HomeMy WebLinkAboutNCG100054_COMPLETE FILE - HISTORICAL_20190410STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
w Lc f p 0o s y
DOC TYPE
HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑ JQl5 Dy 10
YYYYM M DD
Wi
STORMWATER
April 10, 2019
Sam Cooke
Devore & Cooke Auto Parts
1529 Clinton Road
Fayetteville NC 28302
Dear Mr. Cooke:
On April 10, 2019, a site inspection was conducted at your facility. This facility located at 1529
Clinton Road, Fayetteville, NC drains to the Locks Creek watershed in the Cape Fear River
Basin. A copy of the Compliance Inspection Report is attached for your review and records. At
the time of inspection, no discrepancies were noted.
I would like to thank you for the time and assistance in conducting this inspection. If there are
any questions regarding this report, please contact me directly at (910) 433-1773.
Thank y u,
c.
sse Oxendine
Stormwater Inspector
City of Fayetteville
Attachment: Copy of Compliance Inspection Report
cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources
433 Hay Street Fayetteville, NC 28301-5537
(910) 433-1773 1 www.fayettevillenc.gov I www.faytv7.com
The CRY of Fayettevilte, North Carolina dnus not distriminate on the basis of race, sex, sexual orientation, color, age, national origin,
religion, or disability in its employnicnt opportunities, programs, services, or activities.
Stormwater Facility Inspection Report/Checklist
Facility Name:
Devore & Cooke Auto Parts
Inspection Type:
Compliance
NCG 100059
Permit No.:
NCSQ
Permit EffectiveDate
(if applicable):
Not Applicable
Permit Status
Active
(if not currently permitted):
Inspection
4/10/19
Discharges to:
UT to Locks Creek
Date:
Facility Personnel
Sam Cooke
Inspector(s):
Jesse Oxendine
Assisting with
910-483-2217
Inspection
910-973-8062
(Name/Phone Number):
Entry Time:
8:50
Exit Time:
9AQ
SIC Code:
5095
Facility Hours of
8am — 5pm
Operation:
Facility Description: Used Motor Vehicles
File Review/History:
Inspection Summary: During my inspection, I made observations of the facility and the Stormwater outfalls. The
facility was clean and neat in appearance
This form is a procedural guide for Inspectors to follow when conducting facility stormwater compliance inspections.
Page 1 of 5 Rev. 0
dw
Stormwater Facility Inspection Report/Checklist
I. Site Inspection
Were deficiencies observed with the following items?
(inspector should comment on violations/deficiencies observed)
yes
No
NA
Repeat
Finding
1. Stormwater System: catch basins, open ditches, channels, pipes, outfalls, etc.
❑
®
❑
❑
Comments:
2. Erosion Issues ❑ I
® ❑
❑
Comments:
3. Structural Stormwater BMPs
❑
❑
® ❑
Comments:
4. Illicit Discharges 1 Connections
❑
®
❑
❑
Comments:
5. Aboveground Storage Tanks (ASTs): List size, material type, and if secondary El® El
is provided
El
Comments: Used oil — 200 gallons; Used fuel -250 gallons
6. Underground Storage Tank (UST) Fill Port Area
❑
❑
®
❑
Comments:
7. Outdoor Material Storage Area(s) ❑
®
❑
❑
Comments:
B. Outdoor Processing Area(s)
❑
1 ❑
L ®
I ❑
Comments:
9. Loading/Unloading Area(s)
❑
I ®
❑
❑
Comments:
10. Vehicle/Equipment Area(s): fueling, washing, maintenance, storage
❑ ❑
®
❑
Comments:
11. Oil/Water Separator / Pretreatment
❑
1 ❑
®
❑
Comments:
12. Waste Storage/ Disposal Area(s): scrap metal, dumpsters, grease bins, etc.
❑
®
❑
❑
Comments: Keep lips closed at all times on dumpsters.
13. Food Service Area(s)
❑
L ❑
®
❑
Comments:
14. Indoor Material Storage Area(s) ❑
®
❑
❑
Comments:
15. Indoor Processing Area(s)
❑
®
❑
❑
Comments:
Page 2 of 5 Rev. 0
it
Stormwater Facility Inspection Report/Checklist
L Site Inspection (Continued)
Yes
No
NA
Repeat
Finding
16. Floor drains - illicit connections
❑
Cl
®
❑
Comments:
17. Spill Response Equipment
❑ ®
❑
❑
Comments:
IL Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan (SPPP)?
®
❑ ❑
❑
If the site has a SPPP, then complete questions in Sections 11 and III.
1. Does the Plan include a General Location (USGS) map?
®
❑
❑
❑
Facility location in relation to roads and surface waters. includes: name of receiving stream or name of municipal storm
sewer system, and accurate lat. and long. of point of discharge.
2. Does the Plan include a "Narrative Description of Practices"? ® I
❑
❑ ❑
Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or
control processes, waste disposal practices, etc.
3. Does the Plan include a detailed site map including outfall locations and ®
❑
❑
❑
drainage areas?
Should show
• Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas)
• The drainage structures
• Drainage areas for each outfall and activities occurring in the drainage area
• Building locations
• Existing BMPs and impervious surfaces and the % of each drainage area that is impervious
• For each outfall, a narrative description of the potential pollutants which could be expected to be present in the
stormwater discharge.
This forces permittee to analyze the site with relation to stormwater discharges. it is also a tool for the inspector to
understand if the site has changed over time, i.e. if site map does not match facility they must update their plan.
4. Does the Plan include a list of significant spills occurring during the past 3
®
❑
❑
❑
years?
Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for
wastewater, oil pollution, and SARA Title III.
5. Have stormwater outfalls been evaluated for the presence of non-stormwater
®
El
❑ ❑
discharges?
Signature required:
• Corporation - signed by Responsible Corporate Officer or assigned manager
• Partnership or Sole Proprietorship — General Partner or the Proprietor
Municipality, State, Federal, or other public agency — either principal executive officer or ranking elected off ciai
B. Has the facility evaluated feasible alternatives to current practices?
I ®
I ❑
I ❑
I ❑
• Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage
practices to eliminate or reduce exposure of materials and processes to stormwater.
• In areas where elimination of exposure is not practical, the stormwater management plan shall document the
feasibility of diverting the stormwater runoff away from areas of potential contamination.
7. Does the facility provide all necessary secondary containment?
I ®
1 ❑ 1 ❑
❑
• Applies to liquid raw materials, manufactured products, waste materials, or by-products
• Single AST capacity > 660 gallons
• Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320
Page 3 of 5 Rev. 0
Stormwater Facility Inspection Report/Checklist
A Stormwater Pollution Prevention Plan (continued)
Yes
No
NA
Repeat
Finding
• If connected to SW conveyance; controlled by manually activated valves or other similar devices? (Closed?)
• Collected water observed for color, foam, outfall staining, visible sheens, and dry weather flow prior to release
• Document individual making observation, description of water, date, and time of release
Retain record 5 years
8. Does the Plan include a BMP summary?
® ❑
❑
❑
Narrative description of BMPs to be considered including oil and grease separation, debris control, vegetative filter strips,
infiltration and stormwater detention or retention, where necessary.
The need for structural BMPs shall be based on the assessment of potential sources to contribute significant quantities of
pollutants to stormwater discharges and data collected through monitoring of stormwater discharges.
9. Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®
1 ❑
❑
❑
• Assessment of potential pollutant sources based on materials inventory of the facility
• Facility personnel responsible for implementing the SPRP shall be identified
• Responsible person shall be on -site at all times during facility operations that have the potential to contaminate
stormwater runoff through spills or exposure of materials associated with the facility operations.
10. Does the Plan include a Preventative Maintenance and Good Housekeeping
®
❑
❑
❑
Plan?
• Document schedules of inspections and maintenance activities of stormwater control systems, plant equipment and
systems
• Inspect material handling areas
• Regular cleaning schedules of these areas
11. Does the facility provide and document Employee Training?
® ❑ ❑
❑
• Provide at a minimum, annual training for all personnel including: proper spill response, cleanup procedures,
preventative maintenance activities for all personnel involved in any of the facility's operations that have the
potential to contaminate stormwater runoff
• Develop training schedule and identify facility personnel responsible for implementing the training
12. Does the Plan include a list of Responsible Parties?
®
❑ ❑
❑
Identify position responsible for the overall coordination, development, implementation, and revision of the SPPP
13 Is the Plan reviewed and updated annually?
®
I ❑
I ❑
❑
Have there been any changes to the design, construction, operation, or maintenance of the facility, which would have a
significant effect on the potential for the discharge of pollutants to surface waters? Does plan include changes?
14. Does the Plan include a Stormwater Facility Inspection Program? ®
❑
❑
❑
• Inspect semi-annually at a minimum - once in Fall and once in Spring
• inspection and subsequent maintenance activities performed shall be documented
o Record date and time
o Individual performing inspection
o Narrative description of the stormwater outfall and plant equipment and systems
• Records should be incorporated into the SPPP
Stormwater Pollution Prevention Plan Comments: Update to new General Permit and Individual permit
Page 4 of 5 Rev. 0
Stormwater Facility Inspection Report/Checklist
!!l. Qualitative and Analytical Monitoring
Yes
No
NA
Repeat
Finding
1. Has the facility conducted its Qualitative Monitoring semi-annually?
®
❑
❑
❑
Color Odor Clarity Floating Solids
Suspended solids Foam Oil Sheen Other indicators
2. Has the facility conducted its Analytical Monitoring?
®
❑
❑
❑
3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance
areas?
❑
❑
®
❑
Qualitative and Analytical Monitoring Comments: 2018 sampling was complete; facility had not started 2019 monitoring
yet
IV. Permit and Outfalls
1. Is a copy of the Permit and the Certificate of Coverage available at the site?
®
❑
❑
❑
2. Were all outfalls observed during the inspection?
®
❑
❑
❑
3. If the facility has representative outfali status, has it been documented by the NC
Division of Water Quality?
❑
❑
®
❑
4. If the facility has a No -Exposure Certificate, has the facility self -inspected and
documented this on an annual basis?
❑
❑
®
❑
Permit and Outfalls Comments:
Page 5 of 5 Rev. 0
J
ROY COOPER
Governor
MICHAEL S. REGAN.
Secretary
WILLIAM I- (TOBY) VINSON, JR.
lntertm Director
Devore Cooke Auto Parts Co., Inc.
Attn: Stuart L. Cooke, Owner
1529 Clinton Road
Fayetteville, NC 28312
NORTH CAROLINA
Envlranmental Quality
November 15, 2018
Subject: COMPLIANCE EVALUATION INSPECTION
NPDES Stormwater General Permit 100000
Devore Cooke Auto Parts Co.; Inc.
Certificate of Coverage NCG100059
Cumberland County
Dear Mr. Cooke:
On October 23, 2018, a site inspection,was conducted for the Devore Cooke Auto Parts Co., Inc. facility located
at 1529 Clinton Road, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is
enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES
Stormwater General Permit NCG100000 under Certificate of Coverage NCG100059. Permit coverage
authorizes the discharge of Stormwater from the facility to receiving waters designated as Locks Creek, a Class
C waterbody in the Cape Fear River Basin.
As a result of the inspection, the facility was found to be in compliance with the conditions of the NCG100000
permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations
made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty
assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments,
or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3384 or by
e-mail at Melissa.joyner@ncdenr.gov.
Sincerely,
Melissa Joyner
Environmental Specialist
DEMLR.
Enclosure: Compliance Evaluation Inspection
ec: Charles B. Hoffman, Principal Geologist — Mid -Atlantic Associates, Inc. (via email)
cc: FRO — DEMLR, Stormwater Files-NCG100000
D .y� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Offioe 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
a.w 910.4333300
r
Commliance Inspection Report
Permit: NCG100059 Effective: 11/16117 Expiration: 10/31/18 Owner.- Devore & Cooke Auto Parts Co Inc
SOC: Effective: Expiration: Facility: Devore & Cooke Auto Parts Co Inc
County: Cumberland 1529 Clinton Rd
Region: Fayetteville
Fayeteville NC 28301
Contact Person: Stuart L Cooke Title: Phone: 910-483-2217
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(a):
Related Permits:
Inspection Date: 10/23/2018
Primary Inspector: Melissa A Joyner
Secondary Inspector(a):
Certification:
Phone:
Entry Time: 01:OOPM Exit time: 02:30PM
Phone:
Reason for Inspection: Routine inspection Type: Compliance Evaluation
Permit Inspection Type: Used Motor Vehicle Parts Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
N
Permit: NCG1000$9 Owner - Facility: Devote & Cooke Auto Parts Cc Inc
Inspection Date: 10/23/2018 Inspection Typo: Complianoe Evalusilon Reason for Malt: Routine
Inspection Summary:
Melissa Joyner met with Mr. Stuart (Sam) Cooke, Owner of the Devote Cooke Auto Parts Co., Inc. facility, located in
Fayetteville, NC. The Stormwater Pollution Prevention Plan was reviewed. It was well -organized and appeared to contain the
information which is stipulated in General Permit NCG100000. At the time of the inspection the Solvent Management Plan
and some Qualitative and Analytical monitoring forms from 2013, 2015 and 2018 were not available for review but were later
emailed to Ms. Joyner from Mr. Hoffman with Mid -Atlantic Associates, Inc. Table 9.3 in the Solvent Management Plan should
be completed, including the amount (gallons) of mineral spirits on site during a calendar year. Mr. Cooke subsequently
emailed Ms. Joyner this information.
Outfalls #1 and #2 were inspected. It appeared that sampling was taking place at incorrect locations for these outfalls.
Sampling should occur on the facility property immediately prior to where the water discharges into the creek. The small
basin associated with Outfall #2 needed maintenancewith sediment removal. The facility grounds appeared orderly.
Page: 2
ii r
Permit NCG100059 Owner - Facility: Devare & Cooke Auto Parts Co inc
Inspection Data:.10123/2018 Inspection Type: Compliance Evaluation
Reason for Melt: Routine
Stormwater Pollution Prevention Plan
Yoe No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
M ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
M ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ ❑ ❑
# Does the Plan include a BMP summary?
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
M ❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
M ❑ ❑ ❑
Comment:
Qualitative Monitorina
Yes Na NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ 0
Comment:
An I tic l Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑
Comment:
Permit and Outfalls Yaa I4o_NA, _ME
# Is a copy of the Permit and the Certificate of Coverage available at the site? M ❑ ❑ ❑
# Were all outfalls"observed duffing the inspection? .- - - - _ .. M
� ❑ ❑ ❑
# If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ M ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑
Comment:
Page: 3
STORMWATER
April 11, 2018
Sam Cooke
Devore & Cooke Auto Parts
1529 Clinton Road
Fayetteville NC 28302
Dear Mr. Cooke:
On April 6, 2018, a site inspection was conducted at your facility. This facility located at 1529
Clinton Road, Fayetteville, NC drains to the Locks Creek watershed in the Cape Fear River
Basin. A copy of the Compliance Inspection Report is attached for your review and records.
I would like to thank you for the time and assistance in conducting this inspection. If there are
any questions regarding this report, please contact me directly at (910) 433-1669.
Thank you,
Samantha Taylor
Stormwater Inspector
City of Fayetteville
Attachment: Copy of Compliance Inspection Report
cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources
Twila Josey, Stormwater Administrative Assistant
433 Hay Street Fayetteville, NC 28301-5537
(910) 433-1091 1 www.fiyettevillenc.gov I www.faytv7.com
17ie City of Fayetteville, North Carolina does not diseritninate on the basis of race, sex, sexual orientating, color, age, national origin,
religion, or disability hi its employment opportunities, programs, services, or activities.
Stormwater Facility Inspection Report/Checklist
Facility Name:
Devore & Cooke Auto Parts
Inspection Type:
Compliance
NCG100059
Permit No.:
NCSO
Permit Effective
11/1/2012
Date (if applicable):
Not Applicable
Permit Status
Active
(If not currently permitted):
Inspection
4/6118
Discharges to:
UT to Locks Creek
Date:
Facility Personnel
Inspector(s):
Samantha Taylor
Assisting with
Sam Cooke
Inspection
910-483-2217
(Name/Phone Number):
Entry Time:
10:20
Exit Time:
11:30
SIC Code:
5pg5
Facility Hours of
8-5
Operation:
Facility Description: Used Motor Vehicles
File Review/History:
Inspection Summary: During my inspection, I made observations of the facility and the Stormwater outfalls. The
facility was clean and neat in appearance
This form is a procedural guide for Inspectors to follow when conducting facility stormwater compliance Inspections.
Page 1 of 5 Rev. 0
-`.r
Stormwater Facility Inspection Report/Checklist
1. Site Inspection
Were deficiencies observed with the following items?
(Inspector should comment on violations/deficiencies observed)
Yes
No
NA
Repeat
Finding
1. Stormwater System: catch basins, open ditches, channels, pipes, outfalls, etc.
❑
®
❑
❑
Comments:
2. Erosion Issues
❑
®
❑
❑
Comments:
3. Structural Stormwater BMPs
❑
®
❑
❑
Comments:
4. Illicit Discharges / Connections
❑
®
❑
❑
Comments:
5. Aboveground Storage Tanks (ASTs): List size, material type, and if secondary
containment is provided
❑
1 ®
❑
❑
Comments:
6. Underground Storage Tank (UST) Fill Port Area
❑
❑
®
❑
Comments:
7. Outdoor Material Storage Area(s)
❑
®
❑
❑
Comments:
8. Outdoor Processing Area(s)
❑
®
❑
❑
Comments:
9. Loading/Unloading Area(s)
❑
® ❑
❑
Comments:
10. Vehicle/Equipment Area(s): fueling, washing, maintenance, storage
❑
❑
® ❑
Comments:
11. OiWVater Separator/ Pretreatment
❑
❑
®
❑
Comments:
12. Waste Storage / Disposal Area(s): scrap metal, dumpsters, grease bins, etc.
❑
®
❑ ❑
Comments: Keep lips closed at all times on dumpsters.
13. Food Service Area(s)
❑
❑
®
❑
Comments:
14. Indoor Material Storage Area(s)
❑
®
❑
❑
Comments:
15. Indoor Processing Area(s)
❑
®
❑
❑
Comments:
Page 2 of 5 Rev. 0
1y
stormwater Facility Inspection Report/Checklist
1. Site Inspection (continued)
Yes
No
NA
Repeat
Finding
16. Floor drains - illicit connections
❑
❑
®
❑
Comments:
17. Spill Response Equipment
❑
®
❑
❑
Comments:
I]. Stor►nwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan (SPPP)?
®
❑
❑
❑
if the site has a SPPP then complete questions in Sections II and III.
1. Does the Plan include a General Location (USGS) map?
®
❑
❑
❑
Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm
sewer system, and accurate lat. and long. of point of discharge.
2. Does the Plan include a "Narrative Description of Practices"?
® 1
❑
❑
❑
Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or
control processes, waste disposal practices, etc.
3. Does the Plan include a detailed site map including outfall locations and
®
❑
❑
❑
drainage areas?
Should show
• Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas)
• The drainage structures
• Drainage areas for each outfall and activities occurring in the drainage area
• Building locations
• Existing BMPs and impervious surfaces and the % of each drainage area that is impervious
• For each outfall, a narrative description of the potential pollutants which could be expected to be present in the
stormwater discharge.
This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the inspector to
understand if the site has changed over time, i.e. if site map does not match facility they must update their plan.
4. Does the Plan include a list of significant spills occurring during the past 3
®
❑
❑
❑
years?
Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for
wastewater, oil pollution, and SARA Title III.
5. Have stormwater outfalls been evaluated for the presence of non-stormwater
®
❑
❑
❑
discharges?
Signature required:
• Corporation - signed by Responsible Corporate Officer or assigned manager
• Partnership or Sole Proprietorship — General Partner or the Proprietor
Municipality, State, Federal, or other public agency — either principal executive officer or ranking elected official
6. Has the facility evaluated feasible alternatives to current practices?
®
1 ❑
1 ❑
❑
• Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage
practices to eliminate or reduce exposure of materials and processes to stormwater.
In areas where elimination of exposure is not practical, the stormwater management plan shall document the
feasibility of diverting the stormwater runoff away from areas of potential contamination.
7. Does the facility provide all necessary secondary containment?
®
❑
❑
❑
• Applies to liquid raw materials, manufactured products, waste materials, or by-products
• Single AST capacity > 660 gallons
• Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320
Page 3 of 5 Rev. 0
Stormwater Facility Inspection ReportlChecklist
1L Stormwater Pollution Prevention Plan (continued)
Yes ---
INo
NA
Repeat
Finding
• If connected to SW conveyance; controlled by manually activated valves or other similar devices? (Closed?)
• Collected water observed for color, foam, outfall staining, visible sheens, and dry weather flow prior to release
• Document individual making observation, description of water, date, and time of release
Retain record 5 years
8. Does the Plan include a BMP summary?
®
❑
❑
❑
Narrative description of BMPs to be considered including oil and grease separation, debris control, vegetative filter strips,
infiltration and stormwater detention or retention, where necessary.
The need for structural BMPs shall be based on the assessment of potential sources to contribute significant quantities of
pollutants to stormwater discharges and data collected through monitoring of stormwater discharges.
9. Does the Plan include a Spill Prevention and Response Plan (SPRP)7
1 ® ❑
❑
❑
• Assessment of potential pollutant sources based on materials inventory of the facility
• Facility personnel responsible for implementing the SPRP shall be identified
• Responsible person shall be on -site at all times during facility operations that have the potential to contaminate
stormwater runoff through spills or exposure of materials associated with the facility operations.
10. Does the Plan include a Preventative Maintenance and Good Housekeeping
®
❑
El
ElPlan?
• Document schedules of inspections and maintenance activities of stormwater control systems, plant equipment and
systems
• Inspect material handling areas
• Regular cleaning schedules of these areas
11. Does the facility provide and document Employee Training?
® ❑ ❑ ❑
• Provide at a minimum, annual training for all personnel including: proper spill response, cleanup procedures,
preventative maintenance activities for all personnel Involved in any of the facility's operations that have the
potential to contaminate stormwater runoff
• Develop training schedule and identify facility personnel responsible for implementing the training
12. Does the Plan include a list of Responsible Parties?
I ®
1 ❑ 1 ❑
❑
Identify position responsible for the overall coordination, development, implementation, and revision of the SPPP
13. Is the Plan reviewed and updated annually?
I ® I
❑ 1
❑ ❑
Have there been any changes to the design, construction, operation, or maintenance of the facility, which would have a
significant effect on the potential for the discharge of pollutants to surface waters? Does plan include changes?
14. Does the Plan include a Stormwater Facility Inspection Program?
®
❑
❑
❑
• Inspect semi-annually at a minimum - once in Fall and once in Spring
• Inspection and subsequent maintenance activities performed shall be documented
o Record date and time
o Individual performing inspection
o Narrative description of the stormwater outfall and plant equipment and systems
• Records should be incorporated into the SPPP
Stormwater Pollution Prevention Plan Comments:
Page 4 of 5 Rev. 0
lWl
Stormwater Facility Inspection Report/Checklist
11L Qualitative and Analytical Monitoring
Yes
No
NA
Repeat
Finding
1. Has the facility conducted its Quailtative Monitoring semi-annually?
®
❑
❑
❑
Color Odor Clarity Floating Solids
Suspended solids Foam Oil Sheen Other indicators
2. Has the facility conducted its Analytical Monitoring?
®
❑
❑
❑
3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance
El
El
®
Elareas?
Qualitative and Analytical Monitoring Comments: "No Flow" reported for 2017.
IV Permit and Outfalls
1. Is a copy of the Permit and the Certificate of Coverage available at the site?
®
❑
❑
❑
2. Were all outfalls observed during the inspection?
®
❑
❑
❑
3. If the facility has representative outfall status, has it been documented by the NC
Division of Water Quality?
❑
❑
®
❑
4. If the facility has a No -Exposure Certificate, has the facility self -inspected and
this on an annual basis?
❑
❑
®
El
Permit and Outfalls Comments:
Page 5 of 5 Rev. 0
iy
- !. A
STORMWATER
April 24, 2017
Sam Cooke
Devore & Cooke Auto Parts'
1529 Clinton Road
Fayetteville NC 28302
Dear Mr. Cooke:
On April 20, 2017, a site inspection was conducted at your facility. This facility located at 1529
Clinton Road, Fayetteville, NC drains to the Locks Creek watershed in the Cape Fear River
Basin. A copy of the Compliance Inspection Report is attached for your review and records.
At the time of inspection, this facility was found to be in compliance. I would like to thank you for
the time and assistance in conducting this inspection If there are any questions regarding this
report, please contact me directly at (910) 433-1091.
T you,
Danny rickland
Stormwater Inspector
City of Fayetteville
Attachment: Copy of Compliance Inspection Report
cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources
Twila Josey, Stormwater Administrative Assistant
433 Hay Street Fayetteville; NC 28301-5537
(910) 433-1091 1 www.fayettevillenc.gov I www.faytv7.com
The City of Fayetteville, North Carolina does not discritninate w the basis of race, sex, sexual orientation, color, age, national orlgln,
religion, or disability in its employment opportunities, programs, services, or activities,
Stormwater Facility Inspection Report/Checklist
Facility Name:
Devore & Cooke Auto Parts
Inspection Type:
Compliance
NCG100059
Permit No.:
NC50
Permit Effective
1111I2012
Date (if applicable):
Not Applicable
Permit Status
Active
(If not currently permitted):
Inspection
a120117
Discharges to:
UT to Locks Creek
Date:
Facility Personnel
Inspector(s):
Danny Strickland
Assisting with
Sam Cooke
Inspection
910-483-2217
(Name/Phone Number).
Entry Time:
1:20 PM
Exit Time:
1:45 PM
SIC Code:
5095
Facility Hours of
8-5
Operation:
Facility Description: Used Motor Vehicles
File Review/History:
Inspection Summary: During my Inspection, 1 made observations of the facility and the Stormwater outfalls. The
facility was clean and neat in appearance
Page 1 of 6 Rev. 0
Stormwater Facility Inspection Report/Checklist
This form is a procedural guide for Inspectors to follow when conducting facility stormwater compliance Inspections.
Page 2 of 6 Rev. 0
Stormwater Facility Inspection Report/Checklist
1. Site Inspection
Were deficiencies observed with the following items?
(Inspector should comment on viofatrons/deficierrcies observed)
Yes
No
NA
Repeat
Findin 8
1. Stormwater System: catch basins, open ditches, channels, pipes, outfalls, etc.
❑
®
❑
❑
Comments:
2. Erosion Issues
❑
®
❑
❑
Comments:
3. Structural Stormwater BMPs
❑
®
❑
❑
Comments:
4. Illicit Discharges 1 Connections
I ®
❑
❑
Comments:
5, Aboveground Storage Tanks (ASTs): List size, material type, and if secondary
containment is provided
❑ ®
❑
Comments:
B. Underground Storage Tank (UST) Fill Port Area
❑
❑
®
❑
Comments:
7. Outdoor Material Storage Area(s)
❑
®
1 ❑
1 ❑
Comments:
8. Outdoor Processing Area(s)
❑
®
❑
❑
Comments:
9. Loading/Unloading Area(s)
❑
®
❑
❑
Comments:
10. Vehicle/Equipment Area(s): fueling, washing, maintenance, storage
❑
❑
®
❑
Comments;
11. Oil/Water Separator 1 Pretreatment
❑
❑
®
❑
Comments:
12. Waste Storage I Disposal Area(s): scrap metal, dumpsters, grease bins, etc.
❑
® ❑ I
❑
Comments: Keep lips closed at all times on dumpsters.
13. Food Service Area(s)
❑
❑
®
❑
Comments:
14. Indoor Material Storage Area(s)
❑
®
❑
❑
Comments;
15. Indoor Processing Area(s)
❑ ®
❑
❑
Comments:
Page 3 of 6 Rev. 0
Stormwater Facility Inspection Report/Checklist
1. Site Inspection (continued)
Yes
No
NA
Repeat
Finding__
16. Floor drains — Illicit connections
❑
❑
®
❑
Comments:
17. Spill Response Equipment
❑
®
❑
❑
Comments:
11. Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan (SPPP)?
®
❑
❑
❑
If the site has a SPPP then complete yuestions in Sections 11 and III
1, Does the Plan include a General Location (USGS) map? ®
❑
❑
❑
Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm sewer
system, and accurate lat. and long, of point of discharge.
2. Does the Plan include a "!Narrative Description of Practices"?
®
❑ ❑ ❑
Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or control
processes, waste disposal practices, etc.
3. Does the Plan include a detailed site map including oulfall locations and drainage
®
ElEl
Elareas?
Should show
• Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas)
• The drainage structures
• Drainage areas for each oulfall and activities occurring in the drainage area
• Building locations
• Existing BMPs and Impervious surfaces and the % of each drainage area that is impervious
• For each oulfall, a narrative description of the potential pollutants which could be expected to be present in the
stormwater discharge.
This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the Inspector to understand
if the site has changed over time, i.e. if alto map does not match facility they must update their plan.
4. Does the Plan Include a list of significant spills occurring during the past 3 years? I
X I
❑ 1
❑
❑
Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for
wastewater, oil pollution, and SARA Title III,
6. Have stormwater outfalls been evaluated for the presence of non-stormwater
®
❑
❑
❑
discharges?
Signature required:
• Corporation - signed by Responsible Corporate Officer or assigned manager
• Partnership or Sale Proprietorship -- General Partner or the Proprietor
Municipality, State, Federal, or other public agency — either principal executive ofBcor or ranking elected official
B. Has the facility evaluated feasible alternatives to current practices? I
®
❑ ❑
❑
• Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage
practices to eliminate or reduce exposure of materials and processes to stormwater.
• In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility
of diverting the stormwater runoff away from areas of potential contamination.
7. Does the facility provide all necessary secondary containment?
® I
❑
F ❑
❑
• Applies to liquid raw materials, manufactured products, waste materials, or by-products
• Single AST capacity > 660 gallons
• Multiple AS containers In close proximity to each other with a total combined capacity of �" 1,320
Page 4 of 6 Rev. 0
Stormwater Facility Inspection Report/Checklist
11, Stormwater Pollution Prevention Plant (continued)
Yes No
NA
I Repeat
Finding
• If connected to SW conveyance; controlled by manually activated valves or other similar devices? (Closed?)
• Collected water observed for color, foam, outfall staining, visible sheens, and dry weather flow prior to release
• Document individual making observation, description of water, date, and time of release
Retain record 5 years
8. Does the Plan include a BMP summary?
❑
❑
❑
Narrative description of BMPs to be considered including oil and grease separation, debris control, vegetative filter strips,
Infiltration and stormwater detention or retention, where necessary.
The need for structural BMPs shall be based on the assessment of potential sources to contribute significant quantities of
pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. -
9, Does the Plan include a Spill Prevention and Response Plan (SPRP)7
®
❑ ❑ ❑
• Assessment of potential pollutant sources based on materials inventory of the facility
• Facility personnel responsible for implementing the SPRP shall be identified
• Responsible person shall be on -site at all times during facility operations that have the potential to contaminate
stormwater runoff through spills or exposure of materials associated with the facility operations.
10. Does the Plan include a Preventative Maintenance and Good Housekeeping
®
❑
❑
❑
Plan?
_t
_L
• Document schedules of inspections and maintenance activities of stormwater control systems, plant equipment and
systems
• Inspect material handling areas
• Regular cleaning schedules of these areas
11. Does the facility provide and document Employee Training?
®
1 ❑
❑
❑
• Provide at a minimum, annual training for all personnel including: proper spill response, cleanup procedures,
preventative maintenance activities for all porsonnel Involved in any of the'facility's operations that have the
potontlal to contaminate stormwater runoff
• Develop training schedule and identify facility personnel responsible for implementing the training
12, Does the Plan include a list of Responsible Parties?
®
❑
❑ ❑
Identify position responsible for the overall coordination, development, implementation, and revision of the SPPP
13. Is the Pion reviewed and updated annually? I
® I
❑
❑
❑
Have there been any changes to the design, construction, operation, or maintenance of the facility, which would have a
significant effect on the potential for the discharge of pollutants to surface waters? Does plan Include changes?
14. Does the Plan include a Stormwater Facility Inspection Program?
®
❑
❑
❑
• Inspect semi-annually at a minimum - once in Fall and once in Spring
• Inspection and subsequent maintenance activities performed shall be documented
o Record date and time
o Individual performing inspection
o Narrative description of the stormwater outfall and plant equipment and systems
• Records should be incorporated Into the SPPP
Stormwater Pollution Prevention Plan Comments:
Page 5 of 6 Rev. 0
Stormwater Facility Inspection Report/Checklist
ill. Qualitative and Analytical Monitoring
Yes
No
NA
Repeat
Finding
1. Has the facility conducted its Qualitative Monitoring semi-annually?
®
❑
❑
❑
Color Odor Clarity Floating Solids
Suspended solids Foam Oil Sheen Other Indicators
2, Has the facility conducted Its Analytical Monitoring?
®
❑
❑
❑
3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance
areas?
❑
❑
®
❑
Qualitative and Analytical Monitoring Comments: "No Flow" reported for 2016.
I K Permit and Outfalls
1. Is a copy of the Permit and the Certificate of Coverage available at the site?
®
❑
❑
❑
2. Were all outfalls observed during the Inspection?
®
❑
❑
❑
3, If the facility has representative outfall status, has it been documented by the NC
of Water Quality?
❑
❑
®
El
4, If the facility has a No -Exposure Certificate, has the facility self -Inspected and
documented this on an annual basis?
❑
❑
z
El
Permit and Outfalle Comments:
Page 6 of 6 Rev. 0
...... Cityof .. _
Engineering & Infrastructure
Stormwater Division
March 17, 2015
Sam Cooke
Devore & Cooke Auto Parts
1529 Clinton Road
Fayetteville NC 28302
Dear Mr. Cooke:
433 Hay Street
Fayetteville, NC 28301-5537
(910)433-1613
wwwxityoffhyetteville,org
On March 9, 2015, a site inspection was conducted for compliance with your facility located at
1529 Clinton Road, Fayetteville, NC. This facility drains to the Locks Creek watershed in the
Cape Fear River Basin. This facility has been granted a Certificate of Coverage, NCG100059
under the NPDES General Permit NCG100000 for stormwater discharge. A copy of the
Compliance Inspection Report is attached for your review and records. The following item was
addressed during the inspection.
• If no discharge occurs during the sampling period, the permittee must submit a
monitoring report indicating "No Flow" or "No Discharge" within 30 days of the end of the
sampling period. (Part 11 Page 6 of 10)
At the time of inspection, this facility was found to be in compliance with your permitted
Certificate of Coverage. I would like to thank you for the time and assistance in conducting this
inspection. If there are any questions regarding this report, please contact me directly at (910)
433-1091.
Thank youaandL��
anny tri
Stormwater Inspector
City of Fayetteville
Attachment: Copy of Compliance Inspection Report
cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources
Nikkia Benitez, Stormwater Administrative Assistant
ifil-m-YO.- i
The City of Nyettevi Ile, North Carolina does not discriminate on the basis of race, sex, color, age, national origin,
religion, or disability in Its employment opportunities, programs, services, or activities.
i
4
Ind iFFMaTUCCompliance Mpec~ ior>I eport j
i
Permit #: Effective: L L&___ - - Expit-fition: !a• 31- /7 ^�— Owner.j.�1 c�r�a -�a kc, -- --
SIC: Sal 5 Itacillty: &Vj2.w I t�oo_ke— /,[,1) AeO / _......... i
Contact Person: _ Sc+M Co 6 _- Title: Ot/, iuz Phone:
Facility Address:,
Inspection Datc; e: Exit Time:
Primary Inspector: 17 /I �� 1 � Phone:
Reason for Inspection: &Inv a ! _ _ Inspection Type:
Permit Inspection Type: } hWi7d �ese.L,n; cc— usGL !9,/l �rrs
-YKS- LLl7
M:`,
Facility Status: Compliant I'Not Compliant
Question Areas: _ ]�
rStorm water '
NoteslComnients:
'
I�
IiI
I
{
339 ALEXANDER STREET
FAYETTEVILLE_, NC 29301-5797
(910) 433-1660/1661 - VAX (914) 433-1647 1
www.cityofrayettevilla.org
An Equal Opportunity Employer
Pcnnit: Owner —Facility: t.
lnspectlon Date: Inspection Type:
Reason for Visit: Routine
5ioranvaler Pollutlon Prevention Pie
Yes
# Does the site have a StormwRter Pollution Prevention Plan?
❑
❑
❑
# Does the Plan Include a General Location (USGS) map?
n ❑
❑
❑
Ll/ ID
❑
❑
# Does the Plan Include a "Narrative Description of Practices"?
# Does the Plan Include a detailed site map including outfall locations and drainage areas?
K�/❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years? qa "s(t 115
El' ❑
❑
[]
0-, ❑
❑
❑
# Has the facility, evaluated feasible alternatives to current praotit:es?
❑
❑
❑
# Does the facility provide all necessary secondary contairvnent?
# Does the Plan include aBNfPsummaryr?
KI--❑
❑
❑
# Does the Plan include a Split Prevention and Response Plan (SPRP)?
9�_❑
❑
❑
i
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
ET' ❑
❑
❑ '
# Does, the facility provide and document Employee Training? 2 " / f'.. / S"
✓�� ❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
Pr ❑
❑
❑
# Is the Plan reviewed and updated annually?
t'�'G O
❑
❑
# Does the Plan include a Storniwater Fact]Ity Inspection Program? 2" Cj' "!f�/
❑
❑
C1
# Has the 5tonnvvater Pollution Prevention Plan been Implemented? ?— 27./r
u ❑
❑
❑
Comment:
Qunlitntive IlfonitoD!jMg
# Has the facility conducted its Qualitative Monitoring seml-annually? 9., 27 _I S•
�❑
❑
❑
Comment:. ...
❑ ❑
AiWyticrtl Monitoring
# klas the facility conducted its Analytical monitoring? N.
# Has the facility conducted Its Analytical monitoring from Vehicle Maintenance areas?
❑ ❑
P41,1111t and Ontfiffla
# is a copy of the Permit and the Certificate of Coverage available at the site?
Fr' ❑
❑
❑
# Were all outfalls observed during the inspectien7
❑
❑
❑
has representative-outthll stetus;'is"it �rn�'ertj� documaotcd liy Ytia Dlv�ton?—"
--
❑�/ ❑
Q
# Has the facility evaluated all illicit (non storm water) discharges?
jL ❑
❑
❑
Comments:
4r r
+�I
NCDE�lR
North Carolina Department of Environment and
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P. E.
Governor Director
December 4, 2012
Stuart Cooke
Devore & Cooke Auto Parts Co Inc
PO Box 230
Fayetteville, NC 28301
Natural Resources
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Devore & Cooke Auto Parts Co Inc
COC Number NCG100059
Cumberland County
Dear Permittee:
In response to your renewal application for continued coverage under Stormwater General Permit NCG100000
the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit-
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Foct Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wg/wsZsulcurrent-
notices), or in the Response to Comments / Summary of Chonges and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N, Salisbury St, Raleigh, North Carolina 27604
Phone: 919.807-63001 FAX 919-807 9492
Internet: v:;yw.ncwaterqualitr.orq
An Equal C, ,Pnrlunily k Affirmative Action F :,PIL yor
Nne
orthCarolina
Naturally
Stuart Cooke
December 4, 2012
Page 2 of 2
Some of the changes include:
Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections B, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/i for HQW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections B, C: The monitoring parameter Oil & Grease (0&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections 8, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on -site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections B, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. if you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-5300.
Sincerely,
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Fayetteville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100059
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Devore & Cooke Auto Parts Co Inc
is hereby authorized to discharge stormwater From a facility located at:
Devore & Cooke Auto Parts Co Inc
1S29 Clinton Rd
Fayetteville
Cumberland County
to receiving waters designated as Locks Creek, a class C waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts 1, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 4, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 41h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
October 20, 2012
Mr Sam Cooke
Devoure & Cooke Auto Recyclers
1529 Clinton Rd
Fayetteville, NC 28301
Subject: Compliance Inspection for Stormwater Discharge Permit
Mr Cooke;
On October 15, 2012 a site inspection was conducted on your facility located at 1529
Clinton Rd in Fayetteville, NC. This facility is covered under the Certificate of Coverage-
NCG100059 issued by the State of North Carolina for stormwater discharge. A copy of
the field report completed during this inspection is enclosed for your records. There were
two items that need attention as a result of this inspection.
l . Training records for the past calendar year were not available at the time of
inspection.
2. Qualitative reports for the July -Dec 2011 and Jan- June 2012 period were not
available for review. In discussing this issue it was determined the qualitative
monitoring was not completed as you thought the qualitative monitoring was done
only with analytical monitoring. As explained the qualitative monitoring is still
required semi-annually as part of your stormwater discharge permit.
It was noted that the physical aspects of your facility are well kept and in compliance
with your permit. All storage of vehicles, parts, mercury switches and disposable fluids
are handled properly. I would like to thank you and your staff for time and assistance in
conducting the inspection. Please contact me if there are any questions regarding this
report.
Sincerely,
Dennis Miller
Fayetteville Stormwater Inspt.
Ph # 910-433-1655
Fax # 910-433-1647
dmiller@ci.fay.nc.us
339 ALEXANDER STREET
FAYETTEVILLE, NC 28301-5797
(910) 433-1660/1661 • FAX (910) 433-1647
ww"'xityuffayeuevi lle.org
An Equal opportunity Employer
Indus rIa ompliance Inspecuon Report j
S
I
Permit N: 61G G 1000 61 Effective: - -DO-JOOj Expiration: Owner: -iQ42 &,Ok:
SICI ,.gol.3 _ Facility: Ai.
Contact Person: —� n M C.oa ty, _ '' nn ��//_ Tiit��le: lltOw6j� er' Phonel
Faclllty Address: J S a-6[ C i 1 al�e„a. _K.X KA-h 4g vto6ln NG
Inspection Date: , _0 15 -O-bf Entry 11rue: , 10 a„v., Exit Time:
Primary inspectors ► Phone:
Reason for Inspection: �6d1♦ a� Inspection Type:
Permit Inspection Type: 1 S�nr n►,L✓TY 1_It lrrAl r . 11ACAP MJ.,
Facility Status: Compliant ❑ Not Compliant
Question Areass
Pp Storsn water
Notes/Comments;
339 ALEXitOER MEAT
FAYETTEVILL6, NC 29301.3797
(910)433.1660/1661 * FAX (910) 433.1647
www.ellyofreyetieville.org
An 6que1 Opporluntly Employer
Pennit: Owner—Faolilty: ..
Inspection Data: Inspection Type:
Reason ibr Visit: Routine
SjgrmweterPoPolwlonhW1ttiQnPlan
# Does Ibe slte have a Stormtvater Pollut[on Prev011on Plan?
Yes
No
NA_
_Nfl
❑
❑
❑
# Does the Plan Include a beneral Location (USGS) map?
❑
❑
❑
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan Include it detailed site reap Including outtall locations and drainage areas?
no
❑
❑
❑
# Does the Plan Include a list of significant spills occurring during the past 3 years?
❑
❑
W
❑
# Has the facility evaluated Feasible alternatives to current practices?
N
❑
❑
❑
❑
❑
a
❑
# Does the facility provide all necessary secondary containment?
# Does the Plan include a SIAP swwary?
10
❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
❑
❑
-4 Doss the Plan Include a Preventative, Maintenance and Good Housekeeping Plan?
❑
❑
❑
# DoeS the facility provide and document Employee Training?
■
❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
N
Q
❑
❑
# Is the plan reviewed and updated annually?
❑
Q
❑
❑
# Does the Plan Include a Stomiwaler Facility Inspection Program?
❑
❑
❑
# Has the Stonmvater Pollution Prevention Plan been Implemented?
❑
❑
❑
Comment.
Oualftttfiva i4fenttoring
# Has the facility conducted its Qualitative Monitoring semi-annually?
❑
41
❑
❑
Comment, No monitoring records were on hand when 1 conducted my fnspccilon. �o t-c a
��-;o_t�
❑
❑
❑
❑
Analylly.91, ltorin4 ttr�ee.
# Has the facility conducted Its Analytical monitoring?
❑
❑
❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑
❑
0
❑
rermit flioufflus
# Is a copy of the Permit and the Certificate of Coverage available at the site?
❑
❑
[]
# Were all outfalls observed during the Inspection?
r
❑
❑
❑
# if the facility has representative oulfall status, Is it properly documented by The Division?
❑
❑
0
❑
# Has the facility evaluated all illicit (non storm water) discharges?
0
0
❑
Comments:
�r�wrrwrnr��
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
September 7, 2011
Stuart L. Cooke
Devore Cooke Auto Parts Co., Inc.
1529 Clinton Road
Fayetteville, NC 28312
Subject: COMPLIANCE EVALUATION INSPECTION
Stuart L. Cooke
Devore Cooke Auto Parts Co., Inc.
NPDES Stormwater General Permit- NCG100059
Cumberland County
Dear Mr. Cooke:
Dee Freeman
Secretary
On September 6, 201.1, I, Trent Allen from the Fayetteville Regional Office of the Division of Water
Quality, conducted a site inspection at the Devore Cooke Auto Parts Co., Inc. Facility located at 1529 Clinton
Road, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your
review. Stormwater from this facility drains to Locks Creek located in the Cape Fear River Basin. The site visit
and file review revealed that the subject facility is covered by NPDES Stormwater General Permit-NCG100059.
Accordingly, the following observations were noted during the Division of Water Quality inspection:
1) Stormwater Pollution Prevention Plan (SPPP)
A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded, and properly implemented.
[Yes ■ No❑
2) Qualitative Monitoring
Qualitative monitoring has been conducted and recorded in accordance with permit requirements.
es■ No❑
3) Analytical Monitoring
Analytical monitoring has been conducted and recorded in accordance with permit requirements.
yes No❑
Location: 225 Green Street, Suite 714. Fayetteville, North Carolina 28301 One
Phone: 910-433-33001 FAX: 910.486-07071 Customer Service: 1.877-623-6748 North Caro fi na
Internet: www.ncwaterquality,org NaturallY
An Equal Opportunity l Affirmative Action Employer
Other Observations:
Please refer to the enclosed Compliance Inspection Report for additional comments and observations made
during the inspection.
Please be advised that violations of the NPDES General Permit are subject to a civil penalty
assessment of up to $25,000 per day for each violation. If you or your staff has any questions, comments, or
needs assistance with understanding any aspect of your permit, please do not hesitate to contact me at (910)
433-3300.
Sincerely,
Trent Allen
Environmental Engineer
Enclosure
cc: FRO -Surface Water Protection
NPS-Assistance & Compliance Oversight Unit
DWQ Central Files
Locat€on: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301 One Phone: 910.433-3300 \ FAX: 910.486.0707 � Customer Service: 1.877.623.6748 NbfthCarolina
€ntemeL• www.ncwaterquality,org rtttrrrr!!J
An Equal Opportunity 1 Affirmative Action Employer
f Compliance Inspection Report
Permit: NCG100059 Effective: 11/01/07 Expiration: 10/31/12 Owner: Devore & Cooke Auto Parts Co Inc
SOC: Effective: Expiration; Facility: Devore & Cooke Auto Parts Co Inc
County: Cumberland 1529 Clinton Rd
Region: Fayetteville
Fayetteville NC 28301
Contact Person: Stuart L Cooke Title: Phone: 910-483-2217
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Elate: 0910612011 Entry Time: 08:50 AM Exit Time: 09:45 AM
Primary Inspector: Trent Allen r. Phone: 910-433-3300
Seery Inspector(s): ,
�'Eee• '����' Mike Lawyer% Phone: 910-433-3300 Ex117_ 3
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Used Motor Vehicle Parts Stormwater Discharge CDC
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
■ Storm Water
(See attachment summary)
Page. 1
W 1. . '%
Permit: NCG100059 Owner - Facility: Devore & Cooke Auto Parts Co Inc
Inspection Date: 09/0612011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Mr. Cooke has installed secondary containment around the fuel tank.
The qualitative and analytical monitoring is now being conducted.
On the day of the inspection the site appeared neat and well kept.
Page: 2
Permit: NCG100059 Owner - Facility: Devore & Cooke Auto Parts Co inc
Inspection Date: 09/06/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
■
❑
❑
❑
# Does the Plan include a General Location (USGS) map?
■
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices"?
■
❑
❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
❑
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
■
❑
❑
0
# Does the facility provide all necessary secondary containment?
■
❑
❑
❑
# Does the Plan include a BMP summary?
■
❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
❑
❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
❑
❑
❑
# Does the facility provide and document Employee Training?
■
❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
■
❑
❑
❑
# Is the Plan reviewed and updated annually?
■
❑
❑
Cl
# Does the Plan include a Stormwater Facility Inspection Program?
■
n
n
❑
Has the Stormwater Pollution Prevention Plan been implemented?
■
❑
❑
❑
Comment:
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
■
❑
❑
❑
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
■
❑
Cl
❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Cl
❑
■
Cl
Comment:
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
■
❑
❑
0
# Were all outfalls observed during the inspection?
■
❑
n
❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
0
■
❑
# Has the facility evaluated all illicit (non stormwater) discharges?
■
n
n
n
Comment:
Page. 3
DeVore Cooke Auto Parts Co., Inc.
1529 Clinton Road
Fayetteville, NC 28312
Phone (910) 483-2217 Fax (910) 486-4753
July 9, 2007
Division Of Water Quality
225 Green Street
Suite 714
Fayetteville, North Carolina 28301
DeVore Cooke Auto Parts Co., Inc.
1529 Clinton Road
Fayetteville, North Carolina 28312
To Whom It May Concern:
RECEIVED
PUBLIC WATER SUppLy SECTION
JUC 1 0 �007
FAI LTTL �TL�' REGIONAL, OFFICE
This letter is in response to the notice received related to the June 4, 2007 inspection.
Unfortunately, we have not been able to obtain the requested water sample due to the lack
of rainfall in our area. Hopefully, within the next 30 days we will be able to obtain the
needed sample. Microbac of Fayetteville has been contacted at 910-864-1920 about doing
the analytical test, Currently, we have our test kit and are awaiting enough rainfall.
I would like to request that Mr. Chad Turlington contact us at 910-483-2217 in reference
to the secondary containment around the fuel tank. Your attention to these matters is
greatly appreciated. If you have any questions please feel free to contact me at 910-483-
2217 between the hours of 8-5.
Sincerely,
C�N
-�'PL
(01c—
r
Stuart L. Cooke
Owner
�0F WA TFRQ
�O
> iy
0 lii1114W1<
STUART L COOKE
DEVORE & COOKE AUTO PARTS CO INC
PO BOX 230
FAYETTEVILLE, NC 28301
Dear Permittee:
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
August 23, 2002
Alan W. Klimek, P.E., Director
Division of Water Quality
l
t 9 2002
�-
Subject: NPDES Stormwater Permit Renewal
DEVORE & COOKE AUTO PARTS CO INC
COC Number NCG 100059
Cumberland County
In response to your renewal application for continued coverage under general permit NCG 100000, the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute.] 43-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
* A new Certificate of Coverage
* A copy of General Stormwater Permit NCO 100000
* A copy of the Analytical Monitoring Form (DMR)
* A copy of a Technical Bulletin for the general permit
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which-may.be required by DENR•or relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law, rule, standard,- ordinance, order; judgment, or
decree.
If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater
and General Permits Unit at (919) 733-5083, ext. 578
Sincerely,
Bradley Bennett, Supervisor
Stormwater and General Permits Unit
cc: Central Files
Stormwater & General Permits Unit Files
Fayetteville Regional Office
���
NCDENR
N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service
1. 800.623-7748
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
o�a� wArFRpG
co r
STUART L COOKE
DEVORE & COOKE AUTO PARTS CO
PO BOX 230
FAYETTEVILLE, NC 28301
Dear Permittee:
Gregory J. Thorpe, Ph.D.
Acting Director
Division of Water Quality
December 27, 2001
Subject: NPDES Stormwater Permit Renewal
DEVORE & COOKE AUTO PARTS CO
COC Number NCG100059
Cumberland County
Your facility is currently covered for stormwater discharge under General Permit NCG100000. This permit expires
on August 31, 2002. The Division staff is currently in the process of rewriting this permit and is scheduled to have
the permit reissued by late summer of 2002. Once the permit is reissued, your facility would be eligible for
continued coverage under the reissued permit.
In order to assure your continued coverage under the general permit, you must apply to the Division of Water
Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in
advance that your permit will be expiring. Enclosed you will find a General Permit Coverage Renewal
Application Form. The application must be completed and returned by March 4, 2002 in order to assure continued
coverage under the general permit.
Failure to request renewal within this time period may result in a civil assessment of at least $250.00. Larger
penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility
without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and
could result in assessments of civil penalties of up to $10,000 per day.
Please note that recent federal legislation has extended the "no exposure exclusion" to all operators of industrial
facilities in any of the 11 categories of "storm water discharges associated with industrial activity," (except
construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facilty industrial
materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional
information contact the Central Office Stormwater Staff member listed below or check the Stormwater & General
Permits Unit Web Site at http://h2o.enr.state.ne.us/su/stormwater.htm]
If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed
Rescission Request )Form. Mailing instructions are listed on the bottom of the form. You will be notified when the
rescission process has been completed.
If you have any questions regarding the permit renewal procedures please contact Ricky Revels of the Fayetteville
Regional Office at 910-486-1541 or Aisha Lau of the Central Office Stormwater Unit at (919) 733-5083, ext. 578
Sincerely,
Bradley Bennett, Supervisor
Stormwater and General Permits Unit
cc: Central Files
Fayetteville Regional Office .
NCDENR
N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service
1-800-623.7748
�F W A rF9!chael F. Easley, Governor
�� '✓ .. illiam G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
June 6, 2007
CERTIFIED MAIL: 7001 2510 0000 6682 9830
RETURN RECEIPT REQUESTED
Stuart L.'Cooke
Devore & Cooke Auto Parts Co. Inc.
P.O. Box 230
Fayetteville, NC 28301
Subject: NOTICE OF VIOLATION
Stuart L. Cooke
Devore & Cooke Auto Parts Co. Inc.
NPDES Stormwater General Permit-NCG100059
Cumberland County
Dear Mr Cooke:
On June 4, 2007, Chad Turlington from the Fayetteville Regional Office of the Division of
Water Quality, conducted a site inspection for the Devore & Cooke Auto Parts Co. Inc. facility located
at 1529 Clinton Road in Fayetteville, Cumberland County, North Carolina. A copy of the inspection
report is enclosed for your review. Your time and assistance during this inspection is greatly
appreciated. Stormwater from the facility drains to Locks Creek, a Class C waters located in the Cape
Fear River Basin. The site visit and file review revealed that the subject project is covered by NPDES
Stormwater General Permit-NCG100059.
Accordingly, the following observations and/or permit conditions violations were noted during
the Division of Water Quality inspection:
1) Stormwater Pollution Prevention Plan (SPPP)
A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded, and properly
implemented.
es X No ❑
2) Qualitative Monitoring
Qualitative monitoring has been conducted and recorded in accordance with permit requirements.
es ❑ No X
3) Analytical Monitoring
Analytical monitoring has been conducted and recorded in accordance with permit requirements.
Yes ❑ No X
No rolina
X&ra!!;
North Carolina Division of Water Quality 225 Green Street -Suite 714 Fayetteville, NC 28301 Phone (910) 433.3300 Customer Service
Internet: www.ncwateroual' .or Fax (910) 486-0707 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer — 50% Recycledl10% Post Consumer Paper
Page 2
Devore & Cooke Auto Pans}\ o. Inc.
June 6, 2007
Other Observations:
It is recommended that secondary containment be provided for the fuel storage tank at the facility.
Requested Response:
You are asked to respond to this office, in writing, within 30 days from the receipt of this report. Your
response should include a plan of action to address the aforementioned violations and observations
(satisfying the qualitative and analytical monitoring requirements) as well as a reasonable time frame
that you expect to be in full compliance with the conditions of the general permit.
Thank you for your attention to this matter. This office requires that the violations, as detailed
above, be properly resolved. These violations and any future violations are subject to a civil
penalty assessment of up to $25,000 per day for each violation. Should you have any questions
regarding these matters, please contact Chad Turlington at (910) 433-3320
Sincerely, ll
Belinda S. Henson
Regional Supervisor
Surface Water Protection Section
Addendum
Enclosure: Inspection Report
cc: FRO-DWQ
Danny Smith-NPS-Assistance & Compliance Oversight Unit
Water Quality Central Files
m
ru
°a Postage
$
, n Certified Fee
Postmark
C3 Return Receipt Fee
Here
Ip (Endorsement Required}
a
¢ Restdcted Delivery Fee
(Endorsement R-- '--
C3 ra Total Postai Stuart_ L, Cooke
n Sent To llevore & Cooke Auto Parts Co. Inc.
r-4 Street, Apt-N P.O, Box 230
o °r�oeQx"° 1"ayetteville, NC 28301
I
V
ADDENDUM
The National Pollutant Discharge Elimination System (NPDES) program was established under the
federal Clean Water Act and then delegated to the Division of Water Quality for implementation in
North Carolina. The NPDES permitting program for stormwater discharges was established in 1990.
Phase I focuses on site and operations planning to reduce pollutant sources.
Through the NPDES permitting program industrial facilities that fall into one of the subject ten
categories are required to obtain permit coverage under a general permit or an individual permit,
depending upon the facilities SIC code and the industrial activity occurring at the facility. There are
currently 19 active general stormwater permits in North Carolina. One condition that is applicable to
both the general permits and individual stormwater permits is the requirement to develop and implement
site -specific comprehensive stormwater pollution prevention plans (SPPP). These plans are required to
include a comprehensive evaluation of the site and operations to reduce pollutant sources and prevent
pollutant discharge.
Copies of the general permits and accompanying documents can be accessed from the following
webpage: http://h2o.enr.state.nc.us/su/Forms—Documents.htm Permit text, technical bulletins, discharge
monitoring forms, and a Notice of Intent [which is the application of for coverage under a NPDES
General Stormwater Permit] can be found at this web site.
The following items are a subset of permit requirements and are listed to assist you and help bring your
attention to certain permitting issues, process and condition requirements of your permit. That said;
please see the above -mentioned web site in order to obtain a copy of the permit such that you may fully
comply with all the conditions therein. Failures to properly comply with conditions of the permit,
like those bulleted below, constitutes violations and are subject to a civil penalty assessment of up
to $25,000.00 per day, per violation.
• Industrial facilities that fall into one of the subject ten categories are required to obtain permit
coverage under a general NPDES stormwater permit or an individual NPDES stormwater permit
• All persons desiring to have facilities covered by a General Permit must register with the
Division of Water Quality (DWQ) by the filing of a Notice of Intent (NOI) and Applicable Fees.
• This Notice of Intent (NOT) must be submitted and a Certificate of Coverage issued prior to any
discharge of stormwater associated with the industrial activity, process wastewater, and/or mine
dewatering.
• Once the Notice of Intent is received, DWQ will review and determine whether a Certificate of
Coverage (COC) may be issued. If this Certificate of Coverage is issued the facility is covered
by the General Permit. That is, the permittee is authorized to discharge stormwater, process
wastewater, and/or mine dewatering pursuant to the type of General Permit until the permit
expires or is modified or revoked.
• Any other point source discharge to surface water of the state is prohibited unless it is an
allowable non-stormwater discharge or is covered by another permit, authorization or approval.
• There are currently 19 active general permits. Permit conditions vary accordingly; however, most
of the permits have following condition requirements (you must read your entire permit to ensure
full compliance):
o Development and compliance with the Stormwater Pollution Prevention Plan
o Collection, reporting, and recording of Analytical Monitoring
o Collection, reporting and recording of Qualitative Monitoring
o Collection, reporting and recording of Vehicle Maintenance Monitoring
o Records — Visual monitoring shall be documented and records maintained at the facility
along with the Stormwater Pollution Prevention Plan. Copies of the analytical monitoring
results shall also be maintained on -site. The Permittee shall retain records of all
monitoring information, including all calibration and maintenance records and all original
strip chart recordings for continuous monitoring instrumentation, and copies of all reports
required by this general permit for a period of least 5 years for the date of the sample
measurement, report or application.
o Expiration — The permittee is not authorized to discharge after the expiration date of the
general permit. In order to receive automatic authorization to discharge beyond the
expiration date, the permittee shall submit forms and fees as are required by the.agency
authorized to issue permits no later than 180-days prior to expiration date. Any permittee
that has not requested renewal at least 180 days prior to expiration, or any permittee that
does not have a permit after the expiration and has not requested renewal at least 180
days prior to expiration, will be subject to enforcement. Failure to renew your permit is
a violation.
o Transfer — The Certificate of Coverage (COC) issued pursuant to this general permit is
not transferable to any person expect after notice to and approval by the Director. The
Director may require modification or revocation and reissuance of the Certificate of
Coverage to change the name and incorporate such other requirements as may be
necessary under the Clean Water Act. The Permit is NOT transferable.
o Name Change, Closure or Facility Ownership change — Permittee is required to notify the
Division in writing in the event the permitted facility is sold or closed. The Division of
Water Quality views changes of name or ownership as a modification that requires the
Director's approval and reissuance of the permit. Name and ownership changes required
you to complete a Name/ownership Change Form from the Division and mail it back to
the Division of Water Quality along with all appropriate information.
o Proper Operation and Maintenance is a requirement of the permit.
UN[TEE7.S�T $ P{�$TPL�� C_jw TFl i�
Kd: C;: 83
• Sender: Please print your name, address -,'and Z1
NORTH CAROUNA DEPARTMENT OF
WM725 GREEN NT ND SUITE L RCSOUIRCE5
RdiENR FAYETTEVILLE, NC 28301-5043
0 L 6-v) XI.e f-
en I1111111Altill111i1t11114s111 AI 11'iltltll1lit 11111till till
Permit: NCG100059
SOC:
County: Cumberland
Region: Fayetteville
Compliance Inspection Report
Effective: 09/01/02 Expiration: 08/31/07 Owner: Devore & Cooke Auto Parts Co Inc
Effective: Expiration: Facility: Devore & Cooke Auto Parts Co Inc
1529 Clinton Rd
Contact Person: Stuart L Cooke
Directions to Facility:
Fayetteville NC 28301
Phone: 910-483-2217
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 06/0412007 Entry Time: 09:00 AM Exit Time: 11:00 AM
d
Primary Inspector: Chad Turlington 'Aad 3......, Phone: 910-433-3
Secondary Inspector(s): a�
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Used Motor Vehicle Parts Stormwater Discharge COC
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
Page: 1
Permit: NCGI00059 Owner - Facility: Devore & Cooke Auto Parts Co Inc
Inspection Date: 06/04/2007 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Facility has very good house keeping. Most activities that have the potential to pollute are conducted inside. Crushing is
not done on -site. One large tank outside did not have secondary containment. A schedule for secondary containment
should be submitted. Facility has Total Toxic Organic sampling waived by incorporating a solvent management plan.
Facility had an extensive and well organized Stormwater Pollution Prevention Plan. Overall good facility with exception of
failure to do necessary monitoring.
Page: 2
d
Permit: NCG100059 owner • Facility: Devore & Cooke Auto Parts Co Inc
Inspection Date: 06/04/2007 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yea
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
❑
❑
❑
# Does the Plan include a General Location (USGS) map?
■
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices"?
■
❑
❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
❑
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
■
❑
❑
❑
# Does the.facility provide all necessary secondary containment?
❑
■
❑
❑
# Does the Plan include a BMP summary?
■
❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
❑
❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
❑
❑
❑
# Does the facility provide and document Employee Training?
■
❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
■
❑
❑
❑
# Is the Plan reviewed and updated annually?
■
❑
❑
❑
# Does the Plan include a Stormwater Facility Inspection Program?
■
❑
❑
❑
Has the Stormwater Pollution Prevention Plan been implemented?
■
❑
❑
❑
Comment:
Qualitative Monitoring
Yes
No
- NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
❑
■
❑
❑
Comment: Facility has not conducted its Qualitative Monitoring. Mr. Cooke stated that
they will begin as soon as we h ave the next rainfall.
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
❑
■
❑
❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑
❑
■
❑
Comment: Facility has not conducted Analytical monitoring but has the supplies and
intentions to do so in the future.
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
❑
❑
❑
# Were all outfalls observed during the inspection?
■
❑
❑
❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑
❑
■
# Has the facility evaluated all illicit (non Stormwater) discharges?
■
❑
❑
❑
Page: 3
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E., Director
Division of Water Quality
August 23, 2002
STUART L COOKE
DEVORE & COOKE AUTO PARTS CO INC
PO BOX 230
FAYETTEVILLE, NC 28301
Subject: NPDES Stormwater Permit Renewal
DEVORE & COOKE AUTO PARTS CO INC
COC Number NCGIO0059
Cumberland County
Dear Permittee:
In response to your renewal application for continued coverage under general permit NCG100000, the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
* A new Certificate of Coverage
* A copy of General Stormwater Permit NCG100000
A copy of the Analytical Monitoring Form (DMR)
* A copy of a Technical Bulletin for the general permit
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or
decree.
If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater
and General Permits Unit at (919) 733-5083, ext. 578
Sincerely,
Bradley Bennett, Supervisor
Stormwater and General Permits Unit
cc: Central Files
Stormwater & General Permits Unit Files
Fayetteville Regional Office
RA
NCDENR
N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service
1-800-623-7748
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCGI00000
CERTIFICATE OF COVERAGE No. NCG100059
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and ,
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
DEVORE & COOKE AUTO PARTS CO INC
is hereby authorized to discharge stormwater from a facility located at
DEVORE & COOKE AUTO PARTS CO INC
1529 CLINTON ROAD
FAYETTEVILLE
CUMBERLAND COUNTY
to receiving waters designated as the Fayetteville MSSS to Locks Creek, a class C stream, in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I,
I1, III, IV, V, and VI of General Permit No. NCG 100000 as attached.
This certificate of coverage shall become effective September 1, 2002.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day August 23, 2002.
n C � 4
for Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D.
Acting Director
Divlsion of Water Quality
December 27, 2001
STUART I.. COOKS
DEVORE & COOKS AUTO PARTS CO
PO BOX 230
FAYP I-I'EVILLE, NC 28301
Subject: NPDES Storntwatcr Permit Renewal
DI VORE & COOKS AUTO PARTS CO
COC Number NCG 100059
Cumberland Courtly
Dear Perrnittee:
Your Facility is currently covered for stormwatcr discharge under Crerteral Permit NCG 100000. 'Phis permit expires
on August 31, 2002. The Division stall' is currently in the process of rewriting this permit and is scheduled to have
the permit reissued by hoe suunmer of.2002. Once the permit is reissued, your facility would be eligible for
continued coverage under the reissued Permit.
In order to assure your continued coverage under the general permit, you must apply to the Division oP Water
Quality (DWQ) Ior renewal of your hermit coverage. To make this renewal process easier, we are informing you in
advance that your permit will he expiring. Enclosed you will find a General Permit Coverage Renewal
Application Form. The application must be couttPletctl and returned by March 4, 2002 in order to assure continued
coverage under the general permlt.
Failure to request renewal within this time period may result in a civil assessment ol'at least $250.00. Larger
penalties may he assossed depending on the dclinqucncy ol'the request. Discharge ol'slorrnwater from your facility
without coverage under a valid stormwatcr NPli Permit would constitute a violation of NCGS 143-215.1 and
could result in assessments ol' civil penalties of up to $10,000 per day.
Please note that recent IWeral legislation has extended file "no exposure exclusion" to all operators of industrial
facilities in any of the I I categories ol—storm water tliscluuges associated with industrial activity," (except
construction activities). ll'you fCCI your facility can certify a condition of "no exposure", i.e. the facilty industrial
materials anti operations are not exposed to slormwater, you can apply for the no exposute exclusion. For additional
informafion contact the Central Office Storntwatcr Slafh meni listed below or check the Slormwaler & Gencral
Permits Unit Web Site at http:llh2o.enr.St,ktC.nc.uslsulstormwater.[itml
II' the subject stormwatcr discharge to waters of'the state has been terminated, please complete the enclosed
Rescission Request Form. Mailing instructions are listed on the bottom ol'the form. You will he notified when the
rescission Process has been completed.
ll'you have any queslions regarding the permit renewal procedures please contact Micky Revels ol'the Fayetteville
Regional OI'licc at 910-486-1541 or Aisha Lau ol'the Central Office Storntwatcr Unit at (919) 733-5083, ext. 578
Sincerely,
Bradley Bennett, Supervisor
Storntwatcr and General Permits Unit
cc: Central Files
Fayetteville Regional Officc
N. C. Division of Water Quality 1617 Mail Service Center Raleigh, INC 27699-1617 (919) 733-7015
NCDENR
Customer Service
1-800-623-7748
1!
^Mate of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
November 4, 1994
C. Evans
Sampson S Co., Inc.
P.O.Box 744
Clinton, NC 28328
AAF6kf4A �-*- —0 VVJA
OM A
�EHNR
Subject: General Permit No. NCG 100000
Sampson Salvage Co., Inc.
COC NCGIO0054
Sampson County
Dear C. WarrenEvans:
In accordance with your application for discharge permit received on 09/15/94, we are forwarding
-- ----herewith the subject-certificate-otcoverage-to-discharge-under- the-subjectstate--- NPDES-general--permit--- -
- This-permit-is-issued-pursuantto, the -requirements -of -North -Carolina -General -Statute 143=215-1- and -the
--------
Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
December 6, 1983.
If any parts, measurement frequencies or sampling requirements contained in this permit are.
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the Division
of Environmental Management. The Division of Environmental Management may require modification or
revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal
Area Management Act or any other Federal or Local governmental permit that may be required.
If you have any question concerning this permit, please contact Mr. Steve Ulmer at telephone number
919/733-5083.
Sincerely, ungirial 6y
David A. Goodrich
A. Preston Howard, Jr. P.E.
cc: Fayetteville Regional Office
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 100% post -consumer paper
1
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DMSION OF ENVIRONMENTAL MANAGEMENT
STORMWATER DISCHARGES
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
DeVore & Cooke Auto Parts Co., Inc.
is hereby authorized to discharge stormwater from a facility located at
Old NC Hwy 24 East
Fayetteville
Cunberland County
to receiving waters designated as the Fayetteville Storm Sewer System and Locks Creek in the Cape Fear River
Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III
and IV of General Permit No, NCG100000 as attached.
This Certificate of Coverage shall become effective November 4,1994.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day November 4, 1994.
Original Signed By
David A. Ci0odrich
A. Preston Howard, Jr., F.E., Director
Division of Environmental Management
By Authority of the Environmental Management Commission
n1.
2-0 � .j as • I IN1.•,.� .I arm, � � .� � LFy.•= :'r$ �` h`;
210 �`y • ./� 87 • e St �ckUirS rr -
�. '�} • +••�/��; If V ~ •�` .• �\i�'rca `yilr i �.
ND
- e31to �� I .�I!•�i t45 ' '� ' i �� i II ti rp� ,
� l�/•� . tel •,S7�. �;. (. O � � , ~r ��11•'!! M1TyN-- .. ¢ -- I �
!� ``� } ff.l � ..11 ram• ' I
3880 � , _ 4 0, � r+ . r Cf� I C - , ,� � ' • • l,. i, l'�v
� { �.,.. �'J: • �� Y' (� ' � �;, •L •. I• ' � - ��. ' � owe;, .• •,} t = � II
!f %� -� tip+• ! � ;= :r:: •=n,^� oq�: j•.�'. � i u•
2130" St x r . u ?I. � "r."' 4�' _,• • �,, 41.
"• —__ - Ufa a 41 .r'I•:� '.%, . ••f� ;!•;,r` 111
....
_sp= ii •N. '�� gyp/ - V.�•' i ..• �i♦ ., ('; ��_�y,� i•: ~ 1 = �
2200
• f '11 .55 111 l � • / •r'•r • �•If
01 I �' �� ;'•t 1 {tta� y
lbnFIO
lapY u - `'53 �.. .. /r
, FAYETIrr it • ^ - 1
3 a
•''/' J �' . l� k "f
w 11 i15: Il`; 54 -"vo� ' f . �� _ t'fl i • 4!
IFi• I4/ FFID
389 •8] a e5 ill
7x°=
Tower ;.M = • I i • _ Y;.. \ _
10
2210
1 If / 1•rl Q (i1 it .i
�I0
} �,� J1 • x
, lat Swam -
3877 r
�'1 1 1 111 — — J��'S}���o~.} •J �� ` f, }n
1ti5
1 y
FEET
. ��" • 555 1p0
,--'— • � = -x° -_-- r � . p , v„ a ;.
�,�. .. Jyy 'a`\ bI } ��_ •�`<.���Fas�a_=�` _i \, it 00
V4 #A Cipa! A4porl {S7
3.00L,
/ G l/
rJ <7Q ., nnn nnn rr-�•. nanvc rncrrvau r`^' •"" � -..
MCILITY ;r
ai ,
i� vorz �- CrIo r-k-F �v PA -a --Fs CD
COUNTY
(� t f A4)Q� LAN D
NPDES
t o
MAC ,
. rr
t:}
�'t,- 2,�J S
DSN FLOW
•
9 !. rr
jr
,,. ,
t SUB BASIN
LATTITUDE
S� b rr
LONGITUDE
sar 55
RECEIVING STREAM
t--Ay EIrFVl cCz--- STe,,fiW S
STREAM CLASS
'(
DIRGE CLASS
= PA"IMO 1 DATE
U !
State of North Carolina �" `°.:'� , 'a 1yt�
Department of Environment,'-
Health and Natural Resources X t`1oV B 1994
Division of Environmental Management' '0 G:MEND 4
p.w law A--
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
C. Warren Evans
Sampson Salvage Co., Inc.
P.O.Box 744
Clinton, NC 28328
Dear C. Warren Evans:
FAY r4 1.LE REG- Urr
ED FE F1
November 4, 1994
Subject: General Permit No. NCG100000
Sampson Salvage Co., Inc.
COC NCG100054
Sampson County
In accordance with your application for discharge permit received on 09/15/94, we are forwarding
- herewith -the -subject -certificate -of coverage to -discharge under the subject-state--NPDES-general permit -
This -permit -is issued -pursuant to -the requirements of -North Carolina General Statute 143-215-:-1-and the
Memorandum of Agreement between North Carolina.and the US Environmental Protection agency dated
December 6, 1983.
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding,
Please take notice that this certificate of coverage is not transferable except after notice to the Division
of Environmental Management. The Division of Environmental Management may. require modification or
revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal
Area Management Act or any other Federal or Local governmental permit that may be required.
If you have any question concerning this permit, please contact Mr. Steve Ulmer at telephone number
919/733-5083.
Sincerely,
Original Signed By
David A. Goodrich
A. Preston Howard, Jr. P.E.
.Ccc; Fayotte—vlle-Regional=Office�.
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
Z
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL MANAGEMENT
GENERAL PERMIT NO. NCGI0000Q
CERTI_FICATE OF COVERAGE NO, NCG1.00059
STORMWATER DISCHARGES
NA_T.IONAL POLLUTANT DISCHARGE ELIMINATIQN SYSTEM
In compliance with the Provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations Promulgated and adopted by the North Carolina Environmental Management Con-unission, and the
Federal Water Pollution Control Act, as amended,
DeVore & Cooke Auto Parts Co., Inc.
is hereby authorized to discharge stormwater from a facility located at
Old NC Hwy 24 East
Fayetteville
Cunberland County
to receiving waters designated as the Fayetteville Storm Sewer System and Locks Creek in the Cape Fear River
Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III
and 1V of General Permit No. NCG100000 as attached.
This Certificate of Coverage shall become effective November 4, 1994,
This Certificate of Coverage shall remain in effect for the duration of the General Pennit.
Signed this day Novemher 4, 1994.
Ori ival Signori 8,
Paved A. ""'oodith
A. Preston Howard, Jr., P.E., Director
Division of Environmental Management
By Authority of the Environmental Management Commission