HomeMy WebLinkAboutRE_ _External_ NCDOT U-5787 Start of Study Letter
Carpenter,Kristi
From:Brittingham, Cathy
Sent:Thursday, August 08, 2019 10:33 AM
To:Scott, Elizabeth S.; Bass, Michael L
Cc:4017737; michelle.lopez@stvinc.com; Steenhuis, Joanne; Lane, Stephen; Shaver, Brad E
SAW (Brad.E.Shaver@usace.army.mil); Herndon, T. Mason
Subject:RE: \[External\] NCDOT U-5787 Start of Study Letter
Attachments:U-5787, Start of Study, DCM comments.pdf
Hello,
Please see attached, and I apologize for the delayed response.
Sincerely,
Cathy Brittingham
Cathy Brittingham, Transportation Project Coordinator N.C. Division of Coastal Management
(919) 707-9149 phone
cathy.brittingham@ncdenr.gov
Mailing Address: :
c/o DWR Transportation Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12th Floor, Room 1204C
Raleigh, NC 27604
Please visit https://deq.nc.gov/about/divisions/coastal-management/ for more information about the N.C. Division of
Coastal Management.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties
-----Original Message-----
From: Scott, Elizabeth S. <Elizabeth.Scott@stvinc.com>
Sent: Thursday, May 09, 2019 9:24 AM
To: Brittingham, Cathy <cathy.brittingham@ncdenr.gov>
Cc: 4017737 <4017737@stvinc.com>; Bass, Michael L <mlbass@ncdot.gov>
Subject: \[External\] NCDOT U-5787 Start of Study Letter
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov <mailto:report.spam@nc.gov>
1
Good morning,
I am a consultant for the North Carolina Department of Transportation (NCDOT). NCDOT Division , plans to extend SR
2715 (Trade Street) on new location between NC 53 (Western Boulevard) to McDaniel Drive in Jacksonville, NC. This
extension was a recommendation of the Western Boulevard (NC 53) Corridor Study conducted by the City of Jacksonville
(January 2015) as one of several local projects identified to alleviate congestion at the US 17/Marine Boulevard and NC
53/Western Boulevard intersection and to provide additional access to the neighborhood along McDaniel Drive.
Attached to this email is a Start of Study letter for the proposed project. Your input regarding the proposed project is
appreciated- please provide by 5/27/19. Please contact me if you have any questions.
Thanks,
Elizabeth Scott
________________________________
Please consider the environment before printing this e-mail.
Redesigned and rebuilt: visit our new website at www.stvinc.com <http://www.stvinc.com>
<https://itunes.apple.com/us/app/stvink-volume-10-issue-2/id799674041?mt=8>
<https://twitter.com/STVGroup> <https://twitter.com/STVGroup>
<https://www.facebook.com/pages/STV-Incorporated/88735741695> <https://www.facebook.com/pages/STV-
Incorporated/88735741695>
<https://www.linkedin.com/company/stv> <https://www.linkedin.com/company/stv>
The information contained in this electronic message is intended only for the use of the individual or entity to which it is
addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law.
If the reader of this message is not the intended recipient, you are informed that any dissemination, copying or
disclosure of the material contained herein, in whole or in part, is strictly prohibited. If you have received this
transmission in error, please notify STV and purge this message.
2