HomeMy WebLinkAbout20180765 Ver 3_DWR Agency Response Letter_20190917Staff Review
Does this application have all the attachments needed to accept it into the review process?
r Yes r No
ID#* Version* 3
20180765
Is this project a public transportation project?* r Yes
r No
Reviewer List:* Sue Homewood:eads\slhomevtood
Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800
Submittal Type:*
Application Attachments
Does this project require a request for payment to be sent?*
r
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: r New Project
r Pre -Application Submittal
r More Information Response
r Other Agency Comments
r For the Record Only (Courtesy Copy)
r Stream or Buffer Appeal
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an existing project.
Is this supplemental information that needs to be sent to the Corps?*
r Yes r No
Project Contact Information
Name: Anna Priest
Who is subrritting the inforrration?
Email Address: anna@cwenv.com
Project Information
Existing ID #: Existing Version:
20180765 3
20170001 (no dashes)
Project Name: High Hampton Redevelopment
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Jackson
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docurrent
918 DWR Agency Response Letter.pdf 3.36MB
Only pdf or IOTz files are accepted.
Describe the attachments:
V By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the online form."
Signature:
K-iAfCl {2410
Submittal Date: Is filled in automatically.
CLearWater
C1earWater Environmental Consultants, Inc.
www.cwenv corn
September 17, 2019
Karen Higgins
NC DEQ, Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
RE: High Hampton Redevelopment
DWR # 20180765 Ver 3
Jackson County, North Carolina
Ms. Higgins,
Please reference the Ietter dated August 15, 2019 sent by the NC Division of Water
Resources (DWR) in response to the permit application submitted by C1earWater
Environmental Consultants, Inc. (CEC), on behalf of Daniel Communities. The permit
application requested authorization for the impacts associated with the High Hampton
Redevelopment Plan. The comments provided by the DWR in response to this plan are
listed and discussed below.
NC Division of Water Resources comments:
1. The review of the project cannot be completed until the Public Comment period has
closed and the Division can review any comments received. If the U.S. Army Corps of
Engineers requests a response to any comments received as a result of the Public
Notice, please provide the Division with a copy of your response to the USA CE. [15A
NCAC 02H. 05 02 (c)]
The public comment period closed August 19, 2019. All responses to comments
received from the U.S. Army Corps of Engineers will be also be provided to the
Division of Water Resources.
2. The culvert that was installed at After -the -Fact stream impact #14 is perched at the
outlet and therefore it does not meet the requirement to provide for low flow passage
of aquatic life. Please provide a remediation plan for this culvert location which will
support aquatic passage. [ISA NCAC 02H .0506(b)(2)]
Please find the attached Figures — UT2 Enhancement Plan & Profile and Details
(Attachment A) which proposes the installation of boulders steps to create step pools
to correct the perched culvert shown in the attached photographs located at stream
32 Clayton Street
Asheville, NC 28801
828-698-9800 Tel
DWR # 20180765 Ver 3
September 17, 2019
Page 2 of 4
impact #14. This work will be conducted outside of the trout moratorium (April 15
October 15).
Thank you for reviewing the responses to agency comments above. Should you have any
questions or comments concerning this project please do not hesitate to contact me at
828-698-9800.
Sincerely,
i G
Anna Priest, P.W.S. R. Clement Riddle, P.W.S
Project Manager Principal
Attachments:
Attachment A — Figures — UT2 Enhancement Plan & Profile and Details
Attachment B — Representative Photographs
Copy Furnished:
NC Division of Water Resources, Asheville Regional Office — Kevin Mitchell
NC Division of Water Resources, Winston-Salem Office — Sue Homewood
100
I,-
90
0+00
UT2 PROFILE DOWNSTREAM OF NORTH CULVERT
SET TOP OF BOULDER STEP 9"
/ BELOW INVERT OF CULVERT
----c'-----,__c_ -----·--
0+30 0+60 0+90 1+20 1+50
100
--90
1+80
SCALES:
H: 1" = 40'
V: 1" = 10'
ELEVATIONS BASED ON
ARBITRARY DATUM OF 100.0'
Cl) (.) 0::: 0.... w c5
�� s ffi 0 UJ <( � w C, I dJ
0.... 0.... 4:
w
0
0....
0
w 0
DATE: MARCH 2019
SCALE: AS SHOWN
(f)
(f) > w 0::::
UT2
ENHANCEMENT
PLAN & PROFILE
SHEET 1 OF 2
TOP OF BANK
[ NON-WOVEN SILT BAG
MATTING PLACED FLUSH WITH BANK SURFACE, LAP
OVER DOWN STREAM / DOWN SLOPE SEAMS
12" WOOD STAKE PLACED IN
3' O.C. DIAMOND PATTERN
1--= �9�•------l
1 O' MIN. FROM STREAM
CLASS B STONE�
NOTES:
REMOVE ALL DEBRIS,
SCARIFY SURFACE, PLACE
TOPSOIL AND SEED/MULCH
BEFORE PLACING MATTING
MATTING ANCHORED 1'
BELOW STREAM BED I
COFFER DAM; CLASS B STONE OR
ON-SITE COBBLE W/ PLASTIC SHEETING
1.MATTING SHALL BE 780 G/M2 COIR.EROSION CONTROL MATTING 2.SEED BANKS WITH RYE GRAIN AND 1----+---------------
1' DEEP
SETTLING POOL
NATIVE RIPARIAN MIX, AND COVER NTS WITH WHEAT OR OAT STRAW MULCH
BEFORE INSTALLING MATTING.
FLOW
TOE OF BANK (TYP)•-�-l TOP OF BANK (TYP)
I
\
ANCHOR NON-WOVEN FILTER
FABRIC ON UPSTREAM SIDE OF
BOULDERS AND BACKFILL WITH
ON-SITE COBBL E AND GRAVEL
DIVERSION PUMP
SIZED FOR 150% OF
BASE FLOW
OR PALLET SILT BAG
DEWATERING PUMP
�
SILT BAG ON PALLET OR
[ AS NEEDED STONE, SEE DETAIL
ABOVE
X
c:
ORK AL�
TOE OF BANK (TYP)
TOP OF BANK (TYP)
PROTECT EXIST.� C BANK VEGETATION_)
FOR ADD'L FILTER
ON-SITE COBBLE
SPLASH PAD
RIFFLE TYPICAL SECTION
ANCHOR 4' INTO BANK
VARIES; D/S DAM MAY NOT BE NEEDED--+->--------------
*NOTE:
ELEV. AT TIE -IN
APPROX. 1' HIGHER
THAN INVERT ELEV.
NOTES:
PLAN
1.BOULDERS SHALL BE DURABLE STONE,
MIN. 2'X3'X3' AND RELATIVELY FLAT.
2.DIMENSIONS AND NUMBER OF
BOULDERS MAY BE ADJUSTED BASED ON
FIELD CONDITIONS.
POOL TYPICAL SECTION
BOULDER STEP
NTS
FLOW �
10"
HOPE SHEETING WITH 6" OF
ON-SITE COBBLE OVERLAY;
USE SAND BAGS AT BASE
AS NECESSARY
PROFILE
WORK AREA SHALL BE STABILIZED BY
THE END OF EACH WORK DAY.
TOP OF BANK --=::I BANK TO BANK r=-
MAX DEPTH STREAM BOTTOM
SECTION
COFFER DAM
PUMP-AROUND SCHEMATIC
NTS
Cl) (.) 0::: 0.... w c5
�� s ffi 0 UJ <( � w C, I dJ
0.... 0.... 4:
w
0
0....
Cl'.:
w 0
DATE: MARCH 2019
SCALE: AS SHOWN
DETAILS
SHEET 2 OF 2
(f)
(f) > w 0::::
Representative Photographs
Perched Culvert – Stream Impact #14
High Hampton Redevelopment Project
Photo 1. View of perched culvert located at stream impact #14.
Photo 2. Additional view of perched culvert.