8 mcm? O?LL o v5l .. w sU y U LL `e E a _E =o mN ?' z a NZ0 fm `om S ? ? o ~ o a i i i i =? < Scz c D ,v D (D ' m O w ? 0 w y) CD w 0) m cn Co O O O c 5" nD3 Q <?<3 mN (om0 =z (D D (DG? 0 v N < 0 a = < o o c ;- < OD CD OD (D =3 cr W a 0 I O c O C C CL U 0 ur 0) c u (D 1 . 1 ? U ?f\? a ^ o Sx o ?m ? ? a / nm O 3 4 < o ? c g? O N 60 ?, O C-- 2. l J 0 v v A 0 CL m r m (D (D =3 (Q < a) (n (D m 0 N Q :3 N CD n Q ? T 11 n C/?L O X• 77 o - o- =3 1-- -0 r- To 0 (D (D V) 7 - . (11 r 0 S!? ? <Oy 2 ° ? W TT 5 ? 25 ?? Z3 AG) (n N m p1z ?p T0?0 YpO 7i? ?g App 7c0 ?+ 3?p 3oN? m0 N ?m Cmm rR O D T Z.1D.10 O 0 O 0 AOOZ> D 0?o Z. Wsm - ?? q m? N 1 = p0 N Z R D 2 0 T l y O M sm 1 00 . L1 Z; Zm _ V 0FjO 0? O Fn N < m ooO O D 5O S miA3? n o ".i OOm?D z x D N 1 Z C C) z O CST ATL1 r 1Dm? cvmzS z O n -.j ?m 0 r 0 ;o n Z 0 0 C/) p -? cn mz70 cn dor z cm o m -? -_ 03 D z m D 0 0 o n m?zz a.Qm ?u cn dxo? ? QN? z N? C: 7 m i u N O '9 C ? O '^ b N D d ? m o g z D ZT C„ R T T O > p Q g F 0 N 70 m z O o F N ? o z m m z ° D Y N m Z z 3 g (1) 3 X4 O O z W C J D m n 0 O A W S 0 - C X. (D lD D n 0 O 0 (D .. c ID En Q O oo N D7? + ao OLWA 0 0 N Co X 7 Q m n r N 0 Cl) c::= ""?< 3 O ? Q Q) _-._ _. .. .:. ... =3 Q Q CD m m (n (D Q (° o 0 D VVV 1 O N O d W CD t C) 0 c? C) 0 v N v K o Z O o ? ... S E ' . • ?„? Z' 1 z v -1 y?rp ? ¢ N 1 LLL W1 J a Q ? ~ \ o M N tza co Z X41 : W .. CL- j ttf Q Z S N o C!1 ?- O > U o O LL t: K a LLy U b N U O z z E H _ n o a ti a a F 0 ^, G J w cG O N Q C7 N m 5Y2 uNi p = a F N x W p o 0v V COO U p ? w Z Z J W Q `.J z v° v C O O H z - - - cocL o ° o C) z Q. w o Cl) ~0W 3 U) F- O Z o )::) 0 C = U C) N O 0 Q ¢ U Z wIZ a ~ V ~ ?Zw°aF J o F- O J O N x ? D U o? ' ? \ Q [ ) j 3 ° N 0 0 O _? O 1r> ? F O T _ vow _ °E Z- _ Z ?o -2 I- I, to O ' gaa¢p o y 6 ,1 P V C ?.. . F wK_ wz--Y O O ?°°Ow >oo 25 ° U ° z¢aa ?NZ g? o ma L U 0. mm?E O T__ / O wow UoULL` .•? QS N z H M o 't n aNNE Y t z N Z2 O z` E w L C) N ?C O d _ d ? = J _O + y Em ~ y 0 CC i N o a X C? ?hC x x i O i i 0 ; 0 o o aull4nlw a c u N g' ago n oa ~ d a L ° (0 =3 oo ! a r a 0-0M 00 > y + - a ?? _ d X j y Y a) C] ++ a a LL to V LO ??- Q o Q= o0 ? Z(r3 fV= O C '.. '... O L rn N J Q n p j 0 C a _ Q Q ° mQQ Q -0 c) N c o Iql" O I'; co p Qo = LO ) M A W CY' o 7 a o (1) = Z M F- > C ( S CD 0 N ? (D W 0 (D "• W 0) f j 0 W - Op nCY p N 00 0 C v C (D O y3 m 33 m N CD 0 -., .; zz r'Op CD > a' o CD v (D c cc :3 CT CD OD 00 CL 0 f c Q. IT ' rr < < N m• S o m A 0 d °o % m m n G , ?+ O s '-+ N N N W W? A? Ln M + O D. co N Oa O.4. 00 N a) O 4 00 N O : oma z?D ?- .. Z3 pz? 3 w- o? , c) N (Q ', Z - m 3 Q a m a d z m C) omm io za° ;u 0 8?gm? W,z 3 m m R ON.' m P N r Z - - (D CL (D a cmr pmo(? zompp O m 2 y0 ZDZ O Z m O y Q OHOE Z . m c m x m 0? :3 z m =otiN x rpo m Z (n >Omm Z, '1 ?• ZOON$N ?//?11 Oyrnz ?O YJ 9Om-r °yNN fl1 z > ? m 2 m C' zxpo 1050 „o„ /yam (D my71T1 l / y m m O r I A ? O /> l ? v T A " 0 C A 1 0 z0^?m Z O m --j r 0 :UQZ? 01Cl) C/) ;70--1 U) _ zzcm G7pnn »_ 00 3> m>00 a>? mrzz ?cn Nmx°oz N ?. y m - N O m z z o m ° O -n --{ 0= ;a Z?5 mFn < Z N O z D z m m 4.,._ o? Z Z C4 -M D? o N p M m R- CV rI ITN, 1 /TV Igo ?? p 4 ° '3 .90 O o J 6 z z? o co O 00 x W Cl) O -o m cj) CD 0 1 U) C Q (D CC y a?0 cc X X 3 c 3 _L (o CD 0 VJ 0 x U) rl• { CD CD W ?Q O CD 0 C') ?po rTl U) Z C= D "' 6l )o l ASE) aegwnN laagS 969-90-ZO .000'1=.1 VN I 80/90/90 woo' pmowlxow'mmm Z9Z9-lSZ(0W:--:l '990VCK(W6):euo4d 10t9Z B-11-0 WON'uol8ulWIM 1-IS luO13 W-N C9Z PMO 4 w!NoW :W02Jd NOIIVW210dN1 A3MIf1S HO/ONV SONIAA"(I WN10180 NO 03SVS SI dVW SIHI MJVN of aAlJelad Gay syldad ja;eM '88 GAVN sl wnlea leo!}uaA veld al!S IlW9AO Oll'/aA!a lead eduO Al dNN s1g6n,aA!y ?1?L1 G1 V y ?L aNnos :Aq ume/O pue pau6!sa0 swnpwls euue" pue jooO ZOnZ eullaeO yUON 'uol6wwlM :01111 ZZ9Z x09 90UJ0 IsOd swn)Insuo.) /wuawuoJ!AUg dfl0lI9,LNHYV99VNVW ONV I lueOllddy :)a01OJd ycua ?eiytlN>!II J HLf?en!ZlyuaimdN -" tlb`.TJU'6U1Jd Ild VVYVD VUUL 000'Z 000' L 005 0 'NOIIVNIW N3130 AON311SISN00 V 03A3103N SVH 03V.SL 9H1 d0 SlIWll 3HI ONOA39 IN3WdOl3A3O ONVldn 3OV-nlA VNlWlN '011'83AIULIV3d 3dVO-AI dNN 01(i3(1SSI LO-Z6 *ON 11W83d 31VIS Ol NOUVOWIOOW 80NIW V U3ONn O31VIIIINI N338 SVH SH3980 SilOW ONV SOUVN'dVg d0 ONISS080 ALllllfl aull puoj?aM r----? t,0t,iln4SO00 , UlOr ---------- gull .?3d ,9L pu3631 PUDIPM b0V cull MHW aull QOM 1,INO JNI111Wb3d IVIN3lNNO2JIAN3 bOd 90b9Z ON `UO46ultul!M L9K xos Od sJapusS 9 eIPnP .P•.ys:$:,gVy G WV9Z ON 1N3W3JVNtlW lH1SV03 JO NOISING 6002E 0 d3S • -111 -, - uol;onJ;suoO Japun liIL _ AgueunO -e)lel Aq ?W ?4/ III - uol;anJ;suoO Japun Anueuno =- // -;uawUBlleaa peon Jawlb gllr_ T V/ Itt- pl it - V 0884d _ _?? III ?l, ? .•, +=,`, --? ?.. =T r + I ?y y n 114 F -1 Ilr pr -1 A I I IIr AIi _ covou ON `uoj6?l psoa poOen;sea 0.11 `u+lm 10 sawoN S1N \ delN uopool al!S ors Stir OdO? ?? G y O?ty 6 d? U ?b 3115 (E uuOAUld) (b Jald) Jald BulggeJO 0 'fl LIt t (Z uuOAeld) (E Jald) Jald BulggeJO ® 91" x 1 6ulyounsl lln?l \ 61;eol 1POW JOUIW goon AJsnuar 4;IM Po;;lLugnS 'a;IS 06elllA eulJeW y ? ? 'p,, "?L SQl?`dNa'dB wVez ON `aO;6 " . _llM GApa UolslAla 00E Z?VSZ ON `UO;6ulu+IlM .LOaON PROM JaAla 9ZSE Oll `MIIM/euueW Wutuje;eM 'LOOZ Alnr ul E)INI Aq pa;eaullep aJ@M 86e11!A euuew ay4 puoAaq spuel;am PISE0010-M # I!uaaad VINVO aql loped se LOOZ Alnr ul 96ell!n euuew ayl u! cull pueljann leIseoo ay} paljuaA I!ed uosep Property Extends 700' (To Barnards Creek) Outer Limits of ) 4 all L6 611 CL Coastal Marsh Width j MLW ' (0 ontour) I?L ;r j ' II r TTF A '1. Storage Facility 14L, d 404 Wetlands 07-1335 Issued 94-07) 1 lylHW 1 Level Spreader , (TYp- \ / f1 Joint Coastal/ 404 Wetland Line Jason Dail verified the coastal wetland line in the Marina Village in July 2007 as part of the CAMA Permit # 92-07.Coastal wetlands beyond the marina village were delineated by LMG in July 2007. ? ?I jl ? II,F I 1 ' 11 111 Ink I ?1 Fj klul M V Z 11/ SEP 0 3 2009 C 1.1) DIVISION OF I r I1' ' COASTAL MANAGENAFNT S I \i II 1 NOTE: Marina Village Upland Development Submitted With January 2008 Minor Modification Request. Property Extends 12,000' (To Motts Creek) T Legend COD Line -???--- 30' Buffer 75' AEC Line MHW Line Joint Coastal/404 404 Wetland Wetland Line UTILITY CROSSING OF BARNARDS AND MOTTS CREEKS HAS BEEN INTITIATED UNDER A MINOR MODIFICATION TO STATE PERMIT NO. 92-07 ISSUED TO NNP IV-CAPE FEAR RIVER, LLC. MARINA VILLAGE UPLAND DEVELOPMENT BEYOND THE LIMITS OF THE 75' AEC HAS RECIEVED A CONSISITENCY DETER MINATION. FOR ENVIRONMENTAL PERMITTING ONLY 0 100 200 400 Veritical Datum Is NAVD 88. Water Depths Are Relative To MLW. Dock and Marina Structures Designed and Drawn by: MARINE THIS MAP IS BASED ON ORIGINAL DRAWINGS ANINOR SURVEY INFORMATION FROM McKim 6 Craed 243 North Front Street Wilmington, North Carolina 28401 Phone: (910)343-1048• Fax: (910)251-8282 www.mckimcreed.com &RAA\9O0R r.AMA FII FC\n7-(1R-AAA -- NAWIAnri Riv-PH (,IIinr\RIVAr R. .00,00 a _ m o 1N3W3E)HNVW -JylSVOO JO NOISIAI4 O sooz e o d3s r ...... ... ... ......... J •Z -0 C 3 Z . All Q' 'w > CL Z _O z w Of o •--09 o "- c 6. ,E H . ? C Im o L E ? _ 0 40 r te ) (1 d -C a ; 0 a 0 O N V Z i w w i pd W 0 C N 0 >. M o vcas 3IL TOM K to r ?. c o` E? lim J ??,, IL o. ?v a wjz a? O waF 2a?w' N Q Q O Z W ? N JOZZZZUiw w 0 O O m Z m'WM ZwzoUy O~ <z 0 (D w? w a `-w YZ d' r Nw O U < OQQmi8 Z awit J `-'wrc?o ZJ=NU `W is 0 p O Q w u ZpOxwz Z<n OO< ma N QQ r ? 7 N O Z? 'S Np'Gryry .. Wm O ZO U S U n b ¢a~ ELL Cis mN? 4oZa? 006 S2S 0 QSZ N co S p ? 0 F a .i. c?oti?3 d-° C'q ° ?3 >, ~ o N . `F V LIJ o ? ? o a, CO c ? c? O •- .L L (0 E E C7 N c Q n i 0-0 Q (D co m .0 c ?yw i -o i N 3 C (U - a3 ? C -- ;I. 0). Q o CD 0 CD CD CD mv Cu C-) = CL Dv m � CL > <a tom= 03 .(Q m 0 cp�ico� >y < N c ON p� N -(° n rQ ��o 0c) CD @ CL m0 =e VI ° fq� . 0$m$5 y 07,0- m OVI/ OrO�oxam- mpNZ yOmA�� , 3 A zO pom�m /• O � D C / o�mZCg Ti Dm >> /. �-mmm KOOOOT T $$ /' mmmg0 i' =nm n pZA Z Z � _ .......... m Z 7 _ m O A V m _ 3 0 CL d b w ° yyN O d V� N O O-' 00 o X r M z� < Z x 19 K m < , m I11055 m 3Z Z 5 0 G �a� ♦ Z rn l FIL m � 0 C N p = crM 2z- 3 > m m _. Q o T 3 D D 3� 7 R P , T �' dz. _ m m m g n Z OFIL T O 2 m 0 m o w � o m me N O V 2 O 0 ° .. 0 mo A p 0$m$5 y 07,0- m OVI/ OrO�oxam- mpNZ yOmA�� , 3 A zO pom�m /• O � D C / o�mZCg Ti Dm >> /. �-mmm KOOOOT T $$ /' mmmg0 i' =nm n pZA Z Z � _ .......... m < p $ 7 _ m A V m N J < z 0 0 _ 3 0 oZ� y(/�� fO a. 3 Cry / b w ° yyN O d O N O O-' 00 y Ul m n N '^ t D _ L (U Ell p 3 Z Z � m < p $ 7 _ m A V m m � 3 0 O X m z� < Z m K m < , m 3Z Z 5 0 G N 1 ♦ Z rn l m � I(- oI(- F F F <- ♦•�..�- `♦ / ON O CL to r - Q / co ?I r ti E a _ ,KCB u, Gj `? 1 , , Z, ?, • e , , ?, N i Z LO, I r-_-f?J N l A il I / Nr r•}nr?N ? / \ III I m I I b ? , r / 111 v ?` m _ --- Q • 04 A ` rWNNN \ \\ cn ` - - - a -, zz N ' wr -tea Ir_ \ m O ' L/ 1 mo all, • • ® • : C7 N r Ql t (LT; 2C, ? ? 9 .?, ?'••? ?• lllll I LL a . . ? ' . ? ' , . . , . . i ` .•. ®. 111 r' T - a,z ? mgw W a? 9? ?? ', \// ilRll 1 11 11 Z Q ?..?sm?m? ? ,// ®° v F t i \ ® ltltlt a' w N ?? i?®` 11 1 tillllllllll 0?00. ., O ?D'IZ a ? . , . . , ? . . . ''i ®` ' ® I O` waw Oz 10 • . • . • . . . . Hw TpH 11 ® /? Q OJ • p O;R ' 1 tltl $p • " aye','? / 11 ® ON KOr, IV qlp Q? o > ls? a ® 111 0' o ALk LL llllll ®' ,O' _ /t?? e,?s l 1111 l ? O ' o 61, <"? l l l 1 J .4 o. 1 ? _2> _ o 11 I d= V IfA ?• I? y Z 1- W C au t aaa`c Z / + •f m ° Vi -zo / ? adz l \ 111 N ??q 0 o r `a w \\ LL Q 00 ' r U_ r a o ? O G 11 -, m ` ,. to S N 1 1 l l l ?-- ' n I ?? A e I ` m I o aF °o m 3, - CL ti V (o W o U1 O lIF- '7 p W = =, d o n A f - ti ml p N _ c _ N - w..-O o I n ' I i - I Cape Fear River O Z Nt>O .. Omp- : ON<Zy 0,010 F m Z m ° Cape Fear River V 1 pm y =j Z rAm? .,. OSOyZN p .: _ i o OM °om$m CJl Oz Z rnfv D0!A Nm Z?m 7m ?r - I 0O 0 1 - - i ° M 2 A A N A 0 O r Z O$oz,o m=D - m N _ O ZA ?-? ZZ mIn -i mm o _.._ __... o S - mo a by, M z (^o v u 13 5 . -- m a y A O a^c1 O b C) 0 n O ? m x o m N O N j ? ? ,IIe?PUeH IiuPUSH 'II iPUeH @elpusH . MuWeH @e?PUeH h m i m _ N r I ;C PIL 3 10. P Y z .? i A y ?.. /j -. m Q N fD N (D = O _ ID < m ;U (D n' Q° D N Q O 0 ID ,6 - > D rO . r C z cD r CD ° A S D - N3 N Z (=Dr z O 0 t-41 ti?^ti m? FBI oc r CD Z - :, L N DZ CD Z i N m D `< < N c ?i J r m m z m maTo- tom n O N v N q W .'.'' O o -' 0 odoa 8 o N p Nz ° (D p o°p lD m ?. * ,v 4v 3 =_ z c: 0 (D U) l m a N?? Cpj g? z ° cD N vvi Q a m ' r, G) 9yo N O Fp N z '° r ro ' o r W Z s w E LL W C) z ' ' rtrt Q M _ N Z Q d cf)G a W C)- ?J O O N N Q w ? l l) ? f -• N m Q O N O D U - ' J s a ? ?o > a ?U 0 a z c a 0 m U n 0i a < t f V r W n" O y C W o x `m q mUO O U) Z Z J w W OI ? U -z 7 w? ui - o -F- _O_OQW L J u¢eo Loc O b y Q N f-- ?-' W- a m N O W nC)Z Z ?-1cW E? _ w z W (n?0ry cnZHO 0 C) Oof) Of 0 N <00Z< W WU <Zz O O z 4-0 f" F j p w n a ? g ? U - Z Q 0 anywz Z) F- z pJOCwjZN ? U ? ??LL ?O O n O N N _O ?? O T z Jm= 1>>>>F aa 0<z r r O NW OmOp F Z N a p a O - ,.... - + z z a a J 0 z w?Wa U ? `J u g aw?J ~ h = N UUQ 7m O O z W Ow O Z Om 2 K N p Z a g?zO N m Ow- 8? ' pm 8 WOO U3Uw? O , bLLr W.2 E`cz°os Y 7E -a NZO .1 Iv + oI Z N s 5 _ ? S m F- O } d C)? ? O w Q C p L ? F1 O N) O , N J C Z X c 0 z .? W r N ? L a 7 0 o 4- (n W :3 00 0-0co a O jI C V > 4 4- ) O I Q ro I- N L Q N p (? r- Z Z W c 4- W N W N N O c i _ > p j ------ --r i -` O N N j cu 0 00 Q - , co QU> ? m ' - C) -° N X00 Fu ° ui M w 0 0 1 CO O r FT I- 1 '? hm N? ro . z m U- H > D z 0 m co 0 0 3 $a Is. ?7 ' Q N `lf W C ti ,- 5 O y a Tp ? a y N N Flo ?3 3?'m 3-°i?7'w ?zN Zao mxo c?Y CO A 71 16 Cm OrO >omyz Z N X O O N OG Z D '02POOf Oq0 m n N 2 m Zi O ZO P,0 Amy 81.Z1DZ1 1 O N A j A N Z 2y?? 0 A Fa Z,, ~ Z >1?_ZyIyN zv?mxm 0 < m -1 'fl .71 NmmOm OOmyD 9m M ?mmz? ? -Zi m :?o 3 rr a 0 Z03 o y smc n?M? wx° c m O N ? z y N , 4: ? C ? C O `^ ?o N m I OI 0. N A z v A? G m A m? ? u O_ O (D C) ?0 ? (? wa UN C) c 0 0 co ca W CD m D 0 CD po CD m m 0 C CL U) C Q' m 3 D 0 C) C D ?oZ Dm0D Q 0 C/) M C/) mZMcn z cm -O m ? ? mD00 m F z z mm m 0 X m z :TJ 0 z m z D r m ^z O 0 z r 0 0 0 0 N 0 O MSL 00 .A O G D r_ Z0 o Z o rn Z -13 O X z MSL -P6 co rQ X D ? _.._.._.._.._.r._.._.. ?.._.._.._ ._ .------ _.._. _ C D Z 0 ?--? m r o O + O O 1..i rn -n < N D z x mo o m n C D OZ 0 T Z G) G7 O O(J) T/'-/ Z " 1 ^ w O 7 C G) N (D !i4 X G: iii w D Q CSC r ?? ; ^ C dog d N C N? N} ?a }cL U 2 } L ?a d x?o d N= c 4- M X uj o I I r 01' m 0- V PL L .1- IL 4- 0 O 4 O LL. 00 3 _.. _., _. _... _.. . .. _ _ O . N .. co I?tl O d- co O mi n , 0 N J o z ° O o E? Z z z W d ? a o °1 N Z LU m G ? N z O N O O LL Z W w O LL vX u a U y K LL ?N K j Y U _ N a z 2 C U U_ ? Q d O a - CL ¢ F= N 4 ? O J a N F „ u V W Z C o x x O N a u m v co) V J U ZZ -?W Va -Ov Ju\Q e°Z O O Z O 1 O u O C) C3 (D c W Z a Ca°'0 w E W C) co Q w 0ZF-O 4(l O W 0 < o C) W F U LL ZO F 'Ppz L ?? w4 7 r U Za a O Z J a? z ZaJw? O Q F- z O z W W N J O O x w Q -O O O > mN??aa ZwzLo UO a a o F U N N Z 0 wSwaoF ?Z¢w Oa C6 J 01<x g Z a a w M °r F o f'F -NU z - J 15 M F Z Q 0 w Z Q Z Z WOK 01 C,W0 5"lo< Z< OZ a I.M ma ?> oN zN"mg 2s,Z &N x w 0ZO U g Uri aaa Ec raE m N Y If z o E N z o o q S Z N c0 N? Em_ I O ? m ~ o a yl L r?J•'I -di d ca g ? '0 O a? C C N ati ? a) L o N L Y 7 U (d O 7 N ` Ac N ? c? C C w, fA ?.., N .Q "6 7 m W ? - O a3i F- Z co co p ? N i O-0 m a co a) ?° v c > ? Q o ? N C Q •c L ?-+ Z w.+ (0 to "'' ? 3 n ? 4? a) 0 O ,C Q) I-> i z N N ? Q- 0 O c9 0 0 E O j 0 E rn .+ .C F- O c m O m -Q OU Q Qv O a) U t W C Si '(L) O W -(p co Q o0 U n a ,? - F- M a) cv a z° co a) c Z m 1=- > J < -iooz a r, al !? " ' =r (D 0 wrn 0 m 0 0 N cn = •- m a N 0 a? 0 ? p? 0 0 O n D3 <?3 cm m v) (a 0 CD o Z mD CD vG)0 a' D (D 0 C a o i CD O OD CO m c a ? U? d 1 ? N (D -r a o . m 3 m °m a C h?l o ° R o g? o N ? O v x m ? 0 N oro W Z? Z9? AGE N ?? N m of a3 niz 1. 3. ?T0 zoom m nm 0 ZOO $xo?$ p.z ico N Cmr n O v Z 0 Zw;D nj0 0 5z> AOO OO?OTO 0 I°13 0 m ? 1 - oxC, 'm ADZ 10 m >0m?zo 2 0 0 y N Izz v c>zz 3 2?0"N D N - ? D A N mr <DO?gO, m,mo 2 ymmz sm Z =n A % C T T Z [O n m Z m H o ? 0 X03 a Z o "L ? N p L) m _ m N % O O_N ? Z N O F ? C N ? T a m a 0 D C) C D jo?T -n F) OC)Z00 X0?(n z z c m Cf) G?mnl?i mD00 m F Z z ;D n T V m M T Z D z Ow N S Vn T x p oa n TI ° 0 m z 0 o £ ?F o m z m z N ? D T .Q m A N A n z Z L: Q Z 0 A ro QO O X r = 0 C? II C? N O W C (D v O - n A + rn CY) Ul 0 O 0 MLW O O W I? O A oo N ^ O N 00 X D a- r N o o 3 a- U1 a1 CL a d (D m ,n ?! N r o (D N D X o r + O o 0 o O O N C:3 O N O Q{ O 0 C LOC ? C o? 0 C o o? O C o c w O C 0 /"I 'cn+ V+ Ct) CD 0 -o Q D D< r r D p Z Z M cN i3 o m -n m z -..' O m a. (a (D O n O N a) Z?l W C- , 0 n O N C A O A m M CD U T? (D = < (a CD D 0) (D N a ^ W` O 7 - CL O X O (Ax- " o r = 0 (D N ( D n -u CD O (D (p (D N