Loading...
HomeMy WebLinkAboutRE_ _External_ NCDOT U-5787 Start of Study Letter Carpenter,Kristi From:Brittingham, Cathy Sent:Thursday, August 08, 2019 10:33 AM To:Scott, Elizabeth S.; Bass, Michael L Cc:4017737; michelle.lopez@stvinc.com; Steenhuis, Joanne; Lane, Stephen; Shaver, Brad E SAW (Brad.E.Shaver@usace.army.mil); Herndon, T. Mason Subject:RE: \[External\] NCDOT U-5787 Start of Study Letter Attachments:U-5787, Start of Study, DCM comments.pdf Hello, Please see attached, and I apologize for the delayed response. Sincerely, Cathy Brittingham Cathy Brittingham, Transportation Project Coordinator N.C. Division of Coastal Management (919) 707-9149 phone cathy.brittingham@ncdenr.gov Mailing Address: : c/o DWR Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building 12th Floor, Room 1204C Raleigh, NC 27604 Please visit https://deq.nc.gov/about/divisions/coastal-management/ for more information about the N.C. Division of Coastal Management. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties -----Original Message----- From: Scott, Elizabeth S. <Elizabeth.Scott@stvinc.com> Sent: Thursday, May 09, 2019 9:24 AM To: Brittingham, Cathy <cathy.brittingham@ncdenr.gov> Cc: 4017737 <4017737@stvinc.com>; Bass, Michael L <mlbass@ncdot.gov> Subject: \[External\] NCDOT U-5787 Start of Study Letter CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov <mailto:report.spam@nc.gov> 1 Good morning, I am a consultant for the North Carolina Department of Transportation (NCDOT). NCDOT Division , plans to extend SR 2715 (Trade Street) on new location between NC 53 (Western Boulevard) to McDaniel Drive in Jacksonville, NC. This extension was a recommendation of the Western Boulevard (NC 53) Corridor Study conducted by the City of Jacksonville (January 2015) as one of several local projects identified to alleviate congestion at the US 17/Marine Boulevard and NC 53/Western Boulevard intersection and to provide additional access to the neighborhood along McDaniel Drive. Attached to this email is a Start of Study letter for the proposed project. Your input regarding the proposed project is appreciated- please provide by 5/27/19. Please contact me if you have any questions. Thanks, Elizabeth Scott ________________________________ Please consider the environment before printing this e-mail. Redesigned and rebuilt: visit our new website at www.stvinc.com <http://www.stvinc.com> <https://itunes.apple.com/us/app/stvink-volume-10-issue-2/id799674041?mt=8> <https://twitter.com/STVGroup> <https://twitter.com/STVGroup> <https://www.facebook.com/pages/STV-Incorporated/88735741695> <https://www.facebook.com/pages/STV- Incorporated/88735741695> <https://www.linkedin.com/company/stv> <https://www.linkedin.com/company/stv> The information contained in this electronic message is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law. If the reader of this message is not the intended recipient, you are informed that any dissemination, copying or disclosure of the material contained herein, in whole or in part, is strictly prohibited. If you have received this transmission in error, please notify STV and purge this message. 2