Loading...
HomeMy WebLinkAbout20191232 Ver 1_R-0211EC Permit Drawings_20190916O 0 V c a li O m a 3 E L a a T L w N 0 / M V 0 M 6l O M / L a c c L 0 3 BEGIN TIP PRa BEGIN SEGMENT -L- STA. 22+27.69 0 9 1 �A 6 Y. I-5507 I THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE CITY OF CHARLOTTE, THE TOWN OF PINEVILLE fry TOWN OF MATTHEWS. CLEARING ON THIS PROTECT SHALL BE PERFORMED TO THE LIMITS ESTABL SHED BY METHOD III. THIS IS A CONTROLLED ACCESS PROTECT WITH ACCESS BEING LIMITED TO INTERCHANGES. END SEGMENT "A" BEGIN SEGMENT "B" -I- STA. 313 + 00.00 STATE OF NORTH CAROLINA DIVISION C HIGHWAYS MECKLENBURG COUNTY LOCATION: I-485 FROM I-77 TO US 74 (INDEPENDENCE BOULEVARD) (I-5507); I-485 / WEDDINGTON ROAD INTERCHANGE (R-0211EC); AND I-485 / EAST JOHN STREET - OLD MONROE ROAD INTERCHANGE (U-4714AB) TYPE OF WORK: DESIGN -BUILD AS SPECIFIED IN THE SCOPE OF WORK CONTAINED IN THE REQUEST FOR PROPOSALS e016 WETLAND AND SURFACE WATER IMPACTS PERMIT lop bq o o�Co\"- t Glee_ a 0 �e `' tea\ y1 ,to e ��'`r J� \`tee '7 28 29 30 1 e e `ec1G� `oA 72 PACKAGE R-0211 E C DATE: SEPTEMBER 12, 2019 I m ahs� O 0 z sXo \ Z 'dP o 0 I 1 , 7* BL!J- THE %%%I ) END TIP PROJECT I-5507 END SEGMENT "D" -L- STA. 947 + 96.48 ✓off s� 7 � ir. FoOr117;le I,_CI' TO CONCORD SITE #2 END SEGMENT "B" ��, \ SITE #1 BEGIN SEGMENT "C" �,'� �`' x \� -I- STA. 474 + 50.00 R-0211EC o e O G1,/0 h h0 „1O 3L34 35 3 - 38 39 40 41 43 44 45 46 47 �8 r -485 �� 42 i r` GSEGMENT "C" PERMIT D RAW I N G SEGMENT "Ell"SHEET 1 OF 11 I — -L- STA. 635 + 00.00 Prepared In the OffJce of: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS GRAPHIC SCALES DESIGN DATA PROJECT LENGTH 1001 Morehead Square D, S'i" 610 STATE OF NORTH CAROLINA Ch—l—, NC, 18103 I� 50 25 0 50 100 ADT 2018 = 118,400 ADT 2040 = 159,200 DHV = 9 % LENGTH OF ROADWAY TIP PROJECT I-5507 = 17.137 mi LENGTH OF STRUCTURES TIP PROJECT I-5507 = 0.395 mi NC TIC NO. F-0165 FOR THE NORTH CAROLfNA DEPARTMENT OF TRANSPORTATION 2018 STANDARD SPECIFICATIONS PLANS (BASED ON 485 WEI BRIDGES) P� s 50 25 0 50 100 D = 55 % T = 9 % V = 7M5 MPH *(TTST 4 + DUAL 5) TOTAL LENGTH OF TIP PROJECT I-5507 = 17.532 mi RIGHT OF WAY. SEPTEMBER 18, 2018 DANIEL H. BRIDGES, PE SIGNATURE: m d 0? ROADWAY DESIGN ENGINEER DESIGN PROJECT MANAGER PROFILE (HORIZONTAL) TIM MCFADD PE NCDOT CONTACT.• DEsrcx RurTD PROJECTEN ENGINEER - TRANSPORTATION PROGRAM MANAGEMENT UNIT 10 5 0 10 20 FUNCTIONAL CLASSIFICATION: INTERSTATE STATEWIDE TIER LETTING DATE. SEPTEMBER 18, 2018 DAVID B. GOURLEY, PE PE PROJECT DESIGN ENGINEER PROFILE (VERTICAL) SIGNATURE: DETAIL DI DETAIL D2 DETAIL D3 DETAIL D4 DETAIL D5 DETAIL D6 SPECIAL CUT DITCH SPECIAL CUT DITCH SPECIAL CUT DITCH LATERAL DITCH LATERAL BASE DITCH LATERAL V DITCH Natural (Not fo Scaly! Natural INof fo Scale) INo'. Scale! No.. N—I INofto U.Io Natural (NO fo Swly) 7L� (Not to Scale! Grouts Ground W.ii Ground Ground IN —I j �— jFill 1/'\ 2% n�31eP.d Min. D= 2.5 R D Din. D= 7NFil DN Min. D= 1.5 N Maxd = 25ItB=4 Nb= 4 ff 6= 5 fr Geofextile B b= 5 N b= 5 R Type of Liner= Class I Riprap Type of Liner= Class I Riprap -L- FROM STA. 615+81 TO 619+50 LT -L- FROM STA. 688+57 TO 701+37 LT -L- FROM STA. 706+21 TO 711+00 LT -L- FROM STA. 753+98 TO 760+32 LT -L- FROM STA. 794+62 TO 795+50 LT -L- FROM STA. 764+81 TO 767+50 LT -L- FROM STA. 916+63 TO 917+50 LT -L- FROM STA. 929+50 TO 931+50 LT -L- FROM STA. 709+81 TO 713+00 RT -L- FROM STA. 804+50 TO 805+50 RT -L- FROM STA. 901+00 TO 905+17 RT -Y5RPD- STA. FROM 24+00 TO 26+50 RT -Y6RPC- FROM STA. 24++50 TO 26+50 RT -L- FROM STA. 615+81 TO 619+50 LT -L- FROM 628+73 TO 634+63 LT -L- FROM STA. 890+47 TO 892+50 LT -L- FROM STA. 791+50 TO 793+50 -L- FROM STA. 835+50 TO 837+27 LT -L- FROM STA. 898+00 TO 900+00 LT -L- FROM STA. 893+84 TO 898+00 LT -L- FROM STA. 936+50 TO 940+50 LT -L- FROM STA. 888 +1 9 TO 890+77 RT -L- FROM STA. 885+00 TO 888+19 RT -L- FROM STA. 890+91 TO 892+00 RT -L- FROM STA. 892+00 TO 897+09 RT -L- FROM STA. 897+24 TO 899+50 RT N` S I ) � 11 BL'J- THE DETAIL D7 DETAIL D8 DETAIL D9 DETAIL D10 DETAIL D11 DETAIL D12 DETAIL D13 LATERAL V DITCH LATERAL V DITCH LATERAL V DITCH LATERAL V DITCH LATERAL BASE DITCH LATERAL BASE DITCH Fill Slope CUT DITCH Nafural (Not. $colvl Natural INofM Style) Nature! INot fo Swlvl Natural INofb Scale! Nafural I Nof fo Swly! Natural (No . Scale! INof fo swIO Noise Woll Ground Fill Ground Fill Grouts Fill Ground Fill Ground ~' Ground r—' Nofuwl 3.y Slope 4:T 3./ Sl 4:T ope 9,.1 Slope 3. 4.T Slope .I `/ . 21 FBI 3. \ 2% '1 Ground p Min. D= 1.5 fr p Min. D= 1.5 fl Min. D= 1.5 fr D Min. D= 1.5 fl p B i._ 5 ItI fl Slope p Min. D= 1.5 fl d 4" Min. D= 1 k B B= 6 11 GeotexBle Geofextil. B 6= 5 N GeotOile B B= 6 fl Max.d= 1 R Type of Liner= Class B Riprap Type of Liner= Class I Riprap Type of Liner= Class I Riprap b= 5 fl Type of Liner= Concrete - -Y5LPA- FROM STA. 14+78 TO 15+28 LT-Y5LPA- FROM STA. 15+28 TO 15+73-Y5LPA- FROM STA. 15+73 TO 17+00 LT-Y5RPA- FROM STA. 19+50 TO 20+24 LT -L- FROM STA. 788+50 TO 790+00-Y6RPB- FROM 9+77 TO 11+02 LT -Y5RPA- FROM STA. 20+24 TO 22+00 LT DETAIL D14 DETAIL D15 DETAIL D16 N ; SPECIAL CUT DITCH TAIL DITCH FALSE SUMP DETAIL D17- Nmare1 (No. S..I.) IN— Sce1.) I N— Style! o FALSE SUMP o � (Not to Scale) Gound �, Outside Ditch 1 Outside Ditch Traffic Flow RoodwoY G—d \ NaNroI Traffic Flow .\ 20:1-�2.0'I-- J0.7 -� 2" - 3./ Ground 3.1 9'� Ground \O� D Min. D= 1.5 R Min. D= 1.o R B= 3 R GI GI B $t GI �-$— etc. S=Ditch Slope (E Proposed Ditch S=Ditch Slope (EE Proposed Ditch -YbLPA- FROM 10+74 TO 11+87 LT -L- STA. 777+37 LT -L- STA. 794+55 LT -L- STA. 709+74 RT -L- STA. 701+58 LT -L- STA. 760+50 RT -L- STA. 827+52 LT -L- STA. 774+58 RT -L- STA. 835+03 LT -L- STA. 827+52 RT -L- STA. 617+94 RT -Y6RPB- STA. 17+70 LT -L- STA. 795+69 RT -L- STA. 808+22 RT -Y5RPA- STA. 15+25 LT -Y5RPD- STA. 21+39 LT -Y5RPD- STA. 21+31 RT DETAIL D22 DETAIL D23 TOE PROTECTION PIPE OUTLET CHANNEL STABILIZATION (No.. Scale) \ OQhh'0.� I NO I. Style! N I" Bed .-UND 1�,`- Elevation - �—.I dN. G�o��a an u�ri d= 1N b= 4 If SLOPE Class I Riprap ci, a....B.d Lempm_ 34 N f/ noble! -L- FROM STA. 651+50 TO 654+49 LT . of lamer= c - K yed-m -L- FROM STA. 654+64 TO 656+50 LT -L- pSTA. 790+14 LT -L- FROM STA. 814+50 TO 816+04 LT -L- FROM STA. 845+32 TO 854+00 LT -L- FROM STA. 649+50 TO 653+10 RT -L- FROM STA. 791+44 TO 792+52 RT -Y5RPA- FROM STA. 21+43 TO 24+00 RT -Y6LPC- FROM STA. 12+03 TO 13+79 RT -Y6RPC- FROM STA. 19+26 TO 20+55 RT -Y6RPC- FROM STA. 23+69 TO 24+87 RT DETAIL D24 SIDE -TAPERED INLET HW, O B=3 R D=3 k B,=5 R r L=4 N 6I B L Taper(4:1) -L- STA. 641+48 LT DETAIL D31 OUTLET CHANNEL m !Not to Scale( -L- STA. 789+30 DETAIL D25 DETAIL D26 SIDE -TAPERED INLET SIDE -TAPERED INLET /11 - HW HW :. :: HW HWf D � D B=4.5 R B=3.5 R E D=4.5 R D=3.5 R B,=6.5 R B,=5.5 R r 4=4 R 4=4 R TaPer(4.3:1) Taper(4.3:1) +91 RT 18+83 RT DETAIL D32 OUTLET CHANNEL ( Not to Scale( -L- STA. 841+00 DETAIL D18 RIPRAP AT EMBANKMENT (No. Scale) tD'mm. Ditch 1.0'min. 16" Grade GEOTEXTILE Type of liner= CL 1 Riprap K.y rip P inro nafurolaround -L- STA. 615+00 LT -L- STA. 612+67 RT -L- STA. 654+53 LT -L- STA. 730+00 RT -L- STA. 654+58 LT -L- STA. 730+04 RT -L- STA. 658+97 LT -L- STA. 740+42 RT -L- STA. 683+21 LT A- STA. 740+45 RT -L- STA. 729+85 LT -L- STA. 746+32 RT -L- STA. 730+13 LT -L- STA. 749+98 RT -L- STA. 741+73 LT -L- STA. 750+09 RT -L- STA. 746+32 LT -L- STA. 788+69 RT -L- STA. 791+36 LT -L- STA. 792+60 RT -L- STA. 808+85 LT -L- STA. 806+28 RT -L- STA. 816+10 LT -L- STA. 806+46 RT -L- STA. 818+86 LT -L- STA. 818+46 RT -L- STA. 890+43 LT -L- STA. 837+46 RT -L- STA. 893+74 LT -L- STA. 890+82 RT -L- STA. 893+80 LT -L- STA. 890+86 RT -L- STA. 910+17 LT -L- STA. 897+08 RT -L- STA. 897+16 RT -Y6RPC- STA. 15+28 RT DETAIL D18-A RIPRAP AT EMBANKMENT (NO fo Swl.) 10,min. Ditch 1.0'min. 21" Grade -Y6- STA. 129+88 LT DETAIL D30 CHANNEL CHANGE ( Not to Scale) DETAIL D19 BANK SIABID2ATION (Naf to Swle) 8" CHANNEL BED f/odabl.! Tyoe of Liner = Class I Riprap -L- FROM 706+50 TO 711+41 RT -L- FROM 727+77 TO 729+44 RT -Y6RPB- FROM 15+11 TO 22+63 LT -L- sIA. 893+2 LI -Y19RPC- STA. 18+60 RT -Y19RPC- STA. 18+64 RT DETAIL D29 OUTLET CHANNEL I Not to Style) eE" -L- STA. 837+70 LT Nafural Gound Natural d Ground— GEOTEXTILE GEOTEXTILE B is- Min. D= 3 R Exist. NO GEOTEXTILE Channel IN STREAM BED Max. d= 3 ItB= 4 P. Type of Liner= CL I Riprap y p p il. no,arol prounB -L- STA. 897+13 RT PROJECT REFERENCE NO. SHEET NO. R-0211 EC 2 D-1 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER LJH,' LANE USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DETAIL D20 BANK STABILIZATION (Not. Sa.l.) PREFORMED SCOUR HOLE 24" or of CHANNEL BED f/adobl. Tyoe of Liner = Class II Riprap I ml rou d. -L- STA. 837+91 LTro -L- STA. 838+91 LT -Y6RPC-STA. 19+10 RT .eurmy SECTION -L- STA. 790+75 LT PERMIT DRAWING SHEET 2 OF 11 SIDE 1 Water Quelily volume: Treated Rainfall Depth = 1,6 inches NBUA = 6.4 acres WO, =1.6 x 6A x 3450 = 35,328 CIF WQ El. = 725.13 WQ Routing Result: Peal WSE = 72473 Peal, Q = 0.26 ct Draw mW n = 525 hours DETAIL D27 DRY DETENTION BASIN DRAWDOWN STRUCTURE 'NOT TO S— SIDE 2 .,all. onuy s1 0 PIPE IH T i Ic�ee°A) SIDE 2 wE PLAN VIEW m SIDE 3 NOTES STRUCTURE (WEIR EUE-hONI SHOULD BE TOP TIWC, EL CONTROL NIMU1 DIAMETER FOR OUTLET PIPE. MINIMUM DIAMETER PLATE IS NOT RFQORIIFFIICE, If ORIFICE 15 GREATER THAN 6,A STE to NOELB DING MA ML TO BE USED. T PIPE INS, DOTNOT FOLLOW O PIPEoUG. MR N FOR OUTLETH 5, SLUICE T— IISRFOR nu REN NCEPAll SHOULD m GATE VA11 MAY BE TETCLEARANCE FOREGATE OPERATIONLAND FOR PROPER SELECT7. REQUIRED TO ACCOMMODATE SLUICE GATE ID 0 FFCE TRASH RACK WIDTHJRE H RACK OPENS FREELY AND WITHOUIT INTERFERENCE WITH SLUICE �r Te 9, AGIUST FOOTER DIMENSIONS AS NEEDED FOR ANTI -FLOTATION. MINIMUM DIMENSIONS FOR DRY DETENTION BASIN DRAWDOWN STRUCTURE STATION STRUCTURE NUMBER IINCHESI 6" MIN. (INCHESI 6" MIN. BASIN BOTTOM MINIMUM ELEV. TOP ELEVATION CONTROL STRUCTURE MAX. STORAGE DEPTH(D) FEET INN. ELEV. CTL STR. CTL. STR. DIMENSIONS JW x L x H) ORIFICE DIAMETER 10) INCHES ORIFICE INN. ELEV. OUTLET PIPE DIAMETERIPI INCHES W.k in ton Rd, Y5LPD 5997 V 6" 723.35 730.W 7.15 720.60 4x 4' x 10' 3" 723,35 18" Y-' NOLE sn— H4N PLAX A DETAIL REMOVABLE ORIFICE TRASH RACK IE- 14 BE — I`'" ` 7• RISER 1RASH RACK NOTES: NTS L BE FULLY WELDED AROUND OPENING SECTION A "'N' WITH A "= OINF AC." Re", FOLLOW D D REBAR TRASH RACK NOT TO SCALE . I I I I I _E h" NBLE —TE I I SECTION A -A I N` S I ) � 11 BL'J- THE PROJECT REFERENCE NO. SHEET NO. R-0211EC 2 —2 R,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER L]F;°Il LANE USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 3 OF 11 0 SIDE 1 Weter Qualitv Volume' Treated Rainfall Depth = 1.6 inches NBUA = 4.5 acres WO' =1.6 x 4.5 x 3450 = 24,840 CF WQ El. = 686.09 WQ Routing Results: Peak WIFE = 685.33 Peak Q = 0.26 CfS Draw do— = 35.3 hours DETAIL D2R DRY DETENTION BASIN DRAWDOWN STRUCTURE 'NOT TO SCALE' SIDE 2 °IS[[ U,_ RASH DEMTni4 s1 0 �1% T Isro oeMGT'e.°o: eI SIDE 2 PLAN VIEW SIDE 3 STRUCTURE WEIR EURVATIONI SHOULD BE E AT THE Tlw ELIEVARON. 2. 157MINIMU I. a roR oLHLEr nPE. 3. 2� MINIMUM DIAMETER nTaaCUT B. IF oaI%cB Is GREATER THAN 6-, A N 4.NOE`PLATE IS NOTB bbING MATERIAL TO BE USED. THEREFORE, DOTNOT FOLLOW O IN AUA N FOR T THROUGH URIT PIPE T. 5. SLUICE GATE ISFOR MA MFNANCE0.AND SHOULD RE m — VALVE MAY BE 4. SLUICE GATE SHALLTPROVI [`wATERTIGHT SEAL. PROVIDE TE CLEARANCE FOR GATE OPERATION AND FOR PROPER SMTNG OF DATE OVER PIPE AS REQUIRED TO ACCOMMODATE SLUICE GATE AN `D ORIFICE TRASHaRACK WIDTHENSURE TRASH —1 OPENS FREELY AND WITHOUT INTERFERENCE WITH SLUICE 9. TE ADRET FOOR DIMENSIONS as NEEOEO FOR —FLOTATION. MINIMUM DIMENSIONS FOR DRY DETENTION BASIN DRAWDOWN STRUCTURE STATION STRUCTURE NUMBER (INCHESI 6" MIN. (INCHESI 6" MIN. BASIN BOTTOM MINIMUM ELEV. TOP ELEVATON CONTROL STRUCTURE MAX. STORAGE DEPTH(D) FEET INV. ELEV. CTL STR. CTL. STR. DIMENSIONS x ` x H) ORIFICE DIAMETER 10) INCHES ORIFICE INV. ELW. OUTLET PIPE DIAMETER(P) INCHES E. John St, Y6LPC 6545 6" 6" 684.00 690.00 6,0 681.00 4' x 4' x 9' 3" 684.00 24" 18" W x 12" H 685.50 DETAIL REMOVABLE ORIFICE TSCARASH RACK � R ALL I`'" ` ILL7' RISER TRASH aACR NOTES: F.RAll ?OINII SHALL BE FULLY WELDED AROUND ISF[ICNO ovENING SECTION A -A cLoauRa EY THE FOR CHAIN - S— METHOD AS THE IIIiuGE avIAlESIQ" oCOEOURE' IBY RACK AND HARDWARE SHALL 8 A "MR ENS FREELY ASWICE GATE ON THE OUTLET PIK ENSUE TRASH BACK ND WITHOUT INTERFERENCE WITH SLUICE GATfs. WOVE AS HECESSARn tVAIRS ..IS PLAN SECTION B-B Lp• RDLE CRATE NAH a REBAR TRASH RACK NOT TO SCALE h- —E ORATE HAND I I SECTION A -A I N` S I ) � 11 BL�.J- THE PROJECT REFERENCE Na. SHEET NO. R-0211 EC 2 D-3 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER L]F;°Il LANE USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 4 OF 11 0 n o / C►U ET CHAN �` I cea�l- NC, 28203 i° Dr. DETAIL D31 Z 1111 PROJECT REFERENCE NO. SHEET NO. OUTLET CHANNEL NC arc NO. F-0165 R-02W11EfCJ ET No. 60 Not to scale, W/ L II RIPRA p INSET A aaoaoseo naraw D E DET 31 ROAENGIN EDWAY NGINEER ENGINEERS P H 2C— . ASE DITCH E W/C I R IMPACT IN ETAIL 21 °a 01 �ao o AIL D11 SURFACE WAT7FR S BE H E n�,aurn� DENOTES IMPACTS IN a1°a SURFACE WATER SITE #1 �PO DOCUMENT NOT CONSIDERED FINAL 01 UNLESS ALL SIGNATURES COMPLETED -L- STA.789+30 DENOTES TEMPORARY 4; , sz, IMPACTS IN SURFACE BLyTHE � WATER X _—_ _ — W F DENOTES IMPACTS IN SUI FACE WATER L��GLQ`Y SBF lQ,DE OTESTEMPORARY -`7`xO v ((� O —� SITE #1 ® IM ACTS IN SURFACE WATER b U CIO SEE \ \ / 50 o eo } . w _ — INSET A LATERAL V DITCH GALE b TEMPO A Y SURFACE _ — W/CL B RIPRA R i SEE DETAIL DI C\ \ WATE IMPACT O 0� � WOODS SITE #1 NOTE: z THE EXISTING CULVERT IS NOT BURIED, THEREFORE i ET CONS o \ WOODS THE CULVERT EXTENSION WILL NOT BE BURIED. THE z �p W/ LIIRip o `�' �� \ \� BOTTOM ELEVATION OF THE EXTENDED CULVERT WILL AT DITCH DET 31 P E 2F a W o MATCH THE ELEVATION OF THE EXISTING STREAM BED. W"ll,.,��RR� ETAIL 21 E11EiAIL D11 Q O LO Lr)+ C' _ \ 2GI-DLu \ LINE WITH CL I RIPRAP 1B. RCP_ \ 173 .. O Z t'2 REMOVE 2GI \ e' \� TON 244 SY 111 JB MH \ 4r' \ ti — O N C \ RCP- S B F O WOODS a 3 F FS J F F F F / CONC 2GI R AND 2GI-D a C Q 3 Cl)- --- i ---_ 10 - _ _ _ --- - — -- w V — — — „ a — — — _ — — _ — _ — —-`---_T W O - . — i -_ -----ter-_ - - - - --_-`r---�r------------ N O REMOVE _ _ _ _ _ _ _ _ 7 boo _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ oQ------- W O GI -A 3 „ R _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ L7�90}00 _ _ _ Gr- - — _ W 24" RCP -III (Construct on 450' ra ius( ONC — — — — — 2GI I N 26n7 CABLE --_111 2GI RCP -III W _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ z - ---- ~ _�- -=—RAIN � REM VE 2 DII DI F 2GI-D Cp CONC e � CON F C i �— ADJUST 2GI .. \\ \ um VBF rrZ� CC1� W2 ELBOWS. C w 2GI-D- 15+00 G G F 3 s F E .. .. .. .. / / WOODZ 'S LT FRIP WOODS 7 LINE WITH CLASS I RIPRAP RIPRAP AT EMBANKMENT a \ 100 TON 141 SY S 7L G PhiIC AL \ (fT w XDETAILSDIB \ �� / G O_ jBTEMPORARY SURFACELu S PATER I�ACTLO M / CL B FRIP PIMPACT INL DETAIL D18 2 TO SURFACE WATER L RIPRAP AT EMBANKMENT 7 V V m ~ (Naito Scale( RIPRAP AT EMBANKMENT PERMIT DRAWING i 10'min. \ / / \ 7 TON 7 SY SITE #1 0 Ditch SEE DETAIL D18 SEE INSET B SHEET 5 OF 11 Grade 1.0'mi 18" Ii TEIV PORARY SURFACE m WATER IMPACT ioo o goo o GEOTEXTILE � �-LJ� �� I N s SITE # h DENOTES IMPACTS IN DENOTES TEMPORARY GRAPHIC SCALE N° Type of Liner= CL IRiprap Keyriprap into nataral9raaaa. SURFACE WATER IMPACTS IN SURFACE WATER 0, O _ _ _ ]007 Morehead Square Dr. PROJECT REFERENCE NO. SHEET NO. DETAIL D31 z / 6/ A I n "� I Satire 610 R-0211EC 60 OUTLET CHANNEL 1 ETH� \ / I V %1 cnareauNC, 28203 ( Not to Scale \ (\ \ J \ L .I,I�I --�/ / ///� / / / 1 / ` J I NC LICE NO. F-0165 RW SHEET NO. PRorosrD ME­s vs.e x a rcx `� E---,D�CT\ ,/ / ROADWAY DESIGN HYDRAULICS AD �f LATE ��9v v - I� �� / �" /// / / / P H 2 C�v ENGINEER ENGINEER / / E \ / ��c o — _ —C —DITC— _ IMppA11 1��//, ETAIL/ aw..oa _ AIL D 1,> ,\I / SC11�FpjC' kTT R � D ar,s.%�_01 1�N ""SU_ENDENOTES IMPACTS IN � j �� ',/ ���,�� � ea3 _ �/� � �, i ./ �'� v SURFACE WATER/ems, SITE #1 / 0 / DOCUMENT NOT CONSIDERED FINAL -L- STA. 789+30�e / / / / / / J UNLESS ALL SIGNATURES COMPLETED DENOTES TEMPORARY / �/ / / / /i/ ,/ , / BLJTHE �C sz, / �\ "MPAGpTS IN SURFACE /" / /' / ! / /_ . — T — — X \ \ A1•E-R \ ` - / / / /� / /. _ W F ® DENOTES IMPACTS IN O \ \ _ i \ SU FACE WATER DE �H-:' S WOODS DE M AOCTS IN SRFACE WATER — _— ` B i . v �- SITE #1 50 -// t � — SEE INSET A \\ / p 1 � LITERAL DITGH \ ` \ \�- \ / A%� �_ = _ �89� -z89= 1e9 6C-=089_ _ /,_.---- - _ = TEMPO Y SURFAC ; WC e R PRA — — - = - — — — DETAIL D,0 v — use_ — — =WATE IMPACT= _ �`—v> ` SITE #1 NOTE: THE EXISTING CULVERT IS NOT BURIED, THEREFORE o THE CULVERT EXTENSION WILL NOT BE BURIED. THE / `" / vlj ✓ `(: w o / . \ \ \ ��� BOTTOM ELEVATION OF THE EXTENDED CULVERT WILL ` ATE - W/CEL, DITCH.� /ETAIV \\ W O MATCH THE ELEVATION OF THE EXISTING STREAM BED. E- AIL DST W ���. — A \ �� A /. - �.✓/i/n//� / O W Cn + / / -�_ - J A 1 2GI-D 1� ''3 / —,ate — — / i / ✓/ // / / / .� , / N J / ,,n— »z — — _ - / \ - - �3 TON 24 _ Sy W _ _ — _ — — _ — — _ - c — REMOVE 2Gt' _ ,ar _ _ _ S _ 2GI O (J I — —a< — - - �i .GONG -m<— — -- _ - - _ _ - - RAN J' - — v _ Cl) - _- _ - i Lu Pn4nn_ — �. - - - - - - - - - - - - - - - ---_ _ - _ —_ _- _-- ---_ - �.r 7r.� _ _ = O REMOVE..... I_A 3 " R o - _- J�-l�� -1 rA O fsu -� '� 24" RCP -III -(Cons rust on 450' ra ius) - - - - . - - _- - - sm- r _ 7_,9Q-1 00 - W + LU .2GI r y Os Z , -� -----� us- - __ _ -- _ I v �'°v F ✓_�- GRADE TO E REM VE 2- ---- ----- --- .��_— _— I /C F- -oI - _ _ 0 2GI-D MIN CP, _ F/ F �� _ C ADJUST 2GI ro i I� c j -' _ E `z _ woo s // / w40D- I LIy E WiTh CLAiS I kIPRAP - _ 7 �� RIP AT EMB�AKI NT S y -o - - - - - - - - - - - / r // \ 7 TO 7 Y / / 100 TOW 14 SY - a X _se7— 68s = _ /y:5E4:' 8z_ 'n3 ss / *YWIL EMPORFACE_E ATER EE --------_-67s tT 1 6 IMPACT IN DETAIL D18 I 2 TO SURFACE WATER / .� WM - RIPRAP AT EMBANKMENT �,T / PERMIT DRAWING rn (Not to Scale) - - i- -;;� / / v v /- I RIPRAP T EM,BAN,KIv�E�IT _ � � � r � � � � � � / / TON/sY SHEET 6 OF 11 SITE #1 / , 1 D�t�n lo'min. / / / / ZL19€E mETAUL �1$ / SEE INSET B ORARY SURFAC`� / Grade } WATER IMPACT ,m0� loo o loo o GEOTEXTILE � / � _ N SITE #. -/ /� j / / DENOTES IMPACTS IN DENOTES TEMPORARY GRAPHIC SCALE 2—Type ofLiner= CL IRirrar Keyriprop into natural ground. SURFACE WATER IMPACTS IN SURFACE WATER V/ h O W 0 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER SITE #2 F - F WOODS U m F- SITE #2 j SEE INSET A jM 2SF&BKD ISF&BKD C CONS/ XI '. qti t'fl o C 4 NC PooL C J'� P Xa -OUTLOICNANNEL POOL r - - - - - 13 TO S o SEE DETAIL �D32 S E WOODS OUTLET CHANNEL LATERAL BASE DITCH 24 TONS W/CL I RIPRAP SEE DETAIL D32 SEE DETAIL D5 30" RCP -I CO NC ISF&BKD O NC 113UTONS�ANNEL I SETA SEE DETAIL D32 TEMARY SURFACE r ATER IMPACT OUTLET CHANNEL 24 TONS SEE DETAIL D32 2SF&BKD I 12SF&BKD H �) I ISF&BKD MI ISF&BKD 0,00 00110 0 "( I J007 Morehead Square Or. NC L \7 Sui[e 610 [[e 28203 NC L/C NO. F-0/65 11 P� SITE #2 NOTE: THE EXISTING CULVERT IS NOT BURIED, THEREFORE THE CULVERT EXTENSION WILL NOT BE BURIED. THE BOTTOM ELEVATION OF THE EXTENDED CULVERT WILL MATCH THE ELEVATION OF THE EXISTING STREAM BED. 2SF&BKD 2SF&BKD X n 2SF&BKD BK 2SF&BKD 2SF&BKD X CONON-C Qe I N NC 2SF&BKD X I-� � o� WD X CONC POST oN BK `pry CONC o G £ X BLK WALL � 11 DIE]� � �IM 3' 1801 X X 4s' 72XWD 1 L X X .. 72" WD .. .. .. 'y 1j�LANTER WOODS WOODS .. DETAIL D19 BANK STABILIZATION ( Not to Scale) �J�tu�a 4 N, Groun c o r Refer n e Ian view t for w�iicbank is to be stabilized. 18" CHANNEL BED (Variable) Tyoe of Liner = Class I Riprap Key riprop into natural ground. PROJECT REFERENCE NO. SHEET NO. R-0211EC 61 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3 BLJTHE ISF&BKD w - r�2 —07 7 REMOVE. C_ SPECIAL CUT DITCH C C �-- — 2 SEE DETAIL D1 E 2=" RCP RC4" CONC CV 10 P-III s JB 2GI----_---- Ia B57 ------ ��_�� — --�T-« — — - _ = = - _ W O OLu — 10 —1-485 -ea-s esr _ -I- —_ - - S O - - ---- - _ ---- --- - - - - -- w + W O T——ULj^------- — — +0 X: _ __ -- -- --- 2 1 _ _ 2GI N O O ---- _ _ _ _ _ _ _ _ ;.7C�5+�Q 15" RCP -III REMOVE _ — _ LLI GD W + _ 2 -A �Crl _- _ - 15" W r5" to _ - _ _ - _ - _RCP-IIF_ -- N ^ CABLE ULj _ -RCP-III- _ _ - _ —_-------_ _ J-------- -----_ — — ---. — S9 ,PCq— I-485 235'BS7 _ — — I - - - - -d - - - - - - - - - - - - _—---_ --_ - - �I ------- Ia5'B57 ::E--------- - ._— -- — --- _-- REMOVEI.G DI —C— ) L/ WOODS 3 1 C 2GI-D \ F F B RIPRAP Wo0D52 TON 7 SY TOE PROTECTION SEE DETAIL D22 BANK STABILIZATION 6 TONS BANK STABILIZATION SEE DETAIL D19 6 TONS SEE DETAIL D19 JS S�. • • • � X 48" WW71S W - SITE #2 00 SEE INSET B ` 00 DENOTES IMPACTS I1`� • SURFACE WATER DENOTES TEMPORAR` IMPACTS IN SURFAC WATER I - - - - - - - - �--- --INSET B 48"WW/ISBW .. .. -- �- _ _— TOE PROTECTION SEE DETAIL D22 BANK STABILIZATION - 6 TONS SEE DETAIL D19 -S IT E #2 rC 3 F CL B RIPRAP WOODS2 TON 7 SY BANK STABILIZATION 6 TONS SEE DETAIL D19 .� T ORARY SURFACE WWW�MTER IMPACT n` ® DENOTES IMPACTS IN NI SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER PERMIT DRAWING SHEET 8 OF 11 100 0 100 GRAPHIC SCALE h O w 0 IT #2 13 TON$ AN`/`1NEL I1�1 E DENOTES IMPACTS IN I SURFACE WATER 9� \` \ SEE DETAIL D37 DENOTES TEMPORARY / \ \ I 16 TF69m / \\�l � SMPORARY SURFACE \ � IMPACTS IN SURFACE ATER, IMPACT, =-6B$ WATER] BE OUTLET CHANNEL \ s9 , 24vTONS \ \ —\\ SEE DETAILID32+ I \ DETAIL D19 BANK STABILIZATION ( Not to Scale) Gounad MiN!s.�To RR N'r n foref�i cst �l nk is }o �e stabiPized. 18" CHANNEL BED (Variable) Tyoe of Liner = Class I Riprap Key riprap into natural ground. "( I C-ha Morehead Square Or. NC L \7 Suite 610 [[e 28203 NC L/C NO. F-0/65 PROJECT REFERENCE NO. SHEET NO. R-0211EC 61 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 11 �QQ DOCUMENT NOT CONSIDERED FINAL - \\ ✓ \ see \ I s�\ \ UNLESS ALL SIGNATURES COMPLETED SITE #2 NOTE: F / F \ THE EXISTING CULVERT IS NOT BURIED, THEREFORE BLJTHE _ THE CULVERT EXTENSION WILL NOT BE BURIED. THE WOODS a 3 — — BOTTOM ELEVATION OF THE EXTENDED CULVERT WILL — — MATCH THE ELEVATION OF THE EXISTING STREAM BED. \ sF&BKD -m89-&2 F&BKD' ,PSF&BKD X) _t \ 2SF&BKD kOE 2-I \/2�SETA 1 v 1 � \S\ SF&BKDSF&BKD F&BKDR 2&BK,�n � n CONC CONC r' ROCK/ICONCIIPCONCL a/LD�JJ''�� r g_-- - _ - - 13 NE1Ll / / i_.. .p9 - °-�¢.°�>^ / - — — /� \ W� SEE DETAIL I; .j�/ -( -/ I- i / / / ram X� X r ^ el �, / - LANTER X-s-72x —X i\ � �°�s"v' I III \` �l"•"�z_.-I L //�//�� _� ( � I � /l �( 4�i'� .. \ � - - - � / _ ��=,�/00D5 --_- - -- � � � _ — \ ERA AB \ E ITCH ILA®'?VOS )157 S�DETAIL SD ADS�2 ,� - , 30 R&_l \ \— \� - �PECU1_oCUT=DITCH c_ 24'RCP R NC �sa. _ � ^_- ___ - � _ _ - - - � _ � _ - - CV �r - _ � was ten° '0 :�«� _ )01 BST W O tee'-29-5'BST - - - _ <a^ / I W O _ � + vl O Lu — — — — -- -- - -- — — — — = O-------- _---- -- --- `— _--- ---- - ---- tD tN O W O - ��,rj %00 15" RCP -III REMOVE `aY - - 2 I - - _00 W r- 5 R -I - — — �GI- RCP71 - - tA - -- -- -CAHLE - - _ _ - �uq - r_ _ JtC�lll- - - - - - - - - - - - - - - - - -- LLl - - - - - J —I-485_ 235BST _ _ C _ _ C FS�\- — — — C C C - - / - �, C C F _ - — C C �s F-- ~ F/—WO CC B _BR // V ` �� - f' M �. \ \ /wrn �J \ bYE T TON P7 SY 1 %t C ION ( BANK STABILI�A N ` \ / - - - \ SST DETAIL D2 \\I -�>z 6 TON - - - - 1 8• WW/ISBW \\ \ 7. § \ R A�SIi17.�4T N \ . - SEE DETAIL &19 INSET V \SEE VETAIC \ n - ff �_ 682 67 > SITE#2 _ \ _ �� —y / = SEE INSET B � \ "� 1� v -89- �� f\�v F�. ��` v F� _ CL B PAPRAP\\,- 1 \ I -W-OO-QS <I E� DENOTES IMPACTS IN \} \ ( 12 TON m7 SY \ a _ `� v \ - ICCCCCC� ' SURFACE WATER TOE I Pj2OC 1 ION l I 1 DENOTES TEMPORARY \ SEED TAIL. D22 BANK STABILIZATION NI ® IMPACTS IN SURFACE WATER 6 TONS DENOTES IMPACTS IN \ \ �AT4K� STAPPL12ATIO�N ��� �� SEE DETAIL`D19 PERMIT DRAWING • SURFACE WATER \\6\�' NS �`� �� M ORARY SURFACE �E �EETAIL�19 �:' ��� �s 'W T RI PACTSHEET 9 OF �� \\\SITE 50 \ \ 0\ — / 100 0 100 DENOTES TEMPORARY S/9 IMPACTS IN SURFACE �- G PiiIC - - ALES �� ' / '\V GRAPHIC SCALE WATER L— — — — V/ WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 790+00 -L- (LT) Extend 6' x 6' RCBC < 0.01 16 1 790+00 -L (LT) Riprap Fill < 0.01 < 0.01 34 19 1 788+50 -L- (RT) Bank Stabilization < 0.01 < 0.01 6 20 2 791 +30 -L- Extend 72" RCP < 0.01 16 2 791+30/792+70 -L- Bank Stabilization < 0.01 < 0.01 53 27 TOTALS*: 0.02 < 0.01 125 66 0 *Rounded totals are sum of actual impacts NOTES: At Sites 1 and 2, the existing culvert is not buried, therefore the culvert extension will not be buried. The bottom elevation of the extended culvert will match the elevation of the existing stream bed. At Site 2, <0.01 ac (26 If) of temporary impacts due to construction activities are included within the bank stabilization impacts. Revised 2018 Feb