Loading...
HomeMy WebLinkAbout19960467 Ver 1_COMPLETE FILE_19960908 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 5U° P.O. BOX 1890 n WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF July 26, 1996 Regulatory Branch Action ID No. 199604162 and Nationwide Permit No. 26 (Headwaters and Isolated Waters) Appalachian State University Dr. Clyde Robbins, Associate Vice Chancellor Physical Operations 265 Dale Street Boone, North Carolina 28608 Dear Dr. Robbins: Reference your April 2, 1996 application, submitted on your behalf by Ogden Environmental and Engineering, for Department of the Army (DA) authorization to culvert approximately 450 linear feet of Boone Creek with a 4 barrel, 10 foot by 10 foot reinforced concrete box culvert, on the Appalachian State University campus adjacent to the Rivers Street and U.S. 321 intersection, in Boone, Watauga County, North Carolina. The purpose for the project is to accomodate the future NCDOT widening of U.S. 321 and facilitate the construction of the Appalachian Convocation Center multi-purpose facility. As a result of the project, approximately 0.32 acre of headwater stream channel will be impacted. No wetlands will be impacted. This project has been coordinated with the NC Wildlife Resources Commission (WRC). For the purposes of the Corps of Engineers' Regulatory Program, Title 33, Code of Federal Regulations (CFR), Part 330.6, published in the Federal Register on November 22, 1991, lists nationwide permits. Authorization was provided, pursuant to Section 404 of the Clean Water Act, for discharges of dredged or fill material into headwaters and isolated waters. Your work is authorized by this nationwide permit provided it is accomplished in strict accordance with the enclosed conditions. This nationwide permit does not relieve you of the responsibility to obtain other required State or local approval. This verification will be valid until the nationwide permit is modified, reissued or revoked. All the nationwide permits are scheduled to be modified, reissued or revoked prior to 21 January 1997. It is incumbent upon you to remain informed of changes to the nationwide permits. We will issue a public notice announcing the changes when they occur. Furthermore, if you commence or are under contract to commence this activity before the date the nationwide permit is modified or revoked, you will have twelve months from the date of the modification or revocation to complete the activity under the present terms and conditions of this nationwide permit. 2 Questions or comments may be addressed to Mr. Steve Chapin, Asheville Field Office, at (704) 271-4014. Sincerely, Robert W. Johns Office Manager Asheville Field Office Enclosure Copies Furnished (without enclosure): Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 Mr. John D. Fersner, III Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality Ja-r a B. Hunt, J r., Gove m o r Jonathan B. Fbwes, Secretary A. Preston Fioward, Jr., P.E., Director APPROVAL of 401 Water Quality Certification Dr. Clyde Robbins Physical Operations Associate Vice Chancellor Appalachian State University Boone, NC 28608 Dear Dr. Robbins: Ag4j7LOA?EHNF=1 July 8, 1996 Watauga County DWQ Project # 960467 You have our approval to place fill material in 0.31 acres of wetlands or waters for the purpose of constructing a convention center at Appalachian State University Campus, as you described in your application dated 8 April 1996 with a clarification sent from your engineering consultant dated 3 July 1996. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 2671. This certification allows you to use Nationwide Permit Number 26 when it is issued by the Corps of Engineers. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits before you go ahead with your project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786. Sincerely, P oOnH 'ow 'ar dJr. P. . Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Winston-Salem DWQ Regional Office Mr. John Dorney Central Files John Fersner, Ogden Environmental and Engineering Services Melba McGee 960467.1tr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper 0800or 0 W-m- ENv1RONA/ ENTAL AAf EA/ G/N EERING SERVICES one Centervrew Drive. Suite 203 July 3, 1996 Greensboro, NC27407 ' 0 855 8993 9'085590^9 Mr. John Dorney Division of Environmental Management NC DEHNR, Environmental Sciences Branch 4401 Reedy Creek Road 2? f `F Raleigh, North Carolina 27607 • t? 9 _` 96 Re: ASU / Appalachian Convocation Center in Boone, NC f_ 401 Water Quality Certification Dear Mr. Dorney: This letter is a follow-up as per your request to our June 28, 1996 telephone conversation regarding the above referenced project. The information for this project was submitted to your office via an April 8, 1996 letter from Scott Bryant of Ogden Environmental. The attachment to that letter was a Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26). As detailed in the application, the impact to the waters of the US is less than one-third of an acre and no wetlands are affected by the proposed project. The total area of impact of 0.31 acres was determined by using a typical bank-to-bank top of channel width of approximately 30 feet. Based on discussions with both the US Army Corps of Engineers and NC DEM, the calculation for computing the area of impact seeks to use the width at the level of ordinary high water. The width at the level of ordinary high water will thus be less than 30 feet. Therefore, the computed area of 0.31 acres represents a very conservative and absolute maximum value. Since the area of impact was less than one-third of an acre, written approval from NC DEM with regards to 401 water quality certification was not required. However, we did respectfully request your written concur-rence as per Section 401 General Certi- ication #2671. In response to our application, you forwarded a May 16, 1996 letter to Dr. Clyde Robbins of Appalachian State University indicating that the US Army Corps of Engineers in Asheville was likely to add the impact from this project (0.31 acres) to the impact (0.22 acres) from the ASU steam plant modifications. This would have then required 401 water quality certification for the proposed Convocation Center. However, based on a June 27, 1996 telephone conversation with Mr. Bob Johnson of the Corps of Engineers' Asheville office, he stated that the Corps could authorize the stream restoration activities related to the steam plant modifications under Nationwide Permit #18. The activities for the Convocation Center will be authorized under Nationwide Permit #26. Therefore, the Corps is regarding the two project activities as separate and distinct In so doing, the Corps will not add the two areas of impact together to arrive at a new "total" a?ea of impact. t, Mr. John Dorney July 3, 1996 Page 2 Based on the above assessment, the area of impact to waters of the US for the Convocation Center will be less than one-third of an acre. Thus, written approval from NC DEM for 401 water quality certification is not required. However, we again respectfully request your written concurrence as per Section 401 General Certification #2671. We respectfully request that this correspondence be forwarded to the Corps of Engineers at your earliest convenience. Thank you for your cooperation and assistance in resolving the above permitting issues. If you have any questions or require additional information or clarification, please give me a call. Sincerely yours, E eering S vices John D. Fersner, III, PE Project Manager cc: Mr. Bob Johnson, US Army COE, Asheville Mr. Ron Linville, NC DEM, Winston-Salem Dr. Clyde Robbins, ASU Mr. Martin Rock, Omni Professional Environmental Associates Mr. Joe Hatem, Wash Hatem Nelson Mr. Mark Zack, Hakan Corley Redfoot Zack Mr. Mike Hammersley, Hakan Corley Redfoot Zack Ms. Barbara Rector, Ogden, Oak Ridge Mr. Scott Bryant, Ogden File State of North Carolina Department of Environment, Health and Natural Resources &Ja Y1.9;WA Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary ID E H N F?L A. Preston Howard, Jr., P.E., Director May 16,1996 Dr. Clyde Robbins Physical Operations Associate Vice Chancellor Appalachian State University Boone, NC 28608 Dear Mr. Robbins: Re: 401 Water Quality Certification Appalachian State University Convocation Center Watauga County DEM #960467 On 8 April 1996 you wrote to the Division of Environmental Management (DEM) requesting a 401 Water Quality Certification for your project to fill wetlands for burial of a portion of Boone Creek to construct the Convocation Center at ASU in Boone in Watauga County. We believe that this project is currently under review by the State Clearinghouse. DEM cannot issue the 401 Certification until the project has received a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) from the State Clearinghouse in accordance with NCAC 15A: 01C.0402. Therefore, I must hereby place this project on indefinite hold until the State Clearinghouse has issued the FONSI or ROD. However we will continue to review the project and make you aware of any concerns. We recommend that you notify us that the NEPA/SEPA process is complete so we can reactivate the project. In addition, by copy of this letter, I am also notifying the U.S. Army Corps of Engineers that this project should be placed on hold. According to Mr. Bob Johnson of the U.S. Army Corps of Engineers in Asheville, the impact from this project (0.31 acres) is likely to be added to the impact (0.22 acres) to Boone Creek for the ASU steam plant modifications since these projects impact the same stream. Mr. Johnson informs me that the COE has approved the other impacts (0.22 acres) which we have placed on hold until the EA/FONSI process is complete (please seemy letter of 18 March 1996 to Dr. Robbins). With respect to the Convocation since a 401 Certification will be required and additional impervious stormwater management will be needed before DEM can grant this this length of perennial stream may be an issue in terms of protective detention basin could address both issues. Please call me at 919-733-1786 to discuss the matter, especially G(} ?? i ?? Convocation Center site. 1y, Joh R Dorsey V - Water Quality CertificLi cc: Winston-Salem DEM Regional Office U.S. Army Corps of Engineers Wilmington District Office Central Files Scott Bryant; Ogden Environemtnal and Engineering Services Bob Johnson; Asheville Field Off ice COE Melba McGee 960467.nocert Division of Environmental Management • Environmental Sciences Branch 4401 Reedy Creek Rd., Raleigh, NC 27626-0535 • Telephone 919-733-1786 • FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Govemor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director FAX TO: FAX NUMBER FROM: PHONE: Von\? 11F.WYVA 'T41 0 ?EHNR 1 win I I 3 NO. OF PAGES INCLUDING THIS SHEET: COMMENTS : Environmental Sciences Branch 4401 Reedy Creek Road Raleigh, North Carolina 27607 Telephone 919-733-9960 FAX # 733-9959 An EQuai opportunity Attimiative Action Employer 50% recycL-&l 0% post consumer Paper ?> I a ry W L:1 ? I D?ru? MUM ENVIRONMENTAL AND ENERGY SERVICES March 15, 1996 One Centerview Drive, Suite 203 Greensboro, NC 27407 Ms. Chrys Baggett, Director 9108558993 State Clearinghouse Fax 1110 855 9049 116 West Jones Street Raleigh, North Carolina 27603-8003 DECEIVED RE: ENVIRONMENTAL ASSESSMENT SCOPING NOTICE Appalachian State University, Boone, North Carolina MAR I ? 1996 Appalachian Convocation Center Construction CODE 49430, ITEM 301, ID#6087300302A N.C. STATE CLEARINGHOUSE Dear Ms. Baggett: Appalachian State University (ASU) is planning to construct a convocation center facility just below existing Lackey Field where university tennis courts currently exist. The proposed construction site lies in the 100-year floodplain of Boone Creek just above the existing intersection of Highway 321 and Rivers Street. Ogden Environmental and Engineering Services Co., Inc. (Ogden) of Greensboro, North Carolina, has been retained to prepare the Environmental Assessment (EA) for the convocation center construction in accordance with the requirements of the North Carolina Environmental Policy Act (NCEPA), General Statutes 113A-1 through 113A- 12.1 Ogden submits this Scoping Notice on behalf of ASU and the design team as the first step in the process to prepare the EA for the convocation center construction. The purpose of this Scoping Notice is to notify interested parties and State agencies of the convocation center construction and to solicit information and comments concerning relevant environmental issues, structures, or features related to the construction. This Scoping Notice is submitted to the State Clearinghouse for publication in the North Carolina Environmental Bulletin and distribution to interested parties and State agencies. The Scoping Notice makes public the investigation of all environmental issues associated with this project. All information and comments received during the 30 working day review period will be considered when preparing the EA. SCOPE OF STUDY This Scoping Notice includes a discussion of the project description, the need for the project, and the general approach to the EA. Topics which will be covered in the EA include potential impacts to land use; air quality; water quality; wetlands; floodplains; fish and wildlife including protected, game, and nongame species; fish and wildlife habitats; archaeological and historic sites; noise levels; waste generation; infrastructure; storm water management and flood control; recreational facilities; and the Town of Boone. This Scoping Notice includes a discussion of those areas that apparently are not impacted as a result of the convocation center construction and those that are proposed for further study (which will be addressed in the final EA). ' ASU has retained the architectural, engineering, and planning firm of Hakan Corley Redfoot Zack, Inc., of Chapel Hill, North Carolina as the primary designer for the project. Ogden was retained to perform the environmental consulting and engineering services required for the convocation center construction. EA Scoping Notice Appalachian Convocation Center March 15, 1996 Page - 2 - The project discussed in this Scoping Notice is the construction of the Appalachian Convocation Center. Construction activities associated with two adjacent projects will also affect the subject site. These activities will be conducted prior to, or in conjunction with, the convocation center construction. A planned "natural mountain stream" restoration area just upstream from the convocation center site includes the realignment of Rivers Street with US 321 (BloNving Rock Road); this is part of the ASU Phase 2 boiler plant replacement project which is currently in design phase. The EA submitted for the boiler plant replacement assessed the impact of creating the natural mountain stream area by restoring an underground culverted portion of Boone Creek. Another project is the widening of Highway 321 adjacent to the planned convocation center site. Widening of High,.vay 321 is a North Carolina Department of Transportation (NCDOT) project. The EA for the convocation center construction will address the impacts of work in the 100-\ car floodplain to accommodate the construction of the convocation center and widening of Hialiv, a. 321 adjacent to the proposed center. PROJECT DESCRIPTION AND NEED FOR PROJECT The Appalachian Convocation Center facility will serve as a multi-purpose place of assemble for university convocations, public speakers. various sports tournaments, trainin(i camps. famii- entertainment shows, conventions, and trade association events and exhibits. The convocation center will serve the Town of Boone, ASU, and the western North Carolina region. The proposed construction site is located adjacent to Boone Creek just downstream of existing ASU Lackey Field (baseball field) and upstream of the existing intersection of Highway 321 and Rivers Street in Boone (Figure 1 provides a general vicinity map for the proposed construction site). Portions of the site lie in the 100-year floodplain of Boone Creek. The proposed construction will take place following Phase 1 and 2 of the ASU boiler plant replacement project and concurrently with NCDOT work to widen Highway 321. The construction of an approximate 225,250 square foot convocation center with a 10,000 person seating capacity is planned near the entrance area on campus, now occupied by the lower portion of Lackey Field and several tennis courts (Figure 2 shows the site as it currently exists). The construction will require filling and grading within the 100-year floodplain to elevate the site's topography for the convocation center and widening of Highway 321. The approximate 450-foot open channel portion of Boone Creek currently next to the tennis courts will be placed in a box culvert to facilitate the grading and filling and convey stream flow. The Phase 2 boiler plant project includes the relocation of Lackey Field to another campus site. It is also anticipated that the tennis courts will be relocated to another campus location. The restoration of the culverted upstream portion of Boone Creek into a "natural mountain stream" is also part of the Phase 2 boiler plant replacement and is addressed in the EA submired for that project. This natural mountain stream will be constructed between the boiler plant and proposed convocation center. Boone Creek will flow through this restored area which will be landscaped with natural vegetation. The new main campus entrance will highlight the newly restored creek area and the convocation center facility (Figure 3 shows the proposed site conditions). EA Scoping Notice Appalachian Convocation Center March 15, 1996 Page - 3 - EXISTING ENVIRONMENT ASU is located in the Town of Boone, Watauga County, which is in the northwestern part of North Carolina. Watauga County is part of the mountainous Blue Ridge land resource area which includes rolling hills and broad valleys. The scenic Blue Ridge Parkway and Pisgah National Forest are located within five miles of the ASU campus. The campus topography is characterized by a long valley located near the Eastern Continental Divide. The proposed site for the convocation center is currently owned by ASU and occupied mainly by part of Lackey Field, several university tennis courts, and a portion of existing Rivers Street. The surrounding town of Boone is commercially developed. There are several recreational ski resorts in the surrounding area. Currently, soils at the proposed convocation center site are being reclassified by the Natural Resource Conservation Service (formerly the Soil Conservation Service). Most of the site has been owned by ASU for over 75 years and was developed by ASU for recreational purposes including Lackey Field and tennis courts. Boone Creek, a tributary of the New River, runs through the proposed site. ENVIRONMENTAL CONSIDERATIONS Changes in Land Use The proposed site is located at the main entrance of the ASU campus which is in an urban area. Current land use at the proposed site is recreational. Construction of the convocation center will alter current land use. The open channel portion of Boone Creek, flowing through the proposed site, will be placed in a box culvert. The existing 100-year floodplain in the immediate site area will be removed and the stream will be contained within a box culvert following fill and grading activities. As part of the boiler plant replacement project, the culverted portion of Boone Creek immediately upstream of the convocation center site will be restored to an open channel. The location for the natural mountain stream area and a portion of the convocation center is currently occupied by part of Lackey Field. The convocation center development will replace the lower portion of Lackey Field and several university tennis courts. These recreational facilities will be eliminated as a result of the planned construction; this loss will be mitigated by the construction of similar facilities elsewhere on campus. Aesthetically and ecologically, the campus will be positively impacted by the creation of the convocation center and natural mountain stream area. The EA for the convocation center construction will therefore further evaluate the impact of culverting the open channel portion of Boone Creek and modifying the existing floodplain environment. Wetlands Mr. Steve Chapin of the U.S. Army Corps of Engineers (COE) stated in a letter to Ogden dated September 8, 1995, (and again at a meeting held at ASU on February 22, 1996) that there are no wetlands on the proposed site. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. EA Scoping Notice Appalachian Convocation Center March 15, 1996 Page-4- Waters of the U.S./State Activities that result in the discharge of fill material into waters of the U.S./State require a Section 404 permit from the COE and, in some cases, a 401 Water Quality Certification from the North Carolina Division of Environmental Management (NC DEM). As part of the convocation center and Highway 321 widening projects, the open portion of Boone Creek adjacent to the tennis courts will be culverted and the elevation of the area raised by fill and grading activities. The total affected waterway for the convocation center project is less than one-third of an acre. This estimate was calculated based on the existing 450 linear feet of open channel and an ordinary high water level width of 30 feet or less, on the average. On February 22, 1996, a meeting was held at ASU with the COE and ITC DEM to discuss the project scope, discuss permitting requirements, and visit the proposed construction site. During this meeting the COE stated that the project is eligible for permitting through Nationwide Permit 26 (NWP26), Headwaters and Isolated Waters, under the Section 404 program. Although the impacted waterway is estimated at one-third of an acre or less, a joint application for the NWP26 under Section 404 and the WQC A'2671 General Certification under Section 401 will be submitted for this project as agreed upon by COE and DEM. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Prime or Unique Agricultural Lands The project does not encompass any agricultural lands. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Public Lands and Scenic Recreational Areas The North Carolina Park Service indicated that there are no State parks within a five mile radius of the ASU campus. Using the 7.5' U.S. Geological Survey (USGS) topographic map (Boone, NC Quadrangle) it was determined that Pisgah National Forest is within one mile of the ASU campus. Another 7.5' USGS topographic map (Deep Gap, NC Quadrangle) was used to locate the Blue Ridge Parkway, which is within five miles of the ASU campus. No impact to these areas is anticipated as a result of this project. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Infrastructure During construction, temporary increases in traffic concentrations will occur due to construction traffic and minor road closures/rerouting. Traffic disruptions should be minimized, however, because the Rivers Street realignment with Highway 321 will be completed prior to significant work on the convocation center site. After the convocation center project is completed, traffic concentrations should return to normal in light of the planned improvements to Highway 321 and Rivers Street. During events held at the convocation center, there will be increased traffic in the area. However, road improvements made in conjunction with this project should accommodate EA Scoping Notice Appalachian Convocation Center March 15, 1996 Page - 5 - an increased traffic volume. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Areas of Archaeological or Historical Value The State Historic Preservation Office (SHPO) in Raleigh was contacted to verify that the ASU campus is not a Historic District nor are any campus buildings on the state list of potential historic sties. Generally, buildings must be more than fifty years old before they are considered for listing on the National Register of Historic Places. No known archaeological sites are present on the ASU campus. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Air Ouualitv No potential air quality impacts have been identified in relation to the convocation center construction. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Groundwater Quality No impact on groundwater is expected as a result of this project. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Noise Levels The Town of Boone ordinance 1989-04 (An Ordinance Regulating Unreasonably Loud and Disturbing Noise in the Town of Boone) establishes the noise level requirements for this project. Temporarily, there will be construction noise from on-site activities, but the noise is not anticipated to be above levels set in the ordinance. Once the convocation center is complete, no noise above the levels in the ordinance is anticipated when the center is in use and filled to capacity. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Water Supplies Potable water supplies will not be affected by this construction project. There are no known water supply wells in the proposed site. ASU supplies its own water to most of the campus. Water quality standards and classifications are set by NC DEM under the North Carolina Administrative Code (NCAC) Section 15A NCAC 2B.0301 through .0317. Boone Creek is identified as a Class C Tr + water. "C" means it is suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation, and agriculture. "Tr" stands for Trout Waters meaning it is suitable for natural trout propagation and maintenance of stocked trout. The symbol indicates it is a water subject to special management strategy specified in 15A NCAC 2B.0216, the Outstanding Resource Waters (ORW) rule, in order to protect downstream waters designated as ORW. EA Scoping Notice Appalachian Convocation Center March 15, 1996 Page-6- For Boone Creek, the ORW rule prohibits new discharges or expansions of existing discharges. The ORW rule requires the development of an Erosion and Sedimentation Control Plan in accordance with the rules established by the North Carolina Sedimentation Control Commission or an appropriate local erosion and sedimentation control program. The construction will require the diversion of Boone Creek when it is "in the dry" to culvert the open channel. During the construction, storm water runoff is the only discharge expected. After the construction is completed, storm water discharges are still the only discharges anticipated. The construction of the convocation center is not expected to have any significant adverse impacts on Boone Creek or the water supplies downstream. Best Management Practices (BMPs) incorporated into the Erosion and Sedimentation Control Plan will be implemented during construction. Any potential impacts from erosion and sedimentation will be addressed in the Erosion and Sedimentation Control Plan for this project. Therefore, unless additional comments are received as a result of this Scoping Notice, this category \yill not require further evaluation during the EA. Shellfish or Fish and Their Habitats The regulations at 15A NCAC 2B.0307 indicate Boone Creek is classified as Trout Waters b% the North Carolina Wildlife Resources Commission (INC WRC). Trout Waters are those waters of the State suitable for natural propagation and maintenance of stocked trout. Mr. Joe Mickey, Fisheries Biologist for District 7 (xvhich includes Watauga County), stated that this section of Boone Creek does not have any kno%vn trout populations at this time. He did state that Boone Creek feeds into Trout Waters downstream. No adverse impacts to these downstream waters are anticipated. No significant loss of fish or shellfish habitat from the culverting of this portion of the creek will occur. The natural mountain stream habitat created as part of the Phase 2 boiler plant replacement project upstream will create a more diverse aquatic habitat. Any potential impacts from erosion and sedimentation will be addressed in the Erosion and Sedimentation Control Plan for this project. Therefore, unless additional comments are received as a result of this Scoping Notice, this category %yill not require further evaluation during the EA. Wildlife and Their Habitats At the meeting on February 22, 1996, Mr. Joe Mickey of the NC WRC stated that there are no known federal or state-listed threatened or endangered species in the area of the proposed site. The state list of threatened and endangered species that may potentially be found in Watauga County was requested from NC WRC on March 5, 1996. The federally-listed threatened and endangered species which may potentially be found in Watauga County includes: Carolina northern flying squirrel (Glaucomys sabrinus coloratus); Blue Ridge Goldenrod (Solidago spithamaea); Heller's blazing star (Liatris helleri); Spreading avens (Geunt radiatum); Roan mountain bluet (Hedyotis purpurea var. nrontana); and Virginia big-eared bat (Plecotus townsendii virginianus). None of these species are known to be present in the vicinity of the proposed site. Overall, the proposed site is currently developed and the grounds are maintained by ASU. The restored stream area adjacent to the convocation center will create a more diverse wildlife habitat. EA Scoping Notice Appalachian Convocation Center March 15, 1996 Page - 7 - Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Introduction of Toxic Substances No toxic substances are anticipated to be introduced into the environment as a result of this project. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. Eutrophication of Receiving Waters The culverting of the open portion of Boone Creek is not expected to cause eutrophication of Boone Creek or any receiving waters. Sedimentation control practices which will be used during construction will be addressed in the Erosion and Sedimentation Control Plan. Further, hydrologic and hydraulic modeling will be provided for the design of the culvert at the proposed site with a goal to eliminate or minimize any significant impacts of the culvert upon flowrates and base flood levels along Boone Creek. Therefore. unless additional comments are received as a result of this Scoping Notice, this categor,.will not require further evaluation during the EA. Boone Creek Floodplain Portions of the proposed convocation center site lie in the 100-year floodplain of Boone Creek as determined by FEMA. Within the limits of the proposed site, the existing 100-year FEMA floodplain is located at approximately elevation 3,156 feet. In order to place the convocation center facility safely above 100-year base flood levels, the elevation of the proposed site will be increased and the finished floor for the convocation center will be at approximate elevation 3,164 feet. A FEMA Conditional Letter of Map Revision (CLOMR) will be prepared to document the proposed stream and floodplain modifications resulting from the project. The CLOMR will follow FEMA procedures and guidelines for proposed modifications to a regulatory floodplain. Further, the designers for the convocation center project are working closely with the Town of Boone, FEMA, and the State of NC to ensure that the design meets all applicable floodplain development requirements. Storm Water At the February 22, 1996 meeting, the NC DEM stated that a National Pollutant Discharge Elimination System (NPDES) storm water permit would not be required for the convocation center construction. Storm water from the ASU campus currently is discharged into Boone Creek. During heavy rains, the current capacity of the upstream underground culverted section (88-inch arch pipe under Lackey Field) and downstream culverted sections of Boone Creek are inadequate. Adjacent to the convocation center, Rivers Street will be realigned and Highway 321 will be widened. This roadwork, along with the construction of the convocation center, will require the culverting of the 450-foot open portion of Boone Creek and modification of the floodplain by filling and grading. The volume and rate of water flowing through Boone Creek is not anticipated to change significantly during construction or when the project is complete. Again, hydrologic and hydraulic modeling will be conducted to design the appropriate parameters for the culvert. Any potential impacts from erosion and sedimentation will be EA Scoping Notice Appalachian Convocation Center March 15, 1996 Page - 8 - addressed in the Erosion and Sedimentation Control Plan for this project. Therefore, unless additional comments are received as a result of this Scoping Notice, this category will not require further evaluation during the EA. CONCLUSION In conclusion, the purpose of this Scoping Notice is to notify and inform interested parties and State agencies of the proposed convocation center construction project. We encourage any comments you may have relative to your area of expertise or concern. All information and comments on relevant environmental issues, structures, or features related to the convocation center construction will be evaluated for the EA. ASU and Ogden would appreciate any comments you may wish to make on this project within 30 working days of receipt of this notice. If further information is needed, you may contact Dr. Clyde Robbins, Associate Vice Chancellor, Physical Operations, ASU, at (704) 262-4961 or Mr. Scott Bryant, Project Engineer, Ogden, at (910) 855-8993. Thank you for your careful consideration of this Scoping Notice. Sincerely, Ogden Environmental and Engineerin Services Co., Inc. Scott D. Bryant, M.S., P.E. Project Engineer cc: Dr. Clyde Robbins, ASU Mr. Joe Mickey, NC WRC Mr. Steve Chapin, US Army COE Mr. Ron Linville, NC DEM Ms. Tara Halstead, JD, REP, Ogden Mr. John Fersner, PE, Ogden Mr. Woody Wicker, Ogden Attachments: Figure 1 Figure 2 Figure 3 Mr. Mark Zack, AIA, Hakan Corley Redfoot Zack Mr. Mike Hammersley, PE, Hakan Corley Redfoot Zack Mr. Herbert Neily, PE, State Construction Office Mr. Doug Jewell, PE, Ogden Ms. Barbara Rector, MS, Ogden Mr. Keith Readling, PE, Ogden File 0 ?P - r a 4 nu+oi+ t O%el OF 0 GJ j?? / ? r / yY O GV ? Lj W ? wa U ? //Z J ? O V Py Q- QP Z No Ca a cn U m N z O aN M 0 z O go U H z = X W ? J ' U Ltl t U ¦S Q -D CD ¦ ? V) i O Cl C) o rum w° 2 : o Ln O a 0- 4 OAV w ¦? GJ??S ¦$ia 13110 - Er ? o O ? Z CL o a am U n N '?V T AAf E?'u 'vEEE ^v'; SE,sV,'??=c N OGDE ¦ ¦ ¦ ¦ ¦ April 8, 1996 ,'?7^?-7 G?ee;s o,o Mr. John Dorney Division of Environmental Management NC DEHNR, Environmental Sciences Branch RFCE?VFQ 4401 Reedy Creek Road 4AI? , Raleigh, North Carolina 27607'?RC,y 1996 RE: ASU/Appalachian Convocation Center in Boone, NC T?t Sc/E?cFs Joint Application for Section 4011404 Permit; Nationwide Permit #26 Dear Mr. Dorney: Please find enclosed seven copies of the joint application for Section 404 Nationwide Permit #26 for the ASU/Appalachian Convocation Center project. This project involves the unavoidable fill and culverting of approximately 450 linear feet of existing open stream channel along Boone Creek in order to accommodate the planned NCDOT widening of Highway 321 and facilitate construction of the multi-purpose Convocation Center facility. The impact to waters of the US is less than one-third of an acre and no wetlands are affected by the proposed project. As we have discussed, written approval from NC DEM with regards to 401 water quality certification is not required for this project. However, we respectfully request the written concurrence from DEM ection 401 General Certification #2671. We appreciate the assistanc - discussions and a projec? Mr. Ron Linville, in par ` appropriate 401/404 perms to date will facilitate DEM questions or require additior. )y NC DEM in several pre-application The Winston-Salem DEM office and °lpful as we have worked towards an It project. We trust that these efforts application. Should you have any . me a call at (910) 855-8993. Very truly yours, Ogden E' nvironmental and Engineering Services Co., Inc. G%??' f' ??. -, Scott D. Bryant, PE Project Engineer Enclosures as noted cc: Dr. Clyde Robbins, ASU Steve Chapin, US Army COE Ron Linville, NC DEM Mark Zack, AIA, HCRZ Mike Hammersley, PE, HCRZ John Fersner, PE, Ogden File ENVIRONMENTAL AND ENGINEERING SERVICES April 8, 1996 Mr. Steve Chapin US Army Corps of Engineers 151 Patton Avenue, Room 143 Asheville, North Carolina 28801-5006 RE: ASU/Appalachian Convocation Center Section 404 Nationwide Permit #26 Application Dear Steve: One Centerview Drive, Suite 203 Greensboro, NC 27407 910 855 8993 Fax 910 855 9049 Please find enclosed the joint application for a Section 404 Nationwide Permit #26 for the ASU/Appalachian Convocation Center project. As we have discussed, this project involves the unavoidable fill and culverting of approximately 450 linear feet of existing open stream channel along Boone Creek in order to accommodate the planned NCDOT widening of Highway 321 and facilitate construction of the multi-purpose Convocation Center facility. The impact to waters of the US is less than one-third of an acre and no wetlands are affected by the proposed project. While written approval from NC DEM with regards to 401 water quality certification is not required for this project, we have forwarded seven copies of this application to Mr. John Domey in the Raleigh DEM office. In addition, we are submitting a copy of this application to Mr. Joe Mickey of the NC Wildlife Resources Commission and Ms. Sonja Wilson of the US Fish and Wildlife Service in Raleigh. We appreciate your assistance and guidance in the pre-application discussions and project coordination meeting in Boone. We trust that these efforts to date will facilitate your review and approval of this application. Should you have any questions or require additional information, please give me a call at (910) 855-8993. Very truly yours, Ogden Environmental and Engineering Services Co., Inc. A?? V . Scott D. Bryant, PE Project Engineer Enclosure as noted cc:, Dr. Clyde Robbins, ASU 4ohn Dorney, NC DEM File Sonja Wilson, US FWS Mark Zack, AIA, Hakan Corley Redfoot Zack Joe Mickey, NC WRC Mike Hammersley, PE, Hakan Corley Redfoot Zack Ron Linville, NC DEM John Fersner, PE, Ogden APPALACffiAN STATE UNIVERSITY Boone, North Caruiina r Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) 1 ' Prepared for: Hakan Corley Redfoot Zack, Inc. ' Post Office Box 2368 Chapel Hill, North Carolina 27515 ' Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 I March 29, 1996 ? OGDENENVIRONMENTAL AND ENGINEERING SERVICES i APPALACHIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 ' DEM ID: ACTION ID: t Nationwide Permit Requested (Provide Nationwide Permit #): 26 ' JOINT FORM FOR Nationwide permits that require notification to the Corps of Engineers ' Nationwide permits that require application for Section 401 certification WILMINGTON DISTRICT ENGINEER DIVISION OF ENVIRONMENTAL MANAGEMENT CORPS OF ENGINEERS NC DEPARTMENT OF ENVIRONMENT, HEALTH, ' DEPARTMENT OF THE ARMY AND NATURAL RESOURCES P.O.Box1890 ENVIRONMENTAL SCIENCES BRANCH Wilmington, NC 28402-1890 4401 Reedy Creek Road ' ATTN: CESAW-CO-E Raleigh, N.C. 27607 Telephone (919) 251-4511 ATTN: MR. JOHN DORNEY Telephone (919) 733-1786 ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINTERS. ' SEVEN (7) COPIES SHOULD BE SENT TO.THE N.C. DIVISION .OF ENVIRON-NfENTAL MANAGEMENT. PLEASE PRINT. 1. Owners Name: Appalachian State University, State of North Carolina ' 2. Owners Addrtss: Apalachian State University, Boone, North Carolina 28608 3. Owners Phone Number (Home): N/A (Work): (704) 262-2000 ' (main number 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Dr. Clyde Robbins, Associate Vice Chancellor, Physical Operations ' Appalachian State University, 265 Dale Street, Boone, NC 28608 Office Phone Number: 704-262-4961 ' 5. Location of work (MUST ATTACH MAP). County: Watauga Nearest Town or City: Town of Boone Specific Location (Include road numbers, landmarks, etc.): Along Boone Creek and f loodolain just below existing ASU Lackey Baseball Field and above the intersection of ' existing Rivers Street and US 321 (Blowing Rock Rd) at the ASU main entrance. 6. Name of Closest Stream/River: Boone Creek ' 7. River Basin: New River Basin 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? YES [X] NO [ ]* ' 9. Have any Section 404 permits been previously requested for use on this property? YES [)d NO [ l If yes, explain. NWP26 for Phase 1 Boiler Plant requested June 1995• NWP26 for Phase 2 Boiler ' Plant requested February 26 1996. 0.31 acre 10. Estimated total number of acres of waters of the U.§., including wetlands, located on project site: of waters of the U.S. (Note: No wetlands located on project site.) ' 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: Filled: 0.31 acre Drained: N/A Flooded: N/A Excavated: N/A - Total Impacted: 0.31 acre ' * Classified as "trout" by NC DEM ' 12. Description of proposed work (Attach 'PLAINS-8 1/2" X 11" drawings only): Fill and culvert installation for 450 ft. of existing Boone Creek open channel. ' 13. Purpose of proposed work:-Accommodate NCDOT widening of US 321 and facilitate construction of the Appalachian Convocation Center multi-purpose facility. 14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. No wetlands are impacted by the proposed prof ect. (Sde attached supplemental information for more discussion on all items) 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Idarine Fisheries Service (NMFS) regarding the presence or any Federally listed or proposed for listing endangered or &atatened species or critical habitat in the permit area that may be afrecmd by the proposed project. Have you done so? . YES [X] NO [ ] IJ? RESPONSES FROM THE USFWS A.N'D/OR NNTS SHOULD BE FORWARDED TO CORPS. 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which may be affected by the proposed project? Have you done so? YES [ X] NO [ J RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS. 17. Additional information required by DENT: A. Wetland delineation map showing all wetlands, streams, and lakes on the property. No wetlands. Attached B. If available, representative Photo?Ph of wetlands to be impacted by project. maps show water feature: See attachment 3 C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the delineation line. N/A D. If a stormwater management plan is required for this project, attach copy. See attachment 2 E. What is land use of surrounding property? Urban develounent (ASU. Boone commercial area) F. If applicable, what is proposed method of sewage disposal? Tie-in to POTW. ` 2 t4 Owner's ignature Date SUPPLEMENTAL INFORMATION FOR JOINT 401/404 APPLICATION Project: Appalachian State University (ASU)/Appalachian Convocation Center Section 404 Nationwide Permit Requested: NWP #26 Section 401 General Water Quality Certification Requested: GC #2671 Application Information: Item 1. Owners Name: Appalachian State University, State of North Carolina Item 2. Owners Address: Appalachian State University, Boone, North Carolina (see item 4) Item 3. Owners Phone Number: Appalachian State University, Main Phone: 704-262-2000 (see item 4) Item 4. Owner Representative, Address, and Phone Number: Dr. Clyde Robbins Associate Vice Chancellor, Physical Operations Appalachian State University 265 Dale Street Boone, North Carolina 28608 Phone: 704-262-4961 Item 5. Location of work: (See maps and plans provided as Attachments 1 and 2) Maps include: USGS "Boone, NC" quadrangle and site plans County: Watauga County, North Carolina Nearest Town or City: Town of Boone Specific Location: Along Boone Creek and floodplain just below the existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Road) at the ASU main entrance. ' ASU/Appalachian Convocation Center page - I - Supplemental 4011404 Application Information March 29, 1996 ' Item 6. Name of Closest Stream/River: Stream: Boone Creek Item 7. River Basin: ' New River Basin. Boone Creek feeds into Winkler Creek which discharges into the South Fork of the New River. ' Item 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? [YES] ' Stream Class: Class C - Trout, Special Waters, "+" NC DEM designation (information obtained from Mr. Ron Linville, Winston-Salem Regional DEM Office). Watershed: Project is not located within a State designated water-supply watershed. WS-11 and WS-IV water-supply watersheds are located south and ' southeast of the project area, respectively. Item 9. Have any Section 404 permits been previously requested for use on this property? [YES] If yes, explain. ' Work along the Boone Creek channel associated with Phase 1 of the ASU Boiler Plant Facility (upstream of the Phase 2 Boiler Plant work and Convocation Center site) was determined to require a US Army COE Nationwide 26 permit. The NWP 26 for Phase 1 was requested in June 1995. The channel restoration work associated with Phase 2 of the Boiler Plant project will also require a NWP 26. The permit for the Phase 2 work was requested on February 26, 1996. ' It is not known if any Section 404 permits have been previously requested for use on the specific Convocation Center project site along Boone Creek, however. ' Item 10. Estimated total number of acres of waters of the US, including wetlands, located on project site: Approximately 0.31 acre of "waters of the US" located on the project site along Boone Creek. (See item 11 for more detail and discussion.) The US Army COE has determined (Mr. Steve Chapin, Asheville Field Office) that no wetlands exist on the proposed project site (reference is made to COE letter ' dated September 8, 1995, Action ID. 199504607, Pre-Application, and a project coordination meeting at ASU on February 22, 1996.) Therefore, a wetlands delineation will not be applicable to this project. ' ASU/Appalachian Convocation Center page - 2 - Supplemental 4011404 Application Information March 29, 1996 ' Item 11. Number of acres of waters of the US, including wetlands, impacted by the proposed project: ' Filled: *Approximately 0.31 acre Drained: not applicable ' Flooded: not applicable Excavated: not applicable Total Impacted: *Approximately 0.31 acre *Note: A culvert system of 800 linear feet (+/-) is proposed for Boone Creek to accommodate the planned NCDOT widening of US 321 and facilitate development ' of the Convocation Center. However, only 450 feet of the stream is currently in an open channel condition. A typical bank-to-bank top channel width for the existing open channel section is approximately 30 feet or less. The width of the ' ordinary high water level along the stream is also 30 feet or less. Also, no wetlands are located in the project area. ' Using these parameters for calculation of area, the estimate of total impact to "waters of the US" along Boone Creek is approximately 0.31 acre. This is determined from the 450 linear ft of existing open channel stream and the 30 ft ' maximum width of the ordinary high water level (450' x 30' = 13,500 sq ft; 13,500 sq ft / 43,560 sq ft per acre = 0.31 acre). This methodology for determining total area of impact to waters of the US is based upon discussions with Mr. Steve Chapin (US Army COE) and confirmed by Mr. John Dorney (NC DEM, Raleigh Central Office) in a telephone conversation with Scott Bryant (Ogden) February 19, 1996. Mr. Dorney further noted that if the impacted area is equal to or less than one-third of an acre, a written approval from DEM is not required for the project. ' Item 12. Description of Proposed Work: (See site plans attached) ' The proposed work involves the development of a multi-purpose Convocation Center facility at Appalachian State University. The planned NCDOT widening of US 321, in conjunction with site placement of the Convocation Center facility, requires that a 450 ft section of Boone Creek open channel be placed into a culvert system. 1 Item 13. Purpose of Proposed Work: The "Appalachian Convocation Center" will serve as a multi-purpose place of ' assembly for university convocations, concerts, public speakers, various sports tournaments, training camps, family entertainment shows, conventions, trade association events and exhibits. This facility will serve the Town of Boone and the region, in addition to the University. ' ASU/Appalachian Convocation Center page - 3 - Supplemental 4011404 Application Information March 29, 1996 Approximately 27% of the Convocation Center's floor area is dedicated to academic program space for the ASU Health Leisure and Exercise Science department. The academic area will include faculty offices, classrooms, special instructional spaces, and research labs. Item 14. State reasons why the applicant believes this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. As noted above, the proposed activity does not involve any disturbance of wetlands. The project will involve the culverting of approximately 0.31 acre of "waters of the US" along Boone Creek. The impact to waters of the US will be minimal, however, because some of the stream is already in culvert. In order to successfully widen US 321 and develop the Convocation Center site, the proposed fill and culverting is necessary. The fill will place the site at an elevation above the 100-year base flood level to protect the building and adjacent facilities. Land use adjacent to the existing reach of Boone Creek open channel is typically urban and includes Blowing Rock Road (US 321), Boone commercial development, Rivers Street, some residential development, and University tennis courts. Therefore, the proposed fill and culverting of the site and stream will not significantly change the nature of the setting nor degrade existing uses. With regards to adjacent projects, ASU has prepared design plans to remove the approximate 960 ft run of culvert immediately upstream from the Convocation Center and restore this area with a "natural mountain stream" concept. The Boone Creek culvert that will be removed begins at Hardin Street near the ASU boiler facility and exits just below ASU Lackey Baseball Field in the proposed Convocation Center site area. As part of the Boone Creek restoration, Lackey Field will also be relocated to another part of the ASU campus. All of this described upstream work is associated with the ASU Phase 2 Boiler Plant Project and includes the realignment of Rivers Street with US 321 immediately upstream of the Convocation Center site. The 404 application for the Phase 2 work was submitted to the Corps of Engineers on February 26, 1996. In sum, the planned widening of US 321 and site placement of the Convocation Center will require the filling and culverting of approximately 0.31 acre or less of "waters of the US" along Boone Creek. With the constraints of these two projects, the proposed culverting is the only practical option for the stream. ' ASU/Appalachian Convocation Center page - 4 - Supplemental4011404Application Information March 29, 1996 Items 15 and 16. Required Contacts: ' U. S. Fish and Wildlife Service (USFWS) Raleigh Field Office Contacted: Ms. Sonja Wilson via telephone call on February 6, 1996 Comments: U.S. Fish and Wildlife Service requested a copy of the Joint 401/404 application form. Upon receipt of a copy of the Joint form, they will reply. Ogden Environmental, on behalf of ASU, will forward a copy of this application to USFWS. ' National Marine Fisheries Service (NMFS) Habitat Conservation Division Contacted: Ms. Arlene Bossie via telephone call on February 6, 1996 ' Comments: The phone call satisfies the contact requirements. The office will receive a copy of the Joint form from the COE and/or DEM (one of the 7 copies required). State Historic Preservation Office (SHPO) N. C. Division of Archives and History Contacted: Ms. Renee Gladdhill-Erly via telephone call on February 6, 1996 ' Comments: One of the 7 copies goes to the SHPO for review. The phone call satisfies the contact requirement on the joint application form. ' Item 17. Additional information for NC DEM: IA. No wetlands are located on the site. See provided site plans/maps for detail on location of Boone Creek (see Attachments 1 and 2). ' B. Photos of the project site are provided herein (see Attachment 3). C. N/A D. The schematic drawings included herein (see Attachment 2) show the proposed grading and drainage plan for the project. E. Land use of the surrounding property is urban development consisting of university and Boone commercial area. ' F. The Convocation Center development will tie-in to the local POTW for sanitary sewage disposal (see Attachment 2 for utility plan). ASU/Appalachian Convocation Center page - 5 - Supplemental 4011404 Application Information March 29, 1996 ATTACHMENT 1 USGS "BOONE,NC" QUADRANGLE SHOWING SITE AREA .\ ' Jl, : / ? ?- '"•`-+• ''?' ? _' /?:`,:?'\_ ' !•`.-? ?_.' ??? ` ` ?l ? ? ? ,??? stir ? ? ?i r ?' ; ? ?\ BMtdC 5 ?299?i? 32 • , ?/ • \ .;1^ l ?ti ??r i - \???^?! \1\?, ?', • ! +:r??\._,\\`.?//'/%?\ t%?? i?/i/ \v i??• ?2??1// ,? • / Y `' li¢?-? \` \ +ll? f.??t0? • •`? • iJ?"-,b1„_ - r \?; --`\ `r-. ?Ta % ^: \ _ • \ ?\??:? `\ r?_yyy (? ? \ 51, %• / Gr StY en1.•!1 + . i! i \` t `? -••3.2.20 ? `??'• .'? • ?Gas? ? I-F \. •hi t E chars?•e• =+• Jr _Gas- Rhr+e?C. • •Lc' \?, J' _ -1_;, r a `' 'H o bowl YA'eaterY, - Uar, I Proposed Site for Convocation Center ? Project ?? ?,?..ti. ?? _ •n?o.? ?? ` a}-tley _ _ _ "__'.? ?'•?\, ?`"-?- .i ;?? 6M Z <R ?nkle •e• -? 'stz •/n,: - ? .- •,?,r_. \\ ` •? 1. ?._. - - - i l b?i r' -r._1??= %^-_ --??h• ?. 1?'G?EE BY Ch ^, ET ?w?l-! m Cem?? /.'? j/??,:/? ?? • X11/ 5/ -/ it rte %'L• \`:m ?: ill ?-J k?/ I jn ?=^ r ?N. 4 :9e It --ca ^ J ?. l}/, -? ec _ `! ;-f'•,? rte; t jil V :I ,,,? i i ?? ?• ??' t f yf??,J''(? ? .,i,l /?I ? ? ,/-!1,? J?-?=%` -i _I a. -, - E E ATTACHMENT 2 SITE PLANS LEGEND •? 9;rZe IC ?- S.V:NI SEND ST tt E x .v arc vu .ut - ..m ur J!L m- LL -CIER rcmx a.. R.crra[ U4 ?.4 r Pow" PaLr UI l 11 n, ryE newt 0 SWT"Y $r4t k-QF o rdUHOE -CLE o v+rn V lA sm /s:r.am4 WL' --- --? acv r r' 1 r r ? i i / r r r / r ? i r - ,1? ` .s x.P 0000000 q r q ?F 0 u z s EXISTING CONDITIONS \? Ocklar-w-w S m i a so O I ao?nmxs h g Nam 3 s ,,,Nr C-1 a W! tw 1 SCHEMATIC ESI N SU I I D G T BM TAL at. law u 1 ATTACHMENT 2 SITE PLANS LEGEND r t xMR v -- T LnY: $T3" M .U uL rc s ICE -DC ?? L? rim `'^c acAR u ar !GVL1 u T"..ac W ?. ,c.cnx c¢ ,YYrpDY[I p nAm nt (} L1W I-E 'fs f% -v[ SMUiYi AV[R YYMRIL o MV-iQK Y *CLE ?- SIP 'Rft v RC,M{Y: v?L , \ V 1 \ 1 tpY1lRR ? ? '? ? / l 6YOCR ?1?/ gyp' ? wY SI YD•? tlIV11Y tt' ' ? 1 as L`T MY •f. Y top ? ? R Rt :' N:. Y Y1 Y Q 6 x:Y • ?q ?Fo ?R UZd z S `EXISTING CONDITIONS = m Easim axmnmm f? ` o ? R § Ml IIQRT E NOM x C-1 e a , RYlal , SG?4EMATfC DESIGN SUBMITTALS LEGENDo- u? o an.nra e n:.n .ret Im9 R e ? UU<?: N:. ?:1 d.-.d x:'s > q ? (MtlOI Z ?^ V m a =sue. . g trm nud.k SITE PLAN E scmunc SCALD , D r-W-V LiIJ 1? - NORM ¢ ?. FAAftdtr ra, no portion of tro prcj..t a C-G within the 100 Lear rloociplain 'a x ene t 6 TIC DESIGN SUBMITTAL) V AM e.i N:. y.V ¦ •3 d • ¦ V 00 q ?Y 0 hh F ?z ?u F z GRADING & DRAINAGE PLAN e SCEDUA77C GRADM PLAN f0 i MCA= § fnM IGIIM { After greol g no portion or the proisct 1lte WIIll lie wlthtn the 100 Veer rloodpieln. d t roetl 1 SCHEMATIC DE51IGN SUBMITTALI law RIVE S?'fYvP. T A. ?.A 1 FUTURE P OWPART OF 77M CAPITAL ?7. ff ?. i inaxr.c*cR .. r j UTILITY PLAN g / ? / .. rrsr•o•a 'i a mom i FR- 9radme no portion of the proJsct ?Ite mill lie mlthin the im0 year flo 1117 t i n SCHEMATIC DESIGN SUBMITTALI ?f .q =E x.? > q ?" F O ?Z d lim . - 9% vtamr OM PLAN C-4 N7 tw P->M .. am w Lamm r n L ATTACHMENT 3 PHOTOGRAPHS OF THE SITE 0 n ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 1. Proposed site area showing ASU Lackey Baseball Field and tennis courts. Photo 2. Proposed site area showing ASU tennis courts and Rivers Street. r C ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 3. Looking downstream along Boone Creek open channel in proposed site area. Photo 4. Looking downstream at arch culvert under Rivers Street at US 321. Note ASU tennis courts adjacent to Boone Creek channel. I i APPALACHIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 DEM ID: ACTION ID: Nationwide Permit Requested (Provide Nationwide Permit #): 26 JOINT FORM FOR Nation-,A-ide permits that require notification to the Corps of Engineers Nationwide permits that require application for Section 401 certification DIVISION OF ENVIRONMENTAL MANAGEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES ENVIRONMENTAL SCIENCES BRANCH 4401 Reedy Creek Road Raleigh, N.C. 27607 ATTN: MR. JOHN DORNEY Telephone (919) 733-1786 WILMINGTON DISTRICT ENGINEER ' CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 1890 Wilmington, NC 28402-1890 ' ATTN: CESAW-CO-E Telephone (919) 251-4511 1 r ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SEMI' TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO_THE N.C. DIVISION .OF ENVIROlv^,4ENI'AL MANAGENIENT. PLEASE PRINT. 1. Owners Name: Appalachian State University, State of North Carolina 2. Owners Address: Apalachian State University, Boone, North Carolina 28608 3. Owners Phone Number (Home): N/A (Work): (704) 262-2000 (main number 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Dr. Clyde Robbins, Associate Vice Chancellor, Physical Operations Appalachian State University, 265 Dale Street, Boone, NC 28608 Office Phone Number: 704-262-4961 5. Location of work (MUST ATTACH MAP). County: Watauga Nearest Town or City: Town of Boone Specific Location (Include road numbers, landmarks, etc.): Along Boone Creek and f loodulain just below existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Rd) at the ASU main entrance. 6. Name of Closest Stream/River: Boone Creek 7. River Basin: New River Basin 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS H? YES [x] NO [ ]* 9. Have any Section 404 permits been previously requested for use on this property? YES [)d NO [ ] If yes, explain. NWP26 for Phase 1 Boiler Plant re Plant requested February 26 199 10. Estimated total number of acres of waters of the U.§., inc juested June 1995; NWP26 wetlands, located on project sits: 0.31 acre of waters of the U.S. (Note: No wetlands located on project site.) 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: Filled: 0.31 acre Drained: N/A Flooded: N/A Excava N/A ted: - - Total Impacted: 0.31 acre * Classified as "trout" by NC OEM t I 12. Description of proposed work (Attach PLANS-8 1/2" X 11" drawings only): Fill and culvert installation for 450 ft. of existing Boone Creek open channel. 13. Purpose of proposed work: Accommodate NCDOT widening of US 321 and facilitate construction of the Appalachian Convocation Center multi-purpose facility. 14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. No wetlands are impacted by the proposed project. (See attached supplemental information for more discussion on all items) 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) regarding the presence or any Fede: telly listed or proposed for listing endangered or thmatened species or critical habitat in the permit area that may be affect: d by the proposed project. Have you done so? . YES [X] NO [ J RESPONSES FROM THE USFWS A..ND/OR NNIFS SHOULD BE FORWARDED TO CORPS. 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which may be affected by the proposed project? Have you done so? YES [ X] No( J RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS. 17. Additional information required by DEN:: A. Wetland delineation map showing all wetlands, streams, and lakes on the property. No wetlands. Attached maps show water feature: B. If available, representative photo=,Ph of wetlands to be impacted by project. See attachment 3 C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the delineation line. N/A . D. If a stormwater management plan is required for this project, attach copy. See attachment 2 E. What is land use of surrounding property? Urban develorment (ASU. Roone ccnunercial rPa ) P. If applicable, what is proposed method of sewage disposal?_ Tie-in to POTW. aLt 0? 2 [11 Owner's ignature Date SUPPLEMENTAL INFORMATION FOR JOINT 401/404 APPLICATION Project: Appalachian State University (ASUI/Appalachian Convocation Center Section 404 Nationwide Permit Requested: NWP #26 Section 401 General Water Quality Certification Requested: GC #2671 Application Information: ' Item 1. Owners Name: ' Appalachian State University, State of North Carolina 1 Item 2. Owners Address: Appalachian State University, Boone, North Carolina (see item 4) ' Item 3. Owners Phone Number: ' Appalachian State University, Main Phone: 704-262-2000 (see item 4) Item 4. Owner Representative, Address, and Phone Number: ' Dr. Clyde Robbins Associate Vice Chancellor, Physical Operations Appalachian State University 265 Dale Street Boone, North Carolina 28608 Phone: 704-262-4961 Item 5. Location of work: (See maps and plans provided as Attachments 1 and 2) Maps include: USGS "Boone, NC" quadrangle and site plans i County: Watauga County, North Carolina ' Nearest Town or City: Town of Boone Specific Location: Along Boone Creek and floodplain just below the existing ASU ' Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Road) at the ASU main entrance. ' ASU/Appalachian Convocation Center page -1 - Supplemental 4011404 Application Information 0M March 29, 1996 Item 6. Name of Closest Stream/River: ' Stream: Boone Creek Item 7. River Basin: ' New River Basin. Boone Creek feeds into Winkler Creek which discharges into the South Fork of the New River. Item 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS H? [YES] Stream Class: Class C - Trout, Special Waters, " + " NC DEM designation (information obtained from Mr. Ron Linville, Winston-Salem Regional DEM Office). ' Watershed: Project is not located within a State designated water-supply watershed. WS-II and WS-IV water-supply watersheds are located south and 1 southeast of the project area, respectively. Item 9. Have any Section 404 permits been previously requested for use on this property? ' [YES] If yes, explain. Work along the Boone Creek channel associated with Phase 1 of the ASU Boiler Plant Facility (upstream of the Phase 2 Boiler Plant work and Convocation Center site) was determined to require a US Army COE Nationwide 26 permit. The NWP ' 26 for Phase 1 was requested in June 1995. The channel restoration work associated with Phase 2 of the Boiler Plant project will also require a NWP 26. The permit for the Phase 2 work was requested on February 26, 1996. ' It is not known if any Section 404 permits have been previously requested for use on the specific Convocation Center project site along Boone Creek, however. Item 10. Estimated total number of acres of waters of the US, including wetlands, located on project site: ' Approximately 0.31 acre of "waters of the US" located on the project site along Boone Creek. (See item 11 for more detail and discussion.) The US Army COE has determined (Mr. Steve Chapin, Asheville Field Office) that no wetlands exist on the proposed project site (reference is made to COE letter dated September 8, 1995, Action ID. 199504607, Pre-Application, and a project coordination meeting at ASU on February 22, 1996.) Therefore, a wetlands delineation will not be applicable to this project. 1 ' ASU/Appalachian Convocation Center page - 2 - Supplemental 4011404 Application Information March 19, 1996 ' Item 11. Number of acres of waters of the US, including wetlands, impacted by the proposed project: ' Filled: *Approximately 0.31 acre Drained: not applicable ' Flooded: not applicable Excavated: not applicable Total Impacted: *Approximately 0.31 acre *Note: A culvert system of 800 linear feet (+/-) is proposed for Boone Creek to accommodate the planned NCDOT widening of US 321 and facilitate development ' of the Convocation Center. However, only 450 feet of the stream is currently in an open channel condition. A typical bank-to-bank top channel width for the existing open channel section is approximately 30 feet or less. The width of the ' ordinary high water level along the stream is also 30 feet or less. Also, no wetlands are located in the project area. Using these parameters for calculation of area, the estimate of total impact to "waters of the US" along Boone Creek is approximately 0.31 acre. This is determined from the 450 linear ft of existing open channel stream and the 30 ft maximum width of the ordinary high water level (450' x 30' = 13,500 sq ft; 13,500 sq ft / 43,560 sq ft per acre = 0.31 acre). This methodology for ' determining total area of impact to waters of the US is based upon discussions with Mr. Steve Chapin (US Army COE) and confirmed by Mr. John Dorney (NC DEM, Raleigh Central Office) in a telephone conversation with Scott Bryant ' (Ogden) February 19, 1996. Mr. Dorney further noted that if the impacted area is equal to or less than one-third of an acre, a written approval from DEM is not required for the project. Item 12. Description of Proposed Work: (See site plans attached) The proposed work involves the development of a multi-purpose Convocation Center facility at Appalachian State University. The planned NCDOT widening of US 321, in conjunction with site placement of the Convocation Center facility, requires that a 450 ft section of Boone Creek open channel be placed into a culvert system. Item 13. Purpose of Proposed Work: The "Appalachian Convocation Center" will serve as a multi-purpose place of ' assembly for university convocations, concerts, public speakers, various sports tournaments, training camps, family entertainment shows, conventions, trade association events and exhibits. This facility will serve the Town of Boone and the 1 region, in addition to the University. ' ASU/Appalachian Convocation Center page - 3 - Supplemental 407/404 Application Information March 29, 1996 F 1 Approximately 27% of the Convocation Center's floor area is dedicated to academic program space for the ASU Health Leisure and Exercise Science department. The academic area will include faculty offices, classrooms, special instructional spaces, and research labs. Item 14. State reasons why the applicant believes this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. As noted above, the proposed activity does not involve any disturbance of wetlands. The project will involve the culverting of approximately 0.31 acre of "waters of the US" along Boone Creek. The impact to waters of the US will be minimal, however, because some of the stream is already in culvert. In order to successfully widen US 321 and develop the Convocation Center site, the proposed fill and culverting is necessary. The fill will place the site at an elevation above the 100-year base flood level to protect the building and adjacent facilities. Land use adjacent to the existing reach of Boone Creek open channel is typically urban and includes Blowing Rock Road (US 321), Boone commercial development, Rivers Street, some residential development, and University tennis courts. Therefore, the proposed fill and culverting of the site and stream will not significantly change the nature of the setting nor degrade existing uses. With regards to adjacent projects, ASU has prepared design plans to remove the approximate 960 ft run of culvert immediately upstream from the Convocation Center and restore this area with a "natural mountain stream" concept. The Boone Creek culvert that will be removed begins at Hardin Street near the ASU boiler facility and exits just below ASU Lackey Baseball Field in the proposed Convocation Center site area. As part of the Boone Creek restoration, Lackey Field will also be relocated to another part of the ASU campus. All of this described upstream work is associated with the ASU Phase 2 Boiler Plant Project and includes the realignment of Rivers Street with US 321 immediately upstream of the Convocation Center site. The 404 application for the Phase 2 work was submitted to the Corps of Engineers on February 26, 1996. In sum, the planned widening of US 321 and site placement of the Convocation Center will require the filling and culverting of approximately 0.31 acre or less of "waters of the US" along Boone Creek. With the constraints of these two projects, the proposed culverting is the only practical option for the stream. I ASU/Appalachian Convocation Center page - 4 - Supplemental 4011404Application Information March 29, 1996 Items 15 and 16. Required Contacts: ' U. S. Fish and Wildlife Service (USFWS) Raleigh Field Office Contacted: Ms. Sonja Wilson via telephone call on February 6, 1996 Comments: U.S. Fish and Wildlife Service requested a copy of the Joint 401/404 application form. Upon receipt of a copy of the Joint form, they will reply. Ogden ' Environmental, on behalf of ASU, will forward a copy of this application to USFWS. ' National Marine Fisheries Service (NMFS) Habitat Conservation Division Contacted: Ms. Arlene Bossie via telephone call on February 6, 1996 ' Comments: The phone call satisfies the contact requirements. The office will receive a copy of the Joint form from the COE and/or DEM (one of the 7 copies ' required). State Historic Preservation Office (SHPO) N. C. Division of Archives and History Contacted: Ms. Renee Gladdhill-Erly via telephone call on February 6, 1996 ' Comments: One of the 7 copies goes to the SHPO for review. The phone call satisfies the contact requirement on the joint application form. ' Item 17. Additional information for NC DEM: IA. No wetlands are located on the site. See provided site plans/maps for detail on location of Boone Creek (see Attachments 1 and 2). B. Photos of the project site are provided herein (see Attachment 3). C. N/A D. The schematic drawings included herein (see Attachment 2) show the proposed grading and drainage plan for the project. ' E. Land use of the surrounding property is urban development consisting of university and Boone commercial area. ' F. The Convocation Center development will tie-in to the local POTW for sanitary sewage disposal (see Attachment 2 for utility plan). ' ASU/Appalachian Convocation Center page - S - Supplemental 4011404 Application Information March 29, 1996 ATTACHMENT 1 USGS 'BOONE,NC" QUADRANGLE SHOWING SITE AREA I >?- UCKe `\ _ ? r ".•= ' J' .-?/ ??'_.:`??? Imo-- ?, ` ? ? i .'? ?.? ? ? ;'? T -' n '? ??? / `,?" ?j?T• °f % ?!il°?'?- is T;'~ f- ?- ??? ^' ?'' I\?? ?1;?.4P ?• `mot r ??? r? ?l rr 't '?? I'?J.;i` !''! \.'?7i• •. i ?,•? -\ ?? B 32 5C \2n%` - •• • /; • `, ' 81"1 -?? • 1 I • I I ;I ,1 _: z I ?/ ?"': ! :, t .? ?`. y?•/;' `?• sue' • ? `?.`. J 7 1: _'?,- • .\ ' / Gr ¢i ertl-,?? ? l i1 ? t ? 0' ? 'e... •., ? .\ VGas? ? ? tzFe FEach?rs??,Ce •`??'? _6as- •?\ •11 .?` :? '1 ?.% 1 /- . _ ?'? 1•h1E `:t?1 -'? R!y Jr,. t•. • .Gc• •\•r - I '??_;, i _ , ?? ?, Orr ?' t? % ?o`.C a? I, _b `? :???//?'?• . ?. ••? _ ' • 1•\ %/Y J. of •Ho Gap'. • ` •.?. (, . [7z11W 60 clu +lieateru ` `. Proposed Site for Convocation Center Project .. t I •`+ 1 :?? •/ ./? (1\ ??' Earn 6M Z 4 inkle e stz 1', Y 1v R: a- r iii \-" / ? ? ) ? , -ilj5 Etn • ? •.'••/ ?r?' Fa y'/?`?? ?` ? ? _? ? ? • _` • i 1( - _ "lam (? Wil_I m Cem `•. f ? ^ 1,? i?iii ??`?( .?? i.' \ ?. .1 ..? i-•.`-. / / 11 (r i 1 ^_^ ` 1. •? 1?'' its, ? '!-L• ' - _<?. ? ??--, ??1 ? _,i??-? 7?? ? /l' `:_? ?,///?-?- - , \\• i , I $? 1 1 y ' ??•'?? ' /? ?? ?' i?l r. 7J/7 Ml S r I /J ? ? 1??? %?/ r?\? // ?i' ? -• ! ` ? ?? ?? ??J --ter- ?? i-.,>.?l/???% %? /,I (l.. "? F JIB ATTACHMENT 2 SITE PLANS s \ \ LEGEND - r?ra. r •- ari. v ST3"$E S:VII LM MICE IIrEll LC[ RKC U[ -- -TER LrIC RVS! 4+ rc.nx s tE.U.x 1.4 rWypen zr rch P1L LJW r1 FM M50.YR m SMBr"r SCM u" U o r¢nac _,"" ,\W4 31DI y?Q rHE cummc V," 1 W" 1 SI w r y oy f EXISTING CONDITIONS l ?N a SGN-MATIC DESIGN SUBMITTAL' ?a:el N: :i ;a x.: 00- 00 a C? > C ?p bu Q p ?Z ?d> V u 6 d' F ,t ?n V z CL ? marpRe CONDUMM C-1 of j total 1 V.) data Una O? RIVERS STREET S \5 atu,,. hCf DL:SIC SUPPORT BrJ dl! :tf! -7'C 7`0 / 1% LEGEND ¢n+u ua.c O a : ., n¢ v..?? n a :wcurr Q n..os [me fl?m [an Qi ao ntr • aia rtr ? c.[r.c urt[ ??.?, mu n [ moo --. Z? VOTPARTOF PMAL USED BRZGE to 0 0 VJ N l? , AL, ?tG ?•. ? Lr\ GN ,- SITE PLAN D e 8CALW W-W m s 6 b b F g' After crao7re, no portion of the prcJect s si t site wIll Ila within the Ice near r3oodplatn n 5 N MATIG DF-51GN 5U5r11TTAL§ N: pp. U:a ?y /yy/????tt 6dd?h 0 F=4Z> YI h trcm Cn M[E YO tat SCHMAATfC sm e«i PLAN C-2 a ! taw 1 P?*l - 106 d.t. V" L'1? \G \ I ! 1 l'1,7ER I _G\5-5LC: 0V! I LEGEND: a? ' {TiY IR C'?tl?9 ar {{n O ynr rct ¦ m nuxcv ma .----------• .MA F K TYCO N: a d ):d q C • U ? ?Y O ? QQCq °U Y f' ? t CAM 14 L ?f+i .?{ csr.. GRADING & g un wx DRAINAGE PLAN aCYlr•ne PSAN mom= so do UOMH Alter grading no portion of tlv prc;ect 3 C'3 .Its will lie WItMn the 100 year fl00dpia ln. , {n. t 50=MATIC DESIGN SUBMITTALS OW 0.. Ow RIVERS St f POR ;' n n •? 'FUTURE PA aiMPART CEF 7XN CAPrrAL II ;, \406 O - ?7\\N -v' i ? - - I i AC? r UTILITY PLAN erxsr•b`eIgM y. mom V _ After 99rading w portion of shs project alts wTi lie within the 100 r !'loooplekt 3'', d 5CHEMATIC DE51GN SUBMITTAL) is xis o? x•: 9 q 18 ?> 0 Z d W .1 u &0- tlrtluC um ME $CHdA7DC iT n= e.t PLAN C-4 d 1 t" . P.:.t - 9" ea. Lam t ATTACHMENT 3 PHOTOGRAPHS OF THE SITE L7 1 ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 1. Proposed site area showing ASU Lackey Baseball Field and tennis courts. Photo 2. Proposed site area showing ASU tennis courts and Rivers Street. n u ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information Om March 29, 1996 Photo 3. Looking downstream along Boone Creek open channel in proposed site area. Photo 4. Looking downstream at arch culvert under Rivers Street at US 321. Note ASU tennis courts adjacent to Boone Creek channel. I I I I I I I I I I I I I I I I I I I C L APPALACHIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 OGDENENVIRONMENTAL AND ENGINEERING SERVICES ME son _0 APPALACIIIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 DENT ID: ACTION ID: Nationwide Permit Requested (Provide Nationwide Permit #): 26 JOINT FORM FOR Nation-Aide permits that require notification to the Corps of Engineers Nationwide permits that require application for Section 401 certification DIVISION OF ENVIRONMENTAL MAN=-GEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES ENVIRONMENTAL SCIENCES BRANCH 4401 Reedy Creek Road Raleigh, N.C. 27607 ATTN: MR. JOHN DORNEY Telephone (919) 733-1786 WILMINGTON DISTRICT ENGINEER ' CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 1890 Wilmington, NC 28402-1890 ' ATTN: CESAW-CO-E Telephone (919) 251-4511 u ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINTERS. SEVEN (7) COPIES SHOULD BE SENT TO.THE N.C. DIVISION OF ENVIROlv'A=AL MANAGEMENT. PLEASE PRINT. 1. Owners Name: Appalachian State University, State of North Carolina 2. OwnersAddress: Apalachian State University, Boone, North Carolina 28608 3. Owners Phone Number (Home): N/A (Work): (704) 262-2000 (main number 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Dr. Clyde Robbins, Associate Vice Chancellor, Physical Operations Appalachian State University, 265 Dale Street, Boone, NC 28608 Office Phone :umber: 704-262-4961 5. Location of work (MUST ATTACH MAP). County: Watauga Nearest Town or City Town of Boone Specific Location (Include road numbers, landmarks, etc.): Along Boone Creek and f loodiolain just below existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Rd) at the .ASU main entrance. 6. Name of Closest Stream/River: Boone Creek 7. River Basin: New River Basin 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? YES [x) NO [ }* 9. Have any Section 404 permits been previously requested for use on this property? YES [ NO [ J If yes, explain. NWP26 for Phase 1 Boiler Plant requested June 1995; NWP26 for Phase 2 Boiler Plant requested February 26 1996. 0.31 acre 10. Estimated total number of acres of waters of the U.§., including wetlands, located on project site. of waters of the U.S. (Note: No wetlands located on project site.) 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: Filled: 0.31 acre Drained: N/A Flooded: N/A Excavated: N/A Total Impacted 0.31 acre * Classified as "trout" by NC DEM N 19 I d b > 2:4 z t? Q• O C. O .. n C • S (D s' n o) C. En p1 ° Crf ?' e' M5a?o' o w' n rt. n o O w o. 5. p° g w . o, Pte' °. ° c O °O 9;, 0 ° E n b Er 00 E? iS '" E 'd w o• [ri1J o 0 N 0 0* :j N n o N N chi O O ?. 5; 0 d O 0 (D 0 a O v fn 7 p? -? in rt z ?• 5 b ir o_ F `< aQ ?< w O n< n 'h p, o 5' d C E M CW? fYK rt S O G O 'TI O y J ?? ':E 5 "' G O O n' K O G C :E " c 7d v' N° a G n 0, H 2 0. ?g En to C w n 00 ?. o ?' H o o- ? rt ni a ° Y' p r w rn 11 (D p O M o. -?, 0 .» F- g 0 •y CL () •d s .t1 w o 0 O o 0 p fAr n (~D G p? F'' -, 7d w O (D M p. rt n (i H to .» ^ ?' aO w " s. v' O .) N n n (D x O b O w o °. p, 0.0 rt .0 n o 0 < c N. .» O p<t ', t1 v M aaq O rn 0 O O a?0 O z G --rg r 0 C!D ^ .?^? . 'l7 c A w (D n O p, n 0. P: O IA C. N fA ::E: ' (D O? n o OO P. ? w ?^ (D ^ O Ev. O 0 N. rt ?' w 'CJ O o o fn F; 0? w rt w £ ? ?. 0 ?, H 'v ^ tD A rt fn (D rt. o w o s. a ((D p p~i ,--• Gi 1--+ 2 G ••, (D CL X 0 rt (D N rt rt. 'n O H• rt, O' m E6 (D w -0 ^ n fn ?' ?--? Cl' v ?. tl v rt- (D A W O N rt K H G ? A o rt 0 O 'a O O [L M _ rt O• (D VI i-? w A W w G (7 0 G c O A w rt P- 0 CJ A z rt (D Fj ft "t7 N (D A rt i D s s a n a J U s 1 u J N W E En n rt X+ w w 0 rt ' W °, O O t-h '0 n 0 LA. Ln O x ? a rt :3 n n 0 r (D x N- N (n oo rt w X c o E (D N (D O A ? X •< O G IA w m r W r w CL A G C (D f'( rt u SUPPLEMENTAL INFORMATION FOR JOINT 401/404 APPLICATION Project: Appalachian State University (ASU)/Appalachian Convocation Center Section 404 Nationwide Permit Requested: NWP #26 Section 401 General Water Quality Certification Requested: GC #2671 Application Information: Item 1. Owners Name: Appalachian State University, State of North Carolina Item 2. Owners Address: Appalachian State University, Boone, North Carolina (see item 4) Item 3. Owners Phone Number: Appalachian State University, Main Phone: 704-262-2000 (see item 4) Item 4. Owner Representative, Address, and Phone Number: t Dr. Clyde Robbins Associate Vice Chancellor, Physical Operations Appalachian State University 265 Dale Street Boone, North Carolina 28608 Phone: 704-262-4961 Item 5. Location of work: (See maps and plans provided as Attachments 1 and 2) Maps include: USGS "Boone, NC" quadrangle and site plans County: Watauga County, North Carolina Nearest Town or City: Town of Boone Specific Location: Along Boone Creek and floodplain just below the existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Road) at the ASU main entrance. ' ASU/Appalachian Convocation Center page - 1 - Supplemental 4011404 Application Information March 29, 1996 Item 6. Name of Closest Stream/River: ' Stream: Boone Creek Item 7. River Basin: ' New River Basin. Boone Creek feeds into Winkler Creek which discharges into the South Fork of the New River. Item 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? [YES] Stream Class: Class C - Trout, Special Waters, "+" NC DEM designation (information obtained from Mr. Ron Linville, Winston-Salem Regional DEM Office). Watershed: Project is not located within a State designated water-supply watershed. WS-II and WS-IV water-supply watersheds are located south and southeast of the project area, respectively. Item 9. Have any Section 404 permits been previously requested for use on this property? [YES] If yes, explain. Work along the Boone Creek channel associated with Phase 1 of the ASU Boiler Plant Facility (upstream of the Phase 2 Boiler Plant work and Convocation Center site) was determined to require a US Army COE Nationwide 26 permit. The NWP ' 26 for Phase 1 was requested in June 1995. The channel restoration work associated with Phase 2 of the Boiler Plant project will also require a NWP 26. The permit for the Phase 2 work was requested on February 26, 1996. ' It is not known if any Section 404 permits have been previously requested for use on the specific Convocation Center project site along Boone Creek, however. ' Item 10. Estimated total number of acres of waters of the US, including wetlands, located on project site: ' Approximately 0.31 acre of "waters of the US" located on the project site along Boone Creek. (See item 11 for more detail and discussion.) The US Army COE has determined (Mr. Steve Chapin, Asheville Field Office) that no wetlands exist on the proposed project site (reference is made to COE letter ' dated September 8, 1995, Action ID. 199504607, Pre-Application, and a project coordination meeting at ASU on February 22, 1996.) Therefore, a wetlands delineation will not be applicable to this project. ' ASU/Appalachian Convocation Center page - 2 - Supplemental 4011404 Application Information March 29, 1996 ' Item 11. Number of acres of waters of the US, including wetlands, impacted by the proposed project: Filled: *Approximately 0.31 acre Drained: not applicable Flooded: not applicable Excavated: not applicable Total Impacted: *Approximately 0.31 acre *Note: A culvert system of 800 linear feet (+/-) is proposed for Boone Creek to accommodate the planned NCDOT widening of US 321 and facilitate development ' of the Convocation Center. However, only 450 feet of the stream is currently in an open channel condition. A typical bank-to-bank top channel width for the existing open channel section is approximately 30 feet or less. The width of the ordinary high water level along the stream is also 30 feet or less. Also, no wetlands are located in the project area. ' Using these parameters for calculation of area, the estimate of total impact to "waters of the US" along Boone Creek is approximately 0.31 acre. This is determined from the 450 linear ft of existing open channel stream and the 30 ft ' maximum width of the ordinary high water level (450' x 30' = 13,500 sq ft; 13,500 sq ft / 43,560 sq ft per acre = 0.31 acre). This methodology for ' determining total area of impact to waters of the US is based upon discussions with Mr. Steve Chapin (US Army COE) and confirmed by Mr. John Dorney (NC DEM, Raleigh Central Office) in a telephone conversation with Scott Bryant ' (Ogden) February 19, 1996. Mr. Dorney further noted that if the impacted area is equal to or less than one-third of an acre, a written approval from DEM is not required for the project. i Item 12. Description of Proposed Work: (See site plans attached) The proposed work involves the development of a multi-purpose Convocation Center facility at Appalachian State University. The planned NCDOT widening of US 321, in conjunction with site placement of the Convocation Center facility, requires that a 450 ft section of Boone Creek open channel be placed into a culvert system. ' Item 13. Purpose of Proposed Work: The "Appalachian Convocation Center" will serve as a multi-purpose place of assembly for university convocations, concerts, public speakers, various sports tournaments, training camps, family entertainment shows, conventions, trade association events and exhibits. This facility will serve the Town of Boone and the ' region, in addition to the University. ASU/Appalachian Convocation Center page - 3 - Supplemental 4011404 Application Information 0M March 29, 1996 ?I Approximately 27% of the Convocation Center's floor area is dedicated to academic program space for the ASU Health Leisure and Exercise Science department. The academic area will include faculty offices, classrooms, special instructional spaces, and research labs. Item 14. State reasons why the applicant believes this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. As noted above, the proposed activity does not involve any disturbance of wetlands. The project will involve the culverting of approximately 0.31 acre of "waters of the US" along Boone Creek. The impact to waters of the US will be minimal, however, because some of the stream is already in culvert. In order to successfully widen US 321 and develop the Convocation Center site, the proposed fill and culverting is necessary. The fill will place the site at an elevation above the 100-year base flood level to protect the building and adjacent facilities. Land use adjacent to the existing reach of Boone Creek open channel is typically urban and includes Blowing Rock Road (US 321), Boone commercial development, Rivers Street, some residential development, and University tennis courts. Therefore, the proposed fill and culverting of the site and stream will not significantly change the nature of the setting nor degrade existing uses. With regards to adjacent projects, ASU has prepared design plans to remove the approximate 960 ft run of culvert immediately upstream from the Convocation Center and restore this area with a "natural mountain stream" concept. The Boone Creek culvert that will be removed begins at Hardin Street near the ASU boiler facility and exits just below ASU Lackey Baseball Field in the proposed Convocation Center site area. As part of the Boone Creek restoration, Lackey Field will also be relocated to another part of the ASU campus. All of this described upstream work is associated with the ASU Phase 2 Boiler Plant Project and includes the realignment of Rivers Street with US 321 immediately upstream of the Convocation Center site. The 404 application for the Phase 2 work was submitted to the Corps of Engineers on February 26, 1996. In sum, the planned widening of US 321 and site placement of the Convocation Center will require the filling and culverting of approximately 0.31 acre or less of "waters of the US" along Boone Creek. With the constraints of these two projects, the proposed culverting is the only practical option for the stream. ASU/Appalachian Convocation Center page - 4 - Supplemental4011404Application Information Om March 29, 1996 Items 15 and 16. Required Contacts: ' U. S. Fish and Wildlife Service (USFWS) Raleigh Field Office Contacted: Ms. Sonja Wilson via telephone call on February 6, 1996 ' Comments: U.S. Fish and Wildlife Service requested a copy of the Joint 401/404 application form. Upon receipt of a copy of the Joint form, they will reply. Ogden Environmental, on behalf of ASU, will forward a copy of this application to USFWS. ' National Marine Fisheries Service (NMFS) Habitat Conservation Division Contacted: Ms. Arlene Bossie via telephone call on February 6, 1996 Comments: The phone call satisfies the contact requirements. The office will receive a copy of the Joint form from the COE and/or DEM (one of the 7 copies ' required). ' State Historic Preservation Office (SHPO) N. C. Division of Archives and History Contacted: Ms. Renee Gladdhill-Erly via telephone call on February 6, 1996 Comments: One of the 7 copies goes to the SHPO for review. The phone call satisfies the contact requirement on the joint application form. Item 17. Additional information for NC DEM: A. No wetlands are located on the site. See provided site plans/maps for detail on location of Boone Creek (see Attachments 1 and 2). ' B. Photos of the project site are provided herein (see Attachment 3). C. N/A ' D. The schematic drawings included herein (see Attachment 2) show the proposed grading and drainage plan for the project. E. Land use of the surrounding property is urban development consisting of university and Boone commercial area. e F. The Convocation Center development will tie-in to the local POTW for sanitary sewage disposal (see Attachment 2 for utility plan). H ASU/Appalachian Convocation Center page - 5 - Supplemental 4011404 Application Information March 29, 1996 ATTACHMENT 1 USGS "BOONE,NC" QUADRANGLE SHOWING SITE AREA t (Oll 441. q ? \J a NJ `BM kC 299`:?? `• \ 3225' / i ti. ff'y' j \ and 'e eg}?{ ad10• ' t/ mar tti errl ??` ', ; i 1' 1 \ •\ 3220 '3:.. ` •; _ r. ?' asps %? . .f `? - \` - i t e Trtsct rs / t. Ce• :, '?? _Gzs-??? •" \\ 4ku -O 0 ;;'?+/- ,i, iJ Ali +:hl \~+'_? ? Roser+IIT`?? ?c?_ •'\'?? . i -?`,-; ; .? ???\ ` sv ??? _ O`?"' ' .i _ 'NU /a??? 1?II \ lQ\C 4?•-)'z?Il =?^ \(\' .?? ./('.' _ •? ^? I r ?'? +''i ? O JIB;-.?-. 1 _ '??- ,?• \ _;; ?? ir' -,. Ho Ge % 6'? i s-?. jtillt`.' _ `? • \? \CJil 6ocn? Yheate*vµ /?/ - - Proposed Site for Convocation Center Pro ect ` _ _ - ? _ ^ ? `?,'??E`?.? ??-? .l . ? 6M Z <b , ,nkle 'e• -.. stz•:/;:'? ' I r???1 ?? • •?-' _'^ _ i1 _ ?- 121 _?,/ CtC&? \. 1. Tr i //... l a:`? 1-, .:? .?_ ??_ ? _ ''-_??_ ail' ^?-1, _FZrk z• it `- ? 1 i ? .;Sts - em r? ;?•• i? ? •w`?a'.zftr J a `.-_?? ??17']f-'-_r?y?-- •? . ,?// x,11 \ rl?•'^ 1 `i???. '%i ya ?,? f. ri ?i% / t?. `1 ,.,`?'?.. ? ?+? ' $? ?? ?? t __. ?? I /??_--?J/^ ;.. ,l 1r5prOaLti '? ?` "q ll ! ? 'y 1 e 1 ATTACHMENT 2 SITE PLANS \ \ \ \ \ , \ LEGEND - ara? r - LV: Nf SEVp LSK - ti]I• SErtl LOE V.t[i LM -?- rm r.• ,.a raw w tE.Lr tE W i R,LVtiY LLE T? ri.ummn Pau PnLc UW r:,E r3e mMAKT m SAtliNr SLEAR MW U o TCLV-, E NvQL o v.ru v C 9- 517. T V R ADW4 v.LL y / •.??\\ 51 ? v ? 11 r \, ? `O 1 ,` - i r I r r- 1 I \ \\\\ \?\\\1111\l \ .. ON \ N \ w, i I i R .wa 1 ?fjj RrmR r k rar rnr i yr I' •? ?4iCR ? Y i *• oI I.1 SI ram I?r p?Y N:. i? ?zz i a x.9 06 v 0 ' 1 ` X111 ? ? I 11 t ? , ?\\1 ` 11,1 1'11 11 `? 11 11 ?? a `, 11 1111 \ ` ? ? F 0 r , , ` ?\\ I e \\ > Qi r \ 111 ?ZV 1?1 1 \ ? a z -?7 1 V ,n ? bawl thithiC EXISTING CONDITIONS Earrm ?/ rxsr•oa # coamrrxm ffa a?a :t ? gt w.R f?f = C-1 bas caa ? „?` SCHEMATIC DESIGN SUBMITTALS wt. RIVERS STREET SUPPORT ar,v c::vc x`.57:?i: ?r,Otr W? 'FUTURE PA NOT PIS RT OF ?NS CAPITAL n i LL-CiENU u7x ? raawa ue - - - - aaa= 7•of C.MaT ?_ ?? utw as .' rd< ??..4 v e[ :.rdfav7 O ds:dos flds DQ 7Ml 0 710Y Nf C- Stl? ?? au Y7, .d.a7 etrc uan ma m e lobo ?.??. O? ?'md ll:?7;w` .. a r: N: 9 > a F Ck 8 /`+ da ca 1 F tram d.O?E \ SITE PLAN = . s = Srm G®Y17.70-0 q; PLAN iD e 0 b 40 p 6 ??a After craalro, no portion or the project C-2 $Its wig he wlthM the 129 Dear riooc ialti i a ell um I S N MATIG DF=SIG-N SUBMITTALS "°"'"` &I. vxm Mr PART OF THS CAAAMAL I• F:C.ti Eu1C r (C NDER \ -EGEND 41DK ? .m er»,w wa CD 1?1 ma uu ? ?M4( N e" r ? m F ??tt ?< V r;C J. .4' .a?or.c+a i GRADING & DRAINAGE PLAN a a go so mom i - After grading no potion of the proJsa C-3 site wtZ lie witnfn the !m0 year rloodp'atrn } 3 of 1 trttl 1 SC#?MATIC 1 1 s UTILITY PLAN F i ARer 99rading no portlon of the protect FA Gill IIe wlthtn the Imo year floodolaln. SCHEMATIC DESIGN SUBMITTALS is N: goll, 00- FPO 000 0 r C n ?? ?ddQ ?ZU m az Q ??:rrs 1m lax SCMEMKIiC LTn= ?. PLA_V C-4 d7 tte P.j? m 904 0 t ATTACHMENT 3 PHOTOGRAPHS OF THE SITE IIl I ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 1. Proposed site area showing ASU Lackey Baseball Field and tennis courts. Photo 2. Proposed site area showing ASU tennis courts and Rivers Street. ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 3. Looking downstream along Boone Creek open channel in proposed site area. Photo 4. Looking downstream at arch culvert under Rivers Street at US 321. Note ASU tennis courts adjacent to Boone Creek channel. I I I I I I I I I I I I I I I I I I APPALACHIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 OODENENVIRONMENTAL AND ENGINEERING SERVICES APPALACHIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 DENT ID: ACTION ID: Nationwide Permit Requested (Provid: Nationwide Permit #): 26 JOINT FORM FOR Nation-Aide permits that require notification to the Corps of Engineers Nationwide permits that require application for Section 401 certification DIVISION OF ENVIRONMENTAL MAN.=-GEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES ENVIRONMENTAL SCIENCES BRANCH 4401 Reedy Creek Road Raleigh, N.C. 27607 ATTN: MR. JOHN DORNEY Telephone (919) 733-1786 WILMINGTON DISTRICT ENGINEER CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 1890 Wilmington, NC 28402-1890 ' ATTN: CESAW-CO-E Telephone (919) 251-4511 ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO.THE N.C. DMSION OF ENVIRONhIENTAL MANAGENM\7. PLEASE PRINT. 1. Owners Name: Appalachian State University, State of North Carolina 2. Owners Address: Apalachian State University, Boone, North Carolina 28608 3. Owners Phone Number (Home): N/A (Work): (704) 262-2000 (main number 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Dr. Clyde Robbins, Associate Vice Chancellor, Physical Operations Appalachian State University, 265 Dale Street, Boone, NC 28608 Office Phone Number: 704-262-4961 5. Location of work (MUST ATTACH MAP). Counry: Watauga Nearest Town or City: Town of Boone Specific Location (Include road numbers, landmarks, etc.): Along Boone Creek and f loodDlain just below existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Rd) at the ASU main entrance. 6. Name of Closest Strearn/River: Boone Creek - 7. River Basin: New River Basin 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? YES [ J NO [ }* 9. Have any Section 404 permits been previously requested for use on this property? YES [,4 NO [ l If yes, explain. NWP26 for Phase 1 Boiler Plant requested June 1995 NWP26 for Phase 2 Boiler Plant request 10. Estimated total number of acres of waters of the U.S. :ed February 26 1996. 0 acre of waters of the U.§., including wetlands, located on project site: (Note: No wetlands located on project site.) 1 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: Filled: 0 31 acre Drained: N/A Flooded: N/A N/A Excavated: Total Impacted: 0.31 acre * Classified as "trout" by NC DEM ' 12. Description of proposed work (Attach PLANS-8 1/2" X 11" drawings only): Fill and culvert installation for 450 ft. of existing Boone Creek open channel. 13. Purpose of proposed work: Abcommodate NCDOT widening of US 321 and facilitate construction of the Appalachian Convocation Center multi-purpose facility. 14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures ' taken to minimize wetland impacts. No wetlands are impacted by the proposed project. (See attached supplemental information for more discussion on all items) 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National hiarine Fisheries Service ' (NMFS) regarding the presence or any Fede: telly listed orproposed for listing endangered or thr-.ztened species or critical habitat in the permit area that may be afrectsd by the proposed project. Have you done so? . YES [X) NO [ RESPONSES FROM THE USFWS A--N'D/OR NMFS SHOULD BE FORWARDED TO CORPS. t 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which may be affected by the proposed project? Have you done so? YES [ X) NO [ ] RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS. 17. Additional information required by DEN:: A. Wetland delineation map showing all wetlands, streams, and lakes on the property. No wetlands. Attached maps show water feature, B. If available, representative photo=ph of wetlands to be impacted by project. See attachment 3 C. If delineation was performed by a consultant, include all data sheets relevant to the plzcemcnt of the delineation line. N/A D. If a stormwater management plan is required for this project, attach copy. See attachment 2 E. What is land use of surrounding property? Urban development (ASU, Boone commercial area) F. If applicable, what is proposed method of sewage disposal?_ Tie-in to POTW. a tpw? ?W. 2 1 l Owner's ignature Date SUPPLEMENTAL INFORMATION FOR JOINT 401/404 APPLICATION Project: Appalachian State University (ASU)/Appalachian Convocation Center Section 404 Nationwide Permit Requested: NWP #26 Section 401 General Water Quality Certification Requested: GC #2671 Application Information: Item 1. Owners Name: Appalachian State University, State of North Carolina Item 2. Owners Address: Appalachian State University, Boone, North Carolina (see item 4) Item 3. Owners Phone Number: Appalachian State University, Main Phone: 704-262-2000 (see item 4) Item 4. Owner Representative, Address, and Phone Number: Dr. Clyde Robbins Associate Vice Chancellor, Physical Operations Appalachian State University 265 Dale Street Boone, North Carolina 28608 Phone: 704-262-4961 Item 5. Location of work: (See maps and plans provided as Attachments 1 and 2) Maps include: USGS "Boone, NC" quadrangle and site plans County: Watauga County, North Carolina Nearest Town or City: Town of Boone Specific Location: Along Boone Creek and floodplain just below the existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Road) at the ASU main entrance. ' ASU/Appalachian Convocation Center page - I - Supplemental 4011404 Application Information March 29, 1996 Item 6. Name of Closest Stream/River: Stream: Boone Creek Item 7. River Basin: New River Basin. Boone Creek feeds into Winkler Creek which discharges into the South Fork of the New River. Item 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS H? [YES] Stream Class: Class C - Trout, Special Waters, "+" NC DEM designation (information obtained from Mr. Ron Linville, Winston-Salem Regional DEM Office). Watershed: Project is not located within a State designated water-supply watershed. WS-II and WS-IV water-supply watersheds are located south and southeast of the project area, respectively. Item 9. Have any Section 404 permits been previously requested for use on this property? [YES] If yes, explain. ' Work along the Boone Creek channel associated with Phase 1 of the ASU Boiler Plant Facility (upstream of the Phase 2 Boiler Plant work and Convocation Center site) was determined to require a US Army COE Nationwide 26 permit. The NWP ' 26 for Phase 1 was requested in June 1995. The channel restoration work associated with Phase 2 of the Boiler Plant project will also require a NWP 26. The permit for the Phase 2 work was requested on February 26, 1996. ' It is not known if any Section 404 permits have been previously requested for use on the specific Convocation Center project site along Boone Creek, however. Item 10. Estimated total number of acres of waters of the US, including wetlands, located on project site: Approximately 0.31 acre of "waters of the US" located on the project site along Boone Creek. (See item 11 for more detail and discussion.) ' The US Army COE has determined (Mr. Steve Chapin, Asheville Field Office) that no wetlands exist on the proposed project site (reference is made to COE letter dated September 8, 1995, Action ID. 199504607, Pre-Application, and a project coordination meeting at ASU on February 22, 1996.) Therefore, a wetlands delineation will not be applicable to this project. ' ASU/Appalachian Convocation Center page - 2 - Supplemental 4011404 Application Information March 29, 1996 Item 11. Number of acres of waters of the US, including wetlands, impacted by the proposed project: Filled: *Approximately 0.31 acre Drained: not applicable Flooded: not applicable Excavated: not applicable Total Impacted: *Approximately 0.31 acre *Note: A culvert system of 800 linear feet (+/-) is proposed for Boone Creek to accommodate the planned NCDOT widening of US 321 and facilitate development of the Convocation Center. However, only 450 feet of the stream is currently in an open channel condition. A typical bank-to-bank top channel width for the existing open channel section is approximately 30 feet or less. The width of the ' ordinary high water level along the stream is also 30 feet or less. Also, no wetlands are located in the project area. ' Using these parameters for calculation of area, the estimate of total impact to "waters of the US" along Boone Creek is approximately 0.31 acre. This is determined from the 450 linear ft of existing open channel stream and the 30 ft maximum width of the ordinary high water level (450'x 30' = 13,500 sq ft; 13,500 sq ft / 43,560 sq ft per acre = 0.31 acre). This methodology for ' determining total area of impact to waters of the US is based upon discussions with Mr. Steve Chapin (US Army COE) and confirmed by Mr. John Dorney (NC DEM, Raleigh Central Office) in a telephone conversation with Scott Bryant ' (Ogden) February 19, 1996. Mr. Dorney further noted that if the impacted area is equal to or less than one-third of an acre, a written approval from DEM is not required for the project. ' Item 12. Description of Proposed Work: (See site plans attached) ' The proposed work involves the development of a multi-purpose Convocation Center facility at Appalachian State University. The planned NCDOT widening of US 321, in conjunction with site placement of the Convocation Center facility, ' requires that a 450 ft section of Boone Creek open channel be placed into a culvert system. Item 13. Purpose of Proposed Work: The "Appalachian Convocation Center" will serve as a multi-purpose place of assembly for university convocations, concerts, public speakers, various sports tournaments, training camps, family entertainment shows, conventions, trade association events and exhibits. This facility will serve the Town of Boone and the 1 region, in addition to the University. 1 ASU/Appalachian Convocation Center page - 3 - Supplemental 4011404 Application Information March 29, 1996 1 Approximately 27% of the Convocation Center's floor area is dedicated to academic program space for the ASU Health Leisure and Exercise Science department. The academic area will include faculty offices, classrooms, special instructional spaces, and research labs. Item 14. State reasons why the applicant believes this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. As noted above, the proposed activity does not involve any disturbance of wetlands. The project will involve the culverting of approximately 0.31 acre of "waters of the US" along Boone Creek. The impact to waters of the US will be minimal, however, because some of the stream is already in culvert. In order to successfully widen US 321 and develop the Convocation Center site, the proposed fill and culverting is necessary. The fill will place the site at an elevation above the 100-year base flood level to protect the building and adjacent facilities. Land use adjacent to the existing reach of Boone Creek open channel is typically urban and includes Blowing Rock Road (US 321), Boone commercial development, Rivers Street, some residential development, and University tennis courts. Therefore, the proposed fill and culverting of the site and stream will not significantly change the nature of the setting nor degrade existing uses. With regards to adjacent projects, ASU has prepared design plans to remove the approximate 960 ft run of culvert immediately upstream from the Convocation Center and restore this area with a "natural mountain stream" concept. The Boone Creek culvert that will be removed begins at Hardin Street near the ASU boiler facility and exits just below ASU Lackey Baseball Field in the proposed Convocation Center site area. As part of the Boone Creek restoration, Lackey Field will also be relocated to another part of the ASU campus. All of this described upstream work is associated with the ASU Phase 2 Boiler Plant Project and includes the realignment of Rivers Street with US 321 immediately upstream of the Convocation Center site. The 404 application for the Phase 2 work was submitted to the Corps of Engineers on February 26, 1996. In sum, the planned widening of US 321 and site placement of the Convocation Center will require the filling and culverting of approximately 0.31 acre or less of "waters of the US" along Boone Creek. With the constraints of these two projects, the proposed culverting is the only practical option for the stream. ' ASU/Appalachian Convocation Center page - 4 - Supplemental 401 /404 Application Information March 29, 1996 Items 15 and 16. Required Contacts: U. S. Fish and Wildlife Service (USFWS) Raleigh Field Office Contacted: Ms. Sonja Wilson via telephone call on February 6, 1996 ' Comments: U.S. Fish and Wildlife Service requested a copy of the Joint 401/404 application form. Upon receipt of a copy of the Joint form, they will reply. Ogden ' Environmental, on behalf of ASU, will forward a copy of this application to USFWS. National Marine Fisheries Service (NMFS) Habitat Conservation Division Contacted: Ms. Arlene Bossie via telephone call on February 6, 1996 ' Comments: The phone call satisfies the contact requirements. The office will receive a copy of the Joint form from the COE and/or DEM (one of the 7 copies required). ' State Historic Preservation Office (SHPO) N. C. Division of Archives and History Contacted: Ms. Renee Gladdhill-Erly via telephone call on February 6, 1996 ' Comments: One of the 7 copies goes to the SHPO for review. The phone call satisfies the contact requirement on the joint application form. Item 17. Additional information for NC DEM: A. No wetlands are located on the site. See provided site plans/maps for detail on location of Boone Creek (see Attachments 1 and 2). B. Photos of the project site are provided herein (see Attachment 3). C. N/A ' D. The schematic drawings included herein (see Attachment 2) show the proposed grading and drainage plan for the project. E. Land use of the surrounding property is urban development consisting of university and Boone commercial area. ' F. The Convocation Center development will tie-in to the local POTW for sanitary sewage disposal (see Attachment 2 for utility plan). ASUTAppalachian Convocation Center page - 5 - Supplemental 4011404 Application Information March 29, 1996 1 ATTACHMENT 1 USGS "BOONE,NC" QUADRANGLE SHOWING SITE AREA L', ~,? - _??' !.•:'? 1? ,?' ?' ?l ?? ?J ?v rte- ?•• ` . ?1 L, j+1-? "I '??- ?! `rte/ ,1//•' ?? }?? mil; 4P BM k 1 t !- .i \.. ' ?/ J????/? jj?. ??1\ ??j. • • -\. // _\- =,"?t1F1: GO ?• 3M MC \; \•. 1 :?•• ?•• ? SON! j , ',? ?"?' '\? 1 . :?• em /rI /. •?,. ^ \?' \ ?'' ? a? ` • ? ?" t. ? 1 ? ` .`may' L `\ ? ? ?'•?• ?{ ' ?-' and 'e He 'g s?? \ ?'adio! ' .'• ?,. Y ff/ Gr CY eR7 ?? '' \?•'?1' •\ 3220, e:.. ?,. •'' \ asp\a t+e Feac1 s 'r-z Ce 1 __Gzs- i ?_ ?-^ ' ? - :,.`'; ?'\. Jl, :, r? 1 c ' alb ?•,,I ? ? JpN ?j^ _ '• ' a Res! l• ?La_' •\ _ - ,I 1_•-. /'.? ?\ \-?,, ?.-\`?.\ 10. •HO Gaps' I ucw I . ?, ', Il \? sl becn? Yneat`e?v"„ ? " \ r-- Proposed Site for Convocation Center Project C? \ ? Fir t ' ? ? \• . \ \ S • ??'r-• M - _ - - =? _\? Es `? ` BM t nkte• a stz ' j / ?^_.?? . `? ??_ ? ? `^ `'-? +' 1 ' •','221 r _? Cie Gk ?/= - i-: _ b%' '• )/ _ l i-- _? ??.%??-' - --_ +??i ''/rte Gt Srh fi;Y Chy ,,?• ; 1f1-'a'Ef ?.? ?...-' /' ?•/ 'r `ate C 4a LWI `, ? ?, 1 ' 1' /?? ? `•' ??? : ( t t t.. ?I ? (. 1 t ? 0 . ?a ! ; ? '' /L " i-. 5 ?? _ ?. ? ,-_ '.r-? '?' 0 1 %-^?? i l \•- ' ? ISS\\ ? f ! / J)? l1 ?y? ?/ ? o° ? I ,. ?ri, i 1, ?./? -_ ` ?•?11? 1 C'_ ssf ?' ` j? -? ? :, ,-\ ?_ /?_/. ? ? !` •?,?' ? •? S \;?? '-?'` l !i'^??/ l?•rT/ J '•, ;; ; ?,? Jr/ , ?.''t ; ?!v J `t ( ';,•` . /?: • ; rte. ??;:. _ _ , /':,'_ 1 (? l 1 1! 1 •rs U ATTACHMENT 2 SITE PLANS , \ \ \ LEGEND - a1TU r 7X LDE MCE '.pa VjQ -- v. m Cr ?, LZ : rove LZ TE- M][ Ow tL ar. Vk7E uE Tuvsonu FOA31 ryc UfAT ME FINE rrrm? m IW7MY MM X <LE 0 Tavwc w*Qz 0 YrTR vc\[ r uw [T.MC v,LL -- r 1 ! rn I r r r! r ?\ \\ i 4 EXISTING CONDITIONS frb f 0 q b F, 3 e Pwilcr E loaN foanor ? Y,? t 0 { . SI mr S 6 Ob -r r r ? N:. rr? ?Y• •i ((((ggqq???? t is q > q /hy b?li? V VFr-?i' ?Qb} C!Z V r V ny f1nriplr i m hm Mwt C-1 0'°t RIVERS STREET F? CO.,,ST? 'FUTURE PA C,4 DEIVIC SJr°P RT BUZy ILVG (UNDER MTPARTOFTN6CAPITAL rr rr I? ENDS MT i1wTT i u c+¢ O an ? mna P ?., oG VliJ6 Q'JILP.Y[ n..nt w utt ¦ alrc u,n ?.??.?„ ?mn x ex iavc? UM)BRLXE ,J `y Y: N: Fy e Y ?Y6 x: q ?= 0 ?M r r 0 n o-m cn?6d SITE PLAN ?'°A` srm s 30 - ^oic B n..e .tarter orao.no, w portion or the proJxt C-'' site W11 ?lO W('.11}n the ? yOaf riooo?ldl2 n N f uW 1 5 N MATIC DESIGN SUBMITTALS ;?; '? URE PAR ati wort oL7,Pal? r2?'JSR a LEGEND: nrx yam roan u[ cunw --- ?.? ? w, on.*w i O O I,d. rrr C' ?p? ? M Yl, O .agt RM x t arC= 0 ?o 0 W r WW . 7 GRADING & DRAINAGE PLAN p na ? 1t711N of tln p oJact Attar oral ny, ro zoo •ns of I L's wl"m W 100 year Floodp ata .a o=? r r r s JAX e SmmgKTW tp 4AM C-3 i a f ! ,rd i cEN j ".yy UTILITY PLAN g ? i .. erxsr.eaa ? aei \ i NOM i After 9radirg no portion of the project elts mill Ile Wlthln the 100 r flooop akL i a SCHEMATIC DESIGN SUBMITTAL) N' x :; Op ? o F h 6?Vj w (?Fam ti? > qqQ ?Z U A y ;? U ?z a Qa men wr.a m tad 9tHE)"Tic UTIIIIY PULK e.t C-4 Oe4 LUN C 1? n u ATTACHMENT 3 PHOTOGRAPHS OF THE SITE u ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information Om March 29, 1996 Photo 1. Proposed site area showing ASU Lackey Baseball Field and tennis courts. Photo 2. Proposed site area showing ASU tennis courts and Rivers Street. ASU/Appalachian Convocation Center Supplemental 4011404 Application Information OW March 29, 1996 Photo 3. Looking downstream along Boone Creek open channel in proposed site area. Photo 4. Looking downstream at arch culvert under Rivers Street at US 321. Note ASU tennis courts adjacent to Boone Creek channel. I I I I I I I I I I I I L? I I 11 I I I APPALACHIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) ' Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 ' Prepared by: ' Ogden Environmental and Engineering Services One Center-view Drive, Suite 203 Greensboro, North Carolina 27407 I March 29, 1996 ? OGDENENVIRONMENTALANDEN6INEERINGSERVICES APPALACHIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 DEM ID: ACTION ID: Nationwide Permit Requested (Provide Nationwide Permit n): 26 JOINT FORM FOR Nation-Aide permits that require notification to the Corps of Engineers Nationwide permits that require application for Section 401 certification DIVISION OF ENVIRONMENTAL MAIVA-GEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES ENVIRONMENTAL SCIENCES BRANCH 4401 Reedy Creek Road Raleigh, N.C. 27607 ATTN: MR. JOHN DORNEY Telephone (919) 733-1786 WILMINGTON DISTRICT ENGINEER ' CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 1890 Wilmington, NC 28402-1890 ATTN: CESAW-CO-E Telephone (919) 251-4511 ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SEMI' TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO.THE N.C. DIVISION .OF ENVIRONT? IENTAL MANAGEMENrI7. PLEASE PRINT. 1. OwnersName: Appalachian State University, State of North Carolina 2. Owners Address: Apalachian State University, Boone, North Carolina 28608 3. Owners Phone Number (Home): N/A (Work): (704) 262-2000 (main number 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Dr. Clyde Robbins, Associate Vice Chancellor, Physical Operations Appalachian State University, 265 Dale Street, Boone, NC 28608 Office Phone Number: 704-262-4961 5. Location of work (MUST ATTACH MAP). Counry: Watauga Nearest Town or City: Town of Boone Specific Location (Include road numbers, landmarks, etc.): Along Boone Creek and f loodplain just below existing ASU Lackey Baseball Field and above the intersection of existinq Rivers Street and US 321 (Blowing Rock Rd) at the ASUmain entrance. 6. Name of Closest Stream/River: Boone Creek 7. River Basin: New River Basin 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? YES [J NO [?* 9. Have any Section 404 permits been previously requested for use on this property? YES [ A NO [ ] If yes, explain. NWP26 for Phase 1 Boiler Plant i Plant requested February 26 19 10. Estimated total number of acres of waters of the U.§., in June 1995; wetlands, located on project site: 0.31 acre of waters of the U.S. (Note: No wetlands located on project site.) ' 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: ' Filled: 0 31 acre Drained: N/A Flooded: N/A ' - Excavated. N/A Total Impacted: 0.31 acre * Classified as "trout" by NC DEM ' 12. Description of proposed work (Attach PLANS-8 1/2" X 11" drawings only): Fill and culvert installation for 450 ft. of existing Boone Creek open channel. 13. Purpose of proposed work: Accommodate NCDOT widening of US 321 and facilitate ' construction of the Appalachian Convocation Center multi-purpose facility. 14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures ' taken to minimize wetland impacts. No wetlands are impacted by the proposed project. (See attached supplemental information for more discussion on all items) 1S. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service ' (NMFS) regarding the presence or any Fede: elly listed or proposed for listing endangered or threatened species or critical habitat in the permit area that maybe affect: d by the proposed project. Have you done so? . YES [X) NO[ ) RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS. ' 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which may be of ected by the proposed project? Have you done so? YES [ X] NO[ ] ' RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS. 17. Additional information required by DEV:: A. Wetland delineation map showing all wetlands, streams, and lakes on the property. No wetlands. Attached maps show water feature, ' B. If available, representative photopaph of wetlands to be impacted by project. See attachment 3 C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the delineation line. N/A ' D. If a stormwater management plan is required for this project, attach copy. See attachment 2 E. What is land use of surrounding property? Urban development (ASU, Boone commercial area) ' F. If applicable, what is proposed method of sewage disposal?. Tie-in to POTW. 2 Owner's ignature Date L?- F- L SUPPLEMENTAL INFORMATION FOR JOINT 401/404 APPLICATION Project: Appalachian State University (ASU)/Appalachian Convocation Center Section 404 Nationwide Permit Requested: NWP #26 Section 401 General Water Quality Certification Requested: GC #2671 Application Information: Item 1. Owners Name: Appalachian State University, State of North Carolina Item 2. Owners Address: Appalachian State University, Boone, North Carolina (see item 4) Item 3. Owners Phone Number: Appalachian State University, Main Phone: 704-262-2000 (see item 4) Item 4. Owner Representative, Address, and Phone Number: Dr. Clyde Robbins Associate Vice Chancellor, Physical Operations Appalachian State University 265 Dale Street Boone, North Carolina 28608 Phone: 704-262-4961 Item 5. Location of work: (See maps and plans provided as Attachments 1 and 2) Maps include: USGS "Boone, NC" quadrangle and site plans County: Watauga County, North Carolina Nearest Town or City: Town of Boone Specific Location: Along Boone Creek and floodplain just below the existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Road) at the ASU main entrance. ' ASU/Appalachian Convocation Center page -I - Supplemental 4011404 Application Information 0M March 29, 1996 ' Item 6. Name of Closest Stream/River: Stream: Boone Creek Item 7. River Basin: ' New River Basin. Boone Creek feeds into Winkler Creek which discharges into the South Fork of the New River. ' Item 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? [YES] ' Stream Class: Class C - Trout, Special Waters, "+" NC DEM designation (information obtained from Mr. Ron Linville, Winston-Salem Regional DEM Office). ' Watershed: Project is not located within a State designated water-supply watershed. WS-II and WS-IV water-supply watersheds are located south and ' southeast of the project area, respectively. Item 9. Have any Section 404 permits been previously requested for use on this property? ' [YES] If yes, explain. Work along the Boone Creek channel associated with Phase 1 of the ASU Boiler Plant Facility (upstream of the Phase 2 Boiler Plant work and Convocation Center site) was determined to require a US Army COE Nationwide 26 permit. The NWP ' 26 for Phase 1 was requested in June 1995. The channel restoration work associated with Phase 2 of the Boiler Plant project will also require a NWP 26. The permit for the Phase 2 work was requested on February 26, 1996. ' It is not known if any Section 404 permits have been previously requested for use on the specific Convocation Center project site along Boone Creek, however. t Item 10. Estimated total number of acres of waters of the US, including wetlands, located on project site: Approximately 0.31 acre of "waters of the US" located on the project site along Boone Creek. (See item 11 for more detail and discussion.) ' The US Army COE has determined (Mr. Steve Chapin, Asheville Field Office) that no wetlands exist on the proposed project site (reference is made to COE letter dated September 8, 1995, Action ID. 199504607, Pre-Application, and a project coordination meeting at ASU on February 22, 1996.) Therefore, a wetlands delineation will not be applicable to this project. ' ASU/Appalachian Convocation Center page - 2 - Supplemental 4011404 Applicanon Information March 29, 1996 Item 11. Number of acres of waters of the US, including wetlands, impacted by the proposed project: ' Filled: *Approximately 0.31 acre Drained: not applicable Flooded: not applicable Excavated: not applicable Total Impacted: *Approximately 0.31 acre *Note: A culvert system of 800 linear feet (+/-) is proposed for Boone Creek to accommodate the planned NCDOT widening of US 321 and facilitate development of the Convocation Center. However, only 450 feet of the stream is currently in an open channel condition. A typical bank-to-bank top channel width for the existing open channel section is approximately 30 feet or less. The width of the I ordinary high water level along the stream is also 30 feet or less. Also, no wetlands are located in the project area. ' Using these parameters for calculation of area, the estimate of total impact to "waters of the US" along Boone Creek is approximately 0.31 acre. This is determined from the 450 linear ft of existing open channel stream and the 30 ft ' maximum width of the ordinary high water level (450' x 30' = 13,500 sq ft; 13,500 sq ft / 43,560 sq ft per acre = 0.31 acre). This methodology for determining total area of impact to waters of the US is based upon discussions with Mr. Steve Chapin (US Army COE) and confirmed by Mr. John Dorney (NC DEM, Raleigh Central Office) in a telephone conversation with Scott Bryant ' (Ogden) February 19, 1996. Mr. Dorney further noted that if the impacted area is equal to or less than one-third of an acre, a written approval from DEM is not required for the project. ' Item 12. Description of Proposed Work: (See site plans attached) ' The proposed work involves the development of a multi-purpose Convocation Center facility at Appalachian State University. The planned NCDOT widening of US 321, in conjunction with site placement of the Convocation Center facility, requires that a 450 ft section of Boone Creek open channel be placed into a culvert system. Item 13. Purpose of Proposed Work: The "Appalachian Convocation Center" will serve as a multi-purpose place of assembly for university convocations, concerts, public speakers, various sports tournaments, training camps, family entertainment shows, conventions, trade association events and exhibits. This facility will serve the Town of Boone and the region, in addition to the University. I ASU/Appalachian Convocation Censer page - 3 - Supplemental 4011404 Application Information March 29, 1996 Approximately 27% of the Convocation Center's floor area is dedicated to academic program space for the ASU Health Leisure and Exercise Science department. The academic area will include faculty offices, classrooms, special instructional spaces, and research labs. Item 14. State reasons why the applicant believes this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. As noted above, the proposed activity does not involve any disturbance of wetlands. The project will involve the culverting of approximately 0.31 acre of "waters of the US" along Boone Creek. The impact to waters of the US will be minimal, however, because some of the stream is already in culvert. In order to successfully widen US 321 and develop the Convocation Center site, the proposed fill and culverting is necessary. The fill will place the site at an elevation above the 100-year base flood level to protect the building and adjacent facilities. Land use adjacent to the existing reach of Boone Creek open channel is typically urban and includes Blowing Rock Road (US 321), Boone commercial development, Rivers Street, some residential development, and University tennis courts. Therefore, the proposed fill and culverting of the site and stream will not significantly change the nature of the setting nor degrade existing uses. With regards to adjacent projects, ASU has prepared design plans to remove the approximate 960 ft run of culvert immediately upstream from the Convocation Center and restore this area with a "natural mountain stream" concept. The Boone Creek culvert that will be removed begins at Hardin Street near the ASU boiler facility and exits just below ASU Lackey Baseball Field in the proposed Convocation Center site area. As part of the Boone Creek restoration, Lackey Field will also be relocated to another part of the ASU campus. All of this described upstream work is associated with the ASU Phase 2 Boiler Plant Project and includes the realignment of Rivers Street with US 321 immediately upstream of the Convocation Center site. The 404 application for the Phase 2 work was submitted to the Corps of Engineers on February 26, 1996. In sum, the planned widening of US 321 and site placement of the Convocation Center will require the filling and culverting of approximately 0.31 acre or less of "waters of the US" along Boone Creek. With the constraints of these two projects, the proposed culverting is the only practical option for the stream. ASU/Appalachian Convocation Center page - 4 - Supplemental 4011404 Application Information March 29, 1996 Items 15 and 16. Required Contacts: U. S. Fish and Wildlife Service (USFWS) Raleigh Field Office Contacted: Ms. Sonja Wilson via telephone call on February 6, 1996 ' Comments: U.S. Fish and Wildlife Service requested a copy of the Joint 401/404 application form. Upon receipt of a copy of the Joint form, they will reply. Ogden ' Environmental, on behalf of ASU, will forward a copy of this application to USFWS. National Marine Fisheries Service (NMFS) Habitat Conservation Division Contacted: Ms. Arlene Bossie via telephone call on February 6, 1996 Comments: The phone call satisfies the contact requirements. The office will receive a copy of the Joint form from the COE and/or DEM (one of the 7 copies required). ' State Historic Preservation Office (SHPO) N. C. Division of Archives and History Contacted: Ms. Renee Gladdhill-Erly via telephone call on February 6, 1996 ' Comments: One of the 7 copies goes to the SHPO for review. The phone call satisfies the contact requirement on the joint application form. Item 17. Additional information for NC DEM: ' A. No wetlands are located on the site. See provided site plans/maps for detail on location of Boone Creek (see Attachments 1 and 2). B. Photos of the project site are provided herein (see Attachment 3). C. N/A ' D. The schematic drawings included herein (see Attachment 2) show the proposed grading and drainage plan for the project. ' E. Land use of the surrounding property is urban development consisting of university and Boone commercial area. ' F. The Convocation Center development will tie-in to the local POTW for sanitary sewage disposal (see Attachment 2 for utility plan). ASU/Appalachian Convocation Center page - S - Supplemental 4011404 Application Information March 29, 1996 ATTACHMENT 1 I USGS "BOONE, NC" QUADRANGLE SHOWING SITE AREA -? and Obi \ •?^ BM N D 299. J n ,.t 1?%' ?'• / ?."r?? iii. ?;;^ ti? / _?\i ;"?=C]f1: , Q • \`' 3225.\ ) or .%w •? n ?? • •Y, i ' ss??;Y4 • (6 M i 67? ?i ':1 I i',' p , / t J !rr •?( ?4 ••?•=r • +- ?7?'Ly=' 1'` {366) . I } ?- y' I ;? •1 ? 1?• ,i ? Nc i and 'e e i jiadio - \ ???--" _ - ? • / • j•• 9 Tar. hirs O ; - !' ? „? (?1 ; • 10 ,C 4? c°-y `ti :r• ?' ? ? _ j • •``' ?, ? ?. N,, ? 12,fl •Ho Ga 6ccnf YAezte*v. r ; - Proposed Site for Convocation Center Project `' 6N_ SI,, Ink1E` e. Sit.//i.?• \ "~ I -.? '^ \ ?? - •????._' ?I _ _ ELI _,'/ c l, ``• _ w .mil `?-' ! ?_? - _ ? ? .?',-"??? ?_ _ '? I-- _--. • l7 '?Vt`1G1 _ •1:• •? \? \ F ?? "rte ---_ ? -v_ - i __ - _ ,:....':•.I'. 1 -- P( MqIJ 7 ? ?i 1 ??•U?eee ezy ??- ? ( ? +its ? em Ir .i i " ? ? yi?ahai? t?? s ?.?? ? _?+__:_- --:? ? s Ce --5- qtr-•r_? ? %ii "??` (..' ii . \ ?,?1 ?_'? •? .? 'r i??? .% s4 /- 4. \??\t •Ii-C'?i/ h?,. 'r'11 .'^???1 ?-?'??•-?? ?j' •1 ''I, • I ?? 1 ,'?"'' ??- -? + ?-- _?s? - ? ,? -?"_.. -r ____ ?- / its ?. I bp Sun i% .?\. C'J s. ? Y r C I !r •?/? i `I' r 1 ?' C8 ?? ?? ?.?- 1 ?• cam- ?- a+•' ?S , t L l}t? ? :??-Dec I - •? `? "1? ?, ?= + `t.' ? , _ /?%1'? 11 ? ?` r• ?(?F l ? +? _ ?1 r"? . ? I =?-"'"• •;'?t.? ?_v `' •+- •,'?.. rl ?j..?'', /'; 1 ',;>,?/ l?l ? psi, •/?? v;? t.+,;? ?? `•,,` ?_??. 'fQ .? ? ^?? SIZ/ 71 v ATTACHMENT 2 SITE PLANS \ LEGEND =a 3Ar ?- TATMA A fLMiYT nVu ow MR. SEVER LDC Mrm.M VIT[R LM c a. TTE-EAOW W ?. T[-OEliJC 64 Tiu6tCTd A'N u LTrwT r? Fmf MMIIR TMMTNT SEVER -.CLE tmv?QK -vat • VAT" VALVE 6TRCUC V.u t r r r r r r ? i r r r i \ r \ r \ s ` \ \ i \ \ t N\\ : w' 1 bMR , Y ??IVFFiii/// ? nr A ?Y S II?''r s iMAY y? C lop ? V, s, • Y J r. N:. i M6 lw rq ?F •? h ? ?D ? q dudp V u ?F z was Q XISTING CONDITIONS " C&I S a rrir.RTO ra \ ? I cmccncm o flo .. i "'aewr E .+»t p C-1 a d f t°a r SCHEMATIC DESIGN SUBMIT TALS .?„"" O? RIVERS STREET Cf??i?1C DL;7l ?'C !L:4DER w? LEGEND 61CJI Dot LSwEa ?'? YTYY IJSai Q .'.11 .2PJI CD q.Yrd r7. o ar rtt ¦ .wt w.s wn ??.?•? Mme n r<ano x P10TPARTOF / n PrTAL T dw 2 SITE PLAN D1 E do s 6 so PRO,= mum 3 within tha 100 LLaer fi Fr?4-IATIC ro por:lon of W prcJxt DF-51GN ShBMITTALA o: • Y QQ: U?6 x. 00 c? ?} 0 ?' ?qqQ ?Z U ?z bcwt NWNd SCHEMAMC sm .» PUN C-2 f s uim 1 roKt» "M an USM t D D FUTURE PAR MrPARTQF77SCAPTrAL -PRaocsE)BRMG-r' - RIVERS STREET, ,11 /8SIC44h! ?seweR% •. ?? ? ? ?` f,C.i7E.V.iC °UIL7: ?C (UNDER IMIV57.4GCT%QN% W? nmK n?® niom ut -_-- .m om? ? A AQ ?J q $ lI/CCN I?L?6i Oi flCy DJC. f1N0. lO n?r[r O rr ? ? xK'V? ra ', r N: 5:14 v p x: O, MWO ya U s a ?p 0 r •? r ?' QQq ?Z U L3 ?z GRADING Q m d DRAINAGE PLAN Ie UM ' ?+'^"•}•e/9 ? PLAN mcmar he w is 0 17 so NO" $ 'l After trading, no port!on of the pro'ect 3 C-3 vite wrl Ito wItHn the i00 Veer floodpleh. 3 v of ? iad l - a wo}n ?> rr SC1;=MAT(C DESIGN SUBMITTAL.. R? oa x.: y? Yp ? QQq d?dZ U 6!J' a" m baa SQEMUTC ?RVIR C-4 ens . .f 3 r.iw - OW dn. URN ATTACHMENT 3 PHOTOGRAPHS OF THE SITE 1 ' ASU/Appalachian Convocation Censer Supplemental 4011404 Application Information March 29, 1996 Photo 1. Proposed site area showing ASU Lackey Baseball Field and tennis courts. Photo 2. Proposed site area showing ASU tennis courts and Rivers Street. f' ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 3. Looking downstream along Boone Creek open channel in proposed site area. Photo 4. Looking downstream at arch culvert under Rivers Street at US 321. Note ASU tennis courts adjacent to Boone Creek channel. I I I I I I I I I I I I I I I I I I n ' APPAI.ACffiAN STATE UNIVERSITY ? Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) 1 r Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 ' Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 I OGDENENVIRONMENTAL AND ENGINEERING SERVICES APPALACII AN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 ' DEM ID: ACTION ID: t Nationwide Permit Requested (Provide Nationwide Permit #): 26 ' JOINT FORM FOR Nation-aide permits that require notification to the Corps of Engineers ' Nationwide permits that require application for Section 401 certification WILMINGTON DISTRICT ENGINEER DIVISION OF ENVIRONMENTAL MWA_GEMENT CORPS OF ENGINEERS NC DEPARTMENT OF ENVIRONMENT, HEALTH, ' DEPARTMENT OF THE ARMY AND NATURAL RESOURCES P.O.Box1890 ENVIRONMENTAL SCIENCES BRANCH Wilmington, NC 28402-1890 4401 Reedy Creek Road ATTN: CESAW-CO-E Raleigh, N.C. 27607 Telephone (919) 251-4511 ATTN: MR. JOHN DORNEY Telephone (919) 733-1786 ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO_THE N.C. DIVISION OF ENVIRONTNIE v'TAL MANAGEIviE:,7. PLEASE PRINT. 1. Owners Name: Appalachian State University, State of North Carolina ' 2. Owners Address: Apalachian State University, Boone, North Carolina 28608 ' 3. Owners Phone Number (Home): N/A (Work): (704) 7_ 6 2 - 2 0 0 0 (main number 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Dr. Clyde Robbins, Associate Vice Chancellor, Physical Overations Appalachian State University, 265 Dale Street, Boone, NC 28608 Office Phone Number: 704-262-4961 ' 5. Location of work (MUST ATTACH MAP). County: Watauga Nearest Town or City: Town of Boone Specific Location (Include road numbers, landmarks, etc.): Along Boone Creek and f loodtolain just below existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Rd) at the ASU train entrance. 6. Name of Closest Stream/River: Boone Creek 7. River Basin: New River Basin 8. Is this project located in a watershed classified as Trout, SA., HQW, ORW, WS I, or WS H? YES [x] NO [ ]* 9. Have any Section 404 permits been previously requested for use on this property? YES [4 NO [ ] Tr explain. NWP26 for Phase 1 Boiler Plant requested June 1995; NWP26 for Phase 2 Boiler Plar 10. Estimated total num guested February 26 1996. 0.31 acre acres of waters of the U.§., including wetlands, located on project site: of waters of the U.S. (Note: No wetlands located on project site.) ' 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: ' Filled: 0.31 acre Drained: N/A Flooded: N/A ' Excava N/A ted: Total Impacted: 0.31 acre * Classified as "trout" by NC DEM ' 12. Description of proposed work (Attach PLANS-8 1/2" X 11" drawings only): Fill and culvert installation for 450 ft. of existing Boone Creek open channel. 1 _ 13. Purpose of proposed work: Accommodate NCDOT widening of US 321 and facilitate construction of the Appalachian Convocation Center multi-purpose facility. 14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. No wetlands are impacted by the proposed prof ect. ' (See attached supplemental information for more discussion on all items) 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service ' (NMFS) regarding the presence or any Federally listed or proposed for listing endangered or thrzuned species or critical habitat in the pernvt area that may be affected by the proposed project. Have you done so? . YES [X] NO [ ] RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS. ?1 1 1 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which may be affected by the proposed project? Have you done so? YES [ X] NO [ ] RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS. 17. Additional information required by DEN:: A. Wetland delineation map shoring 211 wetlands, streams, and lakes on the property. No wetlands. Attached maps show water feature: B. If available, representative photop2ph of wetlands to be impacted by project. See attachment 3 C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the delineation line. N/A - D. If a stormwater management plan is required for this project, attach copy. See attachment 2 E. What is land use of surrounding property? Urban development (ASU. Roone commercial area) F. If applicable, what is proposed method of sewage disposal? Tie-in to POTW. a t o? AW, 2 «1 Owner's ignature Date SUPPLEMENTAL INFORMATION FOR JOINT 401/404 APPLICATION Project: Appalachian State University (ASUI/Appalachian Convocation Center Section 404 Nationwide Permit Requested: NWP #26 Section 401 General Water Quality Certification Requested: GC #2671 Application Information: Item 1. Owners Name: Appalachian State University, State of North Carolina Item 2. Owners Address: Appalachian State University, Boone, North Carolina (see item 4) Item 3. Owners Phone Number: Appalachian State University, Main Phone: 704-262-2000 (see item 4) Item 4. Owner Representative, Address, and Phone Number: Dr. Clyde Robbins Associate Vice Chancellor, Physical Operations Appalachian State University 265 Dale Street Boone, North Carolina 28608 Phone: 704-262-4961 Item 5. Location of work: (See maps and plans provided as Attachments 1 and 2) Maps include: USGS "Boone, NC" quadrangle and site plans County: Watauga County, North Carolina Nearest Town or City: Town of Boone Specific Location: Along Boone Creek and floodplain just below the existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Road) at the ASU main entrance. ' ASU/Appalachian Convocation Censer page - 1 - Supplemental 4011404 Application Information March 29, 1996 Item 6. Name of Closest Stream/River: ' Stream: Boone Creek Item 7. River Basin: ' New River Basin. Boone Creek feeds into Winkler Creek which discharges into the South Fork of the New River. ' Item 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS H? [YES] Stream Class: Class C - Trout, Special Waters, "+" NC DEM designation (information obtained from Mr. Ron Linville, Winston-Salem Regional DEM Office). ' Watershed: Project is not located within a State designated water-supply watershed. WS-II and WS-IV water-supply watersheds are located south and ' southeast of the project area, respectively. Item 9. Have any Section 404 permits been previously requested for use on this property? ' [YES] If yes, explain. Work along the Boone Creek channel associated with Phase 1 of the ASU Boiler ' Plant Facility (upstream of the Phase 2 Boiler Plant work and Convocation Center site) was determined to require a US Army COE Nationwide 26 permit. The NWP 26 for Phase 1 was requested in June 1995. The channel restoration work associated with Phase 2 of the Boiler Plant project will also require a NWP 26. The permit for the Phase 2 work was requested on February 26, 1996. It is not known if any Section 404 permits have been previously requested for use on the specific Convocation Center project site along Boone Creek, however. Item 10. Estimated total number of acres of waters of the US, including wetlands, located on project site: Approximately 0.31 acre of "waters of the US" located on the project site along Boone Creek. (See item 11 for more detail and discussion.) ' The US Army COE has determined (Mr. Steve Chapin, Asheville Field Office) that no wetlands exist on the proposed project site (reference is made to COE letter ' dated September 8, 1995, Action ID. 199504607, Pre-Application, and a project coordination meeting at ASU on February 22, 1996.) Therefore, a wetlands delineation will not be applicable to this project. ASU/Appolachian Convocation Censer page - 2 - Supplemental 4011404 Application Information March 29, 1996 Item 11. Number of acres of waters of the US, including wetlands, impacted by the proposed project: Filled: *Approximately 0.31 acre Drained: not applicable ' Flooded: not applicable Excavated: not applicable Total Impacted: *Approximately 0.31 acre *Note: A culvert system of 800 linear feet (+/-) is proposed for Boone Creek to accommodate the planned NCDOT widening of US 321 and facilitate development of the Convocation Center. However, only 450 feet of the stream is currently in an open channel condition. A typical bank-to-bank top channel width for the existing open channel section is approximately 30 feet or less. The width of the 1 ordinary high water level along the stream is also 30 feet or less. Also, no wetlands are located in the project area. t Using these parameters for calculation of area, the estimate of total impact to "waters of the US" along Boone Creek is approximately 0.31 acre. This is determined from the 450 linear ft of existing open channel stream and the 30 ft maximum width of the ordinary high water level (450' x 30' = 13,500 sq ft; 13,500 sq ft / 43,560 sq ft per acre = 0.31 acre). This methodology for determining total area of impact to waters of the US is based upon discussions with Mr. Steve Chapin (US Army COE) and confirmed by Mr. John Dorney (NC DEM, Raleigh Central Office) in a telephone conversation with Scott Bryant (Ogden) February 19, 1996. Mr. Dorney further noted that if the impacted area is equal to or less than one-third of an acre, a written approval from DEM is not required for the project. Item 12. Description of Proposed Work: (See site plans attached) The proposed work involves the development of a multi-purpose Convocation Center facility at Appalachian State University. The planned NCDOT widening of US 321, in conjunction with site placement of the Convocation Center facility, I requires that a 450 ft section of Boone Creek open channel be placed into a culvert system. Item 13. Purpose of Proposed Work: The "Appalachian Convocation Center" will serve as a multi-purpose place of assembly for university convocations, concerts, public speakers, various sports tournaments, training camps, family entertainment shows, conventions, trade association events and exhibits. This facility will serve the Town of Boone and the region, in addition to the University. FA ' ASU/Appalachian Convocation Center page - 3 - Supplemental 4011404 Application Information MH March 29, 1996 1 Approximately 27% of the Convocation Center's floor area is dedicated to academic program space for the ASU Health Leisure and Exercise Science department. The academic area will include faculty offices, classrooms, special instructional spaces, and research labs. Item 14. State reasons why the applicant believes this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. As noted above, the proposed activity does not involve any disturbance of wetlands. The project will involve the culverting of approximately 0.31 acre of "waters of the US" along Boone Creek. The impact to waters of the US will be minimal, however, because some of the stream is already in culvert. In order to successfully widen US 321 and develop the Convocation Center site, the proposed fill and culverting is necessary. The fill will place the site at an elevation above the 100-year base flood level to protect the building and adjacent facilities. Land use adjacent to the existing reach of Boone Creek open channel is typically urban and includes Blowing Rock Road (US 321), Boone commercial development, Rivers Street, some residential development, and University tennis courts. Therefore, the proposed fill and culverting of the site and stream will not significantly change the nature of the setting nor degrade existing uses. With regards to adjacent projects, ASU has prepared design plans to remove the approximate 960 ft run of culvert immediately upstream from the Convocation Center and restore this area with a "natural mountain stream" concept. The Boone Creek culvert that will be removed begins at Hardin Street near the ASU boiler facility and exits just below ASU Lackey Baseball Field in the proposed Convocation Center site area. As part of the Boone Creek restoration, Lackey Field will also be relocated to another part of the ASU campus. All of this described upstream work is associated with the ASU Phase 2 Boiler Plant Project and includes the realignment of Rivers Street with US 321 immediately upstream of the Convocation Center site. The 404 application for the Phase 2 work was submitted to the Corps of Engineers on February 26, 1996. In sum, the planned widening of US 321 and site placement of the Convocation Center will require the filling and culverting of approximately 0.31 acre or less of "waters of the US" along Boone Creek. With the constraints of these two projects, the proposed culverting is the only practical option for the stream. ' ASU/Appalachian Convocation Center page - 4 - Supplemoud 401/404Apphcation Information March 29, 1996 n Items 15 and 16. Required Contacts: U. S. Fish and Wildlife Service (USFWS) Raleigh Field Office Contacted: Ms. Sonja Wilson via telephone call on February 6, 1996 ' Comments: U.S. Fish and Wildlife Service requested a copy of the Joint 401/404 application form. Upon receipt of a copy of the Joint form, they will reply. Ogden ' Environmental, on behalf of ASU, will forward a copy of this application to USFWS. National Marine Fisheries Service (NMFS) Habitat Conservation Division Contacted: Ms. Arlene Bossie via telephone call on February 6, 1996 Comments: The phone call satisfies the contact requirements. The office will receive a copy of the Joint form from the COE and/or DEM (one of the 7 copies ' required). ' State Historic Preservation Office (SHPO) N. C. Division of Archives and History Contacted: Ms. Renee Gladdhill-Erly via telephone call on February 6, 1996 ' Comments: One of the 7 copies goes to the SHPO for review. The phone call satisfies the contact requirement on the joint application form. ' Item 17. Additional information for NC DEM: IA. No wetlands are located on the site. See provided site plans/maps for detail on location of Boone Creek (see Attachments 1 and 2). ' B. Photos of the project site are provided herein (see Attachment 3). C. N/A D. The schematic drawings included herein (see Attachment 2) show the proposed grading and drainage plan for the project. E. Land use of the surrounding property is urban development consisting of university and Boone commercial area. F. The Convocation Center development will tie-in to the local POTW for sanitary sewage disposal (see Attachment 2 for utility plan). ASU/Appalachian Convocation Center page - 5 - Su lemental 4011404 A lication Information Mar h 29 1996 pp pp c , ATTACHMENT 1 USGS "BOONS, NC" QUADRANGLE SHOWING SITE AREA L L? V\ •r....i ?. 1` ?/% ? ?;'; ?1 \ ii?;r:?• ? ??• .??' ?tl l 3225' •• • 'J? : r / •Yx, ? ? ?? \ Z C?ii r•??t? • w???i`?? ?.,` `=r ? (?J?`?? ???? \\ ?r? sss*?T? \ ,??/? 1-7 • J // / v? / • •2" '•? X66) , ? , ' u':I •:•, . ?,F '??' •?NI t ? i ? ?'\/= , i and 'e e g ? :. L ? 1.? '?'cadio `_??_ .?,`., • / ?. Gr J ` ?`/ I i1 i i ! ` ;': tlM A „w ? ?o I , vl. p ''1?'AT y? , a ?..? • • /r at err,__- 1' I - 3220 ?? :». ?? ,`\ ?• s? •?• i t e 7eaCh'crs >t?\Ce• \_ •-s:.. ?? \? __ it • : =-' ?''= '? - ? _ ? ?? ' ? ?-..' • ?•.\ Kes? `_ ? ?( ,r\ /III \' ???• ,?!,?? .r. /?,? - / _ I 4t.. t s n II : ?, i7an,bl 6con? Theate*v, HO ?? • Proposed Site for Convocation Center Pro ect \, - ?? appley `'? ???4 r ? ( •?i f`? ? ate. lC" /?/?•i ??. ?/ _}'\ ? _ ' ••' f : ^ \\ \ 2' nkl, - sta _ n, 6M_Z <b ./-`?•? = _ ?- ' . - ? ( -_ - __ _ N _ _ ;121. _, ? Ct?? Jr- -1mr-I cern rte, ( / ?• _' . .\ ? j i / ? e-?lY/ //,- ' `: ??.'?_?J _ '?. I•-,'ii ? /??r 11 ?A?%n?•%'•/• ?(I il!f '\` ?,. .'+J? - j)_y=?G - ?4/? ,.', J: 1???%?/(\\? ?i ?f`.????-?11 °•??J -??- ?'1!.?//???% %/./.' lC.. +r?'?/'-!r=te n ATTACHMENT 2 SITE PLANS LEGEN) - =C, 2A r -- = rTw. w YVT- SSVLR LIK SST" Y.L 1U mct '. V.TER LM ?R cx 'GAN L4 JRaI TC-EMx 1C r u ?. retnx un rR.aroea S9hi P= LIG T rl FM IMMT SWSNr SMI w.O.L VIt[R W:VC SIG. V KUL, a vK! -- L , SI nw ? A 4 a•: N:. :i .6 . 00, a > q Y ?F bay tlw6M '6 EXISTING CONDITIONS E m CONDUMNS f170 t C p b .' 7k $ Mnt p HocK,7 C 1 i C-l v d 7 lets SCHEMATIC DESIGN SUBMITTALS b" ` '°' xmm w? m 0 ?x ?b N R ? t ? f ? N: d?L F b En WINNE- W- moaw SITE PLAN D E ?C srrz auu r .ere PLAN Artr crao:ro, no portion of t7 prcjoct = C-2 atte W11 Ile elihln tte 100 year flcodpla!n e a ?a r I I"fATIC DESK-N 0 TEND: n0ac +am nvorc, u, - - - - atall ?,? .m onuni elsa O 13!/RS I1Ci AC In90. O mr rrt cotlo .p ? err o :JMK wA ?.?,?? 'M kK II ry is -?-? 0 w 4 Lcw+ua , :- 1 ?J GRADING & g - DRAINAGE PLAN { _`1 CAtef•aQ? t a o a a After oradug, no portion of the protect i &its uili lie wiwn the 100 year rloodpietn u 6C?7EMATIC DESIGN SUBMITTALi r: N:. :3 0-010000 IV ?> o h q ?ZV ?u h z n? acct-. M- SCMDAA= (RADM r.n PLAN C-3 d 1 Md 1 PI n6 101 00:. Ulifl 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 FUTURE PA MTPARTOF 77M CAPITAL I `. RIVERS mho _. wan uo noun ____ ane ?_ sw? otvroi i? Call Wi.Jl a na V..V a ? txmuu[ xuxt -W, Kq r a LM eagin 6{.M 011 IUI t LY F 23 nm x e tnxa ..--.-? A a ryuRl{¦? V t ? is t? a? ¦ x.: 00-r r q ?F 0 ? QQq ?ZV w O ? - x i UTILITY PLAN m goo so nlosr PLAN ?• ?. - NG M After greding no patron of the prc!sct C-4 *Ite Lull] Ile within the 120 r rloodplele. a ¦f 3 ta% ?„'? SCNEMATIC DESIGN SUBMITTAL. d.t. 0 0 u ATTACHMENT 3 PHOTOGRAPHS OF THE SITE u ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 1. Proposed site area showing ASU Lackey Baseball Field and tennis courts. Photo 2. Proposed site area showing ASU tennis courts and Rivers Street. 0 r L ' Photo 4. Looking downstream at arch culvert under Rivers Street at US 321. Note ASU tennis courts adjacent to Boone Creek channel. 1 ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 3. Looking downstream along Boone Creek open channel in proposed site area. 0 ' APPAI.ACffiAN STATE UNIVERSITY ? Boone, North Carolina Appalachian Convocation Center Project 1 Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) ' Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 ' Chapel Hill, North Carolina 27515 ' Prepared by: ' Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 I March 29, 1996 I OGDENENVIRONMENTAL AND ENGINEERING SERVICES APPALACHIAN STATE UNIVERSITY Boone, North Carolina Appalachian Convocation Center Project Joint Form Application for Section 404 Nationwide Permit (Nationwide Permit #26) Prepared for: Hakan Corley Redfoot Zack, Inc. Post Office Box 2368 Chapel Hill, North Carolina 27515 Prepared by: Ogden Environmental and Engineering Services One Centerview Drive, Suite 203 Greensboro, North Carolina 27407 March 29, 1996 DEM ID: ACTION ID: Nationwide Permit Requested (Provide Nationwide Permit #): 26 JOINT FORM FOR Nation-aide permits that require notification to the Corps of Engineers Nationwide permits that require application for Section 401 certification WILMINGTON DISTRICT ENGINEER CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 1890 Wilmington, NC 28402-1890 A=: CESAW-CO-E Telephone (919) 251-4511 DIVISION OF ENVIRONMENTAL MW--GEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES ENVIRONMENTAL SCIENCES BRANCH 4401 Reedy Creek Road Raleigh, N.C. 27607 ATTN: MR. JOHN DORNEY Telephone (919) 733-1786 ' ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGIAT-ERS. SEVEN (7) COPIES SHOULD BE SENT TO. THE N.C. DIVISION .OF ENVIRONTIN NTAL MANAGEMENT. PLEASE PRINT. 1 I I F 1. Owners Name: Appalachian State University, State of North Carolina 2. Owners Address: Apalachian State University, Boone, North Carolina 28608 3. Owners Phone Number (Home): N/A (Work): (704) 262-2000 (main number 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Dr. Clyde Robbins, Associate Vice Chancellor, Physical Operations Appalachian State University, 265 Dale Street, Boone, NC 28608 Office Phone Number: 704-262-4961 5. Location of work (MUST ATTACH MAP). County: Watauga Nearest Town or City Town of Boone Specific Location (Include road numbers, landmarks, etc.): Along Boone Creek and f loodDlain just below existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Rd) at the ASU main entrance. 6. Name of Closest StrearnlRiver: Boone Creek - 7. River Basin: New River Basin 8. Is this project locamd in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS H? YES [x] NO [ )* 9. Have any Section 404 permits been previously requested for use on this property? YES [)d NO [ I If yes, explain. NWP26 for Phase 1 Boiler Plant requested June 1995; NWP26 for Phase 2 Wile] ' Plant requested February 26 1996. 0.31 acre 10. Estimated total number of acres of waters of the U.§., including wetlands, located on project site: of waters of the U.S. (Note: No wetlands located on project site.) 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: Filled: 0.31 acre Drained: N/A Flooded: N/A N/A Excavated: Total Impacted: 0.31 acre * Classified as "trout" by NC DEM ' 12. Description of proposed work (Attach PLANS-8 1/2" X 11" drawings onlv): Fill and culvert installation for 450 ft. of existing Boone Creek open channel. 13. Purpose of proposed work: Accommodate NCDOT widening of US 321 and facilitate ' construction of the Appalachian Convocation Center multi-purpose facility. 14. State reasons why the applicant believes that this activity must be carved out in wetlands. Also, note measures taken to minimize wetland impacts. No wetlands are impacted by the proposed project. ' (Sde attached supplemental information for more discussion on all items) 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National ?.urine Fisheries Service ' (NMFS) regarding the presence or any Fede. ally listed or proposed for listing endangered or threatened species or critical habitat in the permit area that may be afect:d by the proposed project. Have you done so? . YES [X) NO[ ] RESPONSES FROM THE USFWS AND/OR NNIFS SHOULD BE FORWARDED TO CORPS. 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which may be affected by the proposed project? Have you done so? YES [ X] NO[ ] RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS. ' 17. Additional information required by DEN1: wetlands. Attached A. Wetland delineation map showing all wetlands, streams, and lakes on the property. ' B. If available, representative photograph of wetlands to be impacted by projec maps show water feature; t. See attachment 3 C. If delineation was performed by a consultant, include all data sheets relevant to the plzcement of the delineation line. N/A ' D. If a stormwater management plan is required for this project, attach copy. See attachment 2 E. What is land use of surrounding property? Urban develotxnent (ASU. Boone cc mlercial areal ' F. If applicable, what is proposed method of sewage disposal?. Tie-in to PQTW. Owners ignatvre Date ?I? SUPPLEMENTAL INFORMATION FOR JOINT 401/404 APPLICATION Project: Appalachian State University (ASU)/Appalachian Convocation Center Section 404 Nationwide Permit Requested: NWP #26 Section 401 General Water Quality Certification Requested: GC #2671 Application Information: Item 1. Owners Name: Appalachian State University, State of North Carolina Item 2. Owners Address: Appalachian State University, Boone, North Carolina (see item 4) Item 3. Owners Phone Number: Appalachian State University, Main Phone: 704-262-2000 (see item 4) Item 4. Owner Representative, Address, and Phone Number: Dr. Clyde Robbins Associate Vice Chancellor, Physical Operations Appalachian State University 265 Dale Street Boone, North Carolina 28608 Phone: 704-262-4961 Item 5. Location of work: (See maps and plans provided as Attachments 1 and 2) Maps include: USGS "Boone, NC" quadrangle and site plans County: Watauga County, North Carolina Nearest Town or City: Town of Boone Specific Location: Along Boone Creek and floodplain just below the existing ASU Lackey Baseball Field and above the intersection of existing Rivers Street and US 321 (Blowing Rock Road) at the ASU main entrance. ' ASU/Appalachian Convocation Center page - 1 - Supplemental 4011404 Application Information 0M March 29, 1996 Item 6. Name of Closest Stream/River: Stream: Boone Creek Item 7. River Basin: New River Basin. Boone Creek feeds into Winkler Creek which discharges into the South Fork of the New River. ' Item 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? [YES] Stream Class: Class C - Trout, Special Waters, "+" NC DEM designation (information obtained from Mr. Ron Linville, Winston-Salem Regional DEM Office). Watershed: Project is not located within a State designated water-supply watershed. WS-II and WS-IV water-supply watersheds are located south and ' southeast of the project area, respectively. Item 9. Have any Section 404 permits been previously requested for use on this property? ' [YES] If yes, explain. Work along the Boone Creek channel associated with Phase 1 of the ASU Boiler Plant Facility (upstream of the Phase 2 Boiler Plant work and Convocation Center site) was determined to require a US Army COE Nationwide 26 permit. The NWP ' 26 for Phase 1 was requested in June 1995. The channel restoration work associated with Phase 2 of the Boiler Plant project will also require a NWP 26. The permit for the Phase 2 work was requested on February 26, 1996. It is not known if any Section 404 permits have been previously requested for use on the specific Convocation Center project site along Boone Creek, however. Item 10. Estimated total number of acres of waters of the US, including wetlands, located on project site: ' Approximately 0.31 acre of "waters of the US" located on the project site along Boone Creek. (See item 11 for more detail and discussion.) The US Army COE has determined (Mr. Steve Chapin, Asheville Field Office) that no wetlands exist on the proposed project site (reference is made to COE letter dated September 8, 1995, Action ID. 199504607, Pre-Application, and a project coordination meeting at ASU on February 22, 1996.) Therefore, a wetlands delineation will not be applicable to this project. ' ASU/Appalachian Convocation Ce&er page - 2 - Supplemaual401/404Apphcanon Information March 29, 1996 r Item 11. Number of acres of waters of the US, including wetlands, impacted by the proposed project: ' Filled: *Approximately 0.31 acre Drained: not applicable Flooded: not applicable Excavated: not applicable Total Impacted: *Approximately 0.31 acre *Note: A culvert system of 800 linear feet (+/-) is proposed for Boone Creek to accommodate the planned NCDOT widening of US 321 and facilitate development of the Convocation Center. However, only 450 feet of the stream is currently in an open channel condition. A typical bank-to-bank top channel width for the existing open channel section is approximately 30 feet or less. The width of the ' ordinary high water level along the stream is also 30 feet or less. Also, no wetlands are located in the project area. ' Using these parameters for calculation of area, the estimate of total impact to "waters of the US" along Boone Creek is approximately 0.31 acre. This is determined from the 450 linear ft of existing open channel stream and the 30 ft maximum width of the ordinary high water level (450'x 30' = 13,500 sq ft; 13,500 sq ft / 43,560 sq ft per acre = 0.31 acre). This methodology for determining total area of impact to waters of the US is based upon discussions with Mr. Steve Chapin (US Army COE) and confirmed by Mr. John Dorney (NC DEM, Raleigh Central Office) in a telephone conversation with Scott Bryant (Ogden) February 19, 1996. Mr. Dorney further noted that if the impacted area is equal to or less than one-third of an acre, a written approval from DEM is not required for the project. Item 12. Description of Proposed Work: (See site plans attached) 1 The proposed work involves the development of a multi-purpose Convocation Center facility at Appalachian State University. The planned NCDOT widening of US 321, in conjunction with site placement of the Convocation Center facility, requires that a 450 ft section of Boone Creek open channel be placed into a culvert system. ' Item 13. Purpose of Proposed Work: The "Appalachian Convocation Center" will serve as a multi-purpose place of ' assembly for university convocations, concerts, public speakers, various sports tournaments, training camps, family entertainment shows, conventions, trade association events and exhibits. This facility will serve the Town of Boone and the 1 region, in addition to the University. ASU/Appalachian Convocation Center page - 3 - Supplemental 4011404 Application Information March 29, 1996 1 Approximately 27% of the Convocation Center's floor area is dedicated to academic program space for the ASU Health Leisure and Exercise Science department. The academic area will include faculty offices, classrooms, special instructional spaces, and research labs. Item 14. State reasons why the applicant believes this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. As noted above, the proposed activity does not involve any disturbance of wetlands. The project will involve the culverting of approximately 0.31 acre of "waters of the US" along Boone Creek. The impact to waters of the US will be minimal, however, because some of the stream is already in culvert. In order to successfully widen US 321 and develop the Convocation Center site, the proposed fill and culverting is necessary. The fill will place the site at an elevation above the 100-year base flood level to protect the building and adjacent facilities. Land use adjacent to the existing reach of Boone Creek open channel is typically urban and includes Blowing Rock Road (US 321), Boone commercial development, Rivers Street, some residential development, and University tennis courts. Therefore, the proposed fill and culverting of the site and stream will not significantly change the nature of the setting nor degrade existing uses. With regards to adjacent projects, ASU has prepared design plans to remove the approximate 960 ft run of culvert immediately upstream from the Convocation Center and restore this area with a "natural mountain stream" concept. The Boone Creek culvert that will be removed begins at Hardin Street near the ASU boiler facility and exits just below ASU Lackey Baseball Field in the proposed Convocation Center site area. As part of the Boone Creek restoration, Lackey Field will also be relocated to another part of the ASU campus. All of this described upstream work is associated with the ASU Phase 2 Boiler Plant Project and includes the realignment of Rivers Street with US 321 immediately upstream of the Convocation Center site. The 404 application for the Phase 2 work was submitted to the Corps of Engineers on February 26, 1996. In sum, the planned widening of US 321 and site placement of the Convocation Center will require the filling and culverting of approximately 0.31 acre or less of "waters of the US" along Boone Creek. With the constraints of these two projects, the proposed culverting is the only practical option for the stream. ' ASU/Appalachian Convocation Center page - 4 - Supplemental 401 /404 Application Information March 29, 1996 Items 15 and 16. Required Contacts: ' U. S. Fish and Wildlife Service (USFWS) Raleigh Field Office Contacted: Ms. Sonja Wilson via telephone call on February 6, 1996 ' Comments: U.S. Fish and Wildlife Service requested a copy of the Joint 401/404 application form. Upon receipt of a copy of the Joint form, they will reply. Ogden Environmental, on behalf of ASU, will forward a copy of this application to USFWS. ' National Marine Fisheries Service (NMFS) Habitat Conservation Division Contacted: Ms. Arlene Bossie via telephone call on February 6, 1996 Comments: The phone call satisfies the contact requirements. The office will receive a copy of the Joint form from the COE and/or DEM (one of the 7 copies ' required). ' State Historic Preservation Office (SHPO) N. C. Division of Archives and History Contacted: Ms. Renee Gladdhill-Erly via telephone call on February 6, 1996 Comments: One of the 7 copies goes to the SHPO for review. The phone call satisfies the contact requirement on the joint application form. Item 17. Additional information for NC DEM: ' A. No wetlands are located on the site. See provided site plans/maps for detail on location of Boone Creek (see Attachments 1 and 2). ' B. Photos of the project site are provided herein (see Attachment 3). C. N/A ' D. The schematic drawings included herein (see Attachment 2) show the proposed grading and drainage plan for the project. E. Land use of the surrounding property is urban development consisting of university and Boone commercial area. F. The Convocation Center development will tie-in to the local POTW for sanitary sewage disposal (see Attachment 2 for utility plan). ' ASU/Appalachian Convocation Center page - 5 - Supplemental 4011404 Application Information om March 29. 1996 ATTACHMENT I USGS "BOONE,NC" QUADRANGLE SHOWING SITE AREA u - --- and Ob , `' r, ? . u eye -/•. / ?,??t-:'-f ?, % ?%r,?- '',,.-r-?-f. ? ? J"'•.? ?? _ ,? !,: ?- I? BOO;fij4F `.BM 5 .=•Ct r 2 rD ; 299. ? , ?I . ; ^t 1 ;. ,? i ??? 1^ ?' \?\, , , 1, 1 { • `? /?? , J ??s ? ^ '?.; _ .,? ?' 1, . ' OOP! ?? •t , •?•\ ?? • !T ! . \ r. {3265) i 1 ?' I 1 t? ?1/ ' f rte. >?.?,' ?4 ? ? _ •? ? 'J?(•. \ ? ?,?, ? ? ;? = and 'e L 1 adio' • , ?. ; •' i \ °? ? \\?/e/g ?o • ti4RT ~-\ \: ?.._ /mar aF e?-??` ? \ `, t \ S""xc0`?? c... ??•r \ asp - __ Tashi t e 7l?ch rs / 1!'!; -.. ce- ?ri as- •'? ??_ - \ Q ice. : -: J ?? ?.'\?` ' ?? ••? ' / . -? / \ ?\ I . la, 'Ho \C! %j6ft: 0 C11 (heaterY 1 _ ?a Proposed Site for Convocation Center Project ;z? ?' ? [mot- \ • ?/? ? •? ?. M \ EM Z-4 ;0 ClcE ????- ' f ? J? ' % ? ? ??? Vii' ?_` - _?r •`?1 `? ... •:\? __ 4-? I:.'r?' • ,. , 7,m G4eh%ar eh I Ile Lark la- • , l'?-' ? ' ? ? i r• ? _. `.,? -? ?? .C7T ? yam---- le A o ms cem ?r? j /? j ?" • ?l l ?/ 17 /?rr. J i?? ? ?>? f ( v `'I'mo it L' '? r T jj •?%/ ? tI ri,1 ^/ -s'd • t.J% ' 1 J ? i // I I / ?? ? -?^? ? J. '; r ?`?' ?- ?( `/ %? \ ? `?L• ? // 't• 1:'/J?){ \?yic '!? o° t,1. (.7 r/? '/% ( ?? i/ ,(? iY/_? ,Ir_ ???^ 1i i?% 1f • / 'ic ?? ? ? / ? G •1 SDrjQiZ-6e-'-?z.-.?' 3? Fci ec 1?!'rl•?' ;,- _?.?,?•' 1i` %? ?'?_:`_ All ?,lv1 (?l'/ f !?I 'r. •/')! _• _ J/ y/` e ; t ATTACHMENT 2 SITE PLANS i i LEGEND Sir]A r ?- =T3A W SA T- SEVD LIK Sr7M SEWER LDC W? oc WATER oc TAR C. .?R 1GVl 1:L RAOC Gli .?. rEA7f 44 MANSMAC7 q ro+w nu L T r..E IME -t T SASTAR, $EKE xwOE Q TnxpKSC -*CLE 0 WATER VA.VE ?RICO, TREE S ? ) NiCR ? Y S Y N:. :i °i x:: 0 >q ?a G u F 3 g Oem pN<bC EXISTING CONDITIONS si RIM COICnImm \?f- CIIDf•RV t ffR - aR o yE g!F .r.r u d 7 Lotol t SCHEMATIC DESIGN SUBMITTAL] a? ?,?` O, RIVERS STREET ::CPLc,'?1C 5i;P.OPT BL'Si?C !L.`DER 6 I D FUTURE P Mr PART OF THE CWAQPJrTAL 5 ?06, ?BROW 1 11 / 1% LEGEND gtxc nggT VC Mvsc ---- Lglk, "T cn.mr -? W"? ue.c 0 cw ? ara q ? 11I t?A/ q Q twLRY[ CD RLICI . o qq .it rwnt uar wn nM 1C R RKO ?.?.?.? D J, fill .rte 0 p7t Y ?x x 0 b Tj) N N: ?.i woo c? a q ?r G ?M r r ?Z r r ?`ygz a d MEW S F acm qdH SCHM"nC SITE PLAN D E srm arxer.rv ? PLAN !U 71 -1 6 30 k ,Char oraoiro, no portlon or tra prcje t 3 C-(. dta atl lid el•.Km g Io9 tear riooopla'n g a totd t r. N MATIC DESIGN SUBMITTALS p- 5 au 1IAx D- FUTURE PAR WT PART OF T H6 CAPITAL II -PROPMEDMUDGE / RIVERS STREET II S&EM AC .?EV/C' PGI?; \'C• \ I (C'1JER ! I 'END nn.c nveao wvo,n ut -_-- a+rar sa nev.nu i10i uua Q a . ? t+.+.J a v usrc°r o o rmu .x r= ?°? a aw vu, O ?¢ 10iQ ------------ rieKi.af !Ra A [ tYCO ?- N:. zz v 7 r ° i I I I I I I n- ^ i j,. GRADING & g - DRAINAGE PLAN / n o NOM 6 AFter grading, no portion of the pro;aCt alta will Ita witHn the 100 yser FloodplaNt SC?;rMATIC DE51GN 5U5MITTALI > q a r t? ? q ?z r ?a x H ..,ter C5or Im tax 9(IMdA= ORADM e,.rr P[APf C-3 N s we V.Ja m Ias 4e. saw t C sa•w _ r•orar we .,prom - - - - _ _ asoa ? •rr acw.na 6? --- ee.. mna a n•[ %A.Al a W srosc.r[ ns1li .rant CtY•6 WR ? •? ---- ------ ntri o.rt RW r.sK ? r1q -T Crr F . trfo•o I]s fIM R t r1R1m •--•--rH RIT 'i a_a x.: got III o 000 00 wr ,pvr W vp 00 c? F ?Y O UZ S m a u Q TY PLAN a TIC ?0 p TNOp? ? IIM •lurt on of the projsot C-4 .'? r rloooolah. i tl a 7 sad - `DESIGN SU31"IITTALj UTILITY PLAN - g ? / ' 10 1 0 O p IK1[R NOM v, After grading, no portion of the project *Ito mill Ile Within the im Vear rloodpialn. e SCHEMATIC DESIGN SUBMITTALI :j v? ¦ n? 00 vp 00 >q hh a C7 z V u ?i {?`'' p, 2goS 4- d.er Im W S(?dA1SC ITTU== M? PLAN C-4 NI t" P10f1t1 M I01 W low ATTACHMENT 3 PHOTOGRAPHS OF THE SITE n ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information MH March 29, 1996 Photo 1. Proposed site area showing ASU Lackey Baseball Field and tennis courts. Photo 2. Proposed site area showing ASU tennis courts and Rivers Street. ' ASU/Appalachian Convocation Center Supplemental 4011404 Application Information March 29, 1996 Photo 3. Looking downstream along Boone Creek open channel in proposed site area. Photo 4. Looking downstream at arch culvert under Rivers Street at US 321. Note ASU tennis courts adjacent to Boone Creek channel. 1 C