Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG110024_COMPLETE FILE - HISTORICAL_20120513
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. IV DOC TYPE JZ HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ DOIDD5 13 YYYYMMDD Citp of (001bdoro P.O.Oramer a -forM prolina 27533-9701 May 6, 2010 Jennifer Jones Wetlands and Stormwater Branch NC DENR 1617 Mail Service Center Raleigh, NC 27699-1617 RE: Goldsboro Compost Facility Stormwater Pollution Prevention Plan Dear Jennifer: e i l�_; is �fl , "l MAY 13 2010 j 1 ,.r+ 'yj v d 1± h. i %" .,d y It was wonderful to meet you yesterday! I would have loved to have spent more time with you. You are very knowledgeable about the biology of composting. I really enjoyed the time spent with everyone that came on the tour. Please feel free to come back and visit any time. Enclosed is a copy of the City of Goldsboro Biosolids Compost Facility Stormwater Pollution Prevention Plan. This is the last update of the plan dated ems` 1 y September 3, 2008: Please let me know if you need any other information. Thanks. Sincerely, Karen Brashear (919) 35-3329, ext. 101 enc. 7- .X, TABLE OF CONTENTS 1. Site Plari .:.............................................................................................................................1 2. Stormwater Management Plan.............................................................................................3 3. Spill Prevention and Response Plan..............:.....................................................................4 4. Preventive Maintenance and Good Housekeeping Plan......................................................7 5. Employee Training............................................................................................I................10 6. Responsible Party...................................................................................................I............10 7. Record of Plan Amendments.............................................................................................10 8. Facility Inspection Program...............................................................................................11 9. implementation.......................................................... ......................................................... I I Tables, Forms, and Records Table 1 Outfall Location Data..................................................................................................I Table 2 Potential Pollutants.......................................................................................................2 Table 3 Non -discharge Evaluation Results..............................................................................12 Table4 BMP Summary .............................................................................................................4 Table 5 Material Inventory Schedule of Inspections.................................................................4 Table 6 Spill Prevention Response Team..................................................................................5 Table 7 Spill Response Procedures............................................................................................7 Table 8 Schedule of facility Inspections....................................................................................8 Table 9 Stormwater Systems Inspection Record....................................................:..................8 Table 10 Schedule of Maintenance of Stormwater Structures...................................................9 Table I 1 Schedule of Cleaning and Preventive Maintenance Activities..................................9 Table 12 Annual Training Requirements .................... Table 13 Record of Plan Amendments....................................................................................10 FacilityInspection Record.......................................................................................................13 FormSWU-242-051308..........................................................................................................14 Training Course Record...........................................................................................................16 Figures Figure 1 General Location Map Figure 2 Site Map Figure 3 Process Flow Plan Appendices Appendix A Non-stormwater Discharge Certificates Appendix B Inspection Record/Record of Action Appendix C Monitoring Records Appendix D Training Records 1. Site Plan a. General Location Map (Figure 1) Table I Outfall Location Data Outfall Number Latitude Longitude' OF] 350 20.933' North 077' 59.556 West OF2 350 20.975' North 077' 59.329 West OF3 350 20.995' North 077' 59.321 West OF4 350 21.009' North 077' 59.309 West OF5 35° 21.029' North 077' 59.298 West OF6 350 21.083' North 077' 59.357 West Note 1: Latitude and Longitude in WGS 84 Coordinates Receiving Waters: Stoney Creek, Source to Neuse River, Segment 427-62, Impaired for Aquatic Life and located within the Neuse River Basin under a TMDL for Nitrogen b. Site Plan (Figure 2) c. Narrative Description General: The Biosolids Composting Facility produces graded compost as shown in the Process Flow Plan (Figure 3). The facility operates during normal daylight hours, and is secured with a chain link fence at night. Yard waste is picked up by City employees and is limited to branches, stumps and other natural debris. The yard waste is ground up, mixed with sludge from the Water Reclamation Facility, and placed in the composting beds in the Compost Building. Compost from the Compost Building is placed in the Curing Building to complete the process. The finished compost is then �-_adcd int^ uniform sizes for sale or use. Storage Practices: Yard waste is brought to the site and stored outside south of the Amendment Building. After grinding the yard waste into 2-inch particles, the material, or Amendment is stored under cover in the Amendment Building. Once the sludge and amendment mixture been composted (21-days), the Compost is stored under cover in the Curing Building for 30 days minimum. Compost is then screened into piles of 4-inch and 3/8-inch size and stored outside on the Curing Pad. Loading and Unloading Activities: Yard waste is unloaded at the Yard Waste Storage area south of the Amendment Pad. Mixing trucks are loaded with Amendment at the Amendment Pad. Mixing trucks unload mixed sludge and Amendment inside the Curing Building at the east end. Compost is loaded into dump trucks at the Curing Pad area. Outdoor Process Areas: Yard waste is ground to 2-inch particles on the Amendment Pad. Compost is separated into 4-inch and 3/8-inch sizes at the Curing Pad. Gases from the Composting are vented through the Biofilter for biological treatment prior to escaping to the atmosphere. Dust/Particulate Control: The grinding and screening operations do not generate significant amounts of dust, and ground and screened material is shaped into piles by bucket loaders to control particulates. The Composting process produces some dust, but this process is inside the Composting Building. Water is sprayed on the Compost as part of the process. Gases and dust are collected and passed through the Biofilter. Waste Disposal Practices: Waste is placed inside the Mixing Trucks and deposited in covered dumpsters at the Water Reclamation Facility. All Yard Waste will eventually be used in the Composting Process. d. Potential pollutants The following potential pollutants could be expected to be present in the stormwater discharge from the listed outfall. Table 2 Potential Pollutants Outfall Pollutant OF 1 Nutrients OF2 Sediment, Organic Matter (Vegetative Material) OF3 Sediment, Organic Matter (Vegetative Material) OF4 Sediment, Organic Matter (Vegetative'Material) OF5 Sediment, Or anic Matter (Vegetative Material) OF6 Sediment, Organic Matter (Vegetative Material) 13 e. List of Significant Spills There have been no spills since the facility began operating in February 2003. f. Non-stormwater Discharge Certification (Appendix A) The permit requires that all discharge locations be evaluated for the presence of non - storm water discharges. Any unauthorized storm water dischargers must be eliminated, or covered under another National Pollutant Discharge Elimination System (NPDES) permit. The following is a list of non -storm water discharges authorized under the general permit. Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushing, water from footing drains, flows from riparian habitats and wetlands, and discharges resulting from fire -fighting or fire -training. The Non-stormwater Discharge Certification will be prepared annually IAW Part 1I, Monitoring, Controls, and Limitations for Permitted Discharges, Section a, Paragraph l (e), and signed JAW Part III, Standard Conditions, Section B, Paragraph 5. The form for WW 2 i the certification is located along with Table 2—Non-discharge Evaluation Results in Appendix A. 2. Stormwater Management Plan a. Feasibility Study Identification of material and processes exposed to stormwater runoff: \,J %-1` • Material: o Yard waste o Screened Compost Processes: a Grinding of yard waste o Screening of compost Actions taken/proposed to -prevent exposure of materials and process: • Ground yard waste (Amendment) is stored under cover in the Amendment Building. • While Compost is curing it is stored under cover in the Curing Building. • When Compost is screened and stored on the Curing Pad, it is shaped into piles that resist particulates mixing with precipitation. Actions taken/proposed to divert runoff away from potential contamination': S+c Compost that is in the curing stage will not be allowed to extend beyond the edge of the roof of the Curing Building and become exposed to precipitation. �7) A silt fence will be installed at the point the runoff from the Curing Pad enters the l� stormwater pond to prevent particulates from washing into the pond. The accumulated particulates will be periodically scooped up and recycled into the Composting Process. -V Technical and economic feasibility of taking actions noted above: Actions noted in the paragraph above are both technical and economically feasible. Insuring that all Compost is pushed back behind the roof edge requires no additional resources and is within the capability of the loader operator's skills to accomplish. Installation of a silt fence will require minimal resources that are available from the General Services Department, and upkeep and maintenance are currently within the capabilities of the work force at the Biosolids Compost Facility. b. Secondary Containment Schedule The Biosolids Composting F^cility has no requirement for secondary coi.'minment. c. BMP Summary Table 4 BMP Summary Area/Location Type BMP Control Measure West of Curing Pad Retention (Wet) Pond Nutrients, Sediment Outfalls 1-6 Rock Check Dams Sediment, Vegetative Matter Outfalls 1-6 Grassed -lined Swales Sediment, Nutrients, Ve etative Matter d. Fueling Operations A 90-gallon tank of diesel fuel is towed to the Biosolids Compost Facility to refill the bucket loader, grinder, and screen. The loader is fueled in the vicinity of the southeastern rollup door to the Compost Building, and the grinder and screen are filled up on the Amendment Pad and Curing Pad respectively. A container of Oil -dry is maintained on site to soak up small spills, along with some rags, broom, and shovel. Spill Prevention and Response Plan a. Assessment of Potential Pollutant Sources Location of areas where spills are likely: • Emergency Generator next to Compost Building parking area • Fueling point for Bucket Loader near southeast roll -up door to Compost Building • Grinder on Amendment Pad • Screen on Curing Pad Discharge points of any likely spills: Any spills at the Generator, Loader fueling point, and Screen will eventually discharge to the stormwater pond and Outfall Number 1. A spill at the Grinder has the potential to reach Outfall Numbers 2-6 through the stormwater drainage ditches in the southeast corner (Yard Waste Storage) of the site. b. Material Inventory Table 5 Material Inventory )Ww Area/Process Material* Method of Exposure Outfall Generator on Parking Pad DF, MO Leak ors ill onto ex osed surface I Grinder on Amendment Pad DF, MO Leak ors ill onto ex osed surface 2-6 Screen on Curing Pad DF, MO. Leak ors ill onto exposed surface I Loading of Amendment DF, HF, TF, MO Leak onto exposed surface 2-6 Loading of Compost DF, HF, TF, MO Leak onto exposed surface I Unloading of Yard Waste DF, HF, TF, MO Leak onto exposed surface 2-6 *DF: Diesel Fuel, HE Hydraulic Fluid, TF: Transmission Fluid, MO: Motor Oil c. Spill Prevention Response Team (SPRT) 4 ,3 The SPRT, also known as the Stormwater Pollution Prevention Team, is responsible for developing, implementing, maintaining, and revising this SWPPP. The members of the team are familiar with the management and operations of the Biosolids Compost Facility. The member(s) of the team and their primary responsibilities (i.e. implementing, maintaining, record keeping, submitting reports, conducting inspections, employee training, conducting the annual compliance evaluation, testing for non -storm water discharges, signing the required certifications) are as follows: Table 6 Spill Prevention Response Team Name & Title Responsibility Karen Brashear a Ensure the implementation of the SWPPP Plan. Director, Public Utilities a Update the SWPPP as necessary to ensure that it is current and responsive to the activities and operations. . a Staff, train, and equip the Spill Prevention Response Team (SPRT). a Coordinate with City Staff, Engineering Department, General Services Department, and operators. e Provide periodic training sessions to employees on the responsibilities concerning implementation of the SWPPP and applicable pollution control laws; - rules and regulations. a Maintain records of training, written procedures, inspections, and SWPPP amendments. I year e Arrange for SWPPP updates at least every 5 years to determine if modifications are required to achieve compliance with the General Stormwater Discharge Permit. a Initiate facility modifications to achieve compliance with the SWPPP by submitting projects for funding as soon as reasonably possible. e Develop written procedures for inspection. and mai,.L,,;?> r-:cords of inspections. a Oversee and direct activities of SWPPP Contrac'�k_'r. a Initiate corrective actions for deficiencies found during inspections. a Review plans and _drawings related to new construction, maintenance, or remodeling to determine if amendments to the SWPPP are required. Don Coles a On -site supervisor for implementation of SWPPP Facility Supervisor a Maintain spill/leak response and clean-up equipment. a Inspect security systems such as access controls, locked storage areas, lighting, fencing, traffic control and others to ensure that vandalism or unauthorized entry do not occur which could damage stormwater control structures. Name & Title Responsibility • Provide initial response for oil spills and leaks. • Maintain storage areas and perform general housekeeping. • Monitor fueling operations. Willie Boseman • Visually inspect vehicles and equipment for leaks and any Facility Technician obvious mechanical deficiencies' that could cause a spill event or accident. • Maintain storage areas and perform general housekeeping. • Monitor fueling operations. Roosevelt Johnson Visually inspect vehicles and equipment for leaks and any Facility Technician obvious mechanical deficiencies that could cause a spill event or accident. • Maintain storage areas and perform general housekeeping. • Monitor fueling operations. Don Sperry • Visually inspect vehicles and equipment for leaks and any Facility Technician obvious mechanical deficiencies that could cause a spill event or accident. • Maintain storage areas and perform general housekeeping. • Monitor fueling operations. Rod.z-,kck Pace • Visually inspect vehicles and equipment for leaks and any Plant'Maintenance obvious mechanical deficiencies that could cause a spill Mechanic/Operator event or accident. • Maintain storage areas and perform general housekeeping. • Monitor fueling operations. William T. Sabata, PE • Coordinate with the Director of Public Utilities in the CLP Services, P.C. development of facility inspection and operating SWPPP Contractor procedures for the equipment and facilities. • Prepare updates to and maintains the SWPPP when requested. Spill response equipment: Safety equipment: Safety equipment consists of equipment which is normally available and used at the Biosolids Compost Facility, such as ear plugs, hard hats, steel toed boots, gloves, fire extinguishers, and communication equipment. Cleanup equipment and material: • Container of Oil -dry, Speedy -dry or other commercially available product • Push Broom • .. Shovel • Rags • 55-gallon drum for waste Alert procedures: Any spill or leak that occurs during normal working hours that cannot be handled on -site will require notification of the following personnel in the order listed. 6 Situation Name/Title Phone Number Spill or leak beyond the ability of Karen Brashear (919) 735-3329 on -site personnel to handle Director of Public Utilities Significant leak or spill involving Alvin Ward Emergency call 911 hazardous materials or conditions Fire Chief Non -emergency call (919) 580-4262 Sspill or leak not requiring Fire Neil Bartlett (919) 580-4225 Department Response Public Works The follow procedures have been developed for spill response for the facility. Table 7 Spill Response Procedures Area Materials Present* Response Plan Location Compost Building DF, MO if a small amount of liquid is spilled, spread Parking Area Oil -dry, broom up residue, put in 55-gallon drum for disposal. Amendment Pad DF, HF, MO, TF Grinder if significant amount, use loader to build temporary dike around spill/leak to contain liquid. Contact the Public Utilities Director, Curin Pad Screen DF, HF, MO, TF Fueling Point DF, HF, MO, TF (Loader) and !if she is not available, then contact General Services if condition is not hazardous, or contact the Fire Department if hazardous conditions exist. *DF: Diesel Fuel, HF: Hydraulic Fluid, MO: Motor Oil;, TF: Transmission Fluid Spill response training: Annual training will be given to all employees at the Biosolids Compost Facility covering, but not limited to, the following topics:. • Spill Prevention • Spill Response • Safety 4 • Good Housekeeping 4. Preventative Maintenance and Good Housekeeping Plan a. Preventive Maintenance Program Preventive maintenance of stormwater control systems: Stormwater management systems will be periodically inspected and maintained. Ditches and swales will be cleaned of trash and sediment, the sides checked for stability, and grass maintained as necessary. The stormwater pond will be inspected and maintained annually, and accumulated sediments removed. Rock check dams will be checked and accumulated trash, vegetative matter, and sediment will be removed. Preventive maintenance of facility equipment: Facility equipment will be inspected and maintained in accordance with the manufacturer's suggested maintenance schedule. Particular attention will be paid to the Grinder, with its large capacity (315 gallons) fuel tank, and the Screen. Both are exposed to precipitation and stormwater runoff. The Emergency Generator will be inspected for leaks periodically. The Bucket Loader and Mixing Trucks will be checked for fluid leaks before, during, and after operations. Both the Curing Building and Amendment Building will be checked periodically for leaks that would allow precipitation to reach the stored material, and to insure that material inside the buildings is not exposed to runoff. b. Schedule of Inspections: Identification of qualified personnel to conduct inspections: The Facility Supervisor will conduct periodic facility and equipment inspections as noted below. Equipment operators will inspect their equipment each day of operation and report Ieaks or. spills that have a potential to pollute receiving waters. Identification of areas and equipment needing inspections: Table 8 Schedule of Facility Inspections *W-weckiv, M-monthly. S-semiannual Areas/Equipment to be Points of Inspection Frequency* Inspected Parking Area, and Drips of Motor Oil, Transmission Fluid M Generator So ills or leaks at Generator Pad Amendment Pad and Spills or leaks at Grinder, Evidence of leaks M Grinder from Loader or NHjxipZ Trucks Roads and Travel Ways Leaks from Loader, Mixing Trucks M Fuel operations Spills from fueling of equipment W Curing Pad/Screen Spills or leaks from Screen, Evidence of leaks M from Loader or dump trucks Yard Waste Look for trash or garbage brought in with M —�- waste Amendment Building -yard Material that is exposed to precipitation or W 6{: -- At, runoff and roof leaks Curing Building Material that is exposed to precipitation or W S C_ Ir t t V. runoff and roof leaks Curing Pad/Graded Piles not shaped, particulate matter subject to W Compost runoff Identification of stormwater control systems that need to be inspected r LV e_p— . 8 Table 9 Stormwater Systems Inspection Record Areas/Equipment to be Points of Inspection Frequency* Inspected Ditches draining to Clean, no standing water, no side erosion, M Stormwater Pond no evidence of oils (Record on Facility Ins ection Checklist) Stormwater Pond See Inspection Checklist for Ponas in S A endix B Swale from Pond to OF 1 See Inspection Checklist for Infiltration S Practices, Section on Swales, Appendix B Swales draining Yard Waste See Inspection Checklist for Infiltration S Area to OF 2-5 Practices, Section on Swales, Appendix B -Storage Swale draining east side of See.Inspection Checklist for Infiltration S J facility to OF 6 Practices, Section on Swales, Appendix B Rock Check Dams at all No trash, garbage, no standing water, no M outfalls erosion, no evidence of oil (Record on Facility Ins ection Checklist)J,4A alao„t c. Schedule of Cleaning and Maintenance Activities r' Table 10 Schedule of Maintenance of Stormwater Structures *W-weekly. M-monthly. fi-semiannual Stormwater Structure Tasks Frequency* Stormwater Pond Remove accumulated sediment S (as needed) Replant vegetation Rock Check Dams Remove accu sediment S. as needed) `mu.lated 1rJ1' Pja S}and:n W41e ' ? Table I 1 Schedule of Cleaning and Preventive Maintenance Activities +W- Liv M_mnnlhly- C-cemianniml Area/Equipment Tasks Frequency* Amendment Pad/Grinder Clean and maintain Grinder per W, M, S Manufacturer's Recommendations Bucket Loader Preventive maintenance per Manufacturer's W, M, S Recommendation Curing Pad/Screen Clean and maintain Screen per W, M, S Manufacturer's Recommendations Mixing Trucks Preventive maintenance per Manufacturer's W, M, S Recommendation 9 .' Schedule for replacement of facility equipment: Equipment will be replaced in accordance with established life cycle operations for the particular type of equipment. 5. Employee Training a. Annual Training Requirements The following is a description of the employee training programs to be implemented to inform appropriate personnel at all levels of responsibility of the components and goals of this SWPPP. Table 12 Annual Training Requirements Topic Employees Included Freguency Spill prevention and response Operators Annually Good Housekeeping All Annually Material Management practices Supervisor Annually Basics of water pollution laws All Annually Inspection of Stormwater BMPs Supervisor Annually Safety All Annually b . Personnel Conducting the Training Identification of Training Personnel: Training personnel will be provided by the SWPPP Contractor or internally from the Public Utilities,Department Training materials: Training Material will be prepared by the SWPPP Contractor and maintained by the Director of Public Utilities. 6. Responsible Party The Responsible Party and contact information is listed on the SWPPP cover page. 7. Record of Plan Amendment(s) Table 13 Record of Plan Amendment(s) I Amendment No. I Date of Amendment I Date Recorded I Recorded By 10 Amendment No. Date of Amendment Date Recorded Recorded B 8. Facility Inspection Program Records of Inspections and Actions taken will be maintained in Appendix B 9. Implementation a. Qualitative Monitoring: Qualitative monitoring must be performed during a representative storm event. This is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. The person performing the monitoring will record the amount of rainfall received (in inches) prior to the monitoring event and note this on the Qualitative Monitoring Report. Qualitative monitoring will be performed twice a year, once between July 1 and December 31 (Period 1), and once between'January I and June 30 (Period 2). The first monitoring period is July 1, 2008 to December 31, 2008. There will be at least a 60-day interval between monitoring dates in Period I and Period 2. Qualitative Monitoring Reports will 1-filed in Appendix C. b. Records and Reports: If there is a problem indicated by the Qualitative Monitoring, the Department of Public Utilities will investigate the causes, evaluate corrective actions, and implement those actions as necessary. A written record of such investigation, evaluation, and implementation will be maintained in Appendix C with the Qualitative Monitoring Records. c. Training Records: Record of training received by Biosolid Compost Facility personnel will be maintained in Appendix D. 11 SWPPP Annual Training Stormwater Pollution Prevention Plan William T. Sabata, PE CLP Services, P.C. SWPPP - Annual training for all employees ' covers the following topics: ❑ Basics of water pollution lays ❑ Material Management practices ❑ Inspection of Stormwater Controls (inlets, etc.) ❑ Spill, prevention and response r ❑ Safety ❑ Good Housekeeping i Material Management ❑ Storage ■ Indoor/outdoor ■ Identification of Pollutants ❑ Loading and Unloading C Outdoor Processes ❑ DustlParticulate Control ❑ Waste Disposal Practices Clean Water Act ❑ NURP-National Urban Runoff Program ❑ National Pollutant Discharge Elimination System ❑ Industrial Sites a Federal program designated to State ❑ Notice of Intent (NOI) ❑ General Permit . New in 2008-Centrat Maint Fac ■ New in 2008-Biosolids Fac I'II Laws, Regulations, Standards and Guidance fi Applicable to SWPPP ❑ NC General Statute, 143.215.1. and 15A NC Administrative Code 02H Procedures For Permits: Approvals ❑ Stormwater Pollution Prevention Plans for Stormwater Runoff at Industrial Activities, NC DWO, Stormwater and General Permits Unit, February 1994 ❑ Standards for inspection of in-service Shop Fabricated Aboveground Tanks for Sforage of Combustible and Flammable Liquids, (SP001-03), Steel Tank Institute, January 2003. Stormwater Controls Inspections Areas/Equipment Points of Inspection Frequency to be Inspected Ditches Draining to Clean, no standing M SW Pond water, no side erosion, no evidence of oils Drop Inlets for Trash, evidence of M pipes draining to petroleum and Outfalls lubricants 1 i I?I f Starmwater Sampling , c Quantitative (Maintenance Facility} e Twice Annually -New Permit 20DS e Actions if Standards are Exceeded . 'sampling a R.presenlative Storm o Report to DENR within 30 days ❑ Qualitative (Biosolids Facility) e Annual Certification of Non-stormwater discharge -New permit2008 e Twice Annually e Actions if problems are not corrected o Representative Storrs u Retain records at facility Safety and Health ❑ Safety Flrst—don't take unnecessary risks ❑ Weal appropriate safely equipment —gloves, boots, hard hats, eye protection ❑ Use appropriate equipment and material for containmentldeel , ❑ Don't go into confined space unless property equipped and trained ❑ Evacuate the area and notify the fire department if in doubt as to what to do 11, 'I General Housekeeping (cunt.) ❑ Preventive maintenance of facility equipment e Facility equipment will be inspected and maintained in accordance with the manufacturer's suggested maintenance schedule. Equipment will be inspected for leaks before, during, and after operations. When tanks are being filled someone will check to insure there are no spills of foals and that filling operations are being conducted property and safely. Spill Control and Contingency Procedures ❑ in the event of a spill, the general procedure will include: r The initial rotlfication of the Plan Coordinator e Spill containment, spill isolation, and spill cleanup by City personnel (Spill Prevention and Response Team) e If the spill is considered hazardous, or has gone olfsita, the notification of the Fire Department (911) and their assistance in contairuog, isolating• and cleanup actions e Final disposal of contaminated material through a licensed disposat contractor. tl General Housekeeping ❑ Preventive maintenance of stormwater control systems ry ■ Stormwater management systems should '#- be periodically inspncted ?rid maintainer, - inlets cleaned of trash, vebetative mar:::., and sediment and areas arourrt inlets cleaned of material that coulc _or�iamina`° storrrrwater. ii !' General Housekeeping (cont,) ❑ The individual facility supervisor should conduct periodic facility and equipment inspections, Equipment operators should inspect their equipment each day of operation and report leaks or spills that have a potential to pollute receiving waters, ❑ Maintain spilVleak response and clean-up equipmenl. ❑ Inspect security systems such as access controls, locked storage areas, lighting• fencing, traffic control and others to ensure that vandalism or unauthorized entry do not occur which could damage starmwater control structures. 2 i NON-STORMWA T ER DISCHARGE CERTIFICATION (Must be completed annually —File with SWPPP Appendix A) The storm water drainage system described in this SWPPP has been tested or evaluated for the presence of non -storm water discharges. The following table summarizes the evaluation results. Table 3 Non -discharge Evaluation Date/ Time Outfall Method (O-Observation) (M-Monitoring) Evaluator (Print Name) Observations (Are there any non -storm water discharges authorized or not?) Date Corrected If applicable) OF1 OF2 OF3 OF4 OF5 OF6 CERTIFICATION OF EVALUATION OF NON -STORM WATER DISCHARGES I certify, under penalty of law, that this document and all attachments were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment for knowing violations. (Signature) (Printed Name) d (Date) (Title) 12 Facility Inspection Record (File with SWPPP Appendix B) "W-weekly. M-monthly. S-semiannual. A -annual Areas/Equipment to Points of Inspection Period Date of Deficiencies Actions Taken be Inspected Inspection Noted Parking Area and Drips of Motor Oil, M Generator Transmission Fluid, Spills or leaks at Generator Pad Amendment Pad and Spills or leaks at Grinder, M Grinder Evidence of leaks from Loader or Mixing Trucks Roads and Travel Leaks from Loader, Mixing M Ways Trucks Fuel operations Spills from fueling of W equipment Curing Pad/Screen Spills or leaks from Screen, M Evidence of leaks from Loader or trucks a Yard Waste Look for trash or garbage` M brought in with yard waste Amendment Building Material that is exposed to W precipitation or runoff and roof leaks Curing Building Material that is exposed to W precipitation or runoff and roof leaks Curing Pad/Graded Piles not shaped, particulate W Compost matter subject to runoff Ditches draining to Clean, no standing water, no M Stormwater Pond side erosion, no evidence of oils Rock Check Dams at No trash, garbage, no M all outfalls standing water, no erosion, no evidence of oil Signature of Inspector Name/Title of Inspector 13 W..s.�Y 0 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Permit No.: NICI I l l I 1 1 I or Certificate of Coverage No.: N/C1Gl l l I I I I Facility Name: County: Phone No. Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): Was this a Representative Storm Event? (See information below) ❑ Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours Q days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint lhvht merflllm dnrlel %c ripcorintnrc- Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Permit No.: N/CI l l l l l l l or Certificate of Coverage No.: N/C/GI l l 1 1/ I Facility Name: County: Phone No. Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): Was this a Representative Storm Event? (See information below) Q Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue,'etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): S WU-242-051308 Page] of 2 14 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is,,Very cloudy: 1 2. 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where I is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes' No 10. Other Obvious Indicators of Stormwater Pollution:. List and describe Note: `Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. ' SWU-242-051308 Page 2 of 2 15 TRAfNTNG COURSE RECORD (File with the SWPPP Appendix D) Training Sponsor Course Name Contact Hours Date of Course Instructor's Name I hereby certify that the persons listed below did in fact attend this course: Instructor's Signature ATTENDEES NAME POSITION FILE THE ORIGINAL SIGN-UP SHEETS- SEND COPIES IF NECESSARY Revised 9/3/2008 9+ 't 1• Q' 0 e 6 O �� v )) r'. �� +.,' s-''4i+• • jE' .'. .,�". .E..� , .. �J M-� ii3diDy., " �� � tll i'7{?••s: i I�,� 5' � �:' i^,. ::�� ii; • ��� �'f �'�``��Fi,.G L .- •'.q.. .h • j�"i. i=.r` i1f: Yia. Y' !..' •.i r� E• `-_- yi 'I, j' ��c��—Irr r '�� � •"^ile jr. X' .tin` ]O( '. V,.,3.•' :,,it �y'I_- l -�' ..,+N fi i .E' , , �`:, •�` .�y :lQfi� ` •}:`.. � •v`t.7Y�n'��' yr "�t I.- I 4 Y 7 l ' �} t i } Ii� +" { * t n • LDS �..i .��. 4�sY �i • � ; r ��e '-r ; ��Jl• r ti, � � .jrq f, ; .: �; .!, .�• ' � ,'' ,� F� r � � • • �' �,,E • t ^: _ !!,lr "4as'r'r � �' '' ` -;' � r,'.'� :. � r OLDPOAO ,Mina. � nsrs� �� ..: .'s:;�. ��• i Weil. .- -' ,1:,. r.r;. �� . 5•.�7'+�r' :I r r :, r I�;aa Perk :.5'ch -{`•• yr^_�.:1r 'k ;ll�~ ,'�['>.� �f. ! }_ '�, ,�• `'+• icy rx +}}!]Y •I•x I,11 " �y :i _.'1' ,,. ��l' '�c. 'r Sh S. lw ,i• ^I'f .1. .1' � I I •� .. 2 f:• .• •��1.i i '�. f�' *.::_ 5- r it"'" .. AT - •• CtTm -�! w• • '=%,r; a F' •.. tip,? t ....� ;@i'i/,+..'• 1.' - r :: .•1 r': NM • 5` T /g ••1 �'` Perk ` �' (�o t r r i �#'• Golf ' ''c' Courree .. o Cbra4b � � � `� `' 7, -1 - � .. ��.+'• c• — —� �'T'� � � rr .Ire �,. ,_ .. _-�--h -�-�'ulrle*� � ,�a ,.��wµ � �.. I �s,�.• i -dV W 4 `'.�' �f :, �� O �. ',r+wJSS i �•.• •� T, "; •� .'! ( �L yy. + r--• � I 1i' lam- � '',, }. % ' p - 'rr yemmp{ul ¢ Airboia • M� :I . Y ^_ .� Ir '�S S(? ^ II F'•�� , _!: rE.}til it jam' f: f Sew e i 1 i � f; IA �7l :� .� :�' -,- ' .7.n � I � 1 -� j } " `is a r • �-,,� ) � i j/ _. a �•�'}� .G ��� `tom `�� - •!; ` ���5/: I{�� ' {•� Q f I� • \ N33 B"iflsai"id Face lit ''� •. � d �'I � .' = . / ,•' J I [ rv�� ., � k dit Fa M1XNX O D O O- k ✓o . i, AL z Lake f RI' ; �r'r c V� \' -,r'I • '�'� :'1 .,y, ` I i ,. }41 5 tar, . I I '' ,rJy ,�-%/',/ '• �-'- � ` ` S �•""I •'r C1 \. ,Y�i { •I �.��r'1' o •fLB Ponds 15 Sl I�lflj I mx `• Lai ti - . 15 y - -- ,^' �s• �'__ a— — -t.,. �- w v -. i n135'0i7 5. .., _�;� I`r,: ��`��, • V i"D 7apoQEud� Capyeitld m 199v Dt[umu YaEaa 6iis 04096 Samu D aa: USGS I-1750 8 Scak L : 25,000 DrtzD: I3-0 D&m: WGU4 Figure 1.General Location Map .. I --•-Cl [.L: ttY •W•»---•,-�•-•, y-�•�. `[�-_'f'1rD wru n1Cr.,ar UM�_',t' mar. SHEET FLOW was a•a.c a-ya - \... ""SHEET 0% IMPERI w _P, r 0% IMPER '•` °y ._ �� SHEET_ FLOW���� -. 4 +rx.P ca r/ra I _ -. ._—. _. _ ...___ . _. -_ _ .. -- ----- : _.- rm',v-•2+ P. rav_.. p / / �o°. . ."clGenerator c �. 1 x _ oI=1 . . ng 6tdg R � a 19 0 rr¢.1:C ,P,r—', ill. Grinde p�L Q i .� mr a•,r)f f„[, fa' _ n_crn i 0 \\ OR .` •:CIIS .S{4; [S+[ �/ � - +" .n 2rt+ rnrua I :a+rcpM,ry "r.. ' .{r' ��'Eh,�.Pa � � —�"�' A` IQ- Inter. � E ;, - .:� o _ _ .ti. - - MPER - - - Pond A 4 �� - - � 8 g p 28% IMPER ,\ SH T FLOW 'SHEET FLOW of ° �- -f '' 41 %IMPS 100% I MPER "" f �Z; n c•t, wn:P, � oxFn eP:n u rc.r.. xu' \ 1 � j �� .4 :-o�r.'r":- -k., \ wcrcceYncxi •m• j 1 •• 5 SHEET FLO r- 88% IMPS Notes: y ; \ v _ -�r-�` _ = �. �. ,; ..� �..•. l +r. v�v IMPER: Impervious a' f--'- --- x. Fiaure 2. Site ManC" ���tar� - ��,���� AND EROSION CONTROL 3 P.2 w.au 114 MY me, I Vr RQ =O=IG mT Figure 3. Process ,Flow Plan r,_ Permit N r WQ0018201 Program Category Non -discharge / Distribution of Residual Solids (503) �( Primary Reviewer 6,vVWP&5 chonticha.mcdaniel Coastal SW Rule Permitted Flow Facilit Central Files: APS SWP 05/06/10 Permit Tracking Slip $10 • A 4U rx g a 7 Status Project Type Active Renewal Iff Version Permit Classification 2.00 Individual Permit Contact Affiliation .Joseph R. Huffman City Manager PO Drawer A Goldsboro NC 275339701 Facility Name Major/Minor Region City of Goldsboro Composting Facility & Residuals Minor Washington Distribution Program Location Address County PO Drawer A Wayne Goldsboro NC 275339701 Facility Contact Affiliation Owner Owner Name Owner Type City of Goldsboro Government - Municipal r 1 Owner Affiliation }- (o o f cl s �Ja ►- �t2 F .Joseph R. Huffman v c- v City Manager 14 L o o Z 3 9 A-1 Z �-° Pr j To r` } PO Drawer A Goldsboro NC 275339701 (Events Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective L05/3i 02/22/01 04/13/06 06/08/06 06/22/06 06/22/06 Regulated Activities Requested! eceived Events _ Unknown 99 I r RO staff report requested 05/01/06 -el pev- s-Zoolt. Additional information requested 05/02/06 b RO staff report received 06/06/06 Additional information received 06/08/06 Outfall NULL Waterbody Name Stream Index Number G-C i l: -►G� e, e N r a gf rke Current Class Subbasin nit. Taf�} (d.$ 4f�-1)IoO� (- r ! v'Ls1 e i& 1. L CA oG 7 Q-0111-7 � -&.-C, , rater Cas on - 010fz PEN N STATE L(814) 3 81 `F Fax (84 86 -45 0�`���� Agricultural Analytical Services Laboratory The Pennsylvania State University +f University Park PA 16802 www.aasi.psu.edu Kathy Hill City of Goldsboro P 0 Box Drawer A Goldsboro NC 27533 LAB ID: I SAMPLE ID: I REPORT DATE: I SAMPLE TYPE; I FEEDSTOCKS COMPOSTTNG METHOD I COUNTY C04219 Finisbed compost # 4/5/2010 Finisbed Compost 004 COMPOST ANALYSIS REPORT Analyte Results Resorts I (As is.basis) (Aryweight basis) . pH 7.5 Soluble Salts (1:5 w:w) 2.13 mmhos/cm Solids 68.6 W Organic Matter (Volatile Solids) 34.0 % 49.6 % Total Kjeidahl Nitrogen (N) 12,017 mg/kg 17,526 mg/kg Ammonium N (NH,-N) 736 mg/kg 1,074 mg/kg Nitrate-N + Nitritc-N 235.1 mg/kg 342.79 mg/kg PAN (Surface -applied)' 1,731 mg/kg 2,525 mg/kg PAN (Sub -surface applied)' 2,099 mg/kg 3,062 mg/kg Phosphorus (P) 7,803 mg/kg 11,380 mg/kg Potasium (K) 6,890 mg/kg 10,048 mg/kg Calcium (Ca) 7,690 mg/kg 11,215 mg/kg Magnesium (Mg) 1,700 mg/kg 2,479 mg/kg Sodium (Na) 304 mg/kg 444 mg/kg Aluminum (Al) 12,468 mg/kg 18,183 mg/kg Arsenic (As) 3.59 mg/kg 5.24 mg/kg Cadmium (Cd) 0.99 mg/kg 1.45 mg/kg Copper (Cu) 70.82 mg/kg 103.28 mg/kg Lead (Pb) 44.84 mg/kg 65.39 mg/kg Mercury (Hg) 0.29 mg/kg 0.42 mg/kg Molybdenum (Mo) 3.13 mg/kg 4.57 mg/kg Nickel (Ni) 6.79 mg/kg 9.90 mglkg Selenium (Se) 1.22 mg/kg 1.79 mg/kg Zinc (Zn) 333.48 mg/kg 486.34 mg/kg 'PAN (Plant-Anai ]able Nitrogen); customer -defined calculation sample collected 3/24/10 1:23 PM U5COMPOSTING COUNCIL Seat of Testing Assurance City of Goldsboro P O Box Drawer A Goldsboro NC 27533 Z 919-735-RECEIVED AN Eft& 919-735-8907 Product Name: Finished compost # 004 Lab ID: C04219 Report Date: 4/5/2010 Compost Technical Data Sheet Compost Parameters Reported as (units of measure) Test Results Test Results Plant Nutrients: %, weight basis % wet weight basis % dry weight basis Nitrogen Total N 1.20 1.75 Phosphorus Pz05 I.79 2.61 Potassium KZO 0.41 0.60 Calcium Ca 0.77 1.12 Magnesium Mg 0.17 0.25 Moisture Content %, wet weight basis 31.43 Organic Matter Content %, dry weight basis 49.63 pH unitless 7.54 Soluble Salts (electrical conductivity) dS/m (mmhos/cm) 2.13 Particle Size < 9.5 mm 100.00 Stability Indicator (respirometry) CO, Evolution mg CO,-CIG TSlday, AND mg COZ CIG OM/day 0.89 1.73 Maturity Indicator (bioassay) Percent Emergence, AND Percent Seedling Vigor average % of control, AND average % of control 98.77 98.77 Select Pathogens PASS/FAU-: per US EPA Class A standard, 40 CFR § 503.32(a) Trace Metals PASSNA1L: per US EPA Class A standard, 40 CFR § 503.13, Tables I and 3 PASS: As, Cd, Cu, Pb, Hg, Mo, Ni, Se, and Zn are less than limits specified by US EPA Class A Standard 40 CFR § 503.13, Tables 1 and 3 rticipants in the US Composting Council's Seal of Testing Assurance Program have shown the commitment to test their mpost products on a prescribed basis and provide this data, along with compost end use instructions, as a means to better -ve the needs of their compost customers. UCOMPOSTING COUNCIL Seal of Testing Assurance City of Goldsboro P O Box Drawer A Goldsboro NC 27533 J 1L 919fMV 0 APR 12 2W EaL- 919-735-8907 Product Name: Finished compost 9004 Lab ID: C04219 Report Date: 4/5/2010 Compost Technical Data Sheet Compost Parameters Reported as (units of measure) Test Results Plant Nutrients: Not reported Moisture Content /D, wet weight basis 31.43 Organic Matter Content %, dry weight basis 49.63 pH unitless 7.54 Soluble Salts (electrical conductivity) dS/m (mmhos/cm) 2.13 Particle Size < 9.5 mm 100.00 Stability Indicator (respirometry) CO, Evolution mg COS C/G TS/day, AND mg COz C/G OM/day 0.89 1.73 Maturity Indicator.(bioassay) Percent Emergence, AND Percent Seedling Vigor average % of control, AND average % of control 98.77 98.77 Select Pathogens g PASS/FAIL.- per US EPA Class A standard, 40 CFR § 50332(a) Trace Metals PASS/FAIL: per US EPA Class A standard, 40 CFR § 503.13, Tables l and 3 PASS: As, Cd, Cu, Pb, H& Mo, Ni, Se, and Zn are less than limits specifed by US EPA Class A Standard 40 CFR § 50113, Tables I and 3 Participants in the US Composting Council's Seal of Testing Assurance Program have shown the commitment to test their -ompost products on a prescribed basis and provide this data, along with compost end use instructions, as a means to better serve the needs of their compost customers. PEN N STATE (814) 863-0841 Fax (814) 9634540 Agricultural Analytical Services Laboratory The Pennsylvania State University ® University Park PA 16802 Kathy Hill City of Goldsboro P O Box Drawer A Goldsboro NC 27533 RECEIVED APR 12 = LAB ID SAMPLE ID REPORT DATE SAMPLE TYPE I FEEDSTOCKS COMPOSTING METHOD COUNTY C04219 Finished compost # 4/5/2010 Finished Compost 0(f4 COMPOST BIOASSAY Seedling Emergence and Relative Growth TEST PARAMETERS Test Dates: " 03/26/2010 to 04/02/2010 Seed Type: Cucumber-Marketmore 76 Variety Media Type: STA-Green Smart Soil Potting Mix (Cartroo Vermiculite: STA-Green Vermiculite TEST RESULTS Emergence: (% of control) 98.77 Seedling Vigor: 98.77 (% of control): COMMENTS I I wo 0 3:19RByMyIElm The bioassay test provides a screen for the presence of phytotoxins in compost based on seedling emergence and seedling vigor relative to a control. It provides an assessment of compost maturity although should not be used as a stand-alone indicator. The U.S. Compost Council "Pest Methods for the Examination of Composting and Compost provides the foilowing Maturity Indicator Ratings based on this test. v 'test Parameter Very Mature Emergence >QQ Seedling Vigor I Test Methods for the Examination of Comporting and Compost, Maturity Indicator Rating' Mature Immature N-` Q U__95 PEN NSTATE (814) 863-0841 Fax (814) 963-4540 • Agricultural Analytical Services Laboratory The Pennsylvania State University University Park PA 16802 Kathy Hill City of Goldsboro P O Box Drawer A Goldsboro NC 27533 RECEIVED APR 12 ?Ole LAB ID SAMPLE ID REPORT DATE SAMPLE TYPE FEEDSTOCKS COMPOSTING METHOD COUNTY Z. C04219 Finished compost N 4/5/2010 Finished Compost 004 RESPIROMETRY Carbon Dioxide (CO) Evolution Rate TEST RESULTS Mg CO2-C" Iu-tsdyday. Mg CO2-Clg organic matterlday: 0.9 1.7 5 INTERPRETATION Respirometry (CO2 Evolution) provides a measurement of the relative microbial activity in a compost and, hence can be used as an estimate of compost stability, The inneprelive index below from the U.S. Compost Council Test Methods For the Examinatian oFComposting and Compost assumes optimal conditions For microbial activity arc present including temperature, mositure and nutrients and that toxic components that would inhibit microbial respiration are absent, Result* Stability Rating General Characteristics < 2 Very Stable Well cured Compost No continued decomposition No odors No potential for volatile fatty acid phytotoxicity and odor 2-8 Stable Cured Compost Odor production not likely Limited potential for volatile fatty acid phytotoxicity and odor Minimal impact on soil carbon and nitrogen dynamics 8-15 Moderately Uncured compost unstable, Minimal odor production raw compost Moderate to high potential for volatile fatty acid phytotoxicity Moderate potential for negative impact on soil carbon and nitrogen dynamics 15-40 Raw compost or Uncured Compost raw organic products Odor production likely High potential for volatile fatty acid phytotoxicity and odor High potential for negative impact on soil carbon and soil nitrogen dynamics > 40 Raw feedstocks, Raw, extremely unstable material unstable material Odor production expected Probably volatile fatty acid phytotoxicity with most materials Negative impact on soil carbon and nitrogen dynamics expected Generally not recommended for use as compost * Units in mg CO2,Clg organic matterlday 6 O�0F W A rFRQG Michael F. Easley, Governor William G. Ross Jr„ Secretary rNorth Carolina Department of Environment and Natural Resources Q Alan W. Klimek, P.E. Director Division of Water Quality May 23, 2006 Mr. Karen H. Brasher, Public Utilities Director City of Goldsboro Biosolids Compost Facility PO Drawer A Goldsboro, NC 27533-9701 Subject: Stormwater General Permit NCG110000 Operations and Maintenance Reminder City of Goldsboro Biosolids Compost Facility COC Number NCG110024 Wayne County Dear Permittee: Our records indicate that you have been issued a Stormwater General Permit and a Certificate of Coverage for your facility. These permits have specific conditions that must be met in order for you to be in compliance with your permit. It is your responsibility, as the permit holder, to read and comply with the conditions contained in the permit. It is our responsibility, as the issuing authority, to make sure that the operation and maintenance of your facility complies with the conditions contained in your permit. To assist you in complying with these conditions, we are attaching a Technical Bulletin specific to your permit requirements.. We are currently in the process of developing our inspection schedule. Therefore, you should have all of your records up to date as we may be contacting you in the near future to set up an inspection of your facility. If you have any questions, please do not hesitate to contact Samir Dumpor, Pat Durrett or myself at (252)946-6481. Sincerely Al Hodge, Supervisor Surface Water Protection Unit Encl. CC: WaRO files North Carolina Division of Water Quality Internet: h2o,enrstate.nc.us 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarofiina An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Natumlly Ms. Karen H. Brasher, Public Utilities Director City of Goldsboro Biosolids Compost Facility PO Drawer A Goldsboro, NC 27533-9701 Dear Ms. Brasher: Michael F. Easley Governor William G. Ross Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality May 9, 2003 MAY 2 2 2003 DWQ-WARO Subject: General Permit No. NCG110000 City of Goldsboro Biosolids Compost Facility COC NCG110024 Wayne County In accordance with your application for discharge permit received on February 19. 2003, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Mach Wiggins at telephone number 9191733- 5083 ext. 543. cc: Washington Regional Office Central Files Stormwater and General Permits Unit Files V V.T ' _ -1 J dJqt. )va Customer Service 1 800 623-774B Sincerely, �1i ir,ij,al Sired By `'Alan W. Klimek, P.E. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733.7015 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG110000 CERTIFICATE OF COVERAGE No. NCGI10024 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute I43-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, City of Goldsboro is hereby authorized to discharge stormwater from a facility located at City of Goldsboro Biosolids Compost Facility 200 Westbrook Road Goldsboro Wayne County to receiving waters designated as an unnamed tributary to Stoney Creek, a class C NSW water in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, I1I, IV, V, and VI of General Permit No. NCG1 10000 as attached. This certificate of coverage shall become effective May 9, 2003 This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day May 9, 2003 ti;i.jal Signed tl Alan W. Klimek, N.E., Director Division of Water Quality By Authority of the Environmental Management Commission oil iii,'l. P rk r:1 . DIR Pbtk ;;I— sch &h 71, 41. n r _ aCHo t 7 i Airbo—V 13 ti 26-- 5ewago iispo IT a -PC. am lift Aft 40 aft. m Ift ZZ, NIN Csin&a ODikh'46,6 'i 13a In Theo j 23.3 1Y TO L BM` 224 VA /7 r215 L a5 'N 70.5 �A w Copyright (C) 1997, MaptLch, Inc. o r� NCDENR NOTICE OF INTENT Division of Water Quality 1 Water Quality, Section National Pollutant Discharge Elimination System NCG1 looao OR AGENCY USE ONLY Date Received I Year- Day I Certificate or Cn�er'a e Check Y .lmnum Perm) L Ass) �7ad LU RECEIVED National Pollutant Discharge Elimination System application for coverage under General Permit NCG110000: APR — T 2003 STORMWATER DISCHARGES associated with activities classified as: Treatment Works treating domestic sewage or any other sewage sludge or wastewater tDVWQ7 iNARO device or system, used in the storage, treatment, recycling, and reclamation of municipal or domestic sewage, with a design flow of 1.0 million gallons per day or more, or required to have an approved pretreatment program under Title 40 Code of Federal Regulations (CFR) Part 403, including lands dedicated to the disposal of sewage sludge that is located within the confines of the facility, (Please print or type) 1) Mailing address of ownerloperator: Name City of Goldsboro Street Address P. 0. Drawer A City Goldsboro State NC ZIP Code 27533-9701 Telephone No. 919 735_-3329, ext. 101 Fax: 919 735-8907 Address to which alt permit correspondence will be mailed 2) Location of facility producing discharge: Facility Name City of Goldsboro Biosolids Compost Facility Facility Contact Karen H. BrasHear Street Address 200 Westbrook Road City Goldsboro State NC ZIP Code 27530 County Wayne Telephone No. 91g 735-3329, ext . 101 - Fax: 919 735-8907 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers and distance and direction from a roadway intersection). From Hwy 70, take Hwy 117 South. T&n left on_ArrinQton Bridge Rd (Hwy 581 South). Turn left on Westbrook Rd. Facility on right (A copy of a county map or USGS quad sheet with facility clearly located on the map is required to be submitted with this application) 4) This NPDES Permit Application applies to which of the following : ® New or Proposed Facility ❑ Existing 5) Standard Industrial Classification: Date operation is to begin January 2003 Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 4 9 5 3 � � � 1 9 2003 5WU-226-101701 Page 1 of 3 NCG110000 N.O.I. 6) Provide a brief narrative description of the types of industrial activities an p oduc s manufactured at this facility: Facility mixes wood chips and dewatered bioso ic�s cafe and composts this mixture inside a compost building. There are limbs stored out oors until 7) Discharge points ! Receiving waters: How many discharge points (ditches, pipes, channels, etc.) convey stormwater from the property? 2 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater discharges end up in? Neuse River If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). 8) Does this facility have any other NPDES permits? IN No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: _ 9) floes this facility have any Non -Discharge permits (ex: recycle permits)? Fx) No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 10) Does this facility employ any best management practices for stormwater control? ❑ No ® Yes If yes, -please briefly describe-. i in ditches. Qnsite ,zc is stored under roofs. ity has a stormwater wetlands pond )usekeeDinsz. Wood chips an un ini mai 11) Does this facility have a Stormwater Pollution Prevention Plan? and riprap e�c-`ompos t cs performed on reaRre cleaned properly. IN No ❑ Yes If yes, when was it implemented? 12) Are vehicle maintenance activities occurring at this facility? R No ❑ Yes 13) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? ® No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? R3 No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of ` - hazardous waste? R1 No ❑ Yes d) if you answered yes to questions b. or c., please provide the following information: Page 2 of 3 5WU-226-101701 NCG110000 N.O.I. Type(s) of waste: How is material stored: Where is material stored: _ How many disposal shipments per year: Name of transport / disposal vendor:_ Vendor address: 14) Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan or other document filed or required to be maintained under Article 21 or regulations of the Environmental Management Commission implemenling that Article, or who falsifies, tampers with or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, shall be guilty of a misdemeanor punishable by a fine not to exceed $10,000, or by imprisonment not to exceed six months, or by both. (18 U.S.C. Section 1001 provides a punishment by a tine of not more than $10,000 or imprisonment not more than 5 years, or both, for a similar offense.) I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Karen H. Brashear Title: Public Utilities Director 2/13/03 (Signature of Applicant) (Date Signed) Notice of Intent must be accompanied by a check or money order for $80.00 made payable to: NCDENR Final Checklist This application will be returned as incomplete unless all of the following items have been included: ® Check for $80 made payable to NCDENR ® This completed application and all supporting documents ® Copy of county map or USGS quad sheet with location of facility clearly marked on map Mail the entire package to: Stormwater and General Permits Unit -" Division of Water {duality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note Page 3of3 SWU-226-101701 NCG 1 1 0000 N.O.I. The submission of this document does not guarantee the issuance of an NPDES permit. SWU-226-101701 Page 4 of 3 I CITY OF GOLDSBORO BIOSOLIDS COMPOSTING FACILITY 200 Westbrook Road Goldsboro, NC 27530 919-735-0110 919-735-0150 fax Compost Technology: In -vessel US Filter/IPS agitated bed with biofilter Processing Capacity: Biosolids: 12 dtpd @ 20% DS or 61 wtpd Amendment: 31 wtpd @ 60% DS or 95 cu yd/day Recycle: 25 wtpd @ 55% DS Retention Time: 21 f days active composting Cure Time: 30 days minimum Compost Facility Overall Size: Compost: 333'0" long x 111'4" wide outside of concrete Cure building f: 200'0" long x 60'0" wide Cure building II: 110'0" long x 50'0" wide Complete Site: 26 acres 8 wide bays 7'0" deep, 10' wide (6 installed, 2 expansion, 4 to 5 operational) 235' bay wall length Zone length Load Area: Zone A: Zone B: Zone C: Zone D. Unloading Area 16'0", strip curtain at end of loading area 51'0" 51'0" 51'0" 51'0" 15'0", strip curtain at beginning of unload area Process aeration blowers: One per zone @ 3 HP for each bay @ 460 cfm, 7 in H2O Total aeration blowers: 4 per bay x 6 bays = 24 fans, 72 installed HP Ventilation blowers: 3 @ 60 HP, at 19,400 cfm, 12 in H2O, 58,200 cfm, 12 air changes per hour Transfer blowers: 2 @ 10 HP Rooftop bypass exhaust blowers: 3 @ 5 HP @ 13,000 cfm, 14.7 psia Aisles: 2 @ 9'0" Mixing area (loading) width: 61' x 301' Doors: biosolids receiving: 2, side by side 14' wide x 16' high Dolly transfer width: 25' Width of transfer dolly: 16'1/2" Discharge area width: 42' x 301' Cure/storage area: 118'0" long x 175'0" Cure loading/screening area: 61'4" x 175' Doors: 2, side by side @ 16' wide x 18' high, roli-up motorized 2 wide bay agitators: 12 tons each, processing capacity 500 cu yd/hour @ 48"/minute rail speed, 75 HP motor 2 transfer dollies: 2.5 tons each, '/4 HP 3 wheel loaders: 1 — infeed: 4 cu yd buckets 1 — unload: 4 cu yd buckets 1 — use at grinder 2 Roto-Mix trucks (amendment/biosolids mixer): Actual capacity: 10,000 to 12,000 Ibs Roto-Mix (Div. of J-Star, Inc.) Dodge City, KS 67801 Phone: 620-225-1142 1 ExTec Trommel Screen — 150 cu yd/hour, screen sizes: <3/4" and <3/8" 1 Morbark 5600 Wood Grinder — 200 to 400 yds/hour, screen size 1-1/2" Biofilters: 2 units: 150' x 270' = 40,500 sq ft Total area: 81,000 sq ft or 1.86 acres Loading: 3.3 cfm/sq ft nominal, --55 seconds retention time Dewatering: 2 SernaTech belt filter presses by US Filter 2 m, 2,000 Ibs/hour 115 to 125 gpm, max. 300 gpm Infeed solids: 1.0% to 1.75% Cake solids: 16% to 21 % Cake storage hopper: 10 cu yds, 270 cu ft. est. 16,000 Ibs. By JDVCorporation, Model U320B/SS (stainless) Biosolids holding tank: 1 mg Cationic polymer: GE Betz, Inc, PA — Betz Muni 7500 2 Dewatering conducted at Directions: Water Reclamation Facility 714 Arrington Bridge Road Goldsboro, NC 27530 Phone: 919-735-3329 Fax: 919-735-8907 14.2 mgd facility, 7 to 7.5 mgd average Portion of effluent goes to farmlands, City Golf Course, and constructed wetlands Raleigh Durham airport to WRF about 70 to 90 minutes 1-40 Outer Belt Line East to 70 East to Goldsboro to US 117113 South, for about 3.5 miles towards Mt. Olive or Wilmington Left onto Arrington Bridge Road (Hwy 581 South) WRF on the right, just across the bridge at 714 Arrington Bridge Road. To Compost Facility: Turn left from Arrington Bridge Road on to Westbrook Road, turn right into drive past the railroad tracks @ 200 Westbrook Road. Staffing Information: Compost Facility Operated by Water Reclamation Facility: Superintendent 4 Compost Operators 1 Superintendent 1 Assistant Superintendent/Chemist Wastewater Operators (WRF provides support to Compost Facility through dewatering process and with lab support.) Contact Information: Public Utilities Director: Karen Brashear 919-735-3329 Compost Facility Superintendent: Don Coles 919-735-0110 Water Reclamation Facility Robert Sherman Superintendent: 919-735-3329 Design Engineers: Arcadis Geraghty & Miller, Raleigh, NC Goldsboro Compost is certified by the I UCOMPOSTING COUNCIL ,.r Seal of Testing Assurance Permit NCG 110000 STATE 017 NORTI-i CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUAI-1-1-Y GENERAL PERMIT NO. NCG110000 j_ L&..at Lo�7y a ;b7d'j n��• TO DISCI-IARGE STORMWATER UNDER TFIE (ITx_*� as, `��tr��►c t NATIONAL POLLUTANT UISCI-IARGE ELIMINATION SYSTEM +ae.e 5,/2bf/o In compliance with the provision of North Carolina General Statute 143-215.1. other lawRil standards and regulations promulgated and adopted by the North Carolina Environmental r1'lanagenlent Commission and the Federal Water Pollution Control Act, as at»ended, this permit is herehv issued to all owners or operators. hereafter permittecs. which are covered by this permit as Mcnced by receipt of a Certificate of Coverage by the Environmental Management Commission to allow the discharge of sun'nnvater to the surface waters of North Carolina or separate storm sewer .systems conveying sto mwater to surface waters in accordance with the terms and conditions set forth herein. Coverage under this general permit is applicable to all owners or operators ol' stormwater point source disdouges associated with activities: classified as Treatment Works t'emhg domestic sewage or any other sewage sludge or wastewater treatment device or system. used in the storage., treatment. rccyclinu. and reclamation of municipal or domestic sewage, with a design Now of 1.0 million gallons per day or more. or facilities Well are required to have an approved pretreatment program Linder 'rho Q CFR Part 401 including lands dedicated to the disposal of sewage sludge that is located within the confines of the facility; and like activities deemed by DWQ to be similar in the: process andlor the exposure of raw Lnaterials, products. by-products, or waste materials. The General Permit shall become; effective on .lame 1, 2008. The General Permit shall expire at midnight on May 31. 2013 Signed this darn May q, 2008. Wr ilinal signed Jor Coleen .Sullins Coleen 1-I. Sullins. Director Division of Water Quality By the Authority of the Environmental Management Commission f cl'llllt No. NCG 110000 TABLE OF CONTENTS PART I INTRODUCTION Section A: General Permit Coverage Section 13: Permitted Activities PART I[ MONITORING. CONTROLS. AND LIMITATIONS FOR PERMI"I"IT-11) DISCHARGES Section A: Stornlwater Pollution PI'CVelllion Plan Section 13: Qualitative Monitoring Requirelricnts Section C: On -Site Vehicle Maintenance Monitorim, Requirements PART [[1 STANDARD CONDITIONS Section A: Compliance and Liability I . compliance Schedule ?. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liabillty 5. Oil and Hazardous Substance Liability 6. Property Rights 7, Severabiiity 8. Duty to Provide Information 9. Penalties for I'alllperllly� 10. Penalties for falsification of Reports Section 13: General Conditions I. General Permit Expiration ?. Transfers 3. Whell an 111dIVlCIu111 Permit May be Required 4. Wherl an Individual Permit May be Requcstecl 5. Signalory Requirements Permit No, NCG 110000 6. General Permit tModification, RCVOCa16011 and Reissuance. or Termination 7. Certil'icate of Coverage Actions Section C: Operation anil Maintenance of Pollution Controls I. Proper Operation and Maintenance 2. Need to I -lull or Reduce not .l I7eferlse 3. Bypassing ol- Stormwater Control Ricilities Section D: tMonitoring, and Records I, Representative Sanlplinll 2. Recording Results 3. Flow MCA 1surenlents 4. Test Procedures 5, Noti-Storrllwater Discharocs 6, Representative Owlall 7. Records Retention S. Inspection and Entry Section E Reporting Rcduirenlents 1. Discharse Monitoring Reports 1 Sul)mi[till", Reports 3. Availability of Reports 4, Non-Stormwater Discharges 5. Planned ChLL11-CS 6. Anticipated Noncompliance 7. Bypass S. TwelUy-follr Hour Repol-tine 9. Other Noncompliance 10. Other lnfol-Illation PART IV LIMITATIONS REOPI-NER PART V AD1IMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART VI DEFINITIONS a Pcnilit No. NCG 1 10000 PART I INTRODUCTION SECTION A: GI.NI RAL NIEIti 11T COVERAGE A11 persons desiAng to be covered by this General Permit must re�,istcr with the Division of Water Quality by Be filing of a Notice of intent (NOD and applicable: fees. The NO[ shall be submitted and a certificate of coverage issued prior to any discharge of'stornlwate:r associated With tndUstrial activity dial has a point Source discharge to tile. Surface Wawl-S of the Stale. Any owner or operator not wishing to be covered or hmhccl by this General Permit may male application for all individual NPDLS permit in accordance with NPDLS procedures in 1 5A NCAC 2H .0100, stating the rcasonS Supporting the request. Any application for all individual permit should be made at least ISO days prior to corltrttencenleill of discharge. This General Perr& does not cover activities or discharges covered by an fndAddua] NPDES permit until the individual permit has expired or has been revoked. Any person conducting an activity covered by an individual permit but which could be covered by this General Permit nmy request that the individual permit be revoked and coverage tinder this General Permit be provided. If industrial materials and activities are not exposed to precipitation or rurlof l as described in 40 CFR 5121261 , the facility may qualify fora No Exposure Exclusion from NPDLS stormwater discharge pernlit requirements. Any owner or operator wishin<J to obtain a No Exposure Certification must stlbmi: a No Exposure Certification NOI form to the Division, must receive approval by the Division, must maintain no exposure conditions unless authorized to cdischarge under a valid NPDLS stormwYer permit, and must reapply for the No Exposure: F-xCIM io ll Once every five (5) years. Facilities submitting NOI,, for coverage under this permit. and facilities submitting renewal f0r111S for continued coverage under this permit. prior to estahlishment or approval of a Total Maxiilltml Daily Load (TNIDL,) for pollutants) for stormwatcr dischaTes (i.e. wet weather flows), may be covered under this permit during its term. For such faciliti led coventge Wider the reissuance of this pernlit is subject to the facility demonstrating, hat h does no have a reasonable potential to violate a )Okable water quality standards for such polluumts due to the atorinwater discharge(s). For faciiitic. that NOve a reasonablcJxnential for violation of applicable water quality standards due to the stormwater discharge(sy the facility shall apply for an individual permit ISO clays prior to the expiration of this general permit. Once the individual permit iS issued and becomes effective the facility will no longer have covera�Tc under the general permit. Impaired waters scheduled for TMDI_ development are on North Carolina's 303(d) List and can be found here: http:Hh2oxnrstMemcmOlmdVGenertil_303d.htin#UcrN►lilolids. A list of approved TN4DLs for the state of North Carolina can be found here: http:/lhZrr.cnr.statc.nc.ElsltmdllGcncral_ I IIDI�s.htm. During the period beginning on the effective elate of the pernlit and lasting until expiration. the Permittee is authorised to discharge Sturmwater associated with industrial activity. Such discharges shall be controllel limited, and monitored as specified in this permit. Pan! Page I of 2 r1a �, r. Tr At a-E'.v^cw Feu I ; �-I Permit No. NCG 110000 SECTION B: PERMITTED ACTIVITIES Until this permit expires or is modified or revoked, the permittee is ,authorized to discharge stornnvater m the surface waters of North Carolina or sepwmw storm sewer system which has been adequately treated and managed in accordance with the: terms and conditions of this General Permit. All discharges shall be in accordance with the conditions of this permit. Any other point sOurce discharge to surface waters of the state is prohibited unless it is an allowable non-stornnwater discharge or is covered by another permit, authorization, or approval. The stormwater discharges allowed by this General Permit shall trot cause or contribute to violations of Water Quality Standards. This permit does not relieve the permittce from responsibility for compliance with any other applicable federal. state. or local law. rule. standard. ordinance. order. judgment. or decree. }Pact I Rje 2 O f 7 Permit No. NCG 110000 PART II t1%IONITOIZING, CONTROLS, ANI) LIMITATIONS FOR PER1N1IITTLD DISCHARGES SE,C I IO` A: 51 OltlNIWA I E-R POLLUTION ION PR1.VE.N I'ION PLAN The Permiltee shall develop a Stormwater pollution Prevention Plan, herein after referred to as the Plan. This Plan shall be considered public information in accordance %Wth Part HL Standard Conditions, Section P Paragraph 3 of this general permit. Tile Platt Shall include. al a 111illi lUlll. the following,, items: Site Plan. The site plan shall provide a description of the physical facility and We potential pollutant sources Mich nwy be expected to contribute to contamination of stormwater discharges. The site plan shall contain the following: (a) A general location map (USGS quadrangle map or appropriately drafted equivalent map). showing the facility's location in relation to transportation routes and surface wawm. the name of to receiving: water(S) to which the stormwater outfall(S) discharges. or if file discharge is to a municipal separate storm sewer system, the name of the municipality and the ultimate receiving waters, and accurate latitude and longitude of the points) of dischar_, The general location map (or alternatively the site map) should identify whether each receiving water is impaired (on the stme's 303(d) list of impaired waters) or is located in a watershed Fol- which a IWDL has been estahlished, and what the pw anlcter(S) of concern an. North Carolina's 303N) List can be found here: lit tpa/h2oxni-.state.nems/lmdllGenei al_303d.lit nl#Dow 1114l.(Is North Carolina TMDL doCLlrilen(S can be found here: hltil:l/h2u.enr.slate.nc.us/tnldlCl'i�l1.}L_list.htln#Final_7'MI Ls. (b) A narrative description of storazge practices, loading and unloading activitieS, outdoor process areas, dust or particulate generating or control processes. and "ame disposal practices. A narrative description of the potential pMamus which could be expected to be present in the Stormwater discharge: front each outfall. (c) A site neap drawn to scale (including a distance legend) showing: the site property boundary, the stormwater discharge pointm all on -site and adjacent surface waters and wetlandk industrial activity yeas (including, Storage of materials. disposal areaS, process areas, loading and unloading areas, and haul roads). site topography. all drainage featureS and structures. direction of Ilow, drainage areas For each outfall, industrial activities occurring in each drainage area, huildiileS, existing and proposal BNIPs, and impervious surfaces. The site map must indicate the percentage of each ch-ainage area that is inlperviouS. (d) A list ol-significant spills or leaks of pollutantS that have occurred at the facility during the three (3) previous years and any corrective actions taken to midgme spill impacts. Part 11 Paige I of 8 Permit No. NCG 110000 �p (c) Certification that the stornnyater outfalts have been evaluated for the presence of Iron-stornlwater discharges. The certification statement will be signed in accordance with the requirements found in Part IT Standard Conditions, Section B, Para:graph 5. The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-sto nlwatcr discharges. Stormwawr Management Plan. The stormwater mana�g nlent plan shall contain a narrative description of the materials management practices enlployed which control or mininli'r_e the exposmv of Agnificilrlt materials to stornlwater, including structural and nonstructural Ineasures. The stormwater management plan, at a minim nl, shall incorporate the following: (a) Feasibility Stud, A I'cvicw of the technical and econonlic feasibility of changing the methods of operations and/or stomge practices to eliminate or reduce exposure of materials and processes to stornlwater. Wherever practical, the permittee shall prevent exposure of all storage areas. Imtterial handling, operations, and manufacturillil or fueling operations by permanent or semipermanent covers. In areas where elimination ofexposurc is not practical, the stormwater nlanagernent plan shall dOCUmenl the feasibility of diverting the stormwater runoff away from areas of potential Contamination. (b) Secondary Containment Reglm'emerns and Records. Secondary containment is required for: bulk storage of liquid Materials; storage in any amount of Section 313 of Title Ill of the SupCTund Amendments and Reauthorization Act (SARA) water priority chenlicals; and storage in any amount of hazardous substances, in order to prevent leaks and spills from contaminwings stornlwater runoff. A table or sunnmlry of all such tanks and stored materials and their associated secondary containment areas shall he ❑ Anulilled, amd shall record the volume capacity of each tank and containment area. If the secondary containment devices are connected directly to stornlwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices (which shall be secured closed %Oth a lockha meelmnism), and ally Stol'lllwatel'that tICC1.1111tllates in the containment Area shall be ill a minimum visually ohserved for color, foam, outfall staining. visible sheens and dry weather flow, prior to release of the accumulated stornlwater. ACCLIInLIIatCd stornlwater shall be released if found to be uncontaminated by the material stored within the containment area. Records documenting the individual making the observation. the description of the accumulated stormwater, and the date and tinge of the release shall be kept for a period of five years. (c) BMP Summary. A narrative description shall he provided of Best Management Practices (l3n1,IPs) to be considered such as. but not limited to. diversion structures. secondary coluainnlent struCurCs, oil and greasc separation, debris control, veuctative filter strips, infiltration and stornlwater detelltlon or retention, where necessary. The need for structural BMPs shall be based on the assessment of potential of sourccS to contribute significant cluantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges, Pan 11 Page 2 of 8 Permit No. \CG I 10000 000 3. Spill Prevention and Response Plan. The Shill Prevention and Response Plan (SPRP) shall incorporate all assessment of potential pollutant sources based on a materials inventory of the facility. I7acility personnel (or team) responsible for implementing the SPRP shall be identified. A responsible person shall be on -site m all times during, facility operations that have the potential to contaminate stonowater runoff through spill~ or exposure of materials associated with the facility operations. The SPRP must be site swrmwater specific. Therefore. a SPCC plan may be a component cif the SPRP. but may not be sufl'icient to completely address the stormwater aspects of the SPRP, The mumon elements of the SPCC with the SPRP may be incorporated by reference into the SPRP, Preventative Maintenance and Good Housekeeping Program. A preventative maintenance program shall be developed. The program shall document schedules Of inspections and maintenance activities of Stormwater control systems. plant cduipntent and systems. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. The program shall specifically identiljr industiial areas that have the potential for soil erosion. and must specifically note the preventative 13h4P or maintenance activity implertlerlted in the areas. and must include regular inspections of the areas. Employee "Draining. Training schedules shall be developed and training provided at a loininurm on all annual basis on proper Spill response and cleanup procedures and preventative maintenance activitics for all personnel involved in any of the facility's operations that have the potential to contarrlinate stornlwater runoff. Facility personnel (or team) responsible for implernentrng, the training, shall he identified. 6. Responsible Party. The Stormwater Pollution Prevention Plan Shall identify a specific positions) responsihle for the overall coomhna6on, development, implementation, and revision to the Plan. Responsibilities For all cornpmwnts of the Plan shall be documented and position assignments provided. 7. Plan Amendment. 'Dhe pout ee shall amend the Plan whenever there is a change in design, construction. operation. or maintenance which hers a significant effect on the potential for the discharge of pollutants to surface waters. The Stormwater Pollution Prevention Plan shall be reviewed and updated on an annual basis. The annual update shall include an updated list of significant spills or leaks of pollutants for the previous three years. or the notation that no spills have occurred. 'Dhe annual update shall include rc-certification that the swrrnwater outfalls have been evaluated for the presence of non- stor'nlwater discharges, The Director wary notify the peinlitwe when the Plan does not meet one or more of the nollimurn rccluirenlents of the permit. Within 30 days ol' such notice, the permittee shall submit a time schedule to the Director for modifying, the Plan to meet mininlurn reyuireluents. The pertnnittee shall provide certification in writing (it) accordance with Part 111. Standard Conditions, Section B. Paragraph I to the Director that the changes have been made. Facility Inspection Program. Inspections of the facility and all stormwater systems shall occur at a rnhhumn on a semi-annual schedule, once during the first half of the year (January to ,June). and once during, the second half (July to Deconber). with at (cast 60 Part 11 Page 3 oi' 8 Permit No. N.CG 110001) days separating inspection dates (unless performed I1101-e Frequently). The inspection and arly subsequent rrlaintenaulce activities peribnned shall be documented, recording date: and time of inspection, individuals) making the inspection and a narrative description of' the facility's stornlwater control systems, plant equipment ailc! systems. Records of these inspections shall be incorporated into the Stormwater Pollution Pr coition Plan. These facility inspections are different from. and in addition to. the storrimuler discharge characteristic monitoring required in Part 11 of this permit. 9. Implementation. The pernihwe shall implement the Plan. Splenlentation of the Plan shall include doculnentation of all monitoring, measurements, inspections, maintenance activities, and training provided to employees. including the log of the sampling data and of actions taken to implement BNIPs associated with the industrial activities, illclucling vchicle mairltcn,'srrcc activities. Such clocumentatiorl shall be kept oil -site for a period of' five years and made available to the Director or the Directors authorized representative inlmecliately upon request. SECTION li: QUALITATIVE MONITORING REQU1RENIENTS Qnalitatrl'e 111011itOrillg regUireS a viSLlal inspection oFeach ,tornlwaterolltfall regardless of representative outfall status and steal! be ped'ormed as specified helow in Table 1. No analytical teats are required, Qualitative monitoring of stornlwmer outralls must be performed clueing a representative storm event. A repr:•esentative storm event is a stored event that measures greater thin 0.1 inches of rainfall and that is preceded by at least 72 hours in which no storin event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. For example, if it rains for 2 hours without producing any collectable discharge, and then stops, a sample may be collected if a rain producing a discharge begins again within the next 10 hours. Part 11 Page 4 of 8 PCrtllit \ca, NCC, 110000 Table 1. Qualitative lkionitoring Requirements Discharge Characteristics Frequency l'lonitoring Location t Color Semi-Annital SDO Odor Se1111-Alllltla1 SDO Clarity Senli-Annual SDO Floating, Solids Scmi-Annual SDO Sins pended Solids Semi -Annual SDO }"oath Senit-Al nut it SDO Oil sheen Sclni-Annual SDO Erosion or deposition at the outfall semi -Annual SDO Other obvlolls Illdlcators of stormwatcr xlllution Semi -Annual 5DO Footnotes: I 11.1onitoring vocation: Qualiuuive monitoring, shall he pertcunied at each stormwatcr di.sclnrgo oulfall tSDol reg,�rdless of representative nutf'ail status. 11 the pernlittec's qualitative rllonitoring indicates either that existing stornlwater 131,IPs arc ineffective. or that significant storillwater coil ttllllIIlatwn is present. the pernlittee shall investigate potential canlses. evaluate the feasibility (.)I' corrective actions. and illlplcnlent those corrective actions appropriate. A written record of the pernlittcc's invcsti`('ntion. evaluation. and response actions shall be kept in the Stor111MI ' PClllulion Prevention Plan. Qualitative monitoring is for the purposes of cvaluatill" the effectiveness of the Stortllwater Pollution 1revention Plan (SPPP), assessing new sources of stormwalter pollution. and prolllpting the perlllittec's response to pollution. If the pernlittee repeatedly fails to respond cffectivOy to correct problems identified by qualitative monitoring. or if the discharge causes or contributes to a water quality standard violation. DWQ may: • require that the pernlittee revise, increase, or decrease the 111011IWri1111 frequency for the remainder of the permit; • rescind coverage under the General Perrllit, alld rCCllltre that the pernlittee apply for an individual storlllwatcr disctlar�('e permit; • require the pernlittee to install structural stormvvater conu,ols: • r'cquire the pernlittee to Implement other stornlwatcl• control nleastlres. or • regllirc that the pernlittcC implement site modifications to duallil'y Im the No Exposure Exclusion. Part 11 Page 5 of S Permit No. NCG 110000 Qualitative niomtoHng will be performed twice per year. in accordance with the schedule in Table 2. A minimum of 60 days niust separate Period l and Mod 2 numhodng dates. unless monthly sampling has been instituted under a Tier Two response for vehicle maintenance activity areas. Table 2. Monitor-iltt; Schedule �'lonitoring periods'' Event Number Start End Years — Period l l July 1, 2008 December 31, 2008 Year l— Period 2 2 January 1. 2009 June 30, 2009 Year 2 — Period 1 3 July 1, 2009 December 31, 2009 Year 2 —Period 2 4 January 1. 2010 June 30, 2010 Year 3 — Period 1 5 July 1, 2010 December 31. 2010 Year 3 — Period 2 6 Jmuary 1, 2011 June 30, 2011 Year =4 — Period 1 7 July I. 2011 December 31, 2011 Year 4 — Period 2 8 January 1. 2012 June 30, 2012 Year 5 — Period 1 9 July 1. 2012 December 31, 2012 Year 5 — Period 2 10 January 1. 2013 May 31, 2013 FDot11"Ie", I 1Mt [imam ;emi-annual mostiw&g during, permit renewal process. II' at the expiration of Be generd prrm'st. the permittce has submitted an application for rmewul ufcm•em, before the submittal deadlino the permittee will be considered for FCIICNVed coyenWe. The applicant must continue semi-annual molit&q until the renewed Certificale of Coverage is issued. if anulvticul nx�nitoring applirs. but no discharge occurs during the nwn'storing period, the permiuee must submit a monitoring report indicatin. "No Flow" within 30 days of the end of the siX-month monitoring period. SECTION C: ON -SITE Vl:l-IICI.,E NIAIN'I ENANCE MONITORING REQU1REIVIENTS Facilities which have any vehicle maintenatce activity occurring on -site which uses Inos'e than 55 gallons of' new motor oil per month when averaged over the calendar year shall perform analytical monitoring as specified in Table 3. "Phis monitoring shall be performed at all outfalls which discharve storinwater runoff from the vehicle maintenance areas, and in accordance with the schedule presented in Table 2. All analytical monitoring shall be performed during a representative storm event. Tablc 3. Analytical tMonilorin Rec uircments I'm- On -Site Veliicle Nlaintenance Discliarge Characteristics Units Nleasurenient I1i-el t1encyl Sample Ty e2 Saniple L,ocatioI13 Ljl standard semi-annual Grab SDO Oil and Grease mgll semi-annual Grab SDO Total Suspended Solids Mgt! semi-annual Grab SDO Total RMnfall4 inches Serni-annual Rain �M],,,e - New Motor Oil Usage gallonslnlonth I semi-annital Estimate - Foolnotes: l \lcasurcntent Frequency: Twice per year during a representative storm e%lent. Part ] l Page 6 o f 8 Permit No. NCG 110000 If the sutrmwater runnrf is controlled by a storlimmer detention poncl a grab sutiple of the discharge from the pond shill Ile collected within the first 3U minute.~ of discharge f'rnm the p�)nd. 3 Sample Location: Samples Shall he collected at each storlimmer discharge oulfall (SILO) Ihat dischar-es slnrmwater runoff from area(s) where vehicle nwintommue aclivitie,� occur. 4 For each sampled rcpresen[al ive storm eVent the total precipitation mua he recorded. Ali on -site or local rain Mine reudin, utusl be rcxnrdccl. In all cases, the pernlittee shall report the tlnalylical results front the I'irst sample with valid results within [lie rnotlitorin- pel-iod. The pernlittee s11a11 corllpare those resrllts to the benchmark Va1t1eS in T lblC d. Excecdences of bcnchniark values rcgttire the pernlittee to increase monitoring, increase malla-cnlent actions, increase record keeping, and/ol' install stornlwater Best tiNbi agement Practices (Bi%,Ills) in a tiered prog,o-am. Sec below the descriptions oi' Tier One and Tier Two. Tahle d. Benchmark Values f'or On -Site Vehicle tMaintenance Activities Discharge Characteristics Benchmark Value H I Within rallge 6.0 - 9,0 Oil alld G1'Case 30 Ing/1 Total Sus )ended Solids 100 n1"11 'tier One If': The first valid sampling I -.Sulu are above a benchmark value, or outSICIC ol- the benchmark ran e, lbr all YlramCtCl' M 111V Oulfall: Then: The permitlee shall: 1. Conduct it Stornl«rater rminagenlent inspection cif the facility within two weeks of receiving sampling; results. ?. Identify and evaluate possible causes of the benchmark value exceedence. 3. Identify potential and select the spccif'ic: source controls. operational controls. or physical iIll provcnicnts to reduce concentrations of the partulleters of, concern, or to brillL, concentrations to within the benchmark range. 4. Iniplement the selected actions within two months of the inspection. 5. Record each instance of a Tier One response in the Stornlwatcr Pollution Prevention Plan. hiClUde the date and vahlc oi' the benchmark exceedencc, the inspection elate. the personnel conducting, the inspection, the Selected aC 011S. and the date the Selected actions were implemented. Part 11 Paige 7 of 8 Permit No. NCG 110000 Pier Two If: During the terns of this permit, the first valid sampling results from two consecutive Monitoring periods are above the benchmark values, or outside of the benchmark range, for any specific peter at a specific dischart'e outfall: 'Chen: The permittee shall: 1. Repeat all the required actions outlined above in Tier One. 1 lmmcdiately institute monthly monitoring for all parameters at every outfall where a sampling result exceeded the benchmark value for two consecutive valid samples. Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the benchmark vakws. or within the benchmark range. 'T If no discharge occurs during the sampling period, the permittee is required to submit a monthly monitoring report indicating "No Flow" to comply with reporting requirements. 4. Maintain a record of the Tier Two response in the Storlilwater Pollution Prevention Plan. During the term of this permit, if the valid sanyWrig results required For the permit monitoring periods exceed the benchmark vahEe, or are outside the benchmark range, for any specific parameter at any specific outfall on more than fotn• occasions, the perinittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results. I)VVQ may: • require that the permittee revise, increase. or decrease the monitoring frequency for the re«1::inder of the permit: • rescind coverage under the General Permit. and require that the permittee apply for an individual stormwater dischar,0e. permit: • require the permittee to install structural storntwater Controls. • require the permittee to implement other stormwater control measures; or • require that the permittee implement site modifications to qualif�' for the No Exposure l xclusion. Part 11 Page 8 of 8 t'crmit No. NCG 1 10000 PART III STANDARD CONDITIONS FOR NPDES STORNIWA7'ER GENERAL PERrNHTS SECTION A: COIVII'LIANCE: AND LIA1311,1'I'Y Com Hance Schedule The permittee shall comply with Limitations and Controls specified for stormwater discharges in accordance with the followirng schedule: Existing facilities already operating. but applying for coverage under this general pennil For Be first 6me: The Stornnwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective dale of the initial Certificate of Coverage issued pursuant to this general permit and updated thereafter on an annual basis, Secondary containment, as specified in Part 11. Section A. Paragraph 2(b) of this permit, shall be accomplished within 12 months of the effective date of the initial Certificate of Coverage. New facilities applying for permit coverage for the first time and existing facilities previously permitted and applying for renewal under this general permit: All requirements, conditions, limitations, and comrols contained rn this pernih become effective immediately upon issuance of the Certificate of Coverage. The Stormwatcr Pollution Prevention Plan shall he developed and implemented prior to the heginnhig of discharges from the operation of the industrial activity and be updated thereafter on an annual basis. Secondary containment, as specified in Pert 11, Section A, Paragraph 2(b) of this permit shall be accomplished prior to the beginning of discharges from the operation of Be industrial activity. 4 2, Duty to Comply. .> The permittee must comply with all conditions of this per-mit. Any permit noncompliance constitutes a violation of Be Clean Water Act and is 11r-ourn(ls for enforcement action: for permit termination, revocation and reissumm or modification: or denial of a permit renewal application. (a) The permittee shall comply with standards or prohibitions established under section 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish We standards or prohibitions . even if the permit has not vet been modified to incorporate the rcquirennent. (b) The Clean Water Act provides that any person who violates a permit condition is subject to it civil penalty not to exceed 525,00O per day for each violation. Any person who negligently violates any permit condition is subject to criminal penalties of SUN to 525,000 per day of violation. or imprisonment for not more than I year, or both. Any person who knowingly violates permit conditions is subject to criminal penalties of 55,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or Part Ill Page 1 of I I Permit No. NCG 110000 both. Also. any person who violates a permit condition may be assessed an administrative penalty not to exceed S I U00 per violation with the maximum ar710[rnt not to exceed $125,000, [ Ref: Section 309 of the Federal Act 33 USC 1319 and 40 CFR 122.41(a).] (c) Under state law, a daily civil penalty of not more than ten thousand dollars ($10,000) Per violation niay be assessed against any person who violates or fails to act ill accordance' With the terms, conditions, or requirements of a permit. [ Ref: NC General Statutes 143-215.6A]. (d) Any person may be assessed an administrative penalty by the Director for violating section 301, 302, 306, 307, 308. 31 S or 405 of the Act, or any permit condition or limitation implementiri" any of Such ScctionS in a permit issued under section 402 of the Act. Administrative penalties for Class 1 violations are not to exceed $10,000 per violation, with the maximum amount ofany Class I penalty assessed not to exceed $25,500. Penalties for Class 11 violations are not to exceed ,$10,000 per clay for each clay clurink' which the violation continucS_ with the maximum ',ui1ount of any Class 11 penalty not to exceed $125,000. Duty to mitiL7ate The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this general permit which has a reasonable likelihood of adversely affecting ]Haman health or the environment. 4. Civil and Criminal Liability Except as provided in Section C of this permit regarding bypassing of stormwater control Facilities, nothing in this gcrteral permit ~hall be construed to relieve the permittee from any responsibilities, liabilities. or penalties for noncompliance pursuant to NCGS 143- 215. 3, 143-215.6A, 143-215.613, 143-215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for consequential damageS, Such aS fish hills, even though the responsibility For effective compliance may be temporarily Suspended. Oil and HurardouS Substance Liability Nothing in this general permit Shall be cor7Strued to preclude the institution of any legal action or relive the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be Subject to under NCGS 143-215.75 et seq. or Section 31 1 of the Federal Act, 33 USC 1321. 6. Property Rights The issuance of this g.eneral permit does not convey any property rights in either real or Personal property. or any exclusive pr'ivilegeS, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or rcOulations. Part 111 Page 2 of 1 l Permit No. NCG 1 10000 Severabi I f tv The provisions of this general permit are severable. and if any provision of this general permit. or the application of any provision of this gendraI perr»it to any circumstances. is held invalid, the application of such provision to Other' CIrCUmstanCe's. and the remainder of this general permit. shall not be affected thereby. Duty to Provide ]nformcrtian The permittee shall furnish to the Director. within a reasonable time, any information) which the Director may request to determine whether cause exists ton- modifying revoking and rs:fssuin". or terminating the certificate of covera�tic issued pursuant to this general permit or to determine compliance with this general permit. The permittee shuli also furnish to the Director upon request, copies of records required to be kept by this gene rat permit. Penalties for Tamuerin The Clean Water Act provides that any person who falsifies_ tampers with, or knowin,ly renders inaccurate:, any monitoring device or method required to be maintained under this general permit shall, upon conviction, be punished by a fine of not more than SR000 per violation, or by imprisonment for not more than two years per violation, or by both. ]f a conviction of a person is for a violation committed alter a first conviction of such person under this paragraph, punishment is a fine of not more that S20,000 per day of violation, or by imprisonment of not more than 4 years. or both. 10Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement. representation, or certification in any record or other dOCLlment submitted or required to he maintained under this general permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 Pei - violation, or by imprisonment for not more than two years per violation, or by boils. SECTION B: GENERAL CONDITIONS General Permit Expiration The permittee is not authorized to discharge after the expiration elate. In order to receive automatic authorization to discharge beyond the expiration date, the permittee shall submit l'orms and fives as arc required by the agency authorized to Issue permits no later than 180 days prior to the expiration date. Any permittee that has not requested renewal at least 180 days prior to expiration. or any permitted that does not have a permit after the expir:ition and has not requested renewal at least 180 days prior to expiration, will be Part Ill Pagc 3 of I 1 Pcrnut No. NCCI f 10000 subjected to enforcerllcnt procedures as provided in NCGS § 143-2153.0 and 33 USC 1251 et. sect. Wmnslrti The certificate of covernge issued pursuant to His general permit is not transferable to any person except after notice to and approval by the Director. The Director may require mo lidmion or revocation and rcksuance of the certificate ofcovemge to change Be name and incorporate such other requirements as may be necessary under the. Clean Water Act. Nermittee is required to noti# the Division in the event the permitted facility is wild or closed. When an Individual Permit May be Required The Director may require any owner/operator alll11067CCI to discharge under it certificate of coverage issued pursuant to this general permit to apply for and obtain an individual pum-th or coverage under an alternative general permit. Any interested person play petition the Director to take action under this paragraph. Cases where an individual permit may be required include. but are not limited to, the following: I The discharger is a significant contributor of pollutants; b. Conditions at the permitted she change, altering the constituents and/or Characteristics of the clischar410 such that the discharge no longer qualifies fora general permit; ---,j C, The discharge violates Be terms or conditions of this general pernllt: d. A change has occurred in the availability of demonstrated technology or practices IS the control or abatement of pollutants applicable to the point source; C. Effluent limitations arc pronutlgated for the point sources covered by this general permit: i. A water quality management plan containing requirements applicable to such point sources is approved alter the issuance ofthis "'�Cneral permit. The Director determines at Iris own discretion that an individual permit is required. 1. When an Individual Permit IN'lav be Requlestcd Any pernlittce operating under this general permit may request to be excluded from the com—age of this general permit by applying for an individual permit. When an individual permit is issued to an ownerloperator the applicability of this general permit is atutonlatically tel'I1linateCl on the effective date of Be individual pernllt. S. Signalory Requirements Part III Page 4 o f I 1 Permit No. NCG1 10000 All applications, reports. or information submitted to the Director shall be signed and certified. All notices of intent to be covered under this general permit shall be signed as follows: (1) In the case of a corporation: by a principal executive officer of at least the level of vice-president, or his duly authorized representative. if such representative is responsible for the overall operation of the facility from which the; discharge described in the permit application form originates, (2) In the case of a partnership or limited partnership: by a general partner: (3) In the case of a sole proprietorship: by the proprietor; (4) In the case of a municipal, state, or other public entity:: by a principal executive officer, nulling elected official. or other cluly authorized employee. b. All reports required by the general permit and other information requested by the Director shall be Agned by a person described above or by a duly authorised mprescnta6ve of that person. A person is a duly authorized rcl)resentative only if: 0) The authorization is nu€cle in voting by a person described above: (2) "['he authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of phrit rnanagcr, operator of a well or well field, superintendent, a position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative: May thE€s be (ither a named individual or any individual occupying a named position.): and (3) The written authorization is submitted to the Director. Any person si4Tning a document under paragraphs a, or b, of this section shall make the following certification: "[ certh under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assw'c that qualified personnel properlygather and evaluale the information submittcd. Based on my inquiry of the person or persons who mhumge the system, or those persons directly responsible for gathering the informationr the infornuriion submitted is, to the best of my knowledge and bchel. true. accurate, and comoew. I am aware that there are Agri scam penalties for Submitting false inforit7ation. including the possibility of fines and iill priso€7nrent for violations." Part I [ I Page 5 of I I Permit No. NCG 110000 6. General Permit N9odirication. ReyocatlOn and Rei.SsnanCe, or Termination The issuance or this general permit clots not prohibit the Director from reopening and modifying the general permit, revoking and reissuing the general permit, or terminating the general permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 121 Wde 15A of the North Carolina Administrative Code, SUhchapter 2H .0100; and North Carolina General Statute 143- 215A et. al. After public notice and opportunity for a hearing,. the general permit may be terminated for cause. The filing of a request For a general peril[ modification, revocation and r-eissuanee. or termination does not stay any general permit condition. The certificate of coverage shall expire when the general permit is terminated. Certiricate of Coverage Actions The certificate of coverage issued in accordance with this general permit may be modified, revoked and reissued, or termirrued fur cause. ']'he notification or planned changes or anticipated noncompliance does not stay any general permit condition. SECTION C: OPERATION AND NIAINI'E:NANCE, OF POLLUTION CONTROLS Proper Operation and 1klaintcnance ']`he periliiltee s11a11 at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this gencral permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or Similar systems which are installed by it permittee only when the operation is necessary to achieve compliance with the conditions of the general permit. Need to Halt or Reduce not a Defense. It shall not he it dQ€i nse for a permittee in an c Rmemem action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this Cgeneral permit. Bypassing of Stormwnter Control Facilities Bypass is prohibited and the Director may We enforcement action aoainst it permittee for bypaSS unless: Bypatis was anutvoidable to prevent loss of lifo, personal injury or severe property damage; and Part III Pate 6 of I l 1'crmit No. NCG 110000 b. There were no feasible alternatives to the hypass, such as the use of auxiliary control facilities. retention of stormwater or maintenance during normal periods of equipment downtime or dry weather. This condition is not satisfied if adequate backup controls should have been in.swHed in the exercise of reasonable enghcOng judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance: and The permittee subn3ittcd notices ors ruluircd under Section E of this Part- IfPilrl- If the Director deteriilincs that it will sleet the three conditions listed above, the Director may approve an anticipated bypass after considerfng its adverse effects. SECTION D: MONI'PORING AND RECORDS Re resenwAve Sam p h n g Samples Mood and measurements taken, as required herein. shall be characteristic of' We volume and nature of the permitted discharge. Analytical sampling, shall be performed during a representative storm event. Samples shall be taken on a day quid time that is characteristic of the discharge. AH samples shall be takers before the discharge joins or is Muted by any., other waste suvam. body of water. or substance. ivlonitoring, points as specified in this permit shall not he changed without notification to and approval of the Director. 12ecordin<< Results For each measurement. sample, inspection or maintenance activity performed or collected pursuant to the requirements of this general permit. the permittee shall record the following information: The date, exact place. and time of sampling, measurements- inspection or maintenance activity: h. The individual(s) who performed the sampling, measurements, inspection or III ainterlalice activity; C. The datc(s) analyses were performed: d. The indiyidual(s) who performed the analyses: C. The analytical techniques or methods used: and f. The results of such analyses. Flowy lcasuremcnts Part 111 Page 7 of I l Permit No. N C G 1 10000 Whcre required. appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. ;St Procedures Test procedures for the analysis of pollutants Shall conform to the ENIC regulations published pursuant to NCGS 141215.63 el. scy. Be VA ter and AN Q mhty Reportinc Acts. and to regulations published pursuant to Section 304(g), 33 USC 1314. of the Federal Water Pollution Control Act, as Amended. and Regulation 40 CFR 136. To meet the intent of the monitoring required by this general permit_ Al test procedures r must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. Representative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled. the permittee may petition the Director for representative outfall status. Tit is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status, then sampling requirements may be performed at a reduced number of rnrtfalls. 6. Records Retention Qualitative monitorin�� shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan. Copies of analytical monitoring results shall also be maintained owshe. The permittee shall retain records of all monitoring information. including all calibration and maintenance records and all orighml strip chart recordings for continuous monitorly instrumentation, and copies of all reports required by this gcncral permit for a period of m least 5 years from the date of the sample. measurement, report or application. This period may be extended by request of the I)hvcmr at any time. 7. Inspection ,and Entry The permittee shall allow the Director, or an authorized representative (including an a whodzed contractor acting as a represenw6ve of the Director), or in the case of a facility which discharges through a municipal separate storm sewer Systerzt, an authorized representative of a municipal! operator or the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to; Enter upon the permittce's premises where a regulated facility Or activity is located or conducted, or where records must he kept under the conditions of this general permit; Part Ill Patio H of 1 1 Permit No. NCG 110000 h. Have access to and copy, at reasonable tithes, any records that must be kept under the conditions of this general permit; Inspect at reasonable times any facilities, equipment (including' 111013itoring. and control equiprncnt). practices. or operations regulated or required under this general permit: and Sample or monitor at reasonable times, for the purposes of assuring general permit compliance or as otherwise authorized by the Clean Water Tact, any substances or parameters at arty location. SECTION 1 : REPORTING REQUIRENIENTs Discharuc NioniiorinL, Reports Samples analyzed in accordance with the terms of this permit shall be sul»nitted to the livision on Discharge Monitodng Report forms provided by the Director. Submittals shall be received by the Division no later than 30 clays from the date the facility receives the sampling resultS front the laboratory. When no discharge has occurred from the facility during the report period, the perwittee is required to submit a discharge monhoring wpow within 30 days of the end of the six- momh stugA&gg period, giving all required information and indicating, "NO FLOW" as per NCAC T15A 02B .05M The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monh(Kng Report form provided by the Division, and shall retain the contpletCd forms on Site. Qualitative monitoring results ShOUld not be Submitted to the Division. except upon DWQ's specific requirement to do so. Subrt}itting, Reports Duplicate signed copies of all reports iTquircd herein, shall be submitted to the follomdng address: AvailabiIiIv of Reports Central Files Division of Water Quality 1617 Mail Service Center Raleigh. North Carolina 27699-1617 Part HI NIC 9 of 1 l Permit No. NCG 110000 Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal Act, 33 USC 131 K all rclvrts prepared in accordance with the term,~ shall be available for public inspection at the offices of the Division of Water Quality. As required by the Act. analytical data shall not be considered coiMenth 1. Knowingly nwiving any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 1430116B or in Section 309 of the Federal Act, 4. Nun-Storinwater Dischar,cs lf- the storm event monitored in accordance w4h thrs general permit coincides with a non- stormwater discharge. the pernlittee shall separately monitor all parameters as required under the non-stonllwater rlischur,-,e permit and provide this information Willi the stornlw"Iter discharge nlollitoring report1. - Planned Chanues The pernlittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or qu,nitity ol- pollutants discharged. This notification requirement includes pollutants which are not specifically listed in the general permit or subject to notification requirements under 40 CFR Part 122A2 (a). 6. Anticipated Nonconlpliancc '['he pernlittee; shall give notice to the Director as soon as possible of any planned changes at the permitted facility which play result in noncompliance with the general permit requirements. i tiLss Lt. Anticipated bypass. [f the permittec knows -in advance of the need for a bypass, it shall submit prior notice, if possible at least tcn days before the: date of the bypass; AxWdkg an evalksation ol- the anticipated (lu,rlky and affect of the bypass. Unanticipated bypass. The permiltec shall submit notice within 24 hours of hccclrnhg aware of an unanticipated bypass. Twenty -lour Hour Reporting The permittce shall report to the central office or Be appropriate regional office any noncompliance whWh nmy endanger health or the environment. Any information shall be provided orally within 24 hours from the time Be permittee became aware of Be circumstances. A written submission shall also be provided within 5 days of the time the permittce becomes aware of the Circumstances. The written submission shall contain a description of Be noncomplOww , and its causes: the period of noncompliance, including exact dates and times, and K the noncompliance Part I ! [ Page 10 01' 1 1 Pcrmit No, NCG 11O000 has not been corrected. the anticipated time compliance is expected to continue; and steps taken or planned to reduce. Clirtinate. and prevent reoccurrence of the noncompliance. the Director may waive the written report m a case-hy-case basis if 111c oral report has been received within 24 hours. 9. Other Noncompliance The Permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time monil ing reports are submitted. 10. Other Information --� Where the permittee becomes aware that it foiled to subrnil any rC1CVa11t facts in .r Nolicc of Intent to he covered under this general hermit or in any report to the Director. it shall promptly submit such filets or information. Part III Pa'c: I l of I I Permit No. NCG 110000 PART I1' LIMITATIONS RE:OPENER This general permit shall be modified or alternatively. revoked and relSSued. to comply with arty applicable efiluentLIuideline or water quality standard issued or approved under Sections 302(b) (2) (c), and (d). 304(b) (2) and 307(a) oi' the Clean Water Act, if the ei'thent guideline or water quality standard so issued or alproved: a. Contains different condiliotls Or is otherwise more strinocnt than wily effluent limitation in the "Clicral permit: or h. Controls any pollutant not limited in the general permit. The Leneral hermit as modified of reissued under this paragraph shill] also contain any other requirements in the Act then applicable. PART V ADMINISTERING AND COMPLIANCE MONITORING FEF. REQUIREN7ENTS The permittee must pay the administering and compliance monitorin�k) lee within 30 (thirty) days after hein�ty billed by tile Division. I aHL11'e to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the Certificate ol' Covera "e. PART VI DEFINITIONS Act See Cleats Water Act. 2, Arithmetic Mean The arithmetic mean of any set 01' values IS the summation of the individual values divided by the number of individual values. 3. Allowable Non-Stonmviiler Dischurges I"111S permit regulates stormwater dischat'ges. Non-tirornl�W;tter discharges-��fiich shall=hem �t1lc:�wed=in=the=5torm�vat�1'zonvcyance sysTem-li'o:? (a) All other discharges that are authorized by a non-storinwater WDES permit. Parts IV. V and V1 Page 1 of 7 P(;rmit No. NCC 110(100 (b) Uncontaminated groundwater, foundation drains. air -conditioner condensate without added chemkWn springs. discharges of mwommuinated potable wam. %vatedine and lire hydrant Fludhigs. water from footing drains, flows from riparian habitats and wetlands. (c) Discharges renddng from Fire -fighting or Firefighting training. Bast Management Practices (13MPs) Measures or practices used to reduce tea mom of pollution cntcring surface wmem. BMPs may We the form of a process, activity, or physical structure. By Liss A bypass is the known diversion of storniwater from any ]portion of a stormwater control facility including the collection system. Which is not a designed or established opcm6ng mode for the facility. Bulk Storaw of Liquid Products U(luid raw materials, manufacturCd products. waste material', or hy-products with a single above ground storage container having a capacity of greater than 660 gallons or With rt3ultip[e above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than L 20 gallons. Certificate of Coves<se The Certificate of Coverage (COC) is the cover sheet Which accompanies the general permit upon issuance and lists the facility name_. location. receivin; stream. river basin, effective date of coverage under the permit and is signed by the Director, lean Water Act The Federal Water Pollution Omwl Act, also known as the Clean WVatcr Act (CWWrA). as amended. 3 USC 1251. et. say. 9. Division or DWVQ The Division of Water Quality, Department of Environment and Natural Resources. 10. Director The Director of the Division of Watc;;Quality, the permit issuing authority. Part W Page 2 of % Pages Permit No. NCG 110000 11. ENIC The North Carolina Environmental Management Commission. 12. Grab Sample An individual swuples collected instantaneously. Grab samples that will be directly analyzed or qualitatively monitored must be Well within the first 30 minute~ oi' discharge. 13. Nazy-dous Substance Any substance designmed under 40 CFR Pan 116 pursuant to Section 31 1 of the Clean W,ner Act. 14, Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a hsnd trealunent facility. a surface impoundment, an injection well, a hazardous waste long, -term storage facility or a surface s101-a2e facility. 15. Municipal Separate Storm Sewer System A stormwater collection system within an incorporated W-ea of local self-government Such as a city or town. 16. No Exposure A condition of no exposure means that all indumrial materials and activities are protected by a storni resistant shelter or acceptable storage containers to prevent exposure; to ruin, snow. snowmen, or runoff. Industrial materials or activities include, but are not limited to. material handling, equipment or activities. industrial machinery. raw materials, intermediate products, by-products, final products, or waste products. DWQ may grant a N'o Exposure Exclusion from i\PDES Stormwater Permitting, requirements only if a Facility complies with the terms and condilions described in 5) CPR §122.26W) 17. Notice of Intent The state application form which. when submitted to the Division. officially indicates the facility's notice of intent to seek coverage under a general permit. Any material of any nature, consolidated or unconsolidated, that overlies a mineral deposit. excludnlg topsoil or similar naturally -occurring surface materials that wv not disturbed by mining, operations. Part VI Pace 3 of 7 Pages Permit No. NCG 110000 19. Permittce The owner or operator issued a certificate of coveragge pursuant to this general permit. 20. Point Source Discharge of Stormwater Any discernible, confined and dismve conveyance AWC1042. but not Specifiadly Plited to, any pipe, ditch, channel, tunnel, conduit, we& or discrete fissure from which sWnnwater is or may be discharged to waters of the .state. 21. Rem-csenlative Storm 1✓vent A storm event that measures greater than R I inches of rainfall and that is precaled by at least 72 horny In which no storm event measuring* greater than R l inches has occurred. A single storm event may contain up to 10 consecutive howN of no precipitation. For example, if it rains for 2 hown wrthont procWCing any collectable discharge. and then Stopm a sample may be collected HA rain producing a discIRvge begins again within the next 10 hours. 22. Re presentative Outfall Status When it is established that the discharge of storniwater ruftoff from a Single outfalE iS representative of the discharges at multiple outfalK the DVV0 may grant representative o aNH status. Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfallS. 23. Rinse Water Discharge The discharge of rinse water from eq&pmurrt cleaning areas associated with industrial activity. Rinse waters from vehicle and equipment cleaning areas are process WaStewaterS and CIO not inciuCIC waShwaters utilizing any type oi' detergent or cleaning agent. 24. SeconAwy Containmew Spill containment for the contents of the single imyest tank within the containrllent Structure plus sufficient freeboard to allow for the 25-year. 24-hour storm event. 27. Section 313 Water Prioriiy Chemical A chemical or chemical category which: a- Is listed in 40 CFR 37165 pursuant to Section 313 of Tide 111 of the Supedind Amendments and Reauthorization Act (SARA) of 1981 also titled the Emu-guncv Planning, and Community Right -to -Know Act of 1986: b. Is present at or above threshold levels at a facility subject to SARA title 111. Section 313 reporting, rcquirenlents: and Part VI Page 4 of 7 Pages Permit No. NCG 110000 That meet at least one of the following criteria: (l) k listed in appendix I] of 40 CFR pwi 122 on either Table I I (organic priority pollutants), Table III (certain metals, cyanides, and phenols) or `['able IV (certain toxic pollutants and hazardous substances); (2) is listed as a hazardous substance pursuant to section 31 1(b)(2)(A) ofthe CWA at 40 CFR [ [6.4: or (3) Is a pollutant for which EPA has published acute or chronic water quality criteria. 26. Severe ProjjeL Da� Means substantial physical damage to property. damage to the control facilities which causes them to become inoperable, or Substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. 27. Significant iaterials Includes. but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; raw materials used in food processing or production; hazardous substances deli�lnated Under section 101(1 4) of CI RCLA; any chemical the facility is required to report pursuant to section 313 of Title III of SARA; WOMB: pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stornlwater discharges. 24 SiNficant Spills Includes, Imn is not limited to: releases of oil or hazardous substances in excess of rep01-table (1(rarltities Under section 311 orthe Clean Water Act (Ref: 40 CFR l I0.10 and CFR I I T2 l) or section 102 of CRRCLA (Ref`. 40 CFR 302.4). 29. Slornlwater Runoff The now of water which results from precipitation and which occurs immediately followinL, rainfall or as a result of snowmelt. 30, Storrllwater Associated with Industrial Activity The discharge fron any point source which is used for collecting and conveying stormwater and which is directly related to irtanufacturing, processing or raW material stortle areas at all Indust6d site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.2Qb)(IQ. The term does not include discharges from facilities or activities excluded from the NPDLS program. Part V1 Page 5 of 7 Pa -es Permit No. NCG 110000 31, Stoi'rnwater Pollution Prevention Plan A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the .rite. 32, Ten Year Desi�,,n Storm The maximum 24-hour precipitation event expected to be equaled or exceeded on the average once in ten years. Design storm information can be mound in the State of North Carolina l Poston and Sediment Control Planrnng and Deign Manual. 33. Total Flow The flow corresponding to the time period over which the entire storm event occurs. Total flow shall be either: (a) measured continuously. (b) calculated based on the amount of area draining" to the oinfall, the amount of lxiilt-upon (impervious) area, and the iota] amount of rainfall, or 0) estinrrted by the measurement of flow at 20-minute intervals during the rainfall event. 34. Total tMaximum Daily Load (TN,1DL) TMDLs are written plans for attaining and maintaining water duality standardk. in all seasons, for a specific waterbody and pollutant. (A list of approved TMDLs for the state of North Camlina can be found at hill Wh Lem%Matc.ncrosAmdl/) 35. "]Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1) or the Clean Water Act. 36. Upset Means an exceptional incident in which there is unintentional arul temporary noncomphmwc with technology based pernnit effluent limitations because of factors heyond the reasonable control of the permitter. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment or control facilities, inadequate trcatmem or control facilities, hick of pmventiye nwintenance. or careless or hnproper operation. 37. Vehicle (Maintenance Activity Vehicle rehabilitation, mechanical repairs. painting. Richly, luhricatiom vehicle cleaning oTeratiorts, m airport deicing operations. Part V] Nye 6 of Paecs Permit No. NCG 1 10000 38, Visible Sedimentation Solid particul,ite nutter, both mineral and organic. that has been or is being transported bye water, air, ,r,nrity. or ice i'ram itS Site oC origin which can be Sein with the unaided c Ve, 39. 25-war, 24 hour stcn-m event The maximum 24-1101.11- precipitation event expected to be equaled or exceeded. on the average. once in 25 years. Part VI Page 7 o f 7 Pages WASTEWATER B10SOLIDS MANAGEMENT WITH GREEN VISION Blocyc JOURNAL OF COMPOSTING & ORGANICS RECYCLING 419 State Avenue, Emmaus, PA 18049-3097 Reprinted from March 2004 BioCyde (610) 967.4135 www.biocycle.net ENVIRONMENTAL STEWARDSHIP WASTEWATER B10SOLIDS MANAGEMENT WITH GREEN VISION Constructed wetlands, reclaimed water irrigation and biosolids composting anchor Goldsboro, North Carolina's commitment to water quality, conservation and improved soils, Karen H. Brashear HE CITY of Goldsboro, North Carolina is located in the Neuse River basin which begins in the middle of the state and runs to the estuarine waters of the Pam- lico Sound: This river basin was declared "nutrient sensitive" by the state of North Carolina in 1995. All per- mitted wastewater dischargers in the Neuse River basin were required by North Carolina to reduce the nitrogen discharged to the river by 30 percent from the baseline The Goldsboro wastewater treatment plant (above) is surrounded by 180 acres of equalization basins that are adjacent to the Neuse River. year of 1995. After news of the nutrient problems in the Neuse River reached the City Council, it was decided that Goldsboro would be a leader in North Carolina in protecting the environment. A comprehensive environ- mental stewardship program was initiated with a goal to reduce nutrients going into the river. In 1995, the city's advanced bio- logical wastewater treatment facility was discharging effluent of 14 mg/L total nitro- gen to the Neuse River, In 1997, through plant control modification this was reduced to 4 mg/L in the effluent. By 2000, the city was able to finetune the plant control to fur- ther reduce the total nitrogen to 3 mg/L, a 76 percent reduction (from 1995). The plant was able to achieve total phosphorus levels of 0.03 mg/L. Treatment for both total ni- trogen and phosphorus is done biologically, without any chemical addition. Even though the levels of nutrients in the treat- ed wastewater effluent were very low, the City Council was determined to do more to protect the Neuse River. CONSTRUCTED WETLANDS FOR NUTRIENT POLISHING Two more nutrient reduction projects were planned and constructed. One built in 2002 was a 40-acre constructed wetlands. In a natural wetlands, aquatic plants re- move pollutants in the water by plant up- take and by microbial action in the roots and stems of the plants. To mimic nature, 52,000 wetland plants of 13 different species were planted in diked, clay -lined basins, creating a wetlands environment. Four zone types were built in the wetlands; the shallow mixed marsh zone, the deep mixed marsh zone, the transition zone, and the littoral zone. The aquatic plants were selected to match the environment of each zone. Between one to four million gallons per day (mgd) of advanced treated wastew- ater were sent through the 40-acres of wet- lands to "polish" nutrients from the water. The water entering the constructed wet- lands had 3 mg/L total nitrogen. The re- sulting "polished" water had less than 1 mg/L total nitrogen remaining in it prior to being discharged in the Neuse River, The constructed wetlands project cost $3.3 mil- lion to build; $1.6 million in grant funds were provided by the North Carolina Clean Water Management Trust Fund to help pay for some of the construction costs. A future constructed wetlands project is being eval- uated fbr the treatment of storm water in a large drainage area in the city to remove to- tal suspended solids as well as nutrients from the urban storm water. Another nutrient reduction project in 2002 involved building a reclaimed water irrigation system using advanced treated wastewater for use on the municipal golf course and 11.4 acres of farmlands. The re- claimed water used for irrigation both re- duce nutrients From entering the Neuse River and conserve the city's potable water BIoCYCLE AIANc11 2004 Dewatering consists of a one million gallon biosolids storage tank (1) and two belt filter presses (2) that produce 18 percent solids cake. Dewatered biosolids are conveyed to hoppers (3) for loading onto mixing trucks that already contain the wood chip amendment. supply. The cost of construction was ap- proximately $3 million. The North Carolina Clean Water Management Trust Fund pro- vided $789,360 in grant funds to help pay for the project. BIOSOLIDS COMPOSTING FACILITY In 1997, Goldsboro, began planning a 3.4 mgd expansion of the city's 10.8 mgd wastewater treatment plant. In conjunction with this expansion, plans were made to construct a modified in -vessel composting facility for biosolids and chipped yard trim- mings. Land application of biosolids was de- termined to be too problematic due to inac- cessibility to fields during extensive rainy periods and also due to environmental lia- bility. As part of the city's solid waste pro- gram, tree limbs are collected from the curb at city residences. The city had no reliable disposal method for these tree limbs. Com- posting both of these waste streams to cre- ate a desirable marketable product solved both problems. The decision to build a composting facili- ty came with a large price tag. It required a biosolids dewatering facility to be con- structed for $2,275,000, in addition to the $7 million composting facility and associat- ed equipment. The City Council decided the long-term advantages outweighed lower cost alternatives, such as land application. Modified in -vessel composting had the ben- efits of running year-round without weath- er related problems and creating a Class A, "Exceptional Quality" compost distributed as a soil amendment under the brand name of Gold Dust Compost. The US Filter IPS composting system was selected as the preferred technology. ARCADIS engineering in Raleigh handled the engineering and project management for both the wastewater treatment and biosolids composting projects. Engineered Construction Company, the general con- tractor, built the com- post facility during 2002. The current ca- pacity of the biosolids composting facility is 7 dry tons/day (6 bays) but is expandable to 9 dry tons/day (8 bays). The biosolids dewater- ing facility was built at the wastewater treat- ment facility which is located nearby. Dewatering consists of a 1-million gallon biosolids storage tank where all the waste activated sludge (0.58 percent total solids) from the advanced biological tertiary treat- ment plant is held and aerated. A 3,300 square foot building houses two SernaTech belt filter presses (2-meter). The dewatered biosolids (18 percent Total Solids) are car- ried by screw conveyors to hoppers for load- ing on the compost mixing trucks. Tree limbs are brought to the composting facility and placed in the vicinity of a Mor- bark horizontal grinder (40 tonsihour). The chipped amendment is stored under cover in the nearby 5,000- square foot building to pre- vent rain from raising its moisture content. Since the dewatering facility is five -min- utes away from the composting operation, two, 22-cubic yard Roto-Mix trucks are used to transport the cake. Each morning prior to loading the compost mixing trucks, mois- ture content analyses are performed at the city's testing laboratory of samples of the chipped wood amendment and the biosolids cake so the compost mixture "recipe" for the clay can be determined. The compost mixing trucks have scales on them so that the weight -based "recipe" can be measured. First the operator will load a compost mixing truck with chipped wood amendment at the Compost Facility prior to picking up biosolids cake at the wastewater treatment facility. The com- post mixing truck uses a large diameter ro- tor that lifts the ingredients up to two side augers that thoroughly mix the wood amendments and biosolids cake together prior to dumping the loads on the floor in the composting building. Once inside the composting building (40,000 square feet), the mixture is loaded into one of eight bays by a large heavy-duty loader (Volvo) with a 4 cy bucket. Each bay is 104eet wide and 235-feet long and 7-feet high. Each new "charge" 00'x 14'x 6') load- ed in a bay is assigned a charge number by a computer for tracking purposes. Agitators mounted on rails mix and reaer- ate the compost as well as move each charge forward in the bay by,1.0 feet each day. Each charge has its temperature tracked daily by thermocouples mounted inside the bay walls. This data is sent back to the main con- trol/data-tracking computer to verify that all PFRP (pathogen reduction) and Vector At- traction Reduction requirements have been met. A computer report is generated for each 1310Cvcr.i; AIARGri 2004 charge verifying compliance. The main con- trol/data-tracking computer also regulates the frequency and duration of operation of 24 blowers that feed air through piping un- der the compost in the bays. A 15,000-sq. ft. biofilter was constructed to treat building and process air. The build- ing air is exchanged 12 times each hour into the biofilter by three 60-lip exhaust blowers capable of moving 19,400 cubic feet of air per minute. Plastic "curtains" at each end of the bays help contain process air, improving odor treatment efficiency. The 6-feet high biofilter is built from various layers of ma- terials, as follows (starting at the bottom): small stone, 10-inch air piping, larger stone, coarse pine wood chips, a biofilter mixture (2:1:1= softwood chips: hardwood chips: leaf compost), and a layer of coarse pine wood chips on the top. An irrigation system is in- stalled to keep the biofilter moist to pro- mote the growth of microorganisms that "scrub" odors. "GOLD DUST" PRODUCTS Typically, each compost mixture charge moves to the end of the compost bay in 21 to 25 days. After the charge reaches the end of the compost bay, it is re- moved by a heavy- duty front end loader The biosolids/woad chip feedstock is put into aerated bays (top) equipped with agitators that mix and move material forward. Plastic curtains (bottom photo) help contain process air within the active composting area. to a separate curing building (12,000 square feet). The compost is cured for at least 30-days prior to screening. A 150-ton/hour Ex- tec trommel screen is used to screen the compost to either one - inch or three -eighth inch. The fin- er screened compost (3/8") is sold as "Gold Dust Compost", The coarser material (1") is sold as "Gold Dust Mulch." The "overs" from the trommel screen are recy- cled back to the front of the plant. The City of Goldsboro has en- rolled in the U.S. Composting Council's Sea] of Testing Assur- ance (STA) program, becoming the fifth member in North Car- olina. Samples of Gold Dust Compost are sent to a STA labo- ratory every 60 days for testing. A July 2003 analysis showed an N-P-K val- ue o(1.9-2.4-0.43 (dry weight basis), 57.8 percent organic matter, pH of 7.71, and sol- uble salts of3.51 dS/rn. Gold Dust Compost carries a guaranteed analysis of 1.5-2.0- 0.25. The product is also registered with the North Carolina Department of Agri- culture as a fertilizer. The city sells Gold Dust Compost mainly to garden centers and landscapers, and it is used in city parks and at the city golf course. The com- post product, made from two municipal waste streams, is a perfect fit for the city's goal ofenvironmental stewardship. ■ Karen Brashear is Public; Utilities Director for the cit)- of Goldsboro, North Carolina. BIOCYCLE MARCH 2004 City of Goldsboro Compost Facility Process Control/ Quality Control The City of Goldsboro has operated a state-of-the-art computerized Compost Facility since 2003. In manufacturing its compost, the facility exceeds the minimum requirements of the EPA Part 503 Biosolids Rules. These rules require that the compost reach at least 55° C for a minimum of 3 days for pathogen reduction. Also for 14 days or longer, the temperatures must be at least 40' C and an average temperature at least 45° C for vector attraction reduction. In addition, the compost must be cured for at least 30 days for stabilization. The City of Goldsboro's compost also meets the EPA designation of Exceptional Quality compost which requires low toxic and metals levels. Typically during the composting process the facility is able to achieve at least 55°C - 70°C for approximately 11 days and 45°C - 60°C for approximately 32 days. The cure period all of the compost is greater than 40 days. The ability for this Compost Facility to be able to reach the higher temperatures than required by EPA gives us greater confidence that pathogens have been destroyed in the process. Process Control & Quality Control: 1. Each day laboratory analysis is performed on each of the three components of the compost mix, the biosolids cake, the recycled compost, and the wood chips. The Dried Solids percentage is determined so that the "recipe" for the compost mix for the day can be determined. 2. Each new mix is assigned a "Charge Number" so that it can be tracked each day through the bays in the Compost Building. This is important so because computers track temperatures in each Charge to verify compliance with the EPA Part 503 Rules. Typically it will take a Charge 32 days to move through the bays in the Compost Building. The computer will generate a printed report to document the temperatures throughout the compost process. 3. The compost coming out of the end of the bays will be transported to the Cure Building for at least a 40-day period. The front-end loader that is used to transport the compost uses only a "clean" bucket to handle the compost. Each week staff uses Clorox to disinfect this loader bucket to make sure it stays clean. 4. After the compost is cured, it is then put through a trommei screen to size the compost to a fine compost (< 3/8") and a mulch compost (< 3/4"'). After screening, the compost is called "finished compost". 5/15/2008 5. Although the City is only required to test the finished compost every 60 days, the City has implemented a program to test the compost more frequently so that each new batch of compost from a specific Cure Bay is verified by a certified laboratory to meet pathogen bacteria requirements before it is distributed. 5/15/2008 Blosolids Dewatering Facility I MG Biosolids Storage Tank 3,300 ft2 Dewatering Building 2 SernaTech 2-meter belt filter presses The wastewater treatment plant biosolids are dewatered, loaded on a Rotamix truck, transported to the Compost Facility, mixed with chipped yard waste and then composted. I3iosohds Compost I-2 Horizonal Grinder 8 Amendment Building Mohrbark Horizontal Grinder, 40 tons/ hour 2 Rotomix trucks (22 yd.3) & 3 Volvo Loaders Amendment Building, 5,000 ft.2 IPS Compost System �• 4 anpry 11 0 . i i�.. N 'olInrrrr � �:� »:: / 2 «� = 2 �� 2 -°.c = � » �• =� �-. - _.— � . .. .�� \\ «::,�© Finished Compost f Ni A For more Compost Facility information contact: Karen Brashear, Public Utilities Director (919) 735-3329, ext. 101 kbrashear@ci.goldsboro.nc.us