HomeMy WebLinkAboutNCG210376_COMPLETE FILE - HISTORICAL_20181130STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT N0.
/V 0 ,37
DOC TYPE
Vk HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑ 0019 I 1 -3
YYYYMMDD
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
WILLIAM E, (TOBY) VINSON, JR.
Interim Director
Oldcastle Lawn and Garden - South Atlantic
Attn: Ted Carter, Assistant Plant Manager
107 Reservation Road
Aberdeen, NC 28315
NORTH CAROLINA
Environmental Quality
November 30, 2018
Subject: COMPLIANCE EVALUATION INSPECTION
NPDES Stormwater General Permit NCG210000
Oldcastle Lawn and Garden - South Atlantic
Oldcastle Lawn and Garden - Aberdeen Division, Certificate of Coverage NCG210376
Hoke County
Dear Mr. Carter:
On November 16, 2018, a site inspection was conducted for the Oldcastle Lawn and Garden - Aberdeen
Division facility located at 107 Reservation Road, Hoke County, North Carolina. A copy of the Compliance
Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is
covered by NPDES Stormwater General Permit NCG210000 under Certificate of Coverage NCG210376. Permit
coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Quewhiffle
Creek, a Class C waterbody in the Lumber River Basin.
As a result of the inspection, the facility'was found to be in compliance with the conditions of the NCG210000
permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations
made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty
assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments,
or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3384 or by e-
mail at melissa.joyner®ncdenr.gov.
Sincerely, .
Melissa Joyner
Environmental Specialist
DEMLR
Enclosure: Compliance Evaluation Inspection
cc: FRO — DEMLR, Stormwater Files-NCG210000
E��� North Carolina Department of Environmental Quality i Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 2830E
[�j}iCMOL1kA ��
910,433.3300
Compliance Inspection Report
Permit: NCG210376 Effective: 08/01/18 Expiration: 07/31/23 Owner: Oldcastle Lawn And Garden Inc
SOC: Effective: Expiration: Facility: Oldcastle Lawn and Garden -Aberdeen Division
County: Hoke 107 Reservation Rd
Region: Fayetteville
Aberdeen NC 28315
Contact Person: Ted Carter Title: Phone: 910-944-1232
Directions to Facility:
Take Highway 211 from Raeford toward Aberdeen, Highway 211 and Reservation Road, turn right onto Reservation Road. Travel
<0.1 mile, the plant will be on the right..
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 11/16/2018 Entry Time: 01:40PM Exit Time: 03:30PM
Primary Inspector: Melissa A Joyner Phone:
Secondary lnspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
permit: NCG210376 Owner - Facility; Oldcastle Lawn And Garden Inc
Inspection Date: 11/1612018 Inspection Type :Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On November 16, 2018, Melissa Joyner met with Ted Carter, Plant Manager of the Oldcastle Lawn and Garden - Aberdeen
Division facility: The Stoi mwater Pollution Prevention Plan was reviewed and contained the required information. The
updated site map was noted. Topography should be shown on this map. Facility inspections have been taking place
annually instead of semi-annually as stipulated in General Permit NCG290000. Analytical and Qualitative monitoring records
were reviewed. A minimum of 60 days must separate Period 1 and Period 2 sample dates.
Observations were made of the basins,drainage ditches and outfall. A couple of new basins had been installed since the
previous inspection. There is sediment and soil conditioner in the new basins in need of removal. The diversion ditches have
erosion and need to be stabilized via regrading and groundcover. Silt fence is installed in the diversion ditch which should not
block a flow of water. Instead, other erosion control measures, such as wattles or rock check dams should be installed in
the diversion ditch. There are two entrances to the facility. They need to be continuously maintained to prevent
sedimentation of Reservation Road.
Page: 2
Permit: NGG21D76 Owner - Facility:Oldcastle Lawn And Garden Inc
Inspection Date: 11/16/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
#'Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a SMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenanoe areas?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment-.
Yes No NA NE
_■❑❑❑
■❑❑❑
®❑ ❑ ❑
M ❑ ❑ ❑
❑ ❑ ❑
W ❑ ❑ ❑
❑ ❑ ❑
M ❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
E 1111 ❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ N ❑
Yes No NA NE
❑ ❑ ❑
"❑ ❑
❑ ❑ N ❑
❑ ❑ ❑
Page: 3
North Carolina Department of Environmental Quality
Pat McCrory, Donald R. van der Vaart,
Governor Secretary
October 1, 2015
Oldcastle Lawn and Garden — South Atlantic
Attn: Ted Carter, Plant Manager
107 Reservation Road
Aberdeen, NC 28315
Subject: COMPLIANCE EVALUATION INSPECTION
NPDES Stormwater General Permit NCG210000
Oldcastle Lawn and Garden — South Atlantic
Oldcastle Lawn and Garden — Aberdeen Division, Certificate of Coverage NCG210376
Hoke County
Dear Mr. Carter:
On September 17, 2015, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land
Resources conducted a site inspection for the Oldcastle Lawn and Garden — Aberdeen Division facility located at 107
Reservation Road, Hoke County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review.
Ted Carter, Plant Manager was also present during the inspection and his time and assistance is greatly appreciated. The
site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG210000.
Certificate of Coverage NCG210376. Permit coverage authorizes the discharge of stormwater from the facility to receiving
waters designated as Quewhiffle Creek, a Class C stream in the Lumber River Basin.
As a result of the inspection, the facility was found to be in compliance with the conditions of the NCG210000 permit.
Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the
inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty
assessment of up to $25,000 per day for each violation. If you or your staff has any questions, comments, or needs
assistance with understanding any aspect of your permit, please contact me at (910)433-3384 or by e-mail at
melissa.joyner@ncdenr.gov.
Sincerely,
Melissa Joyner
Environmental Specialist
Land Quality Section
Enclosure: Compliance Inspection Report
cc: FRO — Land Quality Section, Stormwater Files-NCG210000
Division of Energy, Mineral, and Land Resources
Land Quality Section
Fayetteville Regional Office 225 Green Street — Suite 714, Fayetteville, North Carolina 28301
Phone: 910-433-33001 FAX: 910-486-0707-Internet: http:llportal.ncdenr.org/web/Ir/land-quality
An Equal Opportunity / Affirmative Action Employer — 50% Recycled 1 10% Post Consumer Paper
4
Permit: NCG210376
SOC:
County: Hoke
Region: Fayetteville
Contact Person: Ted Carter
Compliance Inspection Report
Effective: 08/01/13 Expiration: 07/31/18 Owner: Oldcastle Lawn And Garden Inc
Effective: Expiration: Facility: Oldcastle Lawn and Garden -Aberdeen Division
107 Reservation Rd
Title:
Aberdeen NC 28315
Phone: 910-944-1232
Directions to Facility:
Take Highway 211 from Raeford toward Aberdeen, Highway 211 and Reservation Road, turn right onto Reservation Road. Travel
<01 mile, the plant will be on the right
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
On -site representative
Related Permits:
Inspection Date: 09/17/2015
Primary Inspector: Melissa A Joyner
Secondary Inspector(s):
Ted Carter
EntryTime: 01:05PM Exit Time: 03:OOPM
910-944-1232
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NGG210376 Owner - Facility: Oldcastle Lawn And Garden Inc
Inspection pate: 09/17/2015 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On September 17, 2015. Melissa Joyner met with Ted Carter, Plant Manager of the Oldcastle !_awn and Garden - Aberdeen
Division facility. The Stormwater Pollution Prevention Plan (SPPP) was reviewed and appeared to contain all of the required
components of the SPPP. There have been site changes since the previous inspection on August 24, 2012. It is
recommended that an updated site map be included in the SPPP. Both Analytical and Qualitative monitoring has been
conducted on a regular basis.
Observations were made of the site's basin, drainage ditch and outfall. The basin and outfall appear to be well -maintained.
Permanent groundcover is established on slopes adjacent to the basin. Maintenance is needed for the drainage ditch. There
is a breach in the side slope of the drainage ditch near the AST building. Mulch is noted in the drainage ditch at this
location.
Page: 2
Permit: NCG210376 Owner- Facility: Oldcastle Lawn And Garden Inc
Inspection pate: 09/1712015 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
N ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0 ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0 ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
E ❑ ❑ ❑
Comment
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? E ❑ ❑ ❑
Comment:
Anal tical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? ■ ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page: 3
USPS.comOO - Track & Confirm
Page I of I
En lfah Customer Service USPS Mob"
3USps.comr
Quick Tools Ship a Package Send Mail Manage Your Mail
Track & Confirm
GET EMAIL UPDATES PRINT BET AILS
YOUR L ABE L NUMBER SE RVICt_'
7a090820000024741862
Check on Another Item
What's your label (or receipt) number?
Regisler ! EryP In
Seared USPS.com of Tl Packages
Shop Business Solutions
STATUS OF YOUR ITEM
HATE 4 TIML
LOCATION FEATURES
! Delivered
September 10, 2012, 1239
ABERDEEN, NO 28315 Certified Mail'
pm
NotlCO Leh
�
September 06, 2012, 4.18 pm
I
ABERDEEN. NO 28315
Amval at Unrt
4 September O6, 2012, 9.17 am
ABERDEEN, NC 28315
I
. Depart USPS Sort
jl`
I September 06, 202
FAYETTEVILLE. NO 28302
Facll€ly
I
Processed through
September 06, 2012. 2:00 am
FAYETTEVILLE, NO 28302
USPS Sat Faidily
Find
LEGAL
ON USPS.COM
Privacy Policy %
Government Services
Terms of Use
Buy Stamps 8, Shop
FQIA I
Print a Label wnh Postaga
No FEAR Act EEO Data,
Customer Sorvic,s )
Site Index I
Copyngl 2012 USPS. All Rights Reserved
ON ABOUT.USPS.COM
A,00ut USPS Home
Newsroom
Mail Serviv.S l
Forms 8 Pllbllpat€OI15 I
Careers .
OTHER USPS SITES
Business Customer Gateway;
Postal I118peCtors ,
Inspector General;
Postal Explorer,
https://tools.usps.com/go/TrackConfirmAction.action 9/11 /2012
U.S., Postal Service,,
CERTIFIED
MAIL,., RECEIPT
{Domesfrc Mail Only;
No Insurance Coverage
Provided)
For delivery information
visit website
our at
www osps.coma
Postage
ru
Certified Fee
C3 Rellum Receipt Fee
C3 Restricted oenvery Fee
Endorsement
.. Re Ned
`��
• err
� �,��
�
PS Form 3800• Qust 2005
C1-5ce
licvcrsc for Inslruclions
wr+. w•'
• Sender: Please print your name, address, and ZIP+4 inthis box •
i
NCDI NR --- DIVISION OF WATER QUALITY
ATIR V11CHAEL I.,AWYER
225 GR "EN STREET, SUITE 714
I�AYE` TE'VILLE NC 2b301-5043'0ENR-FR0
5tP 1 1 2012 1
Owo I
III111111111/Ill lllilr111i11F11l1111iii11lil1i1,11111111111111
i�
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P.E.
Governor Director
September 4, 2012
CERTIFIED MAIL: 7009 0820 0000 2474 1862
RETURN RECEIPT REQUESTED
Oldcastle Lawn & Garden, Inc.
Attn: Ted Carter, EH&S Coordinator
107 Reservation Road
Aberdeen, NC 28315
Dee Freeman
Secretary
Subject: NOTICE OF DEFICIENCY (NOD-2012-PC-0199)
Oldcastle Lawn & Garden, Inc.
Oldcastle Lawn & Garden -Aberdeen Division, Certificate of Coverage-NCG210376
NPDES Stormwater General Permit-NCG210000
Hoke County
Dear Mr. Carter:
On August 24, 2012, Michael Lawyer, Environmental Specialist from the Fayetteville Regional Office of the
Division of Water Quality, conducted a site inspection for the Oldcastle Lawn & Garden -Aberdeen Division facility
located at 107 Reservation Road in Aberdeen, Hoke County, North Carolina. A copy of the Compliance Inspection
Report is enclosed for your review. Your time and assistance during the inspection is greatly appreciated. Permit
coverage authorizes the discharge of Stormwater from the facility to receiving waters designated as Quewhiffle
Creek, a Class C stream in the Lumber River Basin. The site visit and file review revealed that the subject facility
is covered by NPDES Stormwater General Permit-NCG210000, Certificate of Coverage-NCG210376.
As a result of the site inspection, the following deficiencies are noted:
1) Analytical Monitoring
Analytical Monitoring has not been conducted and recorded in accordance with permit requirements.
2 Operation and Maintenance of Pollution Controls
Part III, Section C, item 1 of the NCG210000 General Permit states in part: "The permittee shall at all times
properly operate and maintain ail facilities and systems of treatment and control (and related appurtenances)
which are installed or used by the permittee to achieve compliance with the conditions of this general permit." As
discussed at the time of inspection, our office has received a complaint from adjacent property owners concerning
runoff from the facility containing materials such as bark/mulch causing unsightly and nuisance conditions. As
relayed during the inspection, facility staff has been aware of this concern and while some site work has recently
been completed; additional maintenance is needed for proper stormwater management. A copy of a proposal for
stormwater BMP rehabilitation and other services as developed by Falcon Engineering in August 2012 was
provided to Mr. Lawyer for review at the time of inspection; however it had yet to be approved by facility
management.
Other Observations:
Please refer to the enclosed Compliance Inspection Report for additional comments and observations made
during the inspection.
Location: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301
Phone: 910-433-33001 FAX: 910A86.0707 t Customer Service:1-877-623-6748
Internet, http:/1portai.ncdencorg/web1wq
O
Nor
thCarolina
An EquM Opportunity i Atfirmalive Ad& Employer
Requested Response:
You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your
written response should include, a reasonable explanation as to why the aforementioned deficiencies have
occurred, a Plan of Action to prevent these deficiencies from re -occurring, as well as a reasonable time frame that
the proposal provided by Falcon Engineering will be implemented and completed.
Thank you for your attention to this matter. This office requires that the deficiencies, as detailed above, be
properly resolved. Failure to address these items could result in the issuance of a Notice of Violation,
which is subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have
any questions regarding these matters, please contact Mr. Lawyer or myself at (910) 433-3300.
Sincerely,
Belinda S. Henson
Regional Supervisor
Surface Water Protection Section
BSH: MLlml
Enclosure
cc: FRO - Surface Water Protection Section
Katie Merritt - WBS Compliance & Permits Unit
QWQ Central Files
Compliance Inspection Report
Permit: NCG210376 Effective: 08/01/08 Expiration: 07/31/13 Owner: Oldcastie Lawn And Garden Inc
SOC: Effective: Expiration: facility. Oldcastie Lawn and Garden -Aberdeen Division
County: Hoke 107 Reservation Rd
Region: Fayetteville
Aberdeen INC 28315
Contact Person: Ted Carter Title: EH&S Coordinator Phone: 800-426-8988
Ext.41802
Directions to Facility:
Take Highway 211 from Raeford toward Aberdeen, Highway 211 and Reservation Road, turn right onto Reservation Road. Travel <0.1
mile the plant will be on the right.
Sysfem Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
On -site representative Ted Carter
Related Permits:
Phone: 800-426-8988 ext 41802
Inspection Date: 0812412012 Entry
Time: 11:00 AM Exit Time: 12:40 PM
Primary Inspector: Mike Lawyer., %/ � Phone: 910-433-3300
Secondary Inspector(s): _ Ext,7-21
33z�
�ViCwi?v
Reason for inspection: Complaint Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: 0 Compliant ■ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NCG210376 Owner - Facility: Oldcastle Lawn And Garden inc
Inspection Date: 08/24/2012 Inspection Type: Compliance Evaluation Reason for Visit: Complaint
Inspection Summary:
Inspection conducted in response to a complaint received on August 13, 2012 from a resident in the adjacent
neighborhood concerning runoff from the facility containing bark/mulch causing odorous conditions. Met with Ted Carter,
EH&S Coordinator on August 24, 2012 to discuss neighbor's concerns with runoff and conduct a compliance evaluation
regarding the conditions of the NCG210000 General Permit. Mr. Carter relayed that he was aware of the situation
regarding their stormwater runoff and some actions had already taken place such as reworking of the site's drainage
canals and that a proposal for additional work had been developed by Falcon Engineering. A copy of this proposa! was
provided at the time of inspection. Observations were made of the site's drainage system and basin, which is located next
to Highway 211 where stormwater would discharge into a roadside ditch that then carries flow under the highway via a
culvert into a drainage feature through the adjacent neighborhood. At the time of inspection, the basin appeared to
contain a significant amount of sediment and overgrowth of vegetation. Mr. Carter was informed that the.proposal
supplied by Falcon Engineering to rehabilitate their stormwater BMPs and restore the basin's treatment capability should
be put into action. A copy of the facility's current Stormwater Pollution Prevention Plan was supplied via e-mail on August
30, 2012 and copies of visual monitoring records from 2008 to present were hand delivered by Mr. Carter on August 31,
2012. The current permit, which became effective in August 2008 with the facility receiving renewed coverage in
September 2008, was revised to contain Analytical Monitoring requirements regardless of whether or not a facility
conducts onsite vehicle maintenance. Visual monitoring record from August 2011 indicates an 'overflow at bank' where
samples were taken and analyzed for the parameters listed in the permit. The visual monitoring record from March 2012
indicates 'discharge pipe obstructed because of beaver activity' and 'water level above discharge pipe with no flow'. There
were no records provided of analytical monitoring (no discharge or otherwise) for the second half of 2008, 2009, 2010, or
first half of 2011. Mr. Carter was informed that a lack of discharges during a monitoring period should be indicated on the
appropriate discharge monitoring report form and submitted within 30 days of the end of the respective monitoring period.
Otherwise, both visual and analytical monitoring should be conducted for a discharge event per the conditions of the
general permit.
Page: 2
Permit: NOG210376 Owner - Facility: Oldcasile Lawn And Garden Inc
Inspection Date: 08/24/2012 Inspection Type: Compliance Evaluation
Reason for Visit:
Complaint
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
n
❑
n
# Does the Plan include a General Location (USGS) map?
■
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices"?
■
in
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
n
n
n
# Has the facility evaluated feasible alternatives to current practices?
■
n
n
n
# Does the facility provide all necessary secondary containment?
■
n
n
n
# Does the Plan include a BMP summary?
■
n
n
n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
❑
❑
Cl
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
n
n
n
# Does the facility provide and document Empioyee Training?
■
n
n
n
# Does the Plan include a list of Responsible Party(s)?
■
n
❑
Cl
# Is the Plan reviewed and updated annually?
■
n
n
n
# Does the Plan include a Stormwater Facility Inspection Program?
■
n
n
n
Has the Stormwater Pollution Prevention Plan been implemented?
■
n
n
n
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ■ n n n
Comment: Copies of visual monitoring records from 2008 to present were provided,
however all but one note that monitoring was conducted during dry conditions. All
monitoring should be conducted during a representative storm event as defined in the
general permit.
Analytical Monitoring
Yes No
NA
NE
Has the facility conducted its Analytical monitoring?
❑ ■
❑
n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑ n
■
n
Comment: Based on provided documentation, one analytical monitoring event was
conducted in August 2011 where sampling was taken from 'overflow at bank'. Results
show Benchmark Value exceedances for COD and TSS at outfall #1 and COD at
outfall #2. Record from March 2012 indicates there was no flow due to the discharge
pipe being obstructed.
Permit and Outfalls Yes No NA NE
Page: 3
Permit: NCG210376 Owner - Facility: Oldcastle Lawn And Garden Inc
Inspection Date: 08/24/2012 Inspection Type: Compliance Evaluation Reason for Visit: Complaint
# Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑
# Were all outfalls observed during the inspection?
on❑n
# If the facility has representative outfall status, is it properly documented by the Division? n n w u
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Page: 4
° r4 NC Division of Water Quality
NPDES Stormwater Permit Contacts Summary
NC DWO has the following contact information in our Permit Database for Your permit as of 5128/2013.
Permit Number: NCG210376��� .
Permit Type: Timber Products Stormwater D95c1iarge COC
Faclllty Name: Oldcastle Lawn and Garden -Aberdeen Division
FaclIIty Addressl: 107 Reservation Rd
Facility Address2:
City, State & Zip: Aberdeen, NC 28315
Owner Information Details:
Owner Name: Oldcasde Lawn And Garden Inc
Owner Type: Non -Government Owner Type Group: Organization
Fl *s** legally Responsible
u5
{Responsible corporate officer/pnncple executive officer A
or ranking elected official/general partner or propnetor y.:�,
",,x - r, �w it (
any other person,wlth'delegated signatoryauthority from thelegally"e,respoaslble persoY•n.) ,
Owner Affiliation: Richard Lankester Title: Operatic P V
Addressl:
Address2: P4 G-
City, State & Zip: Louisburg, NC 27549 ' ! Y (vr S v '•C ~ � ] ` o s
Work Phone: Fax:
Email Address: richard.lankester(Eboldcastie.com
Owner Contact Person.(s)+ f
w
Contact Name Title Address Phone EM Email
Richard Operations P V PO Box 526, Louisburg, NC 27549 919-497.5505 919-497-5050 richard.lankester@old
Lankester Ext. 40001 castie.com
4e-r,. i'p S', �,w.hY * �'. ;..^'.r�kY�"-r...�. �
Facility-Cantact.P,erson{s) ....r .I 1 w '""
Contact Name Title 'R_T, P Address Phone EM Email
107 Reservation Rd, Aberdeen, NC 28315 877-224-1822 1 C it., 'tk i� SG o
Permit Contact Persons) a. a�?�.. ;n.fi°r.i "1'ih ;:r Jf Si'.1 r.'•.3- i? y 4 =s °' 4 r
Contact Name wig Address Phone EM Email
Co m
5/28/2013 Page 164
�' b
Ls -blb
IKL
Georgoulias, Bethany
From: admin@ncdenr.gov
Sent: Friday, August 02, 2013 7:21 AM
To: SVC DFNR.stormwater
Subject: Confirmation for Renewal of DWQ Stormwater NPDFS General Permit
** Do not reply to this e-mail as it is from an unmonitored mailbox. **
Thanks for renewing your permit using our on-line option. No further action is necessary. The new General
Permit is available for printing from our website at http://porta1.ncdenr.org/web/Ir/stormwater .
If you have questions, please contact Bethany Georgoulias at bethany—georgoulias Rwricclenr.gov phone (919)
807-6372 or Bradley Bennett at brad Icy. bennetttncdenr.gov phone (919) 807-6378. If you forgot to print your
Certificate of Coverage you can resubmit the data and print another copy.
This COC is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the
memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection
Agency, dated October 15, 2007 (or as subsequently amended.)
The General Permit authorizes discharges of stormwater and specifies your obligations for discharge controls,
management, monitoring, reporting, and record keeping. Please review the new permit to familiarize yourself
with all of the changes. Parts III and IV contain the Standard Conditions, including Compliance and Liability,
Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions.
Your facility has six months from receipt of the COC to update its Stormwater Pollution Prevention Plan
(SPPP) to comply with changes in SPPP requirements. Other changes are effective immediately. Please note
that Tier 3 Actions (if applicable) are triggered by four benchmark exceedances beginning on the effective
date of the renewal permit and do not count prior exceedances. Please visit our website above to review the
new General Permit carefully.
Please note that the Stormwater Permitting Unit is in the process of moving to the Division of Energy, Mineral,
and Land Resources (DEMLR). Your coverage under the General Permit is transferable only through the
specific action of DWQ and/or DEMLR. This permit does not affect the legal requirements to obtain other
permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance
with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
CONFIRMATION DETAILS
�Perrnit Number:
;NCG210376
Expiration Date:
7/31/2018
Organization Name:
Oldcastle Lawn And. Garden Inc ,
Facility Name:
Oldcastle Lawn and Garden -Aberdeen Division
Admin Region:
County Name:
;Fayetteville
Hoke
,Regulated Activity,
Receiving Stream Name:
,Timber products manufacture / Wood Chip Mills
Quewhiffle Creek
Receiving Stream Class:
j'C_4
Basin:
Lumber
'Facility Address:
1107 Reservation Rd
179
Lawyer, Mike
From: Carter, Ted <Ted.Carter@oldcastle.com>
Sent: Tuesday, April 02, 2013 8:35 AM
To: Lawyer, Mike
Cc: Wilson, Matt (L&G SouthAtlantic)
Subject: Oldcastle Lawn & Garden Stormwater Enhancements
Attachments: Storm Water Project 00S.JPG; Storm Water Project 004.JPG; Storm Water Project
003.JPG; Storm Water Project 006.JPG
Good morning Mike,
Mere are the pictures I took of the project to date. Matt and I met with Bill Dawson yesterday to establish a completion
plan. As it stands now, there is grading to be completed in front of the main detention pond, piping for the fore bay and
outfall, matting to be placed in the Swale from the railroad tracks, then seeding of vegetation. Because of the wet
weather, we have been delayed in the completion of the project. We should be looking at or near completion within
sixty days barring circumstances beyond our control.
Take care and call or email me if you need further information.
Ted
Ted L. Carter Jr.
Oldcastle Building Products — Lawn & Garden South Atlantic - Aberdeen
107 Reservation Road
Aberdeen, N.C. 28315
Office (910) 944-1232 Ext. 41802
Cell (910) 638-5554
Secure Fax (877) 224-1822
ShoreTel 41802
Email Ted.Carter@oldcastleapq.com
Safety - First, Last, & Always!!!
w
October 03, 2012
VIA HAND DELIVERY
Belinda Henson
Regional Water Quality Supervisor
North Carolina Department of
Environment and Natural Resources
Division of Water Quality - Fayetteville Regional Office
225 Green Street, Suite 714
Fayetteville, NC 28301-5043
Re: Notice of Deficiency (NOD-2012-PC-0199)
Oldcastle Lawn & Garden, Inc.
Aberdeen, NC, 28315 Hoke County
Dear Belinda Henson,
OENR--ERO
OCT 0 8 2012
Dwo
Fallowing is the response to the above referenced Notice of Deficiency
addressed to Ted Carter, EH&S Coordinator, dated September 4, 2012 requesting a
response on or before October 10, 2012. We have appreciated the assistance of
Michael Lawyer in this process and for helping understand the issues.
The deficiency of Analytical Monitoring occurred because there was no flow
observed at the identified Outfall. Discharge from Outfall 2 occurred due to heavy storm
conditions. Given the Outfall location being within a roadside ditch that has heavy
flooding during these type of storm events, it is considered to present unsafe sampling
conditions. As per DWQ guidance such sampling conditions should be avoided to
protect the health and welfare of the personnel collecting these water quality samples.
All stormwater discharge that occurs along Outfall 1 leaves the site as sheet flow and
does not concentrate to be considered a stormwater outfall. This assessment was
made by Falcon Engineering when evaluating our site conditions for revisions to our
Storm Water Pollution Prevention Plan. As for the reporting, we were not informed by
our initial consultant that with conditions of no flow/no discharge should be reported to
DWQ.
The deficiency in the operation and maintenance of pollution controls is also
currently being addressed by Oldcastle and a plan of action has been developed. Our
current plan of action for stormwater BMP enhancements began prior to DWQ receiving
the current complaint. Oldcastle maintains regular contact with all adjacent property
owners and have discussed our current course of action for additional stormwater
enhancements at our site. Additionally, prior to these compliants and subsequent DWQ
inspections, Oldcastle engaged Falcon Engineering to evaluate the site conditions and
r
provide us with a course of action to enhance our current stormwater BMPs and assist
us with our stormwater compliance program of sampling and reporting.
Since our site inspection, Oldcastle has contracted with Falcon Engineering,
Josh Dunbar, PE, to assist us in the construction oversight of all necessary stormwater
BMP enhancements. Bill Dawson Construction, under the direction of Josh Dunbar,
has also been contracted to perform the required enhancement of the stormwater basin
located along Highway 211. Planned enhancement to the stormwater conveyance
system will also be completed to prevent the future transport and deposition of
sediments into the stormwater basin. Oldcastle. anticipates all planned enhancements
to be completed by March 31, 2013.
To summarize our plan of action:
1. Enhance the current stormwater basin
2. Enhance the stormwater conveyance systems
3. Implement the inspection process outlined in the newly revised SWPPP to
identify and address required maintenance
4. Complete Analytical Monitoring or make report of No Flow to DWQ as
appropriate.
Again we appreciate the willingness of DWQ staff to assist us in resolving these
issues. Should you have any further questions, please do not hesitate to contact us.
Sincerely,
Ted Carter, Jr.
EH&S Representative
Oldcastle Lawn & Garden, Inc.
.. 1
OENR-FRO
UU 0 8 2012
r)W()
October 03, 2012
VIA HAND DELIVERY
Belinda Henson
Regional Water Quality Supervisor
North Carolina Department of
Environment and Natural Resources
Division of Water Quality - Fayetteville Regional Office
225 Green Street, Suite 714
Fayetteville, NC 28301-5043
Re: Notice of Deficiency (NOD-2012-PC-0199)
Oldcastle Lawn & Garden, Inc.
Aberdeen, NC, 28315 Hoke County
Dear Belinda Henson,
Following is the response to the above referenced Notice of Deficiency
addressed to Ted Carter, EH&S Coordinator, dated September 4, 2012 requesting a
response on or before October 10, 2012. We have appreciated the assistance of
Michael Lawyer in this process and for helping understand the issues.
The deficiency of Analytical Monitoring occurred because there was no flow
observed at the identified Outfall. Discharge from Outfall 2 occurred due to heavy storm
conditions. Given the Outfall location being within a roadside ditch that has heavy
flooding during these type of storm events, it is considered to present unsafe sampling
conditions. As per DWQ guidance such sampling conditions should be avoided to
protect the health and welfare of the personnel collecting these water quality samples.
All stormwater discharge that occurs along Outfall 1 leaves the site as sheet flow and
does not concentrate to be considered a stormwater outfall. This assessment was
made by Falcon Engineering when evaluating our site conditions for revisions to our
Storm Water Pollution Prevention Plan. As for the reporting, we were not informed by
our initial consultant that with conditions of no flow/no discharge should be reported to
DWQ.
The deficiency in the operation and maintenance of pollution controls is also
currently being addressed by Oldcastle and a plan of action has been developed. Our
current plan of action for stormwater BMP enhancements began prior to DWQ receiving
the current complaint. Oldcastle maintains regular contact with all adjacent property
owners and have discussed our current course of action for additional stormwater
enhancements at our site. Additionally, prior to these compliants and subsequent DWQ
inspections, Oldcastle engaged Falcon Engineering to evaluate the site conditions and
i
provide us with a course of action to enhance our current stormwater BMPs and assist
us with our stormwater compliance program of sampling and reporting.
Since our site inspection, Oldcastle has contracted with Falcon Engineering,
Josh Dunbar, PE, to assist us in the construction oversight of all necessary stormwater
BMP enhancements. Bill Dawson Construction, under the direction of Josh Dunbar,
has also been contracted to perform the required enhancement of the stormwater basin
located along Highway 211. Planned enhancement to the stormwater conveyance
system will also be completed to prevent the future transport and deposition of
sediments into the stormwater basin. Oldcastle anticipates all planned enhancements
to be completed by March 31, 2013.
To summarize our plan of action:
1. Enhance the current stormwater basin
2. Enhance the stormwater conveyance systems
3. Implement the inspection process outlined in the newly revised SWPPP to
identify and address required maintenance
4. Complete Analytical Monitoring or make report of No Flow to DWQ as
appropriate.
Again we appreciate the willingness of DWQ staff to assist us in resolving these
issues. Should you have any further questions, please do not hesitate to contact us.
Sincerely,
_Q.
Ted Carter, Jr.
EH&S Representative
Oldcastle Lawn & Garden,
Inc.
ALCON
E7NG1NFffNG
August 14, 2012
Mr. Ted Carter
Assistant Plant Manager
Oldcostle Lawn & Garden
107 Reservation Road
Aberdeen, NC 28315
Re: Proposal for Stormwater BMP Rehabilitation and Sampling/Inspection Services
Dear Mr. Carter:
Falcon Engineering, Inc. (Falcon) is pleased to submit a proposal to provide Stormwater quality services
for Oldcastle Lawn & Garden for the Abderdeen facility. This facility includes mulch and soil processing
operations and is located at 107 Reservation Road in Aberdeen, North Carolina. The scope of these
services would rehabilitation work on the stormwater BMPs and conveyance systems at this site. Based
upon our site visit it was observed that the current stormwater BMPs are in a failing mode and require
maintenance to rehabilitate them back into an acceptable condition for proper stormwater treatment.
In order to mitigate cost and ensure ease of maintenance in the future, Falcon staff will work closely and
directly with Oldcastle staff to coordinate this work. In addition, we have included an optional task to
provide compliance services once these BMPs have been upgraded. These services would include
sampling and inspection of these BMPs as prescribed by North Carolina Department of Environment
and Natural Resources, Department of Water Quality (DWQ). This sampling and inspection program is
required per the NPDES permit issued for this facility (Permit No. NCG210000) .
Based on our site visits, knowledge of the current stormwater BMPs, review of site plans prepared by
Bensinger & Garrison, and using currently accepted engineering practices, Falcon proposes the
following scope of services:
Task 1 1 Stormwater BMP Rehabilitation
Stormwater generated at this site is conveyed across the site through a series of detention basins and
stormwater swales/ditches to treat and discharge all stormwater via a wet detention pond located
along the southwest corner of the property. Currently the stormwater conveyance and pretreatment
facility leading up to this wet detention pond are not adequately installed or maintained to perform
their required treatment functions. The wet detention pond is also in need of maintenance to increase
treatment capacity and provide the required stormwater treatment. Falcon staff will coordinate with
Old Castle to rehabilitate the detention pond using on site personnel to perform this work and is
therefore not included in the described scope of services below. Per our understanding Falcon staff will
direct and oversee the rehabilitation of these systems beginning at the railroad tracks up to this wet
detention pond. This will include the following stormwater BMPs:
1. Construction of a dissipation pool / rock filter basin device at the discharge pipes that run
beneath the railroad tracks
www.FalconEngineers.com 1
Engineering I Inspection I Testing I Agency CM
1210 Trinity Road i Suite 110 I Raleigh, North Carolina 27607 1 i 919.871.08001 F 919.871 .0803
Mr. Ted Carter
Old Castle Lawn & Garden
August 14, 2012
2. Rehabilitation of the stormwater culvert from the railroad tracks to the wet detention pond. This
effort will include proper slope of the culvert banks, stabilizing these banks for vegentation, and
providing rock check dams along this culvert to dissipate stormwater flow and reduce the
sediment conveyance that has caused the current systems to fail.
3. Install two concrete culverts and repair the damaged driveway access along the southwestern
property boundary. This will restore access to this area and prevent further deterioration of this
area that is contributing to the sediment loading entering and failing the current wet detention
pond.
This is intended to provide a first phase of rehabilitation effort. Further enhancements have also been
discussed and may be scoped following completion of these rehabilitation efforts and in coordination
with Old Castle staff. This task will include all required construction oversight, utility locations, materials
and labor required to constructed the above mentioned stormwater BMPs.
Task 2 1 Stormwater Sampling Program
It is our understanding that semi-annual sampling is currently required at this site. This site is currently due
for stormwater collections for required compliance demonstrations. These samples would be collected
following the rehabilitation efforts described within Task 1. Based upon our site visit, it is anticipated that
sampiing is required at one stormwater outfall for this property. Falcon staff will collect these required
stormwater samples and have them analyzed for the following constituents:
• Total Suspended Solids JSS)
• pH (field method)
• Chemical Oxygen Demand
Falcon will coordinate with SGS Environmental for lab analysis. While pH is a field method, Falcon will
collected a pH sample for lab analysis as a QC check. Falcon will also collect a duplicate sample at
one of the Outfalls for each sampling event as part of our QC program. Falcon will also prepare the
required Qualitative Monitoring Report as required by the NPDES Permit requirements
Following this sampling event, Falcon will prepare the required Discharge Monitoring Report (DMR) for
submission to DWQ and inclusion in the facility's Stormwater Pollution Prevention Plan (SWPPP), Falcon
will also prepare the required Qualitative Monitoring Form for inclusion in the SWPP, as also required.
Falcon staff will coordinate with plant personnel to ensure that all inspection reports are placed within
the SWPPP records section for maintenance of records compliance. Completion of this task would
ensure compliance with permitting requirements for the given sampling period.
LF
Mr. Ted Carter
Old Castle Lawn & Garden
Cost Estimate
August 14, 2012
Falcon will perform this work on a lump sum basis for an estimated cost as shown in the table below.
Field conditions during sampling events will influence the time required to collect these samples. Should
mobilization occur and samples are not able to be collected and/or analyzed due to field/site
conditions, Falcon will charge a minimum $150.00 monitoring mobilization fee.
Direct expenses will be charged at cost plus fifteen percent to cover overhead and handling costs.
Falcon will invoice on a monthly basis for all work performed and all invoices are payable within thirty
(30) days. Written authorization to proceed is required before we can begin work on any project. A
purchase order would constitute written authorization to proceed. This proposal is valid for sixty (50)
days. If this proposal is acceptable, please sign both of the attached agreement for services forms.
Both copies will be executed and one will be returned to you for your files.
We appreciate this opportunity to provide services you and look forward to partnering with you on this
and other projects. If you have any questions, please give me a call at (919) 871-0800.
Sincerely,
FALCON ENGINEERING, INC.
Josh Dunbar, PE
Director of Design Services
Enciosures
LF
AGREEMENT FOR SERVICES
Form No. AS-92
This Agreement made this i 4th Day of August, 2012 by and between OLDCASTLE LAWN & GARDEN (hereinafter referred to as Client( and
FALCON ENGINEERING, INC. (hereinafter referred to as Consultant.
WHEREAS, Client desires to contract with Consultant to furnish services to Client's project known as: Stormwoter BMP Rehabilitation -and
Samalina/lnsipectjon Services for Aberdeen Plant (hereinafter referred to as Project( located in Aberdeen. North Carolina.
WHEREAS, Consultant is engaged in the business of providing services and related labor, materials, and equipment. (Hereinafter individually
and collectively referred to as services.) NOW, THEREFORE, in consideration of the Mutual Covenants and Promises included herein, Client
and Consultant agree as follows: OFFER ACCEPTANCE - Client hereby accepts Consultant's offer to provide services as described in
Consultant's proposal for services referenced below, as described below under "Services to be Rendered" or both and agrees that such
services and any additional services specifically authorized by client, shall be governed by this agreement,
CONTRACT DOCUMENTS - "Contract Documents" shall mean this document as well as proposals and other documents listed under
"SERVICES TO BE RENDERED" which are incorporated herein
SERVICES TO BE RENDERED - Consultant will furnish Services to the Project as indicated in the attached proposal which is included and
incorporated herein. If a proposal was not submitted described services included in this agreement.
PAYMENT - Client will pay Consultant for services and expenses in accordance wiih the
Contract Documents. If prices for services are not established under SERVICES TO BE
RENDERED then the current fee schedule in effect for the location providing the services
shall be used as the amount to be paid by cfent for services provided. Consultani will
submit progress invoices to Client monthly and a final invoice upon completion of its
Services. Each invoice, on presentation, is due and payable by Client. Invoices ore past
due alter 30 days. Past due amounts are subject to a service charge of one and one -hall
percent per month 118 percent per annum) or the highest amount allowed by applicable
law on the outstanding balance whichever is less. Attorneys fees and other costs
Incurred in collecting pass due amounts shall be paid by Client,
Consultant shall be paid in full for all services rendered under this Agreement, including
any additional services as specifically authorized in writing by Client in excess of those
stated in this Agreement.
The Client's obligation to pay for the Services contracted for Is in no way dependent upon
the Client's ability to obtain financing, payment from third parties, approval of
governmental or regulatory agencies. or upon the Client's successful completion of the
Project.
WARRANTY AND STANDARD OF CARE - Consultant sholl endeavor to provide Services to
Client. consistent with the standards of others providing similar services in the same or
similar locality as the Project. In the event any portion of the Services fails to substantially
comply with Ihis Warranty and Standard of Cate obligation and Consultant is promptly
notified in writing prior to one year all completion of such portion of the Services,
Consultant will promptly re -perform such portion of the Services, or if ro-performance is
Impracticable, Consultant will refund the amount of compensation paid to Consultant for
such portion of the Services. THE REMEDIES SET FORTH HEREIN ARE EXCLUSIVE.
THIS WARRANTY AND STANDARD OF CARE IS IN LIEU OF ALL OTHER WARRANTIES AND
STANDARDS OF CARE. NO OTHER WARRANTY OR STANDARD OF CARE, EXPRESSED OR
IMPLIED. INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR
PURPOSE IS MADE OR INTENDED BY THE PROPOSAL FOR SERVICES BY FURNISHING AN ORAL
RESPONSE OF THE FINDINGS MADE OR BY Al REPRESENTATIONS MADE REGARDING THE
SERVICES INCLUDED IN THIS AGREEMENT.
LIMITATION OF LIABILITY - CONSULTANT AND CLIENT MUTUALLY AGREE THAT THE SERVICES
PROVIDED PURSUANT TO THIS AGREEMENT INVOLVE RISKS OF LIABILITY WHICH CANNOT BE
ADEQUATELY COMPENSATED FOR BY THE PAYMENTS CUENT WILL MAKE UNDER THIS
AGREEMENT. THEREFORE, THE TOTAL CUMULATIVE LIABILITY OF CONSULTANT, ITS AGENTS,
EMPLOYEES AND SUBCONTRACTORS WHETHER IN CONTRACT, TORT INCLUDING
NEGLIGENCE (WHETHER SOLE OR CONCURRENT] AND STRICT LIABILITY, OR OTHERWISE
ARISING OUT OF, CONNECTED WITH OR RESULTING FROM THE SERVICES PROVIDED
PURSUANT TO THIS AGREEMENT SHALL NOT EXCEED THE TOTAL FEES PAID BY CUENT OR FIFTY
THOUSAND DOLLARS, WHICHEVER IS GREATER. AT ADDITIONAL COST, CLIENT MAY OBTAIN
A HIGHER LIMIT OF LIABILITY PRIOR TO COMMENCEMENT OF SERVICES. CONSULTANTS
CONSIDERATION TO CLIENT FOR THIS LIMIT OF UABIUTY IS SPECIFICALLY REFLECTED IN THE
FEES CONSULTANT WILL BE PAID FOR SERVICES UNDER THIS AGREEMENT AS SUCH FEES ARE
LESS THAN CONSULTANT WOULD BE PAID FOR SERVICES UNDER AN AGREEMENT WITHOUT A
LIMITATION OF LIABILITY. CLIENT IS CAUTIONED THAT THIS IS A LIMITED LIABILITY AGREEMENT
LIMITING THE LIABILITY OF CONSULTANT; THEREFORE, CLIENT IS ADVISED TO CAREFULLY
REVIEW CLIEN75 RISKS OF LIABILITY RELATED TO THIS CONTRACT AND ADDRESS SUCH RISKS
THROUGH CLIENTS INSURANCE OR OTHER MEANS.
DISCLAIMER OF CONSEQUENTIAL DAMAGES - IN NO EVENT SHALL CONSULTANT OR CLIENT
BE LIABLE 70 THE OTHER FOR ANY SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL
LOSS OR DAMAGES, INCLUDING LOST PROFITS AND LOSS OF USE.
REPORTS - In connection with the performance of the Services. Consultant shall delver to
Client one or more reports or other wrillen documents reflecting Services provided and
the results of such Services. All reports and written documents delivered to Client are
instruments reflecting the services provided by Consultant pursuant to this Agreement
and are made available for Client's use subject to the limitations of this agreement.
Instruments of services provided by Consultant to Client pursuant to this Agreement are
provided for the exclusive use of Client. Client's agents and employees for the Project
and are not to be used or relied upon in connection with other projects. Subject to
Client, Client's agents, and employees authorized use, all instruments of service, other
written documents, all original data gathered by Consultant and work papers produced
by Cansvii in the performance of the Services are, and shall remain, the sole and
exclusive property of Consultant.
Should Client make instruments of service. including reports, available to o'hers or request
thal consullont address or forward copies of such to others then consultant's obligation
wilts regard to such reports shall be to client only and limited to the provisions of This
agreement. Such recipients and addressees tan addressee Is a third party which receives
a report prepared for Client but at Cill request such report is addressed to the third
party) receiving copies of instruments of service shall as third parties to Ihis agreement
have no recourse or basis for claim against Consultant and agree to look solely to Client
as provider of the instruments of service. Client shall indemnity and hold harmless
Consultant, its agents, employees and subcontractors from any and all costs, liabilities,
claims and attorney's lees arising from any third party's use or reliance on such instruments
of service when such use or reliance is with Clients knowledge.
SAFETY - With respect to the performance of the Services. Consvltanl sholl take safety
precautions required by federal, slate and local laws, rules, regulofil statutes or
Ordinances. Should Client, or third parties, be conducting activities on the Site. then each
shall have responsibility for their own safety and compliance with opDlicoble safely
requirements.
CONFIDENTIALITY - Subject to any obligation Consultant may have under applicable low
or regulation. Consultant will endeavor to release information relating to the Services only
to its employees and subcontractors in the performance of the Services or to Clent's
authorized representative and to persons designated by the authorized representative Io
receive such information.
SAMPLES - Unless otherwise requested, test specimens or samples will be disposed of
immedtaley upon completion of tests and analysis. Upon written request. Consultant will
retain samples for a mutually acceptable storage charge and period of lime. In the
event that samples contain or may contain hazardous materials, Consultant shall, after
completion of testing and at Client's expense, return such samples to Client or make
samples available for disposal by Client's agent. Client recognizes and agrees that
Consultant is acting as a bailee and at no time assumes title to said samples.
1F
INVENTIONS - Any and oil inventions or discoveries relating to the Services. including
improvements and modifications to existing product or processes made or conceived by
Consullanl or its employees during the term of This Agreement are and shall remain the
sole and exclusive property of Consullanl.
REPRESENTATIONS OF CLIENT - Client warrants and covenants that sufficient funds are
available or will be available upon receipt of Consultant's invoice to make payment in full
for the services rendered by Consultant, Client warrants that all information provided to
Consultant regarding the project and project location are complete and accurate to the
best of Client's knowledge. Client agrees to furnish Consultant and its agents,
subcontractors and consultants o right -of -entry onto the project site and permission to
perform the services included in this Agreement.
PROJECT SITE - Reasonable precautions will be taken to minimize damage to the Project
Site from Consultant's activities and use of equipment. Client recognizes that the
performance of the services included in this Agreement may cause alteration or damage
to the site. Client accepts the fact that this is inherent in the work and will rat look to
Consultant for reimbursemenl or hold Consultant liable or responsible for any such
alteration or damage. Should Client not be owner of the properly, then Client agrees to
notify the owner of the aforementioned possibility of unavoidable alteration and damage
and to indemnify, and defend Consultant against any claims by the owner or persons
having possession of the site through the owner. which are related to such alteration or
damage.
Site and the presence and accurate location of hidden or obscure man-made objects
known to Client relative 10 field tests or boring locations. Client agrees to indemnify and
hold harmless Consultant from all claims, suits, losses, personal injuries, death and properly
liability resulting from damage or injury Io subterranean structures (pipes, tanks. telephone
cables, etc.l arising from the performance of Consultant's services when the existence of
such are not called to Consultant's attention or the location not correctly shown on the
plans furnished Consultant,
TERMINATION FOR CONVENIENCE - Upon written notice, Client or Consultant may
lerminate the performance of any further services included in this agreement if the
lermincAng party determines termination is in the terminating portys interest. Upon
dispatch or receipt of the termination notice, Consultant shall stop work on all services
Included in this agreement and deliver any instruments of service complete at that time
to Client and Client shall pay Consultant for all services performed up to the dispatch or
receipt of the termination notice.
UNFORESEEN OCCURRENCES - If. during the performance of services hereunder, any
unforeseen hazardous substance, material, element or constituent or other unforeseen
conditions or occurrences are encountered which, in Consultant's judgment significantly
affects or may affect the services, the risk involved in providing the services, or the
recommended scope of services. Consultant will promptly notify Client thereof.
Subsequent to that notification. Consullanl may: la) If practicable, In Consultant's
judgment and with approval of Client, complete the original scope of services in
accordance with the procedures originally intended in the Proposal: f b) Agree with Client
to modify the scope of services and the estimate of charges to include the previously
unforeseen conditions or occurrences, such revision to be in writing and signed by the
parties and Incorporated herein; or (c) Terminate the services effective on the dole of
notification pursuant to the terms of TERMINATION OF CONVENIENCE,
FORCE MAJEURE - Should completion of any portion of the Services be delayed for
causes beyond the reasonable control of or without the fault or negligence of Consullanl
including force majeure, the lime for performance shall be extended for a period equal
to the delay and the parties shop mulualy agree on the terms and conditions upon which
the Services may be continued. Force majeure Includes but is not restricted to, acts of
God or the public enemy, acts of the Government of the United Slates or of the several
slates, or any foreign country, or any of them ocling in their sovereign capacity, acts of
Client's contractors or agents, Bres, floods, riots, personnel shortages, strikes, civil
insurrections. freight embargoes, and abnormal weather.
INSURANCE - Consultant shall maintain at its own expense the following insurance subject
to normal industry exclusions: (I) Workmen's Compensation Insurance for statutory
obligations imposed by Workmen's Compensation or occupational disease laws:
Employer's Liability Insurance with a limit of $500.000.00 per accident, (2) Comprehensive
Automobile Liability Insurance with Gmits of $I ,000,000.00. (3) General Liability Insurance
with limits of $1,000,000.00. Certificates can be issued upon request identifying details and
limits of coverage.
INDEMNITY - CLIENT AGREES TO INDEMNIFY. DEFEND AND SAVE HARMLESS CONSULTANT,
ITS AGENTS. EMPLOYEES AND SUBCONTRACTORS FROM AND AGAINST ANY AND ALL
LOSSES, LIABILITIES, AND COSTS AND EXPENSES OF EVERY KIND (INCLUDING COST OF
DEFENSE, INVESTIGATION, SETTLEMENT, AND REASONABLE ATTORNEYS FEES), WHICH
CONSULTANT MAY INCUR, BECOME RESPONSIBLE FOR OR PAY OUT AS A RESULT OF BODILY
INJURIES (INCLUDING DEATHI TO ANY PERSON, DAMAGE TO ANY PROPERTY OR BOTH, TO
THE EXTENT CAUSED BY CUENT'S NEGLIGENCE, WILLFUL MISCONDUCT, OR BREACH OF THIS
AGREEMENT, CONSULTANT AGREES TO INDEMNIFY, DEFEND AND SAVE HARMLESS CLENT
FROM AND AGAINST ANY AND ALL LOSSES, LIABILITIES, AND COSTS AND EXPENSES OF
EVERY KIND (INCLUDING COST OF DEFENSE, INVESTIGATION, SETTLEMENT, AND
REASONABLE ATTORNEY'S FEES) WHICH CLIENT MAY INCUR, BECOME RESPONSIBLE FOR OR
PAY OUT AS A RESULT OF BODILY INJURIES fINCLUDING DEATH) TO ANY PERSON, DAMAGE
TO ANY PROPERTY OR BOTH, TO THE EXTENT CAUSED BY CONSULTANT'S NEGLIGENCE,
WILLFUL MISCONDUCT, OR BREACH OF THIS AGREEMENT.
CLIENT AND CONSULTANT SHALL, IN THE EVENT OF LIABILITY ARISING OUT OF THEIR JOINT
NEGLIGENCE OR WILLFUL ACTS, BE LIABLE TO EACH OTHER AND ANY DAMAGED THIRD
PARTY IN PROPORTION TO THEIR RELATIVE DEGREE OF FAULT,
CAPTIONS AND HEADINGS - the captions and headings throughout this Agreement are
for convenience and reference only, and the words contained therein shall in no way be
held or deemed Io define, limit, describe, modify. or add to the interpretation,
construction. or meaning of any provision of or scope or intent of this Agreement.
SEVERABILITY - If any provision of this Agreement, or application thereof to any person or
circumstance, shall to any extent be invalid, then such provision shall be modified if
possible, to Will the intent of the parties as reflected in the original provision, the
remainder of this Agreement. or the application of such provision to persons or
circumstances other than those as to which it is held invalid, shall not be affected
thereby, and each provision of this Agreement shall be valid and enforced to the fullest
extent permitted by law.
NO WAIVER - No waiver by either party of any default by the other party in the
performance of any provision of this Agreement shall operate as or be construed as a
waiver of any future default. whether like or different in character.
LAW TO APPLY - The validity, interpretation, and performance of this Agreement shall be
governed by and construed in accordance with the laws of the slate in which the project
is located.
CONSULTANT HEREBY ADVISES CLIENT THAT ITS PERFORMANCE OF THIS AGREEMENT IS EXPRESSLY CONDITIONED ON CLIENT'S ASSENT TO THE
TERMS AND CONDITIONS DETAILED HEREIN.
ENTIRE AGREEMENT - This Agreement represents the entire understanding and agreement between the parties hereto relating to the
Services and supersedes any and OII prior negotiations, discussions and agreements, whether written or oral, between the parties regarding
same.
To the extent that any additional or different Provision conflict with the Provisions of this Agreement, the Provision of this Agreement shall
govern. No amendment or modification to this Agreement or any waiver of any provjsjons hereof shall be effective unless in writing, signed
by both parties.
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed by their duly authorized representative
CLIENT
By,
FALCON ENGINEERING, INC.
By
N
rO� STANDARD RATE SCHEDULE
LL.� Stormwater BMP Inspection and Maintenance Services
EINEERING Effective: January2012
Category
Unit Rate
Administrative
$50.00 per hour
CAD Designer
$65.00 per hour
BMP Technician
$75.00 per hour
Staff Professional
$85.00 per hour
Certified BMP Inspector
$100.00 per hour
Project Manager
$1 10.00 per hour
Environmental Technical Consultant
$1 15.00 per hour
Senior Environmental Technical Consultant
$130.00 per hour
Principal Engineer/Technical Expert
$150.00 per hour
Maintenance Crew
$45.00 per man hour
Minor Maintenance Trip Charge
$75.00 per trip
Major Maintenance Mobilization Fee
$250.00 per occurrence
Bobcat
$120.00 per hour
Mini -Excavator
$100.00 per hour
Rip -Rap
$35.00 per ton*
Fi4ter Stone (ABC, # 57, # 5, etc)
$30.00 per ton*
Silt Fence
$2.50 per linear foot*
Excelsior blanket installation
$0.35 per square foot*
Pinestrow bale
$8,00 per bale*
4" Corrugated Pipe
$8.00 per linear foot*
4" Corrugated sock pipe
$10.00 per linear foot*
6" Corrugated Pipe
$1 1,50 per linear foot*
6" Corrugated sock pipe
$13.00 per linear foot*
4" French Drain
$2.00 per linear foot*
12" Catch Basin
$115.00*
18" Catch Basin
$460.00*
Includes delivery and stockpile of material. Price subject to change, due to current market pricing,
Ail '�' 'A
�0
NODE R
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Caleen H. Sullins
Governor Director
February 6, 2009
Dave Besaw
Oldeastle Lawn and Garden -Aberdeen Division
107 Reservation Rd
Aberdeen NC 28315
Subject.: COMPLIANCE EVALUATION INSPECTION
Oldeastle Lawn And Garden Inc
Oldcastle Lawn and Garden -Aberdeen Division
NPDES Stormwater General Permit-NCG210376
Hoke County
Dear Mr. Besaw:
Dee Freeman
Secretary
On January 29, 2009, I, Hughie White from the Fayetteville Regional Office of the Division of Water
Quality, conducted a site inspection at the Oldcastle Lawn and Garden -Aberdeen Division facility located in
Hoke County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Mr.
Ted Carter was also present during the inspection and his time and assistance is greatly appreciated. Stormwater
from this facility drains to an unnamed tributary to Quewhiffle Creek, a Class C stream located in the Lumber
River Basin. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater
General Permit-NCG210376.
Accordingly, the following observations were noted during the Division of Water Quality inspection
(please see the enclosed addendum for infonnation about your permit):
1.) Stormwater Pollution Prevention Plan SPPP
A Stornwater Pollution Prevention Plan (SPPP) has been developed, recorded, and properly implemented.
Yes® No❑NA❑
2) Qualitative Monitoring
Qualitative monitoring has been conducted and recorded in accordance with permit requirements.
es53 No❑NA❑
r_ocaticn: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301
Phone. 910433-33001 FAX: 910-486-07071, Customer Service: 1-877-623-6748
Internet: www.nowaterquality.org
0110
NorthCai-o iiia
An Equal oppor unity) Affirmative Aeton Emp'oyer
Page- 2
Mr. Besaw
Fehruary G, 2009
3) Analytical Monitorin
Analytical monitoring has been conducted and recorded in accordance with permit requirements,
Yes ❑ No ❑ NA
Other Observations:
Please refer to the enclosed Compliance inspection Report for additional comments and observations made
during the inspection.
Please be advised that violations of the NPDES General Permit are subject to a civil penalty
assessment of up to $25,000 per day for each violation. If you or your staff has any questions, comments, or
needs assistance with understanding any aspect of your permit, please do not hesitate to contact me at (910)
433-3308.
Sincerely,
z A`
Hughie White
Environmental Specialist
Enclosure
cc: Ted Carter, EH & S Coordinator, Oldcastle
FRO-SUrface Water Protection
NPS-Assistance & Compliance Oversight Unit
DWQ Central Files
Location: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301
Phone: 910-433-3300 l FAX 910 486-07071 Customer Service' 1-877-623-6748
Internet.: www.ncwalerquality.org
An Faual Opnorluniiy. . AYirnalive Acricn Employer
. 011C
North Carolin a
Naturally
.i
Compliance Inspection Report
Permit: NCG210376 Effective: 08/01/08 _ Expiration: 07/31/13 Owner: Oldcastle Lawn And Garden Inc
SOC: Effective: Expiration: Facility: Oldcastle Lawn and Garden -Aberdeen Division
County: Hoke 107 Reservation Rd
Region: Fayetteville
Aberdeen NC 28315 i232
Contact Person: Dave Basaw Title: Phone: 910-944-11
Directions to Facility:
Take Highway 211 from Raeford toward Aberdeen, Highway 211 and Reservation Road, turn right onto Reservation Road. Travel <0.1
mile the plant will be on the right.
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 01/2912009 EntryTime: 10:00 AM Exit Time: 0 1: 15 PM
Primary Inspector: Hughie White ��/i b�"'"Phone: 910-433-3300
Ext.708
Secondary Inspector(s):
Belinda S Henson . Phone: 910-433-3300 Ext.726
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: ■ Compliant n Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
Page: 1
Permit: NGG210376 Owner - Facility: Oldcastle Lawn And Garden Inc
Inspection Date: 01/29/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
This facility has developed and implemented a stormwater pollution prevention plan. Qualitative monitoring is being
conducted bi-annually as required. The facility has been using a report form for the monitoring that was developed by the
consultant that developed the SPPP. It was recommended that the facility begin using the Stormwater Discharge Outfall.
(SDO)Qualitative Monitoring Report form that is provided by the Division. The Division form is more descriptive than the
current form the facility is using. No analytical monitoring is required because this facility does not meet the new motor oil
usage threshold required to perform the monitoring. Outfalls were observed during the inspection.
Page: 2
Permit: NCG210376 Owner - Facility: Oldcastle Lawn And Garden Inc
Inspection Date: 01/29/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
■
D
D
D
# Does the Plan include a General Location (USGS) map?
■
D
O
O
# Does the Plan include a "Narrative Description of Practices"?
■
D
D
D
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
D
n
D
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
D
D
n
# Has the facility evaluated feasible alternatives to current practices?
®D
D
D
# Does the facility provide all necessary secondary containment?
■
D
D
# Does the Plan include a BMP summary?
■
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®
D
D
D
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
D
D
0
# Does the facility provide and document Employee Training?
®
D
D
D
# Does the Plan include a list of Responsible Party(s)?
■
D
0D
# Is the Plan reviewed and updated annually?
■
D
❑
# Does the Plan include a Stormwater Facility Inspection Program?
®n
D
D
Has the Stormwater Pollution Prevention Plan been implemented?
■
D
D
D
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ■ 0 ❑ D
Comment: This facility has been conducting the qualitative monitoring using a
checklist developed by the consultant tha developed the SPPP. It was suggested they
begin using the Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report form
provided by the Division.
Analytical_ Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? D 0 ■
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? D D ® n
Comment: This facility does not have to conduct any analytical monitoring because
they fall below the 55 gallons of new motor oil per month threshold for analytical
monitoring.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ® D Q 0
# Were all outfalls observed during the inspection? ■ I] ❑ D
# If the facility has representative outfall status. is it properly documented by the Division? D ❑ ■ D
Page: 3
Permit: NCG210376 Owner - Facility: Oldcastle Lawn And Garden Inc
Inspection Date: 01/29/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
®nnn
Page: 4
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Fnvironment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
September 12, 2008
Gene Kropfelder
Oldcastle Lawn And Garden Inc
375 N Ridged Rd
Atlanta, GA 30350
Subject: NPDE<S Stormwater Permit Coverage Renewal
Oldcastle Lawn and Garden -Aberdeen Division
COG Number NGG210376
Hoke County
Dear Permittee:
In response to your renewal application for continued coverage under stormwater General Permit NCG210000 the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater General Permit. This permit has been reissued pursuant to
the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North
Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007,
The following information is included with your permit package:
• A new Certificate of Coverage
• A copy of stormwater General Stormwater Permit NCG210000
• A copy of the Technical Bulletin for the General Permit
• Five copies of the Discharge Monitoring Report (DMR) Form
• Five copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater only, and it specifies your obligations with respect to stormwater
discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all
the changes in the reissued permit.
The more significant changes to the General Permit include the following:
• Permit cover page, second paragraph — The General Permit now may cover activities that DWQ determines to be similar in
either the process, or in the exposed materials, to the Timber Products Industry.
• Part I Section A — A new provision that facilities draining to 303(d) listed waters, or in watersheds with an approved TMDL,
may not be eligible for continued coverage at the next renewal of the General Permit.
• Part I Section B second paragraph — A new clarification that the permit does not authorize discharges that DWQ determines
are wastewaters.
• Part II Section A — The required contents of the Stormwater Pollution Prevention Plan have been expanded and clarified.
• Part II Section B Table 1 — A new requirement to sample stormwater discharges twice per year for those facilities with
exposed piles of certain materials remaining on site longer than seven days.
• Part 11 Section B Tables 2 and 3 and following — For permittees with exposed piles, there are new provisions requiring the
permittee to execute Tier One and Tier Two response actions, based on the first benchmark exceedence (Tier One) and the
second consecutive benchmark exceedence (Tier Two). Tier Two requires that the permittee institute monthly monitoring
instead of twice -per -year monitoring, until three consecutive monitoring events show no benchmark exceedences.
• Part II Section B — For permittees with exposed piles, a new provision that four exceedences of any particular benchmark
will trigger increased DWQ involvement in the permittee's stormwater management and control actions. DWQ may direct
the permittee to apply for an individual permit, or may direct the implementation or installation of specific stormwater control
measures.
• Part 11 Section C — Clarification that under the qualitative monitoring provisions of the permit, the permittee is obligated to
respond to repeated observations of stormwater pollution. DWQ may impose additional stormwater management
requirements if the permittee is non -responsive, or if the responses are ineffective.
Your coverage under the General Permit is transferable only through the specific action of DWQ.
\� 1G a
�'�#utrir�r u
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 807-6300 Customer Service
Intemet: h2o.enr.state.nc.uslsulstormwater.html 512 N. Salisbury St. Raleigh, NC 27604 FAX 019) 807-0494 1-877-623-6748
An Equal OpportunliylAffirmative Action Employer— 50% Recycled/10% Post Consumer Paper
it
NPDES Stormwater Permit Coverage Renewal
Permit Number NCG210376
Page 2
This permit does not affect the legal requirements to obtain other permits which may be required by NCDENR, nor does it relieve
the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance,
order, judgment, or decree.
If you have any questions regarding this permit package please contact Bethany Georgoulias of the Central Office Stormwater
Permitting Unit at (919) 807-6376.
Sincerely,
for Coleen H. Sullins
cc: DWQ Central Files
Stormwater Permitting Unit Files
Fayetteville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG210000
CERTIFICATE OF COVERAGE No. NCG210376
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and
the Federal Water Pollution Control Act, as amended,
Oldcastle Lawn And Garden Inc
is hereby authorized to discharge stormwater from a facility located at
Oldcastle Lawn and Garden -Aberdeen Division
107 Reservation Rd
Aberdeen
Hoke County
to receiving waters designated as Quewhiffle Creek, a class C stream in the Lumber River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II,
III, IV, V, and VI of General Permit No. NCG210000 as attached.
This certificate of coverage shall become effective September 15, 2008.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day September 12, 2008.
for Coleen H. Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
Department of Environment,,����+��
and Natural Resources {''--
Division of Water Quality t-tts 2 3 2097
Michael F. Easley, Governor
William G. Ross Jr., Secretary
Alan W. Klimek, Director
Ted Carter, E14S Director
Oldcastle Lawn and Garden Inc.
375 North Ridged Road, Suite 250
Atlanta, Georgia 30350
Dear Mr. Carter:
r
WYM)
February 21, 2007
Tk4 � •
AM
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RE50URCE5
Subject: General Permit No. NCG210000
Southern Importers Inc.
COC NCG210376
Hoke County
In accordance with your application for discharge permit received on September 11, 2006, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and
the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
May 9, 1994 (or as -subsequently amended).
If any parts, measurement frequencies, or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the
Division of Water Quality. The Division of Water Quality may require modification or revocation and
reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by
the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area
Management Act, or any other Federal or Local governmental permit that may be required.
Please note that the Division is currently evaluating the question of whether drainage from composting
and mulching operations should be permitted as stormwater or as wastewater. The future renewal of your
coverage under General Permit NCG210000 may be affected by the results of our determinations.
If you have any questions concerning this permit, please contact Ken Pickle at telephone number
(919) 733-5083-ext. 584,
Sincerely,
. 4 (-) P_I_dzlz�
I'&r Alan W. Klimek, P. E.
cc: �. Fayetteville Regional Office
DWQ Central Files
Stormwater Permitting Unit Files
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG210000
CERTIFICATE OF COVERAGE No. NCG210376
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Oldcastle Lawn and Garden Inc.
is hereby authorized to discharge stormwater from a facility located at
Southern Importers Inc.
107 Reservation Road
Aberdeen, North Carolina
Hoke County
to receiving waters designated as unnamed tributary to Quewhiffle Creek, a class C water in the Lumber River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III,
IV, V, and VI of General Permit No. NCG210000 as attached.
This certificate of coverage shall become effective February 21, 2007.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day February 21, 2007.
/IrAlan W. Klimek, Director
Division of Water Quality
By Authority of the Environmental Management Commission
ce
5k_ .47. " Q
SOUTHERN IIV"RTERS, ABERDEEN NC
STORM WATER —INSPECTION
Daterri me of inspeciioa i
Wet or Dry Conditions:
I. VISUAL
INSPECTION OF DRAINAGE AREAS
• -Area
Pa*al
.�:
for non -soon► disdwges _ yes i no
Evid�ence
ofnon-Amawater discharges yes .-/no
Evidence
of trash, improper outdoor scrap storage,
or 'v
iproper outdoor chemical or product storage T yes 1/ no
Evic
ence of erosion or excessive sedimentation _._ yes -6,40
Evidence
of spills or leaks — yes ✓o
Evidence
of decay or disrepair of any containment structures v yes Vono .
Evi
of any contamination m Storm Water Ditch __yes o
Evi
ce of any corm ination (pigment) in gully by coloring area ` yes
Describe,
if yes -
Cori
ective Action Required.
Da
Corrective Action Taken.
• fiMjgffe
Arm 2:
Pote
Oial for non-stmnwater.discharges —yes 4211n,0
Evidence
of non-stormwater discharges —yes �o
Evidlence
i
of trash, impWer outdoor scrap storage,
or
proper outdoor chemical or product storage _ yes
Evi
nce of erosion or excessive sedimentation _ yes "Inlo
Evidence
of spills or leaks _ yes 20
Evi
" nce of decay or disrepair of drainage or culvert structures — yes Z no
Evic
nce of disrepair on storm water retention basin. _ yes
DeJribe,
if es:
Corribetive Action Required.
Dati, Comxtive Action Taken.
K VIStJAL INSPECTION OF grORMWATER (Semi- Annually)
Owlfibu 0011-
Floating Solids —Yes vio Color — yes
Suspended Solids —yes ZBO Turbidity — yes
Outfall Staining —yes -IZ Odor Foam — Yes. �no
z
no 7
Visible Sheens yes; r4o — yes
DYY Weather Flow yes 'Zno Samples submitted
oAdfa
for analysis yes -ZRO(*)
Floating Solids
—yes Zno
Color
—yes jzfio
Suspended Solids
yes j/✓'no
_
Turbidity
— yes Vw
Ouffall Staining,
—yes -,zno
Odor
— yes z'ho
Visible Sheens
— yes _Zno
Foam
— yes &zifo
Dry Weather Flow _yes ,,ho Samples submitted for analysis _ yes _ no(*)
Investigate and Docusnent Cause, if yes
jev-�-( q6,.�e i with
Con'lective Action Required. MLU Lf
-t Date Corrective Action Taken. jo
Samples need to be submitted for analysis on the first and last year of coverage, if the monthly motor
oil Osage is 55 gallons or more (see section 3A of the SWP3).
IH. SPILL PREVENTION & RESPONSE PLAN INSPECTION
Arel�pill kits adequately stocked in' locations indicated in the plan?
Is the %61 oil tank and containment berm in good condition?
Are all pumps and hoses in good condition and operating properly?
Are Wl fill lines and drain valves closed and securely locked when not in use?
If no, describe.
Corr"ve Action Required.
Date'; Corrective Action Taken.
IV SIGNATU"k OflNSPIV TION TEAM
I
vsy s —no
-L-fes —no
_jZy-es —no
-�s — np,
Date and Tim*. -4,4t2—
?"Co.ew
00Idcastle
SOUTHERN IMPORTERS, ABERDEEN NC
STORM WATER — INSPECTION
Dateffime of inspection: / ! s '-0
Wet or Dry Conditions:(` _
I. VISUAL INSPECTION OF DRAINAGE AREAS
• Drainage Area l:
Potential for non-stormwater discharges —yes _1.__4o
Evidence of non-stormwater discharges — yes ---55�
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage — yes --no
Evidence of erosion or excessive sedimentation — yes --no
Evidence of spills or leaks _yes -L no
Evidence of decay or disrepair of any containment structures — yes V/no
Evidence of any contamination in Storm Water Ditch des � no
Evidence of any contamination (pigment) in gully by coloring area _yes ✓no
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
• Draina,-e Area 2:
Potential for non-stormwater discharges _ yes L--n/o
Evidence of non-stormwater discharges _ yes ✓o
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage —yes L/no
Evidence of erosion or excessive sedimentation —yes _�Zn��o
Evidence of spills or leaks yes Vno
Evidence of decay or disrepair of drainage or culvert structures —yes jzno
Evidence of disrepair on storm water retention basin. —yes a no
if
!1
Corrective Action Required.
Date Corrective Action Taken.
VISUAL INSPECTION OF STORMWATER (Semi- Annually)
gutau 001:
Floating Solids
Suspended Solids
OutfaIl Staining
Visible Sheens
Dry Weather Flow
ow au ooz:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
_yes o
Colors
— no
des _ no
Turbidity
� _ no
yes jZno
Odor
_ yes
yes 4/'fio
Foam
_ yes
_ yes Zna
Samples submitted for analysis Zyes _ _ no(*)
yes -v no
Zno
Color
Turbidity
des _ no
no
yes
es —
— yes
Odor
_ yes to
yes no
—yes 2no
Foam yes _
Samples submitted for analysis Zyes no(*)
Investigate and Document Cause, if yes rr- f LW A,� b csA
Corrective Action Required. \11a'S
Date Corrective Action Taken. CT_ 3 1 — , I — dvs adt- A-e- VA k,U 0 are'q C- CL64 Duf-pD
(*) Samples need to be submitted for analysis on the first and last year of coverage, if the monthly motor
oil usage is 55 gallons or more (see section 3.4 of the SWP3).
M. SPILL PREVENTION 4 RESPONSE PLAN INSPECTION
Are spill kits adequately stocked in locations indicated in the plan?
Is the fuel oil tank and containment berm in good condition?
Are all pumps and hoses in good condition and operating properly?
Are all fill lines and drain valves closed and securely locked when not in use?
If no, describe.
Corrective Action Required.
Date Corrective Action Taken.
IV. SIGNATURES OF INSPECTION TEAM
dyes —no
LZyes _ no
yes —no
yes _ no
Date and Tima. E 11
W 30444
Fayetteville Division
2592 Hope Mills Rd
Fayetteville, NC 28306
910.864,1920 Phone
910.864.8774 FM
Certificate of Analysis
Oldcastle Lawn and Garden - Mid Atlantic
Mr- Ted Carter Date Reported: September 07, 2011
Project: Sloan water- Aberdeen Date Received: Au ust 29, 201 1
I O7 Reservation Road g
Aberdeen NC, 29315 Sampled By: Ted Carter Date Sampled: August 27, 201 1
Outfall 41 (107 Reservation Road)
1108545-01
Analyte
Result
Unit Analysis Date/Time
Analyst
Method
Qualifier
Analyzed try: microbac - Fayetteville Division
COD, Total
202
mg1L 8/30/11 8:15
ARS
SM 20th Ed- 5220 D
PH
6.65
pH Units 8l29/11 15:00
DSK
SM 4500 H+ B
H
Total Suspended Solids
290
mg/L 8/31/1 l 15:00
DSK
SM 20th Ed. 2540 D
Al2
Outfall 42 (107 Reservation Road)
1108545-02
Analyte
Result
Unit Analysis Date/Time
Analyst
Method
Qualifier
Analyzed by: Microbac - Fayetteville Division
COD, Total
315
mg/L 8/30111 8:15
ARS
SM 20th Ed. 5220 D
pH
6.38
pH Units 8/29/1 l 15:00
DSK
SM 4500 H+ B
H
Total Suspended Solids
790
mg/L 8131/11 15:00
DSK.
SM 20th Ed. 2540 D
Qualifier Definitions
H Analyte was prepared and/or analyzed outside of the analytical method holding time
Alt MSJMSD fail recovery, but the LCS passes criteria.
State Certifications, Respectfully Submitted
NCD#W1 p � �n
NCDOH OH #37714 �f�(}Q
USDA 43787 Roben Dermer, Division Manager
Thank you for your bUSireSS_ Wr rmirr ynur.Jcrdhurq nn our level ofyeMcc ra wa. Please conraci the I>rvirlon hlanager, Foherr Dcrnrer or 9J"64-1920, James NoAcr, President, ar
james.nakex.rnnricruhaucnm nr T'revnr Hnvcc, CPO, ar rrrvurhryce��mirrohuecnm n-Lh any c nrnmenrs nr suggesrinns,
' Page I of 1
0Ofdcastle
SOUTHERN IMPORTERS, ABERDEEN NC
STORM WATER - INSPECTION
Date/Time of inspection: r e) A
Wet or Dry Conditions:
I. VISUAL INSPECTION OF DRAINAGE AREAS
• Drainare Area l:
Potential for non-stormwater discharges _ yes —,Ito
Evidence of non-stormwater discharges _ yes -no
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage _ yes _ no
Evidence of erosion or excessive sedimentation _ yes ."no
Evidence of spills or leaks _ yes .no
Evidence of decay or disrepair of any containment structures _ yes no
Evidence of any contamination in Storm Water Ditch yes r no
Evidence of any contamination (pigment) in gully by coloring area des -,"no
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
• Drainage Area 2:
Potential for non-stormwater discharges
—yes -,.er[o
Evidence of non-stormwater discharges
_ yes L-rio
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage
_ yes —.no
Evidence of erosion or excessive sedimentation
_ yes _-L'no
Evidence of spills or leaks
_ yes no
Evidence of decay or disrepair of drainage or culvert structures
_ yes S,eno
Evidence of disrepair on storm water retention basin.
— yes no
ffl
II.
Corrective Action Required.
Date Corrective Action Taken.
VISUAL INSPECTION OF STORMWATER (Semi- Annually)
Outfall 001:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
Out 002:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
yes /o
Color _yes ono
yes -,- no
Turbidity _ yes ono
yes -,-no
Odor — yes -no
yes ,,no
Foam _ yes -fro
Samples for
/
_ yes - no
submitted analysis _
yes ✓t!o(*)
yes _/no
Color _ yes %no
yes ono
Turbidity_ yes ono
—yes no
Odor _ yes � no
_ yes ! no
Foam —yes --,,no
yes -'no
Samples submitted for analysis _,
yes —�-do(*)
Investigate and Document Cause, if yes
Corrective Action Required.
Date Corrective Action Taken.
{*) Samples need to be submitted for analysis on the first and Iast year of coverage, if the monthly motor
oil usage is 55 gallons or more (see section 3.4 of the SWP3).
M. SPII.L PREVENTION & RESPONSE PLAN INSPECTION
Are spill kits adequately stocked in locations indicated in the plan? —yie's _ no
Is the fuel oil tank and containment }Term in good condition? yes —no
Are all pumps and hoses in good condition and operating properly? —!:�Y'es —no
Are all fill lines and drain valves closed and securely locked when not in use? dyes — no
If no, describe.
, Corrective Action Required_
Date Corrective Action Taken.
IV. SIGNATURES OF INSPECTION TEAM Date and Tima. �- c4
0Oldcastle
SOUTHERN IMPORTERS, ABERDEEN NC
STORM WATER — INSPECTION
Date/Time of inspection: 0
Wet or Dry Conditions:
I. VISUAL INSPECTION,OF DRAINAGE AREAS
• Drainage Area 1:
Potential for non-stormwater discharges ` yes �4_0
Evidence of non-stormwater discharges — yes no
Evidence of trash, improper outdoor scrap storage, /
or improper outdoor'chemical or product storage _ yes (/ no
Evidence of erosion or excessive sedimentation _yes -n'o
Evidence of spills or leaks yes ono
Evidence of decay or disrepair of any containment structures ^ yes ell -no
Evidence of any contamination in Storm Water Ditch -_yes no
Evidence of any contamination (pigment) in gully by coloring area yes /no
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
• Drainage Area 2:
Potential for non-stormwater discharges
—yes
—/'no
Evidence of non-stormwater discharges
yes
o
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage
_ yes
/,"no
Evidence of erosion or excessive sedimentation
_ yes
ono
Evidence of spills or leaks
— yes
no
Evidence of decay or disrepair of drainage or culvert structures
_ yes
/ no
Evidence of disrepair on storm water retention basin.
_ yes
/no
if
i
• j
Corrective Action Required.
Date Corrective Action Taken.
H. VISUAL INSPECTION,OF STORMWATER (Semi- Annually)
Outfall 001
Floating Solids
yes
—,-no
Color _
yes -,'-no
Suspended Solids
yes
rno
Turbidity _
yes no
Outfall Staining
_yes
!no
Odor
_yes /r5o
Visible Sheens
_ yes
ono
Foam _
yes _/no
Dry Weather Flow
_ yes
%no
Samples submitted for analysis _ yes ,-to(*)
Outfall 002:
Floating Solids
_ yes
ono
Color
yes e—no
Suspended Solids
_ yes
ino
Turbidity
—yes ono
Outfall Staining
_ yes
no
Odor
_ yes lno
Visible Sheens
—yes
/np
Foam
_ yes -'no
Dry Weather Flow
_ yes
` no
Samples submitted for analysis _ yes _ no(*)
Investigate and Document;Cause, if yes
Corrective Action Required.
Date Corrective Action Taken.
(*) Samples need to' be submitted for analysis on the first and last year of coverage, if the monthly motor
oil usage is 55 gallons or more (see section 3.4 of the SWP3).
III. SPILL PREVENTION & RESPONSE PLAN INSPECTION
Are spill kits adequately stocked in locations indicated in the plan? - Z es —no
Is the fuel oil tank and containment berm in good condition? oyes —no
Are all pumps and hoses in good condition and operating properly? yes —no
Are all fill lines and drain valves closed and securely locked when not in use? dyes _ no
If no, describe.
Corrective Action Required.
M��
Date Corrective Action Taken.
IV. SIGNATURES OF INSPECTION TEAM Date and Tima.
0� q- 10 If,
_- i
dOldcastle
SOUTHERN IMPORTERS, ABERDEEN NC
STORM WATER - INSPECTION
Date/Time of inspection: C�6L C(Wi
Wet or Dry Conditions: �f I�Q
I. VISUAL INSPECTION OF DRAINAGE AREAS
• Drainage Area 1:
Potential for non-stormwater discharges —yes �no
Evidence of non-stormwater discharges —yes —no
Evidence of trash, improper outdoor scrap storage,
or -improper outdoor chemical or product storage _yes no
Evidence of erosion or excessive sedimentation —yes —no
Evidence of spills or leaks —yes — no
Evidence of decay or disrepair of any containment structures —yes —no
Evidence of any contamination in Storm Water Ditch __yes _ no
Evidence of any contamination (pigment) in gully by coloring area yes — T10
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
• Drainage Area 2:
Potential for non-stormwater discharges ____ yes �no
Evidence of non-stormwater discharges _ yes -'no
Evidence of trash, improper outdoor scrap storage,
,no
or improper outdoor chemical or productstorage
_ yes
Evidence of erosion or excessive sedimentation
_ yes --fio
Evidence of spills or leaks
_ yes --/no
Evidence of decay or disrepair of drainage or culvert structures
— yes -/no
Evidence of disrepair on storm water retention basin.
—yes — no
Describe. if
II.
III
IV.
Corrective Action Required.
Date Corrective Action Taken.
VISUAL INSPECTION OF STORMWATER (Semi- Annually)
Out all 001:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
Out all 002:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
— yes
✓no
Color _
yes ✓no
yes
✓no
Turbidity _
yes /no
_ yes
✓no
✓no
Odor
Foam
_yes �no
✓no
_ yes
— yes
_,-no
_ yes
Samples submitted for analysis ` yes �'/fto(*)
_ yes
✓ r�O
Color
_yes Zno
_ yes
no
Turbidity_
yes Zno
yes
no
Odor
_ yes -no
yes
/-
Foam
_yes 2-noyes
l no
Samples submitted for analysis , yes ` no(*)
Investigate and Document Cause, if yes
Corrective Action Required.
Date Corrective Action Taken.
(*) Samples need to be submitted for analysis on the first and last year of coverage, if the monthly motor
oil usage is 55 gallons or:more (see section 3.4 of the SWP3).
SPILL PREVENTION & RESPONSE PLAN INSPECTION
Are spill kits adequately stocked in locations indicated in the plan?
Is the fuel oil tank and containment berm in good condition?
Are all pumps and hoses in good condition and operating properly?
Are all fill lines and drain valves closed and securely locked when not in use?
If no, describe.
Corrective Action Required.
Date Corrective Action Taken.
SIGNATURES OF INSPECTION TEAM
,yes — no
/yes —no
I'll,
es — no
Yes _ no
Date and Timit
'4vbbo
F=cA)G (VI
()Oldcastle
SOUTHERN iMPORTERS, ABERDEEN NC
STORM WATER — INSPECTION Date/Time of inspection: r7 �C *X,
Wet or Dry Conditions:
I. VISUAL INSPECTION OF DRAINAGE AREAS
• Drainage Area 1: /
Potential for non-stormwater discharges _ yes ✓ lio
Evidence of non-stonnwater discharges —yes no
Evidence of trash, improper outdoor scrap,storage,
or improper outdoor chemical or product storage — yes '-"no
Evidence of erosion or excessive sedimentation — yes ----no
Evidence of spills or leaks —yes /no
Evidence of decay or disrepair of any containment structures _ yes no
Evidence of any contamination in Storm Water Ditch __yes no
Evidence of any contamination (pigment) in gully by coloring area _yes '/no
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
• Draingge Area 2:
Potential for non-stormwater discharges —yes -no
Evidence of non-stormwater discharges yes __11,10
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage — yes no
Evidence of erosion or excessive sedimentation — yes --"no
Evidence of spills or leaks _ yes _,-no
Evidence of decay or disrepair of drainage or culvert structures _ yes �/io
Evidence of disrepair on storm water retention basin. yes ✓ no
Describe, if
II.
Corrective Action Required.
Date Corrective Action Taken.
VISUAL INSPECTION OF STORMWATER (Semi- Annually)
Outfal1001:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
Outfall 002:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
yes ./no
Color ^
yes ✓no
_ yes ✓no
Turbidity —
yes ino
yes ino
Odor
— yes -no
_ yes ./no
Foam
_ yes ---no
yes Z no
Samples submitted for analysis _ yes Zno(*)
yes _.,-no
Color
_ yes —no
yes !no
Turbidity
—yes !no
yes ino
Odor
_ yes -no
yes i no
Foam _ yes ---no
_ yes ! no
Samples submitted
for analysis _ yes -no(*)
Investigate and Document Cause, if yes
Corrective Action Required.
Date Corrective Action Taken.
(*} Samples need to be submitted for analysis on the first and last year of coverage, if the monthly motor
oil usage is 55 gallons or more (see section 3.4 of the SWP3).
III. SPILL PREVENTION & RESPONSE PLAN INSPECTION
Are spill kits adequately stocked in locations indicated in the plan?
Is the fuel oil tank and containment berm in good condition?
Are all pumps and hoses in good condition and operating properly?
Are all fill lines and drain valves closed and securely locked when not in use?
If no, describe.
Corrective Action Required.
Date Corrective Action Taken,
IV. SIGNATURES OF INSPECTION TEAM
✓yes —no
✓yes _no
Zyes —no
V yes —no
Date and Time
�%2_7/0� 6,30
0Oldcastle
II SOUTHERN IMPORTERS, ABERDEEN NC
STORM WATER -- INSPECTION (�
Date/Time of inspection:
Wet or Dry Conditions: t'
1. VISUAL INSPECTION OF DRAINAGE AREAS
• Drainage Area I:
Potential for non-stonnwater discharges _ yes --'no
Evidence of non-stormwater discharges _ yes -'-'110
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage — yes fo
Evidence of erosion or excessive sedimentation _ yes /no
Evidence of spills or leaks _ yes --/"Ito
Evidence of decay or disrepair of any containment structures ves '--'-110
Evidence of any contamination in Storm Water Ditch des 110
Evidence of any contamination (pigment) in gully by coloring area _yes ✓o
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
• Drainage Area 2:
Potential for non-stormwater discharges _ yes --'no
Evidence of non-stormwater discharges — yes Rio
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage yes iro
Evidence of erosion or excessive sedimentation _ yes o
Evidence of spills or leaks — yes no
Evidence of decay or disrepair of drainage or culvert structures — yes /na
Evidence of disrepair on storm water retention basin. _ yes ---'no
Describe, if
FAA
1 11
III
Corrective Action Required.
Date Corrective Action Taken.
VISUAL INSPECTION OF STORMWATER (Semi- Annually)
Out all 001:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
Out all 002:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
_ yes
--no
Color _ yes --no
_ yes
-no
Turbidity _ yes Rio
yes
,,-"no
Odor _ yes --no
— yes
--no
no
Foam — yes !no
Samples for no(*)
yes
submitted analysis ` yes
yes
no
Color _ yes _ no
_ yes
_ no
Turbidity _ yes —no
yes
_ no
Odor yes _ no
yes
_ no
Foam yes _ no
_ yes
_ no
Samples submitted for analysis _ yes _ no(*)
Investigate and Document, Cause, if yes
Corrective Action Required.
Date Corrective Action Taken.
(*) Samples need to be submitted for analysis on the first and last year of coverage, if the monthly motor
oil usage is 55 gallons or more (see section 3.4.of the SWP3).
SPILL PREVENTION & RESPONSE PLAN INSPECTION
Are spill kits adequately stocked in locations indicated in the plan?
Is the fuel oil tank and containment berm in good condition?
Are all pumps and hoses in good condition and operating properly?
Are all fill lines and drain valves closed and securely locked when not in use?
If no, describe.
Corrective Action Required.
Date Corrective Action Taken.
IV. SIGNATU
TEAM
°yes no
Zyes , no
Iles no
yes no
and Tima.
_//WOct, '..�1au
C101dcastte
OLDCASTLE LAWN AND GARDEN - ABERDEEN, NC
STORM WATER - INSPECTION
Date/Time of inspection: 0(, ` Z3 ,2
Wet or Dry Conditions:
I. VISUAL INSPECTION OF DRAINAGE AREAS
• Drainage Area 1:
Potential for non-stormwater discharges _ yes ----no
Evidence of non-stormwater discharges — yes �o
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage _ yes _ no
Evidence of erosion or excessive sedimentation _ yes -'-'110
Evidence of spills or leaks — yes -�/no
Evidence of decay or disrepair of any containment structures — yes no
Evidence of any contamination in Storm Water Ditch yes �/ i10
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
• Drainage Area 2:
Potential for non-stormwater discharges . _ yes "'no
Evidence of non-stormwater discharges yes n
Evidence of trash,,improper outdoor scrap storage, r
or improper outdoor chemical or product storage yes no
Evidence of erosion or excessive sedimentation _ yes /- no
Evidence of spills or leaks _ yes ---)no
Evidence of decay or disrepair of drainage or culvert structures yes �1/110
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
II.
IV.
VISUAL
Out all 001:
Floating Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
Out all 002.
Fioafing Solids
Suspended Solids
Outfall Staining
Visible Sheens
Dry Weather Flow
Outfall 003:
OF STORMWATER (Semi- Annually)
— yes
Xno
Color
_ yes -iio
_ yes
no
Turbidity _
yes 1110
_ yes
rno
Odor
_ yes L no
yesn
Foam
_ yes !no
/na
Samples submitted for analysis _ yes inn(*)
yes
1 o
Color
_ yes e'no
yes
/no
Turbidity
_ yes -,--no
yes
!no
Odor
_ yes ono
— yes
,no
Foam
_ yes
— yes
-'no
Samples submitted for analysis _ yes
Floating Solids
_ yes _ no
Suspended Solids
yes _no
Outfall Staining
_yes _ no
Visible Sheens
_ yes _ no
Dry Weather Flow
_ yes _ no
Investigate and Document Cause, if yes
Corrective Action Required.
Date Corrective Action Taken.
Color _ yes _ no
Turbidity _ yes _ no
Odor i yes _ no
Foam _ yes — no
Samples submitted for analysis _ yes _ no(*)
(*) Samples need to be submitted for analysis on the first and last year of coverage, if the monthly motor
oil usage is 55 gallons or more (see section 3.4 of the SWP3).
SPILL PREVENTION & RESPONSE PLAN INSPECTION
Are spill kits adequately stocked in locations indicated in the plan?
Is the fuel oil tank and containment berm in good condition?
Are all pumps and hoses in good condition and operating properly?
Are all fill lines and drain valves closed and securely locked when not in use?
If no, describe.
Corrective Action Required.
Date Corrective Action Taken.
SIGNATURES OF INSPECTION TEAM
Date and Pme
#"Z-q
-' yes 110
`✓ yes _ no
./
yes _ na
vyes _ no
i
��a -C
()Oldcastle
OLDCASTLE LAWN AND GARDEN — ABERDEEN, NC
STORM WATER —INSPECTION
DateMme of inspectionol &
Wet or Dry Conditions:
I. VISUAL INSPECTION OF DRAINAGE AREAS
• Drainage Area 1:
Potential for non-stormwater discharges
Evidence of non-stormwater discharges
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage
Evidence of erosion or excessive sedimentation
Evidence of spills or leaks
Evidence of decay or disrepair of any containment structures
Evidence of any contamination in Storm Water Ditch
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
• Drainage Area 2:
Potential for non-stormwater discharges
Evidence of non-stormwater discharges
Evidence of trash, improper outdoor scrap storage,
or improper outdoor chemical or product storage
Evidence of erosion or excessive sedimentation
Evidence of spills or leaks
Evidence of decay or disrepair of drainage or culvert structures
Describe, if yes.
Corrective Action Required.
Date Corrective Action Taken.
yes Zno
_ yes ✓o
_ yes 411
yes _V_/110
yes ✓o
yes _e'no
___yes _w_'(10
yes ✓no
yes ✓o
yes 11111"o
yes ./no
yes //no
yes
v
Y
S.
II.
VISUAL INSPECTION OF STORMWATER (Semi- Annually)
M,
IV.
Dut al! 001:
Floating Solids
_ yes Ao
Color
_ yes
./no
Suspended Solids
_ yes zno
Turbidity
_ yes
--'no
Outfall Staining
_ yes 1no
Odor
_ yes
--1�110
Visible Sheens
— yes ,'no
Foam
— yes
,---no
Dry Weather Flow
— yes ✓no
Samples submitted for analysis_ yes --"no(*)
Out al! 002:
Floating Solids
_ yes -fio
Color
yes
ono
Suspended Solids
yes ono
Turbidity
_ yes
!no
Outfall Staining
_ yes ! no
Odor
_ yes
no
Visible Sheens
yes no
Foam
yes
-,no
Dry Weather Flow
_ yes no
Samples submitted for analysis _ yes -'no(*)
Out all 003:
Floating Solids
^ yes _ no
Suspended Solids
_ yes _ no
Outfall Staining
_ yes _ no
Visible Sheens
_ yes no
Dry Weather Flow
_yes _no
Investigate and Document Cause, if yes
Corrective Action Required.
Date Corrective Action Taken.
Color — yes —no
Turbidity _ yes no
Odor —yes _ no
Foam _ yes _ no
Samples submitted for analysis _ yes _ no(*)
(*) Samples need to he submitted for analysis on the first and last year of coverage, if the monthly motor
oil usage is 55 gallons or more (see section 3.4 of the SWP3).
SPILL PREVENTION & RESPONSE PLAN INSPECTION
Are spill kits adequately stocked in locations indicated in the plan?
Is the fuel oil tank and containment berm in good condition?
Are all pumps and hoses in good condition and operating properly?
Are all fill lines and drain valves closed and securely locked when not in use?
If no, describe.
Corrective Action Required.
Date Corrective Action Taken.
SIGNATURES OF INSPECTION TEAM
Date and Time
Zes — no
.eyes _ no
,Zyes _ no
✓yes _ no
'�' .' !I
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
William G. Ross Jr., Secretary
Alan W. Klimek, Director
February 21, 2007
Ted Carter, EHS Director
Oldcastle Lawn and Garden Inc.
375 North Ridged Road, Suite 250
Atlanta, Georgia 30350
P ��w
4�•
poft
IM
C n[a) N R
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RE50URCE5
Subject: General Permit No. NCG210000
Southern Importers Inc.
COC NCG210376
Hoke County
Dear Mr. Carter:
In accordance with your application for discharge permit received on September 11, 2006, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and
the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
May 9, 1994 (or as subsequently amended).
If any parts, measurement frequencies, or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the
Division of Water Quality. The Division of Water Quality may require modification or revocation and
reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by
the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area
Management Act, or any other Federal or Local governmental permit that may be required.
Please note that the Division is currently evaluating the question of whether drainage from composting
and mulching operations should be permitted as stormwater or as wastewater. The future renewal of your
coverage under General Permit NCG210000 maybe affected by the results of our determinations.
If you have any questions concerning this permit, please contact Ken Pickle at telephone number
(919) 733-5083 ext. 584.
Sincerely,
9 L') P.I .
A Alan W. Klimek, P. E.
cc: Fayetteville Regional Office
DWQ Central Files
Stormwater Permitting Unit Files
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of i:nvironment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
September 12, 2008
Gene. KU feider
O1dt astle;Lawn And Ga_ rd�en Inc
375 N.Ridgetld R
Atlanta, GA` 30350
Subject: NPDES Stormwater Permit Coverage Renewal
Oldcastle Lawn arid?Garderi Aberdeen'Di�ision
.. ._
COC Number NCG210376
W ko e County
Dear Permittee:
In response to your renewal application for continued coverage under stormwater General Permit NCG210000 the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater General Permit. This permit has been reissued pursuant to
the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North
Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007.
The following information is included with your permit package:
• A new Certificate of Coverage
• A copy of stormwater General Stormwater Permit NCG210000
• A copy of the Technical Bulletin for the General Permit
• Five copies of the Discharge Monitoring Report (DMR) Form
• Five copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater only, and it specifies your obligations with respect to stormwater
discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all
the changes in the reissued permit.
The more significant changes to the General Permit include the following:
• Permit cover page, second paragraph — The General Permit now may cover activities that DWQ determines to be similar in
either the process, or in the exposed materials, to the Timber Products Industry.
• Part I Section A — A new provision that facilities draining to 303(d) listed waters, or in watersheds with an approved TMDL,
may not be eligible for continued coverage at the next renewal of the General Permit.
• Part I Section B second paragraph — A new clarification that the permit does not authorize discharges that DWQ determines
are wastewaters.
• Part I I Section A — The required contents of the Stormwater Pollution Prevention Plan have been expanded and clarified.
• Part II Section B Table 1 — A new requirement to sample stormwater discharges twice per year for those facilities with
exposed piles of certain materials remaining on site longer than seven days.
• Part II Section B Tables 2 and 3 and following — For permittees with exposed piles, there are new provisions requiring the
permittee to execute Tier One and Tier Two response actions, based on the first benchmark exceedence (Tier One) and the
second consecutive benchmark exceedence (Tier Two). Tier Two requires that the permittee institute monthly monitoring
instead of twice -per -year monitoring, until three consecutive monitoring events show no benchmark exceedences.
• Part li Section B — For permittees with exposed piles, a new provision that four exceedences of any particular benchmark
will trigger increased DWQ involvement in the permittee's stormwater management and control actions. DWQ may direct
the permittee to apply for an individual permit, or may direct the implementation or installation of specific stormwater control
measures.
• Part II Section C —'Clarification that under the qualitative monitoring provisions of the permit, the permittee is obligated to
respond to repealed observations of stormwater pollution. DWQ may impose additional stormwater management
requirements if the permittee is non -responsive, or if the responses are ineffective.
Your coverage under the General Permit is transferable only through the specific action of DWQ.
N4pr�hCarolina
Aalllrally
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 807-6300 Customer Service
Internet: h2o.enr.state.nc.uslsulstormwater.html 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 807-6494 1-877-623-6748
An Equal OpportunitylAffsrmadve Action Employer — 50% Recycled110% Post Consumer Paper
NPDES Stormwater Permit Coverage Renewal
Permit Number NCG210376
Page 2
This permit does not affect the legal requirements to obtain other permits which may be required by NCDENR, nor does it relieve
the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance,
order, judgment, or decree.
If you have any questions regarding this permit package please contact Bethany Georgoulias of the Central Office Stormwater
Permitting Unit at (919) 807-6376.
Sincerely,
for Coleen H. Sullins
cc: DWO Central Files
Stormwater Permitting Unit Files
Fayetteville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG210000
CERTIFICATE OF COVERAGE No. NC'G210_76
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and
the Federal Water Pollution Control Act, as amended,
Oldcastle Lawn And Garden Inc
is hereby authorized to discharge stormwater from a facility located at
dcastle Lawn and Garden -Aberdeen Division Ol
107 Reservation; Rd
--~�'Me rdeeri
Hoke C my
to receiving waters designated as Quewhiffle� Cr k, a class C stream in the Lumb River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II,
III, IV, V, and VI of General Permit No. NCG210000 as attached.
This certificate of coverage shall become effective September 15, 2008.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day September 12, 2008.
for Coleen H. Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG210000
CERTIFICATE OF COVERAGE No. NCG210376
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Oldcastle Lawn and Garden Inc.
is hereby authorized to discharge stormwater from a facility located at
Southern Importers Inc.
107 Reservation Road
Aberdeen, North Carolina
Hoke County
to receiving waters designated as unnamed tributary to Quewhifile Creek, a class C water in the Lumber River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, I1,111,
IV, V, and VI of General Permit No. NCG210000 as attached.
This certificate of coverage shall become effective February 21, 2007.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day February 21, 2007.
1' rAlan W. Klimek, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Re: Stormwater permit application
Subject: Re: Stormwater permit application
From: Mike Lawyer <Mike.Lawyer@ncmail.net>
Date: Wed, 21 Feb 2007 08:50:44 -0500
To: Ken Pickle <ken.pickle@ncmai1.net>
CC: Belinda Henson <belinda.henson@ncmail.net>
Hey Ken. I've had a couple of telephone conversations with Mr. Randy Glover from
Southern Imports regarding stormwater vs. wastewater. He's expressed to me that the
facility has something of a detention basin that receives all runoff from the
property, whether stormwater or what we would categorize as "wastewater". He would
probably be pleased to just get coverage under the stormwater permit even if its just
until 2008. I agree that we should get this facility under a permit soon because as
of now they're not doing any monitoring whatsoever. I concur with issuing the COC
under the NCG21 stormwater permit now and pursuing the wastewater issues at a later
date.
Thanks,
Mike
Ken Pickle wrote:
Hi Mike,
I have an NOI for Southern Importers, Inc., in Ashley Heights, Hoke County. They
produce and bag mulch. Their stormwater discharge would flow to an unnamed
tributary to Quewhiffle Creek, a class C water. Their NOI is in order, and I
intend to issue Certificate of Coverage #NCG210376, pending comments from you.
It's my intent to issue this COC even though our unit is investigating whether the
drainage from mulch piles should be treated generally as a stormwater or as a
wastewater. But, decisions move slowly up here, and I'd like to get these guys
under permit soon. This General Permit NCG21 expires in April 2008 - a relatively
short time from now, anyway.
As per my standard procedure, if I don't hear from you within two weeks I'll go
ahead and issue the COC.
Thanks for any response,
Ken
Michael Lawyer
Environmental Technician
NCDENR-Division of Water Quality
Surface Water Protection Section
Fayetteville Regional Office
Direct: (910)433-3329
Main: (910)433-3300
Fax: (910)486-0707
1 of 1 2/21/2007 8:52 AM
Re: stormwater permit application
Subject: Re: Stormwater permit application
From: Mike Lawyer <Mike.Lawyer@nctnail.net>
Date: Wed, 21 Feb 2007 08:50:44 -0500
To: Ken Pickle <ken.pickle@ncmail.net>
CC: Belinda Henson <belinda.henson@ncmail.net>
Hey Ken. I've had a couple of telephone conversations with Mr. Randy Glover from
Southern Imports regarding stormwater vs. wastewater. He's expressed to me that the
facility has something.of a detention basin that receives all runoff from the
property, whether stormwater or what we would categorize as "wastewater". He would
probably be pleased to just get coverage under the stormwater permit even if its just
until 2008, 1 agree that we should get this facility under a permit soon because as
of now they're not doing any monitoring whatsoever. I concur with issuing the COC
under the NCG21 stormwater permit now and pursuing the wastewater issues at a later
date.
Thanks,
Mike
Ken Pickle wrote:
Hi Mike,
I have an NOI for Southern Importers, Inc., in Ashley Heights, Hoke County. They
produce and bag mulch. Their stormwater discharge would flow to an unnamed
tributary to Quewhiffle Creek, a class C water. Their NOI is in order, and I
intend to issue Certificate of Coverage #NCG210376, pending comments from.you.
It's my intent to issue this COC even though our unit is investigating whether the
drainage from mulch piles should be treated generally as a stormwater or as a
wastewater. But, decisions move slowly up here, and I'd like to get these guys
under permit soon. This General Permit NCG21 expires in April 2008 - a relatively
short time from now, anyway.
As per my standard procedure, if I don't hear from you within two weeks I'll go
ahead and issue the COC.
Thanks for any response,
Ken
Michael Lawyer
Environmental Technician
NCDENR-Division of Water Quality
Surface Water Protection Section
Fayetteville Regional Office
Direct: (910)433-3329
Main: (910)433-3300
Fax: (910)486-0707
of 1 2/21/2007 8:52 AM
Cal
INS,
'
PC
�ii , � /' � � �,/' ,� ��\ I � qs i-' , •n 1�--••��� .� Jo
VA
1 1f e■i��� / It -)7 •�
le eig
a� if �✓ . \ A/ .! / ! ._�' M 4 ! '� '� :1 `-_._ - I �
��'..f .IIC f '�'•r�v '��If ,\ I• e,?l .l_�y.` 4�'f +a i
l�rz
••,��'. ,r-�` <.,. � �. /��''/J//��y�. �/'Y �'- y n \\ - l/�/ �! 1.
,/' r•*r �.re a 11i ,b%f �d �..% /: ^,was �1 .yam tt�'• \ / kr : p.
`��,i`�y>W., � I !I�f; ti` ; •``cam ij �"�• i—�'�� � i �1 -✓. %,I Y� •r�'" `� Yf/I1 �-,
. ! C. �y-•' ..__i -r! -•.`_ ram. _ - : � � � . i f(` •.. ,.• .. � n
.� 1 ,T: -�,,�-�f� -�=`=��s: �.-f�x.��a! t� /� •�.yJ/ 5 ��-�" H ff1
_.a-�/li?5�-
�..r rya•' y \�� 3� w..\ �(,t � !/'�-4� t{ � I�� ��ti��\ �. � l` � .l i."\ N � 1 -./ I
7 l S ) 1 4{ !! \1 t \
t
- jai • ow h i {' �`�� , ' �! a'ti x 7
w
n t .•�'! `a � �"r"- `�\ � : - -��'• � ^ 14 I���' llitr � -. s� II, , a � ::_•.. S �� '4-
�. .4 c L r $ei ��^ �' r� '' y--'� �_.� \\� 1 r. 1 I j(/ !r ,.r'�Q �• �.I � /�l^ ".,� 4 _ �� •
N _�I. U II �„ -:.'�� \\ �.r, ..✓"mot-`-T2--..__"r'•..�-..\ I ,.W, .
3"
Copyright (C) 1997, Maptech, Inc.
g
Ji
"O�
ev
q
.,. _
t 1
4,09
�1."'G �•r+�,,�+}9
��w✓'v".-J ` � p �.r �e P � ��.F �a� '� d. may+". r� r ="
le eig
o
dt
dp
] ,
✓ r
r R
r
' 1
•:...� � J � r. � '�1 � 11 -v ii'� ` ' 'Lim 6 f q'�i4���°�. � � .fir. �� E � i .-��
• S
tt.
�e
1 a j
r °
,� ...+w.. �.�,�•�� ��' 1. .y�'� .1ei y — ��'" z `t f.„ 2fr � p # `
Copyright (C) 1997, Maptech, Inc
13.1,01-d
F
Y
OldcastleO Inspection and Reporting Requirements
(Appendix A-H)
Figures
Annual Non -Storm Water
Discharge Certification
tr 0 3
rt r �� Appendix
BSI
{7 �l a C l `t f �.f 1 'w •;i� `i.�'s � � � � .t� TY Y�,
Containment D• ••- Recordsw
1 iyy -
fLDocument of Training Form
- T x• 4 Y ky 6
Qualitative Monitoring Forms
v �7 A� � •� �R try _
[4e�1'tl a rt_r�� ����Y' �� �
iw:i FF� lu`�' d�,;S�,l.,iaCaM 1,trF.
k a h .. b Analytical • • • Reports
•fr •, "�.� r Ey. ` �l; `�'$ "1 3 i t`-A is Appendix ��;, ��- ��+
,Nil.
.�/I a ^:Facility Inspections
Appendix North Carolina Stormwater
General Permit
STORM WATER POLLUTION PREVENTION PLAN (SWP3)
Old Castle Lawn & Garden, Inc.
Aberdeen Plant
Aberdeen, North Carolina
Prepared by:
Falcon Engineering, Inc.
1210 Trinity Road, Suite 110
Raleigh, North Carolina 27607
919.871,0800
Project Number:
E12015.00
Version:
March 2012
T
MANAGEMENT CERTIFICATION AND DULY AUTHORIZED REPRESENTATIVE
[NPDES Permit No. NCG210000, Part III, Section 13(5)]
I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing violations.
Matthew Wilson, Plant Manager
Ted Carter, Assistant Plant Manager/EHS Director, is duly authorized, as my representative, to sign
and certify reports and other information requested by the Director of the Division of Water
Quality, Department of Natural Resources as part of this Plan.
Matthew Wilson, Plant Manager
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page ii Version: March 2012
PLAN REVIEW AND AMENDMENT
[NPDES Permit No, NCG210000, Part II, Section A[7)]
The Storm Water Pollution Prevention Plan shall be reviewed and updated on an annual basis.
The annual update shall include an updated list of significant spills or leaks of pollutants for the
previous three years, or the notation that no spills have occurred (Section 2.2). The annual
update shall include re -certification that the stormwater outfolls have been evaluated for the
presence of non-stormwater discharges (Appendix B). Each annual update shall include a re-
evaluation of the effectiveness of the BMPs listed in the BMP Summary of the Stormwater
Management Plan (Section? 3.3 and Appendix G).
The Plan shall be amended whenever there is a change in design, construction, operation, or
maintenance which has a significant effect on the potential for the discharge of poliutants to
surface waters or when requested by EPA or the NCDENR.
Reviewer Date Comments or Revisions
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page iii Version: March 2012
POLLUTION PREVENTION TEAM
[NPDES Permit No. NCG210000, Part II, Section A(3) and A(6)]
The following table identifies the members of the Pollution Prevention Team and the personnel
responsible the facility Spill Prevention and Response Plan (SPRP). These individuals are
responsible for developing, implementing, maintaining, and revising the Plans.
Acknowledgements of these responsibilities are duly noted by the signatures provided below by
these individuals.
Name and Posffion
Responsibility
Matthew Wilson
a
Commitment of corporate resources to implement the
Plant Manager
Plan
Ted Carter
0
Overall implementation
Assistant Plant Manager / EHS Director
9
Notifications
•
Compliance during containment and cleanup
•
Comprehensive site compliance audits
•
Specific procedures implementation
•
Training of facility personnel
Inspections
Signature Date
Maintenance I Bagging I Yard Supervisors
Maintenance
•
Corrective Measures
•
Implementing containment and cleanup actions
•
Monitor workers for proper procedures
(signatures provided at time of training)
Good housekeeping
Cleanup of small spills and residues
Plant Personnel
.
Proper procedures
•
Good Housekeeping
•
Daily observations for leaks, spills or equipment
Problems
(signatures provided at time of training)
Old Casile Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page B-iv Version: March 2012
TABLE OF CONTENTS
Pane
Mancgement Celification and DUy Authorized epresen a ive......................................................... u
Plan Review and Amendment....................................................................................................................
iiiIII
Pollution Preveniion Team...........................................................................................................................iv
Figures............................................................................................................................................................vii
Tables.. .... ...... ...... _ ........ ...... ...... ..........................................................................................
vll
Section1 1 Introduction...............................................................................................................................
1
1.1 General Overview......................................................... ......................
............................
1
1.2 Plan Availability and Submittai......................................................................................
1
1.3 Plan Review, Amendments, and Signatures..... ..........................................................
2
Section2 � Facility Information................................................................................................................... 3
2.1 Facility Description Overview........................................................................................ 3
2.2 Site Drainage....................................................................................................................
5
2.3 Significant Materials and Activities............................................................................... 6
2.4 Significant Spills or Leaks.................................................................................................
8
2.5 Non -Storm Water Discharges.........................................................................................
8
Section 3 1 StormWater Management.. ...... ...... ...................................................................................... 9
3.1 Feasibility...........................................................................................................................9
3.2 Secondary Containment and Procedures..................................................................9
3.3 Summary of Best Management Practices.................................................................
11
Section 4 1 Spill Prevention and Response Plan (SPRP)........................................................................
13
4.1 Potential Pollution Sources...........................................................................................
13
4.2 Spill Containment Equipment....................................................................................1.
13
4.3 Initial Action and Spill Response Procedures............................................................
14
Section 5 1 Plan Imolementation.............................................................................................................
15
5.1 Preventative Maintenance..........................................................................................
15
5.2 Good Housekeeping Practices...................................................................................
16
5.3 Employee Training.........................................................................................................
17
5.4 Facility Inspections ..........................
Section 6 1 Outfall Monitoring...................................................................................................................
19
6.1 Analytical Monitoring Requirements..........................................................................
19
6.2 Qualitative Monitoring..................................................................................................
20
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page v Version: March 2012
TABLE OF CONTENTS (CONTINUED)
Page
Section 7 1 Recordkeeping and Reporting............................................................................................ 21
7.1 Recordkeeping...................... ...................................................................... ..... .......... _ 21
7.2 Reporting Requirements............................................................................................... 22
AppendixA Figures ............................................. ............................................,...................................... A-1
Appendix B Annual Non -Storm Water Discharge Certification....................................................... B-1
Appendix C Containment Drainage Records.................................................................................. C-1
Appendix D Document of Training Form........................................................................................... D-1
Appendix E Qualitative Monitoring Forms.......................................................................................... E-1
Appendix F Analytical Monitoring Reports.......................................................................................... F-1
Appendix G Facility Inspections... .............................................................. ......... ............... G-1
Appendix H North Carolina Storm Water General Permit................................................................H-1
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page vi Version: March 2012
FIGURES
Page
Figure 1 1 General Site Location............................................................................................................. A-2
Figure2 1 Detailed Site Layout................................................................................................................ A-3
TABLES
Page
Table1 1 Outfall Locations.......................................................................................................................... 5
Table 2 Activity Areas and Outfall Pollutani Potential......................................................................... 7
Table3 Bulk Storage Vessels................................................................................................................... 10
Table 4 Summary of kmplemented BMPs.............................................................................................. 12
Table 5 Analytical Monitoring Requirements....................................................................................... 19
Table 6 SDO Monitoring Schedule......................................................................................................... 20
Table 7 Qualitative Monitoring Requirements..................................................................................... 20
Old Castle Lawn & Garden, Inc.
Aberdeen, NC
Page vii
SWPP Plan
Version: March 2012
SECTION 1 I INTRODUCTION
1.1 General Overview
This Storm Water Pollution Prevention Plan (SWP3) - the "Plan," has been prepared for Old Castle
Lawn & Garden, Inc. (Old Castle), with physical location at 107 Reservation Road, Aberdeen,
NC 38315. Old Castle operates under Standard lndusirial Classification Code (SIC) 2499 and
conducts industrial activities employing the storage and processing of raw materials necessary
for the production of mulch products, soils/soil amendments, and bagging of these products.
The SWP3 is required for facilities in North Carolina that are covered by General Permit
NCG210000 to Discharge Storm Water under the National Pollutant Discharge Elimination System
(NPDES). Coverage under this general permit is applicable to all owners or operators of
stormwater point source discharges associated with activities classified as establishments
primarily engaged in Timber Products [Standard Industrial Classification (SIC) 241, The SWP3
identifies potential sources of pollution that may reasonably be expected to affect the quality of
stormwater discharges associated with industrial activities- and describes and ensures the
implementation of practices that are to be used to reduce the pollutants in stormwater
discharges.
This SWP3 was developed in accordance with permit requirements, sound engineering practices
and employs best management, operational, and response practices (BMPs) designed to
minimize the likelihood of stormwater pollution.
1.2 Plan Availability and Submittal
The facility is required to keep the Plan with all appropriate records, addenda, and appendices
on file at the site. The Plan will be kept in the main office. The facility must make the Plan
available for review and the facility available for inspection at reasonable times by authorized
personne4 from the North Carolina Department of Environment and Natural Resources (NCDENR)
or the US Environmental Protection Agency (EPA).
Under the SWP3 requirements, this Plan does not need to be submitted to the NCDENR.
However, the NCDENR may request the Plan for review and may request modifications if the
Plan does not meet the requirement of the facility's permit. If modificotions are requested, the
facility must submit a schedule for revising the Plan to the NCDENR within 30 days.
Old Castle Lawn 8 Garden, Inc. SWPP Plan
Aberdeen, NC Page I Version: March 2012
1.3 Plan Review, Amendments, and Signatures
Pursuant to the SWP3 requirements, the facility shall conduct an annual Comprehensive Site
Compliance Evaluation (refer to Section 6.0 and Appendix G) and the Plan shall be
amended whenever there is a significant change that affects the potential for discharges
of pollutants to surface water or if the SWP3 provisions prove to be ineffective in eliminating
or significantly minimizing pollutants from sources identified at the facility. In the event that
the facility is closed or sold, notification to the NCDENR is required.
All applications, reports, or information submitted must be signed and certified by a
corporate officer, general partner, or proprietor. Reports or information may be signed by a
"duly authorized representative" only if written authorization is submitted to the NCDENR
identifying a named individual or an individual occupying a named position. All signed
documents shall include the certification included on page i.
Old Castle lawn & Garden, InC. SWPP Plan
Aberdeen, NC Page 2 Version: March 2012
SECTION 2 1 FACILITY INFORMATION
[NPDES Permit No. NCG210000, Part II, Section A (1)]
Facility Name: Old Castle Lawn &, Garden, Inc. I Aberdeen Plant
Facility Address: 107 Reservation Road
Aberdeen, North Carolina 38315
Telephone: (910) 944-1232
Owner Information: Oldcastle APG
375 Northridge Road, Suite 350
Atlanta, GA 30350
2.1 Facility Description Overview
Oid Castle operates the Aberdeen Plant as a mulch/soil amendments processing plant, Figure 1
in Appendix A provides a general location map of the facility in relationship to transportation
routes and surface waters. The plant site is approximately 36 acres. Old Castle produces and
distributes mulch and soil products as described in more detail below.
Old Castle receives virgin trees and pre-processed organic material (i.e., pine bark, woody
debris, soils, etc.), to process a variety of mulch products, generate soil from the mulching
operation, create a variety of potting soil products, and screen bulk bark for re -sale.
Virgin logs are transported to the property via truck. These materials are unloaded from the
truck using a diesel powered knuckle boom and stored on the west -central portion of the yard
until they are needed. Once processing of these materials is required, they are processed using
a log grinder. Pre-processed organic materials arrive in open top trailers from various suppliers.
The mulch that is delivered is stored in windrows on the eastern yard until ready for bagging. Old
Castle uses a variety of grinders and screens to process mulch products to provide a high quality
mulch product and remove any wood byproducts.
All ground and screened mulch is piled on the northeast portion of the property for use either in
the coloring operation or bagging. Wood byproducts, from screening processes, are stored in
piles for natural composting over time in order to generate a portion of the needed soil that is
bagged in similar equipment as the wood mulch. No pesticides or fungicides are added to
either soil or mulch products prior to bagging.
The mulch dying operation utilizes a pre -established formula containing no reportable quantities
of toxic chemicals, the main ingredient in the dying operation is Iron Oxide at an extremely dilute
concentration (>I%by weight). In the dying process, mulch is loaded into a hopper that further
Old Castle Lawn & Garden, Inc. SWPP Plon
Aberdeen, NC Page 3 version: March 2012
feeds a self -enclosed paddle mixer where a mixture of water and dye are introduced via a
metering pump in order to coat the product. Once the mulch is coated it is then taken via a
conveyor to a storage pile so it can dry prior to bagging. Colored or uncolored mulch is
transported to the four separate mulch bagging lines via a loader that places the material into a
dedicated hopper. The mulch is then conveyed to a bagger inside the building. A bagging
machine spout, which is hand operated, is attached to the bottom of the bagging assembly.
Wood byproducts from the wood mulching processes are combined with the soil in pre-
established piles for proper composting. Typically the soil is piled on the east side of bagging
building. Pearllite is mixed into the soil depending on the desired make-up of the soil to be
bagged. At proper intervals the soil mixture is then turned over and further blended prior to
bagging.
Once the mulch and soil products a're ready to be bagged, they are individually transported via
loader to the bagging areas and deposited into steel bins that feed their respective bagging
equipment. All of the bagging and palletizing operations take place within an industrial
warehouse. The bagged material is heat -sealed and hand stocked onto pallets. The pallets,
measuring 4 to 8 feet high are stretch wrapped on a turntable wrap machine. The wrapped
pallets are then transported outside via forklift for storage in the yard prior to shipping or loaded
onto waiting transports for delivery to retail locations.
A site map for the facility (drawn to scale) is included as Figure 2. The site map includes the
following information (where applicable):
• Facility property boundary,
• Location of each stormwater outfall,
All on -site and adjacent surface waters and wetlands,
• Industrial Activities/Areas (including storage of materials, disposal areas, process areas,
loading and unloading areas, haul roads, fueling, engine maintenance and repair, vessel
maintenance and repair, washing, painting, sanding, blasting, welding, and metal
fabrication),
• Site Topography,
• All drainage features and structures,
• Drainage areas for each outfall,
• Direction of flow within each drainage area,
• Buildings/Structures
• Existing BMPs, and
Impervious surfaces (percentage of each drainage area).
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 4 version: March 2012
2.2 Site Drainage
The facifify drainage is generally controlled by the surface topography and earthened berms.
Approximate drainage patterns are indicated on Figure 2 (Appendix A). The total area of this
site is approximately 35 acres of which approximately 25 percent is impervious (i.e. pavement,
buildings}, For the purposes of this plan, the site can be divided into two major drainage areas.
2.2.1 Drainage Area 1
Drainage area 1 comprises the majority of the production areas and extends the upper part of
the facility before it gets divided by the rail road tracks at the west part of the yard. Stormwater
flow in this drainage area travels via sheet -flow towards the western part of the yard along the
rail road tracks. Stormwater from the northwest section of the yard travels in a southwest
direction and stormwater in the southeast portion of the yard travels in a southwest fashion
crossing over a culvert pipe underneath the rail road tracks.
Drainage area 1 comprises of all the manufacturing areas, maintenance building, coloring area,
and fuel and oil storage locations. The majority of the area is unpaved, with poorly compacted
soil along the west part of the facility. 'A drainage ditch to the southeast of the coloring area
captures storm effluent from the back side of the main bagging building, and takes to a small
retention basin prior discharging towards the drainage ditch along the rail lines.
All stormwater effluent from this area travels across the rail lines and eventually draining into
drainage area two before it makes it into the retention basin at the southwest corner of the yard
and discharging via Outfall 001.
2.2.2 Drainaae Area 2
Drainage area 2 consist of a small parcel of land located southwest of the rail road tracks. This
area is primarily undeveloped flat land with sparse vegetation that serves as the finished product
storage are for the facility. Stormwater from this general area travels to the southwest corner of
the yard to a retention basin designed to handle the stormwater for both drainage areas.
Stormwater then discharges the site via Outfall 001.
The stormwater outfolls are indicated on Figure 2 and are listed within Table 1 below.
TABLE 1 I OUTFALL LOCATIONS
. Outtall
Latitude
1`�'Longitude
:Receiving, Water Body
001
35', 5', 12.72" N
79', 22', 0.88" w
Unnamed tributary to Quewhiffle Creek
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 5 Version: March 2012
2.3 Significant Materials and Activities
This faciiity is divided into several activity areas that manage, store, or process different materials
or provide differert support operations. These areas can be seen referenced on Figure 2.
Generally, the potential for stormwater contamination can be categorized into potential spills of
bulk stored materials (i.e., petroleum products, dye pigment, and mulch/soil materials), general
soil erosion and spills/leaks from heavy equipment. These areas, the materials and equipment
involved, and the drainage characteristics are described in Table 2 (management practices will
be revised as required).
The major items that could potentially impact stormwater include the following:
Raw materiai piles (mulch, soils, and woody waste)
• Bulk liquid storage (petroleum products and dye pigments)
• Heavy equipment (trucks, loaders, and grinding/screening equipment)
Processing Equipment (bagging and dying)
Vehicle service areas including fueling, maintenance and/or loading areas
• General erosion on bare surfaces
Old Castle Lawn &. Garden, Inc. SWPP Plan
Aberdeen, NC Page 6 Version: March 2012
TABLE 2 1 ACTIVITY AREAS AND OUTFALL POLLUTANT POTENTIAL
Activity Area
Material/Ec{uipmenfi•,
Management Practices
Pollulant(s)
Drainage/
Impact Oufitall(s)
• Piles of mulch and soil products.
0
Appropriate pile
Raw Material
management.
Oil and Grease
Storage Area
Heavy equipment (Front end loaders, knuckle
. Maintain all equipment
Drainage Area 1 /
booms, trucks, grinders, and screens)
and repair any leaks.
Sediment
Outfall 001
{"The Yard")
9 Stabilize any observed
General erosion of bare soils
erosion areas
• Piles of mulch and soil products.
0 Appropriate pile
management.
• Dye containers
. Maintain all equipment
Packaging and
gagging Process
and repair any leaks.
. Stabilize any observed
Oil and Grease
Drainage Area 1 /
Dyeing Area
erosion areas.
Sediment
Outfall 001
• Heavy Equipment (Front end loaders)
0 Proper storage and
handling practices of
General erosion of bare soils
bulk dye containers.
• 55-gallon drums
0 Spill pallets to be
provided for the drums
• Bulk above ground storage tanks
that are located in this
Maintenance Shop
0Heavy equipment (Front end loaders, knuckle
area.
0 Secondary
Oil and Grease
Drainage Area 1 /
Outfa11001
booms, trucks, grinders, and screens)
containment for hulk
storage.
• Maintain all equipment
and repair any leaks.
• Piles of mulch and soil products.
0 Appropriate pile
management.
• Bagged product
0 Proper stacking to
Overflow Storage
General erosion of bare soils
prevent bagged
product from being
Oil and Grease
Drainage Area 2 /
Area
breached due to turn
Sediment
Outfoll 001
• Heavy equipment (Front end loaders and trucks)
over.
• Stabilize any observed
erosion areas.
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 7 Version: March 2012
2.4 Significant Spills or Leaks
The facility has had no reportable spill or leak events which discharged outside of the
containment structures during the 3 years prior to the date of the most recent review update. A
significant spill includes, but is not limited to releases of oil or hazardous substances in excess of
reportable quantities (RQ) under section 311of the Clean Water Act (40 CFR110.10 and CFR
117.21) or section 102 of CERCLA (40 CFR 302.4). The RQ for an oil spill that does not end up in
waters of the state is a spill greater than 25 gallons of petroleum products in one 24-hr period. If
the spill is into waters of the state then the criteria will be based on the appearance of a sheen
in the surface of the body of water.
This section and shall be maintained and updated during the term of the permit. All spill records
can be found within the Appendix of the most recent Spill Prevention, Control and
Countermeasures (SPCC) plan for this plant.
2.5 Non -Storm Water Discharges
The facility has been evaluated for the presence of non-stormwater discharges. There are
no floor drain connections to subsurface stormwater drainage. There is no discharge of
vehicle/equipment washing waters to the stormwater system. The facility has no discharges
of wastewaters that are generated from plant production activities. No testing for the
presence of non-stormwater discharges was required. The facility does not have any other
process wastewater discharges authorized under an existing NPDES permit. The certification
for the non-stormwater discharge evaluation is included in Appendix B.
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 8 Version: March 2012
SECTION 3 1 STORMWATER MANAGEMENT
[NPDES Permit No. NCG210000, Part II, Section A(2)]
3.1 Feasibility
Wherever practical, the facility shall prevent or minimize exposure of all storage areas, material
handling operations, and fuel loading to stormwater. Due to the nature of the facility
operations, it is neither economically feasible nor operationally practical to cover or contain all
operations. In such cases, efforts will be made to limit run-on and run-off in areas where
materials are exposed to stormwater. The feasibility and constraints of various measures are
discussed in the following two Sections.
3.2 Secondary Containment and Procedures
3.2.1 Secondary Containment
Bulk storage of fuel, at this facility, is provided with secondary containment. The oil pollution
prevention regulations require containment for the largest single tank within the
containment area and sufficient freeboard for precipitation (if exposed) [40 CFR 112.8 (c)
(2)]. Although the regulations do not set a standard for the "sufficient" freeboard, the =PA
recommends sufficient freeboard for a 25-year storm event ("response to comments" 67 FIR
47101). For this site's region, a 25-year storm event is approximately 6 inches. For a more
detailed discussion of the secondary containment and its sufficiency refer to the facility's
Spill Prevention, Control, and Countermeasures (SPCC) plan. Manually operated drainage
valves are used to drain accumulated water from the containment areas. Table 3 provides
a summary of the bulk storage vessels located at this facility.
3.2.2 Secondary Contoin_mgnt Drainage Procedures
After rainfalls, containment areas shall be inspected for rainwater. If and when rainwater is
standing in the containment areas, the procedure for secondary containment drainage is as
follows:
• Appropriately trained plant personnel shall visually observe standing water for evidence
of oil, sheens, color, or foam and determine if water may be drained.
• If no evidence of contamination is observed, the drainage valve may be unlocked and
the water may be drained.
• If evidence of contamination is observed, inspect the tanks, containers, and/or
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 9 Version: March 2012
equipment for leaks. Estimate the quantity of water to be discharged. Obtain a water
sample if necessary. Arrange for proper disposal of the water.
• Close and lock drainage valve after drainage is completed.
• Document draining and subsequent inspection, and maintain documentation in
Appendix E.
TABLE 3 1 BALK STORAGE VESSELS
Area
Description of Storage
Contents
Containment
Vessel .
1,050-gallon AST
Off road diesel
Secondary containment
with concrete dike and
525-gallon AST
Used Oil
pad
Maintenance
Shop
330-gallon AST
Lubricant
Double walled tanks
330-gallon AST
Lubricant
Storage Yard
150-gallon AST
Off road diesel
Metal fabricated secondary
containment.
Truck Dump
475-galion AST
Hydraulic Fluid
Double walled tank
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 10 Version; March 2012
3.3 Summary of Best Management Practices
Best Management Practices (BMPs) ore measures designed to prevent or mitigate
contaminants entering surface water, air, land, and groundwater. Mosi BMPs involve good
management and common sense, while others require activity -specific controls or
practices. BMPs can be categorized as structural (i.e., consisting of constructed facilities,
such as detention basins, sewer systems, etc.) or nonstructural (i.e., consisting of practices,
procedures, regulations, etc.). Whenever possible, nonstructural BMPs are implemented
first, with structural BMPs implemented when nonstructural measures fail to achieve the
desired results.
The facility operator shall review the Best Management Practices (BMPs) annually for
applicability and feasibility. BMPs that are applicable and feasible for the facility shall be
selected and scheduled for implementation. BMPs not selected shall be documented as to
why it was either not applicable or feasible. Table 4 provides a list of currently implemented
structural BMPs at this facility. As the site is modified, this list of BMPs should be updated.
Structural BMP's included in this site include:
• A retention basin to slow down discharges of water and settle solids.
• Construction of Secondary containment areas for fuel/oil storage areas
Examples of basic nonstructural BMPs included in this SWP3 include:
• Good housekeeping
• Preventive maintenance
• Spill prevention and response
• Sediment and erosion control
Management of runoff
• Employee training, and
• Proper recordkeeping
Old Cosile Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page I 1 version: March 2012
TABLE 4 1 SUMMARY OF IMPLEMENTED BMPS
Best Management
Piactice Im lementdd
' potential Pollutant' =
Location •.
Rationale for Implementation, ;
Retention Pond
Sediment /Oil and
Grease
Southwest corner of the property [Drainage Area
2)
Control of TSS and secondary retention of
any major spill activities.
Secondary Containment
Oil and Grease
Maintenance Shop
Control of Oil and Grease, prevent
petroleum release.
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 12 Version: March 2012
SECTION 4 1 SPILL PREVENTION AND RESPONSE PLAN (SPRP)
[NPDES Permit No. NCG210000, Part 11, Section A(3)l
Spills or releases, regardless of quantity or location, excluding minor spills within containment
areas, will be immediately reported to the EHS Director. The EHS Director is responsible for
documentation procedures and for reporting to regulatory agencies. The response to spills and
the degree of documentation and reporting is dependent on the magnitude of the spill and the
potential impact on the environment. Fully contained spills that do not threaten the
environment may not require official reporting or emergency response by the Fire Department.
Alf discharges shall be cleaned up immediately. The resources utilized to clean up such spills,
safely and effectively, are at the discretion of the EHS Director.
4.1 Potential Pollution Sources
The areas of potential pollution sources are indicated on Figure 2. Table 2 provides a
summary of these activity areas, potential pollutant sources within these areas, and
potential directional flow should a spill occur at this facility. The facility's SPCC plan provides
a detailed response plan that should be used and referenced in the event of a spill.
4.2 Spill Containment Equipment
The facility shall maintain adequate supplies for providing cleanup of minor spills and initial
containment of releases. Spill response materials are stored at the designated areas. The
storage area shall be identified with a sign. At a minimum, spill containmenticontrok
equipment shall include:
• Granulated absorbent materials
• Booms and absorbent pads
One 55-gallon open -headed drum for used absorbents
• Spill mats
Appendix D provides a listing of personnel trained to perform spill prevention activities and
who are responsible for providing initial response actions.
Old Casile Lawn &. Garden, Inc. SWPP Plan
Aberdeen, NC Page 13 Version: March 2012
4.3 Initial Action and Spill Response Procedures
In the event that a spill should occur at this facility, the following procedures should be followed:
• Immediately notify the appropriate area supervisor, who will determine if the spill or
release can be handled safely by facility personnel.
• Only respond to spills or releases that are small enough to handle safely, and only
respond to substances with which you work or have familiarity. (While the NCDENR does
not have a definition of a small spill, generally, a small spiN is one less than 25 gallons that
does not enter state waters and is cleaned up.)
• Stop the source of the spill or release, if possible. The primary concerns are to minimize
the impacted area and to prevent oil from entering the environment. If the spill or -
release is within a spilt containment structure, the structure drain outlet shall be checked
to ensure that it is closed.
• If stationary equipment is leaking use drip pans to buckets to catch the leak. Monitor the
pan or bucket for leaks and overfilling.
• Initiate necessary spill containment using available spill control equipment. Any storm
drains that are threatened shall be covered with spill mats and surrounded by absorbent
booms.
• The EHS Director will initiate notification procedures with regulatory agencies and call an
Emergency Response Contractor (ERC), if warranted.
• If the spill cannot be handled safely or contained, if storm sewers are threatened, if there
are injuries or the potential for injuries, if there is fire or the potential for fires, call the Fire
Department (Dial 91 1) immediately. Evacuate the site immediately.
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 14 Version: March 2012
SECTION 5 1 PLAN IMPLEMENTATION
[NPDES Permit No, NCG210000, Part II, Section A[4), A(5), A(8), and A(9)]
In order for the permittee to fully implement this plan, all monitoring, measurements, inspections,
maintenance activities, and training of employees must be documented. These records must
remain on -site for a period of five years and made available to DENR upon request. This section
will cover these required activities that must be documented for plan implementation.
5.1 Preventative Maintenance
5.1.1 Eauipment
The facility will conduct inspections and maintenance on critical equipment. The facility shall
maintain maintenance records at the facility.
Equipment inspections shall include reservoirs, hoses, piping, valves, cylinder seals and gaskets,
and other parts or systems that could release pollutants if they breakdown or fail. Inspections
should look for leaks, corrosion, excessive smoke, or other deterioration.
Maintenance shall include timely adjustment, repair or replacement of equipment, parts, and
systems. The bag house filters shall be inspected on a regular schedule and replaced when
necessary. Defective equipment found during inspections shall be promptly repaired. The
facility should maintain spare parts anticipated for routine replacement.
5. 1.2 Material HandGna Areas
To the degree practical, material handling areas will be maintained in a neat and orderly
manner. Areas will be periodically cleaned of dusts and residues where such materials have the
potential to enter stormwater runoff. To the extent feasible and practical, materials with oils or
other residues will be maintained within containment bins or under cover.
5.1.3 Stormwoter Control Devices
Stormwater control devices will be inspected in accordance with Section 5.4. Specific
preventive maintenance on stormwater control devices includes the following:
• The stormwater drainage ditch shall be cleaned of sediment, trash, and large vegetation
as needed.
Vegetation That does not inhibit flow but filters stormwater will be maintained.
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 15 version: March 2012
5.2 Good Housekeeping Practices
The facility employs good housekeeping practices to minimize contact of materials with
stormwater discharges. Specific good housekeeping practices are as follows:
• Each worker is directly responsible for good housekeeping practices in the area which
they are working or for the procedures they are conducting. Any improperly operating
or leaking equipment shall be reported to the appropriate supervisor, who will be
responsible for having the equipment repaired or replaced.
• Any outside spills of materials (liquid or solid); regardless of the size of the spill shall be
cleaned up immediately. No outside spills or dust accumulation shall be washed into the
stormwater system. Interior spills shall not be swept to the outside. The appropriate
supervisor shall ensure that personnel understand spill cleanup procedures.
• Care shall be taken in unloading delivered materials and moving materials at the facility.
Materials shall be immediately moved to the proper storage area. Material handling
equipment shall be operated only by qualified personnel.
• Care shall be taken in filling ASTs or other containers to minimize spills, overfills, and drips.
Any spills or stained soils shall be cleaned up immediately,
• No vehicle or equipment washing shall be conducted at the facility unless rinse water
discharges to the sanitary sewer.
• No discharge from the mulch dyeing operation shall be allowed. Absorbent materials
used in this area shall be cleaned up and contained for proper disposal.
• Receptacles used for putrescible solid or liquid waste shall be so constructed that it is
covered and does not leak and it shall be maintained in a sanitary condition. These
wastes shall be managed to reduce the potential for discharges of stormwater that have
come into contact with garbage or waste. All seeping, solid or liquid waste, refuse, and
garbage shall be removed on a regular and periodic basis so as to avoid creating a
nuisance or menace.
Old Cosile Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 16 Version: March 2012
5.3 Employee Training
All facility personnel shall be trained on the goals, components, and procedures in the SWP3.
New personnel shall be trained upon their hiring (within one week) at the facility. Facility
personnel shall receive annual refresher training. Additional training will be provided as
necessary for operational modifications, malfunctioning equipment, and recent spills. Instruction
and training shall be the responsibility of the EHS Director. Documentation of each training or
briefing session shall be continually maintained within this Plan, in Appendix D, for a period of five
years,
Personnel shall be instructed as to:
• Sources of pollutants.
• The responsibility of each person to prevent spills and discharges.
• Good housekeeping procedures.
• Specific material management practices and precautions for each area of operation.
• Proper collection, storage, and disposal of residual fluids.
• Proper handling and storage of oils and fluids.
4P No outside washing of equipment/vehicles.
• Avoid topping off fuel tanks and proper handling and storage of oils and fluids.
• Reporting of all spills to the ENS Director.
Initiai response to spills and the location and use of spill control and containment
equipment.
Contractors and temporary personnel shall also be informed of facility operation and design
features in order to prevent discharges or spills from occurring.
5.4 Facility Inspections
Inspections of the facility including storage areas, processing areas, stormwoter conveyances
and stormwater controls shall be performed on a semi-annual basis, once in the first half of the
year (January to June) and once in the second half of the year (July to December). The
inspections and reports are the responsibility of the EHS Director. Inspection Forms are included
in Appendix G. Corrective Action Orders or maintenance activities shall be noted on the
inspection forms and shall be tracked to ensure that they are completed in a timely manner.
Inspection activities and Corrective Action Orders shall be documented and appended to this
Plan and shall be maintained as part of the Plan for five years. These inspections are different
Old Casile Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 17 Version: March 2012
from, and in addition to, the stormwater discharge monitoring reports required as part of the
stormwater sampling events.
Semi -Annual inspections shall include the following,
A visual appraisal of each outside storage and motericl handling area. Specific
observations shall include proper storage of materials, evidence of debris and/or residues
and pollutants entering stormwater run-off (stains, residues, etc.).
• A visual appraisal of the area for application of mulch dyes. Specific observations shall
include improper discharges of dyes, ASTs and other containers observing for leaks,
corrosion, and stains, indicative of spills or improper filling.
• A visual appraisal of any containment structures, observing for settlement, cracks,
corrosion, ceterioration at joints, stains indicative of spills or other signs that water and/or
product is seeping through the structures.
• An inspection and inventory of emergency spill supplies for proper storage and
quantities. Deficient supplies shall be restocked or replaced as necessary.
Any leaks or other condition that may result in a significant release shall be immediately
corrected. Any leak, contaminated soil, debris, or other material shall be promptly removed
and disposed.
Old Castle Lawn & Garden, Inc. SWP3 Plan
Aberdeen, NC Page 18 Version: March 2012
SECTION 6 1 OUTFALL MONITORING
[NPDES Permit No. NCG210000, Part II, Section B]
The facility is required to conduct Semi -Annual Analytical Monitoring and Semi -Annual
Qualitative Monitoring of stormwater discharges throughout the period of the NPDES permit. The
facility does not have a vehicle/equipment maintenance area, and is therefore not subject to
additional analytical monitoring requirements.
6.1 Analytical Monitoring Requirements
Analytical Monitoring shall be conducted semi-annually, unless permitted benchmarks are
exceeded, for the discharge characteristics noted in Table 5. For Analytical Monitoring,
sampling shall be conducted by obtaining a grab sample at each stormwater discharge outfall
(SDO) during a representative storm event. A representative storm event is defined as a storm
event that is greater than 0.1 inches of rainfall that is preceded by least 72 hours with no storm
event that measured greater than 0.1 inches of rainfall. A single storm event may have no
precipitation for up to 10 hours. For example if it rains but does not produce any stormwater
discharge, a sample may be collected if the rain event continues within 10 hours and produces
a stormwater discharge for this site. The samples shall also be collected during the period of
"first flush" or within 30 minutes of when stormwater begins to discharge from the site. This
discharge may occur after the rain event ends and stormwater migrates to the appropriate
BMPs for treatment and discharge.
TABLE 5 1 ANALYTICAL MONITORING REQUIREMENTS
DiscFiarge, .
'Measurement
Sample.
Sample
Permitter!
Characteristics
Fregyency"' '
Type ,.
Location ' -'Benchmark
pH
Semi -Annually
Grab
SDO
Within rangeof 6.0 - 9.0
Total Suspended Solids (TSS}
Semi -Annually
Grab
SDO
100 mg/I
Chemical Oxygen Demand
Semi -Annually
Grab
SDO
120 mg/I
Oil and Grease
(IF on -site maintenance exceeds
Semi -Annually
Grab
SDO
30 mg/1
55 gallons of used oil a month
Total Rainfall
Semi -Annually
Rain Gauge
On facility
property
> 0.1 in
{exceeding permitted benchmarks alters monitoring frequency; refer to NPDES Permit found in Appendix N
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, INC Page 19 version: March 2012
In addition, the sampling shall be collected in accordance with the sampling schedule as
outlined in Table 6. A minimum of 60 days must separate Period 1 and Period 2 sampling dates.
TABLE 6 1 SDO MONITORING SCHEDULE
Monitoring Period
..Start Date
End Date
Period 1
August 1
December 31
Period 2
January 1
June 30
6.2 Qualitative Monitoring
Semi -Annual Qualitative Monitoring requires a visual inspection of each stormwoter outfall
regardless of representative outfall status. This qualitative monitoring of SDOs must also be
conducted during a representative storm event. Table 7 provides a list of discharge
characteristics that will be monitored for each outfall. Any indicators discovered that current
BMPs ore ineffective or in need of repair should be investigated further and addressed as
appropriate. The same monitoring schedule should be followed as outlined in Table 7.
TABLE 7 1 QUALITATIVE MONITORING REQUIREMENTS
Discharge Characteristics
Frequency
Monitoring, Location
Color
Semi -Annual
SDO
Odor
Semi -Annual
SDO
Clarity
Semi -Annual
SDO
Floating Solids
Semi -Annual
SDO
Suspended Solids
Semi -Annual
SDO
Foam
Semi -Annual
SDO
Oil Sheen
Semi -Annual
SDO
Erosion or deposition at the outfall
Semi -Annual
SDO
Other obvious indicators of stormwater pollution
Semi -Annual
SDO
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 20 Version: March 2012
SECTION 7 1 RECORDKEEPING AND REPORTING
[NPDES Permit No, NCG210000, Part III, Sections D and El
7.1 Recordkeeping
Facility records shall be attached to the Plan (or kept on -site with this plan) and maintained for a
minimum of five years. Records pertaining to the following shall be included:
• Inspections
• Corrective actions
• Spifl events or other discharges
• Stormwater discharges - quality and quantity
• Training
• Discharge of water from containment structures
All records should include the following minimum information (as applicable):
• The date, exact place and time of sampling, measurements, inspections or maintenance
activity;
• The individual(s) who performed the sampling, measurements, inspections or
maintenance activity;
• The date(s) analyses were performed;
• The individual(s) who performed the analyses;
• The analytical techniques or methods used; and
• The results of such analyses.
Qualitative and Analytical monitoring records shall be maintained as an addendum to this plan
and kept on -site. All monitoring information, including all calibration and maintenance records,
and copies of all reports required by NPDES General Permit 210000 shall also be maintained on -
site with this plan, All records shalt be maintained for a period of 5 years from the date of
sample, measurement, or report.
old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 21 Version: March 2012
7.2 Reporting Requirements
All analytical monitoring reports must be submitted to DWQ no later than 30 days from the dote
the facility receives the sampling results from the laboratory. When no discharge has occurred
from the facility during the required reporting period, the permittee is required to submit a
dischorge monitoring report (DMR) to DWQ within 30 days from the end of the semi-annual
sampling period. This report should include all the required information and indicate "NO
FLOW". Two signed copies of the DMRs must be submitted to DWQ Central Files as per the
current permit.
All qualitative (visual) monitoring records are to be kept on -site for inspection by DWQ but are
not required to be submitted.
All reports submitted must include the signed certification statement as follows:
"I certify, under penalty of law. that this document and all attachments were prepared under my direction
or supervision in accordance wilh a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,
or those persons directly responsible for gathering the information, the information submitted is, to the best
of my knowledge and belief, true, accurate, and complete. 1 am aware that there are signi scant penalties
for submitting false information, including the possibility of fines and imprisonment for knowing
violations. "
Other reports required to be submitted to DWQ are outlined in the current NPDES permit and
include the following:
Non -Storm Water Discharges
Planned Changes
• Anticipated Noncompliance
• Bypass
• Twenty-four dour Reporting
• Spills
• Other Noncompliance
• Other Information
For more information on these reporting requirements refer to NPDES General Permit 210000, Part
III, Section E(4) to E(10).
Old Castle Lawn & Garden. Inc. SWPP Plan
Aberdeen, NC Page 22 Version: March 2012
•' r • L R, .r +"�.rJ c- a a i s, ., k ,�5. � } '" � ri &!7_ 1
t- + F _�s•. ." S i,.: • r - • `•r ♦ r e Y i �..s• "mix r^ t _.
y• - '.'r..v 2
C ..x -•- s _ -{ t_ {�'^' al"'iiF A�.e �T rs: -cs �..�.,�. r ifrt t. �^• ,.,.F b- t �}` `r' - �t s;,1
f. -h. k -� _ .,n o � ._� � �,�i�r,.�-s`.e•r� �, y�:. ;arS �• T F- y �r��� `- ���ti_ x`� a W+'a.,.. }{ Y Atr�
�- , F � 6..✓ y..- t=r �� -+ i —y . �+, � f .Z. - i Y _ .Y,�.k.�v� ,..r t. i r:J`�
I �'.'��"". k-. a • }i�..d''1f ,i r. +...'• a ,� { �., L. i4 r.;H .,fir i _ - t ;it
a ,s t ' ^^ ! i,. s'C• - �" 'i r �.,r . r ^t , �- ti� - F F +..
.i )•. l • , 1 �' \ 4 - }._ 7 tsk i w c,�.� ,� y _,l C, IRV�;
4' i r :-k . :_\ T y, ] •• rf. ; r �s N,a -al-i r �`-r • 1 t -rr. 7-�-. -r '' . 4 -1 �'. Z,n:
'!: ° �.y,+ } r >: a _ s+•F3- r:.£4 i r.. S-. M,r - a T.`tyT sr'; xi �• a .�
',., _. x.Y.+ R Y, #y ,sy • - F +'�"- �i ,$ _g't. �.t„ •s M c+�� st t [.. #; ,„d 1�u '~S t• { % t1 '07
.t>f' s g \ >-; - r . • �,.rrc - a•;,sr .,,� r o: ' r'•.,p w t s.�r� �j.•5 > $ Y �"^f -it; •i'.+h'i
'-"k �. r '}'{*- 1'+•'+,. -�s , ,`Tr �' y�it•• f�.•� r ' e+ �` r �;'',� Nl c ,.,r try �"��,
^ t M t .J S' � v3 tZ
� � F .. � ). t7 . 4 4 � { F _, ' • -�• F 3 I T4..�w
b•.L`,a M •t J ,t a C'O i _ l y, ' - }} a 7 y
^Lb .. T. '"C_•I'. F tr04-r yr Y + ."`mow'• Y rf rrt'-y
41
�7-7
I
.F _ 5+5 at-ry'•�s. "H�..�f!,;.j,�v
c y = f y. fCY �- ar4 ga w rr ^xra y r'L '' ^4 �
l - ~``� k-.>Ir _ �'9 �sl- �' .;,3�� �,,,�.�5�e r� �„ ry. r � . � - • � "'+%'� r_ �r�r''a''y3�'3.1�� u� -jaw:
yT t.. _ . I . . _ -.+• � �� ' > > 1., � � �. ���� ,.`+�'-§. tia � "yz4i'iF''' ,di.Z: �•.'� r t ; _ - - � ,: �t � -w' �' r y,- ,W c � t � `,�
c.,41,fie�R*r',n. ,�. I g +.ica r. f •T T -
..ti.'_^__`..'yt�"ss�''..-NS�1e}I!Hei9h351r�j..a� x :r LF7 4 "••.-.•�c','w- ; -..••r r�v}s•'=F'--+'- --•.. .-.+.-.+`- "I':
t40?fit- NttSo C" �tt Frr
+ .rt s f r
_ s ��'*•4' � � �.. ,�; �✓•zsXr'7+'' �-,: i- 7��''r� ?,hi° � yy 1 � � �� -'' .. - � i• ""G o �r a t r� - ��
1 Q. i 3 • < t'
11 i 4t 1
t
i,f3 --'t'=a„ Q'S`y, '�":�.'•F+,.r •-.�'�t. � fr r � r �' �� �` i R.., _.t'.�h+ + �� } 1 L�� ��' �
3 -.s ti { r..t tr?•{ wt �' --'`� `,�("z� ^t- 3ili' � fah jo ' s•'t-.�~3.z�E' 1 ,_ e t� � 5 K s -T. -s . ,
q `T A �'n i "{-c-r-�t' r-�' G-a �w, ra`� J � r`•� +•.fir = � •- t r>
.Y.�'� -•1. C .y e T 2 . ] t er z r y ,� :";} - C _ - �.,L 5 `r' .r �`•,+
*., • r )I t - '+• •. � '� � t r �r •� _'r'+ � FF. .+'� ` Z 'r �:, �: i P� i ,I� 7 - - F `7-
,i N, +`-� - !i>�• -•'"t. ?. 3- `_ sr�.bP4� .,i tT t + f' -+.i .r ;i;,- - 'r - r� Y-y
c
� 7 • it ,Py'3r� `.r`• 4 �� _ (��"' •�, .3 1r �Ys �_ t •} TJ`o .^ �� f �•f�5'• `�•�fYy ��.-� , < t r. •[�{.
a o �. -t'. '+'P"aa`fA�• 3} �..Y �s.
br
. 't ..�..� - w `.. � +{ r- _ � ..s.� t"., � ham, i� � � r .�. �� y ,r s � - J,^".+,� �- •?• �'#"'•'x` � "f'•' ` '•-.c• t 7 ; .y ..- .
" .^��•� t is� a -f � �. � .rK`' .F c. r •...I a, •� t t } � _ - ... .3
.� p _ it .-.� t Mai K�� -.h� r F , rf. , +x_ �s � a;� a t' •t Y'.`, .Y ,,_ r'd_.1:
� 'Ff `t'� s�__Y� f x evf o,Man �'}�• �1' :'�'�.%..�: c � _ - xy� • 'j',�•'Sr �' •s� �, � `f a_ r'e'Xr4.- •� � '.--�:- �•t�. i. _. 1"•
r dsf di T-a 5. I - ..+' , .>- tr Y4 ,3 r';.�+- a •� +;E':�• ,sy r', 7 d-�R '}- ;z..i� `� ! .?.r yt �,'F..:+
:z• ,4 s y ye r y
�»* ,.t t : _ YL,' _ r f t' 2, _ a d q ts' - , ,it. }] :1 :i �C�3 1 i '�,.•:•'S .f-,',nfs .7�.%, 4 r�..E�:7'
•* , { sC a 1 T r _t. 7" rr 11 p {!,� -' [ :=a �.-'r'4 .c' "'. • y`�'F �. al - yg' '„r,
. iT � 1Y�ru!eF _ . « # 4 _ � „� � � .r'1 r � � 3• n a'"'( �"'. f
• � S �.� 1 F<•vS �.... b`".. ?} •. a. s F SS'i"�• t .;� s �� � f .,� ^Ts;` :t° i£.,�. � � - a.. "rg - a rrs itt �, � h+
.� - *- `r % ..r.,.7 � 7 r }. .� r-- a+'r Imo. ° �•„I :K r :,
, a
i F•-S AyF '.'�L y �� .1 �S•r+ '�i'.,r+- `'� ,:s �o }lam r'r tl �" �� I'' a'�. c'f - n`r �? M I r `q
s +F - cam, ;x."��mar '"':Ut2:Geo'"Ygr e izr° E } i �'-aY �'S`��•^..-:...,'�;,*•• f;` 7G
3 r4 ?.i _ F `- t. 'a• i'_ k .ia f ;� 4%-.Iq-
r _ -• - t; ti . jL, `� 3„�_ i2012 Gooyr { rY 7 -s•1 /. �OOxll..y C.tl _I 11 y.
• s n C .c�" Jam.- - i ti-� , ✓J--a \ '�"' t 7iSY S { (J
'� - '`•�} _ � . ` �� 7 4 a `r ",fir -'e�' ... r �:t i ate: ±_ ° � .;�� �.'� a� � R 'Y . � � }$nS '"_( -•I
,Image; rGa!e� {L 12614 Y{� Y _ - na359'1952 Y- 5'7 i'SB .FI :elm 43S r1 .L �•�yitT`r .,_ aT e altY3
-_. .. __. .._ _ _ .. c.ax _� _ _.... _. __
APPENDIX B j ANNUAL NON -STORM WATER DISCHARGE CERTIFICATION
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page 8-1 Version; March 2012
001dcastleop
NON -STORM WATER DISCHARGE CERTIFICATION
Old Castle Lawn & Garden, Inc. I Aberdeen, North Carolina
The following evaluation is provided as demonstration that the facility does not have
unpermitted non-stormwater discharges:
• There are no floor drains inside the facility buildings that are connected to the
stormwater system.
• Residual fluids are collected and properly disposed.
• The facility has no equipment/truck cleaning operations or other vehicle discharges, that
discharge to the stormwater system.
• All sanitary discharges are to an on -site septic system or municipal sewer system.
This evaluation is based on the personal knowledge of facility personnel. No other
evaluative approaches were utilized or deemed necessary.
I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing violations."
Matthew Wilson / Plant Manager
Old Castle Lawn & Garden, Inc.
Aberdeen, NC
Date
SWPP Plan
version! March 2012
()Oldcastlee
RELEASE OF STORM WATER FROM CONTAINMENT AREA
Old Castle Lawn & Garden, Inc. I Aberdeen, North Carolina
Date
Depth of Water
Inches
-0. 11 or Fuel-Sheen.Present
- '-. Yes/No
Time
Open
Time
Closed
Reason
Plant Personnel
Si nature_
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC version: March 2012
Employee Training Form
Old Castle lawn & Garden, Inc.
Aberdeen, North Carolina
Description of Training
Employee,Name Date = Signature
Old Castle Lawn & Garden. Inc. SWPP Plan
Aberdeen, NC version: March 2012
[insert Completed Qualitative Monitoring Forms]
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page E-2 Version: March 2012
[INSERT COMPLETED ANALTICAL MONITORING REPORTS — DMRs and Supporting
Documents]
Old Castle Lawn & Garden, Inc. SWPP Plan
Aberdeen, NC Page F-2 Version: March 2012
LjOldcastleo
Annual Stormwater Facility Inspection
Oki Castle Lawn & Garden, Inc.
Aberdeen, North Carolina
Front Office/Scale House Area
Is there any potential for a non-stormwater discharge?
Yes
No
Comments
Is there an evidence of a non-stormwater discharge?
Yes
No
Comments
Is there any evidence of improper storage of trash, chemicals, product, or other materials?
Yes
No
Comments
Are there any areas that are exhibiting erosion or excessive sediment buildup?
Yes
No
Comments
Is there any evidence of any spills or leaks?
Yes
No
Comments
Is there any evidence of decay or disreopir to any containment structures?
Yes
No
Comments
Is there any evidence of any contamination or sediment buildup in any stormwater conveyance
system (i.e., catch basin, ditch, pond, etc.)?
Yes
No
Comments
Is corrective action requi►ed?
Yes
No
If Yes, describe required action and date completed
Version: March 2012 Page I of 5
Annuak Stormwater Facility Inspection
Old Castle Lawn & Garden, Inc.
Aberdeen, North Carolina
Baqqinq and Dying Operations Buildinq Area
Is there any potential for a non-stormwater discharge?
YenComments
Is there an evidence of a non-stormwater discharge?
Yes
Nt
mments
Is there any evidence of improper storage of trash, chemicals, product, or other materials?
Yes
No
Comments
Are there any areas that are exhibiting erosion or excessive sediment buildup?
Yes
No
Comments
Is there any evidence of any spills or leaks?
Yes
No
Comments
Is there any evidence of decay or disreapir to any containment structures?
Yes
No
Comments
Is there any evidence of any contamination or sediment buildup in any sto►mwater conveyance
system (i.e., catch basin, ditch, pond, etc.)?
Yes
No
Comments
Is corrective action required?
Yes
No
If Yes, describe required action and date completed
Version: March 2012 Page 2 of 5
Annual Stormwater Facility inspection
Old Castle Lawn & Garden, Inc.
Aberdeen, North Carolina
Maintenance Shop Area
Is there any potential for a non-stormwater discharge?
Yes
No
Comments
Is there an evidence of a non-stormwater discharge?
Yes
No
Comments
Is there an evidence of improper storage of trash, chemicals, product, or other materials?
YetComments
Are there any areas that are exhibiting erosion or excessive sediment buildup?
Yes
No
Comments
Is there any evidence of any spills or teaks?
Yes
No
Comments
Is there any evidence of decay or disreapir to any containment structures?
Yes
No
Comments
Is there any evidence -of any contamination or sediment buildup in any stormwater conveyance
system (Ii.e., catch basin, ditch, pond, etc.)?
Yes
No
Comments
Is corrective action required?
Yes
No
If Yes, describe required action and date completed
Version: March 2012 Page 3 of 5
Annual Stormwater Facility Inspection
Old Castle Lawn & Garden, Inc.
Aberdeen, North Carolina
S#oracge Yard Area
is there any potential for a non-stormwater discharge?
Yes
No
Comments
Is there an evidence of a non-stormwater discharge?
Yes
No
Comments
Is there an evidence of improper storage of trash, chemicals, product, or other materials?
Yes
No
Comments
Are there any areas that are exhibiting erosion or excessive sediment buildup?
Yes
No
Comments
Is there any evidence of any spills or leaks?
Yes
No
Comments
Is there any evidence of decay or disreapir to any containment structures?
Yes
No
Comments
Is there any evidence of any contamination or sediment buildup in any stormwater conveyance
system (i.e., catch basin, ditch, pond, etc.)?
Yes
No
Comments
Is corrective action required?
Yes
No
If Yes, describe required action and date completed
Version; March 2012 Page 4 of 5
Annual Stormwater Facility Inspection
Old Castle Lawn & Garden, Inc.
Aberdeen, North Carolina
Overflow Storaae Yard Areas
Is there any potential for a non-stormwater discharge?
Yes
No
Comments
Is there an evidence of a non-stormwater discharge?
Yes
No
Comments
Is there any evidence of im ro er storage of trash, chemicals, product, or other materials?
YetComments
Are there any areas that are exhibiting erosion or excessive sediment buildup?
Yes
No
Comments
Is there any evidence of any spills or leaks?
Yes
No
Comments
Is there any evidence of decay or disreapir to any containment structures?
Yes
No
Comments
Is there any evidence of any contamination or sediment buildup in any stormwater conveyance
system (i.e., catch basin, ditch, pond, etc.)?
Yes
No
Comments
Is corrective action required?
Yes
No
If Yes, describe required action and date completed
version: March 2012 Page 5 of 5
APPENDIX H I NORTH CAROLINA STORM WATER GENERAL PERMIT
Old Castle Lawn & Garden, Inc, SWPP Plan
Aberdeen, NC Page H-1 Version: March 2012
Permit No. NCG210000
STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL
RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG210000
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1., other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission and the Federal Water Pollution Control Act, as amended, this permit
is hereby issued to all owners or operators, hereafter permittees, which are covered by this permit
as evidenced by receipt of a Certificate of Coverage by the Environmental Management
Commission to allow the discharge of stormwater to the surface waters of North Carolina or
separate storm sewer systems conveying stormwater to surface waters in accordance with the
terms and conditions set forth herein.
Coverage under this general permit is applicable to all owners or operators of stormwater point
source discharges associated with activities classified as establishments primarily engaged in
Timber Products [standard industrial classification (SIC) 24]; and like activities deemed by
DWQ to be similar in the process and/or the exposure of raw materials, products, by-products, or
waste materials, including Wood Chip Mills.
The following activities are specifically excluded from coverage under this General Permit:
Wood Kitchen Cabinets [SIC 2434], Wood Preserving [SIC 2491].
The General Permit shall become effective on April 1, 2011.
The General Permit shall expire at midnight on July 31, 2013.
Signed this day March 25, 2011.
Original signed by Matt Matthews, for
Coleen H. Sullins, Director
Division of Water Quality
By the Authority of the Environmental Management Commission
Permit No. NCG210000
TABLE OF CONTENTS
PART I INTRODUCTION
Section A: General Permit Coverage
Section B: Permitted Activities
PART 11 MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED
DISCHARGES
Section A: Stormwater Pollution Prevention Plan
Section B: Analytical Monitoring Requirements
Section C: Qualitative Monitoring Requirements
Section D: On -Site Vehicle Maintenance Monitoring Requirements
PART III STANDARD CONDITIONS
Section A: Compliance and Liability
I. Compliance Schedule
2. Duty to Comply
3. Duty to Mitigate
4. Civil and Criminal Liability
5. Oil and Hazardous Substance Liability
6. Property Rights
7. Severability
$. Duty to Provide Information
9. Penalties for Tampering
10. Penalties for Falsification of Reports
Section B: General Conditions
I . General Permit Expiration
2. Transfers
3. When an Individual Permit May be Required
4. When an Individual Permit May be Requested
5. Signatory Requirements
6. General Permit Modification, Revocation and Reissuance, or
Termination
Permit No. NCG210000
7. Certificate of Coverage Actions
Section C: Operation and Maintenance of Pollution Controls
l . Proper Operation and Maintenance
2. Need to Halt or Reduce not a Defense
3. Bypassing of Stormwater Control Facilities
Section D: Monitoring and Records
I.
Representative Sampling
2.
Recording Results
3.
Flow Measurements
4.
Test Procedures
5..
Representative Outfall
6.
Records Retention
7.
Inspection and Entry
Section F: Reporting Requirements
1. Discharge Monitoring Reports
2. Submitting Reports
3. Availability of Reports
4. Non-Stormwater Discharges
5. Planned Changes
6. Anticipated Noncompliance
7. Bypass
8. Twenty-four Hour Reporting
9. Other Noncompliance
10, Other Information
PART IV LIMITATIONS REOPENER
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
PART VI DEFINITIONS
In
Permit No. NCG210000
PART I INTRODUCTION
SECTION A. GENERAL PERMIT COVERAGE
All persons desiring to be covered by this General Permit must register with the Division of
Water Quality by the filing of a Notice of Intent (NO[) and applicable fees. The NOI shall be
submitted and a certificate of coverage issued prior to any discharge of stormwater associated
with industrial activity that has a point source discharge to the surface waters of the state.
Any owner or operator not wishing to be covered or limited by this General Permit may make
application for an individual NPDES permit in accordance with NPDES procedures in 15A
NCAC 2H .0100, stating the reasons supporting the request. Any application for an individual
permit should be made at least 180 days prior to commencement of discharge.
This General Permit does not cover activities or discharges covered by an individual NPDES
permit until the individual permit has expired or has been revoked. Any person conducting an
activity covered by an individual permit but which could be covered by this General Permit may
request that the individual permit be revoked and coverage under this General Permit be
provided.
If industrial materials and activities are not exposed to precipitation or runoff as described in 40
CFR § 122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater
discharge permit requirements. Any owner or operator wishing to obtain a No Exposure
Certification must submit a No Exposure Certification NOI form to the Division, must receive
approval by the Division, must maintain no exposure conditions unless authorized to discharge
under a valid NPDES stormwater permit, and must reapply for the No Exposure Exclusion once
every five (5) years.
Facilities submitting NOIs for coverage under this permit, and facilities submitting renewal
forms for continued coverage under this permit, prior to establishment or approval of a Total
Maximum Daily Load (TMDL) for pollutant(s) for stormwater discharges (i.e. wet weather
flows), may be covered under this permit during its term. For such facilities, continued coverage
under the reissuance of this permit is subject to the facility demonstrating that it does not have a
reasonable potential to violate applicable water quality standards for such pollutants due to the
stormwater discharge(s). For facilities that do have a reasonable potential for violation of
applicable water quality standards due to the stormwater discharge(s), the facility shall apply for
an individual permit 180 days prior to the expiration of this general permit. Once the individual
permit is issued and becomes effective the facility will no longer have coverage under the general
permit. Impaired waters scheduled for TMDL development are on North Carolina's 303(d) List
and can be found here: http://h2o.enr.state.nc.us/tmdl/General_303d.htm#Downloads.
A list of approved TMDLs for the state of North Carolina can be found here:
http://h2o.enr.state.ne.us/tmdl/General_TMDLs.htm.
During the period beginning on the effective date of the permit and lasting until expiration, the
Permittee is authorized to discharge stormwater associated with industrial activity. Such
discharges shall be controlled, limited, and monitored as specified in this permit.
Part I Page 1 of 2
Permit No. NCG210000
SECTION B: PERMITTED ACTIVITIES
Until this permit expires or is modified or revoked, the permittee is authorized to discharge
stormwater to the surface waters of North Carolina or separate storm sewer system which has
been adequately treated and managed in accordance with the terms and conditions of this General
Permit. All discharges shall be in -accordance with the conditions of this permit.
Any other point source discharge to surface waters of the state is prohibited unless it is an
allowable non-stormwater discharge or is covered by another permit, authorization, or approval.
The stormwater discharges allowed by this General Permit shall not cause or contribute to
violations of Water Quality Standards. This General Permit does not allow discharges
determined by the Division of Water Quality to be wastewaters.
This permit does not relieve the permittee from responsibility for compliance with any other
applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
Part I Page 2 of 2
Permit No. NCG210000
PART II MONITORING, CONTROLS, AND LIMITATIONS FOR
PERMITTED DISCHARGES
SECTION A: STORMWATER POLLUTION PREVENTION PLAN
The Permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as
the Plan. This Plan shall be considered public information in accordance with Part III, Standard
Conditions, Section E, Paragraph 3 of this general permit. The Plan shall include, at a minimum,
the following items:
1. Site Plan. The site plan shall provide a description of the physical facility and the
potential pollutant sources which may be expected to contribute to contamination of
stormwater discharges. The site plan shall contain the following:
(a) A general location map (USGS quadrangle map or appropriately drafted
equivalent map), showing the facility's location in relation to transportation
routes and surface waters, the name of the receiving water(s) to which the
stormwater outfall(s) discharges, or if the discharge is to a municipal separate
storm sewer system, the name of the municipality and the ultimate receiving
waters, and accurate latitude and longitude of the point(s) of discharge. The
general location map (or alternatively the site map) shall identify whether each
receiving water is impaired (on the state's 303(d) list of impaired waters) or is
located in a watershed for which a TMDL has been established, and what the
parameter(s) of concern are.
North Carolina's 303(d) List can be found here:
http,//h2o.erkr.state.nc.us/tmdl/General_303d.htm#Downloads
North Carolina TMDL documents can be found here:
http://h2o.enr.state.nc.us/tmdl/TMDL_list.htm#Final_TMDLs.
(b) A narrative description of storage practices, loading and unloading activities,
outdoor process areas, dust or particulate generating or control processes, and
waste disposal practices. A narrative description of the potential pollutants which
could be expected to be present in the stormwater discharge from each outfall.
(c) A site map drawn to scale (including a distance legend) showing: the site property
boundary, the stormwater discharge outfalls, all on -site and adjacent surface
waters and wetlands, industrial activity areas (including storage of materials,
disposal areas, process areas, loading and unloading areas, and haul roads), site
topography, all drainage features and structures, drainage areas for each outfall,
direction of flow in each drainage area, industrial activities occurring in each
drainage area, buildings, existing BMPs, and impervious surfaces. The site map
must indicate the percentage of each drainage area that is impervious.
(d) A list of significant spills or leaks of pollutants that have occurred at the facility
during the three (3) previous years and any corrective actions taken to mitigate
spill impacts.
Part .11 Page 1 of 10
Permit No. NCG210000
(e) Certification that the stormwater outfalls have been evaluated for the presence of
non-stormwater discharges. The certification statement will be signed in
accordance with the requirements found in Part III, Standard Conditions, Section
B, Paragraph 5. The permittee shall re -certify annually that the stormwater
outfalls have been evaluated for the presence of non-stormwater discharges.
2. Stormwater Management Plan. The stormwater management plan shall contain a
narrative description of the materials management practices employed which control or
minimize the exposure of significant materials to stormwater, including structural and
nonstructural measures. The stormwater management plan, at a minimum, shall
incorporate the following:
(a) Feasibility Study. A review of the technical and economic feasibility of changing
the methods of operations and/or storage practices to eliminate or reduce exposure
of materials and processes to stormwater. Wherever practical, the permittee shall
prevent exposure of all storage areas, material handling operations, and
manufacturing or fueling operations. In areas where elimination of exposure is
not practical, the stormwater management plan shall document the feasibility of
diverting the stormwater runoff away from areas of potential contamination.
(b) Secondary Containment Requirements and Records. Secondary containment is
required for: bulk storage of liquid materials; storage in any amount of Section
313 of Title Ili of the Superfund Amendments and Reauthorization Act (SARA)
water priority chemicals; and storage in any amount of hazardous substances, in
order to prevent leaks and spills from contaminating stormwater runoff. A table
or summary of all such tanks and stored materials and their associated secondary
containment areas shall be maintained. if the secondary containment devices are
connected directly to stormwater conveyance systems, the connection shall be
controlled by manually activated valves or other similar devices (which shall be
secured closed with a locking mechanism), and any stormwater that accumulates
in the containment area shall be at a minimum visually observed for color, foam,
outfall staining, visible sheens and dry weather flow, prior to release of the
accumulated stormwater. Accumulated stormwater shall be released if found to
be uncontaminated by the material stored within the containment area. Records
documenting the individual making the observation, the description of the
accumulated stormwater, and the date and time of the release shall be kept for a
period of five years.
(c) BMP Summary. A listing of site structural and non-structural Best Management
Practices (BMP) shall be provided. The installation and implementation of BMPs
shall be based on the assessment of the potential for sources to contribute
significant quantities of pollutants to stormwater discharges and data collected
through monitoring of stormwater discharges. The BMP Summary shall include a
written record of the specific rationale for installation and implementation of the
selected site BMPs. The BMP Summary shall be reviewed and updated annually.
Spill Prevention and Response Plan. The Spill Prevention and Response Plan (SPRP)
shall incorporate an assessment of potential pollutant sources based on a materials
inventory of the facility. Facility personnel (or the team) responsible for implementing the
Part 11 Page 2. of 10
Permit No. NCG210000
SPRP shall be identified in a written list incorporated into the SPRP and signed and dated
by each individual acknowledging their responsibilities for the plan. A responsible
person shall be on -site at all times during facility operations that have the potential to
contaminate stormwater runoff through spills or exposure of materials associated with the
facility operations. The SPRP must be site stormwater specific. Therefore, an oil Spill
Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP,
but 'may not be sufficient to completely address the stormwater aspects of the SPRP. The
common elements of the SPCC with the SPRP may be incorporated by reference into the
SPRP.
4. Preventative Maintenance and Good Housekeeping Program. A preventative
maintenance and good housekeeping program shall be developed. The program shall list
all stormwater control systems, stormwater discharge outfalls, all on -site and adjacent
surface waters and wetlands, industrial activity areas (including material storage areas,
material handling areas, disposal areas, process areas, loading and unloading areas, and
haul roads), all drainage features and structures, and existing structural BMPs. The
program shall establish schedules of inspections, maintenance, and housekeeping
activities of stormwater control systems, as well as facility equipment, facility areas, and
facility systems that present a potential for stormwater exposure or stormwater pollution.
Inspection of material handling areas and regular cleaning schedules of these areas shall
be incorporated into the program. Timely compliance with the established schedules for
inspections, maintenance, and housekeeping shall be recorded in writing and maintained
in the SPPP.
5. Employee Training. Training programs shall be developed and training provided at a
minimum on an annual basis for facility personnel with responsibilities for: spill response
and cleanup, preventative maintenance activities, and for any of the facility's operations
that have the potential to contaminate stormwater runoff. Facility personnel (or team)
responsible for implementing the training shall be identified, and their annual training
shall be documented by the signature of each employee trained.
6. Responsible Party. The Stormwater Pollution Prevention Plan shall identify a specific
position(s) responsible for the overall coordination, development, implementation, and
revision to the Plan. Responsibilities for all components of the Plan shall be documented
and position assignments provided.
Plan Amendment. The permittee shall amend the Plan whenever there is a change in
design, construction, operation, or maintenance which has a significant effect on the
potential for the discharge of pollutants to surface waters. All aspects of the Stormwater
Pollution Prevention Plan shall be reviewed and updated on an annual basis. The annual
update shall include an updated list of significant spills or leaks of pollutants for the
previous three years, or the notation that no spills have occurred. The annual update shall
include re -certification that the stormwater outfalls have been evaluated for the presence
of non-stormwater discharges. Each annual update shall include a re-evaluation of the
effectiveness of the BMPs listed in the BMP Summary of the Stormwater Management
Plan.
The Director may notify the permittee when the Plan does not meet one or more of the
minimum requirements of the permit. Within 30 days of such notice, the permittee shall
Part II Page 3 of 10
Permit No. NCG210000
submit a time schedule to the Director for modifying the Plan to meet minimum
requirements. The permittee shall provide certification in writing (in accordance with
Part 111, Standard Conditions, Section B, Paragraph 5) to the Director that the changes
have been made.
8. Facility Inspections. Inspections of the facility and all stormwater systems shall occur as
part of the Preventative Maintenance and Good Housekeeping Program at a minimum on
a semi-annual schedule, once during the first half of the year (January to June), and once
during the second half (July to December), with at least 60 days separating inspection
dates (unless performed more frequently than semi-annually). These facility inspections
are different from, and in addition to, the stormwater discharge characteristic monitoring
required in Part 11 of this permit.
9. Implementation. The permittee shall implement the Plan. Implementation of the Plan
shall include documentation of all monitoring, measurements, inspections, maintenance
activities, and training provided to employees, including the log of the sampling data and
of actions taken to implement BMPs associated with the industrial activities, including
vehicle maintenance activities. Such documentation shall be kept on -site for a period of
five years and made available to the Director or the Director's authorized representative
immediately upon request.
SECTION B: ANALYTICAL MONITORING REQUIREMENTS
Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. A facility
that does not retain exposed (either exposed to incident precipitation or exposed to stormwater run on)
piles of sawdust, wood chips, bark, mulch, or other similar material on site for more than seven (7) days
before removing the material is not required to monitor the parameters in Table 1. A facility that is
exempt from analytical monitoring on this basis of removing material in seven (7) days or less shall keep
in its SPPP a record of dates when the material is generated and removed, and how/by whom it was
removed. If at any time the material is not removed within this time frame, the facility must begin
analytical monitoring immediately. All facilities covered by this permit must perform Qualitative
Monitoring in Section C. of this Part.
Table 1. Analytical Monitoring Requirements
Discharge
Characteristics
'Units
Measurement,
Fre uenc 1, 5-
Sample h
Tpe2 '
Sample
',:Location3
H
standard
semi-annual
Grab
SDO
Chemical Oxygen Demand
mg/1
semi-annual
Grab
SDO
Total Suspended Solids
m
I semi-annual
Grab
SDO
Total Rainfa114
inches
I semi-annual
Rain gauge
-
Footnotes:
1 Measufement Frequency: Twice per year during a representative storm event.
2 If the stormwater runoff is controlled by a stormwater detention pond, a grab sample of the discharge from the pond shall
he collected within the first 30 minutes of discharge from the pond.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall
status has been granted.
Part 11 Page 4 of 10
Permit No. NCG210000
4 For each sampled representative storm event the total precipitation must be recorded. An on -site rain gauge or local rain
gauge reading must be recorded.
5 No monitoring is required if the facility does not retain exposed piles of sawdust, wood chips, bark, mulch, or other similar
material on site for more than seven (7) days. If a facility opts out of monitoring on the basis of removing accumulated
material in seven (7) days or less, the facility shall record and maintain a log in its SPPP of dates of when material is
generated and removed, and details about how/by whom it was removed.
All analytical monitoring shall be performed during a representative storm event at each
stormwater discharge outfall (SDO).
A representative storm event is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1
inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation. For example, if it rains for 2 hours without producing any collectable discharge,
and then stops, a sample may be collected if a rain producing a discharge begins again within the
next 10 hours.
The permittee shall complete the analytical samplings in accordance with the schedule specified
in Table 2. A minimum of 60 days must separate Period 1 and Period 2 sample dates unless
monthly monitoring has been instituted under a Tier Two response.
Table 2. Monitoring Schedule
Monitoring period1,2 '
Sample
Start _
End
Year 1 — Period I
1
August 1, 2008
December 31, 2008
Year I— Period 2
2
January 1, 2009
June 30, 2009
Year 2 —Period 1
3
July 1, 2009
December 31, 2009
Year 2— Period 2
4
January 1, 2010
June 30, 2010
Year 3 — Period 1
5
July 1, 2010
December 31, 2010
Year 3 — Period 2
6
January 1, 2011
June 30, 2011
Year 4 —Period 1
7
July 1, 2011
December 31, 2011
Year 4 — Period 2
8
January 1, 2012
June 30, 2012
Year 5 — Period 1
9
July 1, 2012
December 31, 2012
Year 5 — Period 2
10
January 1, 2013
July 31, 2013
Footnotes:
1 Maintain semi-annual monitoring during permit renewal process. If at the expiration of the general permit,
the permittee has submitted an application for renewal of coverage before the submittal deadline, the
permittee will be considered for renewed coverage. The applicant must continue semi-annual monitoring
until the renewed Certificate of Coverage is issued.
2 if no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating
"No Flow" within 30 days of the end of the six-month sampling period.
In all cases, the permittee shall report the analytical results from the first sample with valid results
within the monitoring period. The permittee shall compare those results to the benchmark values in
Part 11 Page 5 of 10
Permit No. NCG210000
Table 3. Exceedences of benchmark values require the permittee to increase monitoring, increase
management actions, increase record keeping, and/or install stormwater Best Management Practices
(BMPs) in a tiered program. See below the descriptions of Tier One and Tier Two response actions.
Table 3. Benchmark Values for Analvtical Monitoring Requirements
DischargeCharacteristics, '
Benchmark Value
N
Within the range 6.0 - 9.0
Chemical Oxygen Demand
120 mg/1
Total Suspended Solids
100 mg/1
Tier One
If: The first valid sampling results are above a benchmark value, or outside of the benchmark
range, for any parameter at any outfall;
Then: The permittee shall:
I . Conduct a stormwater management inspection of the facility within two weeks of
receiving sampling results.
2. Identify and evaluate possible causes of the benchmark value exceedence.
3. Identify potential and select the specific: source controls, operational controls, or physical
improvements to reduce concentrations of the parameters of concern, or to bring
concentrations within the benchmark range.
4. Implement the selected actions within two months of the inspection.
5. Record each instance of a Tier One response in the Stormwater Pollution Prevention Plan.
Include the date and value of the benchmark exceedence, the inspection date, the personnel
conducting the inspection, the selected actions, and the date the selected actions were
implemented.
Part 11 Page 6 of 10
Permit No. NCG210000
I Tier Two ,.
If: During the term of this permit, the first valid sampling results from two consecutive monitoring
periods are above the benchmark values, or outside of the benchmark range, for any specific
arameter at a specific discharge outfall;
Then: The permittee shall:
1. Repeat all the required actions outlined above in Tier One.
2. Immediately institute monthly monitoring for all parameters at every outfall where a
sampling result exceeded the benchmark value for two consecutive samples. Monthly
(analytical and qualitative) monitoring shall continue until three consecutive sample results
are below the benchmark values or within the benchmark range.
3. If no discharge occurs during the sampling period, the permittee is required to submit a
monthly monitoring report indicating "No Flow" to comply with reporting requirements.
4. Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan.
During the term of this permit, if the valid sampling results required for the permit monitoring
periods exceed the benchmark value, or are outside the benchmark range, for any specific parameter
at any specific outfall on more than four occasions, the permittee shall notify the DWQ Regional
Office Supervisor in writing within 30 days of receipt of the fourth analytical results. DWQ may:
• require that the permittee revise, increase, or decrease the monitoring frequency for the
remainder of the permit;
• rescind coverage under the General Permit, and require that the permittee apply for an
individual stormwater discharge permit;
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control measures; or
• require that the permittee implement site modifications to qualify for the No Exposure
Exclusion.
SECTION C: QUALITATIVE MONITORING REQUIREMENTS
Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of
representative outfall status and shall be performed as specified below in Table 4. Qualitative
monitoring is for the purpose of evaluating the effectiveness of the Stormwater Pollution
Prevention Plan (SPPP) and assessing new sources of stormwater pollution. No analytical tests
are required. Qualitative monitoring of stormwater outfalls must be performed during a
representative storm event.
Part II Page 7 of 10
Permit No. NCG210000
Table 4. Qualitative Monitoring Requirements
Discharge Characteristics
Fregt eetcy
Monitoring`
Locationl
Color
Semi -Annual
SDO
Odor
Semi -Annual
SDO
Clarity
Semi -Annual
SDO
Floating Solids
Semi -Annual
SDO
Sus ended Solids
Semi -Annual
SDO
Foam
Semi -Annual
SDO
Oil Sheen
Semi -Annual
SDO
Erosion or deposition at the
outfall
Semi -Annual
SDO
Other obvious indicators
of stormwater pollution
Semi -Annual
SDO
Footnotes:
1 Monitoring Location: Qualitative monitoring shall be performed at each
stormwater discharge outfall (SDO) regardless of representative outfall status.
If the permittee's qualitative monitoring indicates either that existing stormwater BMPs are ineffective,
or that significant stormwater contamination is present, the permittee shall investigate potential causes,
evaluate the feasibility of corrective actions, and implement those corrective. actions appropriate. A
written record of the permittee's investigation, evaluation, and response actions shall be kept in the
Stormwater Pollution Prevention Plan.
Qualitative monitoring is for the purposes of evaluating the effectiveness of the Stormwater
Pollution Prevention Plan (SPPP), assessing new sources of stormwater pollution, and prompting
the permittee's response actions to pollution. If the permittee repeatedly fails to respond
effectively to correct problems identified by qualitative monitoring, or if the discharge causes or
contributes to a water quality standard violation, DWQ may:
• require that the permittee revise, increase, or decrease the monitoring frequency for the
remainder of the permit;
• rescind coverage under the General Permit, and require that the permittee apply for an
individual stormwater discharge permit;
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control measures; or
• require that the permittee implement site modifications to qualify for the No Exposure
Exclusion.
Qualitative monitoring will be performed twice per year, in accordance with the schedule in
Table 2. A minimum of 60 days must separate Period 1 and Period 2 monitoring dates,
unless monthly sampling has been instituted under a Tier Two response as part of other analytical
monitoring requirements in this permit.
Part II Page 8 of 10
Permit No. NCG210000
SECTION D: ON -SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS
Facilities which have any vehicle maintenance activity occurring on -site which uses more than 55
gallons of new motor oil per month when averaged over the calendar year shall perform
analytical monitoring as specified in Table 5. This monitoring shall be performed at all outfalls
which discharge stormwater runoff from the vehicle maintenance areas, and in accordance with
the schedule presented in Table 2. All analytical monitoring shall be performed during a
representative storm event.
Table 5. Analytical Monitoring Requirements for On -Site Vehicle Maintenance
•Discharge Characteristics
"'Units
Measurement
Fr ueric 1
Sample
Type2
Sample
Location
H
standard
semi-annual
Grab
SDO
Oil and Grease
m /l
semi-annual
Grab
SDO
Total Suspended Solids
m Il
semi-annual
Grab
SDO
Total Rainfal14
inches
semi-annual
Rain gauge
New Motor Oil Usage
1 gallons/month
annual
I Estimate
Footnotes:
1. Measurement Frequency: Twice per year during a representative storm event
2 if the stormwater runoff is controlled by a stormwater detention pond, a grab sample of the discharge from the
pond shall be collected within the first 30 minutes of discharge from the pond.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges
stormwater runoff from area(s) where vehicle maintenance activities occur.
4 For each sampled representative storm event the total precipitation must be recorded. An on -site or local rain
gauge reading must be recorded.
In all cases, the permittee shall report the analytical results from the first sample with valid results
within the monitoring period. The permittee shall compare those results to the benchmark values in
Table 6. Exceedences of benchmark values require the permittee to increase monitoring, increase
management actions, increase record keeping, and/or install stormwater Best Management Practices
(BMPs) in a tiered program. The permittee shall comply with the required Tier One and Tier Two
response actions identified above.
Table 6. Benchmark Values for On -Site Vehicle Maintenance Activities
Discliara Ch"aracteristics , - : e
Cu#=off Concentration'`;
H
Within range 6.0 - 9.0
Oil and Grease
30 m /l
Total Suspended Solids
100 mg/1
Part II Page 9 of 10
Permit No. NCG210000
During the term of this permit, if the valid sampling results required for the permit monitoring
periods exceed the benchmark value, or are outside the benchmark range, for any specific parameter
at any specific outfall on more than four occasions, the permittee shall notify the DWQ Regional
Office Supervisor in writing within 30 days of receipt of the fourth analytical results. DWQ may:
• require that the permittee revise, increase, or decrease the monitoring frequency for the
remainder of the permit;
• rescind coverage under the General Permit, and require that the permittee apply for an
individual stormwater discharge permit;
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control measures; or
• require that the permittee implement site modifications to qualify for the No Exposure
Exclusion.
Part 11 Page 10 of 10
Permit No. NCG210000
PART III STANDARD CONDITIONS FOR NPDES STORMWATER
GENERAL PERMITS
SECTION A: COMPLIANCE AND LIABILITY
Compliance Schedule
The permittee shall comply with Limitations and Controls specified for stormwater
discharges in accordance with the following schedule:
Existing facilities already operating, but applying for coverage under this general permit
for the first time: The Stormwater Pollution Prevention Plan shall be developed and
implemented within 12 months of the effective date of the initial Certificate of Coverage
issued pursuant to this general permit and updated thereafter on an annual basis.
Secondary containment, as specified in Part 11, Section A, Paragraph 2(b) of this permit,
shall be accomplished within 12 months of the effective date of the initial Certificate of
Coverage.
New facilities applying for permit coverage for the first time and existing facilities
previously permitted and applying for renewal under this general permit: All
requirements, conditions, limitations, and controls contained in this permit become
effective immediately upon issuance of the Certificate of Coverage. The Stormwater
Pollution Prevention Plan shall be developed and implemented prior to the beginning of
discharges from the operation of the industrial activity and be updated thereafter on an
annual basis. Secondary containment, as specified in Part 11, Section A, Paragraph 2(b) of
this permit shall be accomplished prior to the beginning of discharges from the operation
of the industrial activity.
2. Duty to Comply
The permittee must comply with all conditions of this general permit. Any permit
noncompliance constitutes a violation of the Clean Water Act and is grounds for
enforcement action; for certificate of coverage termination, revocation and reissuance, or
modification; or denial of a certificate of coverage upon renewal application.
a. The permittee shall comply with standards or prohibitions established under section
307(a) of the Clean Water Act for toxic pollutants within the time provided in the
regulations that establish these standards or prohibitions, even if the permit has not yet
been modified to incorporate the requirement.
b. The Clean Water Act provides that any person who violates a permit condition is subject
to a civil penalty not to exceed $25,000 per day for each violation. Any person who
negligently violates any permit condition is subject to criminal penalties of $2,500 to
$25,000 per day of violation, or imprisonment for not more than 1 year, or both. Any
person who knowingly violates permit conditions is subject to criminal penalties of
$5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or
both. Also, any person who violates a permit condition may be assessed an
Part III Page 1 of 11 Pages
Permit No. NCG210000
administrative penalty not to exceed $10,000 per violation with the maximum amount not
to exceed $125,000. [Ref: Section 309 of the Federal Act 33 USC 1319 and 40 CFR
122.41(a).]
Under state law, a daily civil penalty of not more than ten thousand dollars ($10,000) per
violation may be assessed against any person who violates or fails to act in accordance
with the terms, conditions, or requirements of a permit. [Ref: North Carolina General
Statutes 143-215.6A]
d. Any person may be assessed an administrative penalty by the Director for violating
section 301, 302, 306, 307, 308, 318, or 405 of the Act, or any permit condition or
limitation implementing any of such sections in a permit issued under section 402 of the
Act. Administrative penalties for Class I violations are not to exceed $10,000 per
violation, with the maximum amount of any Class I penalty assessed not to exceed
$25,000. Penalties for Class II violations are not to exceed $10,000 per day for each day
during which the violation continues, with the maximum amount of any Class 11 penalty
not to exceed $125,000.
3. Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent any discharge in
violation of this general permit which has a reasonable likelihood of adversely affecting
human health or the environment.
4. Civil and Criminal Liabilit
Except as provided in Section D of this permit regarding bypassing of stormwater control
facilities, nothing in this general permit shall be construed to relieve the permittee from
any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-
215.3, 143-215.6A, 143-215.613, 143-215.6C or Section 309 of the Federal Act, 33 USC
1319. Furthermore, the permittee is responsible for consequential damages, such as fish
kills, even though the responsibility for effective compliance may be temporarily
suspended.
5. Oil and Hazardous Substance Liability
Nothing in this general permit shall be construed to preclude the institution of any legal
action or relieve the permittee from any responsibilities, liabilities, or penalties to which
the permittee is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the
Federal Act, 33 USC 1321.
6. Property Rights
The issuance of this general permit does not convey any property rights in either real or
personal property, or any exclusive privileges, nor does it authorize any injury to private
property or any invasion of personal rights, nor any infringement of federal, state or local
laws or regulations.
Part III Page 2 of I I Pages
Permit No. NCG210000
7. Severability
The provisions of this general permit are severable, and if any provision of this general
permit, or the application of any provision of this general permit to any circumstances, is
held invalid, the application of such provision to other circumstances, and the remainder
of this general permit, shall not be affected thereby.
8. Duty to Provide Information
The permittee shall furnish to the Director, within a reasonable time, any information
which the Director may request to determine whether cause exists for modifying,
revoking and reissuing, or terminating the certificate of coverage issued pursuant to this
general permit or to determine compliance with this general permit. The permittee shall
also furnish to the Director upon request, copies of records required to be kept by this
general permit.
9. Penalties for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly
renders inaccurate, any monitoring device or method required to be maintained under this
general permit shall, upon conviction, be punished by a fine of not more than $10,000 per
violation, or by imprisonment for not more than two years per violation, or by both. If a
conviction of a person is for a violation committed after a first conviction of such person
under this paragraph, punishment is a fine of not more that $20,000 per day of violation,
or by imprisonment of not more than 4 years, or both.
10. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement,
representation, or certification in any record or other document submitted or required to
be maintained under this general permit, including monitoring reports or reports of
compliance or noncompliance shall, upon conviction, be punished by a fine of not more
than $10,000 per violation, or by imprisonment for not more than two years per violation,
or by both.
SECTION B: GENERAL CONDITIONS
General Permit Expiration
The permittee is not authorized to discharge after the expiration date. In order to receive
automatic authorization to discharge beyond the expiration date, the permittee shall
submit forms and fees as are required by the agency authorized to issue permits no later
than 180 days prior to the expiration date. Any permittee that has not requested renewal
at least 180 days prior to expiration, or any permittee that does not have a permit after the
expiration and has not requested renewal at least 180 days prior to expiration, will be
Part III Page 3 of 11 Pages
Permit No. NCG210000
subjected to enforcement procedures as provided in NCGS § 143-2153.6 and 33 USC
1251 et. seq.
2. Transfers
The certificate of coverage issued pursuant to this general permit is not transferable to any
person except after notice to and approval by the Director. The Director may require
modification or revocation and reissuance of the certificate of coverage to change the
name and incorporate such other requirements as may be necessary under the Clean
Water Act. Permittee is required to notify the Division in writing in the event the permit
is sold or closed. Permittee is required to notify the Division in the event the
permitted facility is sold or closed.
When an Individual Permit May be Required
The Director may require any owner/operator authorized to discharge under a certificate
of coverage issued pursuant to this general permit to apply for and obtain an individual
permit or an alternative general permit. Any interested person may petition the Director
to take action under this paragraph. Cases where an individual permit may be required
include, but are not limited to, the following:
The discharger is a significant contributor of pollutants;
b. Conditions at the permitted site change, altering the constituents and/or
characteristics of the discharge such that the discharge no longer qualifies for a
general permit;
The discharge violates the terms or conditions of this general permit;
d. A change has occurred in the availability of demonstrated technology or practices
for the control or abatement of pollutants applicable to the point source;
e. Effluent limitations are promulgated for the point sources covered by this general
permit;
A water quality management plan containing requirements applicable to such
point sources is approved after the issuance of this general permit.
g. The Director determines at his own discretion that an individual permit is
required.
4. When an Individual Permit May be Requested
Any permittee operating under this general permit may request to be excluded from the
coverage of this general permit by applying for an individual permit. -When an individual
permit is issued to an owner/operator the applicability of this general permit is
automatically terminated on the effective date of the individual permit.
Part III Page 4 of 1 1 Pages
Permit No. NCG210000
Si nag toEy Requirements
All applications, reports, or information submitted to the Director shall be signed and
certified.
All notices of intent to be covered under this general permit shall be signed as
follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of
this Section, a responsible corporate officer means: (a) a president,
secretary, treasurer or vice president of the corporation in charge of a
principal business function, or any other person who performs similar
policy or decision making functions for the corporation, or (b) the manager
of one or more manufacturing production or operating facilities employing
more than 250 persons or having gross annual sales or expenditures
exceeding 25 million (in second quarter 1980 dollars), if authority to sign
documents has been assigned or delegated to the manager in accordance
with corporate procedures.
(2) For a partnership or sole proprietorship: by a general partner or the
proprietor, respectively; or
(3) For a municipality, state, federal, or other public agency: by either a
principal executive officer or ranking elected official.
b. All reports required by the general permit and other information requested by the
Director shall be signed by a person described above or by a duly authorized
representative of that person. A person is a duly authorized representative only if:
(1) The authorization is made in writing by a person described above;
(2) The authorization specified either an individual or a position having
responsibility for the overall operation of the regulated facility or activity,
such as the position of plant manager, operator of a well or well field,
superintendent, a position of equivalent responsibility, or an individual or
position having overall responsibility for environmental matters for the
company. (A duly authorized representative may thus be either a named
individual or any individual occupying a named position.); and
(3) The written authorization is submitted to the Director.
Any person signing a document under paragraphs a. or b. of this section shall
make the following certification:
Part III Page 5 of 11 Pages
Permit No. NCG210000
"I certify, under penalty of law, that this document and all attachments were
prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information
submitted. Based on my inquiry of the person or persons who manage the system,
or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing
violations."
6. General Permit Modification Revocation and Reissuance or Termination
The issuance of this general permit does not prohibit the Director from reopening and
modifying the general permit, revoking and reissuing the general permit, or terminating
the general permit as allowed by the laws, rules, and regulations contained in Title 40,
Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina
Administrative Code, Subchapter 2H .0100; and North Carolina General Statute 143-
215.1 et. al.
After public notice and opportunity for a hearing, the general permit may be terminated
for cause. The filing of a request for a general permit modification, revocation and
reissuance, or termination does not stay any general permit condition. The certificate of
coverage shall expire when the general permit is terminated.
7. Certificate of Coverage Actions
The certificate of coverage issued in accordance with this general permit may be
modified, revoked and reissued, or terminated for cause. The notification of planned
changes or anticipated noncompliance does not stay any general permit condition.
SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS
1. Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of
treatment and control (and related appurtenances) which are installed or used by the
permittee to achieve compliance with the conditions of this general permit. Proper
operation and maintenance also includes adequate laboratory controls and appropriate
quality assurance procedures. This provision requires the operation of back-up or
auxiliary facilities or similar systems which are installed by a permittee only when the
operation is necessary to achieve compliance with the conditions of the general permit.
Need to Halt or Reduce not a Defense
It shall not be a defense fora permittee in an enforcement action that it would have been
necessary to halt or reduce the permitted activity in order to maintain compliance with the
condition of this general permit,
Part III Page 6 of 11 Pages
Permit No. NCG210000
3. Bypassing of Stormwater Control Facilities
Bypass is prohibited and the Director may take enforcement action against a permittee
for bypass unless:
a. Bypass was unavoidable to prevent loss of life, personal injury or severe property
damage; and
b. There were no feasible alternatives to the bypass, such as the use of auxiliary
control facilities, retention of stormwater or maintenance during normal periods of
equipment downtime or dry weather. This condition is not satisfied if adequate
backup controls should have been installed in the exercise of reasonable
engineering judgment to prevent a bypass which occurred during normal periods
of equipment downtime or preventive maintenance; and
C. The permittee submitted notices as required under Section E of this Part.
If the Director determines that it will meet the three conditions listed above, the Director
may approve an anticipated bypass after considering its adverse effects.
SECTION D: MONITORING AND RECORDS
Representative Sampling
Samples collected and measurements taken, as required herein, shall be characteristic of
the volume and nature of the permitted discharge. Analytical sampling shall be
performed during a representative storm event. Samples shall be taken on a day and time
that is characteristic of the discharge. All samples shall be taken before the discharge
joins or is diluted by any other waste stream, body of water, or substance. Monitoring
points as specified in this permit shall not be changed without notification to and
approval of the Director.
2. Recording Results
For each measurement, sample, inspection or maintenance activity performed or collected
pursuant to the requirements of this general permit, the permittee shall record the
following information:
a. The date, exact place, and time of sampling, measurements, inspection or
maintenance activity;
b. The individual(s) who performed the sampling, measurements, inspection or
maintenance activity;
C. The date(s) analyses were performed;
Part III Page 7 of 11 Pages
Permit No. NCG210000
d. The individual(s) who performed the analyses;
The analytical techniques or methods used; and
The results of such analyses.
3. Flow Measurements
Where required, appropriate flow measurement devices and methods consistent with
accepted scientific practices shall be selected and used to ensure the accuracy and
reliability of measurements of the volume of monitored discharges.
4. Test Procedures
Test procedures for the analysis of pollutants shall conform to the EMC regulations
published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting
Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the
Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136.
To meet the intent of the monitoring required by this general permit, all test procedures
must produce minimum detection and reporting levels and all data generated must be
reported down to the minimum detection or lower reporting level of the procedure.
5. Representative Outfall
If a facility has multiple discharge locations with substantially identical stormwater
discharges that are required to be sampled, the permittee may petition the Director for
representative outfall status. If it is established that the stormwater discharges are
substantially identical and the permittee is granted representative outfall status, then
sampling requirements may be performed at a reduced number of outfalls.
6. Records Retention
Visual monitoring shall be documented and records maintained at the facility along with
the Stormwater Pollution Prevention Plan. Copies of analytical monitoring results shall
also be maintained on -site. The permittee shall retain records of all monitoring
information, including all calibration and maintenance records and all original strip chart
recordings for continuous monitoring instrumentation, and copies of all reports required
by this general permit for a period of at least 5 years from the date of the sample,
measurement, report or application. This period may be extended by request of the
Director at any time.
Inspection and Entry
The permittee shall allow the Director, or an authorized representative (including an
authorized contractor acting as a representative of the Director), or in the case of a facility
which discharges through a municipal separate storm sewer system, an authorized
representative of a municipal operator or the separate storm sewer system receiving the
Part III Page 8 of I I Pages
Permit No. NCG210000
discharge, upon the presentation of credentials and other documents as may be required
by law, to;
Enter upon the permittee's premises where a regulated facility or activity is located
or conducted, or where records must be kept under the conditions of this general
permit;
b. Have access to and copy, at reasonable times, any records that must be kept under
the conditions of this general permit;
Inspect at reasonable times any facilities, equipment (including monitoring and
control equipment), practices, or operations regulated or required under this
general permit; and
d. Sample or monitor at reasonable times, for the purposes of assuring general
permit compliance or as otherwise authorized by the Clean Water Act, any
substances or parameters at any location.
SECTION E: REPORTING REQUIREMENTS
Discharge Monitoring Reports
Samples analyzed in accordance with the terms of this permit shall be submitted to the
Division on Discharge Monitoring Report forms provided by the Director. Submittals
shall be delivered to the Division no later than 30 days from the date the facility receives
the sampling results from the laboratory.
When no discharge has occurred from the facility during the report period, the permittee
is required to submit a discharge monitoring report, within 30 days of the end of the six-
month sampling period, giving all required information and indicating "NO FLOW" as
per NCAC T 15A 02B .0506.
The permittee shall record the required qualitative monitoring observations on the SDO
Qualitative Monitoring Report form provided by the Division, and shall retain the
completed forms on site. Visual monitoring results should not be submitted to the
Division, except upon DWQ's specific requirement to do so.
2. Submitting Reports
Duplicate signed copies of all reports required herein, shall be submitted to the following
address:
Central Files
Division of Water Quality
Part III Page 9 of I 1 Pages
Permit No. NCG210000
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
3. Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section
308 of the Federal Act, 33 USC 131 S, all reports prepared in accordance with the terms
shall be available for public inspection at the offices of the Division of Water Quality. As
required by the Act, analytical data shall not be considered confidential. Knowingly
making any false statement on any such report may result in the imposition of criminal
penalties as provided for in NCGS 143-215.68 or in Section 309 of the Federal Act.
4. Non-Stormwater Discharges
If the storm event monitored in accordance with this general permit coincides with a non-
stormwater discharge, the permittee shall separately monitor all parameters as required
under the non-stormwater discharge permit and provide this information with the
stormwater discharge monitoring report.
5. Planned Chanp-es
The permittee shall give notice to the Director as soon as possible of any planned changes
at the permitted facility which could significantly alter the nature or quantity of pollutants
discharged. This notification requirement includes pollutants which are not specifically
listed in the general permit or subject to notification requirements under 40 CFR Part
122.42 (a).
6. Anticipated Noncompliance
The permittee shall give notice to the Director as soon as possible of any planned changes
at the permitted facility which may result in noncompliance with the general permit
requirements.
7. Bypass
a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, it
shall submit prior notice, if possible at least ten days before the date of the bypass;
including an evaluation of the anticipated quality and affect of the bypass.
Unanticipated bypass. The permittee shall submit notice within 24 hours of
becoming aware of an unanticipated bypass.
Twenty-four Hour Reporting
Part III Page 10 of I I Pages
t it
Permit No. NCG210000
The permittee shall report to the central office or the appropriate regional office any
noncompliance which may endanger health or the environment. Any information shall be
provided orally within 24 hours from the time the permittee became aware of the
circumstances. A written submission shall also be provided within 5 days of the time the
permittee becomes aware of the circumstances.
The written submission shall contain a description of the noncompliance, and its causes;
the period of noncompliance, including exact dates and times, and if the noncompliance
has not been corrected, the anticipated time compliance is expected to continue; and steps
taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
The Director may waive the written report on a case -by -case basis if the oral report has
been received within 24 hours.
9. Other Noncompliance
The permittee shall report all instances of noncompliance not reported under 24 hour
reporting at the time monitoring reports are submitted.
10. Other Information
Where the permittee becomes aware that it failed to submit any relevant facts in a Notice
of Intent to be covered under this general permit or in any report to the Director, it shall
promptly submit such facts or information.
Part III Page 11 of 1 1 Pages
Permit No. NCG210000
PART IV LIMITATIONS REOPENER
This general permit shall be modified or alternatively, revoked and reissued, to comply with any
applicable effluent guideline or water quality standard issued or approved under Sections 302(b)
(2) (c), and (d), 304(b) (2) and 307(a) of the Clean Water Act, if the effluent guideline or water
quality standard so issued or approved:
a. Contains different conditions or is otherwise more stringent than any effluent limitation in
the general permit; or
b. Controls any pollutant not limited in the general permit.
The general permit as modified or reissued under this paragraph shall also contain any other
requirements in the Act then applicable.
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days
after being billed by the Division. Failure to pay the fee in timely manner in accordance with
15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the Certificate of
Coverage.
PART VI DEFINITIONS
Act
See Clean Water Act.
Arithmetic Mean
The arithmetic mean of any set of values is the summation of the individual values
divided by the number of individual values.
Allowable Non-Stormwater Discharges
This permit regulates stormwater discharges. Non-stormwater discharges which shall be
allowed in the stormwater conveyance system are:
(a) All other discharges that are authorized by a non-stormwater NPDES permit.
(b) Uncontaminated groundwater, foundation drains, air -conditioner condensate
without added chemicals, springs, discharges of uncontaminated potable water,
Part IV, V, and VI Page I of 6 Pages
Permit No. NCG210000
waterline and fire hydrant flushings, water from footing drains, flows from
riparian habitats and wetlands.
(c) Discharges resulting from fire -fighting or fire -fighting training.
4. Best Management Practices (BMPs)
Measures or practices used to reduce the amount of pollution entering surface waters.
BMPs may take the form of a process, activity, or physical structure.
5. Bypass
A bypass is the known diversion of stormwater from any portion of a stormwater control
facility including the collection system, which is not a designed or established operating
mode for the facility.
6. Bulk Storage of Liquid Products
Liquid raw materials, manufactured products, waste materials or by-products with a
single above ground storage container having a capacity of greater than 660 gallons or
with multiple above ground storage containers located in close proximity to each other
having a total combined storage capacity o1' greater than 1,320 gallons.
Certificate of Coverage
The Certificate of Coverage (COC) is the cover sheet which accompanies the general
permit upon issuance and lists the facility name, location, receiving stream, river basin,
effective date of coverage under the permit and is signed by the Director.
8. Clean Water Act
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as
amended, 33 USC 1251, et. seq.
9. Division or DWQ
The Division of Water Quality, Department of Environment and Natural Resources.
10. Director
The Director of the Division of Water Quality, the permit issuing authority.
H. EMC
The North Carolina Environmental Management Commission.
Part IV, V, and VI Page 2 of 6 Pages
* u. 1
Permit No. NCG210000
12. Grab Sample
An individual samples collected instantaneously. Grab samples that will be directly
analyzed or qualitatively monitored must be taken within the first 30 minutes of
discharge.
13. Hazardous Substance
Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean
Water Act.
14. Landfill
A disposal facility or part of a disposal facility where waste is placed in or on land and
which is not a land treatment facility, a surface impoundment, an injection well, a
hazardous waste long-term storage facility or a surface storage facility.
15. Municipal Separate Storm Sewer System
A stormwater collection system within an incorporated area of local self-government such
as a city or town.
16. No Exposure
A condition of no exposure means that all industrial materials and activities are protected
by a storm resistant shelter or acceptable storage containers to prevent exposure to rain,
snow, snowmelt, or runoff. Industrial materials or activities include, but are not limited
to, material handling equipment or activities, industrial machinery, raw materials,
intermediate products, by-products, final products, or waste products. DWQ may grant a
No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a
facility complies with the terms and conditions described in 40 CFR § 122.26(g)
17. Notice of Intent
The state application form which, when submitted to the Division, officially indicates the
facility's notice of intent to seek coverage under a general permit.
18. Overburden
Any material of any nature, consolidated- or unconsolidated, that overlies a mineral
deposit, excluding topsoil or similar naturally -occurring surface materials that are not
disturbed by mining operations.
19. Permtttee
The owner or operator issued a certificate of coverage pursuant to this general permit.
Part IV, V, and VI Page 3 of 6 Pages
Permit No. NCG210000
20. Point Source Discharge of Stormwater
Any discernible, confined and discrete conveyance including, but not specifically limited
to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which
Stormwater is or may be discharged to waters of the state.
21. Representative Storm Event
A storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72
hours in which no storm event measuring greater than 0.1 inches has occurred. A single storm
event may contain up to 10 consecutive hours of no precipitation. For example, if it rains for 2
hours without producing any collectable discharge, and then stops, a sample may be collected if a
rain producing a discharge begins again within the next 10 hours.
22. Representative Outfall Status
When it is established that the discharge of stormwater runoff from a single outfall is
representative of the discharges at multiple outfalls, the DWQ may grant representative
outfall status. Representative outfall status allows the permittee to perform analytical
monitoring at a reduced number of outfalls.
23. Rinse Water Discharge
The discharge of rinse water from equipment cleaning areas associated with industrial
activity. Rinse waters from vehicle and equipment cleaning areas are process
wastewaters and do not include washwaters utilizing any type of detergent or cleaning
agent.
24. Secondary Containment
Spill containment for the contents of the single largest tank within the containment
structure plus sufficient freeboard to allow for the 25-year, 24-hour storm event.
25. Section 313 Water Priority Chemical
A chemical or chemical category which:
a. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund
Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency
Planning and Community Right -to -Know Act of 1986;
b. Is present at or above threshold levels at a facility subject to SARA title III,
Section 313 reporting requirements; and
Meets at least one of the following criteria:
Part IV, V, and VI Page 4 of 6 Pages
I f
Permit No. NCG210000
(1) Is listed in appendix D of 40 CFR part 122 on Table it (organic priority
pollutants), Table 111 (certain metals, cyanides, and phenols) or Table IV
(certain toxic pollutants and hazardous substances);
(2) Is listed as a hazardous substance pursuant to section 31 1(b)(2)(A) of the
CWA at 40 CFR 1 16.4; or
(3) Is a pollutant for which EPA has published acute or chronic water quality
criteria.
26. Severe Property Damage
Means substantial physical damage to property, damage to the control facilities which
causes them to become inoperable, or substantial and permanent loss of natural resources
which can reasonably be expected to occur in the absence of a bypass. Severe property
damage does not mean economic loss caused by delays in production.
27. Significant Materials
Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents,
and plastic pellets; finished materials such as metallic products; raw materials used in
food processing or production; hazardous substances designated under section 101(14) of
CERCLA; any chemical the facility is required to report pursuant to section 313 of Title
III of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that
have the potential to be released with stormwater discharges.
28. Significant Spills
Includes, but is not limited to: releases of oil or hazardous substances in excess of
reportable quantities under section 311 of the Clean Water Act (Ref: 40 CFR 1 10.10 and
CFR 117.21) or section 102 of CERCLA (Ref: 40 CFR 302.4).
29. Stormwater Runoff
The flow of water which results from precipitation and which occurs immediately
following rainfall or as a result of snowmelt.
30. Stormwater Associated with Industrial Activity
The discharge from any point source which is used for collecting and conveying
stormwater and which is directly related to manufacturing, processing or raw material
storage areas at an industrial site. Facilities considered to be engaged in "industrial
activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not
include discharges from facilities or activities excluded from the NPDES program.
31. Stormwater Pollution Prevention Plan
A comprehensive site -specific plan which details measures and practices to reduce
Stormwater pollution and is based on an evaluation of the pollution potential of the site.
Part IV, V, and VI Page 5 of 6 Pages
k s. t
Permit No. NCG210000
32, Ten Year Desian Storm
The maximum 24-hour precipitation event expected to be equaled or exceeded on the
average once in ten years. Design storm information can be found in the State of North
Carolina Erosion and Sediment Control Planning and Design Manual.
33. Total Flow
The flow corresponding to the time period over which the entire storm event occurs.
Total flow shall be either; (a) measured continuously, (b) calculated based on the amount
of area draining to the outfall, the amount of built -upon (impervious) area, and the total
amount of rainfall, or (c) estimated by the measurement of flow at 20-minute intervals
during the rainfall event.
34. Total Maximum Dail,, Load
TMDLs are written plans for attaining and maintaining water quality standards, in all
seasons, for a specific water body and pollutant. (A list of approved TMDLs for the state
of North Carolina can be found at http:/fh2o.enr.state.nc.us/tmdV)
35. Toxic Pollutant
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act.
36. Upset
Means an exceptional incident in which there is unintentional and temporary
noncompliance with technology based permit effluent limitations because of factors
beyond the reasonable control of the permittee. An upset does not include
noncompliance to the extent caused by operational error, improperly designed treatment
or control facilities, inadequate treatment or control facilities, lack of preventive
maintenance, or careless or improper operation.
37. Vehicle Maintenance Activity
Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning
operations, or airport deicing operations.
38. Visible Sedimentation
Solid particulate matter, both mineral and organic, that has been or is being transported
by water, air, gravity, or ice from its site of origin which can be seen with the unaided
eye.
39. 25-year, 24 hour storm event
The maximum 24-hour precipitation event expected to be equaled or exceeded, on the
average, once in 25 years.
Part IV, V, and VI Page 6 of 6 Pages